P P P P // »›·ˇ|• t‚‰/|•t‚ –F“D„ C„ S.K.H. Ching Shan Primary School C.C.C. Kei Wa Primary School S.K.H. St. Benedict’s School Playground Eastern Road Substation WIP Jun 2011 6.8 6.3 7.3 6.7 5.8 6.5 6.4 7.1 6.6 6.3 5.5 5.8 6.8 6.7 6.6 18.4 6.4 5.2 6.2 6.1 5.9 6.4 6.3 6.1 6.0 6.2 5.7 17.9 5.9 5.0 5.8 6.1 5.9 6.2 4.9 13.2 17.0 5.8 5.2 5.8 5.5 5.5 16.6 5.0 10.8 8.6 5.5 16.0 5.4 5.1 5.0 14.6 5.0 5.8 12.3 5.7 5.7 L L H L L L L H L H L L L L H L L L L L L L L L L L H L L L L L L H L L L L L H H L L L L H L L H L L L L L L H H L H L L L L L L H L L L L L L L L L L L L L L L L L L L H L L L L L L L L L H L H L L L L L L L L L L L L L L L H H L L L L L Block 4 Block 9 Block 5 Block 6 Block 7 ˜²E ˜²» ˜²K —ƒ/ C„ ˘–y F“£ßw… C„ £ßw…ƒ Rhythm Garden Badminton Court Playground Volleyball Court ai Tak East Playground Kai Tak Operational Base WIP Mar 2011 WIP Mar 2011 6.3 6.6 6.7 7.0 6.4 6.8 6.2 6.3 6.8 6.7 6.6 6.7 6.4 6.7 6.4 9.4 6.5 6.5 6.1 6.2 5.9 13.2 6.1 12.8 5.8 5.9 5.9 5.0 13.1 8.6 5.0 4.2 5.9 6.4 5.7 4.8 5.3 5.9 5.6 6.3 5.1 8.4 5.8 6.1 6.4 5.9 4.7 6.5 5.7 6.4 5.9 5.8 6.1 4.9 5.9 5.2 5.9 5.8 6.1 L L L H H H L L L L H L L L L L L L L L L L L H L L L L L L L L H L L L L L L H L H L L L L L L L L L L L L L L L L H L H L L L L L L L L L L L H L L L H L L L L WIP Mar 2011 5.6 5.7 5.4 5.6 4.6 4.6 4.2 4.8 4.6 4.8 4.6 L L L H L L L L TS WIP Mar 2011 5.2 5.6 4.7 8.9 14.6 11.9 5.5 20.9 16.1 5.6 5.2 5.1 5.1 5.2 5.5 22.2 16.6 5.9 9.8 13.4 4.9 18.5 13.3 5.1 5.0 5.5 5.0 11.8 4.6 4.8 5.1 4.9 5.4 4.6 4.7 5.0 L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L H L L L L L L L L L L H L L L L H H L H L L L office scale CIVIL ENGINEERING AND DEVELOPMENT DEPARTMENT g/ / u/ { ¿˘ ˇ„h« æ/ ˇ„h« plan title plan no. j:\23462\arup\civil\Gazette Plan\Contract 3\23462_GAZ_1-3.dgn E/ s project title u/{ KOWLOON DEVELOPMENT OFFICE /u¨›p„”¶¥²˜469CL‚„ –…wofii›p„”¡— –…w‡ı¥_›––'W“”´ƒ‡]‹I ²˜/T·`«/u{ •s»Z–^ /Es˘W San Po Kong Kowloon Bay LIMIT OF WORKS AREA ‹I/uˇ‹›› LOCATION PLAN SCALE 1:15000 ƒ‚m„ˇ «/§L2‚(‡¡/) +5.8 +5.5 -6.3 «/§SW3ƒ/HG„D 'ƒø‡¡/ «/§LW4¶Ø·”‹ü/˘ “‹[ƒ/H„D ø˜: NOTES: ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE STATED. ALL LEVELS ARE APPROXIMATE VALUES AND IN METRES ABOVE HONG KONG PRINCIPAL DATUM. 1. £ƒb¤¥L/L›–«ü'w¥~,'ƒ‡¶q«¥Hƒ‹‡ƒ¡C 2. 'ƒ‡/¥›§¡‹‹ø…˘,¥Hƒ‹‡ƒ,¤ˆƒb›»· ¥D/¥›•˙/W¡C 9hd< S(]z6 (²˜370‡„)ƒƒb¸‡l/‰¥‹/§„ˇ«h < > ‡s–‰u A-A ‡s–„ˇ«h ‰s‚„ 23462/GAZ/1.1 +13.6 RHYTHM GARDEN “[“Æ¶Ø «/§VT1 ƒ¤fiG„D ²{ƒ‡‚//l„D“F/˛–“F„D“” ƒ¤fi/–N/'¥ˆ/[«˚‡‹/˛'¤l ²{ƒ‡ƒ¤fi„D–N/'¥ˆ/[«˚‡‹/˛§«‹//¥¡/„j–a/ƒw¥fiq PROPOSED LANDSCAPED ELEVATED WALKWAY «“”¶Ø·”‹ü/˘“‹[ƒ/H„D «“”ƒ¤fi„D „ˇ¤ «“”ƒ/HG„D PROPOSED PEDESTRIAN CROSSING «“”/› «“”ƒa/U'/fl‚ PROPOSED STAIRCASE «“”…–L «“”ƒ¤fi„D“”ƒ¤fi‰u(¤C/@‰b…L“¥/@–lƒ¤fi‰u) ²{ƒ‡ƒ¤fi„D–N/'¥ˆ/[«˚‡‹/˛§«‹ƒ/H‚ ²{ƒ‡ƒ¤fi„D–N/'¥ˆ/[«˚‡‹/˛§«‹‹ü/˘]fieƒa–a ²{ƒ‡ƒ/H‚–N/'¥ˆ/[«˚‡‹/˛§«‹ƒ¤fi„D EXISTING FOOTPATH TO BE PERMANENTLY CLOSED AND CONVERTED INTO CARRIAGEWAY ²{ƒ‡ƒ/H‚–N/'¥ˆ/[«˚‡‹/˛§«‹‹ü/˘]fieƒa–a EXISTING FOOTPATH TO BE PERMANENTLY CLOSED AND CONVERTED INTO AMENITY AREA ²{ƒ‡ƒ/H‚–N/'¥ˆ/[«˚‡‹/˛§«‹//¥¡/„j–a/ƒw¥fiq EXISTING FOOTPATH TO BE PERMANENTLY CLOSED AND CONVERTED INTO CENTRAL MEDIAN / TRAFFIC ISLAND ²{ƒ‡ƒ¤fi„D–N/'¥ˆ/[«˚‡‹ ²{ƒ‡ƒ/H‚–N/'¥ˆ/[«˚‡‹ EXISTING FOOTPATH TO BE PERMANENTLY CLOSED ²{ƒ‡ƒ¤fi„D–N/'…¨fi«˚‡‹/˛›«« ²{ƒ‡ƒ/H‚–N/'…¨fi«˚‡‹/˛›«« PROPOSED LEVEL (APPROXIMATE) +5.5 PROPOSED UNDERGROUND PUMPING STATION «“”¤fi‰l¶i¥X/J‡q„D PROPOSED VEHICULAR RUN-IN «“”ƒ¤fiG„D «“”ƒ/HG„D'ƒø‡¡/ ²{ƒ‡‚//l„D“F/˛–“F„D“”ƒ¤fi/–N/'¥ˆ/[«˚‡‹/˛'¤l EXISTING FLYOVER ACROSS PRINCE EDWARD ROAD EAST AND EASTERN ROAD TO BE PERMANENTLY CLOSED AND DEMOLISHED 3. ƒpƒ‡»›n, ‹I/uˇ‹››/”/§²{ƒ‡ƒ¤fi„D¡B ƒ/H‚'M¥˝¥˛ƒa“”‡¡/‚‹q/‰d‡'˛¤ ‡¡/'˛•|/¶¥‹q…¨fi«˚‡‹ SECTIONS OF THE EXISTING CARRIAGEWAYS, FOOTPATHS AND OPEN SPACE OR PARTS THEREOF WITHIN THE LIMIT OF WORKS AREA MAY BE TEMPORARILY CLOSED IN PHASES AS AND WHEN REQUIRED. «•s»Z–^ˇ»P//l„D“F “”‡s–‚