El El TenienteTeniente overviewoverviewNovember, 2010
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved.
Copper production
0
1000
2000
3000
4000
5000
6000
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
kton
Cu Privates
Codelco
2
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved. 3
Codelco - overview• Geological Resources: more than 307 million tonnes of fine copper.
• Ore Reserves: 113 millions tonnes of fine copper.
• Six operative division’s: Codelco Norte, Gaby, Salvador, Andina, Teniente and Ventanas (Smelter).
• Copper and Molybdenum
• Production - 2009– Copper: 1.7 millions metric tonnes fine copper per year– Molybdenum: 21 thousand metric tonnes per year
• Cash Cost- 2009 93.9 dollars cent per pound
• Profits – 2009 4,069 millions dollars
• Workers-2009 19,335 Company employees22,386 Contractors employees
• Safety-2009 2.42 Frequency rate index 120 Severity rate index
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved.
El Teniente
4
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved. 5
El Teniente Iocation
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved. 6
El Teniente - overview• One of the largest copper deposits: more than 111 million tonnes of fine copper in
geological resources
• The biggest underground copper mine, In operation since 1906
• An integrated complex: mine-plant-smelter facilities
• Copper , molybdenum and sulfuric acid producer
• Current capacities– Mine-Plant: 131,000 tonnes per day ore– Smelter: 1.3 Mt/year concentrate
• Production - 2009– Copper: 404,035 fine metric tonnes per year– Molybdenum: 5,179 metric tonnes per year– Sulfuric acid: 1.1 million tonnes per year
• Cash Cost- 2009 81.8 dollars cent per pound
• Workers - 2009 5,152 Company employees6,291 Contractor companies employees
• Safety-2009 2.33 Frequency rate index152 Severity rate index
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved. 7
1905 19751914 1922 19681967 1998 2010
Comienza
explotación Sector
Fortuna
Inicia sus
operaciones la
Fundición Caletones
Se pone en
marcha el Plan
280 tmf/a
Comienza la
Construcción
del Proyecto
Nuevo Nivel Mina
Desarrollo del
Convertidor
Teniente
Comienza la
ejecución del
PDT
Producción
131.000 tpd.
Al antiguo
Establecimiento se le
bautiza como Sewell
1978
Entran los
primeros LHD a
la mina.
1970
Comienza a operar
el concentrador
Colón
El Teniente history - highlights
Comienza la
Construcción
del nivel
Teniente 8
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved. 8
COPPER CONCENTRATE TOMARKET
MOLYBDENUM CONCENTRATE TO MARKET
ANODES
FIRE REFINED COPPER
CATHODES
SULFURIC ACID
PRODUCTS
UG MINE
BLOCK/PANEL CAVINGMINING METHOD
SAN ANTONIO PORT
PRODUCTS
ROAD INFRASTRUCTURE
• EL COBRE HIGHWAY
COLON PROCESSING PLANT
SAG
COMMINUTION & FLOTATION
BALLMILL
FUSION AND CONVERSION
CALETONES SMELTER
TAILINGS DISPOSAL SYSTEM
• LAUNDER (CONCRETE CHANNEL)• CAREN TAILINGS DISPOSAL
Business description
WATER SUPPLY POWER SUPPLY
SX-EW PLANT
ACID WATER
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved. 9
• The southern and newest Porphyry Cooper Deposit in South America (4 to 7 My)
• Ore control for copper and molybdenum is related to porphyry intrusions and hydrothermal breccias
• Upper secondary enriched ore mined out
• High grade in Primary ore (compared to other porphyry copper deposits)
• Smooth vertical variations, high homogeneity of copper grade around 0.9 % CuT
• Copper grades remain approximately constant even down to depths of 1,600 masl.
• Mineralogically not complex, mainly chalcopyrite as main copper sulphide
Geology
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved. 10
Resources & reserves
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved. 11
Mine Development
Mine Development
UndercuttingUndercutting
ExtractionExtraction
Caving ProcessCaving Process
By:
MiningMining Method
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved. 12
Mining methodIsometric view
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved. 13
MiningMine description
• Mechanized Panel Caving method
• Hard rock mining under high stress conditions
• Massive mining of Primary ore since 1980’s
• Today six sectors running simultaneously allow El Teniente to reach an overall production of 131 kt/d
• Material handling through combinations of LHD’s, Trucks-Trains-Crushers-Conveyors-Ore Pass to a main haulage system (Teniente 8 Railway haulage level)
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved.CODELCO CHILE / DIVISIÓN EL TENIENTECODELCO CHILE / DIVISIÓN EL TENIENTE Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados 14
PLAN MIXTOktpd %Cu
Cuf
Mina Subterránea: Sectores Actuales y Proyectos (P) Nuevo Nivel Mina (incluye opción a 180 ktpd en PND)
� T4 Sur
� Esmeralda
� Diablo Regimiento
� Pipa Norte
� Proyecto Estructural del Plan de Negocio
� Soporta la competitividad y continuidad operacional
de DET en el largo plazo
� Inicio Producción: 2017
� Reservas Norte
� Pilar Norte
� Dacita Project
� Pacifico Project
� Rajos Project
Mine planRun off mine production
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved.
Año 2009
Total área abierta 289.500 m2
Total área nueva 2009
Esmeralda
Reservas Norte
Teniente 4 Sur
Diablo Regimiento
Pipa Norte
Sur Andes Pipa
Production areas
15
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved.
El Teniente - development activities
16
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved. 17
Main projects-mining
DacitaProject
New Mine LevelProject
Rajo NorteProject
Rajo Sur Project
Pacifico Project
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved. 18
Plant process - Colón facilities VOLVER
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved. 19
Plant process Colón Facilities
• Flotation concentration process– Two Primary crushers – Two SAG mills – 12 lines of standard ball mills– Collective & selective Flotation
• Tailings transported by an 80km tailings channel to the Carén dam in the Alhue Valley• Copper Concentrate transported by pipeline to Caletones and by trucks to Ventanas
El C
obre
Roa
d
SX/EW PLANTSX/EW PLANT
SAG SAG GrindingGrindingandand FlotationFlotation
Tailing
Tailing
chan
nel
chan
nel
AdministrationAdministrationOfficesOffices
FFCC T
enie
nte
FFCC T
enie
nte
88
UnitaryUnitaryGrindingGrinding
CrushingCrushingPlantPlant
UnitaryUnitaryGrindingGrinding andand
FlotationFlotation
Source: Fly Top-Eye, february, 2005
Minero Minero PowerPowersubsub--stationstation
ThickenersThickeners
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved. 20
Caletones smelterGeneral Description
• Smelting capacity ~ 1.3 Mt/y of copper concentrate
• Refined copper production:– Anodes (60% of total)
• Clients: Ventanas, Codelco Norte Division, El Paso, Mexicana
– Fire Refined Copper (RAF) (40% of total)• European market
• By-product: Sulfuric acid • Mine activities in Northern Chile
• Internal use
• Fulfillment of environmental regulations
• Teniente Converter (CT): Technological Innovation used in Codelco Smelters. Exported to Thailand, Peru and Zambia
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved. 21
Caletones smelter process
TENIENTECONVERTER (2)
CPS CONVERTER(4)
Slag to Disposal
Dryer(2)
Copper Concentrate
ANODEFURNACE (2)
BLISTER COPPER 99.3 % Cu
Slag
SO2
Acid Plant(2)
White Metal...............
........ ..............
ANODES99,7 % Cu
FIRE REFININGFURNACE (3)
..
SLAG CLEANINGFURNACE (4)
RAF COPPER99.9 % Cu
Sulfuric Acid
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved. 22
N
Power supply
.El Teniente
SING
SIC .
.
..
..
.. SewellMinero Substation
EL TENIENTE MINE
COLON PLANT
Coya
CALETONES SMELTER
RANCAGUA
TransferStation
Los Lirios
Candelaria
Pangal
Long Long TermTerm ContractContract SupplySupply –– 260 MW 260 MW –– ColbunColbun
DemandDemand 245 MW245 MW
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved. 23
Water supply
Pangal River
Blanc
o River
Cac
hapo
alRiver
Flores
River
Paredes River
SEWELL
TTE R
iver
Coya R
iver
Cachapoal River
Dam Sapos5.5 Mm3
1,200 L/sCOLONCOLON(1.260 L/s)(1.260 L/s)
CALETONES(125 L/s)
250 L
/s
COYA
Coya R
iver
•Hydrologic Potential: 13,300 L/s
•Main Water Rights: 5,500 L/s (Consumables)
•Main Sources
- Río Blanco: 1,200 L/s
- Coya System: 500 L/s
- Drainages Mine: 300 L/s
•Consumption: Actual 1,425 L/s, Projected:1,.800 L/s
Water Supply(Average Annual; 95% Exceeding Probability)
Mine Drainages
Consumption Centers
Main Rivers
Main Aduction Systems
Main Pick Up Points
Pump System
New Plant
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved. 24
Technological achievements
• Mine– Controlled mining
– Pre and Advanced undercutting
– Preconditioning
– Remote controlled operations
– Semi-autonomous LHDs
– Automated railway haulage system
• Smelter– Teniente Converter
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved. 25
Safety – Health & QualityManagement
• Health and Safety:
– OHSAS 18000 Certificate
– Reduction of global D-40 rate
– National Safety Council awards
• Quality:
– ISO 9001 Certificate in smelting andconcentrating processes (2002)
– National Quality Award
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved. 26
• Environment:– ISO 14001 Certificate
– Gas emissions:• Achievement of SO2, dust (pm10) and As
regulations
– Solid Waste:• Centralized solid waste, and slag handling
facilities
– Liquid Waste• Compliance with national regulations planned in
2006
• Community:– Pro O’Higgins regional development Corporation
Environmental Management andCommunity relationship
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved. 27
Main milestonesPRODUCTION
At131 kt/d
SMELTING
INCREASED CAPACITY 100% WHITE METAL
PRODUCTION
MINE
RAJO SUR PROJECTSTART-UP
MINE
DACITA PROJECTSTART-UP
MINE
NLM PROJECT START-UP
NEW PLANT
CONCENTRATOR START-UP
MINE
NLM PROJECT at180 kt/d
MINE
PILAR NORTE PROJECT START-UP
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2017 2023 2024 2025 2026 2027 2028
MINE
PACIFICO PROJECTSTART-UP
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved.
El Teniente – Capex2010 - 2034
28
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved. 29
Critical Factors of Success
• Business– Prices evolution of critical supplies and services– Impact in mine plan for present especial copper prices.
• Technical– Rock-Mechanics issues (Rockbursts & collapses)– Strong rock mechanics team – knowledge / Prevention
through seismic monitoring / Planning parameters andproduction/cave management
• Environmental– More strict environmental regulations– Environmental planning / Work with the environmental
authorities and local communities
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved.
El Teniente El Teniente OverviewOverviewNovember, 2010
End
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved.
Explotación por rajo abierto de las reservas
ubicadas en la naciente de la Quebrada
Diablo, al sureste del yacimiento y de la
cavidad El Teniente, entre la cotas 2.720 y
3.140 msnm.
� Método : Rajo abierto y procesamiento en plantas
Sewell y Colón
� Reservas: 33,2 Mt @ 0,69% CuT (LC 0,4%CuT)
� Cobre fino: 224 ktmf
� Tipo mineral: 100% secundario
� Inversión total estimada: MUS$ 215,2
(OOCC 2011, versión mayo 2010)
� Inicio obras tempranas: Año 2010
� Inicio producción: Año 2012
� Capacidad diseño: 20 ktpd
� DIA con RCA autorizada
Proyecto Rajo SurDescripción General
Estado Actual: Etapa prefactibilidad terminada y
aprobada inversión obras tempranas.
Hitos Principales
JUN 09
DIC 09
ABR 11 MAR 12
ABR 10
Cierre Fase
Pre-factibilidad
Hito de Control
API Obras Tempranas
Aprobación
API Inversional
Inicio
Producción
SEP 10
Inicio Construcción
Obras Tempranas
Inicio
Pre-Stripping
NOV 11
Aprobación Item 1
API Factibilidad
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved.
� Reservas Conocidas: 37,6 millones ton.
� Ley media: 1,20% Cu / 0,017% Mo
� Tipo Mineral: 100% primario
� Producción en Régimen: 20.000 tpd
� Área a Hundir: 106.550 m2
� Cota Piso Hundimiento: 2.120 msnm
� Dimensiones Aprox.: 200(a) x 500 (l) m2
� Etapa Actual: Término Perfil
� Inversión Estimada: U$ 104 millones
Proyecto de Explotación que considera la
incorporación del sector Dacita a partir del año
2014, ubicado al norte de la Pipa Braden y
caracterizado por roca primaria del tipo pórfido
dacítico.
Proyecto DacitaDescripción General
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved.
Pacifico superior project
PROYECTO PACIFICO SUPERIOR – API T09E204 33
PACIFICO SUPERIOR
RAJO SUR
RAJO NORTE
RAJO PACIFICO
EL PROYECTO PACIFICO SUPERIOR EN SU
ETAPA DE PREFACTIBILIDAD CONSIDERA
DOS OPCIONES DE EXPLOTACIÓN
EXCLUYENTES ENTRE SI:
� RAJO ABIERTO.
� SUBTERRÁNEA EN COTA UCL 2320
ESTAS OPCIONES ENTREGAN TONELAJE QUE
PERMITE DAR FLEXIBILIDAD AL PND.
EL PERÍODO DE EXPLOTACIÓN CONSIDERA 7
AÑOS
(2015 – 2021).
DESTINO DE MINERAL A PLANTA COLON VIA
FFCC TEN 8.
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved.
COTA 2210
COTA 1983
Nv. ACARREO.
BUZON
NIVEL TRANSPORTE PRINCIPAL FFCC TEN 8
A SUPERFICIE
PIQUE TRASPASO
Ø 3 m
CAMION 50 t
semiautomático
227.0
OP 13 – 15 - 16
140.0
PLANTA COLON
Pacifico Superior – Open pit option
PROYECTO PACIFICO SUPERIOR – API T09E204 34
RAJO
MARTILLO
PICADOR
CAMION (91 t) / CARGADOR FRONTAL (17 yd3)
BOTADERO
COTA 2350
PLATAFORMA.
LASTRE MINERAL
COTA PISO 2380
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved.
JUMBO
REDUCCION
MINI
CARGADORMARTILLO
PICADOR
COTA 2304Nv. PRODUCCION
COTA 2320
Nv. HUNDIMIENTO.
12.0
AREA FORZAMIENTO
JUMBO
EMPERNADOR
JUMBO DE AVANCE
COTA 2260
COTA 2292
COTA 1983
Nv. ACARREO.
SNV. INY / EXT.
BUZON
NIVEL TRANSPORTE PRINCIPAL FFCC TEN 8
A SUPERFICIE
PIQUE TRASPASO
CHIMENEA
VENTILACION
277.0
OP 13 – 15 - 16
VENTILADOR
INYECTOR
32.0
16.0
VENTILADOR
EXTRACTOR
CHIMENEA
VENTILACION
CARGADOR LHD
7 yd3
PLANTA COLON
COTA 2440
Nv. FORZAMIENTO.
Pacifico Superior – underground option
PROYECTO PACIFICO SUPERIOR – API T09E204 35
140.0
JUMBO DE AVANCE
JUMBO RADIALCARGADOR LHD
PERFORADORACARGADOR LHD
CAMION 50 t
semiautomático
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved.
PROYECTO EXPLOTACIÓN SECTOR NORTE
Descripción: Considera la Explotación de las reservas ubicadas
en la Quebrada Teniente, al Norte del yacimiento, entre la
coordenadas 1.200 Norte y 2.000 Norte. Como parte del Estudio
de Prefactibilidad se identificará, evaluará y recomendará la mejor
alternativa de beneficio para ser desarrollada en la Factibilidad.
Estado Actual: En proceso de emisión de API para Prefactibilidad.
� Reservas: 87 millones ton.
� Ley media: 0,62% Cu / 0,013% Mo
� Producción en Régimen: Hasta 35.000 tpd
Hitos PrincipalesInversión Estimada KUS$ 255.189
Inicio Producción Mar 2016
%CuTKt/d
Aprobación API Prefactibilidad
MAR 11
JUL 12
MAR 2016
Inicio Producción
Emisión API para Factibilidad
OCT 12
Aprobación API Factibilidad
Término Factibilidad
DIC 13
Inversión en MP 2010
MAR 14
Aprobación API Inversional
Inicio Construcción
NOV 14
Colón
Sw
Proyecto Rajo NorteDescripción General
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved.
Proyecto Rajo NorteDescripción GeneralProyecto Rajo NorteDescripción General
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved.
New Mine Level project
TTE 4 Sur Cota 2372
Esmeralda Cota 2210
Diablo Regimiento Cota
2210
TTE 8 FFCC Cota 1980
Nuevo Nivel Mina Cota 1880
Nivel Profundo Cota 1480
38
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved. 39
with NML
0
50 000
100 000
150 000
200 000
06 11 16 21 26 31 36 41 46 51
t/d
0.00
0.20
0.40
0.60
0.80
1.00
1.20
%C
u
t/d %Cu
Objective:Assure continuity of mine operations in the long run, replacing sectors above Teniente 8 level
Description:• UCL elevation at 1.880 masl, 100 m below Teniente
8 Railroad level• Panel Caving method• Reserves: 1,645 Mt @ 0.91%Cu • Steady production: 180.000 t/d• Expected Life time: 37 years• Main haulage by conveyor belts• CAPEX 1,520 MUS$
Impact of the Project• Increase of capacity (131 to 180 kt/d)• Increase life mine (2035 a 2052)
less NML
0
50 000
100 000
150 000
200 000
06 11 16 21 26 31 36 41 46 51
t/d
0.00
0.20
0.40
0.60
0.80
1.00
1.20
%C
u
t/d %Cu
New Level Mine Project
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved.
COTA 1713
A CONCENTRADOR COLON
JUMBO
REDUCCION
CARGADOR LHD MINICARGADOR MARTILLO
PICADOR
COTA 1860
NIVEL PREACONDICIONAMIENTO
Nv. PRODUCCION
COTA 1880
Nv. HUNDIMIENTO.
20.0
AREA PREACONDICIONADA
O F
RACT. H
IDRTIRAULICO
JUMBO
EMPERNADOR
JUMBO DE AVANCE
JUMBO DE AVANCE
COTA 1800
COTA 1840
Nv. ACARREO.
SNV. INYECCION.
ESTACION
DE VACIADO
CHANCADOR
GIRATORIO
BUZON
TUNEL CORREA TRANSPORTE PRINCIPAL
A CONFLUENCIA
PIQUE TRASPASO
CAMION SUPRA
CHIMENEA
VENTILACION
87.0
20
BUZONPORTAL
VENTILADOR
INYECTOR
JUMBO RADIAL
20.0
20.0
VENTILADOR
EXTRACTOR
COTA 1820
SNV. EXTRACCION.
20.0
COTA 11780
Nv. DRENAJE.
CHIMENEA
VENTILACION
Perfil esquemático Cota 1.880
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved.
Características Principales• 2 Túneles de 8,9 Km de longitud, sección de 9.4m de diámetro, pendiente 2,0% aprox.
Túneles Principales
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved.
Rampa Salida de Emergencia
TTE. 7 CONEXION OP 20-21 – Cota 2042
RAMPA SALIDA DE EMERGENCIA
TTE. 8 – Cota 1980
OP 17 HW
NNM Nv. Hdto.- Cota 1880
NNM Nv. Prod. – Cota 1860
NNM SNV
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved.Proyecto Nuevo Nivel Mina
DESARROLLOS HORIZONTALESPNNM
DESCRIPCIÓN UNIDAD CANTIDAD
Accesos ml 16.389
Rampa de Acceso Interior Mina (P&T) ml 2.520
Túnel de Acceso de Personal ml 8.969
Conexiones (Túneles de Acceso y Correa) ml 900
Túnel Curvo ml 4.000
Manejo de Materiales ml 9.420
Túnel de Transporte de Mineral ml 8.870
Túnel entre Confluencia y Stock Pile ml 550
Ventilación ml 4.600
Adit´s de Ventilación Inyecc. y Extracc. ml 4.600
Preparación Minera (1° Bajada) ml 34.965
Nivel de Hundimiento (UCL) ml 11.679
Nivel de Producción ml 10.423
Subniveles de Ventilación ml 6.742
Nivel Transporte Intermedio ml 6.121
TOTAL ml 65.374
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved.Proyecto Nuevo Nivel Mina
DESARROLLOS VERTICALESPNNM
DESCRIPCIÓN UNIDAD CANT.Ventilación ml 2.200
Chimeneas Adit´s de Ventilación (4) ml 1.340
Chimeneas de Ventilación Túneles TBM (2) ml 860
Preparación Minera ml 3.860
Piques de Traspaso (41) ml 2.460
Chimeneas de Ventilación Niveles (48) ml 1.400
TOTAL ml 6.060
Copyrights © 2008 CODELCO-CHILE. Todos los Derechos Reservados./Copyrights © 2008 by CODELCO-CHILE. All Rights Reserved.Proyecto Nuevo Nivel Mina
OTRAS EXCAVACIONESPNNM
DESCRIPCIÓN UNIDAD CANT.Superficie m3 2.594.229
Plataformas m3 1.308.000
Zanjas de Galerías y Cañerías m3 112.613
Caminos m3 1.173.616
Interior Mina m3 231.104
Sistema de Chancado m3 61.010
Desarenadores m3 17.686
Talleres y Barrios Cívicos m3 142.231
Otros Suministros m3 10.187
TOTAL m3 2.825.333