ePROPOSAL PRE-AWARDSYSTEM IMPLEMENTATIONUPDATE Presentation to the Academic Senate - Committee on Research May 16, 2011
23

e Proposal Pre-award System Implementation Update

Feb 25, 2016

Download

Documents

e Proposal Pre-award System Implementation Update. Presentation to the Academic Senate - Committee on Research May 16, 2011. Meeting Topics. Project Scope Project Status Project Phases and Timeline Project Approach High-level Requirements Overview - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: e Proposal Pre-award System  Implementation Update

ePROPOSAL PRE-AWARD SYSTEM

IMPLEMENTATION UPDATE

Presentation to the Academic Senate - Committee on ResearchMay 16, 2011

Page 2: e Proposal Pre-award System  Implementation Update

Meeting Topics

Project Scope Project Status Project Phases and Timeline Project Approach High-level Requirements Overview

Appendix: List of SC and SME Members

2

Page 3: e Proposal Pre-award System  Implementation Update

eProposal System Scope

Proposal & Award Process Areas*

Post-award fiscal management (out of scope)

3

Profiles

* Process not linear

Page 4: e Proposal Pre-award System  Implementation Update

Project Status Requirements

Review with Subject Matter Experts (SMEs) High-level requirements review and sign-off by Link Steering Committee

Currently in Design and Build Phase

Regular Coordination with Functional Owner and OE

June Design/ Use Case Workshop with SMEs to show how System will work

4

Page 5: e Proposal Pre-award System  Implementation Update

Project Phases & Timeline* 5

Nov-Jan2010/11

Sept-Dec2011

May-Aug 2011

Feb-April 2011

Pre-

awar

d Sy

stem

Impl

emen

tatio

n

SME Interviews & Requirements

Build & Unit TestConceptual Design

Design *

System Interfaces & Data Conversion

End User Change Management

*Final timeline can’t be completed until conclusion of design/build phase

Jan-March2012

Systems Testing Perf.& End User Testing

We are here

3/26/2012Pre-Award

Pilot Go-Live

Page 6: e Proposal Pre-award System  Implementation Update

eProposal Design and Build Approach

Iterative/modified agile

Design strategy identifies and sequences eProposal build and configuration needs

Identification of “must have” functionality for go-live, and functionality deemed needed but not required for go-live (implemented as time permits before go-live)

Ongoing meetings and site visits with vendor to review mock-ups and design/build concepts

SME meetings to get input on design, answer questions; to leverage SME group to connect to their PIs

6

Page 7: e Proposal Pre-award System  Implementation Update

eProposal Design and Build Approach (2)

Change management strategy includes roll-out strategy for use of current and new systems during transition period

Systems integration architecture under developmentData flows documentedSystem integration to be finalized

Once all processes/system data needs finalized, reporting strategy to be finalized

7

Page 8: e Proposal Pre-award System  Implementation Update

Summary Requirements by Process Areas

Post-award fiscal management (out of scope)

8

Profiles

1. 2. 3. 4. 5. 6. 7.

Page 9: e Proposal Pre-award System  Implementation Update

ProfilesSponsor/Legal EntityAuthorized Organizational Representative (AOR)Shared Services Teams (SSTs)*DepartmentPerson (PI, RSC, etc.)

PI profile tab to accommodate multiple attachments, including CVs, biosketches, publications list, etc. • Objective is to leverage functionality investment made in Advance

Interfaces with systems of record (e.g., getting info from PeopleSoft for sponsors, etc.)*

Shared data with CHR (same vendor, shared underlying database)

9

*Customization

Page 10: e Proposal Pre-award System  Implementation Update

1. Identify Funding Opportunities Funding Opportunity Announcement (FOA) searches and alerts

*Link to search COS and RAP opportunities

Grants.gov and Research.gov interfaces to pull FOA data and ability to start creating a proposal (auto-population of proposal fields where possible)*Research.gov interface (NSF project based on the Grants.gov framework for S2S)

Users can create a “favorites” list of opportunities to apply to later

*Customization

10

Page 11: e Proposal Pre-award System  Implementation Update

2. Create Proposal/Project (1)

Basic Proposal/Project InformationProject title and personnel

*PeopleSoft interface to feed info to iMedRIS (e.g., personnel info, sponsor info, etc.)

Project type (proposal, program project, MTA , etc.) and action (new, resubmission, renewal, etc.)*Specific forms for different proposal/project types and project/action-specific routing.

Sponsor information, deadlines

Compliance information

*Customization/Work-intensive Configurations

11

Page 12: e Proposal Pre-award System  Implementation Update

2. Create Proposal/Project (2)

Subaward information*Subcontractor portal for subcontractors to upload their information (budget, performance site, key personnel information) to feed into eProposal

Generation of the appropriate Grants.gov (SF 424, PHS 398, etc.) & Research.gov forms*Research.gov forms/interface *NIH forms generation required for paper submissions (e.g., PHS 398 for program project, PHS 2590 for progress reports, also to be used for other sponsors that may request NIH forms)

Additional attachments – place to attach relevant documents, including letters of support, etc.

*Customization

12

Page 13: e Proposal Pre-award System  Implementation Update

3. Create Budget (1)

Budget Details

Budget types*Budget tool to accommodate different budget types (program project, subcontractor, modular, etc.)

Budget justification

Budget period

Project personnel names, salary, effort, etc. *Interface with PPS to pull salary info

Salary cap, direct cost cap, fringe rates, escalation rates

Budget categories (personnel, equipment, travel, etc.)*Cost sharing details (yes, no; if yes, what type, % effort, fund/dpa, etc.)

*Customization

13

Page 14: e Proposal Pre-award System  Implementation Update

3. Create Budget (2)

Indirect cost types and rates

On and off campus rates

Auto-populate appropriate Grants.gov & Research.gov forms with budget info

*Ability to copy budgets

*Customization

14

Page 15: e Proposal Pre-award System  Implementation Update

4A. Review & Approve Comments, CollaborationCollaboration on proposal/project docs for all assigned to

the proposal (“check out” and edit function for all proposal documents)

*Comment areas about proposals for reviewers/approvers, submitters, negotiations

*Routing for review and sign-off according to proposal type and UCSF business practices

*Customization

15

Page 16: e Proposal Pre-award System  Implementation Update

4B. Track & Submit Proposal Status Transparency re. proposal/project status (draft, routed for

departmental approval, received by OSR, submitted to sponsor, etc.) and who is assigned to work on it/next action needed

*General comments field to accompany status

Submission Name of submitter, dates, tracking number, etc.System to system submission (for Grants.gov &

Research.gov) *Research.gov interface Notification/indication of receipt

*Customization

16

Page 17: e Proposal Pre-award System  Implementation Update

5. Negotiate & Award

Negotiations and StatusInterim use of Bridge for negotiations-related documentation,

comments and tracking

Award ActivitiesContinue to perform award set-up, update of budget,

DPA/fund info, invoice set-up, etc. in PeopleSoft

*Set-up of non-financial milestones/deliverables (e.g., scientific progress reports) and reminders/notifications in eProposal

*Customization

17

Page 18: e Proposal Pre-award System  Implementation Update

6. Create and Manage Subcontracts

Subcontract/Subaward Information

Subaward records established and managed through PeopleSoft (recent updates have been made to expand functionality according to OSR requests) and linked to award record

Tracking of subrecipient deliverables*Subcontractor portal for subcontractors to submit/upload

documentation to feed into eProposal

*Customization

18

Page 19: e Proposal Pre-award System  Implementation Update

7. Manage AwardAward Agreement Actions

*Link continuation and supplements to the original proposal/award and flow data from the original proposal

*Routing and tracking continuations and supplement actions for appropriate approval

*Document management for scientific progress reports and other milestones/award-related docs

*Customization

19

Page 20: e Proposal Pre-award System  Implementation Update

Link SC and SME Members

20

Page 21: e Proposal Pre-award System  Implementation Update

Link Implementation Steering Committee

Marie CaffeyPsychiatry & LPPI Administration

Michelle Kim SON- Dean’s Office

Susan O’HaraRadiology and Biomedical Imaging

Christine DurieuxController’s Office

Susan Lin Controller’s Office

John RadkowskiOffice of Sponsored Research

Mara FellourisProgram Management Office

Erik LiumOffice of Sponsored Research

Susan SallOphthalmology

Susanne Hildebrand-ZankiOffice of Research

Suzanne MurphyOffice of Research

Suzanne Chui SuttonDOM- Central Administration

Lynda JacobsenORU – Cancer Center

Michael NordbergSOP – Dean’s Office

Jane WongITS - Infrastructure & Business Applications

21

Page 22: e Proposal Pre-award System  Implementation Update

Requirement Workshop SMEs (1)

Name Department

Joyce Abe Office of Sponsored Research

Sally Brown S/Pharmacy Dean’s Office

Lamorna Brown-Swigart Pathology

Christine Durieux Controller’s Office

Tony Hunter Application Services

Kent Iwamiya Industry Contracts

Regnier Jurado Office of Sponsored Research

Michelle Kim S/Nursing & S/Dentistry

Laurel Koepernik LPPI

Donna Langston Global Health Sciences

Susan Lau Infectious Diseases

Susan Lin Controller’s Office

Moira McAlister S/Pharmacy Dean’s Office

22

Page 23: e Proposal Pre-award System  Implementation Update

Requirement Workshop SMEs (2)

Name DepartmentDeanna McHugh Office of Sponsored ResearchMae Moredo Diabetes Center ITN/BRUJohn Radkowski Office of Sponsored ResearchChristine Razler RadiologyKerri Santos Cellular and Molecular PharmacologyIsaac Sato CVRISusan Shih Industry ContractsOlivia Viloria Biochemistry & BiophysicsJoseph Wilson Medicine

23