Top Banner
E+C December 2013 version from TfL Peninsular3t.pdf NKR – New Kent rd NC – Newington Causeway LR – London rd StG – St Georges Rd Link – E+C Link Rd Very similar to Oct and Nov versions. Peninsularisation from the south. 2-way round approx track of roundabout. Ped underpasses replaced by surface crossings. Possible cyle path, dashed line, not on present plan. Section from NC to LR light controlled. Otherwise free-flowing except for ped crossing lights. Most ped crossings 2 stage. LR NC NKR StG Link
6

E+C December 2013 version from TfL Peninsular3t.pdf NKR – New Kent rd NC – Newington Causeway

Jan 25, 2016

Download

Documents

gezana

E+C December 2013 version from TfL Peninsular3t.pdf NKR – New Kent rd NC – Newington Causeway LR – London rd StG – St Georges Rd Link – E+C Link Rd Very similar to Oct and Nov versions. Peninsularisation from the south. 2-way round approx track of roundabout. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: E+C December 2013 version from TfL Peninsular3t.pdf NKR – New Kent rd NC – Newington Causeway

E+CDecember 2013 version from TfLPeninsular3t.pdfNKR – New Kent rdNC – Newington CausewayLR – London rdStG – St Georges RdLink – E+C Link RdVery similar to Oct and Nov versions.Peninsularisation from the south.2-way round approx track of roundabout.Ped underpasses replaced by surface crossings.Possible cyle path, dashed line, not on present plan.Section from NC to LR light controlled.Otherwise free-flowing except for ped crossing lights.Most ped crossings 2 stage.

LRNC

NKR

StG

Link

Page 2: E+C December 2013 version from TfL Peninsular3t.pdf NKR – New Kent rd NC – Newington Causeway

Link Rd/St Georges Rd/Peninsula Rd JunctionOK going southGoing North, conflict between straight on cyclists and left turning motors is not resolved.At am peak Thurs 12 Dec, av. flows as follows:Left turning motors – 1 every 13 secStraight on cycles – 1 every 6 secs

Page 3: E+C December 2013 version from TfL Peninsular3t.pdf NKR – New Kent rd NC – Newington Causeway

E+C, present layout and collision statsNote many collisions on Link to StG corner, 5/11 serious collisions here.Data for 36 months period to 30 April 201242/92 (46%) collisions involved cyclists3 of serious collisions at StG junction involved cyclistsApprox 7 years ago a cyclist was killed at this location.

Page 4: E+C December 2013 version from TfL Peninsular3t.pdf NKR – New Kent rd NC – Newington Causeway

Note radius of corner is now larger – this is now a faster piece of road.

At present all motors slow at give way line (- -)to check for traffic from right.

When ped xing is green, there will be nothing to slow motors down.

Page 5: E+C December 2013 version from TfL Peninsular3t.pdf NKR – New Kent rd NC – Newington Causeway

London Rd / Newington Causeway SectionOn peninsular road, light control anticlockwise at NC; light control clockwise at LR. LR and NC have traffic lights.No information from TfL on phasing of lights.

1. Exiting NC southbound is OK2. From peninsula or LR, straight on cyclists are at risk from traffic turning into NC (left hook).3. Similarly for straight on cyclists at LR, at risk from turning buses.4. Cyclists exiting right from London Rd have to get across 2 motor traffic lanes on LR. 5. Cycle lane across junction only goes half way.

1.

2.3.

4.

5.

Page 6: E+C December 2013 version from TfL Peninsular3t.pdf NKR – New Kent rd NC – Newington Causeway

December

October

October version had safer way for cyclists to turn right out of London Road