Education and Youth Enterprise Centre A presentation to Billingshurst Parish Council – 05/10/2011 1
17

Education and Youth Enterprise Centre A presentation to Billingshurst Parish Council – 05/10/2011 1.

Dec 25, 2015

Download

Documents

Maria Murphy
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Education and Youth Enterprise Centre A presentation to Billingshurst Parish Council – 05/10/2011 1.

Education and Youth Enterprise Centre

A presentation to Billingshurst Parish Council – 05/10/2011

1

Page 2: Education and Youth Enterprise Centre A presentation to Billingshurst Parish Council – 05/10/2011 1.

Objective of this Presentation

The EYE Project Team under the auspices of the Billingshurst Community Partnership, and with the backing of the Friends of the Gardens Group, wishes to present a proposal whereby the parish council will agree to lease a plot of community land for the building of a dedicated youth facility, on the site of the old football pitch in Station Road.

2

Page 3: Education and Youth Enterprise Centre A presentation to Billingshurst Parish Council – 05/10/2011 1.

BPC Initiative

• Minutes from 29/04/08 The Russell protocols

• Minute from 11/03/11 Unanimous vote in favour of the project

3

Page 4: Education and Youth Enterprise Centre A presentation to Billingshurst Parish Council – 05/10/2011 1.

Our Mission

To provide young people with: • somewhere to go • something to do • and someone to talk to

4

Page 5: Education and Youth Enterprise Centre A presentation to Billingshurst Parish Council – 05/10/2011 1.

Appeal by Local Young People

• Why we need a dedicated youth facility

• What it will be used for

• Why the proposed site is the best location for a dedicated youth facility

5

Page 6: Education and Youth Enterprise Centre A presentation to Billingshurst Parish Council – 05/10/2011 1.

Day Time Use

• Self esteem & anger management groups• Behaviour intervention & workshops• Training student leaders (sustainability)• Venue for CAFs, TACs and case conferences• Half-way house for school phobics• Training vocational & life skills• Intervention work• Possible venue for Job Centre Plus / Connexions

6

Page 7: Education and Youth Enterprise Centre A presentation to Billingshurst Parish Council – 05/10/2011 1.

Community Use

• Seniors’ luncheon club • Overspill from Children & Family Centre• Public toilets accessible from Gardens• BBQ and decking area• Drop-in café• Uniformed and church groups• Community events

7

Page 8: Education and Youth Enterprise Centre A presentation to Billingshurst Parish Council – 05/10/2011 1.

Site Suitability Criteria

• Near-to-school but not within school campus• Central to the village• Adequate parking• Full services availability• Away from main residential areas• Secure environment for young people• Transport links – station / buses / taxis• Accessible for old /disabled using gardens• Opportunity for intergenerational engagement and learning

via gardens

8

Page 9: Education and Youth Enterprise Centre A presentation to Billingshurst Parish Council – 05/10/2011 1.

Site Footprint

9

Page 10: Education and Youth Enterprise Centre A presentation to Billingshurst Parish Council – 05/10/2011 1.

What the EYE Centre could look like from the Gardens view

10

Page 11: Education and Youth Enterprise Centre A presentation to Billingshurst Parish Council – 05/10/2011 1.

Legal Entity

• Enterprise to be registered as a Charitable Company with limited liability. • Articles of Association to follow the Charity Commission guidance

document.• Agree with BPC a 25-year lease for this community land to enable the

facility to be built. (BPC would remain custodians of the title of the land).• A managing committee, comprising representatives of the Trustees, the

youth themselves, and others drawn from the ranks of stakeholders with specific interest in the project, would manage the day-to-day running of the facility.

• The next stage is for the detailed Articles of Association to be worked up and agreed by principle parties*; thence to the formal stage of registration. A draft is with solicitors in readiness.

*BPC and BCP (EYE Committee representatives)

11

Page 12: Education and Youth Enterprise Centre A presentation to Billingshurst Parish Council – 05/10/2011 1.

The Business Case

We have produced a draft income and expenditure statement based on best estimates from existing knowledge:

– Building cost £800 - £1m to include fitting and fixtures

– Income sources from local authorities and facility rental and sales

– best practice data sought from other existing similar facilities

12

Page 13: Education and Youth Enterprise Centre A presentation to Billingshurst Parish Council – 05/10/2011 1.

Annual Expenditure / Income

Expenditure IncomeRRI 2.8 Subs etc 2.4Utilities 6.5 WSCC Educ 12.4Cleaning 5.5 Hire 4.2Maintenance 4.0Resources 1.8SUB TOTAL 20.6 19.0Staff 24.0 Workshops 15.0Contingency 4.4 Grants 15.0TOTAL 49.0 49.0

13

Page 14: Education and Youth Enterprise Centre A presentation to Billingshurst Parish Council – 05/10/2011 1.

Funding Challenges

• It is anticipated that the facility as envisaged will cost between £800 - £1m

• The first requirement was to gain £20k funding to enable the project to proceed to planning application.

• The stages will include:– Building design and drawings to ‘Regulation’ standard– Planning consent– Building construction costs– Revenue funding

14

Page 15: Education and Youth Enterprise Centre A presentation to Billingshurst Parish Council – 05/10/2011 1.

Fiscal Sustainability

• The project is not predicated on the need for any precept support from BPC

• The BPC may unilaterally decide to support with funds or in the future contribute revenue as a facility user

• Capital funding will be sought from a variety of sources (see briefing packs)

• Running costs will be met through a combination of local authority funding and commercial revenues from users

• The project shall embrace voluntary support schemes available through police, church, local authority and other community schemes

• The project may benefit from S106 funds at the discretion of the local authorities but the project is not dependent on planning gain monies

15

Page 16: Education and Youth Enterprise Centre A presentation to Billingshurst Parish Council – 05/10/2011 1.

Summary

• Originally a BCP initiative• Overwhelming local community support• No burden on BPC time or precept• Joint community project with FoG• Multi-use facility • Sustainable fiscally and operationally

16

Page 17: Education and Youth Enterprise Centre A presentation to Billingshurst Parish Council – 05/10/2011 1.

The Decision is in Your Hands