Page 1
RISPs and ONRI’s Role in RISPs
African Development Bank Group
AfDB
Moono Mupotola, ONRI.2 Manager
ONRI RISP Coordinator
ONRI Presentation on RISPs–05.02.2010
1
East African Corridors
Amadou Oumarou
NEPAD, Regional Integration & Trade Department
AfDB ICA 2010 Annual Meeting –6 May 2010
AfDB
African Development Bank Group
Page 2
RISPs and ONRI’s Role in RISPs
African Development Bank Group
AfDB
Moono Mupotola, ONRI.2 Manager
ONRI RISP Coordinator
ONRI Presentation on RISPs–05.02.2010
2
1.Achievements in Transport
infrastructure
2.Transport & Trade Facilitation
3.Into the Future –Going Forw
ard
4.Challenges
2
Outline –East African Corridors
2
AfDB
African Development Bank Group
Page 3
RISPs and ONRI’s Role in RISPs
African Development Bank Group
AfDB
Moono Mupotola, ONRI.2 Manager
ONRI RISP Coordinator
ONRI Presentation on RISPs–05.02.2010
33
Regional Corridors –the case for im
proved transport infrastructure
fostering Trade Growth in East Africa
3
Trade Growth in the Region 2002 & 2009 in M
US$
Trade Growth in the Region 2002 & 2009 in M
US$
The region recorded 70% growth in
trade over the period of 7 years
Page 4
RIS
Ps a
nd
ON
RI’
s R
ole
in
RIS
Ps
Afr
ica
n D
ev
elo
pm
en
t B
an
k G
rou
p
AfD
BM
oo
no
Mu
po
tola
, O
NR
I.2
Ma
na
ge
r
ON
RI
RIS
P C
oo
rdin
ato
r
ONRI Presentation on RISPs–05.02.2010
44
Northern Corridor Mombasa-Nairobi-Kampala-Kigali-Bujumbura
4
Page 5
RIS
Ps a
nd
ON
RI’
s R
ole
in
RIS
Ps
Afr
ica
n D
ev
elo
pm
en
t B
an
k G
rou
p
AfD
BM
oo
no
Mu
po
tola
, O
NR
I.2
Ma
na
ge
r
ON
RI
RIS
P C
oo
rdin
ato
r
ONRI Presentation on RISPs–05.02.2010
55
Central Corridor Dar es Salaam-Kampala-Kigali-Bujumbura
5
Page 6
6
Case of Mombasa-Nairobi-Addis Ababa Road Corridor
* AfDB: US$ 575 M
* AfDB: US$ 575 M
* EU: US$ 115 M
* EU: US$ 115 M
* Ethiopian Govt: US$ 25 M
* Ethiopian Govt: US$ 25 M
* Kenyan Govt: US$ 40 M
* Kenyan Govt: US$ 40 M
��700km missing links (roads)
700km missing links (roads)
��One stop border post
One stop border post
��Roadside social infrastructure
Roadside social infrastructure
��Increase in trade by 500% by 2014
Increase in trade by 500% by 2014
��30% increase in household in project area
30% increase in household in project area
by 2014
by 2014
��Reduced transit tim
e Addis/Nairobi from
Reduced transit tim
e Addis/Nairobi from
5 days in 2009 to 1 day by 2012
5 days in 2009 to 1 day by 2012
TTotal Funding of 496.79Musd between 2004 & 2009
otal Funding of 496.79Musd between 2004 & 2009
Page 7
RISPs and ONRI’s Role in RISPs
African Development Bank Group
AfDB
Moono Mupotola, ONRI.2 Manager
ONRI RISP Coordinator
Imp
act
of
Inve
stm
en
ts i
n P
hysi
cal
Infr
ast
ruct
ure
ON
RI
Pre
sen
tati
on
on
RIS
Ps–
05
.02
.20
10
7
77
KenyaIm
pact of Investm
ents in Physical Infrastructure
Page 8
RISPs and ONRI’s Role in RISPs
African Development Bank Group
AfDB
Moono Mupotola, ONRI.2 Manager
ONRI RISP Coordinator
ONRI Presentation on RISPs–05.02.2010
88
Despite
Improved
Transport
Infrastructure, Costs remain H
igh
due to Soft Issues constraints
8
�Up to 75% of delays on transport corridors are related
to Inefficient Transport & Trade Procedures
�Therefore need to address Trade & Transport Facilitation
Page 9
RISPs and ONRI’s Role in RISPs
African Development Bank Group
AfDB
Moono Mupotola, ONRI.2 Manager
ONRI RISP Coordinator
ONRI Presentation on RISPs–05.02.2010
99
Addressing Facilitation Issues
9
�One Stop Border Posts
�Customs Cooperation –
Single Document -
EDIFACT
�Harmonisationof liability
Regimes
�Institutional arrangements
for corridor management
�Legal Frameworks for
multilateral Transit
Agreements
�Harmonisationof
standards, e.g., axle loads
Page 10
RISPs and ONRI’s Role in RISPs
African Development Bank Group
AfDB
Moono Mupotola, ONRI.2 Manager
ONRI RISP Coordinator
ONRI Presentation on RISPs–05.02.2010
10
10
Case ofEast Africa Trade & Transport Facilitation Project
Building One-Stop-Border Posts
10
�10 One-Stop-Border Posts being built under East Africa
Trade and Transport Facilitation Project –World Bank,
AfDB and others
�Construction of one stop border posts and harmonization
of documentation can reduce delays by 30%
Page 11
RISPs and ONRI’s Role in RISPs
African Development Bank Group
AfDB
Moono Mupotola, ONRI.2 Manager
ONRI RISP Coordinator
ONRI Presentation on RISPs–05.02.2010
11
11
Case of East Africa Trade and Transport Facilitation Project
Addressing Customs Cooperation
11
�AfDB Financing of interconnection of EAC
customs Administrations networks for
electronic exchange of documents -
EDIFACT
�World Bank funded Modernisation
of
National Customs Systemsand integrated
databases
Page 12
RISPs and ONRI’s Role in RISPs
African Development Bank Group
AfDB
Moono Mupotola, ONRI.2 Manager
ONRI RISP Coordinator
ONRI Presentation on RISPs–05.02.2010
12
12
Case of East Africa Trade and Transport Facilitation Project
Improving Legal and Institutional Arrangements for Transit
12
�Multilateral transit transport facilitation
agreement –signed by central corridor
countries in September 2006
�Set up Central Corridor Transit Transport
Agency -TTFA
Rwanda
Burundi
Uganda
Tanzania DRC
Page 13
RISPs and ONRI’s Role in RISPs
African Development Bank Group
AfDB
Moono Mupotola, ONRI.2 Manager
ONRI RISP Coordinator
ONRI Presentation on RISPs–05.02.2010
13
13
Into the Future
13
�Approach should be
Regional, Sector-Wide &
Multi-Modal
�Planning and
Programming at Regional
level
�Prioritizingamongst
competing corridorsand
investments along
corridors
25 Year Regional
Transportation
Systems Plan
10 Year
Regional Project
Priorities
5 Year
Construction
Program
Page 14
RISPs and ONRI’s Role in RISPs
African Development Bank Group
AfDB
Moono Mupotola, ONRI.2 Manager
ONRI RISP Coordinator
ONRI Presentation on RISPs–05.02.2010
14
14
Regional Level Planning & Programming is an important step forw
ard
14
�EAC Transport Strategy and Regional Road Sector
Development Program –supported by AfDB
Page 15
African Development Bank Group
AfDB
ONRI Presentation on RISPs–05.02.2010
15
15
Challenges Still remain..
15
Kenya
�How to translate regional plans and priorities onto
the national level planning and prioritisation
�How to ensure domestication of regional protocols,
rules and regulations
�How to enhance coordination and collaboration in
the implementation of cross border infrastructure
�How to enhance Private Sector Participation in
PPPs, e.g. the Nairobi section on the NC
�ICA Brokering Role
Page 16
RISPs and ONRI’s Role in RISPs
African Development Bank Group
AfDB
Moono Mupotola, ONRI.2 Manager
ONRI RISP Coordinator
ONRI Presentation on RISPs–05.02.2010
16
ICA 2010 Annual Meeting –6 May 2010 1616
Thank you
African Development Bank Group
AfDB
Amadou Oumarou
Division Manager
NEPAD Regional Integration and Trade Department
Tel: +216 71 10 30 75
Email: [email protected]