  • 7/28/2019 Eisenhower Design Public Hearing Presentation April 4, 2013

    1/19

  • 7/28/2019 Eisenhower Design Public Hearing Presentation April 4, 2013

    2/19

    The project team includes:

    City of Alexandria Lisa Jaatinen, P.E., Project Manager, Transportation &

    Environmental Services (T&ES)

    City Design Team

    A. Morton Thomas & Associates Virginia Department of Transportation (VDOT)

    Introduction

    2

  • 7/28/2019 Eisenhower Design Public Hearing Presentation April 4, 2013

    3/19

    Purpose of this meeting

    Present the design Provide the public with the opportunity to comment

    and discuss the project

    Receive suggestions and input

    Court Reporter Comment card

    EMAIL: [email protected]

    WELCOME

    3

  • 7/28/2019 Eisenhower Design Public Hearing Presentation April 4, 2013

    4/19

    PROJECT LOCATION MAP

    4

  • 7/28/2019 Eisenhower Design Public Hearing Presentation April 4, 2013

    5/19

    The City of Alexandrias goals and objectives for

    Eisenhower Avenue were outlined in theEisenhower East Small Area Plan (EESAP)

    Objectives

    Create a multimodal environment

    Promote safety for all modes of transportation Reduce traffic delays in the corridor

    PROJECT HISTORY

    5

  • 7/28/2019 Eisenhower Design Public Hearing Presentation April 4, 2013

    6/19

    Project is identified in VDOTs Six Year Plan

    Project is approved in the Citys Capital

    Improvements Program

    Roadway improvements are based on development

    forecasts and the Woodrow Wilson Bridge Project

    PROJECT HISTORY

    6

  • 7/28/2019 Eisenhower Design Public Hearing Presentation April 4, 2013

    7/19

    The future full build out plan for Eisenhower

    Avenue consists of:

    A six lane roadway

    Three travel lanes and a bike lane in each direction

    Tree-lined median with left turn lanes Wide sidewalks

    FULL BUILD OUT PLAN

    7

  • 7/28/2019 Eisenhower Design Public Hearing Presentation April 4, 2013

    8/19

    Increase traffic capacity Promote safety for pedestrians, bicyclist and

    motorists

    Enhance streetscape features

    PROJECT GOALS

    8

  • 7/28/2019 Eisenhower Design Public Hearing Presentation April 4, 2013

    9/19

    As a result of the slow down in development and

    right of way constraints, the City decided to buildthe project in phases

    Future phases will be constructed by developers

    as the parcels are re-developed

    PROJECT PHASING

    9

  • 7/28/2019 Eisenhower Design Public Hearing Presentation April 4, 2013

    10/19

    Phase I consists of:

    Adding an additional left turn lane at theEisenhower Avenue/Mill Road intersection onwestbound Eisenhower Avenue

    Upgrading the receiving lanes on Mill Road to

    accept the dual left turns from Eisenhower Avenue

    PROJECT SCOPE

    10

  • 7/28/2019 Eisenhower Design Public Hearing Presentation April 4, 2013

    11/19

    EISENHOWER AVENUE

    AT MILL ROAD

    11

  • 7/28/2019 Eisenhower Design Public Hearing Presentation April 4, 2013

    12/19

    Converting the traffic circle at EisenhowerAvenue and Holland Lane to a signalized T

    intersection

    Providing streetscape improvements at Holland

    Lane and Mill Road

    Resurfacing the full width of EisenhowerAvenue between Holland Lane and Mill Road

    PROJECT SCOPE

    12

  • 7/28/2019 Eisenhower Design Public Hearing Presentation April 4, 2013

    13/19

    EISENHOWER AVENUE

    AT HOLLAND LANE

    13

  • 7/28/2019 Eisenhower Design Public Hearing Presentation April 4, 2013

    14/19

    Right of way constraints

    Maintain access to businesses

    Minimize environmental impact to

    Old Cameron Run stream

    PROJECT CHALLENGES

    14

  • 7/28/2019 Eisenhower Design Public Hearing Presentation April 4, 2013

    15/19

    Project is funded by Federal, State and City funds The total project cost is $7 million

    Design: $1.5 million

    Right of way: $1.3 million

    Construction: $4.2 million

    PROJECT FUNDING

    15

  • 7/28/2019 Eisenhower Design Public Hearing Presentation April 4, 2013

    16/19

    Design Public Hearing April 2013Right of Way Acquisition Summer 2013

    Design Completed Fall 2013

    Advertisement Late 2013

    Begin Construction Spring 2014

    PROJECT SCHEDULE

    16

  • 7/28/2019 Eisenhower Design Public Hearing Presentation April 4, 2013

    17/19

    Review the displays Discuss the project with the City Design Team

    Provide comments to the court reporter

    PUBLIC PARTICIPATION

    17

  • 7/28/2019 Eisenhower Design Public Hearing Presentation April 4, 2013

    18/19

    Visit the project web site:

    http://alexandriava.Gov/tes/info/default.Aspx?Id=11248

    Submit written comments for public record by April 18, 2013

    E-MAIL : [email protected]

    Please reference Eisenhower Avenue Design Public Hearing

    in the subject heading

    PUBLIC PARTICIPATION

    18

    http://alexandriava.gov/tes/info/default.Aspx?Id=11248http://alexandriava.gov/tes/info/default.Aspx?Id=11248
  • 7/28/2019 Eisenhower Design Public Hearing Presentation April 4, 2013

    19/19

    QUESTIONS?

    THANK YOU

    19