SHEET OF DATE CHECKED DRAWN PROJ. NO. ALSC ARCHITECTS, P.S. C A B C D 2 3 4 5 6 1 A B C D E 1 2 3 4 5 6 07.26.11 KJM CMD 2011-007 G-001 TITLE SHEET NEW RESIDENCE HALL EASTERN WASHINGTON UNIVERSITY EASTERN WASHINGTON UNIVERSITY NEW RESIDENCE HALL 07.26.11 DESIGN DEVELOPMENT DRAWING INDEX CIVIL LANDSCAPE ARCHITECTURAL MECHANICAL ELECTRICAL C-001 COVER SHEET C-100 EXISTING SITE SURVEY C-200 DEMOLITION PLAN C-300 EROSION CONTROL PLAN C-400 GRADING PLAN C-500 STORM DRAINAGE PLAN C-600 UTILITY PLAN L-101 LANDSCAPE IRRIGATION PLAN L-201 LANDSCAPE PLANTING PLAN L-501 LANDSCAPE IRRIGATION DETAILS AS101 SITE PLAN A-101 OVERALL FLOOR PLANS A-102 ROOF PLAN A-111 FIRST FLOOR PLAN A-112 FIRST FLOOR REFLECTED CEILING PLAN A-114 FIRST FLOOR FURNITURE PLAN A-121 SECOND -FOURTH FLOOR PLAN TYP A-122 SECOND -FOURTH FLOOR REFECTED CEILING PLAN A-124 SECOND -FOURTH FLOOR FURNITURE PLAN A-131 FIFTH FLOOR PLAN A-132 FIFTH FLOOR REFECTED CEILING PLAN A-141 ATTIC PLAN A-201 EXTERIOR ELEVATIONS A-202 EXTERIOR ELEVATIONS A-203 EXTERIOR ELEVATIONS A-301 BUILDING SECTIONS A-302 BUILDING SECTIONS A-351 WALL SECTIONS A-352 WALL SECTIONS A-401 ENLARGED TOILET ROOMS A-421 ELEVATOR PLAN & SECTION M-001 LEGENDS & ABBREVIATIONS - MECHANICAL MS101 SITE PLAN - MECHANICAL M-101 FIRST FLOOR PLAN - HVAC M-102 FIFTH FLOOR PLAN - HVAC M-103 ATTIC PLAN - HVAC M-201 FIRST FLOOR PLAN - HYDRONICS M-202 SECOND FLOOR PLAN - HYDRONICS M-203 ATTIC PLAN - HYDRONICS M-501 DETAILS - MECHANICAL M-502 DETAILS - MECHANICAL M-503 DETAILS – MECHANICAL M-601 SCHEDULES - MECHANICAL M-602 SCHEDULES - MECHANICAL M-701 DIAGRAMS - MECHANICAL M-801 CONTROLS - MECHANICAL M-802 CONTROLS - MECHANICAL M-803 CONTROLS - MECHANICAL E-001 LEGENDS & ABBREVIATIONS - ELECTRICAL ES101 SITE PLAN - ELECTRICAL E-701 ONE-LINE DIAGRAM - ELECTRICAL EL201 FIRST FLOOR PLAN - LIGHTING EL202 SECOND FLOOR PLAN - LIGHTING EL203 ATTIC PLAN - LIGHTING EP101 FIRST FLOOR PLAN - POWER EP102 SECOND FLOOR PLAN - POWER EP103 ATTIC PLAN - POWER ET201 FIRST FLOOR PLAN - TELECOMMUNICATIONS ET202 SECOND FLOOR PLAN -TELECOMMUNICATIONS ET701 RISER DIAGRAM - TELECOMMUNICATIONS EY101 FIRST FLOOR PLAN - SYSTEMS EY102 SECOND FLOOR PLAN - SYSTEMS EY103 ATTIC PLAN - SYSTEMS EY701 RISER DIAGRAM - SYSTEMS DESIGN DEVELOPMENT ALSC ARCHITECTS, P.S. CONTACT - KEN MURPHY 203 NORTH WASHINGTON STREET, SUITE #400 SPOKANE, WA 99201 (509) 838-8568 (509) 458-3710 Fax www.alscarchitects.com DCI ENGINEERS STRUCTURAL ENGINEER CONTACT - LYNN BURTON 601 WEST RIVERSIDE, SUITE #600 SPOKANE, WA 99201 [email protected](509) 455-4448 SPVV LANDSCAPE ARCHITECTS LANDSCAPE ARCHITECT CONTACT - TOM SHERRY 621 WEST MALLON, SUITE #306 SPOKANE, WA 99201 [email protected]MW ENGINEERS MECHANICAL ENGINEER CONTACT - KJERSTEN KHUTA 222 NORTH WALL STREET, SUITE #200 SPOKANE, WA 99201 [email protected](509) 838-9020 MW ENGINEERS ELECTRICAL ENGINEERS CONTACT - BRANDON ENEVOLD 222 NORTH WALL STREET, SUITE #200 SPOKANE, WA 99201 [email protected](509) 838-9020 SPARLING ACOUSTIC CONSULTANT CONTACT - MICHAEL YANTIS 720 OLIVE WAY, SUITE #1400 SEATTLE, WA 98101-1853 [email protected]DCI ENGINEERS CIVIL ENGINEER CONTACT - STEVE SCHMEDDING 601 WEST RIVERSIDE, SUITE #600 SPOKANE, WA 99201 [email protected](509) 455-4448 REV DATE DESCRIPTION STRUCTURAL S-201 FOUNDATION PLAN S-202 SECOND FLOOR PLAN S-203 THIRD FLOOR FRAMING PLAN S-204 FORTH FLOOR FRAMING PLAN S-205 FIFTH FLOOR FRAMING PLAN S-206 ATTIC FRAMING PLAN S-207 ROOF FRAMING PLAN S-301 FOUNDATION DETAILS S-401 CONCRETE DETAILS S-501 FRAMING DETAILS S-502 FRAMING DETAILS FIRE PROTECTION F-101 FIRST FLOOR PLAN - FIRE PROTECTION F-102 SECOND FLOOR PLAN - FIRE PROTECTION F-103 ATTIC PLAN - FIRE PROTECTION PLUMBING P-001 LEGENDS & ABBREVIATIONS - PLUMBING P-100 FOUNDATION PLAN - PLUMBING P-101 FIRST FLOOR PLAN - PLUMBING P-102 SECOND FLOOR PLAN - PLUMBING P-103 FIFTH FLOOR PLAN - PLUMBING P-104 ATTIC PLAN - PLUMBING P-501 DETAILS - PLUMBING P-601 SCHEDULES – PLUMBING GENERAL G-001 TITLE SHEET G-002 SYMBOLS AND ABBREVIATIONS G-003 CODE SHEET
13
Embed
E EASTERN WASHINGTON UNIVERSITY - EWUwiki.ewu.edu/campusmasterplan_wiki/images/9/99/1of8_DD_Set... · et201 first floor plan ... lab laboratory lad ladder lam laminate lav lavatory
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
ALSC ARCHITECTS, P.S.C
A
B
C
D
2 3 4 5 61
A
B
C
D
E
1 2 3 4 5 6
07.26.11
KJM
CMD
2011-007
G-001
TITLE SHEET
NEW RESIDENCE
HALL
EASTERN
WASHINGTON
UNIVERSITY
EASTERN WASHINGTON UNIVERSITYNEW RESIDENCE HALL07.26.11
DESIGN
DEVELOPMENT
DRAWING INDEX
CIVIL
LANDSCAPE
ARCHITECTURAL
MECHANICAL
ELECTRICAL
C-001 COVER SHEETC-100 EXISTING SITE SURVEYC-200 DEMOLITION PLANC-300 EROSION CONTROL PLANC-400 GRADING PLANC-500 STORM DRAINAGE PLANC-600 UTILITY PLAN
AS101 SITE PLANA-101 OVERALL FLOOR PLANSA-102 ROOF PLANA-111 FIRST FLOOR PLANA-112 FIRST FLOOR REFLECTED CEILING PLANA-114 FIRST FLOOR FURNITURE PLANA-121 SECOND -FOURTH FLOOR PLAN TYPA-122 SECOND -FOURTH FLOOR REFECTED CEILING PLANA-124 SECOND -FOURTH FLOOR FURNITURE PLANA-131 FIFTH FLOOR PLANA-132 FIFTH FLOOR REFECTED CEILING PLANA-141 ATTIC PLANA-201 EXTERIOR ELEVATIONSA-202 EXTERIOR ELEVATIONSA-203 EXTERIOR ELEVATIONSA-301 BUILDING SECTIONSA-302 BUILDING SECTIONSA-351 WALL SECTIONSA-352 WALL SECTIONSA-401 ENLARGED TOILET ROOMSA-421 ELEVATOR PLAN & SECTION
M-001 LEGENDS & ABBREVIATIONS - MECHANICALMS101 SITE PLAN - MECHANICALM-101 FIRST FLOOR PLAN - HVACM-102 FIFTH FLOOR PLAN - HVACM-103 ATTIC PLAN - HVACM-201 FIRST FLOOR PLAN - HYDRONICSM-202 SECOND FLOOR PLAN - HYDRONICSM-203 ATTIC PLAN - HYDRONICSM-501 DETAILS - MECHANICALM-502 DETAILS - MECHANICALM-503 DETAILS – MECHANICALM-601 SCHEDULES - MECHANICALM-602 SCHEDULES - MECHANICALM-701 DIAGRAMS - MECHANICALM-801 CONTROLS - MECHANICALM-802 CONTROLS - MECHANICALM-803 CONTROLS - MECHANICAL
E-001 LEGENDS & ABBREVIATIONS - ELECTRICALES101 SITE PLAN - ELECTRICALE-701 ONE-LINE DIAGRAM - ELECTRICALEL201 FIRST FLOOR PLAN - LIGHTINGEL202 SECOND FLOOR PLAN - LIGHTINGEL203 ATTIC PLAN - LIGHTINGEP101 FIRST FLOOR PLAN - POWEREP102 SECOND FLOOR PLAN - POWEREP103 ATTIC PLAN - POWERET201 FIRST FLOOR PLAN - TELECOMMUNICATIONSET202 SECOND FLOOR PLAN -TELECOMMUNICATIONSET701 RISER DIAGRAM - TELECOMMUNICATIONSEY101 FIRST FLOOR PLAN - SYSTEMSEY102 SECOND FLOOR PLAN - SYSTEMSEY103 ATTIC PLAN - SYSTEMSEY701 RISER DIAGRAM - SYSTEMS
DESIGN DEVELOPMENT
ALSC ARCHITECTS, P.S.CONTACT - KEN MURPHY203 NORTH WASHINGTON STREET, SUITE #400SPOKANE, WA 99201(509) 838-8568 (509) 458-3710 Faxwww.alscarchitects.com
DCI ENGINEERSSTRUCTURAL ENGINEERCONTACT - LYNN BURTON601 WEST RIVERSIDE, SUITE #600SPOKANE, WA [email protected](509) 455-4448
SPVV LANDSCAPE ARCHITECTSLANDSCAPE ARCHITECTCONTACT - TOM SHERRY621 WEST MALLON, SUITE #306SPOKANE, WA [email protected]
MW ENGINEERSMECHANICAL ENGINEERCONTACT - KJERSTEN KHUTA222 NORTH WALL STREET, SUITE #200SPOKANE, WA [email protected](509) 838-9020
MW ENGINEERSELECTRICAL ENGINEERSCONTACT - BRANDON ENEVOLD222 NORTH WALL STREET, SUITE #200SPOKANE, WA [email protected](509) 838-9020
SPARLINGACOUSTIC CONSULTANTCONTACT - MICHAEL YANTIS720 OLIVE WAY, SUITE #1400SEATTLE, WA [email protected]
DCI ENGINEERSCIVIL ENGINEERCONTACT - STEVE SCHMEDDING601 WEST RIVERSIDE, SUITE #600SPOKANE, WA [email protected](509) 455-4448
REV DATE DESCRIPTION
STRUCTURAL
S-201 FOUNDATION PLANS-202 SECOND FLOOR PLANS-203 THIRD FLOOR FRAMING PLANS-204 FORTH FLOOR FRAMING PLANS-205 FIFTH FLOOR FRAMING PLANS-206 ATTIC FRAMING PLANS-207 ROOF FRAMING PLANS-301 FOUNDATION DETAILSS-401 CONCRETE DETAILSS-501 FRAMING DETAILSS-502 FRAMING DETAILS
FIRE PROTECTION
F-101 FIRST FLOOR PLAN - FIRE PROTECTIONF-102 SECOND FLOOR PLAN - FIRE PROTECTIONF-103 ATTIC PLAN - FIRE PROTECTION
PLUMBING
P-001 LEGENDS & ABBREVIATIONS - PLUMBINGP-100 FOUNDATION PLAN - PLUMBINGP-101 FIRST FLOOR PLAN - PLUMBINGP-102 SECOND FLOOR PLAN - PLUMBINGP-103 FIFTH FLOOR PLAN - PLUMBINGP-104 ATTIC PLAN - PLUMBINGP-501 DETAILS - PLUMBINGP-601 SCHEDULES – PLUMBING
GENERAL
G-001 TITLE SHEETG-002 SYMBOLS AND ABBREVIATIONSG-003 CODE SHEET
& AND
ANGLE
@ AT
C CENTER LINE
O DIAMTER or ROUND
┴ PERPENDICULAR
# POUNDS or NUMBER
x TIMES or BY
P PROPERTY LINE
'A'
AB ANCHOR BOLT
ABC AGGREGATE BASE COURSE
AC ASPHALTIC CONCRETE
ACID RES ACID RESISTANT
ACOUS ACOUSTICAL (TILE or PANELS)
ACOUSINSUL ACOUSTICAL INSULATION
AD AREA DRAIN
ADJ ADJUSTABLE
AF ACCESS FLOOR
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
AFS ABOVE FINISH SLAB
AGGR AGGREGATE
ALUM ALUMINUM
ANOD ANODIZED
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATE(LY)
ARCH ARCHITECT(URAL)
ASB ASBESTOS
ASKLR AUTOMATIC SPRINKLER
ASPH ASPHALT
ASSY ASSEMBLY
ASTM AMERICAN SOCIETY for TESTING
& MATERIALS
ATC ACOUSTICAL TILE CEILING
ATF ATHLETIC FLOORING
AWP ACOUSTICAL WALL PANEL
'B'
BALC BALCONY
BB BULLETIN BOARD
BD BOARD
BITUM BITUMINOUS
BKG BACKING
BLDG BUILDING
BLKG BLOCKING
BLTN BUILT-IN
BM BEAM
BOF BOTTOM OF FOOTING
BOJ BOTTOM OF JOISTS
BOT BOTTOM
BR BEDROOM
BRCG BRACING
BRG BEARING
BS BOTH SIDES
BSMT BASEMENT
BUR BUILT-UP ROOF
BW BOTH WAYS
'C'
CAB CABINET
CB CATCH BASIN, CORNER BEAD
CAN CANOPY
CANTIL CANTILEVER
CBB CEMENTITIOUS (BACKER) BOARD
CEM CEMENT
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/
CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/
OWNER INSTALLED
CFE CONTRACTOR FURNISHED
EQUIPMENT
CFLG COUNTERFLASH(ING)
CG CORNER GUARD
CI CAST IRON
CH BD CHALKBOARD
CHFR CHAMFER
CIP CAST-IN-PLACE
CJ CONTROL JOINT,
CONSTRUCTION JOING
CLG CEILING
CLR CLEAR
CLRM CLASSROOM
CMU CONCRETE MASONRY UNIT(S)
CMPST COMPOSITE
CNTR COUNTER
CO CLEANOUT, CASED OPENING,
CUTOUT
COL COLUMN
CONC CONCRETE
CONF CONFERENCE
CONN CONNECT
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
CORR CORRIDOR
COTG CLEANOUT TO GRADE
CPT CARPET
CR CLOSET ROD
CRT YD COURTYARD
CSK COUNTERSUNK
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTR CENTER
CU FT CUBIC FEET
CU YD CUBIC YARD(S)
CW COLD WATER
'D'
D DEEP, DEPTH
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL, DIAGRAM
DIM DIMENSION
DISP DISPENSER
DL DEAD LOAD
DMPF DAMPROOF(ING)
DN DOWN
DR DOOR, DINING ROOM,
DRESSING ROOM, DRIVE
DRST DOOR STOP
DS DOWNSPOUT
DSP DRY STANDPIPE
DSPL DISPOSAL
DT DRAIN TILE
DWG DRAWING
DWR DRAWER
'E"
E EAST
(E) EXISTING
EA EACH
EHD ELECTRIC HAND DRYER
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
ENGR ENGINEER
ENTR ENTRANCE
ESMT EASEMENT
EQ EQUAL
EQUIP EQUIPMENT
EW EACH WAY
EXH FN EXHAUST FAN
EXH HD EXHAUST HOOD
EXIST EXISTING
EXP EXPANSION, EXPOSED, EXPOSURE
EXP BT EXPANSION BOLT
EXT EXTERIOR
EXT LT EXIT LIGHT
'F'
FA FIRE ALARM, FRESH AIR
FACP FIRE ALARM CONTROL PANEL
FB FLAT BAR
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF EL FINISH FLOOR ELEVATION
FF&E FURNITURE, FIXTURE &
EQUIPMENT
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FIN FINISH(ED)
FIN FLRFINISH FLOOR
FIN GR FINISH GRADE
FLA FLASHING
FLR FLOOR, FILLER
FLUOR FLUORESCENT
FO FINISH OPENING
FOB FACE OF BRICK
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUD(S)
FP FIREPROOF
FRMG FRAMING
FRP FIBER REINFORCED POLYESTER
FRTW FIRE RETARDENT
TREATED WOOD
FRZ FREEZER
FS FULL SIZE, FULL SCALE
FT FOOT or FEET, FIRE TREATED
FTD FACIAL TISSUE DISPENSER
FTG FOOTING
FURG FURRING
FUT FUTURE
FWC FABRIC WALLCOVERING
'G'
GA GAUGE
GALV GALVANIZED, GALVANIC
GB GRAB BAR
GC GENERAL CONTRACTOR
GDR GUARD RAIL
GEN GENERAL, GENERATOR
GFCI GROUND FAULT
CIRCUIT INTERRUPTER
GL GLASS
GL BLK GLASS BLOCK
GLU LAM GLU-LAMINATED BEAM or WOOD
GR FL GROUND FLOOR
GR LN GRADE LINE
GSB GYPSUM SHEATHING BOARD
GSM GALVANIZED SHEET METAL
GUT GUTTER
GYM GYMNASIUM
GYP GYPSUM
GYP BD GYPSUM BOARD
'H'
HB HOSE BIBB
HC HANDICAP, HOLLOW CORE
HD HAND DRYER, HEAVY DUTY
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HM HOLLOW METAL
HNDRL HANDRAIL
HO HOLD-OPEN
HORIZ HORIZONTAL
HT HEIGHT
HVAC HEATING VENTILATING
AIR CONDITIONING
HW HOTWATER
HWT HOTWATER TANK
'I'
ID INSIDE DIAMETER,
INSIDE DIMENSION
IWH INSTANTANEOUS
WATER HEATER
INCAND INCANDESCENT
INCL INCLUDED
INSUL INSULATION
INT INTERIOR
INV INVERT
IS ISLAND, INSECT SCREEN
ISO ISOMETRIC
'J'
J-BOX JUNCTION BOX
'K'
KO KNOCK OUT
KIT KITCHEN
KPL KICKPLATE
'L'
LAB LABORATORY
LAD LADDER
LAM LAMINATE
LAV LAVATORY
LB POUND
LD BRG LOAD BEARING
LIB LIBRARY
'L' continued
LINO LINOLEUM
LKR LOCKER
LKR RM LOCKER ROOM
LL LIVE LOAD, LOWER LEVEL
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LOC LOCATION
LOUV LOUVER
LP LIGHT POLE
LPT LOW POINT
LPG LIQUID PETROLEUM GAS
LRG LARGE
LT LIGHT
LT SW LIGHT SWITCH
LTG LIGHTING
'M'
MAINT MAINTENANCE
MATL MATERIAL
MAX MAXIMUM
MB MACHINE BOLT, MAIL BOX
MBR MEMBER
MC MEDICINE CABINET,
MANHOLE COVER, METAL-CLAD
MECH RM MECHANICAL ROOM
MECH MECHANICAL
MED MEDIUM, MEDICAL
MEL MELAMINE
MEMB MEMBRANE
MEZZ MEZZANINE
MFR MANUFACTURER
MFR REC MANUFACTURER'S
RECOMMENDATION
MH MANHOLE
MIN MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MLDG MOLDING (MOULDING)
MLWK MILLWORK
MO MASONRY OPENING,
MOTOR OPERATED
MOD MODIFY
MOPR MOP RACK
MS MOP SINK, MACHINE SCREW
MT MOUNT
MTD MOUNTED
MTL METAL
MTLR METAL ROOF
MULL MULLION
MVBL MOVABLE
'N'
N NORTH
NAT NATURAL
NCOMBL NONCOMBUSTIBLE
NIC NOT IN CONTRACT
NL NIGHT LIGHT
NO NUMBER
NOM NOMINAL
NS NO SCALE
NTS NOT TO SCALE
'O'
OA OVERALL, OUTSIDE AIR
OC ON CENTER
OCC OCCUPY
OD OUTSIDE DIAMETER,
OUTSIDE DIMENSION
OF OUTSIDE FACE
OF/CI OWNER FURNISHED/
CONTRACTOR INSTALLED
OF/OI OWNER FURNISHED/
OWNER INSTALLED
OFD OVERFLOW DRAIN
OFF OFFICE
OFS OUTSIDE FACE OF STUD
OGL OBSCURE GLASS
OH OVERHANG
OH DR OVERHEAD (COILING) DOOR
OPNG OPENING
OPP OPPOSITE
OPT OPTIONAL
ORD OVERFLOW ROOF DRAIN
'P'
PA PUBLIC ADDRESS
PAT PATTERN
PB PANIC BAR, PANELBOARD
PCC PRECAST CONCRETE
PED PEDESTAL
PEND PENDANT
PERF PERFORATED
PERIM PERIMETER
PERM PERMANENT
PH PHASE
PIL PILASTER
PK GARPARKING GARAGE
PK LOT PARKING LOT
PL PROPERTY LINE, PLYWOOD
PLAM PLASTIC LAMINATE
PLAS PLASTIC
PLST PLASTER
PNL PANEL
POL POLISH(ED)
PORC PORCELAIN
PR PAIR, PIPE RAIL
PRCST PRECAST
PREFAB PREFABRICATE(D)
PREFIN PREFINISHED
PRELIM PRELIMINARY
PRKG PARKING
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSL PIPE SLEEVE
PT PAINT, PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTDR PAPTER TOWEL DISPENSER
& RECEPTACLE
PTN PARTITION
PTR PAPER TOWEL RECEPTACLE
PVC POLYVINYL CHLORIDE
PWR POWER
'Q'
QT QUARRY TILE
QTB QUARRY TILE BASE
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
QUAL QUALITY
'R'
R RADIUS, RISER, RANGE
RA RETURN AIR
RB RUBBER BASE
RB HK ROBE HOOK
RCP REFLECTED CEILING PLAN
RCPTN RECEPTION
RD ROOF DRAIN, ROAD
REBAR REINFORCING STEEL BARS
REC RECESSED
RECPT RECEPTACLE
REF REFRIGERATOR, REFERENCE
REFL REFLECTED
REINF REINFORCE(D)
REM REMOVABLE
REQD REQUIRED
RESIL RESILIENT
REST RESTROOM
REV REVISED, REVISION
RF RESILIENT FLOORING
RH ROOF HATCH
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
RTF RUBBER TILE FLOOR
RVS REVERSE
RWL RAIN WATER LEADER
RWR RECESSED WASTE RECEPTACLE
'S'
S SOUTH
SA SUPPLY AIR
SAN SANITARY
SC SOLID CORE
SCD SEAT COVER DISPENSER
SCHED SCHEDULE
SCP SCUPPER
SCR SHOWER CURTAIN ROD
SD SMOKE DETECTOR, STORM DRAIN,
SOAP DISPENSER
SDG SIDING
SECT SECTION
SF SQUARE FOOT (FEET)
SGD SLIDING GLASS DOOR
SHFT SHAFT (ELEVATOR)
SHR SHOWER
SHT SHEET
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SKLT SKYLIGHT
SLNT SEALANT
SM SHEET METAL, SMALL, SMOOTH
SMP SUMP PUMP
SND SANITARY NAPKIN DISPENSER
SND INS SANITARY NAPKIN DISPOSAL UNIT
SOV SHUTOFF VALVE
SP STANDPIPE, SUMP PIT
SPM SOLID PLASTIC MATERIAL
SPEC SPECIFICATION
SPKLR SPRINKLER
SPKR SPEAKER
SPRT SUPPORT
SQ SQUARE
SS SANITARY SEWER, SERVICE SINK,
STORM SEWER
SST STAINLESS STEEL
ST STAIR(S), STREET
STA STATION
STC SOUND TRANSMISSION CLASS
STD STANDARD
STL LNTL STEEL LINTEL
STL PL STEEL PLATE
STL RF DK STEEL ROOF DECK
STOR STORAGE
STR STRAIGHT, STRINGER(S)
STRUCT STRUCTURAL
SUB FL SUB FLOOR
SUSP SUSPEND(ED)
SV SHEET VINYL
SW SIDEWALK, SWITCH
SYMM SYMMETRICAL
SYS SYSTEM
'T'
T TREAD
T&B TOP & BOTTOM
T&G TONG & GROOVE
T/S TUB / SHOWER
TB TOWEL BAR, THROUGH BOLT
TD TRENCH DRAIN
TDR TOWEL DISPENSER & RECEPTACLE
TEL TELEPHONE
TEMP TEMPORARY
TER TERRAZZO
TFF TOP OF FINISH FLOOR
THK THICK(NESS)
THRU THROUGH
TK BD TACKBOARD
TOB TOP OF BEAM
TOC TOP OF CONCRETE, TOP OF CURB
TOC FTG TOP OF CONCRETE FOOTING
TOC WALL TOP OF CONCRETE WALL
TO FDN TOP OF FOUNDATION
TOM TOP OF MASONRY
TOP TOP OF PARAPET,
TOP OF PAVEMENT
TOPO TOPOGRAPHY
TOS TOP OF SLAB, TOP OF STEEL
TOT TOP OF TRUSS
TOW TOP OF WALL
TP TELEPHONE POLE
TPD TOILET PAPER DISPENSER
TPH TOILET PAPER HOLDER
TR TOWEL RACK
TRANS TRANSOM, TRANSPARENT
TRTD TREATED
TS TUBE STEEL
TSTAT THERMOSTAT
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION
TYP TYPICAL
'U'
UGND UNDERGROUND
UL UNDERWRITERS
LABORATORIES
UNFIN UNFINISH(ED)
UNIF UNIFORM
UNO UNLESS NOTED OTHERWISE
UR URINAL
UTIL UTILITY
'V'
V VOLT
VAR VARIES, VARIATION
VB VINYL BASE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VNR VENEER
VOLT VOLTAGE
VP VENEER PLASTER
VR VAPOR RETARDER
VRFY VERIFY
VWC VINYL WALLCOVERING
'W'
W WEST, WIDE, WASTE, WATT
W/ WITH
W/O WITHOUT
WB WOOD BASE
WC WATER CLOSET,
WALL COVERING
WD WOOD
WDW WINDOW
WGL WIRED GLASS
WH WATER HEATER, WEEP HOLE,
WALL HYDRANT
WHSE WAREHOUSE
WLD WELDED
WO WHERE OCCURS
WP WATERPROOFING,
WORKING POINT
WPM WATERPROOF MEMBRANE
WR WEATHER RESISTANT
WS WEATHER STRIP
WSCT WAINSCOT
WT WEIGHT, WATERTIGHT
WW WINDOW WALL
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
'X'
XFMR TRANSFORMER
'Y'
YH YARD HYDRANT
'Z'
Z ZEBRA
ARCHITECTURAL ABBREVIATIONS
L
L
SYMBOLS & MATERIALS LEGEND
72
76
G.1
P1
+12.00'
-OR-
= CONTOUR LINES 'NEW'
= CONTOUR LINES 'EXISTING'
SPOT ELEVATION
PROPERTY LINE
CENTER LINE
DATUM POINT - FLOOR LEVEL ON SECTIONS
DETAIL W/ DETAIL NUMBER - @ TOP & SHT NO,
WHERE DETAIL IS LOCATED BELOW
MATCH LINE - TAG SIDE INDICATES
SIDE TO BE CONSIDERED
COLUMN/GRID LINE - LETTERS BOTTOM TO TOP ON
SHEET AND NUMBERS LEFT TO RIGHT ON SHEET
REFERENCE ARROWS
ROOM IDENTIFICATION SYMBOL - FIRST DIGIT INDICATES
FLOOR LEVEL. REFER TO 'ROOM USE' SCHEDULE
PARTITION REFERENCE - W/ PARTITION NOTES
& PARTITION DESCRIPTION
INT ELEVATION REF SYMBOL - W/ INTERIOR ELEVATION
NUMBERS & SHT. NO. IN THE MIDDLE -
WHERE THEY ARE LOCATED
DRAWING TITLE - W/ VIEW NAME, LOCATION NUMBER
AND SCALE OF DRAWING BELOW
WALL SECTION REFERENCE - W/ SECTION REFERENCE
NUMBER @ TOP & SHT NO, WHERE SECTION IS
LOCATED BELOW.
BUILDING SECTION REFERENCE - W/ BUILDING SECTION
NUMBER @ TOP & SHT N0 WHERE BUILDING SECTION IS
LOCATED, BELOW
WOOD FRAME - CONTINUOUS
WOOD FRAME - BLOCKING
PLYWOOD
GLAZING
GYPSUM BOARD
ACOUSTICAL TILE
BLANKET INSULATION
RIGID INSULATION
ASPHALTIC PAVING
EARTH/SOIL
ROCK OR POROUS FILL
SAND, PLASTER, MORTAR
CONCRETE
CONCRETE MASONRY UNITS
IRON, STEEL
FINISHED WOOD
EQUIPMENT SYMBOL - EQUIPMENT NO. REFERS
TO EQUIPMENT SCHEDULE IN SPECIFICATIONS
DIVISION 10671
DOOR SYMBOL - DOOR NO. REFERS TO DOOR
SCHEDULE (NUMBER SAME AS ROOM NUMBER)
PAINT SYMBOL - PAINT NO. REFERS TO PAINT OR
SPECIAL COATING AS NOTED IN SPECIFICATIONS
SIGN SYMBOL - SEE SPECIFICATIONS FOR SYMBOL
DESIGN, MOUNTING HEIGHT AND AND DIRECTIONS
101
1i
TEXT
/1 A101
/1 A101
/1 A101
/1 A101
1
A101
SIM1
A101
SIM
1
A101
SIM
A1011
SIM
A1011
SIM
NAMEELEVATION
101
ROOM
NAME
1 2
A
EXTERIOR ELEVATION TITLE - W/ ELEV NUMBER
NUMBERS & SHT. NO. IN THE MIDDLE -
WHERE THEY ARE LOCATED
A-201
1
A-201
1
2
3
4
1View NameSCALE: xx" = 1'-0"
NORTH ARROW
#
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
ALSC ARCHITECTS, P.S.C
A
B
C
D
2 3 4 5 61
A
B
C
D
E
1 2 3 4 5 6
07.26.11
KJM
CMD
2011-007
G-002
SYMBOLS ANDABBREVIATIONS
NEW RESIDENCE
HALL
EASTERN
WASHINGTON
UNIVERSITY
DESIGN
DEVELOPMENT
REV DATE DESCRIPTION
RD OFFICE
105
DIRECTOR
136
OFFICE
135
STORAGE
133
OPEN OFFICE
127
LLC OFFICE
138
COMMONS/GREAT
ROOM
117
SEMINAR / MP
111
TELECOM
109RD APT
106
SERVERY /
BREAK
114
BIKE STORAGE
124
STORAGE
122
MECH
129
CHIEF
HOUSING
OFFICER
137
STAFF
108
LOBBY
101
UNFINISHED
SPACE
125
ELECTRICAL
121
ELECTRICAL
132
TELECOM
131
B
A2
S2R2
2 HR SHAFT
UNFINISHED
SPACE
1
2 3 4 5 6 7 8 9 10 11
AA
BB
CC
DD
EE
F.8
G
F
H
J
K
L
6.2
A.2
30' - 5 1/4" 4' - 1" 22' - 0" 34' - 6"
6' -
11
"3
' - 7
1/4
"1
26
' - 4
1/2
"
169' - 4"
26
' - 5
"2
8' -
1 3
/4"
4' -
1"
36
' - 4
3/4
"
2 HR SHAFT
R2
B
1
1
2
2
3
3
4
4
5
5 6 7 8 9 10 11
A
BB
CC
DD
EE
F.8
G
F
H
J
K
L
6.2
A.2
DOUBLE
313
DOUBLE
314
DOUBLE
315
GAME
316
DOUBLE
309
DOUBLE
308
DOUBLE
307
TRIPLE
317
DOUBLE
318
DOUBLE
319
DOUBLE
321
TRIPLE
322
DOUBLE
323
DOUBLE
324
DOUBLE
325
SITTING /
SOCIAL
327
DOUBLE
329
DOUBLE
331
CUST /
RECYCLE
334
CA
335
DOUBLE
336
DOUBLE
337
DOUBLE
338
DOUBLE
339
KITCHEN
341
LAUNDRY
343
TELE
344
DOUBLE
345
DOUBLE
346
SITTING /
SOCIAL
347
DOUBLE
348
DOUBLE
349
CA
350
CUSTODIAN
351DOUBLE
353
TRIPLE
354
SITTING /
SOCIAL
356
DOUBLE
358
DOUBLE
359
DOUBLE
361
DOUBLE
362
DOUBLE
363
DOUBLE
364
DOUBLE
365
DOUBLE
366
RECYCLING
368
ELEC
367
CORRIDOR
301
DOUBLE
369
DOUBLE
371
DOUBLE
372
STAIR
376
DOUBLE
377
DOUBLE
378
TRIPLE
379
DOUBLE
305
1ST FLOOR0"
2ND FLOOR14' - 8"
3RD FLOOR25' - 4"
4TH FLOOR36' - 0"
5TH FLOOR46' - 8"
ATTIC57' - 4"
1 HR FIRE
RATING, TYP
3 HR HORIZONTAL
FIRE SEPARATION
CO
NS
TR
UC
TIO
N
TY
PE
1-A
COMMONS/GREAT
ROOM
117
B C D E F
DOUBLE
313
DOUBLE
213
DOUBLE
237
DOUBLE
337
DOUBLE
537
DOUBLE
513
TY
PE
V-A
CO
NS
TR
UC
TIO
N
DOUBLE
437
DOUBLE
413
1/2 HR FIRE
RATING, TYP
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
ALSC ARCHITECTS, P.S.C
A
B
C
D
2 3 4 5 61
A
B
C
D
E
1 2 3 4 5 6
07.26.11
KJM
CMD
2011-007
G-003
CODE SHEET
NEW RESIDENCE
HALL
EASTERN
WASHINGTON
UNIVERSITY
DESIGN
DEVELOPMENT
SCALE : 1/16" = 1'-0"A1
1ST FLOOR CODE PLAN
SCALE : 1/16" = 1'-0"C1
FLOORS 2-5 CODE PLAN
SCALE : 1/8" = 1'-0"A4
CODE SECTION
REV DATE DESCRIPTION
CODE REVIEW
Additional Calculations for Mixed Occupancy Area Determination Included.
06/29/11
Floors 2-5 Occupancy: R-2 with an accessory occupancy A2 Social Lounge
/Kitchen on each floor
First Floor Occupancy: B, R-2, A3, M and S
No Basement
Building will have a fully automatic sprinkler system in accordance with 903.3.1.1
including the R occupancies
Using Section 509 Special Provisions
Section 509.2 Buildings considered separate and distinct for the purposes of
determining area limitations, continuity of fire walls, limitations of stories and type
of construction where all of the following are met:
1. The buildings are separated with a horizontal assembly having a minimum
3-hour fire-resistance rating.2. The building below the horizontal assembly is no more than one story abovegrade plane.3. The building below the horizontal assembly is of Type 1A construction.
4. Shaft, stairway, ramp and escalator enclosures through the horizontalassembly shall have not less than a 2-hour fire-resistance rating with opening
protectives in accordance with Section 715.4.
5. The building or buildings above the horizontal assembly shall be permitted
to have multiple Group A occupancy uses, each with an occupant load of less than
300, or Group B, M R or S occupancies.
6. The building below the horizontal assembly shall be protected throughout by
an approved automatic sprinkler system in accordance with Section 903.3.1.1, and
shall be permitted to be any of the following occupancies:
6.1. Group S-2 parking garage used for the parking and storage of private
motor vehicles;
6.2. Multiple Group A, each with an occupant load of less than 300;
6.3. Group B;
6.4. Group M;
6.5 Group R; and
6.6. Uses incidental to the operation of the building (including entry
lobbies, mechanical rooms, storage areas and similar uses).
7. The maximum building height in feet (mm) shall not exceed the limits set
forth in Section 503 for the building having the smaller allowable height as
measured from the grade plane.
Area Calculation
First Floor: unlimited area with Type IA construction
Second Floor R-2 occupancy Type VA construction
Basic area from Table 503 12,000 sf
Frontage increase 28% 3,360 sf
Sprinkler increase 24,000 sf
Allowable area 39,360 sf
Section 506.4 single occupancy x 3
More than one story
______________
Total building allowable area 118,080 sf
Actual R-2 building area 85,060 sf
Total building area 104,400 sf
Maximum Stories 4
Maximum height 60 ft
Mixed Occupancy Area Determination
506.5.1 No more than one story above grade plane
(Residence Hall below 3 hr P.T. Slab)
Comply with provisions of 508.1
Exception 1: Occupancies separated in accordance with Section
509
509 Special Provisions
509.2 Horizontal building separation allowance
Residence Hall to comply with provisions 1-7
6. The building below the horizontal 3 hr assembly shall be
protected by an automatic sprinkler system in accordance with
Section 903.3.1.1, and shall be permitted to be any of the following
occupancies:
Multiple group A with less than 300 occupants.
Groups B, M R and uses incidental to the operation of the
building, including storage areas.
Incidental Accessory Occupancies with sprinkler system.
506.5.2 More than one story above grade plane
(Residence Hall above 3 hr P.T. slab)
Comply with provisions of 508.1
Exception 1: Occupancies separated in accordance with Section
509
509 Special Provisions
509.2 Horizontal building separation allowance
Residence Hall to comply with provisions 1-7.
5. The building above the 3 hr assembly shall be permitted to
have multiple Group A occupancy uses, each with an occupant
load of less than 300, or Group B, M, R or S occupancies.
506.5.2 Floor Area Ratio Check for buildings more than three stories above
grade plane. (Residence Hall 5 stories).
Ratio of actual area per floor divided by the allowable area:
Area for each floor 2-5 19,019 s.f.
Allowable floor area 39,360 s.f.
Ratio .483
Aggregate Sum of Ratios:
.483 + .483 + .483 + .483 = 1.933
Aggregate Sum not to exceed 3.
1 2 3 4 65
PROJ. NO.
ALSC ARCHITECTS, P.S.C
A
B
D
2 3 4 5 61
A
B
C
D
E
NEW RESIDENCEHALL
EASTERNWASHINGTONUNIVERSITY
REV DATE DESCRIPTION
C
DESIGNDEVELOPMENT
621 W MALLON, STE 306SPOKANE, WA 99201509.325.0511 | WWW.SPVV.COM
NORTH
0 feet40
1" = 20'
20 60
SPRAY HEADNTS
1L-101
POP-UP SPRAYHEADLAWN OR MULCHFINISHED GRADE
SPRAY HEADBODY
SCH. 80 P.V.C. NIPPLELENGTH AS REQUIRED(TYPICAL)
90 THREADED ELL
SCH. 40 P.V.C. LATERAL
90 STREET ELL
SCH. 40 P.V.C. FITTINGS
1. INSTALL AS PER MANUFACTURERS SPECIFICATIONS.
2. ADJUST ARC ACCORDINGLY TO PROVIDE 100% COVERAGE.
NOTES:
12"
SPVV
1. REFER TO PLANS FOR MORE INFORMATION.
2. INSTALL AS PER MANUFACTURER'S SPECIFICATIONS.
3. ADJUST ARC ACCORDINGLY TO PROVIDE 100% COVERAGE.
PVC LATERAL LINESCH. 40 PVC TEE
NOTES:
FINISHED GRADE
TOP OF PLUNGER
GEAR DRIVENROTOR BODY
(2) SCH. 40 PVC FITTINGSSCH. 80 PVC NIPPLE
SCH. 80 PVC NIPPLE(LENGTH ASREQUIRED)
SCH. 40 PVCFITTING
SPVV
GEAR DRIVEN HEADNTS
2L-101
NOTES:1. INSTALL THRUST BLOCKS AT ALL CHANGES IN DIRECTION ON MAINLINE ONLY.
2. ALL CONCRETE TO BE RATED AT 3000 PSI AT 28 DAYS.
3. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
4. MINIMUM OF 5 GAL. VOLUME OF CONCRETE PER THRUST BLOCK.
5. AREA TO RECEIVE THRUST BLOCK SHALL BE WRAPPED WITH APPROVED FILTER FABRIC PRIOR TO PLACEMENT OF CONCRETE.
TYPICAL LOCATIONS FORCONCRETE THRUST BLOCK
SPVV
2" MIN.
SAND BEDDING MATERIALTHROUGH OUT. MIN. 2" SAND
BETWEEN ALL PIPES.
CONTROL WIRE TAPED AT 5'INTERVALS, BUT NOT TAPED
TO MAINLINE
LATERALLINE
MAINLINE
TOPSOIL
LAWN/MULCH
NATIVEBACK FILL
SPVV
TECHLINE
6" MIN.
SCH. 40 P.V.C.UNIONS AS REQ'D
1. REFER TO IRRIGATION SHEET FOR LOCATIONS
2. REFER TO SPECIFICATIONS FOR INSTALLATION INSTRUCTIONS.
NOTES:
BRICK(1 OF 4)
3/4" MINUSDRAIN ROCK
MAINLINESIZE PER
PLAN
SPVV
VALVE BOX WITHLOCKING COVER
SIZE ACCORDINGLY
2 PIECE STANDARDPORT BRONZE BALL
VALVE. SEE IRRIGATIONLEGEND FOR SIZE.
LAWN OR MULCHFINISHED GRADE
NOTES:1. INSTALL 4" OF DRAINAGE ROCK IN THE BOTTOM OF QUICK COUPLER BOXES.2. INSTALL LOCKING COVER ON QUICK COUPLER VALVE.
SPVV
SCH. 40 PVCMAINLINE ANDFITTINGS, SIZEAS INDICATED
BRICK (1 OF 4)
(3) GALV. STREET ELLSCONNECT FOR TRIPLESWING MOVEMENT.
GALV. NIPPLE,LENGTH ASNEEDED
GALVANIZED TEESIZE PER LINE
2"
VALVE BOX W/LOCKING COVER
QUICK COUPLER W/LOCKING COVER
FINISHED GRADE
CONCRETE THRUST BLOCKNTS
3L-101
IRRIGATION TRENCHNTS
4L-101
ISOLATION VALVENTS
5L-101
QUICK COUPLER VALVENTS
6L-101
12"
18"
TO HEADS
1. TYPICAL ELECTRIC CONTROL VALVE VERIFY WITH VALVE SCHEDULE FOR SIZE,PRESSURE REGULATION AND TYPE.
3/4" MINUSDRAIN GRAVEL4" MIN. DEPTH
NOTES:
BRICK(1 OF 4)
SPVV
COMMON WIRE OTHER VALVES ONSAME CONTROLLER
IRRIGATIONMAIN
FITTINGSSCH. 40
WIRESCONTROL
SCH. 80NIPPLES
ELECTRIC CONTROLVALVE ONE PER
VALVE BOX
VALVE BOX W/LOCKING COVER
UNIONS SCH. 40
LAWN OR MULCH
FINISHED GRADE
ELECTRIC VALVENTS
7L-101
TOP OF MULCH
FITTING: RAIN BIRD
SINGLE-OUTLET EMITTER: RAIN BIRD
CF-12 OR CF-13
RAIN BIRD TDS-050
RAIN BIRD CF-21 FLUSH CAP:
COMPRESSION
TIE-DOWN STAKE:
PE PIPE: RAIN BIRD
PVC SCH 80 NIPPLE
LATERAL PIPE
(LENGTH AS REQUIRED)
COMPRESSION X 1/2-INCH FPT
AND FITTING
MODULE PC-24 PRESSURE-COMPENSATING
1. USE RAIN BIRD BUG GUN MODEL EMA-BG TO INSERT EMITTER DIRECTLY INTO XERI-TUBE AND RAIN TUBE.
NOTE:
RAIN-TUBE RT-050-500
SPVV SPVV
1. USE RAIN BIRD BUG GUN MODEL EMA-BG TO INSERT BARB CONNECTOR DIRECTLY INTO XERI-TUBE.
NOTE:
3" MIN.
PVC SCH 40 TEE OR ELL
BRICK (1 OF 4)
PVC SCH 40 ELL
PVC SCH 80 CLOSE NIPPLE
ID TAG: RAIN BIRD VID SERIES
PVC MAINLINE
FINISH GRADE
LATERAL PIPE
SPVV
PVC SCH 80 NIPPLE (2-INCHLENGTH, HIDDEN) AND PVC SCH40 ELL
CONTROL ZONE KIT: RAIN BIRD XCZ-100(INCLUDES 100-DV VALVE, RBY100MPTX IN-LINEFILTER, PSI-M40X-100 PRESSURE REGULATOR)
3.0-INCH MINIMUM DEPTH OF3/4-INCH WASHED GRAVEL
PVC SCH 80 UNION FORSERVICING ASSEMBLY
PVC SCH 40MALE ADAPTER
VALVE BOX WITH COVER:RAIN BIRD VB-JMB
WATERPROOF CONNECTION: RAIN BIRDSPLICE-1 (1 OF 2)
30-INCH LINEAR LENGTH OFWIRE, COILED
PVC SCH 80 NIPPLE (LENGTH ASREQUIRED, 1 OF 2)
SPVV
NOTES:1. MOUNT WIRELESS RAIN-CLIK ON ANY SURFACE WHERE IT WILL BE EXPOSED TOUNOBSTRUCTED RAINFALL, BUT NOT IN THE PATH OF SPRINKLER SPRAY.
WALL
WIRES TOCONTROLLER
XERIGATION CONTROL ZONE KITNTS
9L-101
PVC TO PE PIPE CONNECTIONNTS
10L-101
EMITTER INTO XERI-TUBENTS
11L-101
WIRELESS RAIN SENSORNTS
12L-101
SPVV
COMPRESSION RING(PROVIDED)
FINISH GRADE
VALVE BOXSEE SPECS.
LINE FLUSHINGVALVE F-TLFV-1
BRICK SUPPORTS(THREE)
3/4" GRAVEL SUMP(1CUBIC FOOT)
Techline 17mm TUBING
SEE SPECS
1"
TECHLINE LINE FLUSH VALVENTS
13L-101
Techline TEE
Techline TUBING
BLANK TechlineTUBING
POLY TUBING W/STAINLESS STEELCLAMPS (TYP.)
PVC INSERT TEE(w/ FEMALE THREADEDOUTLET)
MALE ADAPTERTechline 3/4"
SPVV
AR
LF
LINE FLUSHING VALVE PLUMBED TO PVC
AREA PERIMETER
Techline START CONNECTION
EXHAUST HEADER
Techline TEE
TechLine LATERAL TUBING
ONE AT EACH HIGH POINT)
AIR/VACUUM RELIEF VALVE(PLUMBED TO Techline
SUPPLY HEADER
REMOTE CONTROL VALVE WITHDISC FILTER AND PRV
BLANK TUBING CENTEREDON MOUND OR BERM
SPVV
LF
AR
LINE FLUSHING VALVEPLUMBED TO PVC OR POLY
AREA PERIMETER
TUBINGTechline LATERAL
CONNECTIONTechline START
MALE ADAPTER
EXHAUST HEADER
Techline TEE
VALVE (PLUMBED TO
HIGH POINT)Techline AT EACH
AIR/VACUUM RELIEF
SUPPLY HEADER
VALVE WITH DISCFILTER AND PRV
REMOTE CONTROL
ON MOUND OR BERMBLANK TUBING CENTERED
SPVV
LF
LF
AR
PVC OR POLY SUPPLY HEADER
PVC OR POLY EXHAUST HEADER
AREA PERIMETER
Techline TUBING LATERAL
SPVV
LINE FLUSHING VALVEPLUMBED TO PVC OR POLY
Techline STARTCONNECTION MALEADAPTER
Techline STARTCONNECTION SEEDETAIL 4 OF 4
REMOTE CONTROLVALVE WITH DISCFILTER AND PRV
BLANK Techline TUBING (CENTERED ONMOUND OR BERM)
AIR/VACUUM RELIEFVALVE
PERIMETER LATERALS 2"TO 4" FROM EDGE
SPVV
FINISH GRADE
6" ROUNDVALVE BOX
AIR/VACUUMRELIEF VALVE
3/4"M X 1/2"FREDUCTION BUSHING
3/4" CRUSHEDGRAVEL SUMP
BRICK SUPPORTS(THREE)
Techline TUBING
Techline 180 DEG.2-WAY ADAPTER TEE
PVC SUPPLY HEADER
TOP OF SLOPE
AIR/VACUUM RELIEF ASSEMBLY
LINE FLUSHING VALVE ASSEMBLY
Techline LATERAL TUBING
PVC EXHAUST HEADER
TOE OF SLOPE
REMOTE CONTROL VALVEASSEMBLY WITH DISC FILTERAND PRV
CONVENTIONALSPACING ON TOP 2/3OF SLOPE
CONVENTIONAL SPACINGPLUS 25% ON BOTTOM 1/3 OF SLOPE
NOTE:ALIGN Techline LATERALS PARALLEL TO THE CONTOURS OF THE SLOPE
SPVV
FINISH GRADE
SUB GRADE
SEE SPECS FOR DEPTH
SEE PLANS FORTechline LATERALSPACING
SPVV
TECHLINE START CONNECTIONNTS
18L-101
TECHLINE AIR/VACUUM RELIEFNTS
14L-101
IRREGULAR AREAS: ODD CURVESNTS
16L-101
IRREGULAR AREAS: TRIANGULARNTS
17L-101
TYPICAL TECHLINE LAYOUTNTS
15L-101
TECHLINE SLOPE FEED LAYOUTNTS
19L-101
TECHLINE SUBGRADENTS
20L-101
TO IRRIGATIONSYSTEM
FROM POINTOF CONNECTION
2" FORD BALL VALVECURB STOP
1" LOCKING QUICKCOUPLER IN SEPARATEVALVE BOX
ADJUSTABLE VALVE BOX
SPVV
NOTES:1. PROVIDE AND INSTALL CURB-STOP VALVE APPROXIMATELY 5' FROM BUILDINGEDGE.
2. PROVIDE AND INSTALL QUICK COUPLER VALVE DOWNSTREAM OF CURB-STOPVALVE FOR WINTER BLOW OUT.