Water Supply Project Eastern and Midlands Region Final Options Appraisal Report (FOAR) Non Technical Summary November 2016
12

Eastern and Midlands Region Final Options Appraisal Report ... · Eastern and Midlands Region Final Options Appraisal Report (FOAR) Non Technical ... This Final Options Appraisal

May 17, 2018

Download

Documents

dangxuyen
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Eastern and Midlands Region Final Options Appraisal Report ... · Eastern and Midlands Region Final Options Appraisal Report (FOAR) Non Technical ... This Final Options Appraisal

Water Supply ProjectEastern and Midlands Region

Final Options Appraisal Report (FOAR)Non Technical Summary

(FOAR)Non Technical Summary November 2016

Page 2: Eastern and Midlands Region Final Options Appraisal Report ... · Eastern and Midlands Region Final Options Appraisal Report (FOAR) Non Technical ... This Final Options Appraisal

ContentsBackground 1

AssessingPotentialSources 2

MovingfromTwoAlternativeOptionstoOnePreferredOption 3

ParteenBasin–ThePreferredOption 4

CommunityGain 6

Theimportanceofaction 7

MovingtoaPlanningApplication 8

Page 3: Eastern and Midlands Region Final Options Appraisal Report ... · Eastern and Midlands Region Final Options Appraisal Report (FOAR) Non Technical ... This Final Options Appraisal

1 | Irish WaterFinalOptionsAppraisalReport(FOAR)-NonTechnicalSummary

BackgroundTheWaterSupplyProject–EasternandMidlandsRegion(WSP)hasbeenindevelopmentsincethemid1990s,originallyunderDublinCityCouncilasprojectsponsor,andunderIrishWatermanagementsinceJanuary2014.

ThreepublicconsultationshavealreadytakenplacesinceMarch2015,firstontheNeedfortheprojectandtheroadmapforhowtheprojectwouldbeundertaken,thenonexaminationofOptionsandthemethodofappraisingthem,andthirdly,atNovember2015,narrowingdowntheoptions,whichwereoriginallyten,totwoforfurtherexamination,namely:

1. AbstractionfromtheShannonatParteen,and

2.DesalinationofseawaterfromtheIrishSea.

ThisFinalOptionsAppraisalReport(FOAR),identifiesthePreferredSchemeasabstractionfromtheRiverShannonatParteen,downstreamofLoughDerg.Theprocessofreachingthisrecommendationisnowofferedforpublicconsultationover14weeks,commencingonNovember8th2016.

Thefeedbackonthisconsultationwillbeincludedaspartofthepreparationofthedesign,theEnvironmentalImpactStatementandthePlanningApplicationwhichwillbesubmittedtowardstheendof2017toAnBordPleanálafortheirindependentadjudication.AtthatpointAnBordPleanálawillundertakeallnecessarystatutoryconsultations.InOctober2015,IrishWateralsopublisheditsWaterServicesStrategicPlan(WSSP),whichsetsoutstrategicobjectivesforthedeliveryofwaterservicesthroughoutthecountryoverthenext25yearsupto2040.TheWSPiscloselyalignedwithkeyobjectivesoftheWSSPand,sinceitservesmorethan40%ofthepopulationoftheState,itisanimportantcomponentinthedeliveryoftheoverallstrategicplan.

Thequestionof‘Need’relatesnotjusttoprovidingadditionalwatertomeetgrowingdemand,butalsotoprovidingincreasedrobustness,orresilience,intheoverallwatersupplysystem,againstlossofsupply,orcontamination/pollutionevents,orrisksarisingfromclimatechange.

Theresearchworkandpublicconsultationoverthepasttwoyearshasconcludedthatexistingsupplysourcesandinfrastructurefortheregion,donothavethecapacityorresiliencetomeetfuturerequirements.Populationandindustrialgrowthwillgenerateademandforanadditional330millionlitresofwaterperdayby2050(whichistheequivalentof130Olympicsizedswimmingpools).ThepresentinfrastructureisstrugglingtomeetcurrentneedasevidencedbyanumberofsignificantandcostlyoutagesinDublinoverthepast5years.

Publicconsultationhasconsistentlyemphasizedtheimportanceofwaterconservationandofreducingleakage,whichisanationalproblem,andwhichistoohigh.Section5oftheFOARoutlinessignificantprogressmadebyIrishWater,overthepast12months,workingwithcustomerstoreduceleakage.ThewaterdemandprojectionsfortheWSPalreadyincludeambitioustargetsforleakagereduction,andassumethatthesetargetswillbemet.However,whilefixingleaksandwaterconservationinitiativeswillprovidevaluablewatersavings,onwhichwearealreadyrelyingtohelptomeetdemand,thiswillnotprovidealongtermsolutionforourwatersupplyrequirements.

TheWSPrepresentsthefirstmajorcomprehensiveupgradetoIreland’s‘newsource’infrastructureinover60years.ItisakeyelementofIrishWater’soverallnationwideremitasitwillmeetthedomestic,commercialandindustrialneedsofover40%ofIreland’spopulationintothemediumtolong-termfuture(to2050).

Page 4: Eastern and Midlands Region Final Options Appraisal Report ... · Eastern and Midlands Region Final Options Appraisal Report (FOAR) Non Technical ... This Final Options Appraisal

2 | Irish WaterFinalOptionsAppraisalReport(FOAR)-NonTechnicalSummary

Assessing Potential SourcesThe four Options

Overthepasttwoyears,fourtechnicallyviableoptionshavebeenassessed,andrefineddowntotwo.ThefouroptionsconsistedofabstractionfromNorthEasternLoughDerg,withandwithoutMidlandsrawwaterstorage,abstractiondownstreamofLoughDergatParteenBasin,anddesalinationofseawaterinNorthFingal.Thefourwerevalidatedfromanoriginallistof10possibleoptions,examinedpreviouslyduringthe2008–2010period.

ThefourtechnicallyviableoptionswereexaminedinthePreliminaryOptionsAppraisalReport(Nov2015),andrefineddowntotworemainingoptions,underassessmentcriteriawhichincluded:-

TheassessmentsfoundthatthetwoNorthEastLoughDergoptionshadasignificantlygreaterpotentialtoimpactnegativelyontheShannonsystem(fromanenvironmentalperspective)thantheParteenBasinoptionwhichalsohasthepotentialtoprovidemorewidespreadbenefitsalongthepipelinecorridor.

WhileDesalinationremainedasthesecondrankedviableoption,itwasnotedthatitwas‘Dublin-centric’,anddidnotaddresstheproblemsofsmallisolatedwatersuppliesintheMidlands.

ThePreliminaryOptionsAppraisalReport(Nov2015)identifiedabstractionfromtheRiverShannonatParteenBasin(LowerLake),withwatertreatmentlocatednearby,astheEmergingPreferredOption,withDesalinationofseawaterasalesspreferredalternativeoption.Italsoidentifiedapipelineroutecorridorwhichwouldbelikelytohaveleastenvironmentalimpacts.PublicconsultationonthePreliminaryOptionsAppraisalReporttookplacefromNovember2015toFebruary2016.

Environmental factors:

• Biodiversity,FloraandFauna

• Fisheries

• Water

• Air/ClimaticFactors

• MaterialAssets(Energy)

• CulturalHeritage(includingArchitectureandArchaeology)

• LandscapeandVisual

• MaterialAssets(LandUse)

• Tourism

• Population

• HumanHealth

• Soils,GeologyandHydrogeology

Technical and Risk factors:

• Safety

• PlanningPolicy

• EngineeringandDesign

• CapitalandOperatingCosts

• Sustainability

• Risk(includingtechnical,environmental,planning,financialandsocioeconomic)

Page 5: Eastern and Midlands Region Final Options Appraisal Report ... · Eastern and Midlands Region Final Options Appraisal Report (FOAR) Non Technical ... This Final Options Appraisal

3 | Irish WaterFinalOptionsAppraisalReport(FOAR)-NonTechnicalSummary

Feedbackfromthatconsultationprocess,resultsfromcontinuingsurveys,modellingandinvestigations,aswellasassessmentofthetworemainingoptionsusingtheconstraintsandassessmentcriteria,hasleadtotheformalidentificationoftheParteenBasinschemeasthePreferredOption.DetailsoftheprocesseswhichledtothisfindingaresetoutintheFinalOptionsAppraisalReportanditsAppendices.

FurtherdetailsonthebackgroundandimplementationoftheassessmentprocessweresetoutinthePreliminaryOptionsAppraisalReport.

Moving from Two Alternative Options to One Preferred Option Thetwoalternativeoptionswhichhavebeenunderconsiderationare:

1) Abstraction from the Shannon at Parteen Basin (Lower Lake)

ThisoptioninvolvesabstractionatParteenBasin(LowerLake),downstreamofLoughDerg,followedbywatertreatmentnearbyatBirdhill.TreatedwaterwouldbepumpedtoahighpointneartheTipperary-Offalyborder,fromwhereitwouldflowbygravitytoaterminationreservoiratPeamountinsouthDublin.Overalltherewouldbe170kmoftransferpipelines,crossingthecountryinawaythatcandeliver,atselectedlocations,resilientsuppliesoftreatedwatertoothercommunitiesalongtheroutefromParteenBasintoDublin.

WatervolumesabstractedatParteenBasinwouldbecounterbalancedbyanequalvolumereductioninwaterusedforpowergenerationatArdnacrusha,sothatnochangewouldberequiredinnormaloperatingwaterlevelsonLoughDerg,orinminimumstatutoryflowsrequiredintheRiverShannon

(InthePreliminaryOptionsAppraisalReportpublishedinNovember2015,thishademergedastheoptionmostlikelytoprovidethebestandmostwidelybeneficialnewsourceofsupplyfortheEasternandMidlandsRegion).

2) Desalination

ThisoptioninvolvestheabstractionofseawaterfromtheIrishSeainNorthFingalanddesalinationofthiswaterthroughaReverseOsmosis(RO)desalinationplant,togetherwiththedischargeofbrine(fromthetreatmentprocess)backintotheIrishSea.Theprocessincludesthepumpingoftreatedwaterthroughapproximately35kmofpipelinestoexistingandproposedreservoirslocatedinnorthernandwesternpartsofDublin.

Figure 1: Schematic of proposed abstraction at Parteen Basin

Page 6: Eastern and Midlands Region Final Options Appraisal Report ... · Eastern and Midlands Region Final Options Appraisal Report (FOAR) Non Technical ... This Final Options Appraisal

4 | Irish WaterFinalOptionsAppraisalReport(FOAR)-NonTechnicalSummary

Parteen Basin – The Preferred OptionWhileDesalinationistechnicallyviableitissignificantlymoreexpensivethantheParteenScheme,whichalsooffersgreaterbenefitsacrossawiderareainaccordancewithIrishWater’s25yearWaterServicesStrategicPlan(WSSP).DesalinationwouldalsobeDublinfocussed,andwouldnotaddressproblemswithexisting,smallandvulnerableMidlandwatersupplies,whichisanobjectiveinIrishWater’sWSSP.Desalinationalsoposedapotentiallygreaterenvironmentalimpactthroughitsuseofchemicalsandhighenergyconsumption.

ThereforeabstractionofwaterfromtheShannonatParteenBasin(LowerLake)hasbeenidentifiedastheoptionwhichbestmeetstheobjectivesoftheWaterServicesStrategicPlanbecause:-

• Ithas,byfar,theleastenvironmentalimpactofanyoftheShannonoptionswhichhavebeenunderconsideration.ItistheclosestlocationtotheriverestuarywithallofthewaterhavingalreadyflowedthroughtheShannontoParteen.Itcarriesleastriskofenvironmentalimpactandtheprovisionofwatertreatmentatsourcepreventsriskoftransferofpotentiallyenvironmentallydamagingalienspecies,suchasAsianclamsandzebramussels,intootherrivercatchments.

• ThepipelinefromParteenhasthepotentialtoservetreatedwatertomorelocations,townsandcommunitiesalongtheroutefromShannontoDublinthananyotheroption.

• ParteenBasinisalreadyhighlyregulatedbecauseofthepresenceofthehydro-powerplant,andwaterabstractedforsupplywillbecounterbalancedbyacorrespondingreductioninwaterusedinpowergeneration.Theproposedabstractionofwateris,inessence,anabstractionofwaterfromthehydro-powerscheme.Abstractionofwaterfromhydro-electricpowerschemesiscommonlyemployedworldwidetoenableenvironmentallysustainableavailabilityofdrinkingwater

Pipeline Route Corridor

Several2kmwidepotentialpipeline“corridors”wereoriginallyidentifiedandassessedinthePreliminaryOptionsAppraisalReport(POAR).Oneofthesecorridorswasassessedaslikelytohavetheleastimpactoncommunitiesandtheenvironment,andthisistermed‘leastconstrained’.ThiswasofferedforpublicconsultationinthePOAR,andisthecorridorwithinwhichworkhasbeencontinuingoverthepastyeartowardsdevelopingthefinalrouteforthepipeline.

Narrowing the corridor down to 200m.

SinceFebruary2016,IrishWater’sLandownerLiaisonOfficershavebeencontactinglandownerstoverifylandownershipdetailsandarrangepermissionforenvironmentalsurveys.Feedbackfromthisconsultationandtheresultsofenvironmentalsurveys,hasdefinedapreferred200mpipelinecorridor,withintheoriginal2km‘leastconstrainedroutecorridor’,whichagainispositionedforleastimpact.ThisisshownasthepurplelineinFig2below.

Withinthispreferred200mpipelinecorridor,theFinalOptionsAppraisalReportandassociatedmappingalsopositionsanindicative50mpipelinecorridorwithinwhichitwouldbefeasibletolocatethepipelineinwaywhichaccommodatesenvironmental,technicalandgeographicalconstraints.Thisisstillsubjecttoconsultationwiththosewhoselandtheroutewillcrossorpassneartoandisalsosubjecttosomerefinementwithdetaileddesign,whichwillcontinuetoaimfortheleastimpactonpeopleandontheenvironment.

Page 7: Eastern and Midlands Region Final Options Appraisal Report ... · Eastern and Midlands Region Final Options Appraisal Report (FOAR) Non Technical ... This Final Options Appraisal

5 | Irish WaterFinalOptionsAppraisalReport(FOAR)-NonTechnicalSummary

Sustainable abstraction

IrishWaterproposetoenteranagreementwithESB,toreducewaterusedinhydropowergenerationatArdnacrushabyapproximately2%,tooffsetthewatertobeabstractedfromParteenBasinforwatersupply.Theabstractionwouldeffectivelycomefromwaterwhichiscurrentlyusedinhydropowergeneration,andsubsequentlydischargedtothetidalestuary.ThewatertobeabstractedfromParteenBasinwouldrequirenochangeinthenormaloperatingwaterlevelrangeinLoughDerg.MinimumstatutoryflowrequirementsontheRiverShannondownstreamofParteenBasinwouldalsoremainunaffected.

Regional benefit

IntheinterimperiodsincetheProjectNeedReportofMarch2015,IrishWaterhasreviewedthewatersuppliesinapotentiallyBenefittingCorridoraroundthetreatmentplantandtransferpipeline.

Irelandhasover850watertreatmentplants,serving4.6mpeople,comparedtolessthan50inNorthernIreland,serving1.8mpeople,and297inScotland,serving5.2mpeople.Manyofthesewatertreatmentplantsandsupplyschemes,throughoutthecountry,operateineffectiveisolation,withlittlesupportingconnectivitywhichwouldmaintainsuppliesarounddisruptionofasource,ortreatmentplant,orkeysectionoftrunkmain.Ourdispersed,isolatedsourcesandtreatmentplantsarealegacyofplanningat‘countylevel’andwiththeformationofIrishWateranopportunityexistsforconsolidationtoachieveconsistentlyhighstandardsandbenefitsofscalewhicharenowneeded.ThelowyieldofmanysmallMidlandsources,theirvulnerabilitytopollution,theenvironmentalimpactsofover-abstractionevenunderpresentconditions,arealloperationalfactsandtheconsistenttrendinternationallyistowardconsolidationofsuchsupplies.

Figure 2: Proposed 200m pipeline corridor and existing water supplies in potential Benefiting Areas

Page 8: Eastern and Midlands Region Final Options Appraisal Report ... · Eastern and Midlands Region Final Options Appraisal Report (FOAR) Non Technical ... This Final Options Appraisal

6 | Irish WaterFinalOptionsAppraisalReport(FOAR)-NonTechnicalSummary

Community GainIrishWateroriginallysetoutitsapproachtoCommunityGaininSection10ofthePreliminaryOptionsAppraisalReport(Nov2015).ItidentifiedthepotentialforasignificantelementofcommunitygainforthoselivingandworkingintheEasternandMidlandsRegion.

Inadditiontoimprovedandsustainabledomesticandcommercialwatersupplies,thecommunitiesalongtherouteofthepipelinearealsoinapositiontogainsomespecificadditionalbenefits.

Manyproductsandservicesneededduringconstructionwillbesourcedfromlocalbusinesses;theconstructionphaseoftheprojectwillprovidearangeofemploymentopportunitiesforlocalpeople;IrishWater,workingwithLocalAuthoritiesandotherrelevantbodies,proposetoprovidefinancialsupportfortrainingschemestoenableasmanylocalpeopleaspossibletoworkontheproject.IrishWateralsoproposetosupportprojectsthatcontributetowardsachievingtheconservationobjectivesoftheLowerShannonSpecialAreaofConservation(SAC)andtheobjectivesoftheRiverBasinManagementPlans(RBMPs),andthedevelopmentofenvironmentaleducationandprotectioninitiativesandsportsandleisurefacilities.Tothisend,IrishWaterinitsPlanningApplication,willrequestAnBordPleanálatoincludeacommunitygainfundasaplanningconditioninanyplanningpermissionfortheproject.

OfthetworemainingwatersupplyoptionsexaminedintheFinalOptionsAppraisalReport,thePreferredOption(ParteenBasin)hasthepotentialtogiverisetothegreatestbreadthandvarietyofcommunitygainasits170kmpipeline(SeeFigure2)crossesseveralcountieson-routebetweentheShannonandDublin.TheDesalinationOptionbenefitsamuchsmallerarea,anditdoesnotaddresstheneedtoconsolidateexistingwatersuppliesacrosstheMidlandsandEasternRegion,inaccordancewiththeobjectivesoftheWaterServicesStrategicPlan.

MoredetailedinformationoncommunitygaincanbefoundinSection10oftheFinalOptionsAppraisalReport.

IrishWateraimstoconsolidateexistingsmallerwatersourcesofunreliableyield,orelevatedvulnerabilitytopollution,orlowlinkageandresilience,toachievenationallyuniformstandardsofservicefromconsolidated,efficientwatertreatmentplantsandresilientdistributionsystems.Thisisaclearobjectiveinthe25YearWaterServicesStrategicPlan.Consolidatingthatoverallnumber,iskeytoprovidingconsistent,reliablehighqualitywatersuppliestoallcitizensrightacrosstheRegion.

AtthetimeofpreparationoftheProjectNeedReport(March2015),apreliminaryestimateoftherequirementsoftheBenefittingCorridorwasprepared,basedonindividualcounty‘needassessments’preparedbyLocalAuthorities,whichpredatedIrishWater’sassumptionofresponsibilityforoverallNationalWaterResourcePlanning.IntheinterimperiodsincetheProjectNeedReportofMarch2015,IrishWaterhasreviewedtheWSPneed,basedondetailedanalysisandriskassessmentof107existingwatersupplyschemes,basedonthe25-yearrationalisationobjectivesoftheWaterServicesStrategicPlan,whilstaccountingfornecessaryupgradeworkswhichhavehadtoproceedinadvanceoftheWSP,duetopressingwaterqualityissuesatsomelocations,particularlythoseintheEPAsRemedialActionList(RAL).

Thereviewhasalsoconsideredriskfactorssuchaschangingwaterabstractionlegislation,sourcecontamination,possibletransferofgroupwatersuppliesandclimatechange.

Page 9: Eastern and Midlands Region Final Options Appraisal Report ... · Eastern and Midlands Region Final Options Appraisal Report (FOAR) Non Technical ... This Final Options Appraisal

7 | Irish WaterFinalOptionsAppraisalReport(FOAR)-NonTechnicalSummary

The importance of actionTheFinalOptionsAppraisalReportrecommendsthatabstractionfromtheRiverShannonatParteenBasinis,subjecttopublicconsultationandanynecessaryfurtherresearch,takenforwardtoaPlanningApplicationforthefollowingreasons:-

i. ThepopulationoftheDublinWaterSupplyArea,onrealisticplanningscenarios,willrisefrom1.52mpeopleat2011,to2.15mby2050.ThepopulationofthepotentialBenefitingCorridoraroundatreatedwaterpipeline,routedacrosstheMidlands,wouldrisefrom0.53mat2011,toapproximately0.68mby2050.

ii. TheprincipalwaterabstractionandtreatmentcentresontheRiverLiffey,atLeixlipandBallymoreEustace,havebeendevelopedoverdecadesoninfrastructureoriginallyprovidedinthe1940sand1960sand,inthecaseoftheVartryReservoir,oninfrastructuredatingfromthe19thcentury.TheWaterSupplyProjectrepresentsthefirstmajorcomprehensiveupgradetoIreland’s‘newsource’infrastructureinover60years.

iii. TheexistingwatersupplysourcesservingtheDublinWaterSupplyAreacancurrentlysupply600-623Mldatfullproductioncapacityunderstressedconditions,againstcurrentaveragedaydemandof550-575Mld.Wheninternationalnormsofprovisionforpeaks,andheadroomareapplied,theshorttermposition,withoutproperplanning,isoneofincreasingdifficultyforreliablymeetingwaterrequirements.Actionisthereforerequiredtoprovidenormalinternationalwaterutilitystandardsofservice.

iv. IntheEastandMidlandsRegion,IrishWater,workingwithcustomers,hasalreadysaved26Mldindomesticleakageoverthepasttwelvemonths.ThecalculatedwaterrequirementfortheWaterSupplyAreaandBenefitingCorridoralreadyassumesthatambitiousleakagerecoverytargetswillbemet(bothonthecustomersideandonthemainsnetwork).However,thereductionofleakagealonewillnotmeettheoverallneed.Therequirementistobothminimisewaterdemandandtodiversifyriskfromoverdependenceonexistingsources.

v. TheoriginalProjectNeedReport,whichincludedanindependentreviewbyIndeconEconomistshasunderlinedthestrategicimportanceofsecure,highqualitywatersuppliesforthekeyexportingsectorsoftheIrisheconomy.Ithasexaminedthecoststotheeconomyofwatersupplydisruptionandthenegativeimpactsofsupplysystemswhichfallshortofinternationalnormsofresilienceandreliability.Indeconhavehighlightedthe“verysignificantnegativeemploymentimpactsifadequatewatersupplyisnotavailabletomeettheneedsofindigenousandoverseasbusinesses”.IDAhavealsoemphasisedtheimportanceofresilientwatersupplies,notonlyfornewindustryconsideringlocatinginIreland,butalsoforthosealreadyestablishedhereandconsideringexpansion.

vi. Waterdemandprojectionshavebeenindependentlydeveloped,byIndeconandbytheProjectEngineeringAdvisers,inconjunctionwithIrishWater.Mostrecentavailabledatafromthemeteringprogrammeondomesticconsumptionhasbeenused,econometricmodellingofindustrialwaterrequirementsacrosseachsectoroftheeconomyhasbeenusedandinternationaltrendsinindustrialwaterusagehavebeenidentifiedandincludedinprojections.

vii.‘DoMinimum’optionsintheabsenceoftheWSPprojectarelikelytobeexpensive,disruptiveandpiecemealinnaturewithoutdecisivelyaddressingtherisksintheabsenceofanewWaterSupplyScheme.

Page 10: Eastern and Midlands Region Final Options Appraisal Report ... · Eastern and Midlands Region Final Options Appraisal Report (FOAR) Non Technical ... This Final Options Appraisal

8 | Irish WaterFinalOptionsAppraisalReport(FOAR)-NonTechnicalSummary

viii.Optionshavebeenassessedwiththesupportofenvironmentalandgeotechnicalsurveys.Apreferredoptionofabstractionof330MldfromtheRiverShannonatParteenhasbeenidentified.ThisissustainableandwillbesupportedbyanAgreementunderstatutetobenegotiatedwithESBwhichwillreducewaterusageinhydropowergeneration,measureformeasure,withwaterabstractedforwatersupply.

ix. IrishWater,inlookingatthewaterrequirementsfromanewsource,hastakenanationalperspectiveandisexaminingthecontributionofanewsourcetotheresilienceofthecollectivesourcesservingtheEasternandMidlandsareasofIreland.Itisexpectedthat,overtime,morethan100publicwatersuppliesintheregion,dependentuponsmallvulnerablesources,willbeconsolidatedtolessthan30%ofthisnumber,supportedbytheWaterSupplyProject.Thisisaccordinglyanationallystrategicproject.

Moving to a Planning ApplicationAteachofthethreepreviousstagesoftheprocessofidentifyingapreferredoption,publicparticipationinthedecisionmakingprocesshastakenplace,andtheviewsofallinterestedpartiesareagaininvitedonthefindingsoftheFinalOptionsAppraisalReport(FOAR),andalsoonthescopingofenvironmentalimpactassessmentworkfromthispointonwards.

Public ConsultationAfourteenweekpublicconsultationprocessfollowsthepublicationoftheFOAR.Duringthisperiod,IrishWaterisalsoconsultingontheScopeofanEnvironmentalImpactStatement(EIS)onthePreferredOptionofabstractionfromtheShannonatParteen.Thisprocessisopentoeveryone,andthetermsofreferencefortheFOARandEISScopingReportpublicconsultationare:

• IsthereanyadditionalinformationthatshouldbeconsideredinthedevelopmentofthePreferredScheme?

• ArethereanyadditionalenvironmentalissuesoralternativemethodologiesthatshouldbetakenintoconsiderationinpreparingtheEIS?

• HowwouldyoulikeIrishWatertocommunicatewithyouastheprojectprogressestowardsplanningapproval?

IrishWateralsowelcomeallrelevantsubmissionsontheproject.Theclosingdateforreceiptofsubmissionsis14February2017.

Thefeedbackonthisconsultationwillbeincludedaspartofthepreparationofthedesign,theEnvironmentalImpactStatementandPlanningApplicationwhichwillbesubmittedtowardstheendof2017toAnBordPleanálafortheirindependentadjudication.AtthatpointAnBordPleanálawillundertakeallnecessarystatutoryconsultations.

Forfurtherinformation,questionsortomakeasubmissionyoucanvisit:www.watersupplyproject.ieorcontactuson1890252848watersupply@water.ieorbypostbyposttoWaterSupplyProject,MerrionHouse,MerrionRoad,Dublin4.

TherewillalsobeaseriesofPublicOpenDaysinthestudyareawhichwillbeadvertisedonlocalradioandpress.Moredetailontheseeventsareavailableonthewebsite.