Keeping building projects on track starts with a complete and thorough environmental document. Whether serving hospitals, technical colleges, or the University of Wisconsin system, Ayres Associates has the skills to discover the informaon needed and deliver a detailed assessment of a project’s potenal impact on the quality of the human environment. Since 1998, Ayres Associates has: • Completed 27 environmental impact statement (EIS) and 26 environmental impact assessment (EIA) reports for UW System projects. • Conducted more than 100 public meengs. • Evaluated projects varying in complexity from steam lines and parking lots to student unions and educaon buildings. • Worked on projects with construcon values ranging from $146,000 to more than $250 million. • Provided services on 12 campuses – from Parkside to Superior and all points in between. • Completed 19 addional EIS/EIAs for other Wisconsin Department of Administraon, Division of Facilies Development (DFD) and Wisconsin Technical College System (WTCS) projects. These documents meet the requirements of the Naonal Environmental Policy Act (NEPA) and Wisconsin Environmental Policy Act (WEPA) and are prepared following guidelines established by the UW Board of Regents in Resoluon No. 2508 (November 6, 1981) and Resoluon No. 8015 (October 8, 1999), “Implementaon of the Wisconsin Environmental Policy Act within the UW System.” Our role is to guide the project through the EIS/EIA process to comply with NEPA, WEPA, and UW System guidelines. We begin each project with a kickoff meeng with DFD, UW System, campus, and design team representaves, followed by a detailed scoping process for early idenficaon of potenal environmental issues associated with the proposed project. EIS/EIA Services • • • •
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Keeping building projects on track starts with a complete and thorough environmental document. Whether serving hospitals, technical colleges, or the University of Wisconsin system, Ayres Associates has the skills to discover the information needed and deliver a detailed assessment of a project’s potential impact on the quality of the human environment.
Since 1998, Ayres Associates has:• Completed 27 environmental impact statement (EIS) and 26
environmental impact assessment (EIA) reports for UW System projects.
• Conducted more than 100 public meetings.• Evaluated projects varying in complexity from steam lines and
parking lots to student unions and education buildings.• Worked on projects with construction values ranging from
$146,000 to more than $250 million.• Provided services on 12 campuses – from Parkside to Superior and
all points in between.• Completed 19 additional EIS/EIAs for other Wisconsin Department
of Administration, Division of Facilities Development (DFD) and Wisconsin Technical College System (WTCS) projects.
These documents meet the requirements of the National Environmental Policy Act (NEPA) and Wisconsin Environmental Policy Act (WEPA) and are prepared following guidelines established by the UW Board of Regents in Resolution No. 2508 (November 6, 1981) and Resolution No. 8015 (October 8, 1999), “Implementation of the Wisconsin Environmental Policy Act within the UW System.”
Our role is to guide the project through the EIS/EIA process to comply with NEPA, WEPA, and UW System guidelines. We begin each project with a kickoff meeting with DFD, UW System, campus, and design team representatives, followed by a detailed scoping process for early identification of potential environmental issues associated with the proposed project.
EIS/EIA Services• • • •
The draft EIS/EIA document includes a detailed description of the campus setting and proposed project and an evaluation of the potential impacts on the physical, biological, social, cultural, archaeological, historical, and economic environments. Comments arising from public information meetings are incorporated into the final report and record of decision. When our work is done, the campus and UW System have the details needed for final design and project approval.
Our team is skilled not only in the technical aspects of an EIS/EIA evaluation but also in the communication skills crucial to developing stakeholder understanding and acceptance of a project. Our team brings a thorough understanding of the EIS/EIA process and the ability to meet aggressive project schedules. Our goal is to keep your project moving steadily forward.
Your EIS/EIA TeamScott Wilson, PSSVice PresidentYears of experience: 38Location: [email protected]
Mitchell BanachEnvironmental ScientistYears of experience: 8Location: Eau Claire715.834.3161 [email protected]
Lynn Scherbert, PEEnvironmental EngineerYears of experience: 28Location: Waukesha262.523.4488 [email protected]
Keely MarsikGeologistYears of experience: 3Location: [email protected]
Ben Peotter, PEEnvironmental EngineerYears of experience: 17Location: Madison608.443.1200 [email protected]
Erin GrossEnvironmental ScientistYears of experience: 3Location: Madison608.443.1200 [email protected]