    Oracles E-Business Suite ofApplications [EBS] and

    Primavera Integration

    Mac ChouhanUKOUG Primavera Conference22ndMarch 2011

  • 8/12/2019 EBS and Primavera Integration

    2/40

    1 /

    1 /Agenda

    Introduction

    Introduction to Thales

    Thales B1 Programme

    Oracle / Primavera Interfaces

    Q & A

  • 8/12/2019 EBS and Primavera Integration

    3/40

    2 /

    2 /Introduction

    This presentation will provide how the B-One Primavera Rolloutwithin Thales was established and the benefits and Return on

    Investment [ROI] it brings with it

    The integration of Oracles E-Business Suite of Applications [EBS]

    and Primavera Integration Architecture brings together a trueEnterprise Solution: B-ONE

    Thales Core Model showing the various Interfaces between Oracle

    EBS and Primavera

  • 8/12/2019 EBS and Primavera Integration

    4/40

    3 /

    3 /A technology leader providing safety and security

    A global company with 68,000 employees

    and 12.9 billion in revenues

    We help our customers to:

    Provide reliable and secure solutions

    Monitor and control

    Protect and defend

    In two major sectors

    Thales: a reliable, long-term partner with

    operations in 50 countries

    Defence and Security

    60%

    Aerospace and Transport

    40%

  • 8/12/2019 EBS and Primavera Integration

    5/40

    4 /4 /

    Defence

    Serving all branches of the armed forces

    Air, Land, Naval and Joint operations

    Security

    Serving governments, institutional

    customers and civil operators

    Interoperable, scalable solutions and services

    focused on operational requirements

    Defence and Security

    A comprehensive approach to national security

    and citizen protection

  • 8/12/2019 EBS and Primavera Integration

    6/40

    5 /5 /Aerospace and Transport

    Aerospace

    Serving aircraft manufacturers, airlines

    and civil aviation authorities

    Space

    A major player through Thales Alenia Space

    Serving satellite operators, space agencies

    and defence customers

    Transport

    Helping to optimise use of

    rail and road infrastructures

    Presence on all types of civil and military aircraft

    and all major new aircraft programmes

    Central role on the major civil and militaryprogrammes

    Driving improvements in traveller safety

    and ground transport efficiency

  • 8/12/2019 EBS and Primavera Integration

    7/40

    6 /6 /

    Global reach, local expertise68,000employees in

    50countries

    A Global Player

  • 8/12/2019 EBS and Primavera Integration

    8/40

    7 /7 /Thales Oracle Practice

    Oracle partner since 1998

    Certified Partner

    Accelerate Partner

    Engaged on Thales Global B1 Project

    History of Worldwide Oracle Implementationsacross all Business types

  • 8/12/2019 EBS and Primavera Integration

    9/40

    8 /8 /What is B1?

    B1 is

    a multinational programme being introduced in the UK,Spain, The Netherlands, France. More to Follow

    aimed at enabling greater efficiency and productivity throughthe convergence of business process

    2000+ B1 users now benefit from a process centric business

    toolset that promotes collaboration and continuousimprovement

    replaces all existing ERPs (Enterprise Resource Planningsystems) with a powerful single technology platform acrossall Thales Group activities

    A global business transformation programme, not an IT

    initiative Primavera provides key data inputs in to IBP (Integrated

    Business Planning)

  • 8/12/2019 EBS and Primavera Integration

    10/40

    9 /9 /Solution Architecture

    17 April 2008th

    Corporate

    Purchasing

    Thalsis

    Component

    Information

    System

    TCIS

    PDM

    DCC (TUS Only)

    Scanning

    System

    Local Scanning

    System

    IMSCAN

    Corporate

    Reporting

    Magnitude

    Banking

    BACS

    Export

    Control

    Local Expor t

    Systems

    BI / Data

    Warehouse

    Cognos

    Planning &

    Resource

    Management

    Primavera

    Timesheet

    OTL

    '

    Purchasing

    MS&C/

    Programme

    Controlling

    Customer

    SupportManufacturing

    Accounting / General Controlling

    (All Domains)

    Clearing

    &

    Netting

    Clearing &

    Netting

    System

    Human

    Resources

    & Payroll

    Northgate

    Travel

    &

    Expenses

    Marco Polo

    Ke y

    OCM Scope

    Country appl ication

    Group appl icat ion

    Buyerless

    Purchasing

    SPAG

  • 8/12/2019 EBS and Primavera Integration

    11/40

    10 /10 /

    One MobileWorkforce OneWay ofWorking OneApproach toInformation

    One Set of

    Systems

    Greater Speedand Accuracy

    ImprovedQuality

    of Service

    LowerCosts

    EnhancedStaff

    Mobility

    B1 is a key enabler of the groups transformation plans

    Implementation of commonbusiness processes and systems

    throughout the group

    To deliver greater efficiencyand productivity

    B1 - Realising the Power of One within Thales

    11 /

    11 /

  • 8/12/2019 EBS and Primavera Integration

    12/40

    11 /11 /BackgroundPrimavera

    Primavera ?

    All During 2004, Thales synthesized all its Divisions programme management

    processes on the basis of existing methodologies within the Group and

    international standards.

    To support this process, a tool was chosen Primavera, which is

    a standard market tool widely utilised worldwide

    particularly within companies functioning in Project mode

    Its parameters are based on accepted business management processes

    Acceptance:

    First, functional and technical experts accepted Primavera together with its parameters before testing

    and validating it on pilot schemes

    Decided at Group level to utilise this tool and its associated processes within the Divisions

    12 /

    12 /

  • 8/12/2019 EBS and Primavera Integration

    13/40

    12 /12 /ObjectiveProcess supported by a tool

    Because Programmes are the whole point of reason for our business, the

    Thales objective is to improve

    Anticipation & forecast accuracy

    Transparency

    Data consistency

    The Thales worldwide deployment of Primavera is at the same time

    A more demanding application, but also more virtuous, of our process of Program

    Management

    A set of cultural changes

    And finally, a tool in the service of the Programme Management

    Use of a Thales Primavera Core Model

    13 /

    13 /

  • 8/12/2019 EBS and Primavera Integration

    14/40

    13 /13 /Why a core model ?

    secured fields

    set of standard codes

    configured layouts

    additional tools / functions

    data history

    simulation

    capability to capture

    validated programme

    situations

    Additional reports

    Excel

    Cognos (finance

    workload)

    Interface with our BO

    PRIMAVERA THALES

    CORE MODEL LAYER

    PRIMAVERA

    THALES PM PROCESScultural changes

    A need to standardize across regions / entities

    14 /

    14 /

  • 8/12/2019 EBS and Primavera Integration

    15/40

    14 /14 /Keep in mind that

    Before looking at the PM process, keep in mind that

    Primavera stores all our data in a centralised & shared database

    Any modificationat any level - is immediately recorded in the database

    With limited undo capabilities

    The current situation of our programmes is a live one (any change

    immediately affects the milestones, the cost at completion, the workload,

    etc ..)

    15 /

    15 /Wh P M t P d T l

  • 8/12/2019 EBS and Primavera Integration

    16/40

    15 /15 /Why a Programme Management Process and Tool

    An integrated Programme Management

    process for schedule, workload and

    costs

    Target situation

    Programme Management tool

    Costs

    Workload

    Integrated

    resource schedule

    No consistent view of schedule, workload

    and costs

    Disjointed situation

    Excel

    Costs

    Artemis

    P3

    MSPExcel

    Schedule(s)

    Excel

    Workload

    Background

    16 /

    16 /

    S f h l

  • 8/12/2019 EBS and Primavera Integration

    17/40

    16 /16 /

    Scope of the Programme Management tool

    All the programmes shall be managed within the Programme Management

    tool.

    The functionalities to be used depend on the programme complexity as a minimum: start dateend date,

    workload, budget, costs

    Workload forecast for the unit will be provided by Primavera and shall

    include:

    Business opportunities, Current programmes, Other budgeted activities (PV, bids, warranties)

    Primavera is built to meet both Programme Management and Financeneeds

    The Programme Management tool is the Masterfor the programme structure

    The ERP is the master for actual costs

    Every work package has its corresponding cost point in the ERP

    EAC are transferred from the PM tool to the ERP

    The Contract budget base is under the responsibility of the Programme Manager

    17 /

    17 /

    I t f B1 UK

  • 8/12/2019 EBS and Primavera Integration

    18/40

    17 /17 /

    PM tool

    Time Sheet

    ERP

    WBSCA / WPs

    ProgrammeHeader ID/Budget/Responsibility

    Cost Points

    Time sheet at costpoint level

    CostEmployee & Non Labour plus

    Summary CommitmentsAt Cost point level

    PM EACProgramme Level

    HierarchyOrganisation / Cost Centre

    ResourcesEmployees/Non Labour/Rates

    CommitmentDetailed PO info / Profiled ETC

    - Labour Hours- Labour Costs To Date- Labour Period Costs

    - NonLabour Period Costs

    Business Organisation Hierarchy and Resource (Labour and Non Labour) to Primavera with various attributes

    Programmes are created in the BO and transferred into Primavera if Status Full WBS is created in Primavera [Master]. Only key elements CA and WP are sent to the BO

    Timesheet captures Hours at Cost Point level (Manufacturing WIP booking direct into BO)

    Actual costs (both labour and non labour) are transferred from the BO to Primavera at cost point levelWP

    Actual labour quantity (hours) also transferred at WP level

    Detail Commitments information by WPsummary only. Next version direct into ETC as profile per PO dates

    Global EAC (PMB + MR) at Programme level is transferred from Primavera to the BO

    InterfacesB1 UK

  • 8/12/2019 EBS and Primavera Integration

    19/40

    19 /

    19 /Screenshots Hierarch

  • 8/12/2019 EBS and Primavera Integration

    20/40

    ScreenshotsHierarchy

    Hierarchy Interfaced into Primavera OBS View

    20 /

    20 /Screenshots Resources

  • 8/12/2019 EBS and Primavera Integration

    21/40

    ScreenshotsResources

    Csv output

    21 /

    21 /Screenshots Resources

  • 8/12/2019 EBS and Primavera Integration

    22/40

    ScreenshotsResources

    Resources Interfaced into Primavera Resources View

    22 /

    22 /Screenshots Programme

  • 8/12/2019 EBS and Primavera Integration

    23/40

    ScreenshotsProgramme

    Oracle Projects

    23 /

    23 /Screenshots Programme

  • 8/12/2019 EBS and Primavera Integration

    24/40

    ScreenshotsProgramme

    Csv output

    Primavera End Log file

    24 /

    24 /Screenshots Programme

  • 8/12/2019 EBS and Primavera Integration

    25/40

    ScreenshotsProgramme

    Programme Interfaced into Primavera Projects View

    25 /

    25 /Screenshots WBS

  • 8/12/2019 EBS and Primavera Integration

    26/40

    Screenshots WBS

    WBS created in Primavera

    26 /

    26 /Screenshots WBS

  • 8/12/2019 EBS and Primavera Integration

    27/40

    Screenshots WBS

    Sending WBS to Oracle

    27 /

    27 /Screenshots WBS

  • 8/12/2019 EBS and Primavera Integration

    28/40

    Screenshots WBS

    WBS Interface

    Log

    Csv output

    28 /

    28 /ScreenshotsWBS

  • 8/12/2019 EBS and Primavera Integration

    29/40

    WBS Interfaced into Oracle

    29 /

    29 /

    ScreenshotsActual Costs

  • 8/12/2019 EBS and Primavera Integration

    30/40

    Costs in

    Oracle Time

    & Labour

    30 /

    30 /ScreenshotsActual Costs

  • 8/12/2019 EBS and Primavera Integration

    31/40

    Oracle Csv

    output

    Costs Interface

    Log File

    31 /

    31 /ScreenshotsWBS

  • 8/12/2019 EBS and Primavera Integration

    32/40

    Costs in Primavera Activities View

    32 /

    32 /ScreenshotsActual Costs in

  • 8/12/2019 EBS and Primavera Integration

    33/40

    Projects View

    WBS View

    33 /

    33 /ScreenshotsPMEAC

  • 8/12/2019 EBS and Primavera Integration

    34/40

    PMEAC

    34 /

    34 /ScreenshotsPMEAC

  • 8/12/2019 EBS and Primavera Integration

    35/40

    PMEAC Log File

    PMEAC Csv

    35 /

    35 /ScreenshotsPMEAC

  • 8/12/2019 EBS and Primavera Integration

    36/40

    PMEAC Interfaced to Oracle Projects

    36 /

    36 /OraclePrimavera Interface Timings

  • 8/12/2019 EBS and Primavera Integration

    37/40

    Frequency and timings of each interface are:

    Cost interface run at month end when month end processing completeScheduled to run overnight

    Log Files

    log files generated for each interface and emailed to Business Super Users

    Nominated key users validate and respond back to users

    37 /

    37 /

    Monthly Update Process

  • 8/12/2019 EBS and Primavera Integration

    38/40

    EAC transfer

    towards ERP. PMV Dashboard updating.

    Possible schedule update (without to

    change the Data Date)

    Data Date

    1st month N+1

    Baselines creation

    (Current Situation) Selection / Type

    baselines change, for

    creation of Financial

    Baselines

    End of month N

    updating.

    !

    Actuals and

    Commitments

    transfer to PMV.

    Data Date

    1st month N

    ETC

    update

    ~ 2 weeks

    !

    The update session as currently practiced on programmesandappears as a very efficient process. The programme team meets

    around the live Primavera schedule and updates it while discussing

    the issues. Typical duration is to 1 daydepending on the

    programme size.

    38 /

    38 /Other Interface / Tools

  • 8/12/2019 EBS and Primavera Integration

    39/40

    Other Interfaces and Tools

    Resource Rate Inflation

    A specific resource rate inflation tool to manage inflation rate for labour resources

    PM Tools

    Tools to aid reporting cycle

    Checks Project data compliance to Standard Planning Practices

    Automates Primavera Summarisation, Baseline creation for PMBI Reporting

    WBS Loader

    Load any ERP WBSs into Primavera

    Used for Data / Cost Migration

    39 /

    39 /

    Questions ?