Explanation ? ? ? ? ? ? Intersection of UU - UU' Intersection of ZZ - ZZ' Intersection of CC - CC' Fill – granular Fill – Group I (soil) CNS concrete WLS fill concrete 1.5 1 1 1 1.5 1 EE North EE' South Turbine Building (non-seismic) Radwaste Building (non-seismic) Unit 1 (SC-1) First Bay (SC-II) Yard Grade B-83AP B-152P (proj. 32 ft.) B-218 (proj. 32 ft.) B-224 (proj. 32 ft.) B-90P (proj. 32 ft.) B-1007 (proj. 28 ft.) B-239 (proj. 35 ft.) B-1010 (proj. 32 ft.) B-246 (proj. 55 ft.) B-1004 (proj. 32 ft.) Intersection of BB - BB' ? ? Residual soil/saprolite Residual soil/ saprolite Partially weathered rock B-1001 (proj. 32 ft.) 0 50 feet 0 25 feet Scale Vertical exaggeration 2X N12°W Continuous rock Continuous rock Continuous rock Existing ground surface Existing ground surface Original ground surface Original ground surface 4 1 ? ? ? B-1004A (proj. 10 ft. trend N20°W, 34° from vertical) B-2001 B-2003 Elevation (feet) 620 640 660 600 580 560 520 540 500 480 460 440 420 400 380 360 340 320 300 280 Elevation (feet) 620 640 660 600 580 560 520 540 500 480 460 440 420 400 380 360 340 FIGURE 2.5.4-262 NUCLEAR STATION UNITS 1 & 2 WILLIAM STATES LEE III Planned Excavation Profile, Geologic Cross Section EE-EE' WLS COL 2.5-6 WLS COL 2.5-7 Rev 7