APPENDIX A
a.1.2. Assessment Area
ELECTRICAL INSTALLATION AND MAINTENANCE NC IITRAINING
REGULATIONSFOR
CONSTRUCTION INDUSTRY( ELECTRICAL SECTOR)
TECHNICAL EDUCATION AND SKILLS DEVELOPMENT AUTHORITYEast Service
Road, South Superhighway, Taguig City, Metro Manila
TABLE OF CONTENTS
CONSTRUCTION INDUSTRY - ELECTRICAL SUB-SECTOR
ELECTRICAL INSTALLATION & MAINTENANCE NC II
Page No.Section 1. ELECTRICAL INSTALLATION & MAINTENANCE NC
II QUALIFICATION 1 - 2
Section 2. COMPETENCY STANDARDS3 - 48
Basic Competencies Common Competencies Core Competencies -
Electrical Installation & Maintenance NC II3 1617 3233 - 48
COMPETENCY MAP49
Section 3. TRAINING STANDARDS50 - 59
3.1 Curriculum Design50
Basic Competencies50
Common Competencies51
Core Competencies52 53
3.2 Training Delivery54 - 55
3.3 Trainee Entry Requirements55
3.4 List of Tools, Equipment and Materials56 57
3.5 Training Facilities58
3.6 Trainer's Qualifications58
3.7 Institutional Assessment59
Section 4. NATIONAL ASSESSMENT AND CERTIFICATION
ARRANGEMENTS60-61
ACKNOWLEDGEMENTS62- 63
3.5 TRAINING FACILITIES 3.5 TRAINING FACILITIESELECTRICAL
INSTALLATION & MAINTENANCE NC II
Based on a class intake of 25 students/trainees, below are the
space requirement & their sizes:
SPACE REQUIREMENTSSIZE IN METERSAREA IN SQ. METERSTOTAL AREA IN
SQ. METERS
Student/Trainee Working Space2.50 x 2.50 per student/trainee6.25
per student156.25
Contextual Learning Laboratory4 x 52020
Learning Resource Center4 x 52020
Facilities/Equipment/Circulation area10 x 66060
TOTAL AREA256.25
a.2.1 Assessment room or LaboratoriesAPPENDIX BA.2 Lighting And
Ventilation
*Based on Accreditation of Assessment Center Self-Assessment
Check List, TSU-CT is within the minimum TESDA requirement lighted
at an average of 30-40 foot-candle with minimal tolerance dark
spot.
a.2.3 Blowers/ Fans
a.3.1. Store Room APPENDIX CA.3 Auxiliary Room
*Based on TESDA Accreditation of Assessment Center
Self-Assessment Check List, the tools are kept in a customize
cabinets.
a.3.2. Room for Performance Assessment *Based on TESDA
Accreditation of Assessment Center Self-Assessment Check List,
TSU-CT can accommodate at least 10 candidates/ batch
a.3.3. Chairs and Tables *Based on TESDA Accreditation of
Assessment Center Self-Assessment Check List, TSU-CT is provided
with chairs, tables, chalkboard/whiteboards, and other needed
furniture as needed in the laboratory.
a.3.3. Comfort Rooms
*Based on TESDA Accreditation of Assessment Center
Self-Assessment Check List, TSU-CT is neat and orderly maintained
by the universitys General Services Office (GSO).
A.4 ASSESSMENT EQUIPMENT, HAND TOOLS, SUPPLIES MATERIALS
LABORATORY UPGRADING MODERNIZATION
TOOLS
No. UnitItem Specification Unit CostQTYTotal Amount
1 pcsSpirit level70053500
2 pcs Hack saw30051500
3 pcsPipe cutter25051250
4 pcs Plumb bob50052500
5 pcsPipe reamer45052250
6 pcsPipe threader50052500
7 pcsPipe bender2500512500
8 pcsBolt cutter80054000
9 pcsJack hammer set100055000
10 pcsElectrician Pliers7002517500
11 pcsScrewdrivers set7002517500
12 pcsWrench box10002525000
13 pcsWire splicer300257500
14 pcsWire stripper300257500
15 pcsElectrician knife300257500
16 pcsTools holster5002512500
17 pcsPush-pull 0-5 mtrs30051500
18 pcsClaw hammer40052000
19 pcsBallpeen hammer40052000
20 pcsPrick punch40052000
21 pcsHeat gun 1200 watts2000510000
22 pcsHeavy-duty soldering iron 1000 watts30051500
23 pcsFlat file smooth 820051000
Total 150000
EQUIPMENT
No. UnitItem Specification Unit CostQTYTotal Amount
1 unitsPower drill3,500517500
2 unitsPortable grinder2,000510000
3 unitPower saw3,500517500
4 unitsFire alarm system5,000525000
5 unitsPipe-in Music/ Paging5,000525000
6 unitsSecurity equipment10,000550000
7 units CCTV10,000550000
8 unitsMATV Master10,000550000
9 unitsCar park ramp detector5,0001050000
10unitsMulti-tester3,5002587500
11 unitsMega-ohmmeter3,5002070000
12 unitsClamp ammeter3,5002070000
13 unitsMegger4,0002080000
14 unitsHigh potential tester40002080000
15 unitsEarth resistance tester40002080000
16 unitsLabeling machine40002080000
17 unitFire extinguisher KGS ABC350013500
18 unitOHP350013500
19 unitsIndustrial Fan5000420000
Total 869500
Materials
No. UnitItem Specification Unit CostQTYTotal Amount
1BoxWire TW AWG#123500310500
2BoxWire TW AWG#14280038400
3pcElectrical Tape2030600
4pcswoodscrew 3/16 X 1/2"0.5800400
5pcsCPC Terminal Connector 1/2" diameter101501500
6pcsPVC Terminal Connector 1/2" diameter101501500
7pcsPVC Strap 1/2" diameter2300600
8PcPVC 1/2" diameter70302100
9PcsMetal Conduit 1/2" diameter200122400
10mCPC 1/2" diameter5130650
11PcsJunction box (4x4)25401000
12PcsUtility box (2x4)25601500
13sets3-way switch90302700
14setssingle switch60201200
15setConvenience Outlet6010600
16setSpecial Outlet (ACU)100101000
17PcPanel Board (4 Branches)80021600
18PcsCircuit Breaker (15Amp Single Phase)3003900
19PcsCircuit Breaker (20Amp Single Phase)3003900
20PcsCircuit Breaker (30Amp Single Phase)3003900
21PcsCircuit Breaker (40Amp Single Phase)3003900
Total 41850
LABORATORY UPGRADING MODERNIZATION
Equipment150,000
Tools869,500
Material41,850
Total1,061,350
a.5.1 Medicine CabinetAPPENDIX DA.5 Safety Provisions
A first-aid cabinet for antidotes and neutralizing solution are
present on the laboratory
a.5.2 Open Floor SpacesAre appropriately grouped to provide ease
of movement
a.5.4. Fire Extinguisher
a.5.4. Equipment LayoutTraining equipment are arrange according
to sequence of operation
a.5.6. Color Coded Buttons
Industrial training equipment emergency buttons are well color
coded and ergonomically installed for safety.
35