Top Banner
EDISON LOCAL SCHOOL DISTRICT Your Levy Funds at Work
38

Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

Sep 26, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

EDISON LOCAL SCHOOL DISTRICT

Your Levy Funds at Work

Page 2: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

Class graduation pictures are being reformatted and will be

rehung.

Page 3: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

Modernized Buildings

■ An estimated $6.2 million has been spent over the past three years to modernizeEdison High School, Stanton Elementary and John Gregg Elementary Schools.

■ Students are working in updated classrooms with state-of-the-art technology to bringtheir education into the 21st Century.

■ Funding from a 5.9-mill operating levy which passed in May of 2014 and a 2.1-millemergency measure approved in 2015 has helped make these projects a reality.The 5.9-mill renewal levy is currently on the Nov. 6 general election ballot for voters’consideration.

Page 4: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

Projects Completed at EHS in 2015-2016

■ LED lighting in gymnasium

■ EHS library replaced with new computer lab for online learning

■ New asphalt in parking lot

Page 5: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

Gym Lighting

New LED lighting was added inthe high school gym and not onlyenhances illumination but alsohelps the district go green byreducing utility costs.

Page 6: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

Computer Lab

The high school library wasreplaced with a computer labfilled with current technology forstudents to conduct researchusing endless online resources,as well as to completeassignments and assessmentsusing a keyboard and the click ofa mouse.

Page 7: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

Project Cost for 2015-16:

$160,500

Page 8: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

Projects Completed in 2016-2017

■ Electrical upgrade at EHS

■ Windows and doors at EHS

■ New doors at Stanton

■ Vo Ag building gains new roof

■ New restrooms at EHS

■ New lockers at EHS

■ LED sign at EHS

■ Press box renovation at Cartwright Stadium

■ Heating, cooling upgrade at EHS

■ Classroom renovations in 1939 building at EHS

Page 9: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

Electrical Upgrade at EHS

Electrical upgrades were madeto meet the demands to moveforward with the HVAC/Classroomrenovations at the high school.

Page 10: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

Windows & Doors at Stanton, EHS

Page 11: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

Vo Ag BuildingGains New Roof

The Vo Ag building received anew roof and the site now housesa classroom and woodshop, whilea new welding shop is underconstruction. Other improvementsincluded a new barn/storagebuilding behind the FFAgreenhouse.

Page 12: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

Bathroom Upgrades at EHS

Page 13: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

New Lockers at EHS

Students have a new place tostore their coats and books afterbrand-new lockers were installedat the high school for a fresherlook.

Page 14: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

Sign of the Times

A state-of-the-art LED signwelcomes students, staff and thepublic to Wildcat Country andkeeps people informed ofupcoming activities.

Page 15: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

Press Box Renovation

The press box at CartwrightMemorial Stadium underwent amakeover, including paint work,an electrical upgrade, newwindows and remodelded interiorand a new roof.

Page 16: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

Heating, Cooling Updates at EHS

Page 17: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

Classroom Renovations at

EHS

Classrooms at EHS havereceived new lighting, drywall,drop ceilings and a coat of paint,as well whiteboard paint thatallows our teachers to writedirectly on the wall with a dryerase marker.

Page 18: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

Total Project Cost for 2016-17

$4,304,948

Page 19: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

Projects for 2017-18

■ Vo Ag Building and Addition

■ Band Room at EHS

■ New Chemistry Lab at EHS

■ New Front Entrance at EHS

■ LED Lighting in EHS 1963 Wing/Auditorium

■ Windows in EHS 1963 Wing & Gymnasium

■ Entrance Doors at EHS

■ New Flooring in 1939 Basement

■ Guidance/Administrative Offices

Page 20: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

Vo Ag Building and Addition

Page 21: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

Making Music

Page 22: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

Band Room Storage Area

Page 23: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

Chemistry LabThe chemistry lab has new amenities

with new storage units for chemicals and lab equipment.

The storage unit pictured will soon be refaced.

Page 24: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

Enter Here

The newly remodeled front entrance is equipped with a new handicap ramp.

This new entrance will also serve as the area where visitors will enter the building, as part of our continued focus on school safety.

Page 25: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

Let There Be Light

LED lighting in the 1963 wing, now has the entire building to have upgraded and more efficient.

Page 26: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

Windows on the World

Page 27: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

Doorway to Education

Page 28: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

On the Floor

The entire basement floor of the 1939 building received new flooring, which includes the classrooms and hallway.

Page 29: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

New plaster on the walls of the 2nd and 3rd floor hallways of the 1939 building.

Page 30: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

Projects still in the works:- Completion of the new entrance

and vestibule area.

- Installation of handrail, cement caps, and entrance doors.

- Windows on the backside of the 1963 wing, gymnasium and bandroom.

- Addition of VoAg metal shop

- Refacing of cabinets in Chemistry Lab.

Page 31: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

Total Project Cost for 2017-18:

$1,767,572

Page 32: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

Overall Project Cost:

$6,233,020

Page 33: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

Projects for Consideration in 2020

■ New Boilers at John Gregg and Stanton

■ New Windows at John Gregg and Stanton

■ New Doors at John Gregg and Stanton

■ Other projects identified over the next two year period

Page 34: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

New Boilers at John Gregg & Stanton

Page 35: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

New Windows at John Gregg & Stanton

Page 36: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

New Doors at John Gregg & Stanton

Page 37: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

FYI

Information available today

- Postcard with directions for district survey.

- Levy window signs

- School calendars

- Wildcat Pride signs

Page 38: Edison Local School District · 2018. 10. 10. · EHS library replaced with new computer lab for online learning New asphalt in parking lot. Gym Lighting New LED lighting was added

QUESTIONS????