EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands of Rupees. 1 2 3 4 5 6 7 8 WORKS IN PROGRESS WALTAIR DIVISION 1 05-06 Provision of combined guard and crew booking office at VSKP. DF3 4575 4428 0 147 2 07-08 Provision of 3 spurs to facilitate berthing of ARMV( 120M)/ ART (250M) and Pilgrim siding 250M at VSKP. CAP 4999 3798 0 1201 3 07-08 Simhachalam North - RYD - Waltair Marshalling Yard - Conversion of reception line into single line status CAP 9072 4263 2000 2809 4 08-09 Electrification of line nos. 8,9 & 10 in connection with island platform between line nos. 7 & 8 at VSKP. DF3 4578 388 1 4189 5 09-10 Development of circulating area of TP/1 at VNCW Goods shed by concreteing the existing surface DF3 26000 19008 1 6991 6 09-10 PDU: Provision on sand hump for common loop R/4 at PDU towards VSKP end. DF3 6375 1547 1 4827 7 09-10 TIU: Provision on sand hump for common loop R/1 at TIU towards VSKP end. DF3 6348 2177 1 4170 8 09-10 PUN: Provision on sand hump for common loop R/4 at PUN towards VSKP end DF3 6359 3657 1 2701 9 09-10 Provision of isolation near UP home signal No.09(R-V UP Vijaya Nagaram to isolate VZM yard for escaping of Vehicles / WAG over suiting from RV direction into VZM Yard.) DF3 9191 3729 1 5461 10 CAP 11680 3718 0 7962 EBR 13972 0 13972 0 11 11-12 Conversion of S.E dispatch line at WMY into single line status CAP 5748 619 4500 629 12 11-12 Provision of shunt signals at RGDA,SPRD,LKMR,KKGM & KTGA CAP 3844 320 1000 2524 13 11-12 Provision of reception & dispatch signals for Line no. 5 at Bacheli/RYD CAP 1996 123 1250 623 14 11-12 Development of circulating area adjacent to Line No. 6 at JDB goods shed DF3 9924 6208 1 3715 15 CAP 7956 250 3000 4706 CRRM(-) 600 16 12-13 Replacement of AC sheet roofs of cabins A to J in WAT Marshalling Yard. DRF 5225 1091 3700 434 17 12-13 Provision of sand hump at LKMR R/1 towards RGDA end. DF3 2397 0 1 2396 KHURDA ROAD DIVISION 18 06-07 MRDL: Provision of FOB. DF3 3363 0 11 3352 19 07-08 RCTC: Provision of FOB. DF3 2674 8256 0 -5582 20 07-08 GRKN: Provision of FOB. DF3 5069 3970 10 1089 21 07-08 BDBA: Provision of FOB. DF3 5762 4049 10 1703 Item no.LB 14-15 Year of inclusion Particulars of work Allocation Latest Anticipated Cost PH-16( Traffic Facilities) 10--11 Electrification of left over lines at R & D yard of Vishakhapattnam Port Trust 11-12 Conversion of OEC/WMY Line no. 13 into full length & bi-directional with full OHE. Cum. Expr upto Mar-14 Outlay 14-15 Balance to Complete 1
56

EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

Nov 26, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

WORKS IN PROGRESS

WALTAIR DIVISION

1 05-06 Provision of combined guard and crew

booking office at VSKP.

DF3 4575 4428 0 147

2 07-08 Provision of 3 spurs to facilitate berthing of

ARMV( 120M)/ ART (250M) and Pilgrim

siding 250M at VSKP.

CAP 4999 3798 0 1201

3 07-08 Simhachalam North - RYD - Waltair

Marshalling Yard - Conversion of reception

line into single line status

CAP 9072 4263 2000 2809

4 08-09 Electrification of line nos. 8,9 & 10 in

connection with island platform between line

nos. 7 & 8 at VSKP.

DF3 4578 388 1 4189

5 09-10 Development of circulating area of TP/1 at

VNCW Goods shed by concreteing the

existing surface

DF3 26000 19008 1 6991

6 09-10 PDU: Provision on sand hump for common

loop R/4 at PDU towards VSKP end.

DF3 6375 1547 1 4827

7 09-10 TIU: Provision on sand hump for common

loop R/1 at TIU towards VSKP end.

DF3 6348 2177 1 4170

8 09-10 PUN: Provision on sand hump for common

loop R/4 at PUN towards VSKP end

DF3 6359 3657 1 2701

9 09-10 Provision of isolation near UP home signal

No.09(R-V UP Vijaya Nagaram to isolate

VZM yard for escaping of Vehicles / WAG

over suiting from RV direction into VZM

Yard.)

DF3 9191 3729 1 5461

10 CAP 11680 3718 0 7962

EBR 13972 0 13972 0

11 11-12 Conversion of S.E dispatch line at WMY into

single line status

CAP 5748 619 4500 629

12 11-12 Provision of shunt signals at

RGDA,SPRD,LKMR,KKGM & KTGA

CAP 3844 320 1000 2524

13 11-12 Provision of reception & dispatch signals for

Line no. 5 at Bacheli/RYD

CAP 1996 123 1250 623

14 11-12 Development of circulating area adjacent to

Line No. 6 at JDB goods shed

DF3 9924 6208 1 3715

15 CAP 7956 250 3000 4706

CRRM(-) 600

16 12-13 Replacement of AC sheet roofs of cabins A to

J in WAT Marshalling Yard.

DRF 5225 1091 3700 434

17 12-13 Provision of sand hump at LKMR R/1 towards

RGDA end.

DF3 2397 0 1 2396

KHURDA ROAD DIVISION

18 06-07 MRDL: Provision of FOB. DF3 3363 0 11 3352

19 07-08 RCTC: Provision of FOB. DF3 2674 8256 0 -5582

20 07-08 GRKN: Provision of FOB. DF3 5069 3970 10 1089

21 07-08 BDBA: Provision of FOB. DF3 5762 4049 10 1703

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

PH-16( Traffic Facilities)

10--11 Electrification of left over lines at R & D yard

of Vishakhapattnam Port Trust

11-12 Conversion of OEC/WMY Line no. 13 into full

length & bi-directional with full OHE.

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

1

Page 2: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

22 08-09 BDPK ; Provison of 1st FOB at Budhapank

(BDPK) station in NRG-TLHR section.

DF3 3608 0 10 3598

23 09-10 KASR : Provision of New Foot Over Bridge. DF3 7174 4429 10 2735

24 09-10 JRZ: Provision of New Foot Over Bridge. DF3 7043 4046 10 2987

25 09-10 Provision of PTFE neutral section at HWH

end of KNPR station in lieu of insulated over

lap of KNPR/TSS.

OLWR 4838 3287 0 1551

26 09-10 SCPR: Provision of New Foot Over Bridge. DF3 5146 557 10 4579

27 10--11 Proposal for the provision of one stabling line

by the side of line no. 1 A at Puri(PUI)

CAP 16300 4177 5870 6253

28 10--11 Proposal for the development of

loading/unloading surface and approach road

with concrete pavement at Bhadrak Goods

Shed

DF3 35328 19203 2910 13215

29 10--11 Proposal for removal of diamond crossing at

VSKP end of Palasa (PSA) yard

DF3 8973 2106 0 6867

30 10--11 Provision of cover shed on the Goods

Platform at Bhadrak(BHC) station.

DF3 9970 3321 10 6639

31 10-11 Proposal for conversion of line no. 9 & 10 as

running lines with connectivity at HWH end of

Palasa(PSA) yard

DF3 9553 6148 1 3404

32 11-12 CAP 9627 0 7000 2627

CRRM (-) 1577 0 1577

33 11-12 Provision of First FOB at Kandarpur(KDRP)

station in CTC-PRDP branch line section

DF3 7077 2847 10 4220

34 12-13 Banker Siding at Dhenkanal(DNKL) CAP 18344 2000 8000 8344

35 12-13 Provision of IBS signal in between RJGR &

JRZ in NRG-TLHR branch line section of

KUR division.

CAP 24187 369 12125 11693

36 12-13 2 Additional stabling lines in BBS coaching

complex.

DF3 9988 1529 1300 7159

37 12-13 2nd additional stabling line at PUI DF3 9998 1010 100 8888

38 12-13 Provision of one cross over in between R3 &

R2 at MCS end to have additional access to

coaching complex without interfereing main

line.

DF3 9990 1498 1 8491

39 12-13 Provision of one cross over in between R4 &

R5 as well as R4 & R3 to enhance the CAL

of R2 & R4 at VSKP end of BBS Yard.

DF3 9993 114 1 9878

40 12-13 Provision of one cross over with ORL at

VSKP end to increase the CAL of R1 & to

ease the curvature sallon siding of BBS

Yard.

DF3 9998 272 1 9725

41 12-13 TLHD: Provision of Ist FOB . DF3 7383 0 4751 2632

42 12-13 IBS between Budhapank-Mermandali stations

on Rajathgarh-Talcher section

CAP 24300 0 10000 14300

Easing of sharp curvature by shifting of

crossover (Point No. 78 A & 80) for smooth

entry and exit in coaching complex of Route

20 & 21 at Puri yard

2

Page 3: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

43 12-13 IBS between Hindol Road and Sadashibpur

stations on Rajathgarh-Talcher section

CAP 24300 0 10000 14300

44 12-13 IBS between Sadashibpur and Dhenkanal

stations on Rajathgarh-Talcher section

CAP 24300 5119 10000 9181

45 12-13 Provision of Auto signaling in Talcher Road

and Budhapank stations on Rajathgarh-Angul

section

CAP 23469 0 10000 13469

46 12-13 Provision of block hut in Barang-Naraj section

of Khurda Raod division to facilitate Double

line working with Naraj section and single line

working with Barang station.

DF3 23700 0 100 23600

47 12-13 Provisionn of permissible Auto Block

signalling in Talcher Road-Angul section.

DF3 24400 0 500 23900

48 12-13 BHC- Shifting of existing neck for 6.5 m by

widening the proposed loading/unloading

surface to keep future provision of 4th line

DF3 6513 0 500 6013

49 13-14 IPM: Extension of PF No.2 with relocaton of

goods loop crossover at IPM Staton.

DF3 24440 0 1 24439

50 13-14 JJKR: Extension of PF-1 & 2 with relocation

of crossover.

DF3 20033 0 1 20032

51 13-14 BUDR-KED : Provision of IBS in BHC-kIS

man line section.

DF3 20783 0 100 20683

52 13-14 MZZ-BTV : Provision of IBS in BHC-KIS main

line section.

DF3 20783 0 100 20683

53 13-14 KIS-BYY : Provision of IBS in BHC-KIS main

line section.

DF3 20659 0 100 20559

54 13-14 Provision of Block cabin between RBA-HMA

station at Km. 561.0 on HWH-MAS Trunk

Route

DF3 3612 0 1432 2180

SAMBALPUR DIVISION

55 08-09 Improvement to goods terminal by provision

of 3 nos. of high masts tower lighting

arrangement at each goods shed of Lapanga

(LPG) station & Mahasamund (MSMD)

station.

DF3 4962 3516 1 1445

56 09-10 MNDH: Provision of Shunting neck 686 m

length .

CAP 17800 10063 0 7737

57 09-10 KSNG : Improvement of existing goods siding

at KSNG along with extension of DMU siding

to accommodate 15 coach length DMU.

DF3 9909 13325 0 -3416

58 10--11 Development of terminal facility beside

existing goods siding / Line No.5 at Bolangir.

CAP 3721 2290 1431 0

59 10--11 Provision of signaling arrangement for direct

reception and dispatch of trains to/from Line

No.4 at Bargarh Road .

CAP 9845 11015 4131 -5301

60 12-13 Extension of existing lin No. 4 at BMCK

station

DF3 8944 812 1 8131

3

Page 4: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

61 10-11 Provision of Common loop in UP grid at

Ambodala(AMB) station

CAP 9290 3562 1403 4325

62 14-15 Works costing below Rs.30 lakhs each

WAT Division CAP 1000

DF3 0

DRF 1000

OLWR 0

KUR Division CAP 1500

OLWR 0

DRF 2300

DF3 0

SBP Division CAP 790

DF3 0

DRF 500

OLWR 0

CAP 250778 51686 95000 107382

DRF 5225 1091 7500 434

DF3 432575 122150 12000 298425

OLWR 4838 3287 0 1551

EBR 13972 0 13972 0

TOTAL 707388 178214 128472 407792

NEW WORKS

KHURDA ROAD DIVISION

63 14-15 IPM(1), JPI(1), SPT(1) & BAV(2): Provision of

Gate lodges.

DRF 6543 0 200 6343

64 14-15 BSDP, GNGD, KIT & JNP: Provision of gate

lodges (one at each station).

DRF 5389 0 200 5189

65 14-15 PURI:-Provision of Hand Plunger Locks

(HPL) in coaching complex.

DF3 3564 0 300 3264

66 14-15 Works costing below Rs.30 lakhs each

CAP 1000

DRF 500

DF3 400

CAP 1000

DRF 500

DF3 400

CAP 1000

DRF 200

DF3 400

CAP 2000

DRF 400

DF3 500

Sub Total - New Works CAP 0 0 5000 0

DRF 11932 0 2000 11532

DF3 3564 0 2000 3264

CAP 250778 51686 100000 107382

DRF 17157 1091 9500 11966

DF3 436139 122150 14000 301689

OLWR 4838 3287 0 1551

EBR 13972 0 13972 0

Total 722884 178214 137472 422588

PH-16 (TRAFFIC FACILITIES, YARD

REMODELLING & OTHERS)

Grand Total

SUB TOTAL -

WORKS IN PROGRESS

WAT Division

KUR Division

SBP Division

Reserve with HQ.

4

Page 5: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

PH-17( COMPUTERISATION)

WORKS IN PROGRESS

WALTAIR DIVISION

67 10-11 PRS/Madhurawada DF1 600 0 0 600

68 10-11 Provision of PRS facility at Gunupur,SO,

Dist.-Rayagada.

DF1 400 0 0 400

69 PRS at Malkangiri mukhya dakagahara. DF1 400 0 0 400

70 12-13 Replacement of PRS Equipment of WAT

division

DRF 1339 1019 376 -56

71 12-13 Replacement of UTS Equipment of WAT

division

DRF 4880 2133 3232 -485

72 India post PRS facility at Rajam sub PO( Dt.

Srikakulam/AP).

DF1 0 0 0

KHURDA ROAD DIVISION

73 04-05 Computerisation of Drawing office of

MCSW.

DF3 1500 0 0 1500

74 07-08 PRS facilities at Post Ofiice situated in the

campus of Utkal University

DF1 600 0 10 590

75 07-08 PRS facilities at KIIT University Campus,

Bhubaneswar

DF1 600 0 10 590

76 07-08 PRS facilities to be provided at Post Office

,ASKA.

DF1 600 0 10 590

77 10-11 Provision of PRS facility at Bhanjanagar,HO,

Dist.-Ganjam

DF1 400 0 0 400

78 10-11 Provision of PRS facility at old Town,

Bhubaneswar.

DF1 400 0 0 400

79 10-11 PRS facilities in the Post office at

Anandpur,MGD P.O ,Distt-Keonjhar ,Orissa

DF1 400 0 0 400

80 10-11 PRS facilities in the Post office at Brahmapur

Head P.O ,Distt-Ganjam ,Orissa

DF1 400 0 0 400

81 11-12 India Post PRS facility at Athamallik DF1 400 0 0 400

82 12-13 Replacement of UTS Equipment of KUR

division

DRF 3896 2255 1931 -290

83 12-13 Replacement of PRS Equipment of KUR

division

DRF 2993 1298 1994 -299

SAMBALPUR DIVISION

84 03-04 MMS for P Way Materials in SBP division CAP 1500 0 0 1500

85 05-06 UTS at Bolangir DF1 800 0 0 800

86 10-11 Provision of PRS facility at Junagarh, Dist.-

kalahandi.

DF1 400 0 0 400

87 11-12 India Post PRS facility at Patnagarah DF1 400 0 0 400

88 11-12 India Post PRS facility at

Rajborasambar(Padmapur)

DF1 400 0 0 400

89 PRS at Phulbani(DHQ NRH) DF1

90 03-04 PRS at Debagarh(DHQ NRH) DF1 500 0 0 500

5

Page 6: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

91 03-04 PRS at Boudh(DHQ NRH) DF1 1000 0 0 1000

92 04-05 PRS at Bhawanipatna(DHQ NRH) DF1 4974 0 10 4964

93 04-05 PRS at Sonapur(DHQ NRH) DF1 24879 0 10 24869

94 05-06 PRS at Nawapada Road(DHQ RH) DF1 100 0 20 80

95 12-13 Replacement of UTS Equipment of SBP

division

DRF 1815 1815 0 0

96 12-13 Replacement of PRS Equipment of SBP

division

DRF 2080 442 1927 -289

Headquarters

97 03-04 Computerisation of A/C office & networking of

CEE's office.

OLWR 500 0 0 500

98 03-04 Office automation & networking of FA &

CAO's office

OLWR 1000 0 0 1000

99 04-05 Implementation of Material Management

Information system(MMIS) in Stores dept(

COS office and Depots) & Accounts Dept(

Stores Accounts section)

DF3 4974 0 0 4974

100 04-05 East Coast Railway -Unreserved ticketing

system( under Railway board)

DF1 24879 0 0 24879

101 05-06 PRS terminals at Dy.CAO/TA/ECoR DF1 100 0 5 95

102 06-07 PRS Unit including database cell at Zonal

head quarter at BBS

DF1 843 0 50 793

103 06-07 East Coast Railway- Unification of passenger

reservation system & unreserved ticketing

system network and creation of Zonal

network hubs.

DF1 15947 0 75 15872

104 08-09 Replacement of 63 Ticket Printers of PRS

units of East Coast Railway

DRF 359 0 0 359

105 09-10 Replacement of Report Printers (25 nos) and

Ticket Printers (75 nos) of 17 UTS Phase-I

stations of ECoR.

DRF 909 0 184 725

106 09-10 Replacement of 66 Dumb Terminals with key

boards at PRS units of East Coast Railway

772 0 0 772

107 09-10 Replacement of 9.6 Kbps/64 Kbps channels

by 2 Mbps channels in respect of PRS Units

of A1,A & B Category stations of East Coast

Railway.

DRF 3005 0 0 3005

108 11-12 Procurement of TSS equipments for TMS PH-

I under replacement

DRF 4190 3828 0 362

109 13-14 Proposal for procurement of TSS CMS DRF 4747 0 0 4747

110 14-15 Reserve with HQ. DRF 10356

DF1 0

SUB TOTAL-WORKS IN PROGRESS DRF 30213 12790 20000 7779

DF1 80422 0 200 80222

DF3 6474 0 0 6474

OLWR 1500 0 0 1500

CAP 1500 0 0 1500

6

Page 7: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

111 14-15 Procurement of PRS peripheral equipment of

PPM cell,EQ cell , Database cell Cum

Console,and reservation office/Railkunj on

Replacement account

DRF 414 0 400 14

112 14-15 Procurement of 68PCs,27

DMTPrinter,68UPSs & 1 Line Printer under

Law Book PH-17 for Eco HQ & three

divisions (KUR,SBP & WAT) under

replacement acco

DRF 3477 0 1000 2477

113 14-15 Procurement of PRS peripheral equipment of

KUR division on Replacement account

DRF 1785 0 1000 785

114 14-15 Procurement of UTS peripheral equipment of

KUR division on Replacement account

DRF 4920 0 2000 2920

115 14-15 Procurement of PRS peripheral equipment of

SBP division on Replacement account

DRF 779 0 600 179

116 14-15 Procurement of UTS peripheral equipment of

SBP division on Replacement account

DRF 4437 0 2000 2437

117 14-15 Procurement of PRS peripheral equipment of

WAT division on Replacement account

DRF 1025 0 1000 25

118 14-15 Procurement of UTS peripheral equipment of

WAT division on Replacement account

DRF 4820 0 2000 2820

119 14-15 Reserve with HQ. DRF 0

DF1 100

DF3 100

Sub Total- New Work DRF 21657 0 10000 11657

DF1 0 0 100 0

DF3 0 0 100 0

DRF 51870 12790 30000 19436

DF1 80422 0 300 80222

DF3 6474 0 100 6474

OLWR 1500 0 0 1500

CAP 1500 0 0 1500

WORKS IN PROGRESS

All divisions

120 12-13 Provision of Rubberised road surfaces on

manned LCs on trial basis

WAT Division SF 0 0 0

KUR Division SF 3389 0 0

SBP Division SF 1896 1000 0

WALTAIR DIVISION

121 09-10 Provision of MACLS in lieu of Semaphore

Signal at L.C Gates in R.V Line .

SF 23545 21573 300 1672

NEW WORKS

PH 17 COMPUTERISATION

GRAND TOTAL

PH-29 ( Road Safety Works-LCs)

7

Page 8: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

122 09-10 Manning of 02 (Two) nos Unmanned L-Xings

no RV-329 at Km 442/8 &KK-82 at Km 293/2-

3 .

SF 4488 1943 0 2545

123 10--11 Waltair Division-Electrical lifting barriers at

interlocked Level crossing gates (27 nos)

SF 19542 11552 1200 6790

124 10--11 Provision of independent telephonic

communication to manned L.C. Gates (34

Nos.) in WAT Divn.

SF 2371 1224 0 1147

125 11--12 Provision of Auto changeover to interlocked

L.C gates (47) and to way side station (25 no)

in main line of Waltair Divn.

SF 4050 0 0 4050

126 11--12 Shifting of existing Neutral section

(Garividi/SP) in connection with proposed LC

gate no. ML-448 at Km. 789/33-35 between

Chipurupalli-Garividi of WAT Divn

SF 5574 0 0 5574

127 11--12 Improvement/construction of road between

Km. 394/1-2 in connection with the closure of

un manned Level Crossing at Km 394/11-12

on R-V line at Waltair division

SF 2616 2009 0 607

128 12-13 Proposed Diversion road from unmanned

level crossing RV - 330 between GPI-KMX

SF 6150 5271 0 879

129 12-13 Diversion of the road for closure of L.C. at

Km. 349/10-11 connecting LDX LC at 350 /

13 - 14 on RVLine

SF 7253 4358 1000 1895

130 12-13 Proposed Diversion road from U/M LC at

km.440/5-6 to M/LC crossing at km.439/7-8

ADEN/VZM on RV line.

SF 8751 6670 0 2081

131 12-13 Proposed Diversion road from U/M LC at

km.463/4-5 to ROB at km 463/19-

464/1etween VZM-GTLM

SF 9650 7630 0 2020

132 12-13 Provision of Double Distant signal to

Interlocked L.C.gates (9 No ) from Ex Palasa

to ex Vizianagaram of Waltair Division in East

Coast Railway

SF 9685 0 2500 7185

133 12-13 Interlockingof LC.Gates (3 Nos) (KK- 20, KK-

10, KK-24)

SF 9659 2685 0 6974

134 12-13 Interlocking of LC.Gates (3 Nos) (RV - 303,

LC No - 6, LC No - 8)

SF 9900 640 0 9260

135 12-13 Interlocking of LC.Gates (2 Nos) (LC No. 429,

LC No. 468)

SF 9656 1055 0 8601

136 13-14 Closure of LC no RV-298 at Km. 406/4-5 by

construction of parallel road to RV-297 at Km.

405/5-6 on R-V line

SF 6270 0 3000 3270

137 13-14 Parallel road from unmanned LC No. RV-302

at Km.410/0-1 to RV 303 at km. 410/12-13

on RV line

SF 8448 0 4000 4448

138 13-14 Construction of Road by connecting KK -69 at

Km.268/5-6 to manned KK-70 at 268/14-15 in

connection with closing of LCKK-69 on KK

line

SF 4953 2349 1300 1304

8

Page 9: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

139 13-14 Construction of parallel road connecting Level

crossing No. ML.413 at Km.729/25-27 to LC

no. 414 between Tilaru and Urlam stations on

Main Line.

SF 9968 0 3500 6468

140 13-14 Construction of road by connecting LC

No.KK-91 to KK-92 in connection with

closing of LC no KK-91 on KK-II section

SF 4832 640 2000 2192

141 13-14 Closing of unmanned LC no. RV-285 by

connecting road from LC. RV-285 to RV-286

bet. PVP-SNM.

SF 7972 0 4000 3972

142 13-14 Parallel road from LC no.RV-313 to ROB at

Km. 422/7 in lieu of U/manned LC no. RV-

313 bet.VBL-DNV on R-V line

SF 9712 0 5000 4712

143 13-14 Closure of LC no. RV-312 at Km.420/14 bu

construction of parallel road to RV-311 at Km.

420/3 between VBL-DNV

SF 9898 0 5000 4898

144 13-14 Construction of parallel road from LC no. KR-

2 at KM.04/11-12 to KR-3 at Km. 05/7-8 for

closure of LC No. KR-2 between KRPU-

DMNJ on K-R line of Waltair Division.

SF 7410 0 800 6610

KHURDA ROAD DIVISION

145 05-06 Replacement of 3 nos wornout L.C.Gates by

electrically Operated Lifting Barrier set under

ADEN/BBS's jurisdiction of KUR division.

SF 1564 308 0 1256

146 08-09 Manning of 02 nos of unmanned LC no. 356

& 341

SF 2955 1251 0 1704

147 08-09 Manning of 02 nos of unmanned LC no. 337

& 319

SF 2955 887 0 2068

148 12-13 1)Closure of LC no-CT-27 , JB-3 & JB -13 by

merging under DEN( C) of KUR Division

SF 17289 12820 0 4469

149 12-13 Proposed construction of connecting roads

for closure of 4 nos of the un-manned level

crossing under Sr.DEN( North)

SF 10351 0 1000 9351

150 12-13 Provision of precast Fibre reinforced R.C.C.

blocks for road surface at 14nos of Level

Crossings in KUR - PSA section.

SF 7233 0 0 7233

151 12-13 Pre-cast Fibre Reinforced RCC blocks for

road surface at Level Crossings at various

manned LC''s under Sr.DEN(N)/KUR.

SF 9272 0 0 9272

152 12-13 Closure of LC. No.CT-66 by connecting road

bet. CT-66 to CT-65 and closure of ST-109

by connecting road betn ST-109 & ST-108

SF 9955 4524 4000 1431

153 12-13 Provision of interlocking of LC gates No 192

at Km443/27-29 of manned LC gates within

SRKT-RTN of KUR division.

SF 4184 0 2000 2184

154 12-13 Construction of by pass road in lieu of closing

of LC No.CP-30 by merging LC No. 31

between GRKN-RHMA

SF 2290 1864 400 26

9

Page 10: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

155 13-14 Closure of LC no. CT-12, CP-18 ,CP-37 ,CT-

72 & ST-110 by merging in KUR division.

SF 19923 0 0 19923

SAMBALPUR DIVISION

156 07-08 Electrification of 13 Nos. of manned level

crossing gates.

SF 2974 1732 1200 42

157 08-09 Interlocking of L.C Gates ST -12 at Km. 13/8-

9 between SBPY-MANE and JT -24 at Km.

557/3-4 between SBP-SLRA divn

SF 2950 1843 0 1107

158 09-10 Provision of gate lodges with toilet facility

against deteriorated non-standard type gate

goomties at various manned Level crossings

of Sambalpur division

SF 3328 0 1500 1828

159 09-10 Manning of unmanned Level Crossing no.JT-

49 at Km 442/1-2 between BRGA-BRPL

stations.

SF 4132 3285 300 547

160 10--11 Provision of gate lodge with toilet facility

against deteriorated non-standard type gate

goomities in JSG-TIG section.

SF 7235 5420 2500 -685

161 10--11 Interlocking of LC gates ST-52 at KM 87/3-4

between Bamur -Sargipalli station .

SF 2999 3282 400 -683

162 10--11 Interlocking of LC gates JT-2 at KM 518/2

between Jharsuguda Road -Brundamal

SF 3024 2694 300 30

163 11-12 Diversion of road between two manned LCs

at Km 237/4-5(RV-196) and Km 237/11(RV-

197) in view of closure of manned Lc at Km

237/11(Rv-197).

SF 3469 2192 900 377

164 12-13 Improvement to level crossing road surface &

approaches from KM 4/10 to 197/11 of R-TIG

section

SF 21016 15031 4000 1985

165 12-13 Replacement of Mechanical LC gates with

electrically operated lifting barrier LC gates at

21 locations over Sambalpur Division.

SF 16209 10210 3000 2999

166 12-13 Telecommunication work in connection with

manning of LC gates from one control station.

SF 2920 1904 360 656

167 12-13 Replacement of gate booms at 15 nos of

manned LC in JSG-BRGA section.

SF 2883 528 1500 855

168 12-13 Upgradation of road surface for 24 Nos. of

Manned LCs with precast fibre reinforced

RCC blocks in TIG-THV Section.

SF 9983 5770 2200 2013

169 12-13 Electrifical works in connection with provision

of lighting arrangements at 16 manned LC

gates over SBP Division.

SF 1497 0 900 597

170 13-14 Provision of diversion road in connection to

closure of LC No ST-9, ST-13, ST-30 in SBP-

ANGL section and JT-68 in JSG-TIG section.

SF 10923 0 6000 4923

10

Page 11: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

171 14-15 Works costing below Rs.30lakhs each

WAT Division SF 540

KUR Division SF 1000

SBP Division SF 1400

Sub Total-WIP SF 385866 150429 70000 174662

SAMBALPUR DIVISION

172 14-15 Provision of diversion road in connection to

closure of LC No ST-49 & ST-74, in SBP-

ANGL section .

SF 7571 0 4000 3571

WALTAIR DIVISION

172A 14-15 Outright closure of 86 nos of unmanned level

crossings over Waltair division.

SF 9956 0 150 9806

KHURDA ROAD DIVISION

172B 14-15 Proposed outright closing 46 nos of

unmanned level crossings under Khurda

Road Division.

SF 5066 0 150 4916

173 14-15 Works costing below Rs.30 lakhs each

WAT Division SF 0 0

KUR Division SF 0 24

SBP Division SF 0 600

Reserve with HQ SF 76

Sub Total - New Works SF 22593 0 5000 18293

SF 408459 150429 75000 192955

WORKS IN PROGRESS

WALTAIR DIVISION

174 11-12 Proposed construction of Limited Height

Subway in lieu of closing of U/M LC No. 46 at

km. 228/12-13 between CTS-JYP, U/M LC

No. 47 at km. 229/8-9 bet. CTS-JYP, UM/LC

No. 48 at km. 232/4-5 bet. JYP-DIR on KK-II

line under DEN(West) of WAT Divn.

SF 22204 0 7000 15204

175 12-13 Proposed construction of LHS Way in lieu of

closing of UMLC No.KR-4 at Km.8/13-14 in

bet.KRPU-DMNJ

SF 8031 0 3000 5031

176 12-13 Proposal for Construction of Limited Height

Sub-Way in lieu of closing level crossings at

LC.no.49 at Km 234/9-10 bet JYP-DIR on KK-

II Line.

SF 11649 2093 5000 4556

177 12-13 Proposed construction of LHS in lieu of

closing of LC No.KR-11 at Km.62/3-4 in

between on KRLine.

SF 11283 0 6000 5283

178 12-13 Construction of LH Sub-Way in lieu of

closeing LC at LC.no.77 at Km 283/3-4 bet

NKX-JDB on KK-II Line under DEN/WEST.

SF 11822 3502 5000 3320

179 12-13 Construction of LH Sub-Way in lieu of closing

LC at LC.96 at Km 326/14-15 bet BDXX-

DMK.

SF 12805 2198 6000 4607

180 12-13 Construction of LH Sub-Way at Km.276/10-

11 in lieu of closing LCs at LC.no.73 at

Km276/10-11 bet AGB- AGZ.

SF 11810 2102 6000 3708

NEW WORKS

PH-29, ( Road Safety Works-LCs)

Grand Total

PH-30 ( Road Safety Works-ROB/RUB)

11

Page 12: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

181 12-13 Construction of LH Sub-Way in lieu of closing

LC at LC 94 at Km 325/2-3 bet BDXX-DMK

on KK-II.

SF 12449 2123 5000 5326

182 12-13 Proposed construction of Normal Height Sub

Wayin lieu of closing of Unmanned LC No.

KR-12

SF 12219 0 8000 4219

183 12-13 Proposed construction of LHS in lieu of LC-

265 at Km.367/4-5 in between JMPT-KNRT.

SF 13009 0 0 13009

184 12-13 Construction of RUB of size 3.60 x 4.0m at

Km 168/18-19 by box pushing technic inlieu

of closing of LCno.KK-38.

SF 19662 2442 9000 8220

185 12-13 R U B size 5.50 x 5.0m at Km 169/8-9 by box

pushing technic inlieu of closing of LC no: KK-

39 at Km 169/8-9 MKRD - PBV .

SF 21320 3636 9000 8684

186 12-13 Proposed construction of LHS in lieu of

closing of LC No. KR-7 at Km.16/9-10 in bet.

KRPU-DMNJ Stations

SF 8937 0 6000 2937

187 12-13 Proposed construction of LHS in lieu of

closing of LCNo.KR-6 at Km.12/4-5 bet.

KRPU-DMNJ Stations

SF 9145 0 6000 3145

KHURDA ROAD DIVISION 0 0

188 11-12 Provision of Rod Under Bridge (RUB) in lieu

of the existing unmanned LC No. 19 at km.

89/3-4 between HCNR-STBJ stations of KUR

division.

SF 13378 0 6000 7378

189 11-12 Provision of Rod Under Bridge (RUB) in lieu

of the existing unmanned LC No. 27 at km.

113/8-9 between HCNR-CLDR stations of

KUR division.

SF 14484 3229 6000 5255

190 11-12 Provision of Rod Under Bridge (RUB) in lieu

of the existing unmanned LC No.143 at km.

339/25-27 between JJKR-JKPR stations of

KUR division.

SF 22856 0 5000 17856

191 11-12 Provision of RDSO standard height gauges at

7 Nos of RUBs under ADEN/CTC’s

jurisdiction of KUR division.

SF 4392 4601 0 -209

192 12-13 Balance work for provision of Road Under

Bridge (RUB) in lieu of the existing unmanned

level crossing at Km. 596/4-6 between JNP-

BAM.

SF 13290 3856 4000 5434

193 12-13 Provision of Limited Height Subway (LHS) in

lieu of the existing unmanned level crossing

No.16 at Km 62/18-63/1 between Naranpur-

Basantpur stations.

SF 15940 0 3000 12940

194 12-13 Provision of Limited Height Subway (LHS) in

lieu of the existing unmanned level crossing

No.17 at Km 69/5-6 between Naranpur-

Basantpur stations.

SF 13187 873 3000 9314

195 12-13 Provision of Limited Height Subway (LHS) in

lieu of the existing unmanned level crossing

No.18 at Km 81/23-24 between Basantpur-

Sitabanji stations of KUR division.

SF 15961 0 3000 12961

12

Page 13: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

196 12-13 Provision of Limited Height Subway (LHS) in

lieu of the existing unmanned level crossing

No.25 at Km 104/19-20 between NKW-

HCNR stations of KUR division.

SF 12472 3345 6500 2627

197 12-13 Provision of Limited Height Subway (LHS) in

lieu of the existing unmanned level crossing

No.29 at Km. 121/1-2 between CLDR-SGDP

stations.

SF 15837 0 3000 12837

198 12-13 Provision of Limited Height Subway (LHS) in

lieu of the existing unmanned level crossing

No.30 at Km. 125/6-7 between Chilikadra-

Sagadpeta stations .

SF 13905 0 3500 10405

199 12-13 Provision of Limited Height Subway (LHS) in

lieu of the existing unmanned level crossing

Nos.CT-7 at Km. 404/19-21 between SQQ-

CBT stations .

SF 13695 2118 5000 6577

200 12-13 Provision of Limited Height Subway (LHS) in

lieu of the existing unmanned level crossing

Nos.JD-11 at Km. 160/6-8 between

Bhaghuapal-Tomka stations.

SF 14014 0 6500 7514

201 12-13 Provision of Limited Height Subway (LHS) in

lieu of the existing unmanned level crossing

Nos.JD-4 at Km. 151/20-22.

SF 14418 0 4000 10418

202 12-13 Provision of Limited Height Subway (LHS) in

lieu of the existing unmanned level crossing

Nos.132 at Km. 323/9-11.

SF 16210 0 4000 12210

203 12-13 Provision of Limited Height Subway (LHS) in

lieu of the existing unmanned level crossing

Nos.JD-12 at Km 162//8-10 & JD-13 at Km.

162/22-24.

SF 16216 2056 4000 10160

204 12-13 Provision of Limited Height Subway (LHS) in

lieu of the existing unmanned level crossing

Nos.144 at Km. 341/27-29 between JJKR-

JKPR .

SF 15253 0 4000 11253

205 12-13 Limited Height Subway (RUB) at LC No-236

between KAPG-GNGD stations of KUR

division

SF 17661 0 4000 13661

206 12-13 Limited Height Subway (RUB) at LC No-308

between BAM-JNP stations of KUR division

SF 17276 5143 6500 5633

207 12-13 Limited Height Subway (RUB) at LC No-323

between GTA-SLRD stations of KUR division

SF 20383 5035 6500 8848

208 12-13 Limited Height Subway (RUB) at LC No-240

between KAPG-GNGD stations of KUR

division

SF 23760 2987 7000 13773

209 12-13 Limited Height Subway (RUB) at LC No-JB-

10 between Ghantikal Nidhipur - Naraj

Marthapur of KUR division.

SF 22207 7556 5000 9651

13

Page 14: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

210 12-13 Provision of Limited height subway in lieu of

the existing unmanned level crossing no. 206

at Km. 466(9-11) between Kaipadar Road

and Tapang stations of Khurda Road

Division.

SF 16517 0 6500 10017

SAMBALPUR DIVISION

211 07-08 Titlagarh - Therubali - Road under bridge in

lieu of unmanned level crossings at km 282/8

& Sambalpur - Angul - km 32/3-4& 75/5-6

SF 25593 26573 0 -980

212 10--11 Provision of Limited Height Subway/RUB in

lieu of the existing unmanned level crossing

at Km. 60/5-6 in between CHAR-RAIR

stations in SBP-ANGL section.

SF 9200 5317 2000 1883

213 10--11 Provision of Limited Height Subway/RUB in

lieu of the existing unmanned level crossing

at Km.61/7-8 in between CHAR-RAIR

stations in SBP-ANGL section.

SF 9611 0 100 9511

214 10--11 Provision of Limited Height Subway/RUB in

lieu of the existing unmanned level crossing

at Km. 89/6-7 in between BAMR-SRGP

stations in SBP-ANGL section.

SF 9334 0 100 9234

215 10--11 Provision of Limited Height Subway/RUB in

lieu of the existing unmanned level crossing

at Km. 98/1-2 in between SRGP-HNPA

stations in SBP-ANGL section.

SF 9888 0 100 9788

216 10--11 Provision of Limited Height Subway/RUB in

lieu of the existing unmanned level crossing

at Km. 114/2-3 in between HNPA-BONA

stations in SBP-ANGL section.

SF 9754 1589 5000 3165

217 10--11 Provision of Limited Height Subway/RUB in

lieu of the existing unmanned level crossing

at Km. 140/7-8 in between JRPD-KPJG

stations in SBP-ANGL section.

SF 9754 0 1000 8754

218 10--11 BRGA(Ex)-TIG: Provision of Limited Height

Subway/RUB in lieu of the existing unmanned

level crossing at Km. 624/13-14 (JT-61)

SF 9800 0 1000 8800

219 10--11 Provision of Limited Height Subway/RUB in

lieu of the existing unmanned level crossing

at Km. 635/1 in between BRPL-DJX stations

in JSG-TIG section.

SF 9849 0 0 9849

220 10--11 Provision of Limited Height Subway/RUB in

lieu of the existing unmanned level crossing

at Km. 655/10 in KHPL-LSX stations in JSG-

TIG section.

SF 10127 0 100 10027

221 10--11 Provision of Limited Height Subway/RUB in

lieu of the existing unmanned level crossing

at Km. 657/8-9 in between KHPL-LSX

stations in JSG-TIG section.

SF 10127 0 100 10027

222 10--11 Provision of Limited Height Subway/RUB in

lieu of the existing unmanned level crossing

at Km. 665/8 in between LSX-BLGR stations

in JSG-TIG section.

SF 9849 0 1000 8849

14

Page 15: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

223 10--11 Provision of Limited Height Subway/RUB in

lieu of the existing unmanned level crossing

at Km. 707/9-10 in between DFR-SFC

stations in JSG-TIG section.

SF 10127 1884 5000 3243

224 10--11 R-TIG: Provision of Limited Height

Subway/RUB in lieu of the existing unmanned

level crossing at Km. 129/14-15 (RV-91)

SF 7975 9730 0 -1755

225 11-12 Provision of RUB in liu of the existing manned

LC no. RV-53 at Km 84/6 between R- THV

sections of SBP Division.

SF 10085 5497 500 4088

226 11-12 Provision of RUB in liu of the existing manned

LC no. RV-65 at Km 96/14-15 between R-

THV sections of SBP Division.

SF 10213 5498 2000 2715

227 11-12 Provision of limited Height Subway

(LHS/RUB) in lieu of the existing manned LC

No.-RV- 160 at Km 203/23 between R-THV

sections of SBP Division.

SF 13815 4886 4000 4929

228 11-12 Provision of limited Height

Subway(LHS/RUB) in lieu of the existing

Unmanned LC No.-RV- 209 at Km 253/11-12

between R-THV sections of SBP Division.

SF 9901 0 4000 5901

229 11-12 Provision of limited Height Subway

(LHS/RUB) in lieu of the existing Unmanned

LC No.-RV- 210 at Km 256/3 between R-THV

sections of SBP Division.

SF 9601 4847 4000 754

230 11-12 Provision of limited Height Subway

(LHS/RUB) in lieu of the existing manned LC

No.-RV- 216 at Km 265/4-5 between R-THV

sections of SBP Division.

SF 11534 0 4000 7534

231 11-12 Provision of limited Height

Subway(LHS/RUB) in lieu of the existing

Unmanned LC No.-RV- 222 at Km 279/1-2

between R-THV sections of SBP Division.

SF 12584 2294 6000 4290

232 11-12 Provision of limited Height

Subway(LHS/RUB) in lieu of the existing

Unmanned LC No.-RV- 234 at Km 304/7-8

between R-THV sections of SBP Division.

SF 17087 0 4000 13087

233 12-13 Provision of LHS/RUB in lieu of existing Un-

Manned LCl at Km 691/9-10 (JT-103) of

Sambalpur Division.

SF 13235 1956 7000 4279

234 12-13 Provision of LHS in lieu of existing Un-

Manned LC No ST-7 in SBP- ANGL section.

SF 20974 0 100 20874

235 13-14 Provision of LHS at Km. RV-114 with

diversion of road between RV-114 and RV-

113 for closure of LC No. RV-113

SF 21730 0 1900 19830

Sub Total-WORKS IN PROGRESS SF 851404 128966 240000 482438

NEW WORKS

WALTAIR DIVISION

236 14-15 Construction of LHS at LC No:KK-01@ 04/04-

05 on KK LIne of Waltair Division.

SF 15469 0 5000 10469

15

Page 16: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

237 14-15 Construction of LHS inlieu of closer of level

crossings at KK-41 on KK LIne of Waltair

Division.

SF 17849 0 5000 12849

238 14-15 Re-Girdering of RUB No: 1526 A UP and

RUB. No: 1013 UP & allied works At Km .

817/ 21 - 24 between NML - VZM

SF 7013 0 5000 2013

KHURDA ROAD DIVISION

239 14-15 Provision of Limited Height Subway (LHS) in

lieu of the existing unmanned level crossing

No.179 at Km. 416/24-26 between GBK-

BRAG stations.

SF 20343 0 5000 15343

240 14-15 Provision of Limited Height Subway (RUB) in

lieu of the existing unmanned level crossing

426/14-16 (LC No.CT-30) between RJGR-

JRZ stations.

SF 21694 0 2500 19194

SAMBALPUR DIVISION

241 14-15 Provision of LHS in lieu of UM Level crossing

No RV-125 in LAE-TIG section.

SF 16396 0 5000 11396

242 14-15 Provision of LHS in lieu of the existing

unmanned level crossing No. RV-48 at Km.

76/4 in LAE-TIG section of Sambalpur

Division.

SF 12530 0 5000 7530

243 14-15 Provision of LHS in lieu of unmanned level

crossing No RV-57 in LAE-TIG section of

Sambalpur division.

SF 14218 0 5000 9218

244 14-15 Provision of LHS in lieu of unmanned level

crossing No.JT-3 at km 519/3 in JSG-TIG

Section of Sambalpur Division

SF 23206 0 2500 20706

Sub Total-New Works SF 148718 0 40000 108718

PH-30 ( Road safety works-ROB/RUB)

Grand TOTAL

SF 1000122 128966 280000 591156

PH-31 (TRACK RENEWALS)

Work costing < 2.5crore & > 1.0 crore (Works in Progress)

KHURDA ROAD DIVISION

245 09-10 TFR-27km betn. Dhanamandal - Retang at

Km. 374.0 - 384.0 (UP & DN) & 443.70 -

447.2 (Up & Dn).

DRF 19306 2455 2000 14851

246 09-10 TFR-22.1km betn. Bhadrak- Kendrapara at

Km. 291.45 - 297.0 (Up) & 291.45 - 308.0

(Dn).

DRF 15804 54 2000 13750

247 09-10 TBR-13.27km betn Talcher JNC-Angul at

Km.491.40 -504.67.

DRF 16949 6212 1500 9237

248 09-10 TWR- 21km betn. Kenduapada-Jakhapura at

Km 308.00 - 319.50 (Up) & 316.00 -

325.50(Dn).

DRF 21461 7000 1000 13461

249 10-11 TFR-20km betn BYY-KIS. DRF 14855 339 2000 12516

250 11-12 TFR-24km at km 154 - 178.0 (SL) betn

Tomka - Jakhapura.

DRF 18342 6609 2000 9733

251 11-12 TTR - 6sets & TTR(D/S)-11sets on

Haridaspur, Dhanmandal, Byree & Kapilas Rd

yard of KUR Div.

DRF 13892 5730 1500 6662

REV 303 0 303

16

Page 17: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

252 11-12 TSR(P)-3km at km.287.471 - 290.471(UP)

betn Ranital - Bhadrak stns.of KUR div.

DRF 13634 7402 2200 4032

REV 1603 0 1603

253 12-13 TRR(P)-1.8KM at km 450.2-452(Up) betn.

RTN - KUR of KUR Div.

DRF 15982 13000 2500 482

254 12-13 TTR-11sets(5sets 1in 8.5 & 6sets D/S) on

JJKR & JEN stns of KUR div..

DRF 10560 2806 5637 2117

Rev 268 0 268

255 12-13 TTR(CMS Crossing)-40sets betn BHC-JEN

stn..

DRF 15115 42 8000 7073

256 12-13 TBCSR-1078 nos. of Br. No.449 Up (span no.

16 to 29) betn JKPR- JEN stns.

DRF 22426 15262 1500 5664

257 13-14 Supply and fixing of 770 Nos.new galvanised

steel channel sleepers on Br.No.- 950(DN)

(10x150'G) between CAP-GAM sations in

KUR-PSA section.

DRF 15862 0 6,000 9862

258 13-14 TRR(P) for 2.7 Kms from Km. 394.50 to

397.20 (S/L) between KIS - SQQ section

DRF 23092 16851 1,500 4741

SAMBALPUR DIVISION

259 08-09 Raipur-Titlagarh-Thiruvali-TBR-17.215Km (

Up & Dn) at different patches( 25 T axle load)

DRF 9047 8721 4000 -3674

R 6807 6807 0

260 09-10 TRR(P)- 2.5km betn. Titlagarh - Theruvalli at

Km 218.50 - 221.00 (DN).

DRF 18662 18497 165 0

261 09-10 TWR -14.321km betn Jharsuguda - Balangir

at Km 560.27-Km 666.65 in patches.

DRF 16650 12179 1000 3471

262 11-12 TSR(P)- 3km at km 524.06 - 527.06 betn.

Brundamal - Lapanga stns. of SBP Div.

DRF 13763 11556 2000 207

REV 1772 0 1772

263 11-12 TFR - 29.57km at different patches betn

Raipur -Theruvali stns of SBP Div.

DRF 21894 2389 3000 16505

264 12-13 TWR-11.8km at different patches with 60kg

rails in TIG-THV section.

DRF 17303 4092 2000 11211

265 12-13 TFR-38.3km at different patches in R-THV

section.

DRF 24347 689 4000 19658

266 12-13 Renewal of 237nos. 52kg Glued joint &

222nos. 60kg Glued joint at different locations

in SBP-ANGL & Bargarh-TIG section. section

DRF 19617 110 1000 18507

17

Page 18: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

267 13-14 Titlagarh-Therubali - CTR(P) - 2.74 km

(Reduced to 0.88 km)

DRF 12261 10 3000 9251

REV 459 0 459

WALTAIR DIVISION

268 07-08 Ladda - Bobbili - TFR -41.35km (in patches)

(Up & Dn line)

DRF 21508 12781 1000 7727

269 08-09 Silakjhori-Kirandul TFR-42.13km at Km

342.00 Km to Km 444.31( in patches) on KK-

II

DRF 23355 24072 1 -718

270 08-09 Palasa-Dusi-TWR-16.8 Km in patches ( Up &

Dn)

DRF 15492 18792 1 -3301

271 08-09 Palasa-Visakhapatnam-FT-9.5 Km DRF 22055 0 3000 19055

272 10-11 Gajapatinagaram - Vizianagaram stns. TFR -

16km

DRF 12064 6254 800 5010

273 11-12 TRR(P)- 2km at km 869-871(UP) betn

Simhachalam North -Simhachalam stn. of

WAT Division

DRF 18786 3759 1800 13227

274 11-12 TBR- 12.475 km in patches at km 3.685 -

8.66, 23-29, 87.4- 88.9 betn. Kottavalasa -

Similiguda on KK line of WAT division.

DRF 17339 5376 3000 8963

REV 4068 0 4068

275 12-13 CTR(P)-1.12kms at km. 464.49 -465.61(Up)

betn Gotlam-VZM stns. on R-V line.

DRF 17010 2519 2000 12491

Rev 678 0 678

276 12-13 TFR-25.27km in 3rd line betn Pendurti-

Gopalapatnam (15.6km) & 9.67kms betn.

PSA-Pundi (Up)

DRF 18680 0 4000 14680

277 12-13 TWR-15.0km betn Chatriput -Ambagaon stn.

on KK-II line.

DRF 24916 4343 500 20073

278 13-14 TRR (s) with 52/60 kg (SH) rails on existing

sleepers for a length of 4.348 Km. of loop line

of VSKP, VZM and CHE .

DRF 21249 0 2500 18749

279 13-14 Koraput - Kirandul - TSR(P) for 3.655Kms (

DMK- SZY)

DRF 19069 507 11788 6774

REV 1849 0 1849

280 13-14 Koraput - Rayagada and Raipur -

Vizianagaram - TRR(P) -1.297 km.(Tikiri-

Rouli and THV- Ladda).

DRF 11028 0 1000 10028

281 13-14 Koraput - Kirandul (TSR-(P) - 4.085

km(Kamalur- Bacheli)

DRF 21312 3068 4500 13744

REV 2066

282 13-14 TSR(P) for 1.685 Kms from Km 218.815 to

Km.221.000 (in patches) between MVG-CTS

Stations

DRF 8791 581 1000 7210

REV 852 0 852

Track Renewal (< 2.5 crores& >1.0crore )

Works in Progress: Sub Total

DRF 663478 224057 96392 343029

18

Page 19: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

Works costing less than Rs. 1.0 crores

(Works in Progress).

KHURDA ROAD DIVISION

283 10-11 Casual Sleeper Renewal for 1000 nos of

cracked and broken sleepers on Route-3 & 6

of washable apron at BBS station of KUR

division.

DRF 2307 0 500 1807

284 11-12 Casual Sleeper Renewal for 4000 nos (52

kg) of cracked and broken sleepers in

different patches between TAP-KUR (DN)

line section of KUR Division.

DRF 7803 168 1000 6635

285 11-12 Casual Rail Renewal for 1.0 Tkm of existing

60Kg rails from Km 416/10 - 417/16 (SL)

betn. GBK-BRAG section of KUR Division.

DRF 7733 7200 500 33

286 11-12 Casual rail renewal of 60kg rails for 1.2 Tr km

at 453.3-454.5 (Dn) betn KUR-RTN section.

DRF 9543 0 1700 7843

287 11-12 Casual rail renewal of 60kg rails for 1.2 Tr km

at 452 - 453.2 (Up) betn KUR-RTN section.

DRF 9543 0 1700 7843

288 11-12 Casual rail renewal of 60kg rails for 1.2 Tr km

at 453.2-454.4 (Up) betn KUR-RTN section.

DRF 9543 0 1700 7843

289 11-12 Casual sleeper renewal for 1000 nos. in

patches betn 455.3-470.6 (Dn) betn KUR-

DEG section.

DRF 2310 0 1500 810

290 12-13 Supply and fixing of 440 Nos.new galvanised

steel channel sleepers on Br.No. 553

(18x150'G) between CTC-GBK at Km 411/6-

42.

DRF 9064 9150 1 -87

291 12-13 Supply and fixing of 245 Nos. new galvanised

steel channel sleepers on Br.No. 557

(20x150'G) between GBK-BRAG at Km

414/4-415/6.

DRF 5047 5765 1 -719

292 12-13 Through rail renewal for 1.00 Tr.km from km

314/5 to 315/5 on up line between KED-MZZ

section.

DRF 7454 6500 900 54

293 12-13 Through glued joint renewal for 280 sets at

different yards of HDS-GBK station.

DRF 6776 0 3600 3176

294 13-14 Casual Sleeper renewal for 2000 nos of

cracked and broken sleepers by new

sleepers in different locations under

ADEN/KDJR

DRF 6261 0 1500 4761

REV 607 0 607

295 14-15Works costing below Rs. 30lakhs

DRF 10

SAMBALPUR DIVISION

296 11-12 Casual renewal of Scabbed / wheel burnt

rails for 1.26 TKm ( km 146- 184) with 52 Kg

90 UTS rails at different patches in betn HSK-

MRBL sec.of SBP Division.

DRF 9598 8058 1000 540

297 11-12 Casual renewal of Scabbed/ wheel burnt rails

for 1.27 TKm ( km 116-146) with 52 Kg 90

UTS rails at different patches in betwn NPD-

TRKR sec. of SBP division.

DRF 9665 7991 800 874

19

Page 20: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

298 11-12 Casual renewal of Scabbed / wheel burnt

rails for 1.19 TKm (km 61- 107) with 52 Kg 90

UTS rails at different patches ARN-NPD

section of SBP division..

DRF 9071 7589 800 682

299 11-12 Casual renewal of Scabbed / wheel burnt

rails for 1.0 TKm with 60 Kg 90 UTS rails at

different patches betwn Km 305.6-313.70

(DN) in BMCK-THV sec.of SBP div.

DRF 8035 7547 500 -12

300 11-12 Casual renewal of Scabbed / wheel burnt

rails for 1.0 TKm with 60 Kg 90 UTS rails in

patches betwn Km 313.7-323.00 (DN) in

BMCK-THV section of SBP division.

DRF 8035 7438 800 -203

301 11-12 Casual renewal of 3000 No. of cracked PSC

sleepers at different patches between BRGA-

BLGR station of SBP Division.

DRF 5717 566 1500 3651

302 11-12 Casual renewal of 2000 No. cracked PSC

sleepers in patches under PWI/ANGL in SBP-

ANGL section of SBP Division.

DRF 3878 475 1500 1903

303 12-13 TSTR in Br. 293 of span 9 to span 15

between DJX-KHPL stations under

AEN/BLGR

DRF 9785 110 500 9175

304 12-13 Through Fastening Renewal of steel channel

sleeper fittings (TFR-CH) in JSG-BRGA

section.

DRF 8413 7010 700 703

305 12-13 Replacement of channel sleepers in bridge

No. 76, 92, 116 and 160 in JSG(Ex)-

BRGA(In) section of Sambalpur division.

DRF 4161 60 700 3401

306 12-13 Casual renewal of IMR and DFW/OBS rails of

60Kg for 1.11 Tkm in SE(P-way)/TIG Section

from Km. 210.96 to 225.09

DRF 9476 3874 1000 4602

307 12-13 R-THV: casual renewal of damaged / failed

60Kg/52Kg Glued joints in various station

yards.

DRF 6345 110 500 5735

308 13-14 TIG-THV: Casual renewal of 2500 Nos.

damaged PSC sleepers

DRF 7857 10 300 7547

REV 762 0 762

309 13-14 JSG-BRGA: Casual renewal of 2500 nos of

cracked PSC sleepers at different locations.

DRF 7826 10 300 7516

REV 759 0 759

310 13-14 JSG-BRGA: Csual renewal of 2800 nos of

cracked PSC sleepers at different locations.

DRF 8817 10 300 8507

311 14-15 Works costing less than 30lakhs each(DRM's

Power) for DRM/SBP.

DRF 10 11 -21

WALTAIR DIVISION

312 08-09 Replacement of crackedsteel channel sleeper

of bridge no: 436,481,468 & 487 on KK line of

WAT division.

DRF 4958 21776 50 -16868

313 08-09 Replacement of crackedsteel channel sleeper

fittings on various bridges on KK-I line & Main

line of WAT division.

DRF 4981 4063 900 18

20

Page 21: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

314 08-09 Casual Renewal of existing 1 set of 1 in 8 1/2

and 2 sets of 1 in 12 Pts and X-ings at

Gotlam yard on R-V line and 1 set of 1 in 8

1/2 Pts and X-ings at CHE yard on PSA-

VSKP line of WAT division.

DRF 4686 4479 200 7

315 08-09 Kottavalasa-Maligura-TWR-3.7 kms on KK-I

line

DRF 3493 2627 500 366

316 09-10 Casual Renewal of Wheel burn rails for 1.325

Tkms 60 kg from km 463/7 - 464/7 (DN) in

various patches between VZM-GTLM on RV

Line under AEN/VZM Section of Waltair

Division.

DRF 10000 10552 25 -577

317 10-11 Casual renewal of 60 kg wheel burnt rails for

0.75 Tr km from km 343 to km 348 UP& DN

(in patches) in between RGDA-LDX in RV

line under ADEN/ RGDA of WAT division.

DRF 6769 5064 500 1205

318 11-12 Casual renewal of wheel burn 60 kg rails for

0.8 Tkm at km 686/19 -687/31 in patches Up

& DN betn PSA- PDU under the jurisdiction of

ADEN/CHE of WAT division.

DRF 6296 0 500 5796

319 11-12 Casual renewal of wheel burn 60 kg rails for

1.0 T km at km 848/2-849/0 DN and km

841/6 -843/0 UP in patches betn KPL -KTV &

ALM -KPL under the jurisdiction of

ADEN/Tr/WAT of WAT division.

DRF 7839 0 500 7339

320 11-12 Casual renewal of wheel burn 52 kg rails for

1.25 Tkm in patches between TKRI-SPRD

from Km. 84-86, Km 141-144 under the

jurisdiction of ADEN/LKMR on KR line of

WAT division.

DRF 9631 0 500 9131

321 11-12 Casual Sleeper renewal of cracked PSC

sleepers for a length of 1.9 km at 1818

nos/km density in patches under the

jurisdiction of ADEN/ARK on KK line of WAT

division.

DRF 8463 5989 300 2174

322 11-12 Casual renewal of IMR and OBS rails 60 kg

for 1.016 Tkms in KK -I section under

jurisdiction of Sr.DEN (Central) of WAT

division.

DRF 9603 2946 500 6157

323 11-12 Casual renewal of wheel burn 60 kg rails for

1.0 Tkm at km 386/3-387/8 in patches under

the jurisdiction of ADEN/KRDL on KK line of

WAT division.

DRF 7838 0 500 7338

324 11-12 Casual renewal of wheel burn rails with new

60 kg rails for 1.0 Tkm at km 394/4-337/2,

330/0-329/12 and 311/0-14 in patches under

the jurisdiction of ADEN/JDB on KK line of

WAT division.

DRF 7838 0 500 7338

325 12-13 Casual Renewal of Defective welds renewal

of 60 Kg / 52 Kg from Km. 349/11 - 388/3

between LDX - PVP Section

DRF 3066 0 300 2766

21

Page 22: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

326 13-14 TSR (P) for of 1.70 Kms from Km: 327.160 to

Km. 426.932 (in patches) on Up & Dn lines

between THV-DNV station

DRF 8869 590 1000 7279

REV 860 0 860

327 14-15 Works costing less than 30lakhs each for

DRM/WAT.

DRF 0 10

Sub Total: Works costing less than

Rs. 1.0Crore.

304393 137737 32608 134068

Track Renewal

Grand Total-Works in progress

967871 361794 129000 477097

PH-31 (TRACK RENEWALS)

Work costing < 2.5crore & > 1.0 crore (New Work)

WALTAIR DIVISION

328 14-15 Palasa-Visakhapatnam,TRR(P)-2.5 Km DRF 22200 0 12000 10200

329 14-15 Palasa-Visakhapatnam(UP)-TRR(P)-2.356

Km

DRF 20921 0 10000 10921

Track Renewal (< 2.5 crores & >1.0crore)

New Works: Sub Total

43121 0 22000 21121

Work costing < 1.0 crore (New Work)

KHURDA ROAD DIVISION

330 14-15 Casual Sleeper renewal for 2500 nos. of

sleepers from 345/17 to 348/5 (Up) in

patches between JKPR - JEN section.

DRF 9458 0 4500 4958

331 14-15 TRR(P) for 1.10 Tr.Kms from Km. 673.20 to

674.30 on Up line between IPM - PSA section

of Khurda Road Division.

DRF 9832 0 6000 3832

332 14-15 TRR(P) for 1.00 Tr. Km from Km 670.50 to

671.50 on Up line between IPM - PSA section

of Khurda Road Division.

DRF 8939 0 5500 3439

333 14-15 TRR(P) for 1.10 Tr.Km from Km 412.50 to

413.60 on single line at GBK yard under

ADEN/I/CTC.

DRF 9832 0 6000 3832

334 14-15 TRR(P) for 0.700 Kms from Km. 676.50 to

675.80 on Dn main line at R-5 of Palasa Yard

of Khurda Road Division.

DRF 6257 0 5000 1257

335 14-15 Casual Sleeper renewal for 2640 nos. of

sleepers from 397.00 to 400.25 (Dn) in

patches between NRG - SQQ Branch line.

DRF 9959 0 5000 4959

336 14-15 Casual rail renewal for 1.10 Tr.km in different

patches for replacement of wheel burnt and

deffective rails between RJGR-TLHR under

ADEN/DNKL.

DRF 9832 0 5000 4832

337 14-15 Through Bridge Channel sleeper renewal for

440 Nos. steel channel sleepers over Br.

No.553 (SL) from Km 411/4 - 412/0 between

CTC - BRAG station

DRF 9082 0 4500 4582

338 14-15 Casual Bridge Channel sleeper renewal for

470 Nos. steel channel sleepers over Br. No.

449 (Dn) from Km 348/6 to 349/24 between

JEN - JKPR section

DRF 9701 0 4500 5201

339 14-15 Casual sleeper renewal for 2600 nos.

sleepers at isolated patches between Barang -

Khurda Road section under ADEN/BBS.

DRF 9833 0 4000 5833

22

Page 23: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

340 14-15 TRR(P) for 0.800 Tr. Km from Km 448/23 -

448/1 on middle line between KUR - RTN

section.

DRF 7151 0 4500 2651

SAMBALPUR DIVISION

341 14-15 Casual renewal of existing wornout 52Kg

90UTS rails with new 52Kg 90 UTS rails for

1.06Tkm on 2.5 degree curve No. 140 in TIG-

THV Section.

DRF 8150 0 5000 3150

342 14-15 Renewal of 6 sets of switches and 16 sets

CMS xings of Turnouts in TIG-THV section

of Sambalpur Division.

DRF 9166 0 4000 5166

343 14-15 Casual fittings renewal of steel channel

sleepers on Br. No. 77, 588, 448, 325 & 343

in LAE-THV Section of SBP Division

DRF 7237 0 3000 4237

344 14-15 Rail renewal of DFW/OBS rails(52 Kg 90

UTS) for 1 Km between Km. 66 to 67 with

60Kg 90 UTS rails in SE(P)/RAIR Section of

Sambalpur Division.

DRF 8939 0 4000 4939

345 14-15 Rail renewal of DFW/OBS rails(52 Kg 90

UTS) for 1 Km between Km. 61 to 62 with

60Kg 90 UTS rails in SE(P)/RAIR Section of

Sambalpur Division

DRF 8939 0 4000 4939

346 14-15 Casual renewal of DFW/OBS rails(60 Kg 110

UTS) for 1 Km at Km. 311 to 312Dn with 60

Kg 110 UTS rails in TIG-THV Section of

Sambalpur Division.

DRF 8880 0 4000 4880

347 14-15 Rail renewal of DFW/OBS rails(52 Kg 90

UTS) for 1 Km between Km. 50 to 51 with

60Kg 90 UTS rails in SE(P)/RAIR Section of

Sambalpur Division

DRF 8939 0 4000 4939

348 14-15 Casual renewal of DFW/OBS rails (60 Kg 110

UTS) for 1 Km at Km. 319 to 320Dn with 60

Kg 110 UTS rails in TIG-THV Section of

Sambalpur Division.

DRF 8880 0 4000 4880

349 14-15 TRR(P) for 1.1 TKm between Km 299.33

(UP) to 300.43 (UP) in MNGD-BMCK section

of Sambalpur Division.

DRF 9768 0 5000 4768

350 14-15 TRR(P) of existing 52 Kg 90 UTS rails with 60

Kg 90 UTS rails between Km 300.43 to

301.53 (UP) in MNGD-BMCK section of

Sambalpur Division.

DRF 9768 0 5000 4768

WALTAIR DIVISION

351 14-15 CMS crossing Renewal of 30 sets 60 Kg 1 in

12 points and crossing at ALM, KPL, PDT

stations

DRF 9761 0 1800 7961

352 14-15 TRR (P) for 0.70 Km from Km. 869.26 to

869.96 on Dn Main line in SCMN Yard

DRF 6216 0 3000 3216

353 14-15 Casual Renewal of damaged rails for 1.10 Tr.

Km. between Boddavara-Similiguda stations

on KK line.

DRF 9768 0 4500 5268

354 14-15 TRR (P) for 1.100 Km from Km. 747.860 to

748.420 and Km. 748.530 to Km 749.070 on

UP Line, between Urlam - Srikakulam Road

stations

DRF 9768 0 4500 5268

23

Page 24: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

355 14-15 Casual Renewal of damaged rails for 1.00 Tr.

Km. between Araku-Koraput stations on KK

line.

DRF 8880 0 4000 4880

356 14-15 TRR (P) for 1.00 Km from Km 243.00 to Km

244.00 between DIR-CJS Stations on KK -II

Section of Waltair division

DRF 8880 0 4000 4880

357 14-15 CMS Crossing Renewal of 30 sets 60 kg 1 in

12 Points and crosat SPRD, RGDA, LDX,

JMPT, KNRT, PVPT, PVP, SNM, VBL and

DNV stations

DRF 9761 0 1800 7961

358 14-15 CMS Crossing Renewal of 24 sets 1 in 12 60

Kg and 2 sets 1 in 8½ at MVG, JRT, MVF,

SXV, PBV and MKRD stations.

DRF 8396 0 1800 6596

359 14-15 TSR(P) for 1.565 Km from Km. 430.27-Km.

434.035 (in patches) bet. BHNS-BCHL stns.

DRF 9801 0 3000 6801

360 14-15 Caual Renewal of 2500 Nos. PSC-14

sleepers betwen Boddavara-Koraput stations.

DRF 9708 0 2500 7208

361 14-15 Through CMS crossing Renewal of 30 sets

points and crossings at various stations on

KK-II section.

DRF 9761 0 2000 7761

362 14-15 Casual Renewal of 450 Nos. cracked steel

channel sleepers on girder bridges on KK

line of Waltair Division.

DRF 9288 0 2800 6488

363 14-15 Insertion of Additional PSC sleepers for 5.00

Km from Km. 276.00-281.00 between AGB-

AGZ-NKX stns.

DRF 9320 0 4000 5320

Track Renewal (< 1.0 crore) New Works:

Sub Total

DRF 307850 0 136200 171650

Track Renewal

Grand Total-New Works

DRF 350971 0 158200 192771

Track Renewal

Grand Total

1318842 361794 287200 669868

WORK IN PROGRESS

WALTAIR DIVISION

364 04-05 Kottavalasa-Kirandul line- jacketing of piers

no.1(bridge no 164 & 169)

DRF 16733 20785 100 -4152

365 06-07 Dabpal-Gidam-RCC pipe for Hume pipe

bridges ( Bridge No. 1042 & 1052)

DRF 27382 26955 500 -73

366 07-08 Replacing of corroded cross girders for BR.

No. 1383 DN & MAS FO-I on main line .

DRF 6391 6131 100 160

367 07-08 Replacing of corroded cross girders for Br.

No. 1554 UP & 1496 DN on main line .

DRF 5706 3540 1500 666

PH-32( Bridge Works)

24

Page 25: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

368 08-09 Proposed conversion of pipe Bridge No. 733

and 800 (having cushion less than 600 mm)

into RCC Box between SPRD-VZM stations

on RV line section of WAT Division in

connection with operation of 25 T axle load.

DRF 4649 1598 0 3051

369 08-09 Proposed conversion of Bridge No. 660 and

605B Rail openings into RCC Box between

SPRD-VZM stations on RV line section of

WAT Division in connection with operation of

25 T axle load.

DRF 3123 1566 260 1297

370 09-10 Proposed strengthening of bridge nos. 640

UP,671 UP,685 UP,706 Up in SPRD-VZM

section by RCC jacketing of abutments and

piers and arch portion on RV line .

DF4 11976 6311 51 5614

371 09-10 Jacketing of Arch Bridge no. 1560 Dn & 1561

Dn between ALM-KUK , 1566 Dn between

ALM-KUK & 1649 Up between SCMN-PDT

section on PSA-VSKP main line .

DF3 18553 9619 4200 4734

372 10--11 Proposed repairs to bridge No.890 by

replacing corroded steel trough with new

ones along with set of end girders and allied

works between DMK-SZY stations on KK line

under DEN/Br/WAT.

DRF 4000 0 100 3900

373 11-12 Construction of RCC box culvert of size

3.75x3.2m by box pushing method at km.

182/15-16 near Br. No. 534 between SUKU-

KRPU sections on KK –Line

DF4 14677 2908 5500 6269

374 11-12 Construction of RCC box culvert by box

pushing method at km. 110/15-16 near Br.

No. 378 on KK –Line of WAT division.

DF4 19465 6887 5500 7078

375 11-12 Additional waterway by providing RCC box

by box pushing method at Km. 88/19-20 near

Br. No. 330 between KVLS-SMLG of WAT

division

DF4 19465 1675 6500 11290

376 11-12 Construction of RCC box culvert of size

3.75x3.2m by box pushing method at km.

77/1-2 near Br. No. 289 on KK –Line of WAT

division.

DF4 20533 1211 2000 17322

377 11-12 Conversion of old bridge No.1062(4x1.22m)

HP at km.390/5-6 between DPF-GIZ on KK-II

line of WAT division.

DF4 18785 0 2450 16335

378 11-12 Conversion of old bridge No.1146(4x1.22m)

and 1160 (2x1.22m) HP at km. 418/10-11

and km.422/16-423/0 between stations KMLR-

BHNS on KK-II line of WAT Division

DF4 22235 0 500 21735

379 11-12 Conversion of old bridge No.998(1x1.22m)

HP at Km.366/11-12 between stations KKLU-

KWGN on KK-II line of WAT division.

DF4 18148 0 617 17531

25

Page 26: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

380 11-12 Construction of RCC box culvert by box

pushing method at km. 205/10-11 near Br.

No. 618 on KK –Line

DF4 16019 2766 2500 10753

381 11-12 Replacement of Trolley Refugees and

provision of side walkways & allied works for

Br. Nos. 1185UP & DN, 1389DN,752UP &

DN on main line, Br. No. 124,125 & 137 on

KR Line & Br. No.750 on KK-II Line under

DEN/Br/WAT.

DRF 9336 2907 1500 4929

382 11-12 Rebuilding of Bridge No. 96 RCC box culvert

of size 3.75x3.2m by box pushing method in

place of Br. No. 96 RCC hume pipe of

1x0.9m between S.Kota-Bodavara stations

on KK Line of Waltair division.

DRF 9961 8076 1000 885

383 11-12 Rebuilding of Br.no.169 foundation by

providing bored piles and rail piling between

TXD-SLPM on KK Line of Waltair division.

DRF 9772 9371 10 391

384 12-13 Rebuilding of hume pipe bridges with RCC

box by box pushing technique for Br.No.1202

under ADEN/KRDL.

DRF 9950 0 1000 8950

385 12-13 Repalcement of cracked top flanged angles

of rail bearer of bridge 1383 DN between DSI-

PDU.

DRF 8347 0 5000 3347

386 13-14 Prop. Re-building of 6 store slab bridges from

Km.831 to DVD section on ML.

DF4 19403 0 3800 15603

387 13-14 RCC BOX size 2.0m x 2.50 m in lieu of

cracked hume pip Br. No.1031 at Kavargaon-

Dabpal and Br. No.1151 at Kamalur-Bhansi

at Km.420/1-2 on KK line.

DRF 24966 0 1000 23966

388 13-14 Replacement of existing RSJ Rail bearers by

Built up sections for Bridge No.1354 UP at

Km.743/35-744/21 between ULM-CHE.

DRF 15271 1741 1000 12530

KHURDA ROAD DIVISION

389 08-09 Proposed conversion of Arch bridges of Br

Nos. 727UP & 728 UP into RCC Box in KUR-

PSA section .

DRF 2398 813 100 1485

390 08-09 Proposed conversion of Arch bridges of Br

Nos. 786UP & 809 UP into RCC Box in KUR-

PSA section .

DRF 2684 142 0 2542

391 08-09 Proposed conversion of Arch bridges of Br

Nos. 916UP & 1012 UP into RCC Box in KUR-

PSA section.

DRF 2291 999 0 1292

392 08-09 Proposed conversion of Arch bridges of Br

Nos. 1137 UP & 1098 UP into RCC Box in

KUR-PSA section .

DRF 2952 0 0 2952

393 09-10 Proposed replacement and strengthening of

different corroded and perforated steel

members such as rail bearers, cross girders

,stringer bracing ,bottom lateral bracing and

gussets of steel girders on Br. No.

553(18x150'G)( Span 1 to 4) between CTC-

GBK at Km.411/6-42 under DEN(Br.).

DRF 9843 1589 0 8254

26

Page 27: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

394 10--11 Strengthening of piers and abutments by

RCC jacketing and foundation by piling of Br.

No. 1046 UP (5x60'+1x80' ) in KUR-PSA

section .

DRF 20124 1167 2000 16957

395 10--11 Proposed rebuilding & conversion of Bridge

No. 6 DN (10x0.914m) stone slab into

(2x3.0x3.15m) RCC Box at Km. 398/12/10 in

between stations NRG-SQQ.

DRF 4984 1226 100 3658

396 11-12 DRF 2646 2361 10 275

CRRM(-) 349 0 349

397 11-12 Proposed jacketing of 15 Nos. spans (span

Nos. 1,2,3,4,5,6,8,13,14,15,16,17,18,19 &20)

of Br. No. 17 (44x3.05mA) at Km. 462/27-

463/1 in KUR-PUI section of KUR division.

DRF 9961 2140 1000 6821

398 11-12 DRF 7149 753 1000 5396

CRRM(-) 375

399 11-12 DRF 9999 0 0 9999

CRRM(-) 469 0 469

400 11-12 DRF 8312 0 1000 7312

CRRM(-) 1126 0 1126

401 DRF 7417 0 1176 6241

CRRM(-) 985

402 12-13 Replacement of corroded and cracked

bottom lateral bracings of span Nos. 1 to 15

of Br.No.449DN .

DRF 9733 3060 4420 2253

403 12-13 Povision of Man refuses on girder bridges

under jurisdiction of SSE(Br.)/North &

SSE(Br.)/South in Khurda Road Division.

DF4 6488 3255 500 2733

404 12-13 Povision of Man refuses on girder bridges

under jurisdiction of SSE(Br.)/Bhadrak &

SSE(Br.)/CTC.

DF4 8448 5951 500 1997

11-12 Replacement of corroded cross girders of

through bridge with new cross girders of Br.

NO. 391 DN(15x150 G) ( spans 9 to 15) at

Km. 318/20-319/12 between MZZ-BTV

stations of KUR Divn.

Replacement of corroded and perforated

cross girders and bottom lateral bracing of Br.

No.535A Dn. (1x150G) at km. 400/22-20

between stations KNPR-NRG under

SSE(Br)CTC of KUR Divn.

Provision of steel stools for lifting of existing

girders to maintain the longitudinal levels on

Br. Nos. 456 Up & DN, 467 UP & DN, 468

UP&DN, 514 UP & DN, 521 DN, 535 DN &

537 DN under jurisdiction of SSE/Br/CTC &

Bridge No. 559 SL, 567 UP& DN,

32,30,20,19,18,17 & 615UP under jurisdiction

of SSE/Br/North/KUR in Khurda Road

division.

Provision of steel stools for lifting of existing

girders to maintain the longitudinal levels on

Br. Nos. 361 UP&DN, 362 UP&DN, 370 UP &

DN, 372 UP & DN, 382 UP&DN, 392UP &

DN, 393 UP & DN, 434 UP & DN, 448 UP &

DN under jurisdiction of SSE/Br/BHC in

Khurda Road division.

Replacement of corroded cross girders of

through bridge with new cross girders of Br.

NO. 391 DN (15x150 G) ( spans 1 to 8) at

Km. 318/20-319/12 between MZZ-BTV

stations of KUR Divn.

27

Page 28: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

405 12-13 Rebuilding of stone slab bridges of Br. No. 8

& 10 and arch Bridge of Br. No. 20 into into

RCC box in KUR-PUI section of Khurda Road

Division.

DRF 5588 2284 3000 304

406 12-13 Rebuilding of stone slab bridges of Br. No.72

and arch bridge of Br. No. 51 into RCC box in

KUR-PUI section of Khurda Road Division.

DRF 5508 368 2500 2640

407 13-14 Khurda Road - Puri - Rebuilding (11 stone

slab bridges)

DRF 18000 0 7665 10335

408 13-14 Proposed raising of abutments & piers,

replacement of existing plate girders by

shallow type girders of Br. No.615(UP&DN) in

KUR.

DRF 22136 0 5000 17136

SAMBALPUR DIVISION

409 05-06 Re-building of 02 nos earthenware pipe

bridges into RCC box (1x1.2Mtr) in JSG-

BRGA section .

DRF 1045 492 0 553

410 06-07 Rebuilding of 06 nos earthenware pipe

bridges into RCC box(1x1.2 Mtr) in Br no. 24,

33, 35,37,38 & 40

DRF 3151 1913 100 1138

411 08-09 Rebuilding Arch Bridge No. 16 in JSG-TIG

section by providing suitable RCC Box

Bridge.

DRF 2590 240 0 2350

412 10--11 BMCK-THV: Rebuilding of existing old

damaged flat top Br. No. 561(4x0.91m FT) in

to RCC Box of 2.6x 2.6m size by Box pushing

technique.

DRF 8887 7688 0 1199

413 10--11 Rebuilding of Br.No.199 of span 2x0.91m at

km.615/13-14 and Br.No.201 of span 2x1.8m

at km. 616/11-12 between BRGA-BRPL

sections to RCC Box.

DRF 7502 0 0 7502

414 10--11 BLSN-MSMD: Rebuilding of existing old

damaged flat top Br. No. 80 (3x0.90m FT) in

to RCC Box of 2x 1.8mx1.8m size by Box

pushing technique.

DRF 1958 911 0 1047

415 11-12 Rebuilding of existing old damaged flat top

bridge No. 563 , 252,158,159 & 160 in R-THV

section of SBP Divn

DRF 13709 1130 7500 5079

416 11-12 The replacement loose/head lost rivets

including under sleeper sheets by new rivets

of size 1/8 inches (3mm) higher than loose

rivets under the jurisdiction of SSE/Br/TIG at

various (24nos) of bridges in TIG - THV

section of SBP division as per Annexure-II of

the proposal.

DRF 3635 4250 2000 -2615

417 11--12 Provision of man refuges on open web

girders on bridge 7, 87, 77, 239, 247,

293,331, 406 & 438 in JSG- TIG and 343 UP

and 77 in R- THV section of SBP division.

DF4 2267 2454 382 -569

418 12-13 Replacement of worn-out and head lost rivets

of different bridge girders in JSG-BRGA

section of Sambalpur division

DRF 4705 1173 359 3173

28

Page 29: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

419 12-13 Sterngthening of existing piers & abutments

to Br. No. 46

DRF 6027 0 0 6027

420 12-13 Rebuilding of damaged bridge no.413 at Km

250/3-4(3x0.91m) stone slab with

1X3.30X2.15m RCC Box bvbridge by Box

pushing method.

DRF 9877 0 7500 2377

421 14-15

DRF 100

DF3 100

DF4 50

CAP 400

DRF 300

DF3 100

DF4 100

CAP 500

DRF 100

DF3 100

DF4 50

CAP 100

DRF 370398 117369 60000 193529

DF3 18553 9619 4500 4734

DF4 197909 33418 31000 133691

CAP 0 0 1000 0

NEW WORKS

KHURDA ROAD DIVISION

422 14-15 Replacement of corroded & perforated fixed

end bearings of Br. No. 22 under

SSE(Br.)/North/KUR of Khurda Road

Division.

DRF 4642 0 1500 3142

423 14-15 Strengthening and Replacement of corroded

members on Bridge No. 362, 382 & 392 Up

& Dn, 448 Dn and 550 SL of BHC-BRAG

section.

DRF 7072 0 1500 5572

424 14-15 Conversion of stone slab bridge No 580 in to

RCC box bridge in BBS Yard.

DRF 9320 0 1500 7820

425 14-15 Replacement of corroded members on Bridge

No. 992 Up & Dn, 1004 Up & Dn and 1052Up

of KUR-PSA section.

DRF 4479 0 1500 2979

426 14-15 Conversion of flat bearings in to centralized

bearings of Br No 4NS and Strengthening of

corroded members on various bridges under

SSE(Br)/CTC

DRF 4539 0 1500 3039

SAMBALPUR DIVISION

427 14-15 Rebuilding 05 Nos Bridges(Br No-52Dn,59Up

& Dn, 60Dn, 61Dn & 61A Dn in JSG-BRGA

section of SBP Divn.

DRF 9296 0 1500 7796

428 14-15 Works costing below 30 lakhs

DRF 200

KUR Division DRF 200

DRF 100

Sub Total -New Works DRF 39348 0 9500 30348

DF4 197909 33418 31000 133691

DF3 18553 9619 4500 4734

Works costing below Rs.30 lakhs each

WAT Division

KUR Division

SBP Division

Sub Total-WIP

WAT Division

SBP Division

PH-32 (BRIDGE WORKS)

Grand Total

29

Page 30: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

CAP 0 0 1000 0

DRF 409746 117369 69500 223877

Total 626208 160406 106000 362302

WORKS IN PROGRESS

429 02-03 East Coast Railway FM-FM track circuiting

(run through) on E Spl route (13 stations)

DF4 12005 166 12 11827

WALTAIR DIVISION

430 13-14 WAT Divn-Replacement of power supply

system by IPS(10 Stns)( 12 Nos)

DRF 22053 0 19430 2623

431 07-08 Replacement of old and wornout rodding and

associated S&T gears in B, I & J Cabins of

Waltair Marshalling yard

DRF 4147 2509 1500 138

432 08-09 WAT Divn- Replacement of shelf type line

and track relays by plug in type relays at KUR

division and 40 stations

DRF 11769 6785 2520 2464

433 08-09 Provision of Wireless in local loop (WLL)

exchanges for disaster management in WAT

Divn(4 nos)( VSKP,RGDA,KRPU & KRDL)

DF4 4619 16 12 4591

434 08-09 Replacement of exchanges at

KTV,VZM,KRDL & SUP of WAT Divn.

DRF 2038 1469 0 569

435 08-09 Replacement of Main Divisional Exchange at

Waltair.

DRF 4979 2491 0 2488

436 09-10 Provision of Universial Block Interface to work

on OFC in Jagdalpur -Kirandul section of KK

line (30 nos)

DF3 10786 0 11765 -979

437 09-10 Replacement of power plant of OFC

equipment in Main Line & RV Line .

DRF 10983 73 100 10810

438 09-10 Home to FM and Loop line track circuiting of

Tikiri, Rouli, Liliguma & S.Kota (4 stations)

DF4 7490 9646 12 -2168

439 11-12 Provision of IPS in IBS (10 nos) in WAT divn DF3 7558 9351 588 -2381

440 11-12 Provision of backup power supply in K.K line

(23 stns) in WAT divn

DF4 9810 7617 706 1487

441 DRF 9366 4097 5883 -614

CRRM(-) 442 0 442

442 11-12 Provision of track circuiting at D cabin in

WMY

DF4 9469 8168 2059 -758

443 12-13 Provision of Double Distant signal (08 Nos) at

NML, IBS bet VZM - NML, DVD, IBS bet DVD

- GPT of Waltair Divn.

CAP 8089 9667 1 -1579

444 12-13 Provision of Double Distant signal (08 Nos) at

SGDM, IBS bet CPP - SGDM, CPP, GVI, IBS

bet NML - GVI of Waltair Divn.

CAP 8110 1000 1 7109

11-12 Replacement of exchanges (10 nos) at

Marripalem, Bacheli, Jagdalpur, Koraput,

Araku, Rayagada, Visakhapatnam Steel

Plant, Jeypore, Laxmipur and Srikakulam Rd.

PH-32 (BRIDGE WORKS)

Grand Total

PH- 33 (SIGNALLING & TELECOMMUNICATION WORKS)

30

Page 31: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

445 12-13 Provision of Double Distant signal at 5 Stns

(GTLM, PVP, VBL, GPI & GRBL) R.V.Line of

WAT Divn

CAP 8058 12407 1 -4350

446 12-13 Provision of Double Distant signal (08 Nos) at

IBS bet TIU - KBM, Tilaru, Urlam, Dusi,

Ponduru

CAP 8055 3650 1 4404

447 12-13 Prov of Double Distant signal (09 Nos) at IBS

between PUN - PSA, PUN, IBS bet NWP -

PUN, NWP, IBS bet KBM - NWP, KBM of

WAT Divn

CAP 8094 4278 1 3815

448 12-13 Replacement of Integrated Power Supply

System (9 Nos) in WAT Divn.

DRF 9144 9430 1 -287

449 12-13 Replacement of Batteries of IPS ( 28 No) in

Waltair Divn.

DRF 9315 7367 1500 448

450 12-13 Provision of Microprocessor based Remote

Terminal Unit for IBS (10 No) in WAT Divn.DF3 4361 4377 0 -16

451 12-13 Provision of LED Signals at 11 Stations DF(4) 9433 12449 0 -3016

452 12-13 Replacement of existing power supply by IPS

at 06 stations of WAT Division.(BGHU,

SMLG, MVF, CTS, KDPA, KKGM)

DRF 9337 4997 1900 2440

453 12-13 Replacement of existing green aspect LED

unit at approach signals on WAT Division.

DRF 9500 5019 9500 -5019

454 12-13 Ugradation of micro lok version along

replacement of outlived industrial CPU and

VDU on 15 sations of WAT Division.

DRF 4116 0 7000 -2884

KHURDA ROAD DIVISION

455 07-08 Provision of Radio based communication

system link in Tangirapal-Sagadapata-

Chilikdara section .

DF4 2937 0 3261 -324

456 08-09 a) Replacement of shelf type relays by plug-

in type relays at TLHD station of KUR

division.

b) Replacement of over aged plug-in type

relays in TLHR section of KUR division. (100

Nos.)

DRF 2318 676 1600 42

457 08-09 Extension of S&T control to all S&T staff ,

supervisors of KUR Divn

DF3 2570 80 1 2489

458 08-09 Provision of Universal failsafe Block Interface

in Jakhapura-Jaroli section .

DF3 4998 0 0 4998

459 11-12 Provision of un-interrupted power supply to

signals by IPS at IBS(10 Nos) of KUR divn

DF3 9888 9818 713 -643

460 11-12 Provision of un-interrupted power supply to

signals by IPS at 7 nos 'C' class stations of

KUR divn (KRIH, NGMP, BRTG, KJR, SRKT,

SLZ, KUU)

DF3 9896 9025 429 442

461 11-12 Provision of un-interrupted power supply to

signals by IPS at 12 nos LC gates of BRAG-

KUR-BALU of KUR divn

DF3 9988 9894 1671 -1577

31

Page 32: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

462 11-12 Provision of LED signals at all stations and

mid section LC gates from SQQ to ANGL in

CTC-ANGL section of KUR divn

DF4 9976 3417 7058 -499

463 11-12 Strengthening of power supply and provision

of no light protection of signals at 12nos LC

gates of BALU - PSA of KUR Division.

DF3 9971 1585 7696 690

464 DF3 4985 1242 4941 -1198

CRRM(-) 30 30

DRF 4985 4518 1000 -533

465 12-13 Upgradation and extension of Railnet

connectivity of Khurda Road Division.DF3 9990 4272 953 4765

466 12-13 Provision of double distant signals at

KNPR,NRG,KIS & JJKR (04 Nos) stations of

CTC-JJKR section of KUR division.

CAP 8291 8787 1 -497

467 12-13 Replacement of old electronic Exchange by

IP Telephone Exchange based on server

Gateway Architecture in KUR division.

DRF 9634 0 4341 5293

468 12-13 (a) Replacement of OFC equipments at CTC-

BHC sections of KUR Division,(b) Shifting of

OFC equipments at KUR exchange to Test

Room

DRF 9757 96 1043 8618

469 12-13 Replacement of existing CMU of datalogger

at KUR DRM office.

DRF 8679 0 1177 7502

470 12-13 Provision of double distant signal in the

section BHC- KED in KUR division.

CAP 8298 0 1 8297

471 12-13 Provision of double distant signal in the

section KUU- BALU in KUR division.

CAP 4498 0 1 4497

472 12-13 Autosignalling in section BRAG-MCS section. CAP 8900 5113 1 3786

473 12-13 Replacement of existing green aspect LED

unit at approach signals on KUR Division.

DRF 9500 7154 8752 -6406

474 12-13 Replacement of existing microlok outlived

industrial CPU and other cards & VDU on 36

sations of KUR Division.

DRF 9282 0 6766 2516

475 12-13 Autosignalling in RET-KUR section in KUR

Division

CAP 7351 5734 3450 -1833

476 13-14 Provision of Microprocessor based Remote

Terminal Unit and net working at IBS (12

Nos) in Khurda Road Division

DF3 5587 0 5625 -38

477 13-14 Replacement of existing Mechanical

Signalling system at Gurudijhatia station by

Electronic Interlocking system released from

BBS station.

DRF 9941 0 9941 0

478 13-14 Replacement of existing Mechanical

Signalling system at Joranda station by

Electronic Interlocking system released from

BBS station

DRF 9941 0 9941 0

SAMBALPUR DIVISION

11-12 Replacement of wiring & provision of data

logger at SQQ, GJTA, MYZ, JRZ & SSPR(05)

stations and networking with divisional and

Zonal HQ in KUR division.

32

Page 33: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

479 02-03 Sambalpur Division : Replacement of old

obsolete separate type point machine by high

thrust point machine at Harisankar Road and

Lakhana.

DRF 2979 1039 100 1840

480 06-07 Replacement of shelf Type track relays with

Plug-in type relays (QT2) of SBP Div.

DRF 2157 1177 980 0

481 06-07 Replacement of separate type of point

machine with combined type point machine

(IRS) of R-TIG .

DRF 2441 799 100 1542

482 07-08 Sambalpur - Block proving by axle counters

(2 block sections) (double line)

DF4 6500 0 7059 -559

483 07-08 Replacement of Shelf Type Line Relays with

Plug-in type Relays(QN1) In R-TIG section.

DRF 2676 933 100 1643

484 07-08 Replacing of defective Signalling cables in

SBPY—KPJG section

DRF 2703 2147 557 -1

485 07-08 Replacement of Obsolete type of panel by

Domino type panel in 07 stations (ANMD,

BMKJ, KRAR, NPD, LKNA, HSK, MRBL)

DRF 2956 3751 100 -895

486 07-08 Provision of maintenance free Earth

arrangements for Signalling Installations in

SBP Divn.

DF4 2906 16 1647 1243

487 08-09 Sambalpur Division- Replacement of Panel

Interlocking-150 Relays and its wiring at 15

stations

DRF 15286 1000 8000 6286

488 08-09 Provision of maintenance free earth

arrangement for the signaling and telecom

installations of 25 stations in SBP division.

DF4 3408 0 1740 1668

489 08-09 Replacement of single line token block

instruments with token less block instruments

in 10 block sections of JSG-TIG section.

DRF 4457 5533 100 -1176

490 08-09 Provision of Wireless in local loop (WLL)

exchanges for ARTs at SBP & KBJ for

disaster management

DF4 2854 50 3294 -490

491 09-10 Replacement of Signal machines in old PI

stations and making provision for advance

starters, outer and warners of RNBT, TRKR,

BGBR, ARN, BLSN, KMK & MNDH stations

on R-TIG section .

DRF 4235 6059 100 -1924

492 11-12 Provision of Integrated Power Supply system

for 10 nos mid section interlocked LC gates

over SBP divn.

DF3 7561 8477 2932 -3848

493 11-12 DRF 9843 11374 100 -1631

CRRM(-) 100

494 11-12 DRF 7876 8141 1176 -1441

CRRM(-) 400

Replacement of semaphore signals with CLS

in RNBT, MRBL stn, & LC RV-115 of TIG-

KBJ section of SBP divn

Replacement of Analog axle counters of

Raipur-Theruvali section of SBP divn with

SSDACs

33

Page 34: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

495 11-12 Replacement of 256 port obsolete type Data

loggers by 512 port data loggers of 06

stations in SBP-ANGL section of SBP

Division( MANE, HATB, JUJA, RAIR, HNPA,

BONA).

DRF 7315 6836 100 379

496 11-12 Provision of Auto signalling in BBS-MCS

section (UP line)

CAP 9653 278 616 8759

497 11-12 Provision of Auto signalling in BBS-MCS

section (Dn line)

CAP 9721 2461 1 7259

498 11-12 Provision of Auto signalling in BBS-SRKT

section (Dn line)

CAP 9551 0 1 9550

499 11-12 Provision of Auto signalling in BBS-SRKT

section (UP line)

CAP 9619 0 5360 4259

500 12-13 Provision of one digital/ISDN exchange at

Rail Nagar of Sambalpur Division.DF3 3030 637 1176 1217

501 12-13 Repairing of defective Quad cable in

Sambalpur-Angul section of Sambalpur

Division.

DRF 8622 8673 969 -1020

502 12-13 Restoration of defective signals and points of

MNDH yard of SBP division.

DRF 9160 46 46 9068

503 12-13 Double distant at 04 stations CAP 9854 0 1 9853

504 12-13 Replacement of old DG sets with new DG

sets in the SBP-ANGL section of Sambalpur

division.

DRF 9881 0 5000 4881

505 12-13 Replacement of power plant equipment and

earthoing arrengement for OFC equipment

along with provision of CL-B/C protection

devices at WAY stations of SBP Division.

DRF 5079 2865 2900 -686

506 12-13 Provision of solar distled water plants at 08

locations over SBP Division.

DF3 4298 3102 588 608

507 12-13 Replacement defective quad cable in TIG-R

section of SBP Division.

DRF 6670 5236 1841 -407

34

Page 35: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

HEADQUARTERS 0 0

508 08-09 Provision of Wireless networked railnet

connectivity at E.Co.Rly Zonal Headquarter.

DF3 4979 4040 12 927

509 14-15 Works costing below Rs.30 lakhs each

CAP 560

DRF 2500

DF3 12

DF4 2941

CAP 1

DRF 5691

DF3 886

DF4 7928

SBP Division CAP 1

DRF 500

DF3 12

DF4 588

Reserve with HQ DF4 11683

Sub Total-WORK IN PROGRESS CAP 126142 53375 10000 63329

DRF 285120 122290 124855 46666

DF3 110446 65900 40000 5456

DF4 71974 29096 50000 16018

NEW WORKS

WALTAIR DIVISION

510 14-15 Provision of LED Signals in Calling on, Shunt

signal, Route aspect in WAT Divn.

DF4 7839 0 5000 2839

KHURDA ROAD DIVISION

511 14-15 Replacement of old version Integrated Power

Supply System [IPS] of KUR division

DRF 9891 0 4000 5891

SAMBALPUR DIVISION

512 14-15 Replacement of IPS at 08 stations. DRF 9749 0 4000 5749

513 14-15 Provsion of LVCD for the station with central

panel in R-TIG section

DF4 8106 0 4000 4106

514 14-15 Works costing below Rs.30 lakhs each

DRF 500

DF4 200

DRF 500

DF4 200

DRF 400

DF4 200

Reserve with HQ DRF 600

DF4 400

DRF 19640 0 10000 11640

DF4 15945 0 10000 6945

CAP 126142 53375 10000 63329

DRF 304760 122290 134855 58306

DF3 110446 65900 40000 5456

DF4 87919 29096 60000 22963

Total 629267 270661 244855 150054

WAT Division

KUR Division

SBP Division

Sub Total-New works

PH- 33 (SIGNALLING &

TELECOMMUNICATION WORKS) Grand

Total

WAT Division

KUR Division

35

Page 36: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

WORKS IN PROGRESS

KHURDA ROAD DIVISION

515 08-09 Bhubaneswar-Cuttack-Talcher-Rehabilitation

of power supply distribution arrangement

DRF 23500 11903 100 11497

516 09-10 Rehabilitation of existing power supply

distribution arrangement (Ph-III) at

Puri,BHC,JJKR & Rail Vihar/BSR

DRF 20000 0 4000 16000

517 09-10 Provision of 16 metre long high mast for

adequate lighting in coaching complex at

Bhubaneswar.

DF3 2270 0 40 2230

518 12-13 Non regenerative test bed facilities for SGAC

Coaches at Puri.

DF3 2016 1327 58 631

SAMBALPUR DIVISION

519 13-14 Improvement of power supply system at

SBP(DRM/complex, station Building,

additional Space for stores of SSE/EL/SBP)

DRF 16012 0 898 15114

520 13-14 Provision of 11KV ring main system and

Feedser Pillar etc. for stability of Power

supply at Rail Vihar

DF3 8250 0 1 8249

521 13-14 Extension of 11 KV feeder from Railkunj

33/11KV receiving substation to Railvihar

DF3 9275 0 1 9274

HEADQUARTERS

522 09-10 Provision of Electronic energy meter in staff

quarters over Khurda Rd,Sambalpur divisions

& Headquarters.

DRF 6000 0 0 6000

523 09-10 Provision of Automatic Power factor

correctors in the Sub Stations at Rail Vihar ,

Rail Kutir, Kanchanjanga, C.S.Pur,

Bhubaneswar and Mancheswar Workshop.

DRF 2207 0 0 2207

524 11-12 Energy Conservation on East Coast Railway DF3 11000 0 3900 7100

525 14-15 Works costing below Rs.10 lakhs each

DF2 0

DF3 0

DRF 1

DF4 400

CAP 2200

DF1 500

CAP 200

DRF 1

DF3 0

DF4 400

DF1 450

CAP 100

DRF 0

DF3 0

DF4 200

DF1 50

CAP 0 0 2500 0

DRF 67719 11903 5000 50818

DF1 0 0 1000 0

DF3 32811 1327 4000 27484

DF4 0 0 1000 0

WAT Division

PH- 36 (OTHER ELECTRICAL WORKS EXCLUDING TRD WORKS)

KUR Division

SBP Division

Sub total- WORK IN POGRESS

36

Page 37: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

NEW WORKS

KHURDA ROAD DIVISION

526 14-15 Grid connected Solar Roof Top provision in

Rail Sadan Building at Bhubaneswar.

CAP 7196 0 850 6346

527 14-15 Non regenerative test bed facilities for SGAC

Coaches at Puri.

DF3 2414 0 800 1614

528 14-15 Works costing below Rs.10 lakhs each

CAP 20

DRF 500

DF3 40

CAP 20

DRF 500

DF3 40

CAP 10

DRF 500

DF3 20

Reserve with HQ CAP 100

DRF 1000

DF3 100

CAP 7196 0 1000 6346

DRF 0 0 2500 0

DF3 2414 0 1000 1614

CAP 7196 0 3500 6346

DRF 67719 11903 7500 50818

DF1 0 0 1000 0

DF3 35225 1327 5000 29098

DF4 0 0 1000 0

Total 110140 13230 18000 86262

WORKS IN PROGRESS

WALTAIR DIVISION

529 06-07 Standardization of sectioning post between

Chattariput and Jeypore (Km.229/7) in KK

line.

DF4 1878 0 0 1878

530 07-08 Provision of Centralised fault analysis and

fault locating system for 25 KV AC Traction at

2 TSSs.

DF4 2227 1586 0 641

531 08-09 Waltair division: Replacement of existing

corroded cantilever assemblies

DRF 7000 1139 4700 1161

532 09-10 Chimidipalli-Araku-Replacement of Cadmium

copper Catenary wire( 65 Sq.mm) )( 38 Km)

DRF 24935 14314 8300 2321

533 10-11 Replacement of OHE Regulating Equipment

with SS wire rope of existing 1:5 winch type

with 1:3 pully block type over Kottavalassa -

Araku-Kirandul section (Phase-I)

DRF 23780 10918 2000 10862

534 12-13 Provision of HT Capacitor Bank at Jeypore

and Gorapur Traction Sub stations in KK Line

DRF 9882 1 0 9881

SBP Division

Sub Total- New Works

PH- 36 (OTHER ELECTRICAL WORKS

EXCLUDING TRD) Grand Total

WAT Division

KUR Division

PH- 37 (TRACTION DISTRIBUTION WORKS)

37

Page 38: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

KHURDA ROAD DIVISION 0 0

535 08-09 Replacement of defective auto recloser relays

at 9 traction substations of KUR Division.(

BAV,JNP,RBA,SLZ,KPXR,MRDL,JRZ,JKPR

& BHC)

DRF 2540 226 0 2314

536 08-09 Provision of additional capacitor bank at

Jaganathpur & Kaipadar Road/TSS to

improve power factor.

DF3 2982 2336 500 146

537 12-13 Provision of SSP in placeof isolator gantry

near central cabin of KUR Yard for early fault

isolation of OHE.

DF3 9999 1 2500 7498

538 14-15 Works costing below Rs.10 lakhs each

WAT Division DRF 0

DF3 0

KUR Division DRF 1000

DF3 0

SBP Division DRF 0

DF3 0

DRF 68137 26598 16000 26539

DF3 12981 2337 3000 7644

DF4 4105 1586 0 2519

NEW WORKS

WALTAIR DIVISION

539 14-15 Replacement of HT Capacitor Bank at VZM DRF 6789 0 2500 4289

540 14-15 Provision of SP at KAKALUR (Phase-I) DF3 2633 0 2000 633

541 14-15 Works costing below Rs.10 lakhs each

WAT Division DRF 0

DF3 0

KUR Division DRF 0

DF3 0

SBP Division DRF 0

DF3 0

Sub Total- New Works DRF 6789 0 2500 4289

DF3 2633 0 2000 633DRF 74926 26598 18500 30828

DF3 15614 2337 5000 8277

DF4 4105 1586 0 2519

Total 94645 30521 23500 41624

WORKS IN PROGRESS

WALTAIR DIVISION

542 06-07 Visakhapatnam- Pathway, crossways,

moorum pathways and other facilities at

departure yard.

DF3 15216 14434 280 502

543 08-09 Waltair-Maintenance Facility for 140 ton

Break down crane at Loco shed

DF3 6754 8225 470 -1941

PH-42 (WORKSHOP INCLUDING PRODUCTION UNITS)

Sub total- WORK IN PROGRESS

PH- 37 (TRACTION DISTRIBUTION

WORKS) Grand Total

38

Page 39: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

544 09-10 KRPU: 120 t BD crane maintenance facilities

at KRPU

DF3 8092 4087 7000 -2995

545 10-11 CC pathways in OEC yard between L

No.1&2, 3&4 and 5&6 each 1.75 mtrs. Wide

and 600 mtrs length.

DF3 2307 1190 1500 -383

546 12-13 Proposal for extension of covered shed of

size 60 X 20mtrs at Central Sick line

DF3 19017 28182 0 -9165

547 12-13 Proposed extension of Covered Shed of 29 x

34 M at NCC/VSKP

DF3 23660 8508 9000 6152

548 12-13 Facilities for stabling 120T BD Crane

maintenance facilities at KRPU through LB

2012-13

DF3 6156 983 5000 173

549 12-13 Proposal for RCC roof building for sanctioned

CNC surface wheel lathe and other facilities

at CSL/VSKP depot through Law Book 2012-

13.

DF3 9901 1462 5000 3439

550 12-13 Welding grid and other facilities for

RYD/C&W/VSKP depot through Law Book

2012-13

CAP 9969 2254 1400 6315

551 12-13 Replacement of defective AC sheet roofing ,

gutters with galvalume sheet and GI gutters

to the work shop of DLS/WAT.

DRF 9976 0 7000 2976

552 12-13 Welding grid facilities, other facilities at RMU

Yard/C&W/ VSPS.

DF3 5948 0 2100 3848

553 13-14 Concrete flooring apron( 50x25 mts) DRF 1955 0 1 1954

554 13-14 Replacement of service rooms for

maintenanace of various components

DRF 3389 0 1000 2389

555 13-14 Improvement of illumination in diesel loco

shed , Visakhapatnam.

DRF 2479 0 1 2478

KHURDA ROAD DIVISION

556 07-08 Construction of new heavy materials Godown

at Stores Depot of CRW/MCS.

CAP 1642 0 1 1641

557 07-08 CRW/MCS: Provision of Air Conditioning of

Wheel Shop Roller Bearing section

DRF 1653 141 500 1012

558 07-08 Two level P,way line 0f 70 N length each in

front of NTXR office in MCS

DF3 1535 1350 0 185

559 08-09 Provision of non regenerative test bed for

testing of alternators at BBS.

DF3 2400 1715 1 684

560 08-09 Provision of 4.5 KW alternator testing

facilities of TL coaches at TL & AC depot PUI

& BBS.

DF3 2400 1222 1 1177

561 08-09 Provision of over voltage relay with filter

circuit of 4.5 KW TL alternators at

CRW/MCS .

DF3 2653 500 118 2035

562 09-10 MCS: Construction of Work Room for Door

Repair of Coaches near CBR shop (18Mtrs x

30Mtrs x 4.5 Mtrs)approx

CAP 5864 1376 4500 -12

563 09-10 MCS:Renovation and Leveling of Floor with

concreting base of Paint shop (60MtsX60Mts

approx)

DF3 1569 883 1 685

39

Page 40: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

564 09-10 MCS:Renovation & Extension of existing

Inspection Pits in Pit line -03 Nos, by further

extension of (21 Mtrs X 1.32Mtrs X 1.2Mtrs

approx.) each, near TL shop

DF3 1245 2229 0 -984

565 10-11 Extension of assembled wheel park at

CRW/MCS

DF3 4881 0 1 4880

566 11-12 Development of bogie loading /unloading &

bogie parking area near new sick line at

coaching depot PUI

DF3 1129 835 1 293

567 11-12 Terminal coaching maintenance facilities as

per RPC - 4 at TLHR & PRDP stations.

DF3 3168 700 1 2467

568 11-12 Construction of concrete pathways between

line no. 5-6 & 7-8 with electrification & without

pathway only electrification of lines between 9-

10 & 10-11 at TLHR examination yard.

DF3 5376 1629 1 3746

569 11-12 Infrastructure facilities for periodicity of 9

months IOH and 18 months of POH near

SAIL area at coaching Depot, Bhubaneswar.

DF3 7382 1188 1 6193

570 11-12 Improvement of battery charging facility at

coaching complex BBS.

DF3 3038 0 1 3037

571 11-12 construction of cover shed for under floor

wheel latche at coaching depot puri.

DF3 6990 0 1 6989

572 11-12 Construction of cover shed for under floor

wheel latche near SAIL area at coaching

depot Bhubaneswar.

DF3 6873 0 1 6872

573 12-13 BBS-Covershed for Infrastructure facilities for

periodicity of 9 months IOH & 18 months

POH near SAIL area Coaching Depot/BBS.

DF3 6157 0 1 6156

574 12-13 Effluent Treatment Plant for 5 LakhsLtrs per

day at Coaching Depot, Bhubaneswar

CAP 8845 0 4380 4465

575 13-14 TLHR:-Construction of CC pathway , High

mast lights & Rolling in lights for TLHR

examination yard.

CAP 8497 0 1 8496

576 13-14 MCSW: Facilities for CTRB wheel

maintenance for wagons

CAP 5770 0 1 5769

577 13-14 Over head tank, Ground storage tank , deep

tube well and new pipe line for fire hydrants at

MCSW.

CAP 6297 0 6000 297

SAMBALPUR DIVISION

578 09-10 SBP: Construction of one coach length pit for

maintenance of under slung equipments of

power coach of SPART.

CAP 2367 1500 0 867

579 09-10 SBP: Improvement of IOH facility and

extension of site catwalk width of one pit at

coaching deopt

DF3 6569 1652 1 4916

580 11-12 Improvement of pathway for freight train

examination yard at Kantabanji.

DF3 4604 2000 600 2004

581 12-13 Renovation of three catwalks of two existing

integrated pit cum washing lines at Coaching

depot, Sambalpur

DRF 9698 100 4333 5265

40

Page 41: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

582 12-13 Kantabanji: Improvement of illumination at

freight train examination yard

DF3 2943 50 2900 -7

583 13-14 SBP: Replacement of the existing lighting

arrangement with Portal lighting arrangement

at Coaching depot

DRF 2934 0 2001 933

584 13-14 Provision of sick lines and extension of

existing freight train examination lines at KBJ.

CAP 3267 0 2528 739

585 14-15 Works costing below Rs10 lakhs each

CAP 271

DRF 156

DF3 732

CAP 200

DRF 62

DF3 797

CAP 200

DRF 62

DF3 794

CAP 52518 5130 19482 28577

DRF 32084 241 15116 17007

DF3 167963 83024 36304 50958

NEW WORKS

KHURDA ROAD DIVISION

586 14-15 CRW/MCS - Washing pit line for Bogies CAP 1658 0 500 1158

587 14-15 Works costing below Rs.10 lakhs each

CAP 0

DRF 100

DF3 100

CAP 0

DRF 100

DF3 100

CAP 0

DRF 100

DF3 100

Reserve with HQ CAP 0

DRF 200

DF3 200

CAP 1658 0 500 1158

DRF 0 0 500 0

DF3 0 0 500 0

CAP 54176 5130 19982 29735

DRF 32084 241 15616 17007

DF3 167963 83024 36804 50958

TOT 254223 88395 72402 97700

PH-51( Staff Quarters)

WORKS IN PROGRESS

WALTAIR DIVISION

588 07-08 Palasa - Visakhapatnam- Repl. Of quarters,

type-I-52 & type-II-6 units

DRF 19375 21220 0 -1845

589 07-08 Construction of 6 units Type-I Qtrs for

Trackman at Darliput station on KK line

CAP 4032 5148 0 -1116

590 08-09 Construction of new 6 units Ty-II qtrs at

Jeypore (JYP)

CAP 3692 6428 2973 -5709

KHURDA ROAD DIVISION

KUR Division

SBP Division

SUB TOTAL-NEW WORKS

PH-42 (WORKSHOPS INCLUDING

PRODUCTION UNITS) Grand

Total

WAT Division

KUR Division

SBP Division

Sub Total-WORK IN PROGRESS

WAT Division

41

Page 42: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

591 08-09 Construction of 4 units Ty-II quarters and 2

units Ty-III quarters at Angul.

CAP 3898 3969 2500 -2571

592 08-09 Construction of 5 units Ty-II quarters and 1

unit Ty-III quarters in replacement of existing

old & damaged Qtrs at Talcher

DRF 3819 0 3500 319

593 09-10 Construction of Railway Quarters Type-II 6

nos. & Type –III 6 nos for Running staffs at

ANGL.

CAP 7721 5433 1500 788

594 09-10 Construction of Railway Quarters Type-II 6

nos. & Type –III 6 nos. for Running staffs at

TLHR.

CAP 8781 0 3000 5781

595 09-10 Construction of Railway Quarters Type-II 5

units. & Type –III 5 units for Running staffs at

PRDP.

CAP 7184 5503 800 881

596 09-10 Construction of Railway Quarters Type-II 6

nos. & Type –III 6 nos. for Running staffs

and C&W staff at BBS.

CAP 9979 0 0 9979

597 09-10 Construction of 16 units new Ty-II quarters at

KUR in replacement of existing old damaged

quarters

DRF 9733 9843 2000 -2110

598 11-12 Construction of 8 units Type-II Qrts at Rail

vihar colony, CSPUR, BBSR

CAP 6975 6906 4500 -4431

599 09-10 Construction of 4 units of Ty-V Qrs. at Rail

Kunj for Hqrs Officers.

CAP 8896 0 2000 6896

600 10-11 Construction of 3 units Type-V quarters at

Rail Kunj for Hqrs officers, Bhubaneswar

CAP 7187 0 1447 5740

601 12-13 Construction of 5 nos.Ty.-III staff quarters at

Talcher.

CAP 6557 7009 1500 -1952

602 12-13 Proposed construction of 10 units of Ty-II

Qtrs in replacement at Talcher

DRF 9533 9135 1809 -1411

603 13-14 Construction of 06 units Ty-II quarters for

the Loco running staff at KDJR(Kendujhar

garh)..

CAP 4666 0 3500 1166

SAMBALPUR DIVISION

604 08-09 Replacement of 55 units of TY-I& 2 units of

TY-II quarters in Jharsuguda-Titlagarh

section

DRF 18924 18797 0 127

605 09-10 ANGL:Construction of 6 units of Ty-II and 6

units of Ty-III quarter for crew booking staff.

CAP 4430 4196 234 0

606 13-14 Replacement of condemened Ty-I quarters

by construction of 6 units Ty-II ( G+2)quarters

at Balangir station of Sambalpur Division.

DRF 5339 0 5338 1

607 14-15 Works costing below Rs.10 lakhs each

DRF 110

CAP 200

WAT Division

42

Page 43: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

DRF 132

CAP 200

DRF 47

CAP 100

CAP 83998 44592 24454 15452

DRF 66723 58995 12936 -4919

NEW WORKS

608 14-15 Works costing below Rs.10 lakhs each

CAP 40

DRF 40

CAP 40

DRF 40

CAP 20

DRF 20

Reserve with HQ CAP 100

DRF 100

CAP 0 0 200 0

DRF 0 0 200 0

CAP 83998 44592 24654 15452

DRF 66723 58995 13136 -4919

Total 150721 103587 37790 10533

WORKS IN PROGRESS

WALTAIR DIVISION

609 05-06 Extension of Casualty in Divisional Railway

Hospital

DF2 1285 1564 0 -279

610 05-06 Erection ,Commission & Installation of central

gas pipeline system of oxygen compressed

air & vacuum system in indoor hospital

,VSKP.

DF2 819 0 100 719

611 08-09 Waltair division: Rewiring of 885 units of staff

quarters over Waltair division( Ty-I-25,Ty-

I(spl)-150,Ty-II-500,Ty-III-75 & Ty-IV-35 nos.

DRF 11500 8367 3233 -100

612 09-10 Medicine Store Room of Divisional Railway

Hospital at WAT.

DF2 710 747 0 -37

613 11-12 Augmentation of water supply & purification

arrangenment with provision of

sedimentation tank ,filter beds along with

associated works at Rayagada station on RV

line of WAT Divn.

DF2 7074 0 0 7074

614 11-12 Augmentation of water supply to Staff

quarters by providing 84 nos Individual Sintex

water tanks of 2000 litre capacity each for

multistoried Qrs at Bacheli Railway colony on

KK-II-Line of WAT divn

DF2 3198 1110 1100 988

615 11-12 Construction of new PME room of Divisional

Railway Hospital,VSKP

DF2 1748 0 112 1636

616 12-13 Proposed Replacement of damaged pipeline

at Steel Plant in SSE/W/VDPD section under

DEN/HQ

DRF 2781 0 1510 1271

617 12-13 Rewiring of staff quarters at KRDL sub unit DRF 8674 5149 696 2829

KUR Division

PH-51( Staff Quarters)

Grand Total

PH-52( Amenities for Staff)

SBP Division

Sub Total-WORK IN PROGRESS

WAT Division

KUR Division

SBP Division

Sub-Total-New works

43

Page 44: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

618 12-13 Proposed construction of Gr-D and

subordinate rest house at VSKP under the

juridiction DEN/HQ/WAT

CAP 9019 5071 1500 2448

619 13-14 Augmentation of water suply arrangements

on wayside stns of KK-1 Line like provision of

deep tube well with all amenities (MVW,

BDVR, SUP, CMDP, TXD, ARK, GPJ, DPC,

MKRD, SXV, KRPU, JRT, MVG), RCC tanks,

infilteration gallery etc. on KK line under the

jurisdiction of Sr.DEN/Central/WAT of

Waltair.

DF2 22081 2318 17500 2263

620 13-14 Provision of G S W Tank of 1.5 lakh Gallons

cap and R.C.C OH Tank of 50,000 Glns cap

for TC Palm, MK area, N Colony at VSKP

DRF 9879 2242 8000 -363

621 13-14 Solar water heater system for Railway

Hospital/VSKP, Running Rooms

SCMN,MYD/VSKP,JDB,RGDA & DMNJ

DF2 4369 0 4200 169

622 13-14 Prop. Improvement to staff quarters at KTV,

PDT, DVD & SCMN stations under

Sr.DEN/E/WAT

CAP 9942 1805 9000 -863

623 13-14 Improvements of 64units of Ty-II staff

quarters at jail area, VSKP of waltair Division.

CAP 7016 1727 5400 -111

KHURDA ROAD DIVISION

624 06-07 Khurda Road & Sambalpur Division-

Eletrochlorinator at 44 nos. (SBP 30 nos&

KUR 14 nos.)

DF2 13700 881 500 12319

625 06-07 Bhubaneswar: Central gas pipe line system

in Central Hospital

DF2 3000 0 100 2900

626 08-09 Construction of Badminton Hall for New East

Coast Railway Zone at Bhubaneswar

CAP 23557 16326 500 6731

627 08-09 Expansion of Central Hospital( 2nd Phase) at

MCS.

DF2 16447 13563 100 2784

628 08-09 Rewiring of staff quarters over Khurda

division(630 units)

DRF 7333 856 1798 4679

629 09-10 Rewiring of staff quarters over KUR Division DRF 7323 3666 1000 2657

630 09-10 Construction of Holiday Home ( Two rooms)

for officers and staff at Gangtok

DF2 2000 0 2000 0

631 11-12 Provision of iron grills & frames at D,E, & F

Type quartes for safety of occupent at Rail

vihar colony, CSPUR, BBSR

DF2 9505 7387 3000 -882

632 11-12 provision of piped water supply arrangement

at stations BTV, BUDR, MZZ, KED & BGPL

with 12 x 100 mm dia deep tube well. RCC

staging to PVC tank of 2000 liters capacity

along with submersible pump under the

jurisdiction ADEN/JJKR of KUR Division.

DF2 8094 4048 4500 -454

633 12-13 Re-wiring of staff Qtrs at RailVihar DRF 3498 1393 1000 1105

44

Page 45: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

634 12-13 Construction of four/two wheeler shed for

parking of vehicles at ECOR Sadan.

CAP 6334 0 4859 1475

635 12-13 Proposed construction of Group-D rest

House on the top of the proposed

subordinate rest house at Chandrasekharpur,

Bhubaneswar.

CAP 5279 331 1641 3307

636 12-13 Proposed construction of Subordinate Rest

House at Chandrasekharpur, Bhubaneswar.

CAP 8653 4081 3000 1572

637 12-13 Provision of Cup boards, mesh doors at Ty-V

Qtrs and at officers transit at Rail Kunj, Rail

kutir, MCS colony

DF2 10000 4525 5000 475

638 12-13 Proposed replacement of damaged door and

windows at staff Qrs at Paradeep Railway

colony

DRF 9288 6866 1500 922

639 12-13 Proposed construction of Yoga hall(Gr.floor0 ,

meditation Hall (1st floor) at Rail Kunj CSPR.

DF2 9991 7939 2500 -448

640 12-13 Provision of Subordinate rest house at KUR. DF2 7390 2700 4000 690

641 12-13 Improvement to community hall at Rail Vihar

Bhubaneswar- providing kitchen area and

dinning space etc.

CAP 1047 0 500 547

642 13-14 Solar water heater in Running Room over

KUR Division

DF2 1835 0 1800 35

643 13-14 Provision of 1st floor on the existing building

for Gynaecological ward of 10 bedded

Hospital at MCS.

CAP 1820 0 800 1020

644 13-14 Construction of 20 bedded rest house for Gr-

D staff at KUR.

CAP 1978 0 1500 478

SAMBALPUR DIVISION

645 02-03 Sambalpur division -Construction of intake

well at Suktel river between Bolangir- LSX.

DRF 6022 5657 300 65

646 08-09 Improvements to old TY-II,TY-III quarters

,provision of individual Sintex tank in Ty-I,II

quarters renovation of kitchen rooms in Ty-

I,II,III quarters & masonary fencing infront of

quarters at SBP .Provision of varanda with

grill gate to staff qtrs

DF2 24098 19663 4734 -299

647 09-10 Rewiring of staff quarters 500 Nos. over SBP

Division

DRF 14827 7307 1000 6520

648 09-10 Augmentation of water supply at

MNGD,THV,AMB ,NRLR & DKLU stations

between TIG-THV section of SBP Division.

DF2 14716 15040 2500 -2824

649 14-15 Works costing below Rs.10 lakhs each

CAP 50

DRF 0

DF2 1464

CAP 50

DRF 0

DF2 2952

WAT Division

KUR Division

45

Page 46: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

CAP 25

DRF 0

DF2 1640

CAP 74645 29341 28825 16604

DRF 81125 41503 20037 19585

DF2 162060 81485 59802 26829

NEW WORKS

WALTAIR DIVISION

650 14-15 GW Storage Tank of 50,000 glns cap.and

RCC OH Tank of 25,000 glns cap. at EP Rly

colony at VSKP under DEN/Estate/WAT.

DF2 9999 0 20 9979

651 14-15 Augmentation of water supply by providing

hand tube wells at railway colonies, level

crossings etc., under Sr.DEN/Central on KK

Line of WAT DIVN.

DF2 3865 0 20 3845

KHURDA ROAD DIVISION

652 14-15 Augmentation of water supply to staff

quarters at Talcher station of Khurda Road

Division

DF2 9581 0 60 9521

653 14-15 Works costing below Rs.10 lakhs each

CAP 40

DRF 20

DF2 0

CAP 40

DRF 20

DF2 0

CAP 20

DRF 10

DF2 0

Reserve with HQ CAP 100

DRF 50

DF2 0

CAP 0 0 200 0

DRF 0 0 100 0

DF2 23445 0 100 23345

CAP 74645 29341 29025 16604

DRF 81125 41503 20137 19585

DF2 185505 81485 59902 50174

Total 341275 152329 109064 86363

WORKS IN PROGRESS

WALTAIR DIVISION

654 06-07 Provision of POET at PRS locations at

VSKP,VZM,CHE and RGDA stations

DF1 575 0 575 0

655 09-10 Improvement of front façade of station

building at VSKP

DF1 21335 9425 11000 910

656 09-10 Raising of platform level of PF No.2/3 and 4/5

from Rail level to High level at at KTV station.

DF1 9983 3662 6321 0

SBP Division

Sub Total-WORK IN PROGRESS

WAT Division

KUR Division

SBP Division

Sub-Total-New Works

PH-52( Amenities for Staff)

Grand Total

PH-53( Passenger Amenities)

46

Page 47: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

657 09-10 KRPU: Provision of New PRS Complex,

Improvements to concourse, provision of

sleeper and general waiting hall and other

incidental works on KK line

DF1 8101 6916 2000 -815

658 09-10 KRPU: Provision of Electronic coach

indication boards

DF1 6107 0 1600 4507

659 09-10 PVP: Provision of Electronic coach indication

boards

DF1 5890 0 2500 3390

660 10-11 Rayagada- Development of circulating area

and provision of 3 bays of PF shelter on PF

No. 2/3 of Rayagada station

DF1 16916 14507 4607 -2198

661 Extension of PF to accommodate 18 coaches

at GPI, DNV, KMX, SNM, GMDA, KNRT &

JMPT stations.

DF1 16573 13340 4211 -978

662 12-13 Provision of dedicated Coach Watering

facilities, additional new island platform with

FOBconnection to Platform No. 1 at

Jagadalpur station.

DF1 15969 3633 11195 1141

663 13-14 Provision of 2 Bays PF Shelters each at VZM,

CHE, VBL, DVD, JDB, PVPT stations and 1

Bay each at JYP and PVPT stations on WAT

Division.

DF1 19727 1197 10000 8530

664 13-14 Washable aprons on Platform No.2 for full

length and North and South extended

portions on PF No.1&3 at Visakhapatnam

Station

DRF 18575 0 20000 -1425

KHURDA ROAD DIVISION

665 04-05 Bhubaneswar- provision of foot over bridge

3.66 m in replacement of existing of foot over

bridge.

DRF 4976 6609 588 -2221

666 05-06 Provision of Mobile charging facilities in 58

self generated AC Coaches

DF1 1800 1830 0 -30

667 06-07 Air conditioning of Booking office at BAM &

BBS

DF1 2914 1730 0 1184

668 06-07 CRW/MCS: Provision of mobile and laptop

charging points in Sleeper coaches.

DF1 2354 0 0 2354

669 08-09 Washable appron for PFs no. 4 at PURI DF1 8193 0 6000 2193

670 08-09 DNKL: Proposed extension & raising of

platform no.2 to accommodate 24 coaches

train at DNKL station.

DF1 4160 4693 0 -533

671 08-09 CTC: Construction of balance cement

concrete apron on PF-1 at Cuttack station on

Howarh end.

DF1 5958 0 4000 1958

672 08-09 CTC: Construction cement concrete apron

on PF no. 2 at Cuttack station

DF1 4948 5342 0 -394

673 08-09 Raising of PF no. 1 at BAM station DF1 6000 5930 1000 -930

674 09-10 CTC-Replacement of old damaged AC sheet

by providing galvalume sheet on PF No. 1,2 &

3 at Cuttack Rly. Station.

DRF 6202 4727 1475 0

47

Page 48: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

675 09-10 KUR:- i) Provision of 08 beds ladies

dormitory ii) Improvement of signage.

DF1 3762 1835 1000 927

676 09-10 KUR: Raising of PF no.2 and PF no.3 (350

mm) from LL to HL

DF1 9937 14817 0 -4880

677 09-10 KUR: Upgradation of enroute watering

system at KUR as per CAMTECH design.

DF1 3296 3910 500 -1114

678 09-10 CTC: Improvement to water supply system by

providing of 50000 gallon capacity RCC Over

Head Tank along with allied works.

DF1 4641 3395 1000 246

679 09-10 Improvement to lighting and fannage

including provision of purified cold drinking

water system at ANGL,CAP,DNKL, IPM,KIT

& SPT

DF1 5024 5096 0 -72

680 09-10 BBS: Provision of emergency power supply

to station building, platforms, PRS and

Circulating area

DF1 5960 0 4500 1460

681 09-10 CTC: Provision of emergency power supply

to station building, platforms, PRS and

Circulating area

DF1 4225 0 4200 25

682 09-10 PUI-Provision of emergency power system to

station buildings, platforms, PRS and

circulating area

DF1 4854 0 4200 654

683 09-10 CTC: Proposed improvement to washable

apron on R/ 2 alongwith allied works

DF1 6555 2553 1500 2502

684 09-10 PSA & BHC: Raising of PF No 1 at PSA and

PF No 1&2 at BHC from LL to HL

DF1 9151 11981 0 -2830

685 09-10 BALU: Provision of 02 bays RDSO type PF

shelter each on PF No.1,2&3

DF1 5105 2501 400 2204

686 09-10 SPT: Provision of 02 bays RDSO type PF

shelter on PF No 2 and 02 bays on PF No 4

DF1 3473 3200 400 -127

687 09-10 TLHR: Provision of 02 bays RDSO type PF

shelter on PF No 1-A and 02 bays PF cover

in between station building and exiting PF

shed on PFNo 1

DF1 4024 3852 200 -28

688 10-11 Provision of one non AC Retiring room , one

06 bedded Gents dormitory,one 06 bedded

ladies dormitory , 1st class waiting room

(Gents),1st class waiting room (Ladies), One

pay and use toilet and provision of piped

water to PF no. 2 &3 at Angul station.

DF1 7772 11157 500 -3885

689 11-12 Raising of PF.No.-1 and PF.No.-2&3 from LL

to HL at KAPG station.

DF1 14417 9805 7000 -2388

690 11-12 Raising of PF No-1&2 from RL to HL and two

bays RDSO type PF shelter each on PF No-1

& 2 at Tacher Road.

DF1 17261 5797 7000 4464

691 12-13 East Coast Railway-Escalators at

Bhubaneswar( 2 nos)

DF1 12600 0 12500 100

692 12-13 Proposed construction of balance portion of

washable apron on PF No.4 at Puri station

DF1 10290 0 7500 2790

48

Page 49: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

693 12-13 Up-gradation of additional watering

infrastructural facilities at Khurda Road

station due to proposed shifting of CTS from

BBS to KUR.

DF1 12275 6359 6000 -84

694 12-13 Provision of RDSO type PF Shelter at

Raghunathpur and Angul stations.

DF1 14138 5300 5000 3838

695 12-13 Extension of FOB at KIS. DF1 5013 463 2000 2550

696 12-13 Provision of water hydrant pipe line at the off

side of PF No. 1 & 3 at PUI station

DF1 7237 6631 4000 -3394

697 12-13 Replacement of the existing station building

by new staion building at Kalupadaghat.

DRF 7438 793 7438 -793

698 12-13 Provision of ramp for inter platform

movement by physycally disabled passengers

at BAM station.

DF1 14166 9998 3000 1168

699 13-14 Provision of train information display units (TV

Based) for A-1 and A category stations

DF1 18168 0 500 17668

SAMBALPUR DIVISION

700 05-06 Provision of Electro-chlorination system of

filter plant at HKG,BRGA,BONA,RAIR &

BUDM stations of Sambalpur division.

DF1 1490 1193 200 97

701 08-09 Hirakud & Boinda-FOB and Rail level

platform

DF1 18816 15490 1000 2326

702 08-09 Provision of Concrete benches of 150

numbers and mini polycarbonate sheet PF

shelters at different stations in JSG-TJG &

SBP-ANGL section .

DF1 4930 4044 300 586

703 08-09 Provision of Concrete benches of 150

numbers and mini polycarbonate sheet PF

shelters at different stations in R-THV

section.

DF1 4930 3205 500 1225

704 08-09 Renovation of second class waiting hall with

the provision of toilet, over head water tank

for station(Syntax) improvement of station

frontage and booking counters at

MRBL,THV,HSK,

MNDH,BRGA,ATS,BRPL,SFC, LSX stations

DF1 4456 4746 0 -290

705 09-10 Provision of pipe line to draw water from

PHED filter house to Railway filter house,

R.C.C. OH Tank of 2,25,000 ltrs. Capacity

and ground water reservoir tank in filter

house for augumentation of water supply at

Sambalpur.

DF1 21253 37 1000 20216

706 09-10 Provision of washable apron with jet cleaning

facility at PF no. 3 at Sambalpur station.

DF1 8565 0 4064 4501

707 09-10 BLGR &TIG: Provision of four bedded AC

Dormotory for ladies each at

BLGR,TIG,Provision of coach indication

board at BLGR and provision of LED based

signage display for Retiring room,Upper

Class waiting room ,Ladies waiting room ,VIP

Lounge, booking office

DF1 4798 1500 1000 2298

49

Page 50: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

708 09-10 TIG - Provision of coach watering facilities

between line no. 1 & 2 for coaches of trains

DF1 4674 3564 1000 110

709 09-10 KSNG: Improvement of circulating area

towards the entrance to PF No1 with the

provision of cycle/ Motor cycle/scooter

parking. Rickshaw and car parking area with

the provision of tower mast lighting

DF1 4950 1769 1000 2181

710 09-10 SBP:- Provision of 7 bays of PF shelter

with kota stone flooring on PF No.2 & 3

DF1 8661 6509 1411 741

711 09-10 BRGA: Extension of PF no. 1 for 12 meters

and PF no. 2 for 104 meters with raising of

PFs to HL to accommodate 24 coaches trains

and provision of 02 bays PF shelter on PF

no.2.

DF1 4950 5000 1500 -1550

712 09-10 KSNG: Extension of PF no.4 for 87 meters

with raising of PF to HL and provision of 03

bays PF shelters on PF no. 4 and Extension

of PF no.1 for another 87 meters by shifting

the existing HP located between CH 139.5 m

to CH 210.5 m to new location at CH 22

DF1 7989 6876 994 119

713 09-10 Renovation of existing merchant room and

provision of labour rest roomalong with

drinking water facility at goods siding of

Mahasamunda,Ksinga,Bolangir and Bargarh

Road.

DF1 4417 1886 2000 531

714 10-11 Provision of ten bays PF shelter on PF

No.2&3 with the provision of concrete

benches at Titlagarh station .

DF1 9255 9231 2000 -1976

715 10-11 Provision of Ladies Dormitory, Ladies waiting

hall, Upper class waiting hall, Pay & use

Toilet and Platform surfacing at DKLU & LJR

stations of Sambalpur Division in connection

with development of Adarsh Station.

DF1 9032 8468 2000 -1436

716 10-11 Development of Rengali & Lapanga for

Adarsh station by providing amenities such

as dormitory, upper class waiting room for

ladies, toilet complex, platform edge

concreting & chequered tiles, toilet for

physically handicapped persons, provision of

precast

DF1 9127 285 6123 2719

717 11-12 Provision of 02 bays PF Shelter each on PF-2

at BRPL, PF- 1 at AMB , PF-1 & PF-2 at

RPRD & NRLR stations with provision of

concrete benches under covered areas.

DF1 14125 7066 11291 -4232

718 13-14 Provision of deficient concrete benches and

water taps and provision of deficient urinals

for ladies and gents separately at various

stations of Sambalpur Division.

DF1 11432 0 2000 9432

719 13-14 Provision of deficient PF shelter 50 sqm each

with fan & concrete benches at 20 stations

and provision of deficient water coolers at

various stations of Sambalpur Division.

DF1 12040 222 2000 9818

720 13-14 Procurement of Dustbin for stations DF1 2956 0 1000 1956

50

Page 51: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

721 14-15 Works costing below Rs.1.0 crore each

DF1 4008

DRF 30000

DF1 7370

DRF 47122

DF1 3000

DRF 25000

DF1 533693 261946 194670 91455

DRF 37191 12129 131623 -4439

NEW WORKS

WALTAIR DIVISION

722 14-15 Improvement of circulating area towards

Gnanapuram side of VSKP station

DF1 19526 0 1500 18026

723 14-15 Impro. of PF No.8 with covering of uncovered

Shelter area, flooring and con. of Pylon at

Entry and exit GNPM at VSKP under

DEN/Estate/WAT

DF1 15301 0 1000 14301

724 14-15 Washable apron on PF no.1& 3 for 700m

length at Koraput Station

DF1 19126 0 500 18626

725 14-15 PF at 12 stations i.e. DVD, ARK, BGHU,

TKRI, GRBL, KMX, DNV, KNRT, RUL, PDT,

SGDM & SNM WAT Division.

DF1 19976 0 500 19476

726 14-15 Llight weight PF shelters at 36 E category

stns WAT Division..

DF1 15995 0 700 15295

727 14-15 Provision of additional FOB towards AKP end

connecting all the platforms (PF No. 1, 2/3 &

4) at DVD Rly. Station.

DF1 10301 0 200 10101

KHURDA ROAD DIVISION

728 14-15 Augmentation of water supply for train and

coach watering at Talcher station .

DF1 19755 0 7000 12755

729 14-15 Provision of water cooler at various stations

over Khurda Road Division as per MEA(Total

80 Nos at 24 stations).

DF1 13940 0 4000 9940

730 14-15 Provision of escalator(02 Nos) at

Bhubaneswar station.

DF1 18521 0 200 18321

731 14-15 Provision of 02 bays PF shelter on PF No.1 &

2 and PF No.3 & 4 and ramp for inter

changing platforms by physically disabled

passengers at CAP.

DF1 19251 0 1500 17751

732 14-15 Raising of PF No.1 & 2 and PF No.3 & 4 from

low level to high level at KIT station.

DF1 18667 0 400 18267

733 14-15 Construction of approach road to Cuttack

goods shed.

DF1 10235 0 1000 9235

734 14-15 Replacement of broken AC sheets of PF

shelters at Bhubaneswar, Cuttack and

Khurda Road stations.

DF1 14213 0 4000 10213

735 14-15 Provision of 04 bays PF Shelter on PF No1

and 12 bays on PF No.2 at Dhenkanal

station.

DF1 19510 0 1200 18310

WAT Division

KUR Division

SBP Division

Sub Total-WORK IN PROGRESS

51

Page 52: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

736 14-15 Construction of RCC OH Tank 2. 5 lakhs ltrs

capacity and power supply arrangement to

tunnel type mechanised laundry at coaching

depot at Bhubaneswar.

DF1 12509 0 200 12309

737 14-15 Provision of latrines and urinals at stations

over KUR Division of East Coast Railway

DF1 12819 0 500 12319

738 14-15 Raising of PF No.1 from LL to HL at RHMA

and RCTC station and 04 bays PF shelter on

PF No.1 at Paradeep and 02 bays at RHMA

station.

DF1 16783 0 400 16383

739 14-15 Provision of escalator (02 Nos) at Cuttack

station

DF1 18577 0 500 18077

SAMBALPUR DIVISION

740 14-15 Provision of RCC over head tank of 2.5 lakh

litre capacity including construction of

clarifloculator with rapid sand gravity filter at

TIG station.

DF1 17737 0 1000 16737

741 14-15 Provision of one bay standard PF shelters at

HSK, NPD, ARN, BMCK, BXQ, DFR, DKLU,

GBQ, LPG, MRBL, BONA, RPRD & SSN

stations.

DF1 18261 0 1500 16761

742 14-15 Replacement of sheets over PF shelters and

replacement of flooring on PF at SBP and

provision of concrete surface over PF.

DF1 19829 0 1500 18329

743 14-15 Augmentation of water supply at HATB,

JUJA, CHAR, BAMR, HNPA, BONA, KPJG

and JRPD station of SBP-ANGL section.

DF1 18890 0 400 18490

744 14-15 Augmentation of water supply at SFK, BUDM,

SFC, DFR, LSX, KHPL, DJX and BRPL

station of JSG-TIG section.

DF1 19560 0 300 19260

745 14-15 Works costing below Rs.1.0 crore each

DRF 6000

DF1 0

DRF 7000

DF1 0

DRF 5000

DF1 0

DRF 2000

DF1 0

WAT Division

KUR Division

SBP Division

Reserve with HQ

52

Page 53: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

DRF 0 0 20000 0

DF1 389282 0 30000 359282

DRF 37191 12129 151623 -4439

DF1 922975 261946 224670 450737

TOT 960166 274075 376293 446298

WORKS IN PROGRESS

746 12-13 East Coast Railway - Boundary wall/fencing

to prevent encroachment on railway land (PB

821/2012-13/NR)

DF3 20000 0 7200 12800

WALTAIR DIVISION

747 04-05 Augmentation of Material storage facilities at

DLS/WAT.

DF2 4795 4045 751 -1

748 04-05 Construction additional space for Elect Stores

at ELS/WAT

DF2 4872 5079 0 -207

749 07-08 Waltair-32 bedded running room for

passenger & goods crew.

DF3 12033 11275 500 258

750 09-10 Construction of type design building as RPF

Post at VSKP

DF3 4798 1705 3000 93

751 09-10 Damanjodi: Running room at Damanjodi for

30 beds

DF3 9998 2565 7674 -241

752 09-10 Renovation of existing running (old) at RGDA

for 45 beds

DF3 9979 9731 2135 -1887

753 11-12 Easening of slopes at Km 71/16-19 near

Tunnel no. 38 B upper face and construction

of guide channel walls on downstream side of

Br. No. 193 to facilitate smooth flow of water

through the bridge at Km. 54/1-2 between

TXD-CMDP stations on KK line under the

jurisdiction of Sr.DEN/Central / WAT

DF3 7589 8119 500 -1030

754 12-13 Proposed repairs for protection of track

between DMNJ - KKGM on K.R. line..

DF4 9837 0 1288 8549

755 12-13 Proposed to Construction of RCC precasat

boundry wall at Visakhapatnam Railway

Station under Integrated Security System

(ISS) under ADEN/MYD/WAT of Waltai

Division

DF2 8549 0 146 8403

KHURDA ROAD DIVISION

756 04-05 Development of Bomb Detection Squad CAP 2921 0 100 2821

757 06-07 CTC: Provision of furniture for Divisional

Training School.

CAP 1541 232 300 1009

758 06-07 Provision of swimming pool at Railkunj/MCS. DF3 1000 485 0 515

759 07-08 Keonjhargarh - Crew booking lobby DF3 6596 7806 0 -1210

760 07-08 Improvement of KUR Crew (Senior) Running

Room at Palasa

DF3 3759 1273 500 1986

761 08-09 Upgradation of Running Rooms at Palasa. DF3 13995 4679 1500 7816

762 09-10 Construction of 32 bedded running room at

ANGL.

DF3 10681 10151 3000 -2470

Sub Total-New Works

PH-53(Passenger Amenities)

Grand Total

PH-64( Other Specified Works)

53

Page 54: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

763 11-12 Provision of modular work station for CWM's

office, Mancheswar

DRF 2048 437 500 1111

764 11-12 PRDP- Proposed construction of Sub-

Ordinate rest house at PRDP.

CAP 5570 0 500 5070

765 11-12 PRDP- Proposed construction of Officer's

rest house at PRDP.

CAP 3628 2995 2000 -1367

766 11-12 CSPR- construction of Kitchen cum store

behind officer's club at Rail Kunj.

CAP 1999 0 1500 499

767 11-12 Provision of boundary walls of 800mtrs length

and 3.00mtrs of height for pollution control

measures at Railway sidings of NYG station.

DF3 3006 0 0 3006

768 11-12 Provision of boundary walls of 800mtrs length

and 3.00mtrs of height for pollution control

measures at Railway sidings of PRNR

station.

DF3 3006 1309 0 1697

769 11-12 Provision of boundary walls of 1000mtrs

length and 3.00mtrs of height for pollution

control measures at Railway sidings of NRG

station with entry and exist facility.

DF3 3743 2644 1500 -401

770 12-13 Construction of additional 16 beded running

room over existing Neelachal running room at

KHURDA ROAD.

CAP 4983 1357 2500 1126

771 12-13 Construction of additional 16 beded running

room over existing jagannath running room at

KHURDA ROAD.

CAP 5022 1268 1500 2254

772 12-13 Additional 16 beded running room Over

existing RR at Paradeep.

CAP 6072 3892 2000 180

773 12-13 Proposed construction of skeleton RCC

frame work for front portion of ground floor on

left side and right side and second

floor(Central Part of Railway Stadium at

MCS/BBS.

DF2 9739 2185 7500 54

774 13-14 Construction of additional rooms in second

floor at OHR/Rail Kunj of Bhubaneswar.

DF2 9965 0 6000 3965

775 13-14 Construction of new 32 bedded running room

at Bhadrak in Khurda Road Division.

DF3 18092 0 15000 3092

776 13-14 Construction of 20 beded barrack for running

staff at Kendujhargarh in KUR Division

DF3 6632 0 6000 632

777 13-14 Provision of poly steel lamp post in Jugging

Park and approach road infront of ORH at

Railkunj.

DRF 2730 0 0 2730

778 13-14 Construction of 16 bedded runing room at

Paradeep.

CAP 8486 0 4000 4486

779 13-14 Provision of Elevator in the premises of

Divisional Railway Manager's office at Khurda

Road

DF2 1493 0 1494 -1

54

Page 55: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

780 13-14 Balance work in connection with

Bhubaneswar-Air conditioning with

temperature and humidity control of ECoR

Sadan.

DF2 3989 0 3141 848

SAMBALPUR DIVISION

781 09-10 Provision of mini stadium at sambalpur DF2 24973 10989 3068 10916

782 09-10 SBP: Construction of 10 bed ladies barrack,

10 bed sub-ordinate officers barrack,

recreation room and Gymnasium for RPF at

Sambalpur.

DF3 5583 2432 481 2670

783 09-10 Brunamal: Construction of RPF Out post

building at Brundamal station.

DF3 3500 2122 1277 101

784 12-13 Construction of 40 bedded running room at

Sambalpur

DF3 17546 367 10000 7179

785 12-13 Provision of Office accommodation in vacant

space at the second floor at Divisional

Railway Manager office at Sambalpur station

.

DF3 6043 3332 44 2667

786 14-15 Works costing below Rs10 lakhs each

CAP 100

DRF 1000

DF2 1500

DF3 1000

DF4 18

CAP 255

DRF 1700

DF2 2500

DF3 2180

DF4 0

CAP 50

DRF 500

DF2 2000

DF3 700

DF4 0

CAP 40222 9744 14805 16078

DRF 4778 437 3700 3841

DF2 68375 22298 28100 23977

DF3 167579 69995 64191 37273

DF4 9837 0 1306 8549

NEW WORKS

WALTAIR DIVISION

787 14-15 Upgradation of running room Koraput DF3 6079 0 600 5479

KHURDA ROAD DIVISION

788 14-15 Interior work of framed structure for ground

floor (West & East side) & second floor

(Central portion) of Railway Stadiun at

Mancheswar.

DF3 8780 0 1000 7780

789 14-15 Construction of box room at crew bases in

KUR division.

CAP 1991 0 900 1091

790 14-15 Proposed construction of 500 mtr boundary

wall around track side near PURI station to

protect the land from encroachment .

DF3 1957 0 100 1857

KUR Division

SBP Division

Sub Total-WIP

WAT Division

55

Page 56: EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, … · 2018. 5. 2. · EAST COAST RAILWAY LAW BOOK 2014-15 ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15 Figures in thousands

EAST COAST RAILWAY

LAW BOOK 2014-15

ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15

Figures in thousands of Rupees.

1 2 3 4 5 6 7 8

Item

no.LB

14-15

Year of

inclusion

Particulars of work Allocation Latest

Anticipated

Cost

Cum.

Expr

upto

Mar-14

Outlay

14-15

Balance to

Complete

Headquarters

791 14-15 CCTV work DF3 9721 0 800 8921

792 14-15 Works costing below Rs.10 lakhs each

CAP 40

DRF 200

DF3 100

CAP 40

DRF 200

DF3 100

CAP 20

DRF 200

DF3 100

Reserve with HQ CAP 0

DRF 400

DF3 200

CAP 1991 0 1000 1091

DRF 0 0 1000 0

DF3 26537 0 3000 24037

CAP 42213 9744 15805 17169

DRF 4778 437 4700 3841

DF2 68375 22298 28100 23977

DF3 194116 69995 67191 61310

DF4 9837 0 1306 8549

TOT 319319 102474 117102 114846

Sub Total-New Works

PH-64 ( Other Specified Works)

Grand Total

WAT Division

SBP Division

KUR Division

56