STANDARDS AND PRACTICES MICHAEL (MIKE) SHOWERS ASSET MANAGEMENT ASSISTANCE, L.L.C. FEDERAL CENTER CHAPTER SEMINAR 1/14/14
35

E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

Apr 02, 2015

Download

Documents

Carla Humble
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

STANDARDS AND PRACTICESMICHAEL (MIKE) SHOWERS

ASSET MANAGEMENT ASSISTANCE, L.L.C.

FEDERAL CENTER CHAPTER SEMINAR

1/14/14

Page 2: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

HAVE YOU EVER ASKED YOURSELF….• WOULDN’T IT BE EASIER IF EVERYONE JUST…(FILL IN THE BLANK)?

• WE COULD DO IT BETTER IF WE JUST….(FILL IN THE BLANK)?

• WHAT IS THE TYPICAL REQUIREMENT FOR….(FILL IN THE BLANK)?

• HOW DOES OUR PERFORMANCE COMPARE TO….?

• HOW DO OTHER ENTITIES DO THIS?

Page 3: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

STANDARDS OMB CIRCULAR A-119

• DIFFERENT TYPES OF STANDARDS• PERFORMANCE STANDARD – • SEEKS RESULTS

• DOES NOT PRE OR PROSCRIBE METHODS

• CONTAINS A CRITERIA FOR MEASUREMENT OR VERIFICATION

• PRESCRIPTIVE STANDARD – • SPECIFICATIONS

• METHODS

Page 4: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

VOLUNTARY CONSENSUS STANDARDS

• PL 104-113, NATIONAL TECHNOLOGY TRANSFER AND ADVANCEMENT ACT OF 1995

• OMB CIRCULAR A-119• IMPLEMENTS ACT

• REQUIRES USE BY FEDERAL AGENCIES IN LIEU OF GOVERNMENT UNIQUE STANDARDS

• DEFINES THE TERM

• PURPOSE• COST REDUCTION

• PROMOTE GOVERNMENT USE OF PRIVATE SECTOR

Page 5: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

DEFINITION OMB CIRCULAR A-119

• “…STANDARDS DEVELOPED OR ADOPTED BY VOLUNTARY CONSENSUS STANDARDS BODIES, BOTH DOMESTIC AND INTERNATIONAL.”

• AVAILABLE ROYALTY FREE OR REASONABLE ROYALTY BASIS TO ALL INTERESTED PARTIES

Page 6: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

FEDERAL ACQUISITION REGULATION PART 45

• ENCOURAGES THE USE OF:• VOLUNTARY CONSENSUS STANDARDS,

• INDUSTRY LEADING PRACTICE AND STANDARD

• CUSTOMARY COMMERCIAL PRACTICE

Page 7: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

NASA POLICY DIRECTIVE (NPR) 4500.1• FURTHER ENCOURAGES THE USE OF THESE

IN NASA CONTRACTS WHEN THEY ARE ADEQUATE TO SATISFY THE REQUIREMENTS OF THE CONTRACT

• DEFINES INDUSTRY LEADING PRACTICE AND STANDARD

• DEFINES CUSTOMARY COMMERCIAL PRACTICE

Page 8: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

NASA POLICY DIRECTIVE (NPR)4500.1• CUSTOMARY COMMERCIAL PRACTICE:“A DOCUMENTED PRACTICE OR STANDARD ACCEPTED ACROSS AN INDUSTRY DEVELOPED THROUGH A CONSENSUS PROCESS LIMITED TO THAT INDUSTRY”

• INDUSTRY LEADING PRACTICE AND STANDARD“A DOCUMENTED, PROVEN PRACTICE OR STANDARD THAT EXCEEDS COMMON INDUSTRY PRACTICE OR STANDARD IN PERFORMANCE OR EFFECTIVENESS AND IN COST CONTROL. INDUSTRY LEADING PRACTICES OR STANDARDS PROVE INCREASED PERFORMANCE, OR EFFECTIVENESS IN ADDITION TO DECREASED OR CONSTANT COST THROUGH THEIR ACCEPTANCE AND PUBLICATION IN REFEREED, PROFESSIONAL JOURNALS.”

Page 9: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

EXAMPLES OF STANDARDS ORGANIZATIONS• INTERNATIONAL ORGANIZATIONS• INTERNATIONAL ELECTROTECHNICAL COMMISSION

(IEC)

• INTERNATIONAL TELECOMMUNICATION UNION (ITU)

• INTERNATIONAL ORGANIZATION FOR STANDARDS (ISO)

• ASTM INTERNATIONAL

• REGIONAL ORGANIZATIONS

• NATIONAL STANDARDS ORGANIZATIONS• AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

Page 10: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

ASSET (PROPERTY) MANAGEMENT STANDARDS

• ASTM INTERNATIONAL • E-53 COMMITTEE ON ASSET MANAGEMENT

• ISO 55000

Page 11: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

HISTORY• 1998 THE IDEA OF PROPERTY STANDARDS TOOK HOLD, MAJOR BREAKTHROUGH AT NES IN SANTA FE

• DEDICATED GROUP RESEARCHED HOW THE PROCESS SHOULD WORK

• CHOOSE ASTM, FOUNDED IN 1898, AS THE ORGANIZATION TO MANAGE THE PROCESS OF CREATING VOLUNTARY CONSENSUS STANDARD

• ASTM COMMITTEE E53 PROPERTY MANAGEMENT SYSTEMS WAS FORMED IN 2000

• THE FIRST STANDARDS WERE ISSUED IN 2001

Page 12: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

E53 COMMITTEE NAME CHANGE

• E53 COMMITTEE ON ASSET MANAGEMENT • APPROVED ON ADMINISTRATIVE BALLOT E53-03

(OCTOBER 2012)

• APPROVED BY THE ASTM COMMITTEE ON TECHNICAL COMMITTEE OPERATIONS (COTCO) APRIL 2013

Page 13: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

NEW E-53 SCOPE

THE DEVELOPMENT, MAINTENANCE AND DISSEMINATION OF STANDARD PRACTICES AND PERFORMANCE STANDARDS FOR ASSET MANAGEMENT SYSTEMS AND THE LIFECYCLE MANAGEMENT OF PERSONAL PROPERTY ASSETS

Page 14: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

E-53 EXECUTIVE BOARDCHAIRMAN – BILL FRANKLIN, NOBLIS INC.

VICE CHAIRMAN – CINDA BROCKMAN, CONSULTANT A2B TRACKING

MEMBERSHIP SECRETARY – KIM DONER, SRA INTERNATIONAL

SECRETARY – RICK SHULTZ, JOHN HOPKINS UNIVERSITY/APL

MEMBER AT LARGE – AMBER PROPERT, US OFFICE OF UNDER SECRETARY OF DEFENSE ACQUISITION TECHNOLOGY AND LOGISTICS

MEMBER AT LARGE – DAVID BARDER, TETRA TECH

MEMBER AT LARGE – MIKE SHOWERS, ASSET MANAGEMENT ASSISTANCE, L.L.C. (FORMER NASA)

MEMBER AT LARGE – TAMARA ZAHN, BOEING

PAST CHAIRMAN – BOB HOLCOMBE, GSA

STAFF MANAGER – KATERINA KAPERNA, ASTM

Page 15: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

SUBCOMMITTEES• E53.01 PROCESS MANAGEMENT

SUBCOMMITTEE CHAIRMAN - RICK SHULTZ, JOHN HOPKINS UNIVERSITY/APL

• E53.02 DATA MANAGEMENT

SUBCOMMITTEE CHAIRMAN - CINDY LOCKEN, DCMA

• E53.03 FINANCIAL MANAGEMENT

SUBCOMMITTEE CHAIRMAN – RICH CULBERTSON, LOCKHEED MARTIN

• E53.04 REUTILIZATION AND DISPOSAL

SUBCOMMITTEE CHAIRMAN – ROD MILLER, INDEPENDENT

• E53.05 PROPERTY MANAGEMENT MATURITY

SUBCOMMITTEE CHAIRMAN – ERIC FASSETT, NORTHRUP GRUMMAN CORPORATION

• E53.06 TERMINOLOGY

SUBCOMMITTEE CHAIRMAN – CAROLYN BUNDY, LEIDOS

• E53.07 SUSTAINABLE PROPERTY MANAGEMENT

SUBCOMMITTEE CHAIRMAN - OPEN

• E53.08 MANAGEMENT OF FLEET ASSETS

SUBCOMMITTEE CHAIRMAN – BOB HOLCOMBE, GSA

• E53.10 ISO ASSET MANAGEMENT ACTIVITY

SUBCOMMITTEE CHAIRMAN – JIM DIETER, SUNFLOWER SYSTEMS

• E53.20 UNITED STATES GOVERNMENT CONTRACT PROPERTY MANAGEMENT

SUBCOMMITTEE CHAIRMAN – BRANDON KRINER, HARRIS CORPORATION

Page 16: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

NPMA AND ASTM• AGREEMENT BETWEEN THE ASTM AND NPMA,

• ASTM E53 DEVELOPS AND PUBLISHES THE STANDARDS

• NPMA DEVELOPS AND PRESENTS EDUCATIONAL AND CERTIFICATION MATERIAL

• DIRECTOR OF STANDARDS AND UTILIZATION

• APPOINTED BY THE NPMA BOARD PRESIDENT AS ONE OF THE NPMA NATIONAL DIRECTORS

• LIAISON BETWEEN NPMA AND ASTM

• USUALLY BUT NOT ALWAYS CURRENT CHAIRMAN OF E53

Page 17: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

ASTM PROPERTY STANDARD COVERAGE

• 27 ACTIVE STANDARDS

• ADDRESS MUCH OF ASSET (PERSONAL PROPERTY) LIFE CYCLE STAGES

• ADDRESS SOME, BUT NOT ALL, OF THE FAR OUTCOMES FOR PROPERTY MANAGEMENT SYSTEMS

Page 18: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

OVERALL PROPERTY MANAGEMENT

• E2135-10AE1 STANDARD TERMINOLOGY FOR PROPERTY AND ASSET MANAGEMENT

• E2279-09 STANDARD PRACTICE FOR ESTABLISHING THE GUIDING PRINCIPLES OF PROPERTY MANAGEMENT

• E2452-12 STANDARD PRACTICE FOR EQUIPMENT MANAGEMENT PROCESS MATURITY (EMPM) MODEL

• E2675-09 STANDARD PRACTICE FOR PROPERTY MANAGEMENT SYSTEM OUTCOMES

• E2936-13 STANDARD GUIDE FOR CONTRACTOR SELF ASSESSMENT FOR U.S. GOVERNMENT PROPERTY MANAGEMENT SYSTEMS

Page 19: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

ACCOUNTING

• E2453-13 STANDARD PRACTICE FOR DETERMINING THE LIFE-CYCLE COST OF OWNERSHIP OF PERSONAL PROPERTY

• E2378-13 STANDARD PRACTICE FOR THE RECOGNITION OF IMPAIRED OR RETIRED PERSONAL PROPERTY

Page 20: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

RISK

• E2495-13 STANDARD PRACTICE FOR PRIORITIZING ASSET RESOURCES IN ACQUISITION, UTILIZATION, AND DISPOSITION

• E2608-08 STANDARD PRACTICE FOR EQUIPMENT CONTROL MATRIX (ECM)

• E2811-11 STANDARD PRACTICE FOR MANAGEMENT OF LOW RISK PROPERTY (LRP)

Page 21: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

RECEIVING, IDENTIFICATION, MARKING

• E2605-13 STANDARD PRACTICE FOR RECEIVING ASSETS

• E2631-09 STANDARD PRACTICE FOR PHYSICAL PLACEMENT OF AN ENTITY-CONTROLLED SUPPLEMENTAL IDENTIFICATION LABEL

• E2672-09 STANDARD PRACTICE FOR IDENTIFICATION AND CATEGORIZATION OF TOOLING

• E2606-13 STANDARD PRACTICE FOR RECEIPT NOTIFICATION AS A RESULT OF TANGIBLE ASSET MOVEMENT

Page 22: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

RECORDS

• E2499-11 STANDARD PRACTICE FOR CLASSIFICATION OF ASSET PHYSICAL LOCATION INFORMATION

• E2604-09 STANDARD PRACTICE FOR DATA CHARACTERISTICS OF EQUIPMENT RECORDS

• E2812-11 STANDARD PRACTICE FOR UNIFORM DATA MANAGEMENT IN ASSET MANAGEMENT RECORDS SYSTEMS

Page 23: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

PHYSICAL INVENTORY

• E2132-11 STANDARD PRACTICE FOR INVENTORY VERIFICATION: ELECTRONIC AND PHYSICAL INVENTORY OF ASSETS

Page 24: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

REPORTS AND RELIEF OF STEWARDSHIP RESPONSIBILITY

• E2131-09 STANDARD PRACTICE FOR ADDRESSING AND REPORTING LOSS, DAMAGE, OR DESTRUCTION OF TANGIBLE PROPERTY

• E2674-09 STANDARD PRACTICE FOR ASSESSMENT OF IMPACT OF MOBILE DATA STORAGE DEVICE (MDSD) LOSS

Page 25: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

UTILIZATION (MOVEMENT, AND STORAGE)

• E2671-10 STANDARD PRACTICE FOR DEFINING MOVEMENTS, SHIPMENTS, AND TRANSFERS OF TANGIBLE PROPERTY

• E2715-09 STANDARD PRACTICE FOR MOVEABLE PROPERTY STORAGE

• E2676-09 STANDARD PRACTICE FOR TANGIBLE PROPERTY MOBILITY INDEX (MI)

• E2497-11 STANDARD PRACTICE FOR CALCULATION OF ASSET MOVEMENT VELOCITY (AMV)

Page 26: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

CLOSEOUT AND DISPOSAL

• E2306-13 STANDARD PRACTICE FOR DISPOSAL OF PERSONAL PROPERTY

• E2858-12 STANDARD PRACTICE FOR SALES OF PERSONAL PROPERTY

• E2607-08(2013) STANDARD PRACTICE FOR CANNIBALIZATION/RECLAMATION OF SERVICEABLE EQUIPMENT COMPONENTS TO SUPPORT DEMAND REQUIREMENTS

Page 27: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

UNADDRESSED TO DATE

• UTILIZATION – ACTUAL USE/ASSURING THAT PROPERTY IS USED ONLY FOR THE PURPOSE (CONTRACT) FOR WHICH IT WAS PROVIDED OR AUTHORIZED

• SUBCONTRACTOR CONTROL – WORK ITEM SCHEDULED FOR DEVELOPMENT OF A STANDARD THIS YEAR

• PERFORMANCE STANDARDS WITH METRICS

Page 28: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

E53 ACTIVITIES/STATUS

• COMPLETED GOALS FOR 2013:• UTILIZATION SURVEY RESULTS TO GUIDE DEVELOPMENT OF NEXT STANDARDS

• CONTRACTOR SELF ASSESSMENT

• TERMINOLOGY REVIEW – COMPARISON WITH ISO 55000

• OUTREACH OPPORTUNITIES – LOCAL CHAPTER, CONFERENCES

• EDUCATION – ROLL OUT OF ONLINE “PHASE ONE” CERTIFICATE INSTRUCTION

• OPEN OPPORTUNITIES FOR MEMBERSHIP INVOLVEMENT IN THE DEVELOPMENT OF NEW STANDARDS AND REVISION OF CURRENT STANDARDS

• DEVELOPMENT OF E53 SPECIFIC ASTM AWARDS

• DIETER - HESTERMANN AWARD

• NEW SUB COMMITTEE E53.20 US GOVERNMENT CONTRACTOR PROPERTY MGMT.

• REVIEW OF E53 BYLAWS

Page 29: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

RECENT ACTIVITY• NEW

• E2936-13 STANDARD GUIDE FOR CONTRACTOR SELF ASSESSMENT FOR U.S. GOVERNMENT PROPERTY MANAGEMENT SYSTEMS

• RENEWED

• E2607-08(2013) STANDARD PRACTICE FOR CANNIBALIZATION/RECLAMATION OF SERVICEABLE EQUIPMENT COMPONENTS TO SUPPORT DEMAND REQUIREMENTS

• REVISED

• E2306-13 STANDARD PRACTICE FOR DISPOSAL OF PERSONAL PROPERTY

• E2378-13 STANDARD PRACTICE FOR THE RECOGNITION OF IMPAIRED OR RETIRED PERSONAL PROPERTY

• E2453-13 STANDARD PRACTICE FOR DETERMINING THE LIFE-CYCLE COST OF OWNERSHIP OF PERSONAL PROPERTY

• E2495-13 STANDARD PRACTICE FOR PRIORITIZING ASSET RESOURCES IN ACQUISITION, UTILIZATION, AND DISPOSITION

• E2605-13 STANDARD PRACTICE FOR RECEIVING ASSETS

• E2135-10AE1 STANDARD TERMINOLOGY FOR PROPERTY AND ASSET MANAGEMENT

Page 30: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

E-53 PLANS• REVIEW, REVISE AND DEVELOP

• MANY CURRENT STANDARDS WILL NEED TO BE REVIEWED AND POSSIBLY REVISED DURING THE NEXT YEAR, VOLUNTEERS FOR TASK GROUPS ALWAYS NEEDED – SEND ME YOUR NAME

• WILL NEED SEVERAL NEW SUBCOMMITTEE CHAIRPERSONS STARTING IN 2014

• DEVELOP PHASE TWO OF EDUCATIONAL COURSE

• TASK GROUP FORMED FOR SUBCONTRACTOR STANDARD, LED BY RICH CUBLBERTSON

• CURRENT WORK ITEMS• PRACTICE FOR FLEET MANAGEMENT – FIRST ROUND OF

SUBCOMMITTEE BALLOTING COMPLETED, NEXT BALLOT TO FULL MEMBERSHIP IN EARLY 2014

Page 31: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

STANDARD PROCESS

• BEGINS WITH AN IDEA - WRITE IT DOWN

• CHECK CURRENT ACTIVE STANDARDS

• WORK ALONE OR WITH GROUP - SHARE WORK, PAIN AND GLORY OR GO IT ALONE

• WHICH SUBCOMMITTEE - SUBCOMMITTEE CHAIRMAN MUST APPROVE

• REGISTER WORK ITEM - DRAFT STANDARD IS CLASSIFIED AS A WORK ITEM

• REVIEW - WORK ITEM GOES THROUGH EDITORIAL TASK GROUP REVIEW

• BALLOT - SUBCOMMITTEE FIRST THEN MAIN COMMITTEE

• CONGRATULATIONS - IT’S A STANDARD (REVIEW IN FIVE YEARS)

Page 32: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

OPPORTUNITIES• SOME DISCUSSION OVER THE NEED FOR

ADDITIONAL STANDARDS

• NEW SUBCONTRACTING STANDARD AND FLEET STANDARD BELIE THAT

• CURRENT STANDARDS ARE TYPICALLY STANDARDS OF PRACTICE

• TIME TO BEGIN DEVELOPMENT OF STANDARDS OF PERFORMANCE • ESTABLISH MINIMAL PERFORMANCE STANDARDS

FOR PROPERTY MANAGEMENT

• DETERMINE WHAT REAL QUALITY PROPERTY MANAGEMENT IS

• DRIVE CONTINUOUS IMPROVEMENT ACROSS THE PROFESSION

• BALANCE RISK, PERFORMANCE, AND COST

Page 33: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

ISO 55000

• JUST PUBLISHED LAST FRIDAY, JANUARY 10

• HIGHER LEVEL STANDARDS

• WORK IN CONJUNCTION WITH ASTM STANDARDS

Page 34: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

THOUGHTS

• WOULDN’T IT BE EASIER IF EVERYONE JUST…(FILL IN THE BLANK)?

• WE COULD DO IT BETTER IF WE JUST….(FILL IN THE BLANK)?

• WHAT IS THE NORMAL REQUIREMENT FOR….(FILL IN THE BLANK)?

• WHAT SHOULD OUR LOSS RATE BE?

Page 35: E53.06 T ERMINOLOGY E53.06 T ERMINOLOGY S UBCOMMITTEE C HAIRMAN – C AROLYN B UNDY, L EIDOS E53.07 S USTAINABLE P ROPERTY M ANAGEMENT.

STANDARDS CAN HELP ANSWER THOSE QUESTIONS!