EHS-PSP-03 PSF-03b REVISION: 04 June 2014 Page 1 of 4 Note: Please refer www.ehss.ae to ensure that this document is current and applicable EHS –NOC for BP : CHECKLIST OF SUBMISSION Consultant : Main Contractor : Consultant Letter Ref. : Location : Lessee/Client : Subject /Project : No. DETAILS Y N N/A FOR EHS FACILITY PERMIT SECTION COMMON REQUIREMENTS 1. EHS Appraisal Form + Payment Receipt Copy 2. Area Statement 3. Cover Letter + Project Description + License copy of Client/owner 4. Architectural Drawings with Affection plan / Setting out Plan 5. Accreditation Training from Facility Permit Section Done & Certificate Attached RACKING OR MACHINERY INSTALLATION 1. Machinery/Equipment Layouts (Existing & Proposed) with operation/manufacturing details & relevant brochures/catalogue of machine/equipment with technical specifications. 2. EHS approved list for existing machinery & updated list with existing & proposed machinery. 3. Racking/Storage layouts with relevant brochures/catalogue and Racking Load design Calculations. 4. Ventilation Design calculations with HVAC drawings–(wherever applicable) 5. NOC from DEWA for additional power/load requirement for additional machine/equipment RESIDENTIAL/COMMERCIAL DEVELOPMENT 1. Preliminary concept design approval letter with stamped Approved drawings from CED 2. Drainage System Details & Drawings. 3. Ventilation Design calculations with HVAC drawings 4. Parking/Garbage Room Details with Design calculations 5. Risk Assessment Report from EHS registered RA consultant only if there is any LPG storage tanks or network installations proposed 6. FOR RESIDENTIAL DEVELOPMENTS. Green Building Project Plan
4
Embed
EHS NOC for BP : CHECKLIST OF SUBMISSION No. DETAILS …trakhees.ae/en/ehs/ps/Documents/Form/psf-03behs-nocchecklistof... · (GBPP) to demonstrate compliance to “EHS-GB-04 EHS Green
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
EHS-PSP-03 PSF-03b
REVISION: 04 June 2014 Page 1 of 4
Note: Please refer www.ehss.ae to ensure that this document is current and applicable
EHS –NOC for BP : CHECKLIST OF SUBMISSION
Consultant :
Main Contractor :
Consultant Letter Ref. :
Location :
Lessee/Client :
Subject /Project :
No. DETAILS Y N N/A
FOR EHS FACILITY PERMIT SECTION
COMMON REQUIREMENTS
1. EHS Appraisal Form + Payment Receipt Copy
2. Area Statement
3. Cover Letter + Project Description + License copy of Client/owner
4. Architectural Drawings with Affection plan / Setting out Plan
5. Accreditation Training from Facility Permit Section Done & Certificate Attached
RACKING OR MACHINERY INSTALLATION
1. Machinery/Equipment Layouts (Existing & Proposed) with
operation/manufacturing details & relevant brochures/catalogue of
machine/equipment with technical specifications.
2. EHS approved list for existing machinery & updated list with existing & proposed
machinery.
3. Racking/Storage layouts with relevant brochures/catalogue and Racking Load
design Calculations.
4. Ventilation Design calculations with HVAC drawings–(wherever applicable)
5. NOC from DEWA for additional power/load requirement for additional
machine/equipment
RESIDENTIAL/COMMERCIAL DEVELOPMENT
1. Preliminary concept design approval letter with stamped Approved drawings from
CED
2. Drainage System Details & Drawings.
3. Ventilation Design calculations with HVAC drawings
4. Parking/Garbage Room Details with Design calculations
5. Risk Assessment Report from EHS registered RA consultant only if there is any
LPG storage tanks or network installations proposed
6. FOR RESIDENTIAL DEVELOPMENTS. Green Building Project Plan
EHS-PSP-03 PSF-03b
REVISION: 04 June 2014 Page 2 of 4
Note: Please refer www.ehss.ae to ensure that this document is current and applicable
(GBPP) to demonstrate compliance to “EHS-GB-08. EHS Green building
Regulations -villas and low rise residential developments” and ALL
supporting documents / forms that form part of the procedure EHS-GBP-09.
7. FOR COMMERCIAL DEVELOPMENTS. Green Building Project Plan
(GBPP) to demonstrate compliance to “EHS-GB-04 EHS Green Building
Regulations aligned to LEED rating system v3.0” and ALL supporting
documents / forms that form part of the procedure EHS-GBP-05.
SITE OFFICE OR LABOUR CAMP
1. Site mobilization Approval from CED & Master Developer / Developer letter
stating allocation of the plot area with stamped drawing for site office / labour
camp.
2. Architectural Drawings with Affection plan / Setting out Plan
3. Drainage System Details & Drawings.
4. Ventilation Design calculations with HVAC drawing
5. Parking/Garbage Room details with design calculations
6. Diesel Generator & Diesel Tank drawings/details with relevant
catalogues/brochures.
FOOD & HEALTH FACILITY
1 General Lay-out Showing All Activities in the Proposed Project (Architectural
Lay-out); ALL Areas with label of activity
2 Material Safety Data Sheets (MSDS) if proposed activity involved in handling /
storage / process / manufacturing of chemicals (wherever applicable)
3 Drainage System Details & Drawings.
4 Ventilation Design calculations with HVAC drawing