Pressurized Systems
• Cryogenic Systems
Superconducting Solenoid Magnet System (SSMS)
• Cooling Water Systems– NSRL Power Supply DI Water System– Booster Magnet Water System– Mini-chillers for RF Cavity Cooling
• Compressed Air/Gas– Utility Compressed Air for Instrumentation/Valves– Vacuum System Bleed-up– SF6 for RF Coax/Circulators
EBIS Accelerator Readiness Review – May/2010
3
Cryogenic Systems - SSMS
EBIS Accelerator Readiness Review – May/2010
4
Cryogenic Systems - SSMS
EBIS Accelerator Readiness Review – May/2010
5
Cryogenic Systems - SSMS
• Is the magnet system safely designed?
(Review by the LESHC)
• Is the installation safe and will it be safely operated?
(Review by ASSRC)
EBIS Accelerator Readiness Review – May/2010
6
Cryogenic Systems – SSMS ODH Calculation
EBIS Accelerator Readiness Review – May/2010
SSMS
O2 % is calculated to be 18.3% after He release. ODH Class is unclassified.
Helium Gas Vented to Outside
7
EBIS Accelerator Readiness Review – May/2010
A
Cryogenic Systems – SSMS Relief Devices and Venting to Outside
View A
BD 490 mB
RV 350 mB
RV Vent 100 mB
Vacuum Vessel BD 450 mB
8
EBIS Accelerator Readiness Review – May/2010
A
Cryogenic Systems – SSMS Relief Devices and Venting to Outside
9
Cryogenic Systems – SSMS and ASME Equivalency LESHC
• ASME Equivalency Ruling on SSMS by LESHC for Design, Manufacture, and Inspection Requirements– LESHC Review of Pre-Manufactured Design – 8 June
2006 with manufacturer ACCEL (now BASC)– LESHC Meeting - 2 February 2009 – ASME Equivalency is
granted upon resolution of Actions Items.
EBIS Accelerator Readiness Review – May/2010
10
Cooling Water Systems – DI Water
EBIS Accelerator Readiness Review – May/2010
Code: ANSI/ASME B31.9Materials: Copper, Type L SST304
Water Expansion Tank Interlock: Pump Shut-down~25 gallon loss. Alarm at ~16 gallons loss.
11
Cooling Water Systems – Magnet Water and RF Cavity Water
EBIS Accelerator Readiness Review – May/2010
Code: ANSI/ASME B31.9Materials: Copper, Type L
12
Cooling Water Systems – Magnet Water and RF Cavity Water
EBIS Accelerator Readiness Review – May/2010
13
HP Gas Bleed-up to Vacuum Systems
EBIS Accelerator Readiness Review – May/2010
Typical RV – Circle Seal L500 with Viton seals
14
SF6 for RF Coax and Circulators
EBIS Accelerator Readiness Review – May/2010
Typical RV – Circle Seal L559 with Buna-N seals