Top Banner
EF 151 Group Project Code Name: Frank
7

EF 151 Group Project Code Name: Frank. Team Members Josh Barnes Michael Mcmillan Dhaval Patel Christopher Tarpy.

Jan 03, 2016

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: EF 151 Group Project Code Name: Frank. Team Members Josh Barnes Michael Mcmillan Dhaval Patel Christopher Tarpy.

EF 151 Group Project

Code Name: Frank

Page 2: EF 151 Group Project Code Name: Frank. Team Members Josh Barnes Michael Mcmillan Dhaval Patel Christopher Tarpy.

Team Members

• Josh Barnes• Michael Mcmillan• Dhaval Patel• Christopher Tarpy

Page 3: EF 151 Group Project Code Name: Frank. Team Members Josh Barnes Michael Mcmillan Dhaval Patel Christopher Tarpy.

Construction Materials

• 1/2’ Thick 2x4 Board.• Two PVC pipes and elbows.• Two Hexagon bolts.• Styrofoam tubing• Two Marbles for Device • Some assorted nails, screws, and

trash!

Page 4: EF 151 Group Project Code Name: Frank. Team Members Josh Barnes Michael Mcmillan Dhaval Patel Christopher Tarpy.

Stage One

• The weighted marble goes down the Styrofoam tubing, which tilts up the other side of the PVC Pipe.

Page 5: EF 151 Group Project Code Name: Frank. Team Members Josh Barnes Michael Mcmillan Dhaval Patel Christopher Tarpy.

Stage Two

Right in front of the bolt in the 2nd Pipe is a light marble. When the Pipe gets knocked up from the 1st Pipe it cause the marble to fall and goes down the ramp.

Page 6: EF 151 Group Project Code Name: Frank. Team Members Josh Barnes Michael Mcmillan Dhaval Patel Christopher Tarpy.

Final Stage

• The marble goes down the shoot, bouncing down to each platform. Until it falls in to the cup.

Page 7: EF 151 Group Project Code Name: Frank. Team Members Josh Barnes Michael Mcmillan Dhaval Patel Christopher Tarpy.

Complete Picture!!!