Top Banner
Early Childhood Networking Meeting April 23, 2009 Happy Spring!
26
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Early Childhood Networking Meeting April 23, 2009 Happy Spring!

Early Childhood Networking Meeting

April 23, 2009

Happy Spring!

Page 2: Early Childhood Networking Meeting April 23, 2009 Happy Spring!

Who is Retiring??

• Congratulations!!!

• AND

• THANK YOU!!!

Page 3: Early Childhood Networking Meeting April 23, 2009 Happy Spring!

Leadership

• Presenting- Sarah Stulc

Page 4: Early Childhood Networking Meeting April 23, 2009 Happy Spring!

Help Me Grow

• This is the statewide name for Part C-Infant and Toddler Intervention and Part B-Preschool Special Education

• We will be using the Help Me Grow branding with our IEIC names.

• MDE will now take direct referrals: • 1-866-693-GROW

Page 5: Early Childhood Networking Meeting April 23, 2009 Happy Spring!

Help Me Grow• Brochures are available through MDE• Down load the brochure at the following

adress:• http://education.state.mn.us/mdeprod/groups/

EarllyLearning/documents/Publication/036566.pdf

• DVDs are available: If you need more contact:

• Shivani Pandit • 651-582-8266• [email protected]

Page 6: Early Childhood Networking Meeting April 23, 2009 Happy Spring!

Early Childhood Criteria Review

• Part C

• Part B

• Resource Guide

Page 7: Early Childhood Networking Meeting April 23, 2009 Happy Spring!

Early Childhood Service Brochure

• Part C

• Part B

• IEIC developed

• For optional use

Page 8: Early Childhood Networking Meeting April 23, 2009 Happy Spring!

Membership Hours

• How do we tabulate?

Page 9: Early Childhood Networking Meeting April 23, 2009 Happy Spring!

Transition from Part C to Part B Revisted:

• The window for holding the transition meeting is from:

• 2 years 3 months• TO• 2 years 9 months• Planning and decision-making must occur

well in advance of the child’s 3rd birthday to ensure uninterupted services.

Page 10: Early Childhood Networking Meeting April 23, 2009 Happy Spring!

Transition from Part C to Part B Revisted:

• FOR ALL CHILDREN TRANSITIONING FROM PART C:

• Serice coordinator facilitates meeting• Families are involved• Review the child’s program options (if

the child is not eligible for part B then special education is not an option)

• Establish a transition plan

Page 11: Early Childhood Networking Meeting April 23, 2009 Happy Spring!

FOR ALL CHILDREN TRANSITIONING FROM PART C:

• Document transition steps in IFSP• Discuss placement ooptions• List steps to help child transition and adjust to new

placement IF new placement is part of the transition plan

• IFSP team must determine whether or not the child is potententially eligible for Part B

• If it is determined that the child is eligible for ECSE under part B you must have the child on an IEP by the time the child turns 3 and no earlier than 2 years 9 months.

Page 12: Early Childhood Networking Meeting April 23, 2009 Happy Spring!

IFSP/Goals for infants with a diagnosed condition:

• BUT what if there is NO need?

• Infants with diagnosed conditions may not yet demonstrate delays:

Page 13: Early Childhood Networking Meeting April 23, 2009 Happy Spring!

IFSP:Outcomes/Goals General Guidelines:

• Major outcome/Goal: Make this general: (I’d like to see my child……, I would like my child to be able to……, I would like my family to be able to……..)

• So that:(why is it important?)• What is already happening?(What is

the child doing now? What has been tried? What is working?)

Page 14: Early Childhood Networking Meeting April 23, 2009 Happy Spring!

IFSP:Outcomes/Goals General Guidelines:

• We will know we are successful when:

(measurement criteria, procedure and timelines)

• What will happen within the child and family’s everyday routines and activities and places?

Page 15: Early Childhood Networking Meeting April 23, 2009 Happy Spring!

Example:IFSP:Outcomes/Goals General Guidelines:

• Major outcome or goal:

Sasha’s emerging development will be monitored by parents and other members of the IFSP Team. “I would like to see my child walk by the time she turns 16 months”

Page 16: Early Childhood Networking Meeting April 23, 2009 Happy Spring!

Example:IFSP:Outcomes/Goals General Guidelines:

• So that:

Any delays or deviations from typical development are immediately identified and addressed. “It is important to me because our family is on the move and very active. I want Sasha to be able to actively participate with us”

Page 17: Early Childhood Networking Meeting April 23, 2009 Happy Spring!

Example:IFSP:Outcomes/Goals General Guidelines:

• What is already happening?: Although Sasha was born weighing 1,324

grams, initial assessment showed that she is demonstrating all skills and behaviors expected for her age. “Sasha is 10 months old and scoots around well. She stands by furniture but does not let go. We encourage her to let go and hold her hands while practice walking and this seems to work and build her confidence”

Page 18: Early Childhood Networking Meeting April 23, 2009 Happy Spring!

Example:IFSP:Outcomes/Goals General Guidelines:

• We know we will be successful when: Parents say they understand typical child

development and a developmental checklist is reviewed and updated monthly for one year by the parents and a member of the IFSP team. “We review the HELP checklist with Sasha’s special education teacher and Sasha falls within a typical range for a child her age.”

Page 19: Early Childhood Networking Meeting April 23, 2009 Happy Spring!

Example:IFSP:Outcomes/Goals General Guidelines:

• What will happen within the child and family’s everyday routines and activities and places?:

Parents will receive child development information (eg. Resources, websites, DVDs) Parents will observe Sasha skills and behaviors throughout family routines.) “We will take Sasha camping, walking, and to the mall and she will be able to walk along with us instead of sitting in a stroller.”

Page 20: Early Childhood Networking Meeting April 23, 2009 Happy Spring!

• Revised IFSP and Guidebook:

• Distribute Sample

Page 21: Early Childhood Networking Meeting April 23, 2009 Happy Spring!

Evaluation Process

• Determine Eligibility for Services:• Supports Parent Referral Concerns• Incorporates three components across

all required areas and in various settings:

• Interview• Observation• Testing

Page 22: Early Childhood Networking Meeting April 23, 2009 Happy Spring!

What tools need to be used in an evaluation?

DD criteria:• Standardized Deviations:USE A

STANDARDIZED, NORM REFERENCED or CRITERION REFERENCED tool-comprehensive

• Diagnosed Condition: YOU DO NOT NEED TO USE A STANDARDIZED, NORM REFERENCED or CRITERION REFERENCED tool-You may use the HELP checklist, systematic observation, interviewing tools, ETC.-comprehensive

Page 23: Early Childhood Networking Meeting April 23, 2009 Happy Spring!

Q & A with Compliance and Assistance:

• Check this out!

• http://education.state.mn.us/MDE/Accountability_Programs/Compliance_and_Assistance/SpecEd_Guide/index.html

• You may find this interesting.

Page 24: Early Childhood Networking Meeting April 23, 2009 Happy Spring!

Data/IEIC

• Data Results

• Action Plans for IEIC

Page 25: Early Childhood Networking Meeting April 23, 2009 Happy Spring!

Important Date to Remember:

• Minnesota Early Intervention Summer Institute: June 15th and 16th

• Register: http://www.regonline.com/bulider/site/tab2.aspx?EventID=696476

Page 26: Early Childhood Networking Meeting April 23, 2009 Happy Spring!

Presenter:

• Sarah Stulc:

• Thank you.