TP26 TP20 TP19 TP3 TP2 TP22 TP1 34.50 33.50 33.50 33.75 33.50 33.75 34 Sion House PAGE'S LANE The Bungalow Tudor Cottage The Rookery Homestead The Gables Corner Bungalow Three Ways Arcadia Rosedale Richton Monks Orchard Western House Crane House Hesslewell Church End Nursery S21 388860.719mE 236160.764mN 34.569m Field Field Field Tudor Cottage A38 S21 34.569m Field 50m from property CHURCH END E E E E E E E E ATW/34/2 Hilton Puckrup Hall Golfcourse SITE ACCESS 34.25 50m from property ATW/36/1 WMBH3 WMBH4 WMBH5 WMBH2 TRENCH TRAVELS THROUGH A CULVERT UNDER SITE ACCESS GROUNDWATER RECHARGE TRENCH CHANNEL TRAVELS THROUGH A CULVERT UNDER BUND PROPOSED POND (Average WL 32.0) 31.5 31.75 34.50 33.50 33.50 33.75 34 33.50 33.75 34 34 34.25 34 INFILLING WASHED MINERAL STOCK PILES MOBILE PLANT RELOCATED DURING PHASE 2 MINERAL EXTRACTION CONVEYANCE CHANNEL PROPOSED POND (Average WL 32.0) EXTRACTION VOID KEY BOUNDARY: APPLICATION SITE PROPOSED TREE AND SHRUB PLANTING BOUNDARY: LAND IN THE CONTROL OF THE APPLICANT EXISTING SPOT LEVELS EXISTING CONTOURS 34.25 TRIAL PIT LOCATION AND REFERENCE OVERHEAD ELECTRICITY CABLE E EXISTING PUBLIC RIGHT OF WAY AND REFERENCE ATW/34/2 INDICATIVE BASE OF OVERBURDEN CONTOURS 33.25 INDICATIVE BASE OF MINERAL CONTOURS 31.25 EXISTING VEGETATION PROPOSED RESTORATION CONTOURS 33.25 WATER MONITORING BOREHOLE, REFERENCE AND CASE TOP LEVEL BOUNDARY: PROPOSED EXTENTS OF MINERAL EXTRACTION TP1 WMBH1 GRASS SEEDED ACOUSTIC SCREEN BUND CONVEYANCE CHANNEL DAVID JARVIS ASSOCIATES planning development landscape environment DAVID JARVIS ASSOCIATES LIMITED 1 Tennyson Street Swindon Wiltshire SN1 5DT Tel: 01793 612173 Fax: 01793 613625 Email: [email protected] Drawing No. 1800/CQ/14E Date Drawing Title Project 1:1250 at A3 FEB 2011 LAND AT CHURCH END, TWYNING MORETON C CULLIMORE (GRAVELS) LTD 0 Reproduced with the permission of the controller of HMSO.Licence No: AR 189685 10 25 50m Client Ŷ Drawing based on Shyres Rural Ltd drawing reference SRL.115.10, dated 21.10.2010 and D & H Surveys Topographical survey, dated May 2007. Ŷ Hydrological channel based on GWPC drawing reference CHURCHE1210 14B, dated 20.12.2012. Revisions E 28.01.13 Scheme revised following comments from GWPC in reference to Groundwater Conveyance Channel D 02.01.12 General amendments C 23.10.12 General amendments B 14.08.12 General amendments A 28.06.12 Scheme of working revised PHASE 2 EXTRACTION & RESTORATION WORKS