Top Banner
E xternal C orrosion D irect A ssessment NACE 2005 Northern Area Western Conference by Gord Parker, C.E.T. Radiodetection Ltd.
25

E xternal C orrosion D irect A ssessment NACE 2005 Northern Area Western Conference by Gord Parker, C.E.T. Radiodetection Ltd.

Dec 15, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: E xternal C orrosion D irect A ssessment NACE 2005 Northern Area Western Conference by Gord Parker, C.E.T. Radiodetection Ltd.

E xternalC orrosionD irectA ssessment

NACE 2005 Northern Area Western Conferenceby

Gord Parker, C.E.T.Radiodetection Ltd.

Page 2: E xternal C orrosion D irect A ssessment NACE 2005 Northern Area Western Conference by Gord Parker, C.E.T. Radiodetection Ltd.

Background

(USA) The Pipeline Safety Improvement Act of 2002signed into law on December 17, 2002applies to natural gas transmission (dist. coming)must identify "high consequence areas (HCA)"

conduct risk analyses of these areasperform baseline integrity assessments of each pipeline segmentinspect the entire pipeline system according to a prescribed schedule and using prescribed methods

Page 3: E xternal C orrosion D irect A ssessment NACE 2005 Northern Area Western Conference by Gord Parker, C.E.T. Radiodetection Ltd.

Other provisions of the law include

(US) The Pipeline Safety Improvement Act of 2002Participation in one-call notification programs Increased penalties “Whistle-blower" protection Qualification programs for employees O.Q. Government mapping of the pipeline systemOther Housekeeping Stuff

Page 4: E xternal C orrosion D irect A ssessment NACE 2005 Northern Area Western Conference by Gord Parker, C.E.T. Radiodetection Ltd.

BUT…Some pipes have serious limitations to inspection

Not Pigable (small valves/openings, 90° fittings)No redundant loops – had to stay in service

Hence, no hydro-testing either

Best Quote I’ve heard this year…“Congress is a little leery of engineering because

you can’t barter, you can’t negotiate with it.”

Page 5: E xternal C orrosion D irect A ssessment NACE 2005 Northern Area Western Conference by Gord Parker, C.E.T. Radiodetection Ltd.

Direct Assessment came alongIt seems to have been accepted & implemented fast

There are 3 types of DA (for 3 types of threats)External Corrosion (ECDA)Internal Corrosion (ICDA)Stress Corrosion Cracking (SCCDA)

ECDA is the most mature of them.RPO502 – 2002 is the defining NACE document

Page 6: E xternal C orrosion D irect A ssessment NACE 2005 Northern Area Western Conference by Gord Parker, C.E.T. Radiodetection Ltd.

ECDA is a 4 Step ProcessPre-assessment

Most important stepIndirect Inspections

Above-ground ToolsDirect Examinations

Verification Digs AND MitigationPost-assessment

Define Reassessment Period (US: 7 yr typ. max)Assess Overall Effectiveness

Page 7: E xternal C orrosion D irect A ssessment NACE 2005 Northern Area Western Conference by Gord Parker, C.E.T. Radiodetection Ltd.

Important DefinitionsECDA Region – Section(s) of pipeline with similar physical characteristics and history in which the same indirect inspection tools are used

Segment – A portion of pipeline assessed using ECDA. Consists of one or more regions.

HCA – High Consequence Area (higher population density, limited mobility, gathering places, etc.)

Page 8: E xternal C orrosion D irect A ssessment NACE 2005 Northern Area Western Conference by Gord Parker, C.E.T. Radiodetection Ltd.

General NotesThere is some flexibility to chose suitable processesContinuous Improvement Process

Compare successive applications to gauge effectiveness

Primary Purpose – Preventing future problemsRP0502 is for onshore, buried, ferrous pipelinesStand-alone or compliment other tests (ILI, hydro)Has limitations (like all asses’mts), use appropriatelyUse under the direction of ‘competent persons’

Page 9: E xternal C orrosion D irect A ssessment NACE 2005 Northern Area Western Conference by Gord Parker, C.E.T. Radiodetection Ltd.

Step 1 – Pre-AssessmentDetermine if ECDA is feasible and applicable

Collect ‘Soft’ Data (both current & historic) Construction, Operating, Maintenance, CP survey, Adjacent

Land Use (and changes to), and more This is a big part – spend the time planning

Define Regions Especially HCA

Select Indirect Tools appropriate for those regions

Page 10: E xternal C orrosion D irect A ssessment NACE 2005 Northern Area Western Conference by Gord Parker, C.E.T. Radiodetection Ltd.

Include each of these Data ElementsPipe-Related

mat’l, diam.,thickness, year, seam type, coatingConstruction Related

year, route, aerial photos, construction practices, valves, depth of cover, more

Soils/Environmentalsoil, drainage, topography, use, frozen, wet

Corrosion ControlCP system, location, stray current, history, evaluation, coating

Operational Datatemperature, stress, fluctuations, excavations, accidents

Page 11: E xternal C orrosion D irect A ssessment NACE 2005 Northern Area Western Conference by Gord Parker, C.E.T. Radiodetection Ltd.

Decide which tools are applicableClose-Interval Survey (CIS)AC Voltage GradientDC Voltage GradientPearsonElectromagneticAC Current Attenuation Surveys

Stray Current analysisDifferent regions may require different tools

Page 12: E xternal C orrosion D irect A ssessment NACE 2005 Northern Area Western Conference by Gord Parker, C.E.T. Radiodetection Ltd.

Step 2 – Indirect InspectionsIdentify and Define the severity of coating faults, other anomalies, and areas where corrosion may beRequires at least two aboveground tools over the entire length of region

Then align & compare the data

More than 2 may be required

Page 13: E xternal C orrosion D irect A ssessment NACE 2005 Northern Area Western Conference by Gord Parker, C.E.T. Radiodetection Ltd.

Gathering Indirect DataQuite expensiveDo it right the first timePlan for traffic, access, problems, surveyingConduct & Analyze with accp’d Industry PracticesReading spacing must be suitably fineDifferent tool (passes) done close in time as wellPrecise Geographic References (GPS)

Page 14: E xternal C orrosion D irect A ssessment NACE 2005 Northern Area Western Conference by Gord Parker, C.E.T. Radiodetection Ltd.

Compare ResultsIf indirect tool results vary greatly, reexamine (directly if need be)Compare the results with Pre-Assessment

Page 15: E xternal C orrosion D irect A ssessment NACE 2005 Northern Area Western Conference by Gord Parker, C.E.T. Radiodetection Ltd.

Step 3 – Direct ExaminationsPurpose: To determine which indirect indications are most severe and collect data to assess corrosionRequires pipe surface exposure & testingAt least one dig is always required

Page 16: E xternal C orrosion D irect A ssessment NACE 2005 Northern Area Western Conference by Gord Parker, C.E.T. Radiodetection Ltd.

Steps IncludedPrioritization of IndicationsExcavations & Data CollectionMeasurements of Coating Damage & CorrosionRemaining Strength CalculationsRoot Cause AnalysisProcess Evaluation

Page 17: E xternal C orrosion D irect A ssessment NACE 2005 Northern Area Western Conference by Gord Parker, C.E.T. Radiodetection Ltd.

Prioritization (3)Immediate Action Required

Ongoing corrosion likelyMultiple Severe IndicationsUnresolved Discrepancies from Indirect Exams

Scheduled Action RequiredSevere indications NOT in area of other severe

Suitable for MonitoringInactive or little likelihood of ongoing/prior corrosion

Page 18: E xternal C orrosion D irect A ssessment NACE 2005 Northern Area Western Conference by Gord Parker, C.E.T. Radiodetection Ltd.

Measurements Used in Direct ExamsPipe-Soil potentialsSoil ResistivityWater & Soil Samples (ph, etc.)Under film liquid phPhotographic DocumentationOther Integrity Data

MIC, SCC, etc..

Page 19: E xternal C orrosion D irect A ssessment NACE 2005 Northern Area Western Conference by Gord Parker, C.E.T. Radiodetection Ltd.

Coating MeasurementsTypeConditionThicknessAdhesionDegradation (blisters, disbondment, etc.)Corrosion productsMapping and photographic documentation

Page 20: E xternal C orrosion D irect A ssessment NACE 2005 Northern Area Western Conference by Gord Parker, C.E.T. Radiodetection Ltd.

Mitigation Shall identify and undertake remediation

Aim to mitigate and preclude future problems

Assess Classification CriteriaReclassification & Reprioritization

Page 21: E xternal C orrosion D irect A ssessment NACE 2005 Northern Area Western Conference by Gord Parker, C.E.T. Radiodetection Ltd.

Indications Encountered – 4 levelsIn each segment….

Immediate – dig allScheduled – dig most severe

If first use of ECDA, must dig 2

Monitored – dig most severe If first use of ECDA, must dig 2

No Indication – one excavation is required To validate Direct tests

Page 22: E xternal C orrosion D irect A ssessment NACE 2005 Northern Area Western Conference by Gord Parker, C.E.T. Radiodetection Ltd.

Step 4 – Post AssessmentDefine re-assessment intervalsAssess overall effectiveness of ECDA programRemaining life calculationsFeedback & Continuous Improvement

Page 23: E xternal C orrosion D irect A ssessment NACE 2005 Northern Area Western Conference by Gord Parker, C.E.T. Radiodetection Ltd.

ECDA Success RequiresExpertise, skill, and experience in understanding and implementing the standardDetailed procedures for all stepsDocument all decisions made in processAssessment and integration and analysis of data during all steps of the DA processData ManagementUnderstand what may limit DA effectiveness

Page 24: E xternal C orrosion D irect A ssessment NACE 2005 Northern Area Western Conference by Gord Parker, C.E.T. Radiodetection Ltd.

CostA properly done ECDA process will have very similar costs to ILI.Don’t expect it to be an order of magnitude cheaper.

Page 25: E xternal C orrosion D irect A ssessment NACE 2005 Northern Area Western Conference by Gord Parker, C.E.T. Radiodetection Ltd.

Questions

?

Thank YouGord Parker, Radiodetection [email protected] www.radiodetection.ca