Page 1
© 2014 MHI®
Copyright claimed as to audiovisual works of seminar sessions and
sound recordings of seminar sessions. All rights reserved.
Sponsored by:
Presented by:
Art Eldred, Client Executive - Vargo
Carlos Ysasi, VP Engineering - Vargo
eCommerce
Flexibility
Needed
Page 2
2
Evolution of the Consumer
1970 1975 1980 1985 1990 1995 2000 2005 2010 2014
Page 3
3
eCommerce Will Continue to
Growth
Page 4
4
Mobile is large driver in growth
Page 5
5
Room for Mobile Growth
Page 6
6
Dynamic Marketing
Page 7
7
SKU Synergies
Does velocity
based slotting
work in
eCommerce?
• Singles vs Multis
• Sortables
• Bulk
Page 8
8
Order Profile Volatility
0.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
11/0
2/1
3 0
:00
11/0
2/1
3 1
5:0
011/0
3/1
3 8
:00
11/0
3/1
3 2
1:0
011/0
4/1
3 1
3:0
011/0
5/1
3 4
:00
11/0
5/1
3 1
7:0
011/0
6/1
3 6
:00
11/0
6/1
3 1
9:0
011/0
7/1
3 9
:00
11/0
7/1
3 2
2:0
011/0
8/1
3 1
2:0
011/0
9/1
3 1
:00
11/0
9/1
3 1
5:0
011/1
0/1
3 5
:00
11/1
0/1
3 1
8:0
011/1
1/1
3 8
:00
11/1
1/1
3 2
1:0
011/1
2/1
3 1
1:0
011/1
3/1
3 0
:00
11/1
3/1
3 1
4:0
011/1
4/1
3 4
:00
11/1
4/1
3 1
7:0
011/1
5/1
3 7
:00
11/1
5/1
3 2
0:0
011/1
6/1
3 1
0:0
011/1
6/1
3 2
3:0
011/1
7/1
3 1
3:0
011/1
8/1
3 3
:00
11/1
8/1
3 1
6:0
011/1
9/1
3 6
:00
11/1
9/1
3 1
9:0
011/2
0/1
3 9
:00
11/2
0/1
3 2
2:0
011/2
1/1
3 1
2:0
011/2
2/1
3 1
:00
11/2
2/1
3 1
5:0
011/2
3/1
3 5
:00
11/2
3/1
3 1
8:0
011/2
4/1
3 8
:00
11/2
4/1
3 2
1:0
011/2
5/1
3 1
1:0
011/2
6/1
3 0
:00
11/2
6/1
3 1
4:0
011/2
7/1
3 4
:00
11/2
7/1
3 1
7:0
011/2
8/1
3 7
:00
11/2
8/1
3 2
0:0
011/2
9/1
3 1
0:0
011/2
9/1
3 2
3:0
011/3
0/1
3 1
3:0
012/0
1/1
3 3
:00
12/0
1/1
3 1
6:0
012/0
2/1
3 6
:00
12/0
2/1
3 1
9:0
012/0
3/1
3 9
:00
12/0
3/1
3 2
2:0
012/0
4/1
3 1
2:0
012/0
5/1
3 1
:00
12/0
5/1
3 1
5:0
012/0
6/1
3 5
:00
Avg units/order
Avg units/order
6AM-29
6AM-22
4-8AM-11 2PM-11
11PM-21
6PM-23
Page 9
9
SKU Consumption
0%
20%
40%
60%
80%
100%
<1 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32
Overall Percent of Active SKUs By # Cases of Daily Usage @ 350,000 Daily Units
0.0%
5.0%
10.0%
15.0%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Percent of Active SKUs With <1 Case Units Daily Usage @ 350,000 Daily Units
Page 10
10
Havoc on the “Wave-ologists”
Source: WV Commerce Department Newsletter
Plan, Correct, Exception Monitor, Plan, Correct, Exception
Correction, Plan, Correct, Exception Monitor, Plan, Correct
Page 11
11
Plans & Design Rates
Design Data
• Number/Availability of Personnel
• Machine Rate(s)
• Equipment Utilization (80%)
• Hours of Operation
• Projected UPH
• Distance of Travel vs SKU Facings
Business Data
• Actual Order Data
• Order Volume
• Order Profile (Singles, Multis, Bulk)
• Active SKUs
• Service Levels
• Shift Hours & Breaks
• Growth Projections
Page 12
12
Brief Overview of Fulfillment
Approaches 1) TRADITIONAL Solution Based
• Discrete Order Picking
• Zone Route
• Goods-To-Man
• Robotic
2) CONTINUOUS Process Based
Page 13
13
Discrete Order Picking
Page 14
14
Cluster/Group Picking Bin Locations
Typical: Flow Rack & Static Shelving
Travel Travel Travel
Discrete Cluster Pick
Cluster
Pick & Pass
Page 15
15
Wave Based Zone-Route
Page 16
16
Goods-To-Man
Source: www.Dematic.us
Page 17
17
Goods-To-Man
Source: Autostore Source: Opex Corp
Page 19
19
Best of Breed = LEAN • Continuous Process/Waveless
• No Waving Team
• Inventory Prepped for Sale at Time of
Receipt
• All Inventory in Active Pick
• Not a silo’d technology solution ,i.e. voice
• De-Coupled Processes
i.e. pack, dunnage, manifest, seal
Page 20
20
Continuous “Lean” Processing
Wave #1 Wave#2 Expedited Wave Wave#3
Ord
er
Cut-
Off
Priority
Order
Priority
Order
“Wave-less” Continuous Processing
Ord
er
Cut-
Off
New Orders Priority
Order
Priority
Order
Shipping
Cut-off
Time
New Orders
Page 21
21
“Lean” Pull Based
Order
Release WIP Picking WIP PreSort WIP Pack
Gather PreSort Pack
Continuous
Pull
Work In-Progress (WIP) Causes:
Inefficiency, More Touches, More
Mechanization, More Management,
Footprint++
Page 22
22
“Lean” Waveless Process
Page 23
23
The Intelligent WCS – One Engine
LMS
WCS
Item
Sorter
WMS
Pick to
Light
Put to
Store
WCS
Shipping
Sorter
Label
Print
Applicator
Case Pick
ERP, Order Management, eCommerce
TMS
Intelligent WCS
Order & Inventory Intelligence w/Ability to Balance Work
Across Both Machines and People for All Channels
WORK PULLED TO AVAILABLE PEOPLE & MACHINES
Synchronizes and Sequences work to “pull” work to available
resource
Page 24
24
Continuous “lean” Process Benefits • Continuous “lean” processes have very little buffers
• Pulling work to available resources provides consistent flow & higher efficiency of automation lowering rate requirements
• Operation not constrained by technology based solution
• Flexible for growth
Capital
• Ergonomic work cells achieving accuracy rates
• Incorrect orders = lost eCommerce customers
• Hard savings associated with each order error reduced Accuracy
• Replenishment is demand based, release for picking is carton based
• Stockouts are resolved in real time in a manner that is transparent to the operator
Stockouts • Operators work simple decoupled processes, training is quick and easy
• Productivity goals are well maintained regardless of the turnover rate
• Easy, ergonomic work cells result in better moral, fewer new hires Training
• Orders are processed in a continuous flow
• Later order cut-off times = more captured sales
• Business rules are maintained
• Decreasing buffers reduces overall order cycle time, even faster turn for high priority orders
Order Cycle Time
Page 25
25
Lean is the way of the future
Page 26
For More Information:
Speaker: Art Eldred, Client Executive
email: [email protected]
Speaker: Carlos Ysasi, VP Engineering
email: [email protected]
Or visit MODEX 2014 Booth #3297
website: www.vargosolutions.com
NOTE: This ending slide is OPTIONAL. Items that can be included are your
speaker’s email address/home page, the Exhibiting Member Company’s name,
home page and Booth Number.