    East San Fernando Valley Transit CorridorProject Information Meetings November 2014

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    2/41

    2

    Purpose of Todays Meeting

    Provide project update

    Share alternatives being studied

    Answer questions

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    3/41

    Project Background

    Measure R Project

    $170.1 million identified in the Long Range

    Transportation Plan Environmental Analysis underway

    ! Process initiated in 2011! Initial Study Alternatives identified in 2013

    ! Refined Alternatives throughout 2014

    3

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    4/41

    Study Partners

    Federal Transit Administration lead on federal

    clearance

    Metro lead on state clearance

    Coordinating with Cities of Los Angeles and San

    Fernando

    4

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    5/41

    Typical Roadway Conditions

    100 right-of-way

    80 intersections

    Two to three travel lanes in eachdirection

    Left turns permitted throughout

    Street parking

    Landscaped median (Pacoima)

    5

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    6/41

    Study Area and CorridorCharacteristics

    9.2 Mile Alignment: Metro Orange Line to Sylmar/SanFernando Metrolink Station

    460,000 People reside in the Study Area! Long Beach, CA. 462,000

    ! Atlanta (City), GA. 420,000

    ! Miami (City), FL. 399,000

    35% Transit Dependent Population Average bus trip is 4.7 miles

    Averages bus speed ~12 mph in PM peak 7th busiest bus corridor in Metro system 2nd highest bus boardings in the SFV

    Source: Metro and U.S. Census 2010, State & County QuickFacts

    6

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    7/41

    RECORD OFDECISION/NOTICE OF

    DETERMINATION

    OperationConstruction

    4

    5

    Project Development Process

    5 Phases

    AlternativesAnalysis

    Completed

    Jan. 2013

    1Engineering

    EnvironmentalStudies (EIS/

    EIR) &

    ConceptualEngineering

    23

    2 Environmental Studies Phase

    DRAFT EIS/

    EIR

    SELECTLOCALLY

    PREFERREDALTERNATIVE

    FINALEIS/EIR

    EIS/EIR

    SCOPING

    Ongoing Public Participation

    We AreHere

    7

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    8/41

    Environmental Issues to be Studied

    Transportation

    Land Use & Development

    Real Estate & Acquisitions

    Communities & Neighborhoods

    Visual & Aesthetics

    Air Quality

    Noise & Vibration

    Ecosystems & Biological

    Resources

    Geotechnical/Seismic/HazardousMaterials

    Water Resources

    Energy Historical, Archaeological &

    Paleontological Resources Parklands & Community

    Facilities Economic & Fiscal Development Safety & Security Construction Impacts Growth Inducing Impacts Environmental Justice Climate Change Cumulative Impacts

    8

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    9/41

    How did we get here?

    20132011 2012Refine

    Alternatives

    Scoping Mtgs.

    AAReport

    InitialStudies

    October April October NovemberMarch

    EnvironmentalProcess Begins

    No Build TSM

    Streetcar Bus

    29 Alternatives

    Rail

    8 Alternatives 5 Alternatives

    May

    9

    2014Low-Floor LRT/Tram

    is introduced

    6 Alternatives

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    10/41

    Alt. 1

    Curb-RunningBRT

    10

    Similar to Wilshire BRT

    9.2 miles total length:

    ! 6.7 miles curb-running dedicated busway

    ! 2.5 miles mixed-flow

    18 enhanced stations:

    ! Ticket Vending Machines

    ! Canopies

    Existing Maintenance Facility :

    ! Division 15

    Could be implemented soonest and with existingfinancial resources

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    11/41

    Alt. 2

    Median-Running

    BRT

    11

    Similar to Metro Orange Line

    9.2 miles total length:

    ! 6.7 miles median busway and 2.5 miles mixed-flow

    17 enhanced stations:

    ! Ticket Vending Machines

    ! Canopies

    Existing Maintenance Facility:

    ! Division 15

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    12/41

    Alt . 3

    Median-Running

    Low-Floor LRT/Tram

    12

    Similar San Diego, Portland and Europeansystems

    9.2 miles total length:

    ! 6.7 miles median dedicated guideway

    ! 2.5 miles mixed-flow

    28 enhanced stations:

    ! Ticket Vending Machines

    ! Canopies

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    13/41

    Alt. 4

    Median-Running

    LRTSimilar to existing Metro LRT Lines 9.2 miles total length:

    ! 6.7 miles median dedicated guideway

    ! 2.5 miles underground

    ! 2.5 miles on railroad right-of-way

    ! Adjacent to San Fernando Road

    14 enhanced stations (3 underground):

    ! Ticket Vending Machines

    ! Canopies

    13

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    14/41

    Requires new Maintenance Storage

    Facility

    ! 25-30 acre site

    ! Within #mile of route

    ! Three candidate areas identified

    Maintenance Storage Facility

    14

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    15/41

    Van Nuys at Metro Orange Line

    Before

    15

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    16/41

    Median-Running BRT at Van Nuys/MOLConceptual

    After

    16

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    17/41

    Van Nuys Civic Center

    Before

    17

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    18/41

    Low-Floor LRT/Tram at Van Nuys CivicCenterConceptual

    After

    18

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    19/41

    Van Nuys at Victory

    Before

    19

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    20/41

    LRT at Van Nuys/VictoryConceptual

    After

    20

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    21/41

    Add Median running Tram

    rendering at Marvin

    Braude or Panorama High

    Van Nuys at Roscoe

    Before

    21

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    22/41

    Curb-Running BRT at Van Nuys/RoscoeConceptual

    After

    22

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    23/41

    Van Nuys at Laurel Canyon

    Before

    23

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    24/41

    Median-Running BRT at Van Nuys/LaurelCanyon - Conceptual

    After

    24

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    25/41

    Rail Road Tracks at Paxton

    Before

    25

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    26/41

    LRT at Rail Road Tracks/PaxtonConceptual

    After

    26

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    27/41

    San Fernando at Maclay

    Before

    27

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    28/41

    Low-Floor LRT/Tram at San Fernando/Maclay Conceptual

    After

    28

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    29/41

    Rail Road Tracks at Maclay

    Before

    29

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    30/41

    LRT at Rail Road Tracks/MaclayConceptual

    After

    30

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    31/41

    Three Route Options

    31

    Truman St.

    San Fernando Rd.

    Truman St.

    San Fernando Rd.

    Railroad Tracks Railroad Tracks

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    32/41

    Considerations for Comparison

    32

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    33/41

    Projected 2040 Average Speed (MPH)

    0

    5

    10

    15

    20

    25

    No Build Alt 1 - Curb-Running BRT Alt 3 - Low-Floor LRT/Tram

    33

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    34/41

    Projected 2040 Travel Time (Minutes)

    No Build

    TSM

    Alt 1 - Curb-Running BRT

    Alt 2 - Median-Running BRT

    Alt 3 - Low-Floor LRT/Tram

    Alt 4 - LRT

    20 30 40 50Minutes

    34

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    35/41

    Projected 2040 Corridor Boardings

    0

    10,000

    20,000

    30,000

    40,000

    50,000

    60,000

    No Build Alt 1 - Curb-Running BRT Alt 3 - Low-Floor LRT/Tram

    35

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    36/41

    Projected 2040 Corridor Boardings

    0

    10,000

    20,000

    30,000

    40,000

    Alt 1 - Curb-Running BRT Alt 2 - Median-Running BRT Alt 3 - Low-Floor LRT/Tram Alt 4 - LRT

    Premium Service BoardingsMetro Local Line 233 (or 233X in Alt1)Non-project Transit Boardings

    36

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    37/41

    FundsReserved$170,000,000

    $0.0

    $3,000,000,000.0

    No Build Alt 1 - Curb-Running BRT Alt 3 - Low-Floor LRT/Tram

    $35 Million

    Capital Costs: 2014 Dollars

    37

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    38/41

    US Mail:

    Walt Davis, Project ManagerOne Gateway Plaza - MS 99-22-5Los Angeles, CA 90012

    Phone: (818) 276-3233

    E-mail: [email protected]

    www.metro.net/eastSFVtransit

    Facebook: EastSFVtransit

    Twitter: @eastSFVtransit

    We Want to Hear from You

    38

    http://www.metro.net/eastSFVtransitmailto:[email protected]
  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    39/41

    Meetings

    November 6, 2014 (Thursday) at 6:00 PM

    ! San Fernando Aquatic Center, 208 Park Ave, San Fernando

    November 12, 2014 (Wednesday) at 4:30 PM

    ! Marvin Braude Constituent Center, 6262 Van Nuys Bl, Van Nuys, CA!Webcast http://ustream.tv/channel/eastsfv

    November 13, 2014 (Thursday) at 6:00 PM

    ! Pacoima Neighborhood City Hall, 13520 Van Nuys Blvd, Pacoima

    39

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    40/41

    Next Steps

    Review comments received at these meetings

    Continue preparation of the Draft EIS/EIR/Technical Studies

    40

  • 8/10/2019 East San Fernando Valley Transit Corridor presentation

    41/41

    Questions

    Q & A