Page 1: ECTION IMPLEMENTATION OF PIPELINE SMS ELEMENTS

1

SECTION – IMPLEMENTATION OF PIPELINE SMS ELEMENTS

Implementation Fundamentals

Element Components

Element Breakdown

Considerations for Implementing Each

Page 2: ECTION IMPLEMENTATION OF PIPELINE SMS ELEMENTS

2

SECTION – IMPLEMENTATION OF PIPELINE SMS ELEMENTS

Focus On: Implementing Stakeholder Engagement

Page 3: ECTION IMPLEMENTATION OF PIPELINE SMS ELEMENTS

3

SECTION – PIPELINE SMS IMPLEMENTATION IN ACTION: EXAMPLES OF PDCA CYCLE

Plan-Do-Check-Act Cycle

PDCA Applied to Integrity Management

PDCA Reflected in Management Review

Page 4: ECTION IMPLEMENTATION OF PIPELINE SMS ELEMENTS

4

SECTION – TOOLS TO SUPPORT OPERATORS

Page 7: ECTION IMPLEMENTATION OF PIPELINE SMS ELEMENTS

7

IMPLEMENTATION SPREADSHEET / GAP ANALYSIS

Getting started

Two spreadsheet tabs

o x

o x

Read API RP 1173 prior

Page 8: ECTION IMPLEMENTATION OF PIPELINE SMS ELEMENTS

8

IMPLEMENTATION SPREADSHEET / GAP ANALYSIS

Pipeline operator

tab

Page 9: ECTION IMPLEMENTATION OF PIPELINE SMS ELEMENTS

9

IMPLEMENTATION SPREADSHEET / GAP ANALYSIS

Gap analysis tab

API RP 1173 Sub-Element & Requirement columns

Page 10: ECTION IMPLEMENTATION OF PIPELINE SMS ELEMENTS

10

IMPLEMENTATION SPREADSHEET / GAP ANALYSIS

Gap analysis tab

Example Evidence and Actual Evidence Columns

Page 11: ECTION IMPLEMENTATION OF PIPELINE SMS ELEMENTS

11

IMPLEMENTATION SPREADSHEET / GAP ANALYSIS

Gap analysis tab

Gap Identification and Potential Actions columns

Page 12: ECTION IMPLEMENTATION OF PIPELINE SMS ELEMENTS

12

IMPLEMENTATION SPREADSHEET / GAP ANALYSIS

Gap analysis tab

Required (R), Optional (O) or Not Chosen (NC) columns

Page 13: ECTION IMPLEMENTATION OF PIPELINE SMS ELEMENTS

13

IMPLEMENTATION SPREADSHEET / GAP ANALYSIS

Gap analysis tab

Priority, Owner, Due Date and Status columns