EC.02.5.07 Standard & NFPA 110 (EPSS) Documentation Best Practice 1: Division Team Mission
14

EC.02.5.07 Standard & NFPA 110 (EPSS) Documentation … · EC.02.5.07 Standard & NFPA 110 (EPSS) Documentation Best Practice 1: ... EP 4 -At least weekly ... , then it must test the

Aug 21, 2018

Download

Documents

lamnhu
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: EC.02.5.07 Standard & NFPA 110 (EPSS) Documentation … · EC.02.5.07 Standard & NFPA 110 (EPSS) Documentation Best Practice 1: ... EP 4 -At least weekly ... , then it must test the

EC.02.5.07Standard&NFPA110(EPSS)

DocumentationBestPractice

1:DivisionTeamMission

Page 2: EC.02.5.07 Standard & NFPA 110 (EPSS) Documentation … · EC.02.5.07 Standard & NFPA 110 (EPSS) Documentation Best Practice 1: ... EP 4 -At least weekly ... , then it must test the

Presenters

Pouyan Layegh, P.E., MBA, LEED APDirector, Campus ServicesFacilities ManagementUT MD Anderson Cancer CenterDisclaimer: Although the speaker is a member of the NFPA Technical Committee on Emergency Power Supplies which is responsible for NFPA 110 Supplies, which is responsible for NFPA 110 and 111, the views and opinions expressed in this presentation are purely those of the speaker and shall not be considered the official position of NFPA or any of its Technical Committees and shall not be considered to be, nor be relied upon as a Formal Interpretation nor be relied upon as, a Formal Interpretation. Readers are encouraged to refer to the entire texts of all referenced documents. NFPA members can obtain staff interpretations of NFPA standards at www.nfpa.org.

Javier J HidalgoManager, Electrical SystemsFacilities ManagementUT MD Anderson Cancer Center

Page 3: EC.02.5.07 Standard & NFPA 110 (EPSS) Documentation … · EC.02.5.07 Standard & NFPA 110 (EPSS) Documentation Best Practice 1: ... EP 4 -At least weekly ... , then it must test the

Background

• 61 backup generators, with over 50 MW capacity• a sophisticated fuel system that feeds 300,000

gallons of diesel to the generators, • an electrical distribution system composed of over

200 automatic transfer switches, electrical switchgears, and parallel gears supported by breakers, synchronizers, and other sophisticated controls.

The University of Texas MD Anderson Cancer Center is one of the largest cancer centers in the United States, we span more than 15 million square feet across 40 structures and three campuses. We servehundreds of patients at any given time. MD Anderson Cancer Center is supported by an emergency power supply system (EPSS) consisting of:

Page 4: EC.02.5.07 Standard & NFPA 110 (EPSS) Documentation … · EC.02.5.07 Standard & NFPA 110 (EPSS) Documentation Best Practice 1: ... EP 4 -At least weekly ... , then it must test the

Codes&Standards

• NFPA 111 – Standard on Stored Electrical Energy Emergency and Standby Power Systems• NFPA 110 – Standard for Emergency and StandbyPower Systems• NFPA 101 – Life Safety Code• NFPA 99 – Healthcare Facility Code• NFPA 70E – Standard for Electrical Safety in the Workplace• The Joint Commission (TJC)• Centers for Medicare & Medicaid Services (CMS)

Page 5: EC.02.5.07 Standard & NFPA 110 (EPSS) Documentation … · EC.02.5.07 Standard & NFPA 110 (EPSS) Documentation Best Practice 1: ... EP 4 -At least weekly ... , then it must test the

Codes&Standards

CMS– 42CFR482.15(e)– Effective15November2016482.15(e)(1)Emergencygeneratorlocation.Thegeneratormustbelocatedinaccordancewith thelocationrequirementsfoundintheHealthCareFacilitiesCode(NFPA99andTentativeInterimAmendmentsTIA12-2,TIA12-3,TIA12-4,TIA12-5,andTIA12-6),LifeSafetyCode(NFPA 101andTentativeInterimAmendmentsTIA12-1,TIA12-2,TIA12-3,andTIA12-4),andNFPA 110,whenanewstructureisbuiltorwhenanexistingstructureorbuildingisrenovated.482.15(e)(2)Emergencygeneratorinspectionandtesting.Thehospitalmustimplementtheemergencypowersysteminspection,testing,andmaintenancerequirementsfoundintheHealth CareFacilitiesCode,NFPA110,andLifeSafetyCode.

Page 6: EC.02.5.07 Standard & NFPA 110 (EPSS) Documentation … · EC.02.5.07 Standard & NFPA 110 (EPSS) Documentation Best Practice 1: ... EP 4 -At least weekly ... , then it must test the

Codes&Standards

JointCommission– EC.02.05.07,EP4-10– Projectedtobecomeeffective9January2017EP4- Atleastweekly,thehospitalinspectstheemergencypowersupplysystem(EPSS), includingallassociatedcomponentsandbatteries.Theresultsandcompletiondatesofweekly inspectionsaredocumented.Note:Foradditionalguidance,seeNFPA110-2010:8.3.1;8.3.3; 8.3.4;8.4.1.EP5- Atleastmonthly,thehospitaltestseachemergencygeneratorunderloadforatleast30 continuousminutes.Thecool-downperiodisnotpartofthe30continuousminutes.Thetest resultsandcompletiondatesaredocumented.EP6- Themonthlytestsfordiesel-poweredemergencygeneratorsareconductedwitha dynamicloadthatisatleast30%ofthenameplateratingofthegeneratorormeetsthe manufacturer’srecommendedprimemovers’exhaustgastemperature.Ifthehospitaldoesnot meeteitherthe30%ofnameplateratingorthe recommendedexhaustgastemperatureduring anytestinEC.02.05.07,EP5,thenitmusttesttheemergencygeneratoronceevery12monthsusingsupplemental(dynamicorstatic)loadsof50%ofnameplateratingfor30minutes, followedby75%ofnameplateratingfor60minutes,foratotalof1½continuoushours.Note: Testsfornon-diesel-poweredgeneratorsneedonlybeconductedwithavailableload.EP7- Atleastmonthly,thehospitaltestsallautomatictransferswitchesontheinventory.The testresultsandcompletiondatesaredocumented.EP8- Atleastannually,thehospitalteststhefuelqualitytoASTMstandards.Thetestresultsand completiondatesaredocumented.Note:Foradditionalguidance,seeNFPA110-2010:8.3.8.EP9- Atleastonceevery36months,hospitalswithageneratorprovidingemergencypowerfor theserviceslistedinEC.02.05.03,EPs5and6,testeachemergencygeneratorforaminimumof 4continuoushours.Thetestresultsandcompletiondatesaredocumented.Note:Foradditionalguidance,seeNFPA110-2010,Chapter8.NotethatNFPA110requiresthe transferringofallATSduringthetriennialtest.EP10- The36-monthdiesel-poweredemergencygeneratortestusesadynamicorstaticload thatisatleast30%ofthenameplateratingofthegeneratorormeetsthemanufacturer’s recommendedprimemovers'exhaustgastemperature.Note:Testsfornon-diesel-powered generatorsneedonlybeconductedwithavailableload.

Page 7: EC.02.5.07 Standard & NFPA 110 (EPSS) Documentation … · EC.02.5.07 Standard & NFPA 110 (EPSS) Documentation Best Practice 1: ... EP 4 -At least weekly ... , then it must test the

NFPA110– SuggestedOperation&TestingProcedures

Page 8: EC.02.5.07 Standard & NFPA 110 (EPSS) Documentation … · EC.02.5.07 Standard & NFPA 110 (EPSS) Documentation Best Practice 1: ... EP 4 -At least weekly ... , then it must test the

NFPA110TypicalMultiple-UnitEPSS

Page 9: EC.02.5.07 Standard & NFPA 110 (EPSS) Documentation … · EC.02.5.07 Standard & NFPA 110 (EPSS) Documentation Best Practice 1: ... EP 4 -At least weekly ... , then it must test the

Documentation

DuringarecentvisitbyTheJointCommissionsurveyors,UTMDAndersonCancerCenterreviewoftheEPSSdocumentationtooklessthan30min.Thisistheculminationofcodecompliance,thirdpartyverificationandteamwork.Surveyorswerepresentedwithabinderthatcontainedallequipmentrequiredmaintenance&compliancefollowedbydetailinformationofcorrectiveandproactivework.ItalsoincludedpertinentEPSSinstitutionalpolicesandproceduresAndasummarizedspreadsheetthatincluded:• TestDate• FrequencyCompliance• ApplicableReadings• Testduration• TestResult

Page 10: EC.02.5.07 Standard & NFPA 110 (EPSS) Documentation … · EC.02.5.07 Standard & NFPA 110 (EPSS) Documentation Best Practice 1: ... EP 4 -At least weekly ... , then it must test the

Sample Summary View

Page 11: EC.02.5.07 Standard & NFPA 110 (EPSS) Documentation … · EC.02.5.07 Standard & NFPA 110 (EPSS) Documentation Best Practice 1: ... EP 4 -At least weekly ... , then it must test the

Sample Documentation

Page 12: EC.02.5.07 Standard & NFPA 110 (EPSS) Documentation … · EC.02.5.07 Standard & NFPA 110 (EPSS) Documentation Best Practice 1: ... EP 4 -At least weekly ... , then it must test the

Demand Response (DR)and EPSS Proper Functioning Validation

WhatisDemandResponse?Itisaprogramthatencouragescustomerstoreducedemand,therebyreducingthepeakdemandforelectricityamongtheutilitypowersystem.Demandresponseallowsend-useelectriccustomerstoreducetheirelectricalusageinagiventimeperiod,inresponsetoautilitypowersystemreliabilityandfinancialincentive.MDAndersonhasandisparticipatinginDRprogramsforbothElectricalReliabilityCouncilofTexas(ERCOT)andCenterPointEnergyCPE.Lastyearseveralgeneratorsranfor4hoursshedding4MWofpowerfromthegridandprovingthatourEPSSisoperatingasintendedduringpeakdemandtime.

Page 13: EC.02.5.07 Standard & NFPA 110 (EPSS) Documentation … · EC.02.5.07 Standard & NFPA 110 (EPSS) Documentation Best Practice 1: ... EP 4 -At least weekly ... , then it must test the

TJCECNews December2016

Page 14: EC.02.5.07 Standard & NFPA 110 (EPSS) Documentation … · EC.02.5.07 Standard & NFPA 110 (EPSS) Documentation Best Practice 1: ... EP 4 -At least weekly ... , then it must test the

Questions?