Top Banner
60

Electrical system in MIT, Manipal University, India

Dec 20, 2014

Download

Education

Abhishek Anand

environmental education project on electrical systems in manipal institute of technolgy made by first year students.Record of all the expenditures and usage pattern
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Electrical system in MIT, Manipal University, India
Page 2: Electrical system in MIT, Manipal University, India

ELECTRICAL SYSTEM IN MIT

SOURCES

UTILISATION

&

EXPENDITURE

Page 3: Electrical system in MIT, Manipal University, India

INTRODUCTION

BASIC ELECTRICAL POWER SYSTEMS

&

PRODUCTION OF ELECTRICITY IN KARNATAKA

Page 4: Electrical system in MIT, Manipal University, India

Power System Components Generation subsystem Transmission subsystem Distribution subsystem Protection & control subsystem

Most complex man made system !!

Page 5: Electrical system in MIT, Manipal University, India

Basic Power System Structure

Page 6: Electrical system in MIT, Manipal University, India

STATUS OF ENERY SECTORIN KARNATAKA

State has no deposits of coal or petroleum, and therefore has to import it .

The electricity source for Karnataka has a mix of hydel, thermal and wind and accounts for 56% of the commercial need.

Page 7: Electrical system in MIT, Manipal University, India

In Karnataka, non-commercial energy sources like firewood, agricultural residues, charcoal and cow dung account for 53.2% which demonstrates a high dependency on biomass to meet rural energy needs.

Page 8: Electrical system in MIT, Manipal University, India

Power Projects in Karnataka

Page 9: Electrical system in MIT, Manipal University, India
Page 10: Electrical system in MIT, Manipal University, India
Page 11: Electrical system in MIT, Manipal University, India

TRANSMISSION OF POWER

The Karnataka Power Transmission Corporation Limited, also known as KPTCL is the sole electricity transmission and distribution company in state of Karnataka.

KPTCL buys power from power generating companies like Karnataka Power Corporation Limited (KPCL) and other IPPs and sell them to their respective ESCOMS

Page 12: Electrical system in MIT, Manipal University, India

Bangalore Electricity Supply Company.

Mangalore Electricity Supply Company ( Mescom ).

Hubli Electricity Supply Company. Gulbarga Electricity Supply Company. Chamundeshwari Electricity Supply

Company.

ESCOMS UNDER KPTCL

Page 13: Electrical system in MIT, Manipal University, India

POWER SOURCE OF MIT

Page 14: Electrical system in MIT, Manipal University, India

Primary source :- MESCOM (State Supply)

Secondary source :- PRIVATE D.G SETS

Page 15: Electrical system in MIT, Manipal University, India

POWER HOUSES OF MIT

Heart of the electrical system

Page 16: Electrical system in MIT, Manipal University, India

Basic function of power house is to synchronize and provide a continuous supply of electrical power.

It takes power from state supply, steps it down and then transmits it to the location of load.

In case of power failure it automatically starts the D.G sets which compensates for the failure of power.

Page 17: Electrical system in MIT, Manipal University, India

Location:- behind cafeteria

Supplies to:- AB-1,AB-2,AB-3,AB-4 WORKSHOP, LIBRARY.

State Supply :- 200A at 11KV

Generator Capacity:- 4 units of 415V, 500KVA

POWER HOUSE 1:-

Page 18: Electrical system in MIT, Manipal University, India

POWER HOUSE :- 2

Location :- 9th block

Supplies to:-8th,9th,10th,11th,12th hostel block, Annaporna mess, Waste water plant.

State Supply:- 200 A at 11KV

Generator Capacity:-2 units of 320 KVA, 415 V

Page 19: Electrical system in MIT, Manipal University, India

POWER HOUSE 3:-

Location:- near Venugopala temple

Supplies to:-Staff quarters, swimming pool, temple,K block hostel

State Supply:-200 A at 11KV Generator Capacity:-320KVA, 415V

Page 20: Electrical system in MIT, Manipal University, India

POWER HOUSE 4:-

Location:- Food court

Supplies to :-5th,6th,7th,13th block hostel, Food court, AC plant

State Supply:-400A at 11KV

Generator Capacity:-2 units of 500KVA, 415 V

Page 21: Electrical system in MIT, Manipal University, India

POWER HOUSE 5:- Location :- In front of 16th block

Supplies to:- 14th,15th,16th,17th block hostel, AC plant

State Supply:-400 A at 11 KV Generator Capacity:-2 units 500 KVA,

415 V

Page 22: Electrical system in MIT, Manipal University, India

POWER HOUSE 6:-

Location :- AB 5

Supplies to:-AB 5, AC plant

State Supply:-200 A at 11KV

Generator Capacity:-2 units of 625 KVA, 415 V

Page 23: Electrical system in MIT, Manipal University, India

Working of power house

Page 24: Electrical system in MIT, Manipal University, India

Transmission losses account for 5% of the units consumed.

Power Houses are to maintain an optimum value of power factor so as to minimize the losses , failing to which supply of power by state is stopped automatically.

Unit-KWh number of kilowatts consumed in an hour.

Page 25: Electrical system in MIT, Manipal University, India
Page 26: Electrical system in MIT, Manipal University, India

Inside a power house

Page 27: Electrical system in MIT, Manipal University, India

Mescom Supply-stepped down by transformer.

Page 28: Electrical system in MIT, Manipal University, India

D.G set – from outside

Page 29: Electrical system in MIT, Manipal University, India

Inside a D.G set- the diesel engine

Page 30: Electrical system in MIT, Manipal University, India

Instrument panel

Page 31: Electrical system in MIT, Manipal University, India

Instrument panel

Page 32: Electrical system in MIT, Manipal University, India

Cooling Tank

Page 33: Electrical system in MIT, Manipal University, India

Exhaust Pipe

Page 34: Electrical system in MIT, Manipal University, India

TRANSMISSION

Page 35: Electrical system in MIT, Manipal University, India

CONSUMPTION

Page 36: Electrical system in MIT, Manipal University, India

Consumption of power is calculated into three different categories :-

1.Hostel

2.College

3.Quarters

Total units consumed is calculated as the sum total of units taken from state supply, total units generated from D.G sets and units lost during transmission.

Page 37: Electrical system in MIT, Manipal University, India

MONTHLY MESCOM AND D.G POWER CONSUMPTION LOG SHEET

Sl NO

R.R NO : HT 4 -MIT COLLEGE YEAR : 2008-09        

Cost paid for the HT energy recived from MESCOM

D.G Set Running Cost.

Recorded Energy (MESCOM+DG) Units.

5% (on MESCOM

+ D.G Units )

for accounting Line losses

Total Consum

ed Energy Units.

Total Cost (MESCOM+DG) Rs/.

Per Unit in Rs/-

MonthRecorded Demand

(KVA)

HT consumption in Units

Amount Paid to

MESCOM in Rs/-

D.G Units

D.G Set Fuel

consumption in Liters

Fuel-(Diesel& oil

) & maintenan

ce Cost Rs/-

2 3 4 5 6 7 8 9=4+610=9*5

% 11=9-10 12=5+8 13=12/11

1 ,APR-08 1348 387600 208669019548 1840 65173

407148 20357.4 386791 2151863 INR 5.56

2 ,MAY-08 1272 371840 22020871443 410 14522

373283 18664.2 354619 2216609 INR 6.25

3 ,JUNE-08 1122 252200 155513416564 2460 99458

268764 13438.2 255326 1654592 INR 6.48

4 ,JULY-08 1224 259960 159709627154 8116 309869

287114 14355.7 272758 1906965 INR 6.99

5 ,AUG-08 1330 322900 19484179341 2860 109481

332241 16612.1 315629 2057898 INR 6.52

6 ,SEPT-08 1284 333180 61664531537 2185 83642

364717 18235.9 346481 700287 INR 2.02

7 ,OCT-08 1346 338100 203380313175 3865 147952

351275 17563.8 333711 2181755 INR 6.54

8 ,NOV-08 1274 279560 170308348814 14280 515222

328374 16418.7 311955 2218305 INR 7.11

9 ,DEC-08 1166 259060 159222912876 3700 14164

271936 13596.8 258339 1606393 INR 6.22

10 ,JAN-09 1162 272100 16627434112 1380 49790

276212 13810.6 262401 1712533 INR 6.53

11 ,FEB-09 1294 303500 18363297165 2260 76569

310665 15533.3 295132 1912898 INR 6.48

12 ,MARCH-09 1350 306100 163793314405 4280 145006

320505 16025.3 304480 1782939 INR 5.86

Page 38: Electrical system in MIT, Manipal University, India

YEAR : 2008-09

MonthRecorded Demand

(KVA)

HT consumption in Units

Amount Paid to MESCOM in

Rs/-

D.G Units

D.G Set Fuel consumption

in Liters

Fuel-(Diesel& oil ) &

maintenance Cost Rs/-

2 3 4 5 6 7 8 9=4+6 10=9*5% 11=9-10 12=5+8 13=12/11

1 ,APR-08 848 432000 19204093464 1250 42350

435464 21773.2 413690.8 1962759 INR 4.74

2 ,MAY-08 834 446300 2176745 3164 755 25579 449464 22473.2 426990.8 2202324 INR 5.16

3 ,JUNE-08 520 164380 903876 4628 1770 63862 169008 8450.4 160557.6 967738 INR 6.03

4 ,JULY-08 900 275900 1407389 6281 6470 247672 282181 14109.05 268072 1655061 INR 6.17

5 ,AUG-08 1024 479820 2328087 11748 2725 98318 491568 24578.4 466989.6 2426405 INR 5.20

6 ,SEPT-08 1044 493260 1033727 4928 1415 54166 498188 24909.4 473278.6 1087893 INR 2.30

7 ,OCT-08 1252 532780 2576484 13498 4050 155034 546278 27313.9 518964.1 2731518 INR 5.26

8 ,NOV-08 1246 540680 2611081 58252 17290 661861 598932 29946.6 568985.4 3272942 INR 5.75

9 ,DEC-08 1118 319040 1602166 4166 2445 93350 323206 16160.3 307045.7 1695516 INR 5.52

10 ,JAN-09 1112 439500 2146043 3144 1971 79688 442644 22132.2 420511.8 2225731 INR 5.29

11 ,FEB-09 1226 492700 23908829280 3225 114230

501980 25099 476881 2505112 INR 5.25

12 ,MARCH-09 1260 577780 2553123 12760 4638 164278 590540 29527 561013 2717401 INR 4.84

Per Unit

in Rs/-

MONTHLY MESCOM AND D.G POWER CONSUMPTION LOG SHEET

Sl NO

R.R NO : HT 24-MIT HOSTEL

Cost paid for the HT energy recived from

MESCOMD.G Set Running Cost.

Recorded

Energy

(MESCOM+DG)

Units.

5% (on

MESCOM +

D.G Units )

for

accounting

Line losses

Total

Consume

d Energy

Units.

Total Cost

(MESCOM

+DG) Rs/.

MANIPAL UNIVERCITY .MANIPAL.FORMAT-1

Page 39: Electrical system in MIT, Manipal University, India

YEAR : 2008-09

MonthRecorded Demand (KVA)

HT consumption

in Units

Amount Paid to MESCOM in

Rs/-D.G Units

D.G Set Fuel consumption

in Liters

Fuel-(Diesel& oil

) & maintenance Cost Rs/-

2 3 4 5 6 7 8 9=4+6 10=9*5% 11=9-10 12=5+8 13=12/11

1 ,APR-08 194 82948 2629321600 370 13105

84548 4227.4 80320.6 276037 INR 3.44

2 ,MAY-08 186 88744 317920 320 105 3719 89064 4453.2 84610.8 321639 INR 3.80

3 ,JUNE-08 130 45016 170994 2080 490 19811 47096 2354.8 44741.2 190805 INR 4.26

4 ,JULY-08 167 52844 197296 7200 1425 54407 60044 3002.2 57041.8 251703 INR 4.41

5 ,AUG-08 183 78840 284642 2240 485 18566 81080 4054 77026 303208 INR 3.94

6 ,SEPT-08 177 80672 200090 3840 780 29858 84512 4225.6 80286.4 229948 INR 2.86

7 ,OCT-08 179 88496 317087 3360 660 25265 91856 4592.8 87263.2 342352 INR 3.92

8 ,NOV-08 196 77552 281155 19520 3515 126821 97072 4853.6 92218.4 407976 INR 4.42

9 ,DEC-08 290 64844 252526 3040 625 23925 67884 3394.2 64489.8 276451 INR 4.29

10 ,JAN-09 174 69648 253757 1280 280 10102 70928 3546.4 67381.6 263859 INR 3.92

11 ,FEB-09 181 74876 271323 2720 540 18295 77596 3879.8 73716.2 289618 INR 3.93

12 ,MARCH-09 192 87456 278730 4480 885 29984 91936 4596.8 87339.2 308714 INR 3.53

MONTHLY MESCOM AND D.G POWER CONSUMPTION LOG SHEET

Sl NO

R.R NO : HT- 92 ,MIT QUARTERS

Cost paid for the HT energy recived from

MESCOMD.G Set Running Cost.

Recorded

Energy

(MESCOM+DG)

Units.

5% (on

MESCOM +

D.G Units )

for

accounting

Line losses

Total

Consumed

Energy

Units.

Total

Cost

(MESCOM

+DG) Rs/.

Per Unit in

Rs/-

MANIPAL UNIVERCITY .MANIPAL.FORMAT-1

Page 40: Electrical system in MIT, Manipal University, India

CATEGORY

MESCOM UNITS CONSUMED IN A YEAR

D.G UNITS CONSUMED IN A YEAR

HOSTEL 51,94,140 1,35,313

COLLEGE 36,16,800 2,06,134

QUARTERS 8,91,936 51,680

CATEGORY TOTAL

HOSTEL 53,29,453

COLLEGE 38,22,934

QUARTER 9,43,616

Page 41: Electrical system in MIT, Manipal University, India

CATEGORY TRANSMISSION LOSSES (5% of total units)

(UNITS)

HOSTEL 2,66,472.65

COLLEGE 1,91,146.7

QUARTERS 47,180.8

CATEGORY TOTAL UNITS CONSUMED

HOSTEL 55,95,925.65

COLLEGE 40,14,080.7

QUARTERS 9,90,796.8

TOTAL 1,06,00,803.15

Page 42: Electrical system in MIT, Manipal University, India

EXPENDITURE

Page 43: Electrical system in MIT, Manipal University, India

Hostel, college and quarters come under different categories of billing and hence they are billed at different rates , highest being the college.

Overall expenditure includes the electricity bill and cost of running D.G sets and the transmission losses & electricity tax on the electricity bill.

Page 44: Electrical system in MIT, Manipal University, India

Cost per unit of electrical energy ranges from Rs 3 per unit to Rs 7 per unit.

D.G sets consume 70-85 liters of diesel per hour of running.

Page 45: Electrical system in MIT, Manipal University, India

CATEGORY AMOUNT PAID TO MESCOM

(Rs)

AMOUNT SPENT ON D.G SETS

(Rs)

CATEGORY COST(Rs)

HOSTEL 2,36,50,012 18,00,388 2,54,50,400

COLLEGE 2,04,72,189 16,30,848 2,21,03,037

QUARTERS 30,88,452 3,73,858 34,62,310

TOTAL 4,72,10,653 38,05,094 5,10,15,747

GRAND TOTAL(Rs)

5,10,15,747

Page 46: Electrical system in MIT, Manipal University, India

CONCLUSION

Page 47: Electrical system in MIT, Manipal University, India
Page 48: Electrical system in MIT, Manipal University, India
Page 49: Electrical system in MIT, Manipal University, India
Page 50: Electrical system in MIT, Manipal University, India
Page 51: Electrical system in MIT, Manipal University, India

Environmental policy of Manipal University

Page 52: Electrical system in MIT, Manipal University, India
Page 53: Electrical system in MIT, Manipal University, India

A Step Ahead….. The Manipal University (MU), has embarked on a joint project with the

Advisory Services in Environmental Management to develop the MU campus into an Eco-City.

ASEM is a joint programme of the German Technical Cooperation (GTZ) and the Indian Ministry of Environment and Forests

The identified goals are, alignment to ISO 14001 and trainings on energy conservation, sustainable design and Eco-budgeting

A training centre on Urban Sustainability Management would also be established to provide courses on Urban and Environmental Management.

The project takes a two-winged approach: on the one hand, promoting the establishment of an ISO 14001 certified environmental management system on campus will directly impact the academy’s resource use and environmental performance, while on the other hand, catalysing the setup of a study scheme on environmental management via international university partnerships serves to multiply environmental management capacities beyond the campus itself.

Page 54: Electrical system in MIT, Manipal University, India

Efforts made by MIT a) Up gradation of air-conditioning system

It includes replacement of old air-conditioning units with power efficient water cooled screw chillers, cooling tower upgrades, unitary air-conditioner controls, implementation of building automation system, with sensors installed in entire building for efficient cooling, automatic switching ON/OFF based on occupancy and fixed time schedule, use of R -138 gas system (environment friendly). 

Page 55: Electrical system in MIT, Manipal University, India

b) Solar Water heaters

Since the coastal belt of Karnataka is blessed with bright and sunny days almost throughout the year excepting the monsoon season, solar energy is in abundance and can be captured to meet our heating needs.

Page 56: Electrical system in MIT, Manipal University, India

Awards and Recognition 

2008-2009  : - Certified as an ISO 14001:2004

Organisation  2004-2005  : - Rajiv Gandhi Parisara

State Award 2002-2004  : - District Award for

Environment- first prize  1999-2000  : - District Award for

Environment- first prize 

Page 57: Electrical system in MIT, Manipal University, India
Page 58: Electrical system in MIT, Manipal University, India

Let start a new beginning…..

with hope of a new and smarter world….

THANK YOU.

Page 59: Electrical system in MIT, Manipal University, India

BIBLIOGRAPHY

Maintenance Department MIT Power House in charges KPTCL website :- www.kptcl.com KPCL website:- www.kpcl.com Manipal university website:-

www.manipal.edu Google search engine.

Page 60: Electrical system in MIT, Manipal University, India

TEAM MEMBERS

ABHISHEK ANAND ANIRUDH GATTANI ANIRUDDH KHERA VIVEK JAJODIA