ECN Team Kicks Off the New Year by Converting Four Elementary Campuses: Postma ES Bond Goal 2.3 Install Network Infrastructure Electronics – Campus Level Posted by: Paula Ross, Director of Network Infrastructure and Communications January 11, 2016 It is only fitting that Thomas Hollister convert Postma elementary, since it was Joan Postma that hired Thomas. The switch conversion began about 7:00am and was completed by12:30pm. The conversion team remained onsite for an additional period of time while the campus uninterruptible power supply (UPS) units were replaced.
23
Embed
ECN Team Kicks Off the New Year by Converting Four ...€¦ · ECN Team Kicks Off the New Year by Converting Four Elementary Campuses: Copeland ES Bond Goal 2.3 Install Network Infrastructure
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
ECN Team Kicks Off the New Year by Converting
Four Elementary Campuses: Postma ES
Bond Goal 2.3 Install Network Infrastructure Electronics – Campus Level
Posted by: Paula Ross, Director of Network Infrastructure and Communications January 11, 2016
It is only fitting that Thomas Hollister convert Postma elementary, since it was Joan Postma that hired
Thomas. The switch conversion began about 7:00am and was completed by12:30pm. The conversion
team remained onsite for an additional period of time while the campus uninterruptible power supply (UPS)
units were replaced.
ECN Team Kicks Off the New Year by Converting
Four Elementary Campuses: Black ES
Bond Goal 2.3 Install Network Infrastructure Electronics – Campus Level
Posted by: Paula Ross, Director of Network Infrastructure and Communications January 12, 2016
Elizabeth Montes lead the conversion effort at Black elementary. She is pictured above with David Deitsch
from Presidio directing the switching effort. In addition, Elizabeth is also pictured with Lillie Swearingen from
the DII team. Lillie assisted with the final testing to ensure the newly installed Cisco switches were functioning
as designed.
ECN Team Kicks Off the New Year by Converting
Four Elementary Campuses: Copeland ES
Bond Goal 2.3 Install Network Infrastructure Electronics – Campus Level
Posted by: Paula Ross, Director of Network Infrastructure and Communications January 13, 2016
Tony Rogers managed the Cisco switch upgrade at Copeland elementary. Tony is pictured here with CFISD
operational staff that were onsite checking campus environmentals. Pictured to the right is an example of the
newly installed Cisco switching infrastructure with properly dressed cabling. Tony and team were extremely
careful during the upgrade due to the fact that district benchmark testing was in progress.
ECN Team Kicks Off the New Year by Converting
Four Elementary Campuses: Danish ES
Bond Goal 2.3 Install Network Infrastructure Electronics – Campus Level
Posted by: Paula Ross, Director of Network Infrastructure and Communications January 14, 2016
Anna Senties managed the last switch upgrade for the week at Danish elementary. Presidio technicians
assist with the removal of the existing switches and the unboxing, racking and stacking of the new Cisco
switches. Gigabit cabling technicians also assist with the dressing of the cables. Danish elementary was
converted and back online shortly after lunch.
Annual Contracts and Tax Forms
Information Services and Applications (ISA)
John Crumbley, Director of Information Services and ApplicationsPosted by
January of every year brings with it ‘Tax Season’.
Eric May, John Crumbley and T Traweek are
working with Mark Flores, Director of Payroll and
Insurance to prepare the 2015 employee and
vendor tax forms.
In addition to the W2 statements for employees and
the 1099 statement for vendors, they are also
preparing the 1095C statements. This is the new
Affordable Care Act reporting requirement.
January 15, 2015
Eric May and Dava Clark worked with
Laura Harman, Director of Human
Resource and Amanda Davis, Assistant
Director, to update the employee
contracts. Every year, the contracts for all
employees are reviewed and updated to
reflect the employee’s current status. This
is a vital function for Human Resources
(HR) and the ISA team is happy to be able
to assistance the HR team.
Leadership and Vision
Posted by Frankie Jackson, Chief Technology Officer
Technology Leadership Team Conducts Technology Transformation Team (T3) Meeting on January 11, 2016
Frankie Jackson led the Technology Transformation Team (T3) leadership meeting
on Monday, January 11, 2016. The leadership topic was Seek Out Key Staff
Members. The team had a great discussion about the need to look for key staff
members on the full leadership team that be provided additional growth
opportunities. Also discussed expanding the number of weekly website reporters for
major projects. Identified a group of 10+ that can help support the effort.
January 13, 2016
Other meeting discussion items are as follows.
• Frankie have a presentation on how she is working to blend the national
Baldrige framework with the Certified Education Technology Leadership
(CETL) criteria. She plans to finalize this in the near future and place this
information under the Performance Excellence section of the website.