ELECTRICAL SAFETY INSPECTION REPORT. Factory List: 1. Kento Asia Limited. Inspected on May 15, 2014 KENTO ASIA LIMITED Plot # B-32,BSCIC I/E,Tongi,Gazipur
9

ELECTRICAL SAFETY INSPECTION REPORT.bangladeshaccord.org/wp...Electrical-Safety-Inspection-Report.pdfELECTRICAL SAFETY INSPECTION REPORT. Factory List: 1. ... Loose connection or overloading

Apr 04, 2018

Download

Documents

lecong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ELECTRICAL SAFETY INSPECTION REPORT.bangladeshaccord.org/wp...Electrical-Safety-Inspection-Report.pdfELECTRICAL SAFETY INSPECTION REPORT. Factory List: 1. ... Loose connection or overloading

ELECTRICAL SAFETY INSPECTION REPORT.

Factory List:

1. Kento Asia Limited.

Inspected on May 15, 2014

KENTO ASIA LIMITED

Plot # B-32,BSCIC I/E,Tongi,Gazipur

Page 2: ELECTRICAL SAFETY INSPECTION REPORT.bangladeshaccord.org/wp...Electrical-Safety-Inspection-Report.pdfELECTRICAL SAFETY INSPECTION REPORT. Factory List: 1. ... Loose connection or overloading

SUMMARY

Kento Asia Ltd. factory is established in a rented premises consisted of Six (6)sheds built for industrial purpose in 2008, but the officials we met were not sure of the year when the sheds were built. Factory rented the premises and started operation in 2008, and the factory, at the time of survey, reported to have about 664 workers working on regular basis.

The Factory was surveyed for electrical safety by Woosun Energy and Construction Co., Ltd.

(WEC). The purpose of the survey was to identify significant electrical safety issues and to provide

recommendations for remediation based on applicable standards specified by the Accord. The

scope of this initial electrical safety inspection was limited to the review and identification of major

electrical safety issues. The inspection did not include identification of minor deficiencies, which will

be further addressed as part of follow-up inspections.

Table below summarizes the major electrical safety issues identified during the inspection.

Recommendations have been provided to address each issue.

An implementation schedule shall be developed by the factory to remediate each of the

findings. The specific timing of improvements, including any requested extensions due to

design / installation constraints, shall be submitted to the Accord for approval.

Page 2 of 9KENTO ASIA LIMITED

Page 3: ELECTRICAL SAFETY INSPECTION REPORT.bangladeshaccord.org/wp...Electrical-Safety-Inspection-Report.pdfELECTRICAL SAFETY INSPECTION REPORT. Factory List: 1. ... Loose connection or overloading

FINDINGS AND RECOMMENDATIONS

Remediation Timeframe:

Recommendation:

Finding:

Finding #:

Category:

1E-

6 Months

Panel installed near transformer and narrow space between the tranformer

and guard.

TRANSFORMER ROOM

In adequate space around the transformer.

Panels installed near transformer may be rearranged and guards around the transformer may be expanded. Barrier wall between the transformer and panels may be constructed.

Remediation Timeframe:

Recommendation:

Finding:

Finding #:

Category:

2E-

Within 1 Month

Transformer breather (at far end). Silica gel color turned white.

TRANSFORMER ROOM

Silica gel in transformer breather, discoloured.

Replace silica gel in the transformer breather and refill the oil cup to trap dusts entering transformer through breather.

Remediation Timeframe:

Recommendation:

Finding:

Finding #:

Category:

3E-

3 Months

HT cables near termination are

sharp bent.

SERVICE LINE

Sharp bent in HT cable near termination, at the HT

breaker panel.

Cable must be supported at the panel base plate

and terminated without stressing at the termination

point.

Page 3 of 9KENTO ASIA LIMITED

Page 4: ELECTRICAL SAFETY INSPECTION REPORT.bangladeshaccord.org/wp...Electrical-Safety-Inspection-Report.pdfELECTRICAL SAFETY INSPECTION REPORT. Factory List: 1. ... Loose connection or overloading

Remediation Timeframe:

Recommendation:

Finding:

Finding #:

Category:

4E-

Within 1 Month

HT Cables laid directly on concrete floor near HT panel.

SERVICE LINE

HT Cables laid directly on concrete floor.

11kV HT cable must be supported in cable trays or

laid in trenches. The cable must be protected

against physical injury.

Remediation Timeframe:

Recommendation:

Finding:

Finding #:

Category:

5E-

3 Months

HT service cable droping from pole

.

SERVICE LINE

HT service cable dropping from pole is not protected

near the base of the pole, above ground level.

HT cable dropping from 11kV pole must be

protected in steel pipe of required size at least 2m

from the ground level to protect from physical

injury by moving objects.

Remediation Timeframe:

Recommendation:

Finding:

Finding #:

Category:

6E-

3 Months

Cables entring panel.

SWITCH BOARD & PANELS

Panel base plates removed to allow cable entry.

Panel base plates must be installed, at all time,

and cable(s) entering panel must be firmly fixed

with cable gland.

Page 4 of 9KENTO ASIA LIMITED

Page 5: ELECTRICAL SAFETY INSPECTION REPORT.bangladeshaccord.org/wp...Electrical-Safety-Inspection-Report.pdfELECTRICAL SAFETY INSPECTION REPORT. Factory List: 1. ... Loose connection or overloading

Remediation Timeframe:

Recommendation:

Finding:

Finding #:

Category:

7E-

Within 1 Month

Thermal imager measuring hotspots inside panel.

SWITCH BOARD & PANELS

Hot spots at terminations inside panel.

Loose connection or overloading are the causes of over heating. Regularly check terminations for loose connections and tighten it. Overloading may be the cause.

Remediation Timeframe:

Recommendation:

Finding:

Finding #:

Category:

8E-

3 Months

Cables and wires terminating at MCCBs inside panel

SWITCH BOARD & PANELS

Cables and wires inside panel are not securely fixed.

Cables and wires inside panel must be arranged and securely fixed to the panel safely. Layout of MCCBs inside panel may be rearranged.

Remediation Timeframe:

Recommendation:

Finding:

Finding #:

Category:

9E-

3 Months

Cable termination at MCCB are

extended using additional copper bars .

SWITCH BOARD & PANELS

Cables terminating at MCCB (ACB) not protected and extention plates not securely placed in safe position.

Cables terminating at MCCB terminals with extenders must be securely fixed in safe possitions and phase barriers between terminals must be installed. Cables may be fixed securely to connect to the MCCBs.

Page 5 of 9KENTO ASIA LIMITED

Page 6: ELECTRICAL SAFETY INSPECTION REPORT.bangladeshaccord.org/wp...Electrical-Safety-Inspection-Report.pdfELECTRICAL SAFETY INSPECTION REPORT. Factory List: 1. ... Loose connection or overloading

Remediation Timeframe:

Recommendation:

Finding:

Finding #:

Category:

10E-

3 Months

Multiple cables are terminating at

single MCCB inside panel (typical).

SWITCH BOARD & PANELS

Multiple wires terminating to MCCB terminals.

Multiple cable connecting at a MCCB terminal

must be disconnected. Existing multiple circuits

may be distributed through bus bars.

Remediation Timeframe:

Recommendation:

Finding:

Finding #:

Category:

11E-

3 Months

Multiple cable terminating at bus bars inside panel

SWITCH BOARD & PANELS

Multiple cables connected at a terminal of the

busbar.

Cables and wires terminating to bus bars must be independently connected installing thimble/lugs.

Page 6 of 9KENTO ASIA LIMITED

Remediation Timeframe:

Recommendation:

Finding:

Finding #:

Category:

12E-

6 Months

Wooden material is used as

cable duct for wiring.

CABLE & CABLE SUPPORTS

Wooden wiring ducts used for wiring support.

Existing wooden ducts supporting wiring may be

replaced with non-combustible ducts supported

at regular intervals.

Page 7: ELECTRICAL SAFETY INSPECTION REPORT.bangladeshaccord.org/wp...Electrical-Safety-Inspection-Report.pdfELECTRICAL SAFETY INSPECTION REPORT. Factory List: 1. ... Loose connection or overloading

Remediation Timeframe:

Recommendation:

Finding:

Finding #:

Category:

13E-

Within 1 Month

Generator frame is not connected

to earth.

GENERATOR ROOM

Generator frame not connected to earth.

Generator frame must be connected to earth with

proper size earth conductor. Solid copper

conductor connecting to earth must be connected

securely with loops.

Remediation Timeframe:

Recommendation:

Finding:

Finding #:

Category:

14E-

3 Months

Wiring for ceiling fan and lightssupported at roof trusses.

WIRINGS

Wirings in flexible PVC conduit partially supported to roof trusses.

Wirings under ceiling or roof must be protected from external heat and supported in cable tray/

ducts.

Remediation Timeframe:

Recommendation:

Finding:

Finding #:

Category:

15E-

3 Months

Steam line (damaged glass wool insulation) crossing wirings above SDB

panel.

CABLE & CABLE SUPPORTS

Steam line crossing electrical wirings.

Steam line (pipes) crossing wiring (protected or not protected) must be separated and installed at safe distances.

Page 7 of 9KENTO ASIA LIMITED

Page 8: ELECTRICAL SAFETY INSPECTION REPORT.bangladeshaccord.org/wp...Electrical-Safety-Inspection-Report.pdfELECTRICAL SAFETY INSPECTION REPORT. Factory List: 1. ... Loose connection or overloading

Remediation Timeframe:

Recommendation:

Finding:

Finding #:

Category:

16E-

Within 1 Month

Compressor machine installed with wheels.

EQUIPMENT & MACHINE

Compressor machine mounted on wheel.

Compressor machine mounted on wheel must be

anchored or the wheels must be locked to prevent

from trolling.

Remediation Timeframe:

Recommendation:

Finding:

Finding #:

Category:

17E-

Within 1 Month

Foot mounted motor without proper

foundation and laying on bricks.

BOILER & COMPRESSOR ROOM

Motor in the boiler room, not firmly fixed on the

foundation/frame.

Motor in boiler must be firmly grouted on the

concrete floor or fixed on the foundation

structures.

Remediation Timeframe:

Recommendation:

Finding:

Finding #:

Category:

18E-

Within 1 Month

Wirings and cables installed in the

boiler room are not properly

protected from the heat.

BOILER & COMPRESSOR ROOM

Wiring and cables installed in boiler room are not

protected.

All electrical installations, including wiring and

cable works must be protected against heat from

the boiler by supporting and separating at safe

distance.

Page 8 of 9KENTO ASIA LIMITED

Page 9: ELECTRICAL SAFETY INSPECTION REPORT.bangladeshaccord.org/wp...Electrical-Safety-Inspection-Report.pdfELECTRICAL SAFETY INSPECTION REPORT. Factory List: 1. ... Loose connection or overloading

Remediation Timeframe:

Recommendation:

Finding:

Finding #:

Category:

19E-

Within 1 Month

MCBs and contactors inside the

boiler control panel.

BOILER & COMPRESSOR ROOM

MCBs and contactors are not fixed firmly on the

panel board, inside boiler control panel.

MCB, contactor and other devises used in panel

must be firmly fixed and protected from touching

unintentionally to other live parts.

Remediation Timeframe:

Recommendation:

Finding:

Finding #:

Category:

20E-

Within 1 Month

Water spillage inside generator room .

GENERATOR ROOM

Wet floors in generator room.

Floors in generator room must be free from water

and oil spillage.

Page 9 of 9KENTO ASIA LIMITED

Remediation Timeframe:

Recommendation:

Finding:

Finding #:

Category:

21E-

3 Months

PVC hose conduit used is not

proper and open gaps are still

found(typical).

WIRINGS

Cables terminating to distribution panels

(switchboards) are not protected.

Flexible PVC conduit used for cable protection, but

slit open from side may be removed and

supported on rigid cable supports. Cable tray, riser

or conduits may be used.