INCREASING PROJECT SUCCESS THROUGH EFFECTIVE PROJECT CHANGE MANAGEMENT Project Management Workshop Brandon Olson, PhD
33

Effective Project Change Management

Oct 19, 2014

Download

Business

Change occurs in almost every project. It may come in the form to increased project scope, decreased budgets, or accelerated timelines. With all of these opportunities for change, project managers must be prepared to adjust the project plan in response to change. Unfortunately, ineffective project change management practices is one of the most common sources of project failure. Project managers must become better equipped at responding to change in order to increase project success. In this presentation the need for project change management is identified and several tools and strategies for effectively dealing with project change are presented.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Effective Project Change Management

INCREASING PROJECT SUCCESS THROUGH

EFFECTIVE PROJECT CHANGE

MANAGEMENTProject Management Workshop

Brandon Olson, PhD

Page 2: Effective Project Change Management

Purpose•Define projects and project management•Describe change and its influence on projects•Determine the best practices for managing change

•Develop a plan to create a formalized project change management practice

Page 3: Effective Project Change Management

Agenda•Definitions•Project Failures•Project Management Variables•Project Change Issues•Project CM Best Practices•Project Change Management Process

Page 4: Effective Project Change Management

Agenda•Definitions•Project Failures•Project Management Variables•Project Change Issues•Project CM Best Practices•Project Change Management Process

Page 5: Effective Project Change Management

Definitions of Project Management• "...a complex, non-routine, one-time effort limited by time, budget,

resources, and performance specifications designed to meet customer needs(Gray & Larson, 2008)

• "...a temporary endeavor undertaken to create a unique product, service, or result.“ (PMI, 2013)

UniqueTemporary

One-Time

Page 6: Effective Project Change Management

Project Characteristics

Kerzner, 2009

PROJECTSpecific Objective withDefined Specifications

Defined Startand End Dates

Funding Limitations

Consume Human andNonhuman Resources

Multiple Disciplines

Page 7: Effective Project Change Management

Purpose of Project Management

Project ManagementA BChang

e

Page 8: Effective Project Change Management

Operations vs. ProjectsOperations Projects

Taking notes in class Writing a research paperRecording sales into ledger Setting up sales kiosk for conventionPracticing a musical instrument Writing a new piece of musicManufacturing the iPhone Designing the new OSAttaching sales tags to merchandise Implementing a new RFID system

Adapted from Gray & Larson, 2008

Page 9: Effective Project Change Management

Agenda•Definitions•Project Failures•Project Management Variables•Project Change Issues•Project CM Best Practices•Project Change Management Process

Page 10: Effective Project Change Management

Project Success Rates

Successful Challenged Failed0%

10%

20%

30%

40%

50%

60%

199419961998200420092011

Gale, S. (2011). Failure rates finally drop. PM Network, 25(8), 10-11.

Page 11: Effective Project Change Management

Sources of Project Failures1. No project champion2. Process shortcuts3. Unable to manage

expectations4. Variable lock-in5. Poor estimating

techniques

6. Over optimism7. Resource assumptions8. Inadequate people

management skills9. Unable to adapt to

change10.Insufficient resources

Adapted from Whitten & Bentley, 2007

Page 12: Effective Project Change Management

Agenda•Definitions•Project Failures•Project Management Variables•Project Change Issues•Project CM Best Practices•Project Change Management Process

Page 13: Effective Project Change Management

Project ManagementScope

ScheduleBudget

ProjectManager

Page 14: Effective Project Change Management

Project Management Variables / Constraints

Project Failure Project Failure

Page 15: Effective Project Change Management

Schedule Compression

Project Failure Project Failure

Page 16: Effective Project Change Management

Budget or Staff Cuts

Project Failure Project Failure

Page 17: Effective Project Change Management

Scope Change

Project Failure Project Failure

Page 18: Effective Project Change Management

Agenda•Definitions•Project Failures•Project Management Variables•Project Change Issues•Project CM Best Practices•Project Change Management Process

Page 19: Effective Project Change Management

Additional / Revised Scope•New functions•Increased scale of functionality•Increased quality of functionality

Page 20: Effective Project Change Management

Scope Creep•Functional Stakeholders•“Wouldn’t it be cool if…”•Small changes•Each change does not influence budget or schedule•Over time accumulated changes influence budgetand schedule

•Example:•Add sound to submit button•Change color of submit button•Confirmation screen•Cancel option

Page 21: Effective Project Change Management

Feature Creep•Project Team Members•“I can improve it by adding this…”•Project team builds in unrequested features•Each change does not influence budget or schedule•Over time accumulated changesinfluence budget and schedule

•Example:•Add sound to submit button•Change color of submit button•Confirmation screen•Easter egg (Google Images – Atari Breakout)

Page 22: Effective Project Change Management

Business Change•New strategies•New external environment•Project deliverables no longer needed•Project deliverables no longer effective

Page 23: Effective Project Change Management

Agenda•Definitions•Project Failures•Project Management Variables•Project Change Issues•Project CM Best Practices•Project Change Management Process

Page 24: Effective Project Change Management

Expectations Management MatrixMeasures of Success

Max / Min

Constrain

Accept

Cost

Schedule

Scope

Adapted from Whitten & Bentley, 2007

Page 25: Effective Project Change Management

Expectations – Moon LandingMeasures of Success

Max / Min

Constrain

Accept

Cost

Schedule

Scope

Page 26: Effective Project Change Management

Expectations – Change in Speed to MarketMeasures of Success

Max / Min

Constrain

Accept

Cost

Schedule

Scope

Page 27: Effective Project Change Management

Stakeholder EducationScope

ScheduleBudget

ProjectManager

ClientStakeholder

Page 28: Effective Project Change Management

Enforce Change Management Process

Change Management

ProcessNew

ChangeProject

Plan

Page 29: Effective Project Change Management

Agenda•Definitions•Project Failures•Project Management Variables•Project Change Issues•Project CM Best Practices•Project Change Management Process

Page 30: Effective Project Change Management

Change Management ProcessRequest

edChange

ChangeRequest

ReviewReques

t

Approved? AdjustPlan

ExecuteNew Plan

Informand

Continue

ProjectPlanDocs

ChangeProposa

l

Page 31: Effective Project Change Management

Change RequestTracking Data•Changer Order ID•Request Date•Project Name•Requester Name•Requester Phone/Email

Specifications•Change Description•Anticipated Benefits

•Anticipated Goals

Page 32: Effective Project Change Management

Change Proposal•Summarize Project Change•Project Scope Implications•New Project Deliverables or Design•Change Budget•Change Schedule•New Project Budget•New Project Schedule

Page 33: Effective Project Change Management

References• Gale, S. (2011). Failure rates finally drop. PM Network, 25(8), 10-

11.• Gray, C.F., & Larson, E.W. (2008). Project management: The

managerial process (4th ed.). Boston, MA: McGraw Hill.• Kerzner, H. (2009). Project management: A systems approach to

planning, scheduling, and controlling. New York, NY: Wiley.• Project Management Institute (2013). A guide to the project

management body of knowledge (5th ed.). Newtown Square: PA: Author.

• Whitten, J.L. & Bentley, L.D. (2007). Systems analysis and design methods (7th ed.). New York, NY: McGraw-Hill Irvin.