Page 1
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
WORKS IN PROGRESS
WALTAIR DIVISION
1 05-06 Provision of combined guard and crew
booking office at VSKP.
DF3 4575 4428 0 147
2 07-08 Provision of 3 spurs to facilitate berthing of
ARMV( 120M)/ ART (250M) and Pilgrim
siding 250M at VSKP.
CAP 4999 3798 0 1201
3 07-08 Simhachalam North - RYD - Waltair
Marshalling Yard - Conversion of reception
line into single line status
CAP 9072 4263 2000 2809
4 08-09 Electrification of line nos. 8,9 & 10 in
connection with island platform between line
nos. 7 & 8 at VSKP.
DF3 4578 388 1 4189
5 09-10 Development of circulating area of TP/1 at
VNCW Goods shed by concreteing the
existing surface
DF3 26000 19008 1 6991
6 09-10 PDU: Provision on sand hump for common
loop R/4 at PDU towards VSKP end.
DF3 6375 1547 1 4827
7 09-10 TIU: Provision on sand hump for common
loop R/1 at TIU towards VSKP end.
DF3 6348 2177 1 4170
8 09-10 PUN: Provision on sand hump for common
loop R/4 at PUN towards VSKP end
DF3 6359 3657 1 2701
9 09-10 Provision of isolation near UP home signal
No.09(R-V UP Vijaya Nagaram to isolate
VZM yard for escaping of Vehicles / WAG
over suiting from RV direction into VZM
Yard.)
DF3 9191 3729 1 5461
10 CAP 11680 3718 0 7962
EBR 13972 0 13972 0
11 11-12 Conversion of S.E dispatch line at WMY into
single line status
CAP 5748 619 4500 629
12 11-12 Provision of shunt signals at
RGDA,SPRD,LKMR,KKGM & KTGA
CAP 3844 320 1000 2524
13 11-12 Provision of reception & dispatch signals for
Line no. 5 at Bacheli/RYD
CAP 1996 123 1250 623
14 11-12 Development of circulating area adjacent to
Line No. 6 at JDB goods shed
DF3 9924 6208 1 3715
15 CAP 7956 250 3000 4706
CRRM(-) 600
16 12-13 Replacement of AC sheet roofs of cabins A to
J in WAT Marshalling Yard.
DRF 5225 1091 3700 434
17 12-13 Provision of sand hump at LKMR R/1 towards
RGDA end.
DF3 2397 0 1 2396
KHURDA ROAD DIVISION
18 06-07 MRDL: Provision of FOB. DF3 3363 0 11 3352
19 07-08 RCTC: Provision of FOB. DF3 2674 8256 0 -5582
20 07-08 GRKN: Provision of FOB. DF3 5069 3970 10 1089
21 07-08 BDBA: Provision of FOB. DF3 5762 4049 10 1703
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
PH-16( Traffic Facilities)
10--11 Electrification of left over lines at R & D yard
of Vishakhapattnam Port Trust
11-12 Conversion of OEC/WMY Line no. 13 into full
length & bi-directional with full OHE.
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
1
Page 2
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
22 08-09 BDPK ; Provison of 1st FOB at Budhapank
(BDPK) station in NRG-TLHR section.
DF3 3608 0 10 3598
23 09-10 KASR : Provision of New Foot Over Bridge. DF3 7174 4429 10 2735
24 09-10 JRZ: Provision of New Foot Over Bridge. DF3 7043 4046 10 2987
25 09-10 Provision of PTFE neutral section at HWH
end of KNPR station in lieu of insulated over
lap of KNPR/TSS.
OLWR 4838 3287 0 1551
26 09-10 SCPR: Provision of New Foot Over Bridge. DF3 5146 557 10 4579
27 10--11 Proposal for the provision of one stabling line
by the side of line no. 1 A at Puri(PUI)
CAP 16300 4177 5870 6253
28 10--11 Proposal for the development of
loading/unloading surface and approach road
with concrete pavement at Bhadrak Goods
Shed
DF3 35328 19203 2910 13215
29 10--11 Proposal for removal of diamond crossing at
VSKP end of Palasa (PSA) yard
DF3 8973 2106 0 6867
30 10--11 Provision of cover shed on the Goods
Platform at Bhadrak(BHC) station.
DF3 9970 3321 10 6639
31 10-11 Proposal for conversion of line no. 9 & 10 as
running lines with connectivity at HWH end of
Palasa(PSA) yard
DF3 9553 6148 1 3404
32 11-12 CAP 9627 0 7000 2627
CRRM (-) 1577 0 1577
33 11-12 Provision of First FOB at Kandarpur(KDRP)
station in CTC-PRDP branch line section
DF3 7077 2847 10 4220
34 12-13 Banker Siding at Dhenkanal(DNKL) CAP 18344 2000 8000 8344
35 12-13 Provision of IBS signal in between RJGR &
JRZ in NRG-TLHR branch line section of
KUR division.
CAP 24187 369 12125 11693
36 12-13 2 Additional stabling lines in BBS coaching
complex.
DF3 9988 1529 1300 7159
37 12-13 2nd additional stabling line at PUI DF3 9998 1010 100 8888
38 12-13 Provision of one cross over in between R3 &
R2 at MCS end to have additional access to
coaching complex without interfereing main
line.
DF3 9990 1498 1 8491
39 12-13 Provision of one cross over in between R4 &
R5 as well as R4 & R3 to enhance the CAL
of R2 & R4 at VSKP end of BBS Yard.
DF3 9993 114 1 9878
40 12-13 Provision of one cross over with ORL at
VSKP end to increase the CAL of R1 & to
ease the curvature sallon siding of BBS
Yard.
DF3 9998 272 1 9725
41 12-13 TLHD: Provision of Ist FOB . DF3 7383 0 4751 2632
42 12-13 IBS between Budhapank-Mermandali stations
on Rajathgarh-Talcher section
CAP 24300 0 10000 14300
Easing of sharp curvature by shifting of
crossover (Point No. 78 A & 80) for smooth
entry and exit in coaching complex of Route
20 & 21 at Puri yard
2
Page 3
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
43 12-13 IBS between Hindol Road and Sadashibpur
stations on Rajathgarh-Talcher section
CAP 24300 0 10000 14300
44 12-13 IBS between Sadashibpur and Dhenkanal
stations on Rajathgarh-Talcher section
CAP 24300 5119 10000 9181
45 12-13 Provision of Auto signaling in Talcher Road
and Budhapank stations on Rajathgarh-Angul
section
CAP 23469 0 10000 13469
46 12-13 Provision of block hut in Barang-Naraj section
of Khurda Raod division to facilitate Double
line working with Naraj section and single line
working with Barang station.
DF3 23700 0 100 23600
47 12-13 Provisionn of permissible Auto Block
signalling in Talcher Road-Angul section.
DF3 24400 0 500 23900
48 12-13 BHC- Shifting of existing neck for 6.5 m by
widening the proposed loading/unloading
surface to keep future provision of 4th line
DF3 6513 0 500 6013
49 13-14 IPM: Extension of PF No.2 with relocaton of
goods loop crossover at IPM Staton.
DF3 24440 0 1 24439
50 13-14 JJKR: Extension of PF-1 & 2 with relocation
of crossover.
DF3 20033 0 1 20032
51 13-14 BUDR-KED : Provision of IBS in BHC-kIS
man line section.
DF3 20783 0 100 20683
52 13-14 MZZ-BTV : Provision of IBS in BHC-KIS main
line section.
DF3 20783 0 100 20683
53 13-14 KIS-BYY : Provision of IBS in BHC-KIS main
line section.
DF3 20659 0 100 20559
54 13-14 Provision of Block cabin between RBA-HMA
station at Km. 561.0 on HWH-MAS Trunk
Route
DF3 3612 0 1432 2180
SAMBALPUR DIVISION
55 08-09 Improvement to goods terminal by provision
of 3 nos. of high masts tower lighting
arrangement at each goods shed of Lapanga
(LPG) station & Mahasamund (MSMD)
station.
DF3 4962 3516 1 1445
56 09-10 MNDH: Provision of Shunting neck 686 m
length .
CAP 17800 10063 0 7737
57 09-10 KSNG : Improvement of existing goods siding
at KSNG along with extension of DMU siding
to accommodate 15 coach length DMU.
DF3 9909 13325 0 -3416
58 10--11 Development of terminal facility beside
existing goods siding / Line No.5 at Bolangir.
CAP 3721 2290 1431 0
59 10--11 Provision of signaling arrangement for direct
reception and dispatch of trains to/from Line
No.4 at Bargarh Road .
CAP 9845 11015 4131 -5301
60 12-13 Extension of existing lin No. 4 at BMCK
station
DF3 8944 812 1 8131
3
Page 4
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
61 10-11 Provision of Common loop in UP grid at
Ambodala(AMB) station
CAP 9290 3562 1403 4325
62 14-15 Works costing below Rs.30 lakhs each
WAT Division CAP 1000
DF3 0
DRF 1000
OLWR 0
KUR Division CAP 1500
OLWR 0
DRF 2300
DF3 0
SBP Division CAP 790
DF3 0
DRF 500
OLWR 0
CAP 250778 51686 95000 107382
DRF 5225 1091 7500 434
DF3 432575 122150 12000 298425
OLWR 4838 3287 0 1551
EBR 13972 0 13972 0
TOTAL 707388 178214 128472 407792
NEW WORKS
KHURDA ROAD DIVISION
63 14-15 IPM(1), JPI(1), SPT(1) & BAV(2): Provision of
Gate lodges.
DRF 6543 0 200 6343
64 14-15 BSDP, GNGD, KIT & JNP: Provision of gate
lodges (one at each station).
DRF 5389 0 200 5189
65 14-15 PURI:-Provision of Hand Plunger Locks
(HPL) in coaching complex.
DF3 3564 0 300 3264
66 14-15 Works costing below Rs.30 lakhs each
CAP 1000
DRF 500
DF3 400
CAP 1000
DRF 500
DF3 400
CAP 1000
DRF 200
DF3 400
CAP 2000
DRF 400
DF3 500
Sub Total - New Works CAP 0 0 5000 0
DRF 11932 0 2000 11532
DF3 3564 0 2000 3264
CAP 250778 51686 100000 107382
DRF 17157 1091 9500 11966
DF3 436139 122150 14000 301689
OLWR 4838 3287 0 1551
EBR 13972 0 13972 0
Total 722884 178214 137472 422588
PH-16 (TRAFFIC FACILITIES, YARD
REMODELLING & OTHERS)
Grand Total
SUB TOTAL -
WORKS IN PROGRESS
WAT Division
KUR Division
SBP Division
Reserve with HQ.
4
Page 5
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
PH-17( COMPUTERISATION)
WORKS IN PROGRESS
WALTAIR DIVISION
67 10-11 PRS/Madhurawada DF1 600 0 0 600
68 10-11 Provision of PRS facility at Gunupur,SO,
Dist.-Rayagada.
DF1 400 0 0 400
69 PRS at Malkangiri mukhya dakagahara. DF1 400 0 0 400
70 12-13 Replacement of PRS Equipment of WAT
division
DRF 1339 1019 376 -56
71 12-13 Replacement of UTS Equipment of WAT
division
DRF 4880 2133 3232 -485
72 India post PRS facility at Rajam sub PO( Dt.
Srikakulam/AP).
DF1 0 0 0
KHURDA ROAD DIVISION
73 04-05 Computerisation of Drawing office of
MCSW.
DF3 1500 0 0 1500
74 07-08 PRS facilities at Post Ofiice situated in the
campus of Utkal University
DF1 600 0 10 590
75 07-08 PRS facilities at KIIT University Campus,
Bhubaneswar
DF1 600 0 10 590
76 07-08 PRS facilities to be provided at Post Office
,ASKA.
DF1 600 0 10 590
77 10-11 Provision of PRS facility at Bhanjanagar,HO,
Dist.-Ganjam
DF1 400 0 0 400
78 10-11 Provision of PRS facility at old Town,
Bhubaneswar.
DF1 400 0 0 400
79 10-11 PRS facilities in the Post office at
Anandpur,MGD P.O ,Distt-Keonjhar ,Orissa
DF1 400 0 0 400
80 10-11 PRS facilities in the Post office at Brahmapur
Head P.O ,Distt-Ganjam ,Orissa
DF1 400 0 0 400
81 11-12 India Post PRS facility at Athamallik DF1 400 0 0 400
82 12-13 Replacement of UTS Equipment of KUR
division
DRF 3896 2255 1931 -290
83 12-13 Replacement of PRS Equipment of KUR
division
DRF 2993 1298 1994 -299
SAMBALPUR DIVISION
84 03-04 MMS for P Way Materials in SBP division CAP 1500 0 0 1500
85 05-06 UTS at Bolangir DF1 800 0 0 800
86 10-11 Provision of PRS facility at Junagarh, Dist.-
kalahandi.
DF1 400 0 0 400
87 11-12 India Post PRS facility at Patnagarah DF1 400 0 0 400
88 11-12 India Post PRS facility at
Rajborasambar(Padmapur)
DF1 400 0 0 400
89 PRS at Phulbani(DHQ NRH) DF1
90 03-04 PRS at Debagarh(DHQ NRH) DF1 500 0 0 500
5
Page 6
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
91 03-04 PRS at Boudh(DHQ NRH) DF1 1000 0 0 1000
92 04-05 PRS at Bhawanipatna(DHQ NRH) DF1 4974 0 10 4964
93 04-05 PRS at Sonapur(DHQ NRH) DF1 24879 0 10 24869
94 05-06 PRS at Nawapada Road(DHQ RH) DF1 100 0 20 80
95 12-13 Replacement of UTS Equipment of SBP
division
DRF 1815 1815 0 0
96 12-13 Replacement of PRS Equipment of SBP
division
DRF 2080 442 1927 -289
Headquarters
97 03-04 Computerisation of A/C office & networking of
CEE's office.
OLWR 500 0 0 500
98 03-04 Office automation & networking of FA &
CAO's office
OLWR 1000 0 0 1000
99 04-05 Implementation of Material Management
Information system(MMIS) in Stores dept(
COS office and Depots) & Accounts Dept(
Stores Accounts section)
DF3 4974 0 0 4974
100 04-05 East Coast Railway -Unreserved ticketing
system( under Railway board)
DF1 24879 0 0 24879
101 05-06 PRS terminals at Dy.CAO/TA/ECoR DF1 100 0 5 95
102 06-07 PRS Unit including database cell at Zonal
head quarter at BBS
DF1 843 0 50 793
103 06-07 East Coast Railway- Unification of passenger
reservation system & unreserved ticketing
system network and creation of Zonal
network hubs.
DF1 15947 0 75 15872
104 08-09 Replacement of 63 Ticket Printers of PRS
units of East Coast Railway
DRF 359 0 0 359
105 09-10 Replacement of Report Printers (25 nos) and
Ticket Printers (75 nos) of 17 UTS Phase-I
stations of ECoR.
DRF 909 0 184 725
106 09-10 Replacement of 66 Dumb Terminals with key
boards at PRS units of East Coast Railway
772 0 0 772
107 09-10 Replacement of 9.6 Kbps/64 Kbps channels
by 2 Mbps channels in respect of PRS Units
of A1,A & B Category stations of East Coast
Railway.
DRF 3005 0 0 3005
108 11-12 Procurement of TSS equipments for TMS PH-
I under replacement
DRF 4190 3828 0 362
109 13-14 Proposal for procurement of TSS CMS DRF 4747 0 0 4747
110 14-15 Reserve with HQ. DRF 10356
DF1 0
SUB TOTAL-WORKS IN PROGRESS DRF 30213 12790 20000 7779
DF1 80422 0 200 80222
DF3 6474 0 0 6474
OLWR 1500 0 0 1500
CAP 1500 0 0 1500
6
Page 7
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
111 14-15 Procurement of PRS peripheral equipment of
PPM cell,EQ cell , Database cell Cum
Console,and reservation office/Railkunj on
Replacement account
DRF 414 0 400 14
112 14-15 Procurement of 68PCs,27
DMTPrinter,68UPSs & 1 Line Printer under
Law Book PH-17 for Eco HQ & three
divisions (KUR,SBP & WAT) under
replacement acco
DRF 3477 0 1000 2477
113 14-15 Procurement of PRS peripheral equipment of
KUR division on Replacement account
DRF 1785 0 1000 785
114 14-15 Procurement of UTS peripheral equipment of
KUR division on Replacement account
DRF 4920 0 2000 2920
115 14-15 Procurement of PRS peripheral equipment of
SBP division on Replacement account
DRF 779 0 600 179
116 14-15 Procurement of UTS peripheral equipment of
SBP division on Replacement account
DRF 4437 0 2000 2437
117 14-15 Procurement of PRS peripheral equipment of
WAT division on Replacement account
DRF 1025 0 1000 25
118 14-15 Procurement of UTS peripheral equipment of
WAT division on Replacement account
DRF 4820 0 2000 2820
119 14-15 Reserve with HQ. DRF 0
DF1 100
DF3 100
Sub Total- New Work DRF 21657 0 10000 11657
DF1 0 0 100 0
DF3 0 0 100 0
DRF 51870 12790 30000 19436
DF1 80422 0 300 80222
DF3 6474 0 100 6474
OLWR 1500 0 0 1500
CAP 1500 0 0 1500
WORKS IN PROGRESS
All divisions
120 12-13 Provision of Rubberised road surfaces on
manned LCs on trial basis
WAT Division SF 0 0 0
KUR Division SF 3389 0 0
SBP Division SF 1896 1000 0
WALTAIR DIVISION
121 09-10 Provision of MACLS in lieu of Semaphore
Signal at L.C Gates in R.V Line .
SF 23545 21573 300 1672
NEW WORKS
PH 17 COMPUTERISATION
GRAND TOTAL
PH-29 ( Road Safety Works-LCs)
7
Page 8
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
122 09-10 Manning of 02 (Two) nos Unmanned L-Xings
no RV-329 at Km 442/8 &KK-82 at Km 293/2-
3 .
SF 4488 1943 0 2545
123 10--11 Waltair Division-Electrical lifting barriers at
interlocked Level crossing gates (27 nos)
SF 19542 11552 1200 6790
124 10--11 Provision of independent telephonic
communication to manned L.C. Gates (34
Nos.) in WAT Divn.
SF 2371 1224 0 1147
125 11--12 Provision of Auto changeover to interlocked
L.C gates (47) and to way side station (25 no)
in main line of Waltair Divn.
SF 4050 0 0 4050
126 11--12 Shifting of existing Neutral section
(Garividi/SP) in connection with proposed LC
gate no. ML-448 at Km. 789/33-35 between
Chipurupalli-Garividi of WAT Divn
SF 5574 0 0 5574
127 11--12 Improvement/construction of road between
Km. 394/1-2 in connection with the closure of
un manned Level Crossing at Km 394/11-12
on R-V line at Waltair division
SF 2616 2009 0 607
128 12-13 Proposed Diversion road from unmanned
level crossing RV - 330 between GPI-KMX
SF 6150 5271 0 879
129 12-13 Diversion of the road for closure of L.C. at
Km. 349/10-11 connecting LDX LC at 350 /
13 - 14 on RVLine
SF 7253 4358 1000 1895
130 12-13 Proposed Diversion road from U/M LC at
km.440/5-6 to M/LC crossing at km.439/7-8
ADEN/VZM on RV line.
SF 8751 6670 0 2081
131 12-13 Proposed Diversion road from U/M LC at
km.463/4-5 to ROB at km 463/19-
464/1etween VZM-GTLM
SF 9650 7630 0 2020
132 12-13 Provision of Double Distant signal to
Interlocked L.C.gates (9 No ) from Ex Palasa
to ex Vizianagaram of Waltair Division in East
Coast Railway
SF 9685 0 2500 7185
133 12-13 Interlockingof LC.Gates (3 Nos) (KK- 20, KK-
10, KK-24)
SF 9659 2685 0 6974
134 12-13 Interlocking of LC.Gates (3 Nos) (RV - 303,
LC No - 6, LC No - 8)
SF 9900 640 0 9260
135 12-13 Interlocking of LC.Gates (2 Nos) (LC No. 429,
LC No. 468)
SF 9656 1055 0 8601
136 13-14 Closure of LC no RV-298 at Km. 406/4-5 by
construction of parallel road to RV-297 at Km.
405/5-6 on R-V line
SF 6270 0 3000 3270
137 13-14 Parallel road from unmanned LC No. RV-302
at Km.410/0-1 to RV 303 at km. 410/12-13
on RV line
SF 8448 0 4000 4448
138 13-14 Construction of Road by connecting KK -69 at
Km.268/5-6 to manned KK-70 at 268/14-15 in
connection with closing of LCKK-69 on KK
line
SF 4953 2349 1300 1304
8
Page 9
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
139 13-14 Construction of parallel road connecting Level
crossing No. ML.413 at Km.729/25-27 to LC
no. 414 between Tilaru and Urlam stations on
Main Line.
SF 9968 0 3500 6468
140 13-14 Construction of road by connecting LC
No.KK-91 to KK-92 in connection with
closing of LC no KK-91 on KK-II section
SF 4832 640 2000 2192
141 13-14 Closing of unmanned LC no. RV-285 by
connecting road from LC. RV-285 to RV-286
bet. PVP-SNM.
SF 7972 0 4000 3972
142 13-14 Parallel road from LC no.RV-313 to ROB at
Km. 422/7 in lieu of U/manned LC no. RV-
313 bet.VBL-DNV on R-V line
SF 9712 0 5000 4712
143 13-14 Closure of LC no. RV-312 at Km.420/14 bu
construction of parallel road to RV-311 at Km.
420/3 between VBL-DNV
SF 9898 0 5000 4898
144 13-14 Construction of parallel road from LC no. KR-
2 at KM.04/11-12 to KR-3 at Km. 05/7-8 for
closure of LC No. KR-2 between KRPU-
DMNJ on K-R line of Waltair Division.
SF 7410 0 800 6610
KHURDA ROAD DIVISION
145 05-06 Replacement of 3 nos wornout L.C.Gates by
electrically Operated Lifting Barrier set under
ADEN/BBS's jurisdiction of KUR division.
SF 1564 308 0 1256
146 08-09 Manning of 02 nos of unmanned LC no. 356
& 341
SF 2955 1251 0 1704
147 08-09 Manning of 02 nos of unmanned LC no. 337
& 319
SF 2955 887 0 2068
148 12-13 1)Closure of LC no-CT-27 , JB-3 & JB -13 by
merging under DEN( C) of KUR Division
SF 17289 12820 0 4469
149 12-13 Proposed construction of connecting roads
for closure of 4 nos of the un-manned level
crossing under Sr.DEN( North)
SF 10351 0 1000 9351
150 12-13 Provision of precast Fibre reinforced R.C.C.
blocks for road surface at 14nos of Level
Crossings in KUR - PSA section.
SF 7233 0 0 7233
151 12-13 Pre-cast Fibre Reinforced RCC blocks for
road surface at Level Crossings at various
manned LC''s under Sr.DEN(N)/KUR.
SF 9272 0 0 9272
152 12-13 Closure of LC. No.CT-66 by connecting road
bet. CT-66 to CT-65 and closure of ST-109
by connecting road betn ST-109 & ST-108
SF 9955 4524 4000 1431
153 12-13 Provision of interlocking of LC gates No 192
at Km443/27-29 of manned LC gates within
SRKT-RTN of KUR division.
SF 4184 0 2000 2184
154 12-13 Construction of by pass road in lieu of closing
of LC No.CP-30 by merging LC No. 31
between GRKN-RHMA
SF 2290 1864 400 26
9
Page 10
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
155 13-14 Closure of LC no. CT-12, CP-18 ,CP-37 ,CT-
72 & ST-110 by merging in KUR division.
SF 19923 0 0 19923
SAMBALPUR DIVISION
156 07-08 Electrification of 13 Nos. of manned level
crossing gates.
SF 2974 1732 1200 42
157 08-09 Interlocking of L.C Gates ST -12 at Km. 13/8-
9 between SBPY-MANE and JT -24 at Km.
557/3-4 between SBP-SLRA divn
SF 2950 1843 0 1107
158 09-10 Provision of gate lodges with toilet facility
against deteriorated non-standard type gate
goomties at various manned Level crossings
of Sambalpur division
SF 3328 0 1500 1828
159 09-10 Manning of unmanned Level Crossing no.JT-
49 at Km 442/1-2 between BRGA-BRPL
stations.
SF 4132 3285 300 547
160 10--11 Provision of gate lodge with toilet facility
against deteriorated non-standard type gate
goomities in JSG-TIG section.
SF 7235 5420 2500 -685
161 10--11 Interlocking of LC gates ST-52 at KM 87/3-4
between Bamur -Sargipalli station .
SF 2999 3282 400 -683
162 10--11 Interlocking of LC gates JT-2 at KM 518/2
between Jharsuguda Road -Brundamal
SF 3024 2694 300 30
163 11-12 Diversion of road between two manned LCs
at Km 237/4-5(RV-196) and Km 237/11(RV-
197) in view of closure of manned Lc at Km
237/11(Rv-197).
SF 3469 2192 900 377
164 12-13 Improvement to level crossing road surface &
approaches from KM 4/10 to 197/11 of R-TIG
section
SF 21016 15031 4000 1985
165 12-13 Replacement of Mechanical LC gates with
electrically operated lifting barrier LC gates at
21 locations over Sambalpur Division.
SF 16209 10210 3000 2999
166 12-13 Telecommunication work in connection with
manning of LC gates from one control station.
SF 2920 1904 360 656
167 12-13 Replacement of gate booms at 15 nos of
manned LC in JSG-BRGA section.
SF 2883 528 1500 855
168 12-13 Upgradation of road surface for 24 Nos. of
Manned LCs with precast fibre reinforced
RCC blocks in TIG-THV Section.
SF 9983 5770 2200 2013
169 12-13 Electrifical works in connection with provision
of lighting arrangements at 16 manned LC
gates over SBP Division.
SF 1497 0 900 597
170 13-14 Provision of diversion road in connection to
closure of LC No ST-9, ST-13, ST-30 in SBP-
ANGL section and JT-68 in JSG-TIG section.
SF 10923 0 6000 4923
10
Page 11
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
171 14-15 Works costing below Rs.30lakhs each
WAT Division SF 540
KUR Division SF 1000
SBP Division SF 1400
Sub Total-WIP SF 385866 150429 70000 174662
SAMBALPUR DIVISION
172 14-15 Provision of diversion road in connection to
closure of LC No ST-49 & ST-74, in SBP-
ANGL section .
SF 7571 0 4000 3571
WALTAIR DIVISION
172A 14-15 Outright closure of 86 nos of unmanned level
crossings over Waltair division.
SF 9956 0 150 9806
KHURDA ROAD DIVISION
172B 14-15 Proposed outright closing 46 nos of
unmanned level crossings under Khurda
Road Division.
SF 5066 0 150 4916
173 14-15 Works costing below Rs.30 lakhs each
WAT Division SF 0 0
KUR Division SF 0 24
SBP Division SF 0 600
Reserve with HQ SF 76
Sub Total - New Works SF 22593 0 5000 18293
SF 408459 150429 75000 192955
WORKS IN PROGRESS
WALTAIR DIVISION
174 11-12 Proposed construction of Limited Height
Subway in lieu of closing of U/M LC No. 46 at
km. 228/12-13 between CTS-JYP, U/M LC
No. 47 at km. 229/8-9 bet. CTS-JYP, UM/LC
No. 48 at km. 232/4-5 bet. JYP-DIR on KK-II
line under DEN(West) of WAT Divn.
SF 22204 0 7000 15204
175 12-13 Proposed construction of LHS Way in lieu of
closing of UMLC No.KR-4 at Km.8/13-14 in
bet.KRPU-DMNJ
SF 8031 0 3000 5031
176 12-13 Proposal for Construction of Limited Height
Sub-Way in lieu of closing level crossings at
LC.no.49 at Km 234/9-10 bet JYP-DIR on KK-
II Line.
SF 11649 2093 5000 4556
177 12-13 Proposed construction of LHS in lieu of
closing of LC No.KR-11 at Km.62/3-4 in
between on KRLine.
SF 11283 0 6000 5283
178 12-13 Construction of LH Sub-Way in lieu of
closeing LC at LC.no.77 at Km 283/3-4 bet
NKX-JDB on KK-II Line under DEN/WEST.
SF 11822 3502 5000 3320
179 12-13 Construction of LH Sub-Way in lieu of closing
LC at LC.96 at Km 326/14-15 bet BDXX-
DMK.
SF 12805 2198 6000 4607
180 12-13 Construction of LH Sub-Way at Km.276/10-
11 in lieu of closing LCs at LC.no.73 at
Km276/10-11 bet AGB- AGZ.
SF 11810 2102 6000 3708
NEW WORKS
PH-29, ( Road Safety Works-LCs)
Grand Total
PH-30 ( Road Safety Works-ROB/RUB)
11
Page 12
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
181 12-13 Construction of LH Sub-Way in lieu of closing
LC at LC 94 at Km 325/2-3 bet BDXX-DMK
on KK-II.
SF 12449 2123 5000 5326
182 12-13 Proposed construction of Normal Height Sub
Wayin lieu of closing of Unmanned LC No.
KR-12
SF 12219 0 8000 4219
183 12-13 Proposed construction of LHS in lieu of LC-
265 at Km.367/4-5 in between JMPT-KNRT.
SF 13009 0 0 13009
184 12-13 Construction of RUB of size 3.60 x 4.0m at
Km 168/18-19 by box pushing technic inlieu
of closing of LCno.KK-38.
SF 19662 2442 9000 8220
185 12-13 R U B size 5.50 x 5.0m at Km 169/8-9 by box
pushing technic inlieu of closing of LC no: KK-
39 at Km 169/8-9 MKRD - PBV .
SF 21320 3636 9000 8684
186 12-13 Proposed construction of LHS in lieu of
closing of LC No. KR-7 at Km.16/9-10 in bet.
KRPU-DMNJ Stations
SF 8937 0 6000 2937
187 12-13 Proposed construction of LHS in lieu of
closing of LCNo.KR-6 at Km.12/4-5 bet.
KRPU-DMNJ Stations
SF 9145 0 6000 3145
KHURDA ROAD DIVISION 0 0
188 11-12 Provision of Rod Under Bridge (RUB) in lieu
of the existing unmanned LC No. 19 at km.
89/3-4 between HCNR-STBJ stations of KUR
division.
SF 13378 0 6000 7378
189 11-12 Provision of Rod Under Bridge (RUB) in lieu
of the existing unmanned LC No. 27 at km.
113/8-9 between HCNR-CLDR stations of
KUR division.
SF 14484 3229 6000 5255
190 11-12 Provision of Rod Under Bridge (RUB) in lieu
of the existing unmanned LC No.143 at km.
339/25-27 between JJKR-JKPR stations of
KUR division.
SF 22856 0 5000 17856
191 11-12 Provision of RDSO standard height gauges at
7 Nos of RUBs under ADEN/CTC’s
jurisdiction of KUR division.
SF 4392 4601 0 -209
192 12-13 Balance work for provision of Road Under
Bridge (RUB) in lieu of the existing unmanned
level crossing at Km. 596/4-6 between JNP-
BAM.
SF 13290 3856 4000 5434
193 12-13 Provision of Limited Height Subway (LHS) in
lieu of the existing unmanned level crossing
No.16 at Km 62/18-63/1 between Naranpur-
Basantpur stations.
SF 15940 0 3000 12940
194 12-13 Provision of Limited Height Subway (LHS) in
lieu of the existing unmanned level crossing
No.17 at Km 69/5-6 between Naranpur-
Basantpur stations.
SF 13187 873 3000 9314
195 12-13 Provision of Limited Height Subway (LHS) in
lieu of the existing unmanned level crossing
No.18 at Km 81/23-24 between Basantpur-
Sitabanji stations of KUR division.
SF 15961 0 3000 12961
12
Page 13
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
196 12-13 Provision of Limited Height Subway (LHS) in
lieu of the existing unmanned level crossing
No.25 at Km 104/19-20 between NKW-
HCNR stations of KUR division.
SF 12472 3345 6500 2627
197 12-13 Provision of Limited Height Subway (LHS) in
lieu of the existing unmanned level crossing
No.29 at Km. 121/1-2 between CLDR-SGDP
stations.
SF 15837 0 3000 12837
198 12-13 Provision of Limited Height Subway (LHS) in
lieu of the existing unmanned level crossing
No.30 at Km. 125/6-7 between Chilikadra-
Sagadpeta stations .
SF 13905 0 3500 10405
199 12-13 Provision of Limited Height Subway (LHS) in
lieu of the existing unmanned level crossing
Nos.CT-7 at Km. 404/19-21 between SQQ-
CBT stations .
SF 13695 2118 5000 6577
200 12-13 Provision of Limited Height Subway (LHS) in
lieu of the existing unmanned level crossing
Nos.JD-11 at Km. 160/6-8 between
Bhaghuapal-Tomka stations.
SF 14014 0 6500 7514
201 12-13 Provision of Limited Height Subway (LHS) in
lieu of the existing unmanned level crossing
Nos.JD-4 at Km. 151/20-22.
SF 14418 0 4000 10418
202 12-13 Provision of Limited Height Subway (LHS) in
lieu of the existing unmanned level crossing
Nos.132 at Km. 323/9-11.
SF 16210 0 4000 12210
203 12-13 Provision of Limited Height Subway (LHS) in
lieu of the existing unmanned level crossing
Nos.JD-12 at Km 162//8-10 & JD-13 at Km.
162/22-24.
SF 16216 2056 4000 10160
204 12-13 Provision of Limited Height Subway (LHS) in
lieu of the existing unmanned level crossing
Nos.144 at Km. 341/27-29 between JJKR-
JKPR .
SF 15253 0 4000 11253
205 12-13 Limited Height Subway (RUB) at LC No-236
between KAPG-GNGD stations of KUR
division
SF 17661 0 4000 13661
206 12-13 Limited Height Subway (RUB) at LC No-308
between BAM-JNP stations of KUR division
SF 17276 5143 6500 5633
207 12-13 Limited Height Subway (RUB) at LC No-323
between GTA-SLRD stations of KUR division
SF 20383 5035 6500 8848
208 12-13 Limited Height Subway (RUB) at LC No-240
between KAPG-GNGD stations of KUR
division
SF 23760 2987 7000 13773
209 12-13 Limited Height Subway (RUB) at LC No-JB-
10 between Ghantikal Nidhipur - Naraj
Marthapur of KUR division.
SF 22207 7556 5000 9651
13
Page 14
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
210 12-13 Provision of Limited height subway in lieu of
the existing unmanned level crossing no. 206
at Km. 466(9-11) between Kaipadar Road
and Tapang stations of Khurda Road
Division.
SF 16517 0 6500 10017
SAMBALPUR DIVISION
211 07-08 Titlagarh - Therubali - Road under bridge in
lieu of unmanned level crossings at km 282/8
& Sambalpur - Angul - km 32/3-4& 75/5-6
SF 25593 26573 0 -980
212 10--11 Provision of Limited Height Subway/RUB in
lieu of the existing unmanned level crossing
at Km. 60/5-6 in between CHAR-RAIR
stations in SBP-ANGL section.
SF 9200 5317 2000 1883
213 10--11 Provision of Limited Height Subway/RUB in
lieu of the existing unmanned level crossing
at Km.61/7-8 in between CHAR-RAIR
stations in SBP-ANGL section.
SF 9611 0 100 9511
214 10--11 Provision of Limited Height Subway/RUB in
lieu of the existing unmanned level crossing
at Km. 89/6-7 in between BAMR-SRGP
stations in SBP-ANGL section.
SF 9334 0 100 9234
215 10--11 Provision of Limited Height Subway/RUB in
lieu of the existing unmanned level crossing
at Km. 98/1-2 in between SRGP-HNPA
stations in SBP-ANGL section.
SF 9888 0 100 9788
216 10--11 Provision of Limited Height Subway/RUB in
lieu of the existing unmanned level crossing
at Km. 114/2-3 in between HNPA-BONA
stations in SBP-ANGL section.
SF 9754 1589 5000 3165
217 10--11 Provision of Limited Height Subway/RUB in
lieu of the existing unmanned level crossing
at Km. 140/7-8 in between JRPD-KPJG
stations in SBP-ANGL section.
SF 9754 0 1000 8754
218 10--11 BRGA(Ex)-TIG: Provision of Limited Height
Subway/RUB in lieu of the existing unmanned
level crossing at Km. 624/13-14 (JT-61)
SF 9800 0 1000 8800
219 10--11 Provision of Limited Height Subway/RUB in
lieu of the existing unmanned level crossing
at Km. 635/1 in between BRPL-DJX stations
in JSG-TIG section.
SF 9849 0 0 9849
220 10--11 Provision of Limited Height Subway/RUB in
lieu of the existing unmanned level crossing
at Km. 655/10 in KHPL-LSX stations in JSG-
TIG section.
SF 10127 0 100 10027
221 10--11 Provision of Limited Height Subway/RUB in
lieu of the existing unmanned level crossing
at Km. 657/8-9 in between KHPL-LSX
stations in JSG-TIG section.
SF 10127 0 100 10027
222 10--11 Provision of Limited Height Subway/RUB in
lieu of the existing unmanned level crossing
at Km. 665/8 in between LSX-BLGR stations
in JSG-TIG section.
SF 9849 0 1000 8849
14
Page 15
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
223 10--11 Provision of Limited Height Subway/RUB in
lieu of the existing unmanned level crossing
at Km. 707/9-10 in between DFR-SFC
stations in JSG-TIG section.
SF 10127 1884 5000 3243
224 10--11 R-TIG: Provision of Limited Height
Subway/RUB in lieu of the existing unmanned
level crossing at Km. 129/14-15 (RV-91)
SF 7975 9730 0 -1755
225 11-12 Provision of RUB in liu of the existing manned
LC no. RV-53 at Km 84/6 between R- THV
sections of SBP Division.
SF 10085 5497 500 4088
226 11-12 Provision of RUB in liu of the existing manned
LC no. RV-65 at Km 96/14-15 between R-
THV sections of SBP Division.
SF 10213 5498 2000 2715
227 11-12 Provision of limited Height Subway
(LHS/RUB) in lieu of the existing manned LC
No.-RV- 160 at Km 203/23 between R-THV
sections of SBP Division.
SF 13815 4886 4000 4929
228 11-12 Provision of limited Height
Subway(LHS/RUB) in lieu of the existing
Unmanned LC No.-RV- 209 at Km 253/11-12
between R-THV sections of SBP Division.
SF 9901 0 4000 5901
229 11-12 Provision of limited Height Subway
(LHS/RUB) in lieu of the existing Unmanned
LC No.-RV- 210 at Km 256/3 between R-THV
sections of SBP Division.
SF 9601 4847 4000 754
230 11-12 Provision of limited Height Subway
(LHS/RUB) in lieu of the existing manned LC
No.-RV- 216 at Km 265/4-5 between R-THV
sections of SBP Division.
SF 11534 0 4000 7534
231 11-12 Provision of limited Height
Subway(LHS/RUB) in lieu of the existing
Unmanned LC No.-RV- 222 at Km 279/1-2
between R-THV sections of SBP Division.
SF 12584 2294 6000 4290
232 11-12 Provision of limited Height
Subway(LHS/RUB) in lieu of the existing
Unmanned LC No.-RV- 234 at Km 304/7-8
between R-THV sections of SBP Division.
SF 17087 0 4000 13087
233 12-13 Provision of LHS/RUB in lieu of existing Un-
Manned LCl at Km 691/9-10 (JT-103) of
Sambalpur Division.
SF 13235 1956 7000 4279
234 12-13 Provision of LHS in lieu of existing Un-
Manned LC No ST-7 in SBP- ANGL section.
SF 20974 0 100 20874
235 13-14 Provision of LHS at Km. RV-114 with
diversion of road between RV-114 and RV-
113 for closure of LC No. RV-113
SF 21730 0 1900 19830
Sub Total-WORKS IN PROGRESS SF 851404 128966 240000 482438
NEW WORKS
WALTAIR DIVISION
236 14-15 Construction of LHS at LC No:KK-01@ 04/04-
05 on KK LIne of Waltair Division.
SF 15469 0 5000 10469
15
Page 16
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
237 14-15 Construction of LHS inlieu of closer of level
crossings at KK-41 on KK LIne of Waltair
Division.
SF 17849 0 5000 12849
238 14-15 Re-Girdering of RUB No: 1526 A UP and
RUB. No: 1013 UP & allied works At Km .
817/ 21 - 24 between NML - VZM
SF 7013 0 5000 2013
KHURDA ROAD DIVISION
239 14-15 Provision of Limited Height Subway (LHS) in
lieu of the existing unmanned level crossing
No.179 at Km. 416/24-26 between GBK-
BRAG stations.
SF 20343 0 5000 15343
240 14-15 Provision of Limited Height Subway (RUB) in
lieu of the existing unmanned level crossing
426/14-16 (LC No.CT-30) between RJGR-
JRZ stations.
SF 21694 0 2500 19194
SAMBALPUR DIVISION
241 14-15 Provision of LHS in lieu of UM Level crossing
No RV-125 in LAE-TIG section.
SF 16396 0 5000 11396
242 14-15 Provision of LHS in lieu of the existing
unmanned level crossing No. RV-48 at Km.
76/4 in LAE-TIG section of Sambalpur
Division.
SF 12530 0 5000 7530
243 14-15 Provision of LHS in lieu of unmanned level
crossing No RV-57 in LAE-TIG section of
Sambalpur division.
SF 14218 0 5000 9218
244 14-15 Provision of LHS in lieu of unmanned level
crossing No.JT-3 at km 519/3 in JSG-TIG
Section of Sambalpur Division
SF 23206 0 2500 20706
Sub Total-New Works SF 148718 0 40000 108718
PH-30 ( Road safety works-ROB/RUB)
Grand TOTAL
SF 1000122 128966 280000 591156
PH-31 (TRACK RENEWALS)
Work costing < 2.5crore & > 1.0 crore (Works in Progress)
KHURDA ROAD DIVISION
245 09-10 TFR-27km betn. Dhanamandal - Retang at
Km. 374.0 - 384.0 (UP & DN) & 443.70 -
447.2 (Up & Dn).
DRF 19306 2455 2000 14851
246 09-10 TFR-22.1km betn. Bhadrak- Kendrapara at
Km. 291.45 - 297.0 (Up) & 291.45 - 308.0
(Dn).
DRF 15804 54 2000 13750
247 09-10 TBR-13.27km betn Talcher JNC-Angul at
Km.491.40 -504.67.
DRF 16949 6212 1500 9237
248 09-10 TWR- 21km betn. Kenduapada-Jakhapura at
Km 308.00 - 319.50 (Up) & 316.00 -
325.50(Dn).
DRF 21461 7000 1000 13461
249 10-11 TFR-20km betn BYY-KIS. DRF 14855 339 2000 12516
250 11-12 TFR-24km at km 154 - 178.0 (SL) betn
Tomka - Jakhapura.
DRF 18342 6609 2000 9733
251 11-12 TTR - 6sets & TTR(D/S)-11sets on
Haridaspur, Dhanmandal, Byree & Kapilas Rd
yard of KUR Div.
DRF 13892 5730 1500 6662
REV 303 0 303
16
Page 17
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
252 11-12 TSR(P)-3km at km.287.471 - 290.471(UP)
betn Ranital - Bhadrak stns.of KUR div.
DRF 13634 7402 2200 4032
REV 1603 0 1603
253 12-13 TRR(P)-1.8KM at km 450.2-452(Up) betn.
RTN - KUR of KUR Div.
DRF 15982 13000 2500 482
254 12-13 TTR-11sets(5sets 1in 8.5 & 6sets D/S) on
JJKR & JEN stns of KUR div..
DRF 10560 2806 5637 2117
Rev 268 0 268
255 12-13 TTR(CMS Crossing)-40sets betn BHC-JEN
stn..
DRF 15115 42 8000 7073
256 12-13 TBCSR-1078 nos. of Br. No.449 Up (span no.
16 to 29) betn JKPR- JEN stns.
DRF 22426 15262 1500 5664
257 13-14 Supply and fixing of 770 Nos.new galvanised
steel channel sleepers on Br.No.- 950(DN)
(10x150'G) between CAP-GAM sations in
KUR-PSA section.
DRF 15862 0 6,000 9862
258 13-14 TRR(P) for 2.7 Kms from Km. 394.50 to
397.20 (S/L) between KIS - SQQ section
DRF 23092 16851 1,500 4741
SAMBALPUR DIVISION
259 08-09 Raipur-Titlagarh-Thiruvali-TBR-17.215Km (
Up & Dn) at different patches( 25 T axle load)
DRF 9047 8721 4000 -3674
R 6807 6807 0
260 09-10 TRR(P)- 2.5km betn. Titlagarh - Theruvalli at
Km 218.50 - 221.00 (DN).
DRF 18662 18497 165 0
261 09-10 TWR -14.321km betn Jharsuguda - Balangir
at Km 560.27-Km 666.65 in patches.
DRF 16650 12179 1000 3471
262 11-12 TSR(P)- 3km at km 524.06 - 527.06 betn.
Brundamal - Lapanga stns. of SBP Div.
DRF 13763 11556 2000 207
REV 1772 0 1772
263 11-12 TFR - 29.57km at different patches betn
Raipur -Theruvali stns of SBP Div.
DRF 21894 2389 3000 16505
264 12-13 TWR-11.8km at different patches with 60kg
rails in TIG-THV section.
DRF 17303 4092 2000 11211
265 12-13 TFR-38.3km at different patches in R-THV
section.
DRF 24347 689 4000 19658
266 12-13 Renewal of 237nos. 52kg Glued joint &
222nos. 60kg Glued joint at different locations
in SBP-ANGL & Bargarh-TIG section. section
DRF 19617 110 1000 18507
17
Page 18
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
267 13-14 Titlagarh-Therubali - CTR(P) - 2.74 km
(Reduced to 0.88 km)
DRF 12261 10 3000 9251
REV 459 0 459
WALTAIR DIVISION
268 07-08 Ladda - Bobbili - TFR -41.35km (in patches)
(Up & Dn line)
DRF 21508 12781 1000 7727
269 08-09 Silakjhori-Kirandul TFR-42.13km at Km
342.00 Km to Km 444.31( in patches) on KK-
II
DRF 23355 24072 1 -718
270 08-09 Palasa-Dusi-TWR-16.8 Km in patches ( Up &
Dn)
DRF 15492 18792 1 -3301
271 08-09 Palasa-Visakhapatnam-FT-9.5 Km DRF 22055 0 3000 19055
272 10-11 Gajapatinagaram - Vizianagaram stns. TFR -
16km
DRF 12064 6254 800 5010
273 11-12 TRR(P)- 2km at km 869-871(UP) betn
Simhachalam North -Simhachalam stn. of
WAT Division
DRF 18786 3759 1800 13227
274 11-12 TBR- 12.475 km in patches at km 3.685 -
8.66, 23-29, 87.4- 88.9 betn. Kottavalasa -
Similiguda on KK line of WAT division.
DRF 17339 5376 3000 8963
REV 4068 0 4068
275 12-13 CTR(P)-1.12kms at km. 464.49 -465.61(Up)
betn Gotlam-VZM stns. on R-V line.
DRF 17010 2519 2000 12491
Rev 678 0 678
276 12-13 TFR-25.27km in 3rd line betn Pendurti-
Gopalapatnam (15.6km) & 9.67kms betn.
PSA-Pundi (Up)
DRF 18680 0 4000 14680
277 12-13 TWR-15.0km betn Chatriput -Ambagaon stn.
on KK-II line.
DRF 24916 4343 500 20073
278 13-14 TRR (s) with 52/60 kg (SH) rails on existing
sleepers for a length of 4.348 Km. of loop line
of VSKP, VZM and CHE .
DRF 21249 0 2500 18749
279 13-14 Koraput - Kirandul - TSR(P) for 3.655Kms (
DMK- SZY)
DRF 19069 507 11788 6774
REV 1849 0 1849
280 13-14 Koraput - Rayagada and Raipur -
Vizianagaram - TRR(P) -1.297 km.(Tikiri-
Rouli and THV- Ladda).
DRF 11028 0 1000 10028
281 13-14 Koraput - Kirandul (TSR-(P) - 4.085
km(Kamalur- Bacheli)
DRF 21312 3068 4500 13744
REV 2066
282 13-14 TSR(P) for 1.685 Kms from Km 218.815 to
Km.221.000 (in patches) between MVG-CTS
Stations
DRF 8791 581 1000 7210
REV 852 0 852
Track Renewal (< 2.5 crores& >1.0crore )
Works in Progress: Sub Total
DRF 663478 224057 96392 343029
18
Page 19
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
Works costing less than Rs. 1.0 crores
(Works in Progress).
KHURDA ROAD DIVISION
283 10-11 Casual Sleeper Renewal for 1000 nos of
cracked and broken sleepers on Route-3 & 6
of washable apron at BBS station of KUR
division.
DRF 2307 0 500 1807
284 11-12 Casual Sleeper Renewal for 4000 nos (52
kg) of cracked and broken sleepers in
different patches between TAP-KUR (DN)
line section of KUR Division.
DRF 7803 168 1000 6635
285 11-12 Casual Rail Renewal for 1.0 Tkm of existing
60Kg rails from Km 416/10 - 417/16 (SL)
betn. GBK-BRAG section of KUR Division.
DRF 7733 7200 500 33
286 11-12 Casual rail renewal of 60kg rails for 1.2 Tr km
at 453.3-454.5 (Dn) betn KUR-RTN section.
DRF 9543 0 1700 7843
287 11-12 Casual rail renewal of 60kg rails for 1.2 Tr km
at 452 - 453.2 (Up) betn KUR-RTN section.
DRF 9543 0 1700 7843
288 11-12 Casual rail renewal of 60kg rails for 1.2 Tr km
at 453.2-454.4 (Up) betn KUR-RTN section.
DRF 9543 0 1700 7843
289 11-12 Casual sleeper renewal for 1000 nos. in
patches betn 455.3-470.6 (Dn) betn KUR-
DEG section.
DRF 2310 0 1500 810
290 12-13 Supply and fixing of 440 Nos.new galvanised
steel channel sleepers on Br.No. 553
(18x150'G) between CTC-GBK at Km 411/6-
42.
DRF 9064 9150 1 -87
291 12-13 Supply and fixing of 245 Nos. new galvanised
steel channel sleepers on Br.No. 557
(20x150'G) between GBK-BRAG at Km
414/4-415/6.
DRF 5047 5765 1 -719
292 12-13 Through rail renewal for 1.00 Tr.km from km
314/5 to 315/5 on up line between KED-MZZ
section.
DRF 7454 6500 900 54
293 12-13 Through glued joint renewal for 280 sets at
different yards of HDS-GBK station.
DRF 6776 0 3600 3176
294 13-14 Casual Sleeper renewal for 2000 nos of
cracked and broken sleepers by new
sleepers in different locations under
ADEN/KDJR
DRF 6261 0 1500 4761
REV 607 0 607
295 14-15Works costing below Rs. 30lakhs
DRF 10
SAMBALPUR DIVISION
296 11-12 Casual renewal of Scabbed / wheel burnt
rails for 1.26 TKm ( km 146- 184) with 52 Kg
90 UTS rails at different patches in betn HSK-
MRBL sec.of SBP Division.
DRF 9598 8058 1000 540
297 11-12 Casual renewal of Scabbed/ wheel burnt rails
for 1.27 TKm ( km 116-146) with 52 Kg 90
UTS rails at different patches in betwn NPD-
TRKR sec. of SBP division.
DRF 9665 7991 800 874
19
Page 20
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
298 11-12 Casual renewal of Scabbed / wheel burnt
rails for 1.19 TKm (km 61- 107) with 52 Kg 90
UTS rails at different patches ARN-NPD
section of SBP division..
DRF 9071 7589 800 682
299 11-12 Casual renewal of Scabbed / wheel burnt
rails for 1.0 TKm with 60 Kg 90 UTS rails at
different patches betwn Km 305.6-313.70
(DN) in BMCK-THV sec.of SBP div.
DRF 8035 7547 500 -12
300 11-12 Casual renewal of Scabbed / wheel burnt
rails for 1.0 TKm with 60 Kg 90 UTS rails in
patches betwn Km 313.7-323.00 (DN) in
BMCK-THV section of SBP division.
DRF 8035 7438 800 -203
301 11-12 Casual renewal of 3000 No. of cracked PSC
sleepers at different patches between BRGA-
BLGR station of SBP Division.
DRF 5717 566 1500 3651
302 11-12 Casual renewal of 2000 No. cracked PSC
sleepers in patches under PWI/ANGL in SBP-
ANGL section of SBP Division.
DRF 3878 475 1500 1903
303 12-13 TSTR in Br. 293 of span 9 to span 15
between DJX-KHPL stations under
AEN/BLGR
DRF 9785 110 500 9175
304 12-13 Through Fastening Renewal of steel channel
sleeper fittings (TFR-CH) in JSG-BRGA
section.
DRF 8413 7010 700 703
305 12-13 Replacement of channel sleepers in bridge
No. 76, 92, 116 and 160 in JSG(Ex)-
BRGA(In) section of Sambalpur division.
DRF 4161 60 700 3401
306 12-13 Casual renewal of IMR and DFW/OBS rails of
60Kg for 1.11 Tkm in SE(P-way)/TIG Section
from Km. 210.96 to 225.09
DRF 9476 3874 1000 4602
307 12-13 R-THV: casual renewal of damaged / failed
60Kg/52Kg Glued joints in various station
yards.
DRF 6345 110 500 5735
308 13-14 TIG-THV: Casual renewal of 2500 Nos.
damaged PSC sleepers
DRF 7857 10 300 7547
REV 762 0 762
309 13-14 JSG-BRGA: Casual renewal of 2500 nos of
cracked PSC sleepers at different locations.
DRF 7826 10 300 7516
REV 759 0 759
310 13-14 JSG-BRGA: Csual renewal of 2800 nos of
cracked PSC sleepers at different locations.
DRF 8817 10 300 8507
311 14-15 Works costing less than 30lakhs each(DRM's
Power) for DRM/SBP.
DRF 10 11 -21
WALTAIR DIVISION
312 08-09 Replacement of crackedsteel channel sleeper
of bridge no: 436,481,468 & 487 on KK line of
WAT division.
DRF 4958 21776 50 -16868
313 08-09 Replacement of crackedsteel channel sleeper
fittings on various bridges on KK-I line & Main
line of WAT division.
DRF 4981 4063 900 18
20
Page 21
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
314 08-09 Casual Renewal of existing 1 set of 1 in 8 1/2
and 2 sets of 1 in 12 Pts and X-ings at
Gotlam yard on R-V line and 1 set of 1 in 8
1/2 Pts and X-ings at CHE yard on PSA-
VSKP line of WAT division.
DRF 4686 4479 200 7
315 08-09 Kottavalasa-Maligura-TWR-3.7 kms on KK-I
line
DRF 3493 2627 500 366
316 09-10 Casual Renewal of Wheel burn rails for 1.325
Tkms 60 kg from km 463/7 - 464/7 (DN) in
various patches between VZM-GTLM on RV
Line under AEN/VZM Section of Waltair
Division.
DRF 10000 10552 25 -577
317 10-11 Casual renewal of 60 kg wheel burnt rails for
0.75 Tr km from km 343 to km 348 UP& DN
(in patches) in between RGDA-LDX in RV
line under ADEN/ RGDA of WAT division.
DRF 6769 5064 500 1205
318 11-12 Casual renewal of wheel burn 60 kg rails for
0.8 Tkm at km 686/19 -687/31 in patches Up
& DN betn PSA- PDU under the jurisdiction of
ADEN/CHE of WAT division.
DRF 6296 0 500 5796
319 11-12 Casual renewal of wheel burn 60 kg rails for
1.0 T km at km 848/2-849/0 DN and km
841/6 -843/0 UP in patches betn KPL -KTV &
ALM -KPL under the jurisdiction of
ADEN/Tr/WAT of WAT division.
DRF 7839 0 500 7339
320 11-12 Casual renewal of wheel burn 52 kg rails for
1.25 Tkm in patches between TKRI-SPRD
from Km. 84-86, Km 141-144 under the
jurisdiction of ADEN/LKMR on KR line of
WAT division.
DRF 9631 0 500 9131
321 11-12 Casual Sleeper renewal of cracked PSC
sleepers for a length of 1.9 km at 1818
nos/km density in patches under the
jurisdiction of ADEN/ARK on KK line of WAT
division.
DRF 8463 5989 300 2174
322 11-12 Casual renewal of IMR and OBS rails 60 kg
for 1.016 Tkms in KK -I section under
jurisdiction of Sr.DEN (Central) of WAT
division.
DRF 9603 2946 500 6157
323 11-12 Casual renewal of wheel burn 60 kg rails for
1.0 Tkm at km 386/3-387/8 in patches under
the jurisdiction of ADEN/KRDL on KK line of
WAT division.
DRF 7838 0 500 7338
324 11-12 Casual renewal of wheel burn rails with new
60 kg rails for 1.0 Tkm at km 394/4-337/2,
330/0-329/12 and 311/0-14 in patches under
the jurisdiction of ADEN/JDB on KK line of
WAT division.
DRF 7838 0 500 7338
325 12-13 Casual Renewal of Defective welds renewal
of 60 Kg / 52 Kg from Km. 349/11 - 388/3
between LDX - PVP Section
DRF 3066 0 300 2766
21
Page 22
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
326 13-14 TSR (P) for of 1.70 Kms from Km: 327.160 to
Km. 426.932 (in patches) on Up & Dn lines
between THV-DNV station
DRF 8869 590 1000 7279
REV 860 0 860
327 14-15 Works costing less than 30lakhs each for
DRM/WAT.
DRF 0 10
Sub Total: Works costing less than
Rs. 1.0Crore.
304393 137737 32608 134068
Track Renewal
Grand Total-Works in progress
967871 361794 129000 477097
PH-31 (TRACK RENEWALS)
Work costing < 2.5crore & > 1.0 crore (New Work)
WALTAIR DIVISION
328 14-15 Palasa-Visakhapatnam,TRR(P)-2.5 Km DRF 22200 0 12000 10200
329 14-15 Palasa-Visakhapatnam(UP)-TRR(P)-2.356
Km
DRF 20921 0 10000 10921
Track Renewal (< 2.5 crores & >1.0crore)
New Works: Sub Total
43121 0 22000 21121
Work costing < 1.0 crore (New Work)
KHURDA ROAD DIVISION
330 14-15 Casual Sleeper renewal for 2500 nos. of
sleepers from 345/17 to 348/5 (Up) in
patches between JKPR - JEN section.
DRF 9458 0 4500 4958
331 14-15 TRR(P) for 1.10 Tr.Kms from Km. 673.20 to
674.30 on Up line between IPM - PSA section
of Khurda Road Division.
DRF 9832 0 6000 3832
332 14-15 TRR(P) for 1.00 Tr. Km from Km 670.50 to
671.50 on Up line between IPM - PSA section
of Khurda Road Division.
DRF 8939 0 5500 3439
333 14-15 TRR(P) for 1.10 Tr.Km from Km 412.50 to
413.60 on single line at GBK yard under
ADEN/I/CTC.
DRF 9832 0 6000 3832
334 14-15 TRR(P) for 0.700 Kms from Km. 676.50 to
675.80 on Dn main line at R-5 of Palasa Yard
of Khurda Road Division.
DRF 6257 0 5000 1257
335 14-15 Casual Sleeper renewal for 2640 nos. of
sleepers from 397.00 to 400.25 (Dn) in
patches between NRG - SQQ Branch line.
DRF 9959 0 5000 4959
336 14-15 Casual rail renewal for 1.10 Tr.km in different
patches for replacement of wheel burnt and
deffective rails between RJGR-TLHR under
ADEN/DNKL.
DRF 9832 0 5000 4832
337 14-15 Through Bridge Channel sleeper renewal for
440 Nos. steel channel sleepers over Br.
No.553 (SL) from Km 411/4 - 412/0 between
CTC - BRAG station
DRF 9082 0 4500 4582
338 14-15 Casual Bridge Channel sleeper renewal for
470 Nos. steel channel sleepers over Br. No.
449 (Dn) from Km 348/6 to 349/24 between
JEN - JKPR section
DRF 9701 0 4500 5201
339 14-15 Casual sleeper renewal for 2600 nos.
sleepers at isolated patches between Barang -
Khurda Road section under ADEN/BBS.
DRF 9833 0 4000 5833
22
Page 23
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
340 14-15 TRR(P) for 0.800 Tr. Km from Km 448/23 -
448/1 on middle line between KUR - RTN
section.
DRF 7151 0 4500 2651
SAMBALPUR DIVISION
341 14-15 Casual renewal of existing wornout 52Kg
90UTS rails with new 52Kg 90 UTS rails for
1.06Tkm on 2.5 degree curve No. 140 in TIG-
THV Section.
DRF 8150 0 5000 3150
342 14-15 Renewal of 6 sets of switches and 16 sets
CMS xings of Turnouts in TIG-THV section
of Sambalpur Division.
DRF 9166 0 4000 5166
343 14-15 Casual fittings renewal of steel channel
sleepers on Br. No. 77, 588, 448, 325 & 343
in LAE-THV Section of SBP Division
DRF 7237 0 3000 4237
344 14-15 Rail renewal of DFW/OBS rails(52 Kg 90
UTS) for 1 Km between Km. 66 to 67 with
60Kg 90 UTS rails in SE(P)/RAIR Section of
Sambalpur Division.
DRF 8939 0 4000 4939
345 14-15 Rail renewal of DFW/OBS rails(52 Kg 90
UTS) for 1 Km between Km. 61 to 62 with
60Kg 90 UTS rails in SE(P)/RAIR Section of
Sambalpur Division
DRF 8939 0 4000 4939
346 14-15 Casual renewal of DFW/OBS rails(60 Kg 110
UTS) for 1 Km at Km. 311 to 312Dn with 60
Kg 110 UTS rails in TIG-THV Section of
Sambalpur Division.
DRF 8880 0 4000 4880
347 14-15 Rail renewal of DFW/OBS rails(52 Kg 90
UTS) for 1 Km between Km. 50 to 51 with
60Kg 90 UTS rails in SE(P)/RAIR Section of
Sambalpur Division
DRF 8939 0 4000 4939
348 14-15 Casual renewal of DFW/OBS rails (60 Kg 110
UTS) for 1 Km at Km. 319 to 320Dn with 60
Kg 110 UTS rails in TIG-THV Section of
Sambalpur Division.
DRF 8880 0 4000 4880
349 14-15 TRR(P) for 1.1 TKm between Km 299.33
(UP) to 300.43 (UP) in MNGD-BMCK section
of Sambalpur Division.
DRF 9768 0 5000 4768
350 14-15 TRR(P) of existing 52 Kg 90 UTS rails with 60
Kg 90 UTS rails between Km 300.43 to
301.53 (UP) in MNGD-BMCK section of
Sambalpur Division.
DRF 9768 0 5000 4768
WALTAIR DIVISION
351 14-15 CMS crossing Renewal of 30 sets 60 Kg 1 in
12 points and crossing at ALM, KPL, PDT
stations
DRF 9761 0 1800 7961
352 14-15 TRR (P) for 0.70 Km from Km. 869.26 to
869.96 on Dn Main line in SCMN Yard
DRF 6216 0 3000 3216
353 14-15 Casual Renewal of damaged rails for 1.10 Tr.
Km. between Boddavara-Similiguda stations
on KK line.
DRF 9768 0 4500 5268
354 14-15 TRR (P) for 1.100 Km from Km. 747.860 to
748.420 and Km. 748.530 to Km 749.070 on
UP Line, between Urlam - Srikakulam Road
stations
DRF 9768 0 4500 5268
23
Page 24
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
355 14-15 Casual Renewal of damaged rails for 1.00 Tr.
Km. between Araku-Koraput stations on KK
line.
DRF 8880 0 4000 4880
356 14-15 TRR (P) for 1.00 Km from Km 243.00 to Km
244.00 between DIR-CJS Stations on KK -II
Section of Waltair division
DRF 8880 0 4000 4880
357 14-15 CMS Crossing Renewal of 30 sets 60 kg 1 in
12 Points and crosat SPRD, RGDA, LDX,
JMPT, KNRT, PVPT, PVP, SNM, VBL and
DNV stations
DRF 9761 0 1800 7961
358 14-15 CMS Crossing Renewal of 24 sets 1 in 12 60
Kg and 2 sets 1 in 8½ at MVG, JRT, MVF,
SXV, PBV and MKRD stations.
DRF 8396 0 1800 6596
359 14-15 TSR(P) for 1.565 Km from Km. 430.27-Km.
434.035 (in patches) bet. BHNS-BCHL stns.
DRF 9801 0 3000 6801
360 14-15 Caual Renewal of 2500 Nos. PSC-14
sleepers betwen Boddavara-Koraput stations.
DRF 9708 0 2500 7208
361 14-15 Through CMS crossing Renewal of 30 sets
points and crossings at various stations on
KK-II section.
DRF 9761 0 2000 7761
362 14-15 Casual Renewal of 450 Nos. cracked steel
channel sleepers on girder bridges on KK
line of Waltair Division.
DRF 9288 0 2800 6488
363 14-15 Insertion of Additional PSC sleepers for 5.00
Km from Km. 276.00-281.00 between AGB-
AGZ-NKX stns.
DRF 9320 0 4000 5320
Track Renewal (< 1.0 crore) New Works:
Sub Total
DRF 307850 0 136200 171650
Track Renewal
Grand Total-New Works
DRF 350971 0 158200 192771
Track Renewal
Grand Total
1318842 361794 287200 669868
WORK IN PROGRESS
WALTAIR DIVISION
364 04-05 Kottavalasa-Kirandul line- jacketing of piers
no.1(bridge no 164 & 169)
DRF 16733 20785 100 -4152
365 06-07 Dabpal-Gidam-RCC pipe for Hume pipe
bridges ( Bridge No. 1042 & 1052)
DRF 27382 26955 500 -73
366 07-08 Replacing of corroded cross girders for BR.
No. 1383 DN & MAS FO-I on main line .
DRF 6391 6131 100 160
367 07-08 Replacing of corroded cross girders for Br.
No. 1554 UP & 1496 DN on main line .
DRF 5706 3540 1500 666
PH-32( Bridge Works)
24
Page 25
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
368 08-09 Proposed conversion of pipe Bridge No. 733
and 800 (having cushion less than 600 mm)
into RCC Box between SPRD-VZM stations
on RV line section of WAT Division in
connection with operation of 25 T axle load.
DRF 4649 1598 0 3051
369 08-09 Proposed conversion of Bridge No. 660 and
605B Rail openings into RCC Box between
SPRD-VZM stations on RV line section of
WAT Division in connection with operation of
25 T axle load.
DRF 3123 1566 260 1297
370 09-10 Proposed strengthening of bridge nos. 640
UP,671 UP,685 UP,706 Up in SPRD-VZM
section by RCC jacketing of abutments and
piers and arch portion on RV line .
DF4 11976 6311 51 5614
371 09-10 Jacketing of Arch Bridge no. 1560 Dn & 1561
Dn between ALM-KUK , 1566 Dn between
ALM-KUK & 1649 Up between SCMN-PDT
section on PSA-VSKP main line .
DF3 18553 9619 4200 4734
372 10--11 Proposed repairs to bridge No.890 by
replacing corroded steel trough with new
ones along with set of end girders and allied
works between DMK-SZY stations on KK line
under DEN/Br/WAT.
DRF 4000 0 100 3900
373 11-12 Construction of RCC box culvert of size
3.75x3.2m by box pushing method at km.
182/15-16 near Br. No. 534 between SUKU-
KRPU sections on KK –Line
DF4 14677 2908 5500 6269
374 11-12 Construction of RCC box culvert by box
pushing method at km. 110/15-16 near Br.
No. 378 on KK –Line of WAT division.
DF4 19465 6887 5500 7078
375 11-12 Additional waterway by providing RCC box
by box pushing method at Km. 88/19-20 near
Br. No. 330 between KVLS-SMLG of WAT
division
DF4 19465 1675 6500 11290
376 11-12 Construction of RCC box culvert of size
3.75x3.2m by box pushing method at km.
77/1-2 near Br. No. 289 on KK –Line of WAT
division.
DF4 20533 1211 2000 17322
377 11-12 Conversion of old bridge No.1062(4x1.22m)
HP at km.390/5-6 between DPF-GIZ on KK-II
line of WAT division.
DF4 18785 0 2450 16335
378 11-12 Conversion of old bridge No.1146(4x1.22m)
and 1160 (2x1.22m) HP at km. 418/10-11
and km.422/16-423/0 between stations KMLR-
BHNS on KK-II line of WAT Division
DF4 22235 0 500 21735
379 11-12 Conversion of old bridge No.998(1x1.22m)
HP at Km.366/11-12 between stations KKLU-
KWGN on KK-II line of WAT division.
DF4 18148 0 617 17531
25
Page 26
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
380 11-12 Construction of RCC box culvert by box
pushing method at km. 205/10-11 near Br.
No. 618 on KK –Line
DF4 16019 2766 2500 10753
381 11-12 Replacement of Trolley Refugees and
provision of side walkways & allied works for
Br. Nos. 1185UP & DN, 1389DN,752UP &
DN on main line, Br. No. 124,125 & 137 on
KR Line & Br. No.750 on KK-II Line under
DEN/Br/WAT.
DRF 9336 2907 1500 4929
382 11-12 Rebuilding of Bridge No. 96 RCC box culvert
of size 3.75x3.2m by box pushing method in
place of Br. No. 96 RCC hume pipe of
1x0.9m between S.Kota-Bodavara stations
on KK Line of Waltair division.
DRF 9961 8076 1000 885
383 11-12 Rebuilding of Br.no.169 foundation by
providing bored piles and rail piling between
TXD-SLPM on KK Line of Waltair division.
DRF 9772 9371 10 391
384 12-13 Rebuilding of hume pipe bridges with RCC
box by box pushing technique for Br.No.1202
under ADEN/KRDL.
DRF 9950 0 1000 8950
385 12-13 Repalcement of cracked top flanged angles
of rail bearer of bridge 1383 DN between DSI-
PDU.
DRF 8347 0 5000 3347
386 13-14 Prop. Re-building of 6 store slab bridges from
Km.831 to DVD section on ML.
DF4 19403 0 3800 15603
387 13-14 RCC BOX size 2.0m x 2.50 m in lieu of
cracked hume pip Br. No.1031 at Kavargaon-
Dabpal and Br. No.1151 at Kamalur-Bhansi
at Km.420/1-2 on KK line.
DRF 24966 0 1000 23966
388 13-14 Replacement of existing RSJ Rail bearers by
Built up sections for Bridge No.1354 UP at
Km.743/35-744/21 between ULM-CHE.
DRF 15271 1741 1000 12530
KHURDA ROAD DIVISION
389 08-09 Proposed conversion of Arch bridges of Br
Nos. 727UP & 728 UP into RCC Box in KUR-
PSA section .
DRF 2398 813 100 1485
390 08-09 Proposed conversion of Arch bridges of Br
Nos. 786UP & 809 UP into RCC Box in KUR-
PSA section .
DRF 2684 142 0 2542
391 08-09 Proposed conversion of Arch bridges of Br
Nos. 916UP & 1012 UP into RCC Box in KUR-
PSA section.
DRF 2291 999 0 1292
392 08-09 Proposed conversion of Arch bridges of Br
Nos. 1137 UP & 1098 UP into RCC Box in
KUR-PSA section .
DRF 2952 0 0 2952
393 09-10 Proposed replacement and strengthening of
different corroded and perforated steel
members such as rail bearers, cross girders
,stringer bracing ,bottom lateral bracing and
gussets of steel girders on Br. No.
553(18x150'G)( Span 1 to 4) between CTC-
GBK at Km.411/6-42 under DEN(Br.).
DRF 9843 1589 0 8254
26
Page 27
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
394 10--11 Strengthening of piers and abutments by
RCC jacketing and foundation by piling of Br.
No. 1046 UP (5x60'+1x80' ) in KUR-PSA
section .
DRF 20124 1167 2000 16957
395 10--11 Proposed rebuilding & conversion of Bridge
No. 6 DN (10x0.914m) stone slab into
(2x3.0x3.15m) RCC Box at Km. 398/12/10 in
between stations NRG-SQQ.
DRF 4984 1226 100 3658
396 11-12 DRF 2646 2361 10 275
CRRM(-) 349 0 349
397 11-12 Proposed jacketing of 15 Nos. spans (span
Nos. 1,2,3,4,5,6,8,13,14,15,16,17,18,19 &20)
of Br. No. 17 (44x3.05mA) at Km. 462/27-
463/1 in KUR-PUI section of KUR division.
DRF 9961 2140 1000 6821
398 11-12 DRF 7149 753 1000 5396
CRRM(-) 375
399 11-12 DRF 9999 0 0 9999
CRRM(-) 469 0 469
400 11-12 DRF 8312 0 1000 7312
CRRM(-) 1126 0 1126
401 DRF 7417 0 1176 6241
CRRM(-) 985
402 12-13 Replacement of corroded and cracked
bottom lateral bracings of span Nos. 1 to 15
of Br.No.449DN .
DRF 9733 3060 4420 2253
403 12-13 Povision of Man refuses on girder bridges
under jurisdiction of SSE(Br.)/North &
SSE(Br.)/South in Khurda Road Division.
DF4 6488 3255 500 2733
404 12-13 Povision of Man refuses on girder bridges
under jurisdiction of SSE(Br.)/Bhadrak &
SSE(Br.)/CTC.
DF4 8448 5951 500 1997
11-12 Replacement of corroded cross girders of
through bridge with new cross girders of Br.
NO. 391 DN(15x150 G) ( spans 9 to 15) at
Km. 318/20-319/12 between MZZ-BTV
stations of KUR Divn.
Replacement of corroded and perforated
cross girders and bottom lateral bracing of Br.
No.535A Dn. (1x150G) at km. 400/22-20
between stations KNPR-NRG under
SSE(Br)CTC of KUR Divn.
Provision of steel stools for lifting of existing
girders to maintain the longitudinal levels on
Br. Nos. 456 Up & DN, 467 UP & DN, 468
UP&DN, 514 UP & DN, 521 DN, 535 DN &
537 DN under jurisdiction of SSE/Br/CTC &
Bridge No. 559 SL, 567 UP& DN,
32,30,20,19,18,17 & 615UP under jurisdiction
of SSE/Br/North/KUR in Khurda Road
division.
Provision of steel stools for lifting of existing
girders to maintain the longitudinal levels on
Br. Nos. 361 UP&DN, 362 UP&DN, 370 UP &
DN, 372 UP & DN, 382 UP&DN, 392UP &
DN, 393 UP & DN, 434 UP & DN, 448 UP &
DN under jurisdiction of SSE/Br/BHC in
Khurda Road division.
Replacement of corroded cross girders of
through bridge with new cross girders of Br.
NO. 391 DN (15x150 G) ( spans 1 to 8) at
Km. 318/20-319/12 between MZZ-BTV
stations of KUR Divn.
27
Page 28
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
405 12-13 Rebuilding of stone slab bridges of Br. No. 8
& 10 and arch Bridge of Br. No. 20 into into
RCC box in KUR-PUI section of Khurda Road
Division.
DRF 5588 2284 3000 304
406 12-13 Rebuilding of stone slab bridges of Br. No.72
and arch bridge of Br. No. 51 into RCC box in
KUR-PUI section of Khurda Road Division.
DRF 5508 368 2500 2640
407 13-14 Khurda Road - Puri - Rebuilding (11 stone
slab bridges)
DRF 18000 0 7665 10335
408 13-14 Proposed raising of abutments & piers,
replacement of existing plate girders by
shallow type girders of Br. No.615(UP&DN) in
KUR.
DRF 22136 0 5000 17136
SAMBALPUR DIVISION
409 05-06 Re-building of 02 nos earthenware pipe
bridges into RCC box (1x1.2Mtr) in JSG-
BRGA section .
DRF 1045 492 0 553
410 06-07 Rebuilding of 06 nos earthenware pipe
bridges into RCC box(1x1.2 Mtr) in Br no. 24,
33, 35,37,38 & 40
DRF 3151 1913 100 1138
411 08-09 Rebuilding Arch Bridge No. 16 in JSG-TIG
section by providing suitable RCC Box
Bridge.
DRF 2590 240 0 2350
412 10--11 BMCK-THV: Rebuilding of existing old
damaged flat top Br. No. 561(4x0.91m FT) in
to RCC Box of 2.6x 2.6m size by Box pushing
technique.
DRF 8887 7688 0 1199
413 10--11 Rebuilding of Br.No.199 of span 2x0.91m at
km.615/13-14 and Br.No.201 of span 2x1.8m
at km. 616/11-12 between BRGA-BRPL
sections to RCC Box.
DRF 7502 0 0 7502
414 10--11 BLSN-MSMD: Rebuilding of existing old
damaged flat top Br. No. 80 (3x0.90m FT) in
to RCC Box of 2x 1.8mx1.8m size by Box
pushing technique.
DRF 1958 911 0 1047
415 11-12 Rebuilding of existing old damaged flat top
bridge No. 563 , 252,158,159 & 160 in R-THV
section of SBP Divn
DRF 13709 1130 7500 5079
416 11-12 The replacement loose/head lost rivets
including under sleeper sheets by new rivets
of size 1/8 inches (3mm) higher than loose
rivets under the jurisdiction of SSE/Br/TIG at
various (24nos) of bridges in TIG - THV
section of SBP division as per Annexure-II of
the proposal.
DRF 3635 4250 2000 -2615
417 11--12 Provision of man refuges on open web
girders on bridge 7, 87, 77, 239, 247,
293,331, 406 & 438 in JSG- TIG and 343 UP
and 77 in R- THV section of SBP division.
DF4 2267 2454 382 -569
418 12-13 Replacement of worn-out and head lost rivets
of different bridge girders in JSG-BRGA
section of Sambalpur division
DRF 4705 1173 359 3173
28
Page 29
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
419 12-13 Sterngthening of existing piers & abutments
to Br. No. 46
DRF 6027 0 0 6027
420 12-13 Rebuilding of damaged bridge no.413 at Km
250/3-4(3x0.91m) stone slab with
1X3.30X2.15m RCC Box bvbridge by Box
pushing method.
DRF 9877 0 7500 2377
421 14-15
DRF 100
DF3 100
DF4 50
CAP 400
DRF 300
DF3 100
DF4 100
CAP 500
DRF 100
DF3 100
DF4 50
CAP 100
DRF 370398 117369 60000 193529
DF3 18553 9619 4500 4734
DF4 197909 33418 31000 133691
CAP 0 0 1000 0
NEW WORKS
KHURDA ROAD DIVISION
422 14-15 Replacement of corroded & perforated fixed
end bearings of Br. No. 22 under
SSE(Br.)/North/KUR of Khurda Road
Division.
DRF 4642 0 1500 3142
423 14-15 Strengthening and Replacement of corroded
members on Bridge No. 362, 382 & 392 Up
& Dn, 448 Dn and 550 SL of BHC-BRAG
section.
DRF 7072 0 1500 5572
424 14-15 Conversion of stone slab bridge No 580 in to
RCC box bridge in BBS Yard.
DRF 9320 0 1500 7820
425 14-15 Replacement of corroded members on Bridge
No. 992 Up & Dn, 1004 Up & Dn and 1052Up
of KUR-PSA section.
DRF 4479 0 1500 2979
426 14-15 Conversion of flat bearings in to centralized
bearings of Br No 4NS and Strengthening of
corroded members on various bridges under
SSE(Br)/CTC
DRF 4539 0 1500 3039
SAMBALPUR DIVISION
427 14-15 Rebuilding 05 Nos Bridges(Br No-52Dn,59Up
& Dn, 60Dn, 61Dn & 61A Dn in JSG-BRGA
section of SBP Divn.
DRF 9296 0 1500 7796
428 14-15 Works costing below 30 lakhs
DRF 200
KUR Division DRF 200
DRF 100
Sub Total -New Works DRF 39348 0 9500 30348
DF4 197909 33418 31000 133691
DF3 18553 9619 4500 4734
Works costing below Rs.30 lakhs each
WAT Division
KUR Division
SBP Division
Sub Total-WIP
WAT Division
SBP Division
PH-32 (BRIDGE WORKS)
Grand Total
29
Page 30
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
CAP 0 0 1000 0
DRF 409746 117369 69500 223877
Total 626208 160406 106000 362302
WORKS IN PROGRESS
429 02-03 East Coast Railway FM-FM track circuiting
(run through) on E Spl route (13 stations)
DF4 12005 166 12 11827
WALTAIR DIVISION
430 13-14 WAT Divn-Replacement of power supply
system by IPS(10 Stns)( 12 Nos)
DRF 22053 0 19430 2623
431 07-08 Replacement of old and wornout rodding and
associated S&T gears in B, I & J Cabins of
Waltair Marshalling yard
DRF 4147 2509 1500 138
432 08-09 WAT Divn- Replacement of shelf type line
and track relays by plug in type relays at KUR
division and 40 stations
DRF 11769 6785 2520 2464
433 08-09 Provision of Wireless in local loop (WLL)
exchanges for disaster management in WAT
Divn(4 nos)( VSKP,RGDA,KRPU & KRDL)
DF4 4619 16 12 4591
434 08-09 Replacement of exchanges at
KTV,VZM,KRDL & SUP of WAT Divn.
DRF 2038 1469 0 569
435 08-09 Replacement of Main Divisional Exchange at
Waltair.
DRF 4979 2491 0 2488
436 09-10 Provision of Universial Block Interface to work
on OFC in Jagdalpur -Kirandul section of KK
line (30 nos)
DF3 10786 0 11765 -979
437 09-10 Replacement of power plant of OFC
equipment in Main Line & RV Line .
DRF 10983 73 100 10810
438 09-10 Home to FM and Loop line track circuiting of
Tikiri, Rouli, Liliguma & S.Kota (4 stations)
DF4 7490 9646 12 -2168
439 11-12 Provision of IPS in IBS (10 nos) in WAT divn DF3 7558 9351 588 -2381
440 11-12 Provision of backup power supply in K.K line
(23 stns) in WAT divn
DF4 9810 7617 706 1487
441 DRF 9366 4097 5883 -614
CRRM(-) 442 0 442
442 11-12 Provision of track circuiting at D cabin in
WMY
DF4 9469 8168 2059 -758
443 12-13 Provision of Double Distant signal (08 Nos) at
NML, IBS bet VZM - NML, DVD, IBS bet DVD
- GPT of Waltair Divn.
CAP 8089 9667 1 -1579
444 12-13 Provision of Double Distant signal (08 Nos) at
SGDM, IBS bet CPP - SGDM, CPP, GVI, IBS
bet NML - GVI of Waltair Divn.
CAP 8110 1000 1 7109
11-12 Replacement of exchanges (10 nos) at
Marripalem, Bacheli, Jagdalpur, Koraput,
Araku, Rayagada, Visakhapatnam Steel
Plant, Jeypore, Laxmipur and Srikakulam Rd.
PH-32 (BRIDGE WORKS)
Grand Total
PH- 33 (SIGNALLING & TELECOMMUNICATION WORKS)
30
Page 31
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
445 12-13 Provision of Double Distant signal at 5 Stns
(GTLM, PVP, VBL, GPI & GRBL) R.V.Line of
WAT Divn
CAP 8058 12407 1 -4350
446 12-13 Provision of Double Distant signal (08 Nos) at
IBS bet TIU - KBM, Tilaru, Urlam, Dusi,
Ponduru
CAP 8055 3650 1 4404
447 12-13 Prov of Double Distant signal (09 Nos) at IBS
between PUN - PSA, PUN, IBS bet NWP -
PUN, NWP, IBS bet KBM - NWP, KBM of
WAT Divn
CAP 8094 4278 1 3815
448 12-13 Replacement of Integrated Power Supply
System (9 Nos) in WAT Divn.
DRF 9144 9430 1 -287
449 12-13 Replacement of Batteries of IPS ( 28 No) in
Waltair Divn.
DRF 9315 7367 1500 448
450 12-13 Provision of Microprocessor based Remote
Terminal Unit for IBS (10 No) in WAT Divn.DF3 4361 4377 0 -16
451 12-13 Provision of LED Signals at 11 Stations DF(4) 9433 12449 0 -3016
452 12-13 Replacement of existing power supply by IPS
at 06 stations of WAT Division.(BGHU,
SMLG, MVF, CTS, KDPA, KKGM)
DRF 9337 4997 1900 2440
453 12-13 Replacement of existing green aspect LED
unit at approach signals on WAT Division.
DRF 9500 5019 9500 -5019
454 12-13 Ugradation of micro lok version along
replacement of outlived industrial CPU and
VDU on 15 sations of WAT Division.
DRF 4116 0 7000 -2884
KHURDA ROAD DIVISION
455 07-08 Provision of Radio based communication
system link in Tangirapal-Sagadapata-
Chilikdara section .
DF4 2937 0 3261 -324
456 08-09 a) Replacement of shelf type relays by plug-
in type relays at TLHD station of KUR
division.
b) Replacement of over aged plug-in type
relays in TLHR section of KUR division. (100
Nos.)
DRF 2318 676 1600 42
457 08-09 Extension of S&T control to all S&T staff ,
supervisors of KUR Divn
DF3 2570 80 1 2489
458 08-09 Provision of Universal failsafe Block Interface
in Jakhapura-Jaroli section .
DF3 4998 0 0 4998
459 11-12 Provision of un-interrupted power supply to
signals by IPS at IBS(10 Nos) of KUR divn
DF3 9888 9818 713 -643
460 11-12 Provision of un-interrupted power supply to
signals by IPS at 7 nos 'C' class stations of
KUR divn (KRIH, NGMP, BRTG, KJR, SRKT,
SLZ, KUU)
DF3 9896 9025 429 442
461 11-12 Provision of un-interrupted power supply to
signals by IPS at 12 nos LC gates of BRAG-
KUR-BALU of KUR divn
DF3 9988 9894 1671 -1577
31
Page 32
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
462 11-12 Provision of LED signals at all stations and
mid section LC gates from SQQ to ANGL in
CTC-ANGL section of KUR divn
DF4 9976 3417 7058 -499
463 11-12 Strengthening of power supply and provision
of no light protection of signals at 12nos LC
gates of BALU - PSA of KUR Division.
DF3 9971 1585 7696 690
464 DF3 4985 1242 4941 -1198
CRRM(-) 30 30
DRF 4985 4518 1000 -533
465 12-13 Upgradation and extension of Railnet
connectivity of Khurda Road Division.DF3 9990 4272 953 4765
466 12-13 Provision of double distant signals at
KNPR,NRG,KIS & JJKR (04 Nos) stations of
CTC-JJKR section of KUR division.
CAP 8291 8787 1 -497
467 12-13 Replacement of old electronic Exchange by
IP Telephone Exchange based on server
Gateway Architecture in KUR division.
DRF 9634 0 4341 5293
468 12-13 (a) Replacement of OFC equipments at CTC-
BHC sections of KUR Division,(b) Shifting of
OFC equipments at KUR exchange to Test
Room
DRF 9757 96 1043 8618
469 12-13 Replacement of existing CMU of datalogger
at KUR DRM office.
DRF 8679 0 1177 7502
470 12-13 Provision of double distant signal in the
section BHC- KED in KUR division.
CAP 8298 0 1 8297
471 12-13 Provision of double distant signal in the
section KUU- BALU in KUR division.
CAP 4498 0 1 4497
472 12-13 Autosignalling in section BRAG-MCS section. CAP 8900 5113 1 3786
473 12-13 Replacement of existing green aspect LED
unit at approach signals on KUR Division.
DRF 9500 7154 8752 -6406
474 12-13 Replacement of existing microlok outlived
industrial CPU and other cards & VDU on 36
sations of KUR Division.
DRF 9282 0 6766 2516
475 12-13 Autosignalling in RET-KUR section in KUR
Division
CAP 7351 5734 3450 -1833
476 13-14 Provision of Microprocessor based Remote
Terminal Unit and net working at IBS (12
Nos) in Khurda Road Division
DF3 5587 0 5625 -38
477 13-14 Replacement of existing Mechanical
Signalling system at Gurudijhatia station by
Electronic Interlocking system released from
BBS station.
DRF 9941 0 9941 0
478 13-14 Replacement of existing Mechanical
Signalling system at Joranda station by
Electronic Interlocking system released from
BBS station
DRF 9941 0 9941 0
SAMBALPUR DIVISION
11-12 Replacement of wiring & provision of data
logger at SQQ, GJTA, MYZ, JRZ & SSPR(05)
stations and networking with divisional and
Zonal HQ in KUR division.
32
Page 33
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
479 02-03 Sambalpur Division : Replacement of old
obsolete separate type point machine by high
thrust point machine at Harisankar Road and
Lakhana.
DRF 2979 1039 100 1840
480 06-07 Replacement of shelf Type track relays with
Plug-in type relays (QT2) of SBP Div.
DRF 2157 1177 980 0
481 06-07 Replacement of separate type of point
machine with combined type point machine
(IRS) of R-TIG .
DRF 2441 799 100 1542
482 07-08 Sambalpur - Block proving by axle counters
(2 block sections) (double line)
DF4 6500 0 7059 -559
483 07-08 Replacement of Shelf Type Line Relays with
Plug-in type Relays(QN1) In R-TIG section.
DRF 2676 933 100 1643
484 07-08 Replacing of defective Signalling cables in
SBPY—KPJG section
DRF 2703 2147 557 -1
485 07-08 Replacement of Obsolete type of panel by
Domino type panel in 07 stations (ANMD,
BMKJ, KRAR, NPD, LKNA, HSK, MRBL)
DRF 2956 3751 100 -895
486 07-08 Provision of maintenance free Earth
arrangements for Signalling Installations in
SBP Divn.
DF4 2906 16 1647 1243
487 08-09 Sambalpur Division- Replacement of Panel
Interlocking-150 Relays and its wiring at 15
stations
DRF 15286 1000 8000 6286
488 08-09 Provision of maintenance free earth
arrangement for the signaling and telecom
installations of 25 stations in SBP division.
DF4 3408 0 1740 1668
489 08-09 Replacement of single line token block
instruments with token less block instruments
in 10 block sections of JSG-TIG section.
DRF 4457 5533 100 -1176
490 08-09 Provision of Wireless in local loop (WLL)
exchanges for ARTs at SBP & KBJ for
disaster management
DF4 2854 50 3294 -490
491 09-10 Replacement of Signal machines in old PI
stations and making provision for advance
starters, outer and warners of RNBT, TRKR,
BGBR, ARN, BLSN, KMK & MNDH stations
on R-TIG section .
DRF 4235 6059 100 -1924
492 11-12 Provision of Integrated Power Supply system
for 10 nos mid section interlocked LC gates
over SBP divn.
DF3 7561 8477 2932 -3848
493 11-12 DRF 9843 11374 100 -1631
CRRM(-) 100
494 11-12 DRF 7876 8141 1176 -1441
CRRM(-) 400
Replacement of semaphore signals with CLS
in RNBT, MRBL stn, & LC RV-115 of TIG-
KBJ section of SBP divn
Replacement of Analog axle counters of
Raipur-Theruvali section of SBP divn with
SSDACs
33
Page 34
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
495 11-12 Replacement of 256 port obsolete type Data
loggers by 512 port data loggers of 06
stations in SBP-ANGL section of SBP
Division( MANE, HATB, JUJA, RAIR, HNPA,
BONA).
DRF 7315 6836 100 379
496 11-12 Provision of Auto signalling in BBS-MCS
section (UP line)
CAP 9653 278 616 8759
497 11-12 Provision of Auto signalling in BBS-MCS
section (Dn line)
CAP 9721 2461 1 7259
498 11-12 Provision of Auto signalling in BBS-SRKT
section (Dn line)
CAP 9551 0 1 9550
499 11-12 Provision of Auto signalling in BBS-SRKT
section (UP line)
CAP 9619 0 5360 4259
500 12-13 Provision of one digital/ISDN exchange at
Rail Nagar of Sambalpur Division.DF3 3030 637 1176 1217
501 12-13 Repairing of defective Quad cable in
Sambalpur-Angul section of Sambalpur
Division.
DRF 8622 8673 969 -1020
502 12-13 Restoration of defective signals and points of
MNDH yard of SBP division.
DRF 9160 46 46 9068
503 12-13 Double distant at 04 stations CAP 9854 0 1 9853
504 12-13 Replacement of old DG sets with new DG
sets in the SBP-ANGL section of Sambalpur
division.
DRF 9881 0 5000 4881
505 12-13 Replacement of power plant equipment and
earthoing arrengement for OFC equipment
along with provision of CL-B/C protection
devices at WAY stations of SBP Division.
DRF 5079 2865 2900 -686
506 12-13 Provision of solar distled water plants at 08
locations over SBP Division.
DF3 4298 3102 588 608
507 12-13 Replacement defective quad cable in TIG-R
section of SBP Division.
DRF 6670 5236 1841 -407
34
Page 35
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
HEADQUARTERS 0 0
508 08-09 Provision of Wireless networked railnet
connectivity at E.Co.Rly Zonal Headquarter.
DF3 4979 4040 12 927
509 14-15 Works costing below Rs.30 lakhs each
CAP 560
DRF 2500
DF3 12
DF4 2941
CAP 1
DRF 5691
DF3 886
DF4 7928
SBP Division CAP 1
DRF 500
DF3 12
DF4 588
Reserve with HQ DF4 11683
Sub Total-WORK IN PROGRESS CAP 126142 53375 10000 63329
DRF 285120 122290 124855 46666
DF3 110446 65900 40000 5456
DF4 71974 29096 50000 16018
NEW WORKS
WALTAIR DIVISION
510 14-15 Provision of LED Signals in Calling on, Shunt
signal, Route aspect in WAT Divn.
DF4 7839 0 5000 2839
KHURDA ROAD DIVISION
511 14-15 Replacement of old version Integrated Power
Supply System [IPS] of KUR division
DRF 9891 0 4000 5891
SAMBALPUR DIVISION
512 14-15 Replacement of IPS at 08 stations. DRF 9749 0 4000 5749
513 14-15 Provsion of LVCD for the station with central
panel in R-TIG section
DF4 8106 0 4000 4106
514 14-15 Works costing below Rs.30 lakhs each
DRF 500
DF4 200
DRF 500
DF4 200
DRF 400
DF4 200
Reserve with HQ DRF 600
DF4 400
DRF 19640 0 10000 11640
DF4 15945 0 10000 6945
CAP 126142 53375 10000 63329
DRF 304760 122290 134855 58306
DF3 110446 65900 40000 5456
DF4 87919 29096 60000 22963
Total 629267 270661 244855 150054
WAT Division
KUR Division
SBP Division
Sub Total-New works
PH- 33 (SIGNALLING &
TELECOMMUNICATION WORKS) Grand
Total
WAT Division
KUR Division
35
Page 36
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
WORKS IN PROGRESS
KHURDA ROAD DIVISION
515 08-09 Bhubaneswar-Cuttack-Talcher-Rehabilitation
of power supply distribution arrangement
DRF 23500 11903 100 11497
516 09-10 Rehabilitation of existing power supply
distribution arrangement (Ph-III) at
Puri,BHC,JJKR & Rail Vihar/BSR
DRF 20000 0 4000 16000
517 09-10 Provision of 16 metre long high mast for
adequate lighting in coaching complex at
Bhubaneswar.
DF3 2270 0 40 2230
518 12-13 Non regenerative test bed facilities for SGAC
Coaches at Puri.
DF3 2016 1327 58 631
SAMBALPUR DIVISION
519 13-14 Improvement of power supply system at
SBP(DRM/complex, station Building,
additional Space for stores of SSE/EL/SBP)
DRF 16012 0 898 15114
520 13-14 Provision of 11KV ring main system and
Feedser Pillar etc. for stability of Power
supply at Rail Vihar
DF3 8250 0 1 8249
521 13-14 Extension of 11 KV feeder from Railkunj
33/11KV receiving substation to Railvihar
DF3 9275 0 1 9274
HEADQUARTERS
522 09-10 Provision of Electronic energy meter in staff
quarters over Khurda Rd,Sambalpur divisions
& Headquarters.
DRF 6000 0 0 6000
523 09-10 Provision of Automatic Power factor
correctors in the Sub Stations at Rail Vihar ,
Rail Kutir, Kanchanjanga, C.S.Pur,
Bhubaneswar and Mancheswar Workshop.
DRF 2207 0 0 2207
524 11-12 Energy Conservation on East Coast Railway DF3 11000 0 3900 7100
525 14-15 Works costing below Rs.10 lakhs each
DF2 0
DF3 0
DRF 1
DF4 400
CAP 2200
DF1 500
CAP 200
DRF 1
DF3 0
DF4 400
DF1 450
CAP 100
DRF 0
DF3 0
DF4 200
DF1 50
CAP 0 0 2500 0
DRF 67719 11903 5000 50818
DF1 0 0 1000 0
DF3 32811 1327 4000 27484
DF4 0 0 1000 0
WAT Division
PH- 36 (OTHER ELECTRICAL WORKS EXCLUDING TRD WORKS)
KUR Division
SBP Division
Sub total- WORK IN POGRESS
36
Page 37
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
NEW WORKS
KHURDA ROAD DIVISION
526 14-15 Grid connected Solar Roof Top provision in
Rail Sadan Building at Bhubaneswar.
CAP 7196 0 850 6346
527 14-15 Non regenerative test bed facilities for SGAC
Coaches at Puri.
DF3 2414 0 800 1614
528 14-15 Works costing below Rs.10 lakhs each
CAP 20
DRF 500
DF3 40
CAP 20
DRF 500
DF3 40
CAP 10
DRF 500
DF3 20
Reserve with HQ CAP 100
DRF 1000
DF3 100
CAP 7196 0 1000 6346
DRF 0 0 2500 0
DF3 2414 0 1000 1614
CAP 7196 0 3500 6346
DRF 67719 11903 7500 50818
DF1 0 0 1000 0
DF3 35225 1327 5000 29098
DF4 0 0 1000 0
Total 110140 13230 18000 86262
WORKS IN PROGRESS
WALTAIR DIVISION
529 06-07 Standardization of sectioning post between
Chattariput and Jeypore (Km.229/7) in KK
line.
DF4 1878 0 0 1878
530 07-08 Provision of Centralised fault analysis and
fault locating system for 25 KV AC Traction at
2 TSSs.
DF4 2227 1586 0 641
531 08-09 Waltair division: Replacement of existing
corroded cantilever assemblies
DRF 7000 1139 4700 1161
532 09-10 Chimidipalli-Araku-Replacement of Cadmium
copper Catenary wire( 65 Sq.mm) )( 38 Km)
DRF 24935 14314 8300 2321
533 10-11 Replacement of OHE Regulating Equipment
with SS wire rope of existing 1:5 winch type
with 1:3 pully block type over Kottavalassa -
Araku-Kirandul section (Phase-I)
DRF 23780 10918 2000 10862
534 12-13 Provision of HT Capacitor Bank at Jeypore
and Gorapur Traction Sub stations in KK Line
DRF 9882 1 0 9881
SBP Division
Sub Total- New Works
PH- 36 (OTHER ELECTRICAL WORKS
EXCLUDING TRD) Grand Total
WAT Division
KUR Division
PH- 37 (TRACTION DISTRIBUTION WORKS)
37
Page 38
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
KHURDA ROAD DIVISION 0 0
535 08-09 Replacement of defective auto recloser relays
at 9 traction substations of KUR Division.(
BAV,JNP,RBA,SLZ,KPXR,MRDL,JRZ,JKPR
& BHC)
DRF 2540 226 0 2314
536 08-09 Provision of additional capacitor bank at
Jaganathpur & Kaipadar Road/TSS to
improve power factor.
DF3 2982 2336 500 146
537 12-13 Provision of SSP in placeof isolator gantry
near central cabin of KUR Yard for early fault
isolation of OHE.
DF3 9999 1 2500 7498
538 14-15 Works costing below Rs.10 lakhs each
WAT Division DRF 0
DF3 0
KUR Division DRF 1000
DF3 0
SBP Division DRF 0
DF3 0
DRF 68137 26598 16000 26539
DF3 12981 2337 3000 7644
DF4 4105 1586 0 2519
NEW WORKS
WALTAIR DIVISION
539 14-15 Replacement of HT Capacitor Bank at VZM DRF 6789 0 2500 4289
540 14-15 Provision of SP at KAKALUR (Phase-I) DF3 2633 0 2000 633
541 14-15 Works costing below Rs.10 lakhs each
WAT Division DRF 0
DF3 0
KUR Division DRF 0
DF3 0
SBP Division DRF 0
DF3 0
Sub Total- New Works DRF 6789 0 2500 4289
DF3 2633 0 2000 633DRF 74926 26598 18500 30828
DF3 15614 2337 5000 8277
DF4 4105 1586 0 2519
Total 94645 30521 23500 41624
WORKS IN PROGRESS
WALTAIR DIVISION
542 06-07 Visakhapatnam- Pathway, crossways,
moorum pathways and other facilities at
departure yard.
DF3 15216 14434 280 502
543 08-09 Waltair-Maintenance Facility for 140 ton
Break down crane at Loco shed
DF3 6754 8225 470 -1941
PH-42 (WORKSHOP INCLUDING PRODUCTION UNITS)
Sub total- WORK IN PROGRESS
PH- 37 (TRACTION DISTRIBUTION
WORKS) Grand Total
38
Page 39
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
544 09-10 KRPU: 120 t BD crane maintenance facilities
at KRPU
DF3 8092 4087 7000 -2995
545 10-11 CC pathways in OEC yard between L
No.1&2, 3&4 and 5&6 each 1.75 mtrs. Wide
and 600 mtrs length.
DF3 2307 1190 1500 -383
546 12-13 Proposal for extension of covered shed of
size 60 X 20mtrs at Central Sick line
DF3 19017 28182 0 -9165
547 12-13 Proposed extension of Covered Shed of 29 x
34 M at NCC/VSKP
DF3 23660 8508 9000 6152
548 12-13 Facilities for stabling 120T BD Crane
maintenance facilities at KRPU through LB
2012-13
DF3 6156 983 5000 173
549 12-13 Proposal for RCC roof building for sanctioned
CNC surface wheel lathe and other facilities
at CSL/VSKP depot through Law Book 2012-
13.
DF3 9901 1462 5000 3439
550 12-13 Welding grid and other facilities for
RYD/C&W/VSKP depot through Law Book
2012-13
CAP 9969 2254 1400 6315
551 12-13 Replacement of defective AC sheet roofing ,
gutters with galvalume sheet and GI gutters
to the work shop of DLS/WAT.
DRF 9976 0 7000 2976
552 12-13 Welding grid facilities, other facilities at RMU
Yard/C&W/ VSPS.
DF3 5948 0 2100 3848
553 13-14 Concrete flooring apron( 50x25 mts) DRF 1955 0 1 1954
554 13-14 Replacement of service rooms for
maintenanace of various components
DRF 3389 0 1000 2389
555 13-14 Improvement of illumination in diesel loco
shed , Visakhapatnam.
DRF 2479 0 1 2478
KHURDA ROAD DIVISION
556 07-08 Construction of new heavy materials Godown
at Stores Depot of CRW/MCS.
CAP 1642 0 1 1641
557 07-08 CRW/MCS: Provision of Air Conditioning of
Wheel Shop Roller Bearing section
DRF 1653 141 500 1012
558 07-08 Two level P,way line 0f 70 N length each in
front of NTXR office in MCS
DF3 1535 1350 0 185
559 08-09 Provision of non regenerative test bed for
testing of alternators at BBS.
DF3 2400 1715 1 684
560 08-09 Provision of 4.5 KW alternator testing
facilities of TL coaches at TL & AC depot PUI
& BBS.
DF3 2400 1222 1 1177
561 08-09 Provision of over voltage relay with filter
circuit of 4.5 KW TL alternators at
CRW/MCS .
DF3 2653 500 118 2035
562 09-10 MCS: Construction of Work Room for Door
Repair of Coaches near CBR shop (18Mtrs x
30Mtrs x 4.5 Mtrs)approx
CAP 5864 1376 4500 -12
563 09-10 MCS:Renovation and Leveling of Floor with
concreting base of Paint shop (60MtsX60Mts
approx)
DF3 1569 883 1 685
39
Page 40
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
564 09-10 MCS:Renovation & Extension of existing
Inspection Pits in Pit line -03 Nos, by further
extension of (21 Mtrs X 1.32Mtrs X 1.2Mtrs
approx.) each, near TL shop
DF3 1245 2229 0 -984
565 10-11 Extension of assembled wheel park at
CRW/MCS
DF3 4881 0 1 4880
566 11-12 Development of bogie loading /unloading &
bogie parking area near new sick line at
coaching depot PUI
DF3 1129 835 1 293
567 11-12 Terminal coaching maintenance facilities as
per RPC - 4 at TLHR & PRDP stations.
DF3 3168 700 1 2467
568 11-12 Construction of concrete pathways between
line no. 5-6 & 7-8 with electrification & without
pathway only electrification of lines between 9-
10 & 10-11 at TLHR examination yard.
DF3 5376 1629 1 3746
569 11-12 Infrastructure facilities for periodicity of 9
months IOH and 18 months of POH near
SAIL area at coaching Depot, Bhubaneswar.
DF3 7382 1188 1 6193
570 11-12 Improvement of battery charging facility at
coaching complex BBS.
DF3 3038 0 1 3037
571 11-12 construction of cover shed for under floor
wheel latche at coaching depot puri.
DF3 6990 0 1 6989
572 11-12 Construction of cover shed for under floor
wheel latche near SAIL area at coaching
depot Bhubaneswar.
DF3 6873 0 1 6872
573 12-13 BBS-Covershed for Infrastructure facilities for
periodicity of 9 months IOH & 18 months
POH near SAIL area Coaching Depot/BBS.
DF3 6157 0 1 6156
574 12-13 Effluent Treatment Plant for 5 LakhsLtrs per
day at Coaching Depot, Bhubaneswar
CAP 8845 0 4380 4465
575 13-14 TLHR:-Construction of CC pathway , High
mast lights & Rolling in lights for TLHR
examination yard.
CAP 8497 0 1 8496
576 13-14 MCSW: Facilities for CTRB wheel
maintenance for wagons
CAP 5770 0 1 5769
577 13-14 Over head tank, Ground storage tank , deep
tube well and new pipe line for fire hydrants at
MCSW.
CAP 6297 0 6000 297
SAMBALPUR DIVISION
578 09-10 SBP: Construction of one coach length pit for
maintenance of under slung equipments of
power coach of SPART.
CAP 2367 1500 0 867
579 09-10 SBP: Improvement of IOH facility and
extension of site catwalk width of one pit at
coaching deopt
DF3 6569 1652 1 4916
580 11-12 Improvement of pathway for freight train
examination yard at Kantabanji.
DF3 4604 2000 600 2004
581 12-13 Renovation of three catwalks of two existing
integrated pit cum washing lines at Coaching
depot, Sambalpur
DRF 9698 100 4333 5265
40
Page 41
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
582 12-13 Kantabanji: Improvement of illumination at
freight train examination yard
DF3 2943 50 2900 -7
583 13-14 SBP: Replacement of the existing lighting
arrangement with Portal lighting arrangement
at Coaching depot
DRF 2934 0 2001 933
584 13-14 Provision of sick lines and extension of
existing freight train examination lines at KBJ.
CAP 3267 0 2528 739
585 14-15 Works costing below Rs10 lakhs each
CAP 271
DRF 156
DF3 732
CAP 200
DRF 62
DF3 797
CAP 200
DRF 62
DF3 794
CAP 52518 5130 19482 28577
DRF 32084 241 15116 17007
DF3 167963 83024 36304 50958
NEW WORKS
KHURDA ROAD DIVISION
586 14-15 CRW/MCS - Washing pit line for Bogies CAP 1658 0 500 1158
587 14-15 Works costing below Rs.10 lakhs each
CAP 0
DRF 100
DF3 100
CAP 0
DRF 100
DF3 100
CAP 0
DRF 100
DF3 100
Reserve with HQ CAP 0
DRF 200
DF3 200
CAP 1658 0 500 1158
DRF 0 0 500 0
DF3 0 0 500 0
CAP 54176 5130 19982 29735
DRF 32084 241 15616 17007
DF3 167963 83024 36804 50958
TOT 254223 88395 72402 97700
PH-51( Staff Quarters)
WORKS IN PROGRESS
WALTAIR DIVISION
588 07-08 Palasa - Visakhapatnam- Repl. Of quarters,
type-I-52 & type-II-6 units
DRF 19375 21220 0 -1845
589 07-08 Construction of 6 units Type-I Qtrs for
Trackman at Darliput station on KK line
CAP 4032 5148 0 -1116
590 08-09 Construction of new 6 units Ty-II qtrs at
Jeypore (JYP)
CAP 3692 6428 2973 -5709
KHURDA ROAD DIVISION
KUR Division
SBP Division
SUB TOTAL-NEW WORKS
PH-42 (WORKSHOPS INCLUDING
PRODUCTION UNITS) Grand
Total
WAT Division
KUR Division
SBP Division
Sub Total-WORK IN PROGRESS
WAT Division
41
Page 42
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
591 08-09 Construction of 4 units Ty-II quarters and 2
units Ty-III quarters at Angul.
CAP 3898 3969 2500 -2571
592 08-09 Construction of 5 units Ty-II quarters and 1
unit Ty-III quarters in replacement of existing
old & damaged Qtrs at Talcher
DRF 3819 0 3500 319
593 09-10 Construction of Railway Quarters Type-II 6
nos. & Type –III 6 nos for Running staffs at
ANGL.
CAP 7721 5433 1500 788
594 09-10 Construction of Railway Quarters Type-II 6
nos. & Type –III 6 nos. for Running staffs at
TLHR.
CAP 8781 0 3000 5781
595 09-10 Construction of Railway Quarters Type-II 5
units. & Type –III 5 units for Running staffs at
PRDP.
CAP 7184 5503 800 881
596 09-10 Construction of Railway Quarters Type-II 6
nos. & Type –III 6 nos. for Running staffs
and C&W staff at BBS.
CAP 9979 0 0 9979
597 09-10 Construction of 16 units new Ty-II quarters at
KUR in replacement of existing old damaged
quarters
DRF 9733 9843 2000 -2110
598 11-12 Construction of 8 units Type-II Qrts at Rail
vihar colony, CSPUR, BBSR
CAP 6975 6906 4500 -4431
599 09-10 Construction of 4 units of Ty-V Qrs. at Rail
Kunj for Hqrs Officers.
CAP 8896 0 2000 6896
600 10-11 Construction of 3 units Type-V quarters at
Rail Kunj for Hqrs officers, Bhubaneswar
CAP 7187 0 1447 5740
601 12-13 Construction of 5 nos.Ty.-III staff quarters at
Talcher.
CAP 6557 7009 1500 -1952
602 12-13 Proposed construction of 10 units of Ty-II
Qtrs in replacement at Talcher
DRF 9533 9135 1809 -1411
603 13-14 Construction of 06 units Ty-II quarters for
the Loco running staff at KDJR(Kendujhar
garh)..
CAP 4666 0 3500 1166
SAMBALPUR DIVISION
604 08-09 Replacement of 55 units of TY-I& 2 units of
TY-II quarters in Jharsuguda-Titlagarh
section
DRF 18924 18797 0 127
605 09-10 ANGL:Construction of 6 units of Ty-II and 6
units of Ty-III quarter for crew booking staff.
CAP 4430 4196 234 0
606 13-14 Replacement of condemened Ty-I quarters
by construction of 6 units Ty-II ( G+2)quarters
at Balangir station of Sambalpur Division.
DRF 5339 0 5338 1
607 14-15 Works costing below Rs.10 lakhs each
DRF 110
CAP 200
WAT Division
42
Page 43
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
DRF 132
CAP 200
DRF 47
CAP 100
CAP 83998 44592 24454 15452
DRF 66723 58995 12936 -4919
NEW WORKS
608 14-15 Works costing below Rs.10 lakhs each
CAP 40
DRF 40
CAP 40
DRF 40
CAP 20
DRF 20
Reserve with HQ CAP 100
DRF 100
CAP 0 0 200 0
DRF 0 0 200 0
CAP 83998 44592 24654 15452
DRF 66723 58995 13136 -4919
Total 150721 103587 37790 10533
WORKS IN PROGRESS
WALTAIR DIVISION
609 05-06 Extension of Casualty in Divisional Railway
Hospital
DF2 1285 1564 0 -279
610 05-06 Erection ,Commission & Installation of central
gas pipeline system of oxygen compressed
air & vacuum system in indoor hospital
,VSKP.
DF2 819 0 100 719
611 08-09 Waltair division: Rewiring of 885 units of staff
quarters over Waltair division( Ty-I-25,Ty-
I(spl)-150,Ty-II-500,Ty-III-75 & Ty-IV-35 nos.
DRF 11500 8367 3233 -100
612 09-10 Medicine Store Room of Divisional Railway
Hospital at WAT.
DF2 710 747 0 -37
613 11-12 Augmentation of water supply & purification
arrangenment with provision of
sedimentation tank ,filter beds along with
associated works at Rayagada station on RV
line of WAT Divn.
DF2 7074 0 0 7074
614 11-12 Augmentation of water supply to Staff
quarters by providing 84 nos Individual Sintex
water tanks of 2000 litre capacity each for
multistoried Qrs at Bacheli Railway colony on
KK-II-Line of WAT divn
DF2 3198 1110 1100 988
615 11-12 Construction of new PME room of Divisional
Railway Hospital,VSKP
DF2 1748 0 112 1636
616 12-13 Proposed Replacement of damaged pipeline
at Steel Plant in SSE/W/VDPD section under
DEN/HQ
DRF 2781 0 1510 1271
617 12-13 Rewiring of staff quarters at KRDL sub unit DRF 8674 5149 696 2829
KUR Division
PH-51( Staff Quarters)
Grand Total
PH-52( Amenities for Staff)
SBP Division
Sub Total-WORK IN PROGRESS
WAT Division
KUR Division
SBP Division
Sub-Total-New works
43
Page 44
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
618 12-13 Proposed construction of Gr-D and
subordinate rest house at VSKP under the
juridiction DEN/HQ/WAT
CAP 9019 5071 1500 2448
619 13-14 Augmentation of water suply arrangements
on wayside stns of KK-1 Line like provision of
deep tube well with all amenities (MVW,
BDVR, SUP, CMDP, TXD, ARK, GPJ, DPC,
MKRD, SXV, KRPU, JRT, MVG), RCC tanks,
infilteration gallery etc. on KK line under the
jurisdiction of Sr.DEN/Central/WAT of
Waltair.
DF2 22081 2318 17500 2263
620 13-14 Provision of G S W Tank of 1.5 lakh Gallons
cap and R.C.C OH Tank of 50,000 Glns cap
for TC Palm, MK area, N Colony at VSKP
DRF 9879 2242 8000 -363
621 13-14 Solar water heater system for Railway
Hospital/VSKP, Running Rooms
SCMN,MYD/VSKP,JDB,RGDA & DMNJ
DF2 4369 0 4200 169
622 13-14 Prop. Improvement to staff quarters at KTV,
PDT, DVD & SCMN stations under
Sr.DEN/E/WAT
CAP 9942 1805 9000 -863
623 13-14 Improvements of 64units of Ty-II staff
quarters at jail area, VSKP of waltair Division.
CAP 7016 1727 5400 -111
KHURDA ROAD DIVISION
624 06-07 Khurda Road & Sambalpur Division-
Eletrochlorinator at 44 nos. (SBP 30 nos&
KUR 14 nos.)
DF2 13700 881 500 12319
625 06-07 Bhubaneswar: Central gas pipe line system
in Central Hospital
DF2 3000 0 100 2900
626 08-09 Construction of Badminton Hall for New East
Coast Railway Zone at Bhubaneswar
CAP 23557 16326 500 6731
627 08-09 Expansion of Central Hospital( 2nd Phase) at
MCS.
DF2 16447 13563 100 2784
628 08-09 Rewiring of staff quarters over Khurda
division(630 units)
DRF 7333 856 1798 4679
629 09-10 Rewiring of staff quarters over KUR Division DRF 7323 3666 1000 2657
630 09-10 Construction of Holiday Home ( Two rooms)
for officers and staff at Gangtok
DF2 2000 0 2000 0
631 11-12 Provision of iron grills & frames at D,E, & F
Type quartes for safety of occupent at Rail
vihar colony, CSPUR, BBSR
DF2 9505 7387 3000 -882
632 11-12 provision of piped water supply arrangement
at stations BTV, BUDR, MZZ, KED & BGPL
with 12 x 100 mm dia deep tube well. RCC
staging to PVC tank of 2000 liters capacity
along with submersible pump under the
jurisdiction ADEN/JJKR of KUR Division.
DF2 8094 4048 4500 -454
633 12-13 Re-wiring of staff Qtrs at RailVihar DRF 3498 1393 1000 1105
44
Page 45
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
634 12-13 Construction of four/two wheeler shed for
parking of vehicles at ECOR Sadan.
CAP 6334 0 4859 1475
635 12-13 Proposed construction of Group-D rest
House on the top of the proposed
subordinate rest house at Chandrasekharpur,
Bhubaneswar.
CAP 5279 331 1641 3307
636 12-13 Proposed construction of Subordinate Rest
House at Chandrasekharpur, Bhubaneswar.
CAP 8653 4081 3000 1572
637 12-13 Provision of Cup boards, mesh doors at Ty-V
Qtrs and at officers transit at Rail Kunj, Rail
kutir, MCS colony
DF2 10000 4525 5000 475
638 12-13 Proposed replacement of damaged door and
windows at staff Qrs at Paradeep Railway
colony
DRF 9288 6866 1500 922
639 12-13 Proposed construction of Yoga hall(Gr.floor0 ,
meditation Hall (1st floor) at Rail Kunj CSPR.
DF2 9991 7939 2500 -448
640 12-13 Provision of Subordinate rest house at KUR. DF2 7390 2700 4000 690
641 12-13 Improvement to community hall at Rail Vihar
Bhubaneswar- providing kitchen area and
dinning space etc.
CAP 1047 0 500 547
642 13-14 Solar water heater in Running Room over
KUR Division
DF2 1835 0 1800 35
643 13-14 Provision of 1st floor on the existing building
for Gynaecological ward of 10 bedded
Hospital at MCS.
CAP 1820 0 800 1020
644 13-14 Construction of 20 bedded rest house for Gr-
D staff at KUR.
CAP 1978 0 1500 478
SAMBALPUR DIVISION
645 02-03 Sambalpur division -Construction of intake
well at Suktel river between Bolangir- LSX.
DRF 6022 5657 300 65
646 08-09 Improvements to old TY-II,TY-III quarters
,provision of individual Sintex tank in Ty-I,II
quarters renovation of kitchen rooms in Ty-
I,II,III quarters & masonary fencing infront of
quarters at SBP .Provision of varanda with
grill gate to staff qtrs
DF2 24098 19663 4734 -299
647 09-10 Rewiring of staff quarters 500 Nos. over SBP
Division
DRF 14827 7307 1000 6520
648 09-10 Augmentation of water supply at
MNGD,THV,AMB ,NRLR & DKLU stations
between TIG-THV section of SBP Division.
DF2 14716 15040 2500 -2824
649 14-15 Works costing below Rs.10 lakhs each
CAP 50
DRF 0
DF2 1464
CAP 50
DRF 0
DF2 2952
WAT Division
KUR Division
45
Page 46
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
CAP 25
DRF 0
DF2 1640
CAP 74645 29341 28825 16604
DRF 81125 41503 20037 19585
DF2 162060 81485 59802 26829
NEW WORKS
WALTAIR DIVISION
650 14-15 GW Storage Tank of 50,000 glns cap.and
RCC OH Tank of 25,000 glns cap. at EP Rly
colony at VSKP under DEN/Estate/WAT.
DF2 9999 0 20 9979
651 14-15 Augmentation of water supply by providing
hand tube wells at railway colonies, level
crossings etc., under Sr.DEN/Central on KK
Line of WAT DIVN.
DF2 3865 0 20 3845
KHURDA ROAD DIVISION
652 14-15 Augmentation of water supply to staff
quarters at Talcher station of Khurda Road
Division
DF2 9581 0 60 9521
653 14-15 Works costing below Rs.10 lakhs each
CAP 40
DRF 20
DF2 0
CAP 40
DRF 20
DF2 0
CAP 20
DRF 10
DF2 0
Reserve with HQ CAP 100
DRF 50
DF2 0
CAP 0 0 200 0
DRF 0 0 100 0
DF2 23445 0 100 23345
CAP 74645 29341 29025 16604
DRF 81125 41503 20137 19585
DF2 185505 81485 59902 50174
Total 341275 152329 109064 86363
WORKS IN PROGRESS
WALTAIR DIVISION
654 06-07 Provision of POET at PRS locations at
VSKP,VZM,CHE and RGDA stations
DF1 575 0 575 0
655 09-10 Improvement of front façade of station
building at VSKP
DF1 21335 9425 11000 910
656 09-10 Raising of platform level of PF No.2/3 and 4/5
from Rail level to High level at at KTV station.
DF1 9983 3662 6321 0
SBP Division
Sub Total-WORK IN PROGRESS
WAT Division
KUR Division
SBP Division
Sub-Total-New Works
PH-52( Amenities for Staff)
Grand Total
PH-53( Passenger Amenities)
46
Page 47
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
657 09-10 KRPU: Provision of New PRS Complex,
Improvements to concourse, provision of
sleeper and general waiting hall and other
incidental works on KK line
DF1 8101 6916 2000 -815
658 09-10 KRPU: Provision of Electronic coach
indication boards
DF1 6107 0 1600 4507
659 09-10 PVP: Provision of Electronic coach indication
boards
DF1 5890 0 2500 3390
660 10-11 Rayagada- Development of circulating area
and provision of 3 bays of PF shelter on PF
No. 2/3 of Rayagada station
DF1 16916 14507 4607 -2198
661 Extension of PF to accommodate 18 coaches
at GPI, DNV, KMX, SNM, GMDA, KNRT &
JMPT stations.
DF1 16573 13340 4211 -978
662 12-13 Provision of dedicated Coach Watering
facilities, additional new island platform with
FOBconnection to Platform No. 1 at
Jagadalpur station.
DF1 15969 3633 11195 1141
663 13-14 Provision of 2 Bays PF Shelters each at VZM,
CHE, VBL, DVD, JDB, PVPT stations and 1
Bay each at JYP and PVPT stations on WAT
Division.
DF1 19727 1197 10000 8530
664 13-14 Washable aprons on Platform No.2 for full
length and North and South extended
portions on PF No.1&3 at Visakhapatnam
Station
DRF 18575 0 20000 -1425
KHURDA ROAD DIVISION
665 04-05 Bhubaneswar- provision of foot over bridge
3.66 m in replacement of existing of foot over
bridge.
DRF 4976 6609 588 -2221
666 05-06 Provision of Mobile charging facilities in 58
self generated AC Coaches
DF1 1800 1830 0 -30
667 06-07 Air conditioning of Booking office at BAM &
BBS
DF1 2914 1730 0 1184
668 06-07 CRW/MCS: Provision of mobile and laptop
charging points in Sleeper coaches.
DF1 2354 0 0 2354
669 08-09 Washable appron for PFs no. 4 at PURI DF1 8193 0 6000 2193
670 08-09 DNKL: Proposed extension & raising of
platform no.2 to accommodate 24 coaches
train at DNKL station.
DF1 4160 4693 0 -533
671 08-09 CTC: Construction of balance cement
concrete apron on PF-1 at Cuttack station on
Howarh end.
DF1 5958 0 4000 1958
672 08-09 CTC: Construction cement concrete apron
on PF no. 2 at Cuttack station
DF1 4948 5342 0 -394
673 08-09 Raising of PF no. 1 at BAM station DF1 6000 5930 1000 -930
674 09-10 CTC-Replacement of old damaged AC sheet
by providing galvalume sheet on PF No. 1,2 &
3 at Cuttack Rly. Station.
DRF 6202 4727 1475 0
47
Page 48
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
675 09-10 KUR:- i) Provision of 08 beds ladies
dormitory ii) Improvement of signage.
DF1 3762 1835 1000 927
676 09-10 KUR: Raising of PF no.2 and PF no.3 (350
mm) from LL to HL
DF1 9937 14817 0 -4880
677 09-10 KUR: Upgradation of enroute watering
system at KUR as per CAMTECH design.
DF1 3296 3910 500 -1114
678 09-10 CTC: Improvement to water supply system by
providing of 50000 gallon capacity RCC Over
Head Tank along with allied works.
DF1 4641 3395 1000 246
679 09-10 Improvement to lighting and fannage
including provision of purified cold drinking
water system at ANGL,CAP,DNKL, IPM,KIT
& SPT
DF1 5024 5096 0 -72
680 09-10 BBS: Provision of emergency power supply
to station building, platforms, PRS and
Circulating area
DF1 5960 0 4500 1460
681 09-10 CTC: Provision of emergency power supply
to station building, platforms, PRS and
Circulating area
DF1 4225 0 4200 25
682 09-10 PUI-Provision of emergency power system to
station buildings, platforms, PRS and
circulating area
DF1 4854 0 4200 654
683 09-10 CTC: Proposed improvement to washable
apron on R/ 2 alongwith allied works
DF1 6555 2553 1500 2502
684 09-10 PSA & BHC: Raising of PF No 1 at PSA and
PF No 1&2 at BHC from LL to HL
DF1 9151 11981 0 -2830
685 09-10 BALU: Provision of 02 bays RDSO type PF
shelter each on PF No.1,2&3
DF1 5105 2501 400 2204
686 09-10 SPT: Provision of 02 bays RDSO type PF
shelter on PF No 2 and 02 bays on PF No 4
DF1 3473 3200 400 -127
687 09-10 TLHR: Provision of 02 bays RDSO type PF
shelter on PF No 1-A and 02 bays PF cover
in between station building and exiting PF
shed on PFNo 1
DF1 4024 3852 200 -28
688 10-11 Provision of one non AC Retiring room , one
06 bedded Gents dormitory,one 06 bedded
ladies dormitory , 1st class waiting room
(Gents),1st class waiting room (Ladies), One
pay and use toilet and provision of piped
water to PF no. 2 &3 at Angul station.
DF1 7772 11157 500 -3885
689 11-12 Raising of PF.No.-1 and PF.No.-2&3 from LL
to HL at KAPG station.
DF1 14417 9805 7000 -2388
690 11-12 Raising of PF No-1&2 from RL to HL and two
bays RDSO type PF shelter each on PF No-1
& 2 at Tacher Road.
DF1 17261 5797 7000 4464
691 12-13 East Coast Railway-Escalators at
Bhubaneswar( 2 nos)
DF1 12600 0 12500 100
692 12-13 Proposed construction of balance portion of
washable apron on PF No.4 at Puri station
DF1 10290 0 7500 2790
48
Page 49
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
693 12-13 Up-gradation of additional watering
infrastructural facilities at Khurda Road
station due to proposed shifting of CTS from
BBS to KUR.
DF1 12275 6359 6000 -84
694 12-13 Provision of RDSO type PF Shelter at
Raghunathpur and Angul stations.
DF1 14138 5300 5000 3838
695 12-13 Extension of FOB at KIS. DF1 5013 463 2000 2550
696 12-13 Provision of water hydrant pipe line at the off
side of PF No. 1 & 3 at PUI station
DF1 7237 6631 4000 -3394
697 12-13 Replacement of the existing station building
by new staion building at Kalupadaghat.
DRF 7438 793 7438 -793
698 12-13 Provision of ramp for inter platform
movement by physycally disabled passengers
at BAM station.
DF1 14166 9998 3000 1168
699 13-14 Provision of train information display units (TV
Based) for A-1 and A category stations
DF1 18168 0 500 17668
SAMBALPUR DIVISION
700 05-06 Provision of Electro-chlorination system of
filter plant at HKG,BRGA,BONA,RAIR &
BUDM stations of Sambalpur division.
DF1 1490 1193 200 97
701 08-09 Hirakud & Boinda-FOB and Rail level
platform
DF1 18816 15490 1000 2326
702 08-09 Provision of Concrete benches of 150
numbers and mini polycarbonate sheet PF
shelters at different stations in JSG-TJG &
SBP-ANGL section .
DF1 4930 4044 300 586
703 08-09 Provision of Concrete benches of 150
numbers and mini polycarbonate sheet PF
shelters at different stations in R-THV
section.
DF1 4930 3205 500 1225
704 08-09 Renovation of second class waiting hall with
the provision of toilet, over head water tank
for station(Syntax) improvement of station
frontage and booking counters at
MRBL,THV,HSK,
MNDH,BRGA,ATS,BRPL,SFC, LSX stations
DF1 4456 4746 0 -290
705 09-10 Provision of pipe line to draw water from
PHED filter house to Railway filter house,
R.C.C. OH Tank of 2,25,000 ltrs. Capacity
and ground water reservoir tank in filter
house for augumentation of water supply at
Sambalpur.
DF1 21253 37 1000 20216
706 09-10 Provision of washable apron with jet cleaning
facility at PF no. 3 at Sambalpur station.
DF1 8565 0 4064 4501
707 09-10 BLGR &TIG: Provision of four bedded AC
Dormotory for ladies each at
BLGR,TIG,Provision of coach indication
board at BLGR and provision of LED based
signage display for Retiring room,Upper
Class waiting room ,Ladies waiting room ,VIP
Lounge, booking office
DF1 4798 1500 1000 2298
49
Page 50
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
708 09-10 TIG - Provision of coach watering facilities
between line no. 1 & 2 for coaches of trains
DF1 4674 3564 1000 110
709 09-10 KSNG: Improvement of circulating area
towards the entrance to PF No1 with the
provision of cycle/ Motor cycle/scooter
parking. Rickshaw and car parking area with
the provision of tower mast lighting
DF1 4950 1769 1000 2181
710 09-10 SBP:- Provision of 7 bays of PF shelter
with kota stone flooring on PF No.2 & 3
DF1 8661 6509 1411 741
711 09-10 BRGA: Extension of PF no. 1 for 12 meters
and PF no. 2 for 104 meters with raising of
PFs to HL to accommodate 24 coaches trains
and provision of 02 bays PF shelter on PF
no.2.
DF1 4950 5000 1500 -1550
712 09-10 KSNG: Extension of PF no.4 for 87 meters
with raising of PF to HL and provision of 03
bays PF shelters on PF no. 4 and Extension
of PF no.1 for another 87 meters by shifting
the existing HP located between CH 139.5 m
to CH 210.5 m to new location at CH 22
DF1 7989 6876 994 119
713 09-10 Renovation of existing merchant room and
provision of labour rest roomalong with
drinking water facility at goods siding of
Mahasamunda,Ksinga,Bolangir and Bargarh
Road.
DF1 4417 1886 2000 531
714 10-11 Provision of ten bays PF shelter on PF
No.2&3 with the provision of concrete
benches at Titlagarh station .
DF1 9255 9231 2000 -1976
715 10-11 Provision of Ladies Dormitory, Ladies waiting
hall, Upper class waiting hall, Pay & use
Toilet and Platform surfacing at DKLU & LJR
stations of Sambalpur Division in connection
with development of Adarsh Station.
DF1 9032 8468 2000 -1436
716 10-11 Development of Rengali & Lapanga for
Adarsh station by providing amenities such
as dormitory, upper class waiting room for
ladies, toilet complex, platform edge
concreting & chequered tiles, toilet for
physically handicapped persons, provision of
precast
DF1 9127 285 6123 2719
717 11-12 Provision of 02 bays PF Shelter each on PF-2
at BRPL, PF- 1 at AMB , PF-1 & PF-2 at
RPRD & NRLR stations with provision of
concrete benches under covered areas.
DF1 14125 7066 11291 -4232
718 13-14 Provision of deficient concrete benches and
water taps and provision of deficient urinals
for ladies and gents separately at various
stations of Sambalpur Division.
DF1 11432 0 2000 9432
719 13-14 Provision of deficient PF shelter 50 sqm each
with fan & concrete benches at 20 stations
and provision of deficient water coolers at
various stations of Sambalpur Division.
DF1 12040 222 2000 9818
720 13-14 Procurement of Dustbin for stations DF1 2956 0 1000 1956
50
Page 51
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
721 14-15 Works costing below Rs.1.0 crore each
DF1 4008
DRF 30000
DF1 7370
DRF 47122
DF1 3000
DRF 25000
DF1 533693 261946 194670 91455
DRF 37191 12129 131623 -4439
NEW WORKS
WALTAIR DIVISION
722 14-15 Improvement of circulating area towards
Gnanapuram side of VSKP station
DF1 19526 0 1500 18026
723 14-15 Impro. of PF No.8 with covering of uncovered
Shelter area, flooring and con. of Pylon at
Entry and exit GNPM at VSKP under
DEN/Estate/WAT
DF1 15301 0 1000 14301
724 14-15 Washable apron on PF no.1& 3 for 700m
length at Koraput Station
DF1 19126 0 500 18626
725 14-15 PF at 12 stations i.e. DVD, ARK, BGHU,
TKRI, GRBL, KMX, DNV, KNRT, RUL, PDT,
SGDM & SNM WAT Division.
DF1 19976 0 500 19476
726 14-15 Llight weight PF shelters at 36 E category
stns WAT Division..
DF1 15995 0 700 15295
727 14-15 Provision of additional FOB towards AKP end
connecting all the platforms (PF No. 1, 2/3 &
4) at DVD Rly. Station.
DF1 10301 0 200 10101
KHURDA ROAD DIVISION
728 14-15 Augmentation of water supply for train and
coach watering at Talcher station .
DF1 19755 0 7000 12755
729 14-15 Provision of water cooler at various stations
over Khurda Road Division as per MEA(Total
80 Nos at 24 stations).
DF1 13940 0 4000 9940
730 14-15 Provision of escalator(02 Nos) at
Bhubaneswar station.
DF1 18521 0 200 18321
731 14-15 Provision of 02 bays PF shelter on PF No.1 &
2 and PF No.3 & 4 and ramp for inter
changing platforms by physically disabled
passengers at CAP.
DF1 19251 0 1500 17751
732 14-15 Raising of PF No.1 & 2 and PF No.3 & 4 from
low level to high level at KIT station.
DF1 18667 0 400 18267
733 14-15 Construction of approach road to Cuttack
goods shed.
DF1 10235 0 1000 9235
734 14-15 Replacement of broken AC sheets of PF
shelters at Bhubaneswar, Cuttack and
Khurda Road stations.
DF1 14213 0 4000 10213
735 14-15 Provision of 04 bays PF Shelter on PF No1
and 12 bays on PF No.2 at Dhenkanal
station.
DF1 19510 0 1200 18310
WAT Division
KUR Division
SBP Division
Sub Total-WORK IN PROGRESS
51
Page 52
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
736 14-15 Construction of RCC OH Tank 2. 5 lakhs ltrs
capacity and power supply arrangement to
tunnel type mechanised laundry at coaching
depot at Bhubaneswar.
DF1 12509 0 200 12309
737 14-15 Provision of latrines and urinals at stations
over KUR Division of East Coast Railway
DF1 12819 0 500 12319
738 14-15 Raising of PF No.1 from LL to HL at RHMA
and RCTC station and 04 bays PF shelter on
PF No.1 at Paradeep and 02 bays at RHMA
station.
DF1 16783 0 400 16383
739 14-15 Provision of escalator (02 Nos) at Cuttack
station
DF1 18577 0 500 18077
SAMBALPUR DIVISION
740 14-15 Provision of RCC over head tank of 2.5 lakh
litre capacity including construction of
clarifloculator with rapid sand gravity filter at
TIG station.
DF1 17737 0 1000 16737
741 14-15 Provision of one bay standard PF shelters at
HSK, NPD, ARN, BMCK, BXQ, DFR, DKLU,
GBQ, LPG, MRBL, BONA, RPRD & SSN
stations.
DF1 18261 0 1500 16761
742 14-15 Replacement of sheets over PF shelters and
replacement of flooring on PF at SBP and
provision of concrete surface over PF.
DF1 19829 0 1500 18329
743 14-15 Augmentation of water supply at HATB,
JUJA, CHAR, BAMR, HNPA, BONA, KPJG
and JRPD station of SBP-ANGL section.
DF1 18890 0 400 18490
744 14-15 Augmentation of water supply at SFK, BUDM,
SFC, DFR, LSX, KHPL, DJX and BRPL
station of JSG-TIG section.
DF1 19560 0 300 19260
745 14-15 Works costing below Rs.1.0 crore each
DRF 6000
DF1 0
DRF 7000
DF1 0
DRF 5000
DF1 0
DRF 2000
DF1 0
WAT Division
KUR Division
SBP Division
Reserve with HQ
52
Page 53
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
DRF 0 0 20000 0
DF1 389282 0 30000 359282
DRF 37191 12129 151623 -4439
DF1 922975 261946 224670 450737
TOT 960166 274075 376293 446298
WORKS IN PROGRESS
746 12-13 East Coast Railway - Boundary wall/fencing
to prevent encroachment on railway land (PB
821/2012-13/NR)
DF3 20000 0 7200 12800
WALTAIR DIVISION
747 04-05 Augmentation of Material storage facilities at
DLS/WAT.
DF2 4795 4045 751 -1
748 04-05 Construction additional space for Elect Stores
at ELS/WAT
DF2 4872 5079 0 -207
749 07-08 Waltair-32 bedded running room for
passenger & goods crew.
DF3 12033 11275 500 258
750 09-10 Construction of type design building as RPF
Post at VSKP
DF3 4798 1705 3000 93
751 09-10 Damanjodi: Running room at Damanjodi for
30 beds
DF3 9998 2565 7674 -241
752 09-10 Renovation of existing running (old) at RGDA
for 45 beds
DF3 9979 9731 2135 -1887
753 11-12 Easening of slopes at Km 71/16-19 near
Tunnel no. 38 B upper face and construction
of guide channel walls on downstream side of
Br. No. 193 to facilitate smooth flow of water
through the bridge at Km. 54/1-2 between
TXD-CMDP stations on KK line under the
jurisdiction of Sr.DEN/Central / WAT
DF3 7589 8119 500 -1030
754 12-13 Proposed repairs for protection of track
between DMNJ - KKGM on K.R. line..
DF4 9837 0 1288 8549
755 12-13 Proposed to Construction of RCC precasat
boundry wall at Visakhapatnam Railway
Station under Integrated Security System
(ISS) under ADEN/MYD/WAT of Waltai
Division
DF2 8549 0 146 8403
KHURDA ROAD DIVISION
756 04-05 Development of Bomb Detection Squad CAP 2921 0 100 2821
757 06-07 CTC: Provision of furniture for Divisional
Training School.
CAP 1541 232 300 1009
758 06-07 Provision of swimming pool at Railkunj/MCS. DF3 1000 485 0 515
759 07-08 Keonjhargarh - Crew booking lobby DF3 6596 7806 0 -1210
760 07-08 Improvement of KUR Crew (Senior) Running
Room at Palasa
DF3 3759 1273 500 1986
761 08-09 Upgradation of Running Rooms at Palasa. DF3 13995 4679 1500 7816
762 09-10 Construction of 32 bedded running room at
ANGL.
DF3 10681 10151 3000 -2470
Sub Total-New Works
PH-53(Passenger Amenities)
Grand Total
PH-64( Other Specified Works)
53
Page 54
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
763 11-12 Provision of modular work station for CWM's
office, Mancheswar
DRF 2048 437 500 1111
764 11-12 PRDP- Proposed construction of Sub-
Ordinate rest house at PRDP.
CAP 5570 0 500 5070
765 11-12 PRDP- Proposed construction of Officer's
rest house at PRDP.
CAP 3628 2995 2000 -1367
766 11-12 CSPR- construction of Kitchen cum store
behind officer's club at Rail Kunj.
CAP 1999 0 1500 499
767 11-12 Provision of boundary walls of 800mtrs length
and 3.00mtrs of height for pollution control
measures at Railway sidings of NYG station.
DF3 3006 0 0 3006
768 11-12 Provision of boundary walls of 800mtrs length
and 3.00mtrs of height for pollution control
measures at Railway sidings of PRNR
station.
DF3 3006 1309 0 1697
769 11-12 Provision of boundary walls of 1000mtrs
length and 3.00mtrs of height for pollution
control measures at Railway sidings of NRG
station with entry and exist facility.
DF3 3743 2644 1500 -401
770 12-13 Construction of additional 16 beded running
room over existing Neelachal running room at
KHURDA ROAD.
CAP 4983 1357 2500 1126
771 12-13 Construction of additional 16 beded running
room over existing jagannath running room at
KHURDA ROAD.
CAP 5022 1268 1500 2254
772 12-13 Additional 16 beded running room Over
existing RR at Paradeep.
CAP 6072 3892 2000 180
773 12-13 Proposed construction of skeleton RCC
frame work for front portion of ground floor on
left side and right side and second
floor(Central Part of Railway Stadium at
MCS/BBS.
DF2 9739 2185 7500 54
774 13-14 Construction of additional rooms in second
floor at OHR/Rail Kunj of Bhubaneswar.
DF2 9965 0 6000 3965
775 13-14 Construction of new 32 bedded running room
at Bhadrak in Khurda Road Division.
DF3 18092 0 15000 3092
776 13-14 Construction of 20 beded barrack for running
staff at Kendujhargarh in KUR Division
DF3 6632 0 6000 632
777 13-14 Provision of poly steel lamp post in Jugging
Park and approach road infront of ORH at
Railkunj.
DRF 2730 0 0 2730
778 13-14 Construction of 16 bedded runing room at
Paradeep.
CAP 8486 0 4000 4486
779 13-14 Provision of Elevator in the premises of
Divisional Railway Manager's office at Khurda
Road
DF2 1493 0 1494 -1
54
Page 55
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
780 13-14 Balance work in connection with
Bhubaneswar-Air conditioning with
temperature and humidity control of ECoR
Sadan.
DF2 3989 0 3141 848
SAMBALPUR DIVISION
781 09-10 Provision of mini stadium at sambalpur DF2 24973 10989 3068 10916
782 09-10 SBP: Construction of 10 bed ladies barrack,
10 bed sub-ordinate officers barrack,
recreation room and Gymnasium for RPF at
Sambalpur.
DF3 5583 2432 481 2670
783 09-10 Brunamal: Construction of RPF Out post
building at Brundamal station.
DF3 3500 2122 1277 101
784 12-13 Construction of 40 bedded running room at
Sambalpur
DF3 17546 367 10000 7179
785 12-13 Provision of Office accommodation in vacant
space at the second floor at Divisional
Railway Manager office at Sambalpur station
.
DF3 6043 3332 44 2667
786 14-15 Works costing below Rs10 lakhs each
CAP 100
DRF 1000
DF2 1500
DF3 1000
DF4 18
CAP 255
DRF 1700
DF2 2500
DF3 2180
DF4 0
CAP 50
DRF 500
DF2 2000
DF3 700
DF4 0
CAP 40222 9744 14805 16078
DRF 4778 437 3700 3841
DF2 68375 22298 28100 23977
DF3 167579 69995 64191 37273
DF4 9837 0 1306 8549
NEW WORKS
WALTAIR DIVISION
787 14-15 Upgradation of running room Koraput DF3 6079 0 600 5479
KHURDA ROAD DIVISION
788 14-15 Interior work of framed structure for ground
floor (West & East side) & second floor
(Central portion) of Railway Stadiun at
Mancheswar.
DF3 8780 0 1000 7780
789 14-15 Construction of box room at crew bases in
KUR division.
CAP 1991 0 900 1091
790 14-15 Proposed construction of 500 mtr boundary
wall around track side near PURI station to
protect the land from encroachment .
DF3 1957 0 100 1857
KUR Division
SBP Division
Sub Total-WIP
WAT Division
55
Page 56
EAST COAST RAILWAY
LAW BOOK 2014-15
ASSETS, ACQUISITION,CONSTRUCTION AND REPLACEMENT FOR 2014-15
Figures in thousands of Rupees.
1 2 3 4 5 6 7 8
Item
no.LB
14-15
Year of
inclusion
Particulars of work Allocation Latest
Anticipated
Cost
Cum.
Expr
upto
Mar-14
Outlay
14-15
Balance to
Complete
Headquarters
791 14-15 CCTV work DF3 9721 0 800 8921
792 14-15 Works costing below Rs.10 lakhs each
CAP 40
DRF 200
DF3 100
CAP 40
DRF 200
DF3 100
CAP 20
DRF 200
DF3 100
Reserve with HQ CAP 0
DRF 400
DF3 200
CAP 1991 0 1000 1091
DRF 0 0 1000 0
DF3 26537 0 3000 24037
CAP 42213 9744 15805 17169
DRF 4778 437 4700 3841
DF2 68375 22298 28100 23977
DF3 194116 69995 67191 61310
DF4 9837 0 1306 8549
TOT 319319 102474 117102 114846
Sub Total-New Works
PH-64 ( Other Specified Works)
Grand Total
WAT Division
SBP Division
KUR Division
56