E. Da Riva/M. Gomez Marzoa 1 CFD Meeting - 25th January 2013 ITS Ultra-low-Mass Cooling System Pipe Design: Minimum Inner Diameter calculation & Constructive Considerations Enrico DA RIVA Manuel GOMEZ MARZOA CFD Meeting - 25 th January 2013
26

E. Da Riva/M. Gomez Marzoa1 CFD Meeting - 25th January 2013 ITS Ultra-low-Mass Cooling System Pipe Design: Minimum Inner Diameter calculation & Constructive.

Jan 29, 2016

Download

Documents

Austen Welch
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: E. Da Riva/M. Gomez Marzoa1 CFD Meeting - 25th January 2013 ITS Ultra-low-Mass Cooling System Pipe Design: Minimum Inner Diameter calculation & Constructive.

E. Da Riva/M. Gomez Marzoa 1CFD Meeting - 25th January 2013

ITS Ultra-low-Mass Cooling System

Pipe Design:

Minimum Inner Diameter calculation

&

Constructive Considerations

Enrico DA RIVA

Manuel GOMEZ MARZOA

CFD Meeting - 25th January 2013

Page 2: E. Da Riva/M. Gomez Marzoa1 CFD Meeting - 25th January 2013 ITS Ultra-low-Mass Cooling System Pipe Design: Minimum Inner Diameter calculation & Constructive.

Contents

CFD Meeting - 25th January 2013 2

1. Overview

2. Cooling system: constraints

3. Cooling concepts

Pipes per stave

Operating pressure

4. Pipe Inner Diameter optimization

Inner Barrel layers

Outer Barrel layers

5. Construction of the tubing

Material

Erosion constraints

U-pipe construction

E. Da Riva/M. Gomez Marzoa

Page 3: E. Da Riva/M. Gomez Marzoa1 CFD Meeting - 25th January 2013 ITS Ultra-low-Mass Cooling System Pipe Design: Minimum Inner Diameter calculation & Constructive.

CFD Meeting - 25th January 2013 3

OverviewInner Barrel Outer Barrel

Wound-truss structure.

Wound-truss structure with high-conductivity plate.

Concept for outer layers (4-5, 6-7), based on the high-conductivity plate cooling idea.

x/X0 < 0.3% per layer x/X0 < 0.8% per layer

E. Da Riva/M. Gomez Marzoa

Page 4: E. Da Riva/M. Gomez Marzoa1 CFD Meeting - 25th January 2013 ITS Ultra-low-Mass Cooling System Pipe Design: Minimum Inner Diameter calculation & Constructive.

CFD Meeting - 25th January 2013 4

1. Refrigerant maximum velocity:

Avoiding failure by erosion.

Minimizing pressure drop.

No specific recommendations found for such small plastic pipe:

ASHRAE Handbook: not exceeding 1.5 m s-1 would minimize effects of erosion.

Catheters use similar pipes and materials.

8.5 French gauge catheter (2.8 mm OD, ~1.5 mm ID) cordis/introducer 1.

Max. flow rate: 126 mL min-1 = 7.56 L h-1 = 1.18 m s-1

Max. flow rate w/ p. bag @300 mmHg: 333 mL min-1=19.98L h-1 = 3.1 m s-1

Damage by erosion in a plastic pipe could be roughly estimated by assessing the material

hardness and compared to that of a regular copper pipe (but degradation?).

2. Admissible pressure drop:

Single-phase cooling: depends on the cooling system design.

Two-phase cooling: must be kept low to ensure the minimum ΔTSat across stave.

3. Admissible ΔTRefrigerant across stave:

Related to stave temperature uniformity.

In a two-phase cooling system, should not decrease a lot (risk of going below dew point).

Cooling system: constraints

1 Source: http://emupdates.com/2009/11/25/flow-rates-of-various-vascular-catheters/

E. Da Riva/M. Gomez Marzoa

Page 5: E. Da Riva/M. Gomez Marzoa1 CFD Meeting - 25th January 2013 ITS Ultra-low-Mass Cooling System Pipe Design: Minimum Inner Diameter calculation & Constructive.

CFD Meeting - 25th January 2013 5

1. No prototype performed OK (0.3 W cm-2)

2. A last prototype with larger winding angle

will be available for test

Where are we? Inner Barrel

1. Successful proposal (up to 0.5 W cm-2)

2. Several prototypes for test:

a) Pipe ID = 1 mm

b) Squeezed pipes

c) K1100 Plate (λ ~ 1000 W m-1 K-1)

E. Da Riva/M. Gomez Marzoa

Page 6: E. Da Riva/M. Gomez Marzoa1 CFD Meeting - 25th January 2013 ITS Ultra-low-Mass Cooling System Pipe Design: Minimum Inner Diameter calculation & Constructive.

CFD Meeting - 25th January 2013 6

1. Pipe dimensions:

Initially: ID = 1.450, OD = 1.514 mm

Reason: winding CF around pipe without breaking it (wound-truss structure).

Used as well for the wound-truss structure with high conductivity plate.

Pipe ID could be reduced from the refrigerant viewpoint (water/C4F10).

Constructively possible in High-conductivity plate prototype!

Reduced pipe ID prototype: ID = 1.024, OD = 1.074mm: TO BE TESTED!!

Pipe ID optimization: consider:

Different cooling system layouts.

Refrigerants.

Pipe erosion.

2. Pipe material:

So far: only polyimide (Kaption®) has been taken into consideration and used for the

construction of prototypes.

Concerns:

Pipe integrity?

Mechanical stiffness? (in case of making the U-bend without connectors).

Where are we? Inner Barrel

E. Da Riva/M. Gomez Marzoa

Page 7: E. Da Riva/M. Gomez Marzoa1 CFD Meeting - 25th January 2013 ITS Ultra-low-Mass Cooling System Pipe Design: Minimum Inner Diameter calculation & Constructive.

CFD Meeting - 25th January 2013 7

T3

T3

T2 = T1+0.5*ΔTStave

Cooling ConceptsPipes per stave

1 straight pipe along each stave:

T1T2

Stave

Stave

T1

U-pipe along each stave:

ΔTRef-Stave = T3-T1

ΔTRef-Stave = T3-T1

Inner Barrel

E. Da Riva/M. Gomez Marzoa

Page 8: E. Da Riva/M. Gomez Marzoa1 CFD Meeting - 25th January 2013 ITS Ultra-low-Mass Cooling System Pipe Design: Minimum Inner Diameter calculation & Constructive.

CFD Meeting - 25th January 2013 8

Cooling ConceptsOperating pressure

Water in single-phase flow:

Leak-less mode (p<1 bar): Δp at stave must be kept low!

No connectors: pMax and Δp limited by pipe strength.

C4F10 in two-phase:

Main limitation is ensuring ΔTSat < ΔTSat-Admissible across the stave.

Current design options

1. Water in single-phase or C4F10 two-phase.

2. Leak-less or no connectors.

3. Single pipe or U-pipe per stave.

6 possible designs.

4 with water

2 with C4F10

Goal: assess the minimum pipe diameter for each of these designs.

Assuming reasonable operating conditions and respecting constraints.

Comparing with experimental results.

Inner Barrel

E. Da Riva/M. Gomez Marzoa

Page 9: E. Da Riva/M. Gomez Marzoa1 CFD Meeting - 25th January 2013 ITS Ultra-low-Mass Cooling System Pipe Design: Minimum Inner Diameter calculation & Constructive.

CFD Meeting - 25th January 2013 9

Pipe Inner Diameter OptimizationWater in single-phase

Assumptions:

Stave power density: 0.4 W cm-2

Water maximum velocity: 1.5 m s-1

1,2. Water, single pipe:

Restrictions:

Single/U-pipe:

ΔTWater = 3-6 K

Lpipe = 0.29-0.58 m

Leak-less/no connectors:

ΔpMax-InOut = 0.2-2 bar

q [W cm-2] Lpipe [m] ΔTWater [K] m [L h-1] vH2O [m s-1] ΔpInOut [bar] ID [mm]

0.4 0.29 3.0 4.65 1.35 0.10<0.20 1.22

3. Water, U-pipe, leak-less:

q [W cm-2] Lpipe [m] ΔTWater [K] m [L h-1] vH2O [m s-1] ΔpInOut [bar] ID [mm]

0.4 0.58 6.0 2.32 0.83 0.18<0.20 0.99

q [W cm-2] Lpipe [m] ΔTWater [K] m [L h-1] vH2O [m s-1] ΔpInOut [bar] ID [mm]

0.4 0.58 6.0 2.32 1.50 1.06<2.00 0.55

4. Water, U-pipe, no connectors:

Inner Barrel

E. Da Riva/M. Gomez Marzoa

Page 10: E. Da Riva/M. Gomez Marzoa1 CFD Meeting - 25th January 2013 ITS Ultra-low-Mass Cooling System Pipe Design: Minimum Inner Diameter calculation & Constructive.

CFD Meeting - 25th January 2013 10

Pipe Inner Diameter OptimizationC4F10 in two-phase

Assumptions:

Stave power density = 0.4 W cm-2

ΔxInOut = 0.5 (conservative)

xAverage = 0.5 (for Friedel corr.)

5. C4F10, single pipe:

Restrictions:

Single/U-pipe:

ΔTMax-InOut = 3-6 K

ΔpMax-InOut = 0.19-0.37 bar

Lpipe = 0.29-0.58 m

q [W cm-2] ΔxInOut [-] Lpipe [m] ΔTRefrig [K] m [g s-1] ID [mm] ΔpInOut [bar]

0.4 0.35 0.29 3.0 0.51 1.10 0.10<0.19

6. C4F10, U-pipe:

q [W cm-2] ΔxInOut [-] Lpipe [m] ΔTRefrig [K] m [g s-1] ID [mm] ΔpInOut [bar]

0.4 0.35 0.58 6.0 0.51 1.13 0.35<0.37

0.4 0.50 0.58 6.0 0.36 0.99 0.36<0.37

Inner Barrel

E. Da Riva/M. Gomez Marzoa

Page 11: E. Da Riva/M. Gomez Marzoa1 CFD Meeting - 25th January 2013 ITS Ultra-low-Mass Cooling System Pipe Design: Minimum Inner Diameter calculation & Constructive.

CFD Meeting - 25th January 2013 11

Pipe Inner Diameter Optimization

Assumptions:

Stave power density: 0.4 W cm-2

Restrictions:

ΔTMax-InOut = 3-6 K

Lpipe = 0.29-0.58 m

Water vH2O [m s-1] Lpipe [m] ΔTRef [K] m [L h-1] ΔpInOut [bar] ID [mm]

1,2 Single pipe 1.35 0.29 3.0 4.65 0.10<0.20 1.22

3U-pipe,

leak-less0.83 0.58 6.0 2.32 0.18<0.20 0.99

4U-pipe, no connectors

1.50 0.58 6.0 2.32 1.06<2.00 0.55

C4F10 ΔxInOut [-] Lpipe [m] ΔTRef [K] m [g s-1] ΔpInOut [bar] ID [mm]

5 Single pipe 0.35 0.29 3.0 0.51 0.10<0.19 1.10

6U-pipe, no connectors

0.35 0.58 6.0 0.51 0.35<0.37 1.13

The minimum pipe diameter is achieved for design number 4:

ID=0.55 mm ~ 62% smaller than current 1.45 mm ID!

Refrigerant material budget (i.e. water) is 7 times lower!

Inner BarrelSUMMARY

E. Da Riva/M. Gomez Marzoa

Page 12: E. Da Riva/M. Gomez Marzoa1 CFD Meeting - 25th January 2013 ITS Ultra-low-Mass Cooling System Pipe Design: Minimum Inner Diameter calculation & Constructive.

CFD Meeting - 25th January 2013 12

Where are we? Outer Barrel

Bus

Si 0.05mm thick

Kapton, ID=2.794 mm wall = 0.06mm

30.4 mm

Carbon prepreg thick=TBD

Carbon prepreg thick=TBD

Layer LStave [mm] Si width [mm] q [W cm-2] Q per stave [W] x/X0 [%]

4-5 843 30 0.4 101.2 <0.8 per layer

6-7 1475 30 0.4 177.0 <0.8 per layer

Spaceframe

CF Plate

E. Da Riva/M. Gomez Marzoa

Page 13: E. Da Riva/M. Gomez Marzoa1 CFD Meeting - 25th January 2013 ITS Ultra-low-Mass Cooling System Pipe Design: Minimum Inner Diameter calculation & Constructive.

CFD Meeting - 25th January 2013 13

T3

T3

T2 = T1+0.5*ΔTHalf-stave

Cooling ConceptsPipes per stave

1 straight pipe along each half stave:

T1T2

Half-stave

Half-stave

T1

U-pipe along each half-stave:

ΔTRef-Stave = T3-T1

ΔTRef-Half-Stave = T3-T1

Outer Barrel

Stave

Half-stave

E. Da Riva/M. Gomez Marzoa

Page 14: E. Da Riva/M. Gomez Marzoa1 CFD Meeting - 25th January 2013 ITS Ultra-low-Mass Cooling System Pipe Design: Minimum Inner Diameter calculation & Constructive.

CFD Meeting - 25th January 2013 14

Cooling ConceptsOperating pressure

Water in single-phase flow:

Leak-less mode (p<1 bar): Δp at stave must be kept low!

No connectors: pMax and Δp limited by pipe strength.

C4F10 in two-phase:

Main limitation is ensuring ΔTSat < ΔTSat-Admissible across the stave.

Current design options

1. Water in single-phase or C4F10 two-phase.

2. Leak-less or no connectors.

3. Single pipe or U-pipe per stave.

6 possible designs.

4 with water

2 with C4F10

Goal: assess the minimum pipe diameter for each of these designs.

Assuming reasonable operating conditions and respecting constraints.

Comparing with experimental results (not yet).

Outer Barrel

E. Da Riva/M. Gomez Marzoa

Page 15: E. Da Riva/M. Gomez Marzoa1 CFD Meeting - 25th January 2013 ITS Ultra-low-Mass Cooling System Pipe Design: Minimum Inner Diameter calculation & Constructive.

CFD Meeting - 25th January 2013 15

Pipe Inner Diameter OptimizationWater in single-phase

Assumptions:

Stave power density: 0.4 W cm-2

Water maximum velocity: 1.5 m s-1

1,2. Water, single pipe per half stave:

Restrictions:

Single/U-pipe:

ΔTWater = 3-6 K

Lpipe = 0.85-1.70 m

Leak-less/no connectors:

ΔpMax-InOut = 0.2-2 bar

q [W cm-2] ΔTWater [K] m [L h-1] vH2O [m s-1] Lpipe [m] ΔpInOut [bar] ID [mm]

0.4 3.0 14.50 1.40 0.85 0.09<0.20 3.66

3. Water, U-pipe per half stave, leak-less:

4. Water, U-pipe per half stave, no connectors:

Outer Barrel

q [W cm-2] ΔTWater [K] m [L h-1] vH2O [m s-1] Lpipe [m] ΔpInOut [bar] ID [mm]

0.4 6.0 7.25 1.25 1.70 0.18<0.20 2.05

q [W cm-2] ΔTWater [K] m [L h-1] vH2O [m s-1] Lpipe [m] ΔpInOut [bar] ID [mm]

0.4 6.0 7.25 1.5 1.70 0.32<2.00 1.71

L4-5

E. Da Riva/M. Gomez Marzoa

Page 16: E. Da Riva/M. Gomez Marzoa1 CFD Meeting - 25th January 2013 ITS Ultra-low-Mass Cooling System Pipe Design: Minimum Inner Diameter calculation & Constructive.

CFD Meeting - 25th January 2013 16

Pipe Inner Diameter OptimizationC4F10 in two-phase

Assumptions:

Stave power density = 0.4 W cm-2

ΔxInOut = 0.5 (conservative)

xAverage = 0.5 (for Friedel corr.)

5. C4F10, single pipe per half stave:

Restrictions:

Single/U-pipe:

ΔTMax-InOut = 3-6 K

ΔpMax-InOut = 0.19-0.37 bar

Lpipe = 0.85-1.70 m

q [W cm-2] ΔxInOut [-] Lpipe [m] ΔTRefrig [K] m [g s-1] ID [mm] ΔpInOut [bar]

0.4 0.35 0.85 3.0 1.59 2.65 0.10<0.19

6. C4F10, U-pipe per half stave:

q [W cm-2] ΔxInOut [-] Lpipe [m] ΔTRefrig [K] m [g s-1] ID [mm] ΔpInOut [bar]

0.4 0.35 1.70 6.0 1.59 2.75 0.36<0.37

0.4 0.50 1.70 6.0 1.11 2.40 0.36<0.37

Outer Barrel

L4-5

E. Da Riva/M. Gomez Marzoa

Page 17: E. Da Riva/M. Gomez Marzoa1 CFD Meeting - 25th January 2013 ITS Ultra-low-Mass Cooling System Pipe Design: Minimum Inner Diameter calculation & Constructive.

CFD Meeting - 25th January 2013 17

Pipe Inner Diameter Optimization

Assumptions:

Stave power density: 0.4 W cm-2

Restrictions:

ΔTMax-InOut = 3-6 K

Lpipe = 0.85-1.70 m

Water vH2O [m s-1] Lpipe [m] ΔTRef [K] m [L h-1] ΔpInOut [bar] ID [mm]

1,2 Single pipe 1.40 0.85 3.0 14.50 0.09<0.20 3.66

3U-pipe,

leak-less1.25 1.70 6.0 7.25 0.18<0.20 2.05

4U-pipe, no connectors

1.50 1.70 6.0 7.25 0.32<2.00 1.71

C4F10 ΔxInOut [-] Lpipe [m] ΔTRef [K] m [g s-1] ΔpInOut [bar] ID [mm]

5 Single pipe 0.35 0.85 3.0 1.59 0.10<0.19 2.65

6U-pipe, no connectors

0.35 1.70 6.0 1.59 0.36<0.37 2.75

The minimum pipe diameter is achieved for design number 4:

ID=1.71 mm ~ 39% smaller than the ordered 2.794 mm ID.

SUMMARY Outer Barrel

L4-5

E. Da Riva/M. Gomez Marzoa

Page 18: E. Da Riva/M. Gomez Marzoa1 CFD Meeting - 25th January 2013 ITS Ultra-low-Mass Cooling System Pipe Design: Minimum Inner Diameter calculation & Constructive.

CFD Meeting - 25th January 2013 18

Pipe Inner Diameter OptimizationWater in single-phase

Assumptions:

Stave power density: 0.4 W cm-2

Water maximum velocity: 1.5 m s-1

1,2. Water, single pipe per half stave:

Restrictions:

Single/U-pipe:

ΔTWater = 3-6 K

Lpipe = 1.5-3.0 m

Leak-less/no connectors:

ΔpMax-InOut = 0.2-2 bar

q [W cm-2] ΔTWater [K] m [L h-1] vH2O [m s-1] Lpipe [m] ΔpInOut [bar] ID [mm]

0.4 3.0 25.40 1.50 1.50 0.09<0.20 5.98

3. Water, U-pipe per half stave, leak-less:

4. Water, U-pipe per half stave, no connectors:

Outer Barrel

q [W cm-2] ΔTWater [K] m [L h-1] vH2O [m s-1] Lpipe [m] ΔpInOut [bar] ID [mm]

0.4 6.0 12.70 1.10 3.00 0.19<0.20 4.08

q [W cm-2] ΔTWater [K] m [L h-1] vH2O [m s-1] Lpipe [m] ΔpInOut [bar] ID [mm]

0.4 6.0 12.70 1.50 3.00 0.47<2.00 2.99

L6-7

E. Da Riva/M. Gomez Marzoa

Page 19: E. Da Riva/M. Gomez Marzoa1 CFD Meeting - 25th January 2013 ITS Ultra-low-Mass Cooling System Pipe Design: Minimum Inner Diameter calculation & Constructive.

CFD Meeting - 25th January 2013 19

Pipe Inner Diameter OptimizationC4F10 in two-phase

Assumptions:

Stave power density = 0.4 W cm-2

ΔxInOut = 0.5 (conservative)

xAverage = 0.5 (for Friedel corr.)

5. C4F10, single pipe per half stave:

Restrictions:

Single/U-pipe:

ΔTMax-InOut = 3-6 K

ΔpMax-InOut = 0.19-0.37 bar

Lpipe = 1.50-3.00 m

q [W cm-2] ΔxInOut [-] Lpipe [m] ΔTRefrig [K] m [g s-1] ID [mm] ΔpInOut [bar]

0.4 0.35 1.50 3.0 2.78 4.25 0.09<0.19

6. C4F10, U-pipe per half stave:

q [W cm-2] ΔxInOut [-] Lpipe [m] ΔTRefrig [K] m [g s-1] ID [mm] ΔpInOut [bar]

0.4 0.35 3.00 6.0 2.78 4.35 0.35<0.37

0.4 0.50 3.00 6.0 1.94 3.80 0.36<0.37

Outer Barrel

L6-7

E. Da Riva/M. Gomez Marzoa

Page 20: E. Da Riva/M. Gomez Marzoa1 CFD Meeting - 25th January 2013 ITS Ultra-low-Mass Cooling System Pipe Design: Minimum Inner Diameter calculation & Constructive.

CFD Meeting - 25th January 2013 20

Pipe Inner Diameter Optimization

Assumptions:

Stave power density: 0.4 W cm-2

Restrictions:

ΔTMax-InOut = 3-6 K

Lpipe = 1.50-3.00 m

Water vH2O [m s-1] Lpipe [m] ΔTRef [K] m [L h-1] ΔpInOut [bar] ID [mm]

1,2 Single pipe 1.50 1.50 3.0 25.40 0.09<0.20 5.98

3U-pipe,

leak-less1.10 3.00 6.0 12.70 0.19<0.20 4.08

4U-pipe, no connectors

1.50 3.00 6.0 12.70 0.47<2.00 2.99

C4F10 ΔxInOut [-] Lpipe [m] ΔTRef [K] m [g s-1] ΔpInOut [bar] ID [mm]

5 Single pipe 0.35 1.50 3.0 2.78 0.09<0.19 4.25

6U-pipe, no connectors

0.35 3.00 6.0 2.78 0.35<0.37 4.35

The minimum pipe diameter is achieved for design number 4:

ID=2.99 mm ~ 6.5% bigger than the ordered 2.794 mm ID.

SUMMARY Outer Barrel

L6-7

E. Da Riva/M. Gomez Marzoa

Page 21: E. Da Riva/M. Gomez Marzoa1 CFD Meeting - 25th January 2013 ITS Ultra-low-Mass Cooling System Pipe Design: Minimum Inner Diameter calculation & Constructive.

CFD Meeting - 25th January 2013 21

Pipe Inner Diameter Optimization

Layer IDMin [mm] Design Refrigerant ΔTRef [K] vH2O [m s-1]

1, 2, 3 0.55

U-pipe, no connectors Water 6.0 1.54, 5 1.71

6, 7 2.99

SUMMARY 0.4 W cm-2

MAT. BUDGET CONSIDERATIONS

Achieving the target of 0.3%:

1. Use a two-phase flow.

2. Minimize pipe diameter to reduce

the impact of the refrigerant to

the global material budget.

BUT need to keep thermal

contact between Si and pipe!

Constructive issues when ↓ID

E. Da Riva/M. Gomez Marzoa

Page 22: E. Da Riva/M. Gomez Marzoa1 CFD Meeting - 25th January 2013 ITS Ultra-low-Mass Cooling System Pipe Design: Minimum Inner Diameter calculation & Constructive.

CFD Meeting - 25th January 2013 22

Construction of the tubing1. General considerations:

Robust: elastic modulus, high burst pressure.

Thin walls: reduce mat. budget.

Compatible with refrigerant (C4F10).

Easy to bend: in case of making a no-connector stave, limited space.

Erosion: related to the material hardness.

2. Specific requirements:

High radiation hardness: minimum damage.

Ageing: physical and chemical stability over time.

Comply to LHC Fire Safety Instruction (IS-41)

Low material budget material (plastics better than metals).

E. Da Riva/M. Gomez Marzoa

Page 23: E. Da Riva/M. Gomez Marzoa1 CFD Meeting - 25th January 2013 ITS Ultra-low-Mass Cooling System Pipe Design: Minimum Inner Diameter calculation & Constructive.

1. General considerations:

Robust:

Tensile strength = 117.9 Mpa

Flexural Modulus = 4.1 GPa

Thin walls: down to 0.025 mm for a pipe with 0.55 mm ID

Compatible with refrigerant (C4F10): yes

Easy to bend:

Must avoid kinking failure: when section deforms to an elliptical shape.

A reinforcement braid can be included locally to prevent kinking.

Braid: SS or others, Covered with Nylon, Pebax…

Flexible liners like Nitinol (Ni + Ti) or Kevlar could reinforce the tube to

be bent and preserve the shape (shape memory).

Erosion: related to the material hardness.

Polyimide/PEEK: 87D (Shore D)

PVC Pipe: 89D (Shore D)

Copper: 372 Mpa (Vickers)

CFD Meeting - 25th January 2013 23

Construction of the tubing

Minimum bend

radius?

In Vickers, polyimide would

have 772 MPa

E. Da Riva/M. Gomez Marzoa

Page 24: E. Da Riva/M. Gomez Marzoa1 CFD Meeting - 25th January 2013 ITS Ultra-low-Mass Cooling System Pipe Design: Minimum Inner Diameter calculation & Constructive.

CFD Meeting - 25th January 2013 24

Construction of the tubing2. Specific requirements:

High radiation hardness: according to CERN-98-01 report, polymide:

No problem below 107 Gy

Mild damage between 107 to 5 107 Gy

1st layer of ITS Inner Barrel will be exposed to 700 krad/yr.=7000 Gy/yr.

Ageing: physical and chemical stability over time.

Plastic Pipe Institute states corrosion is not an issue in plastic pipes.

Comply to LHC Fire Safety Instruction (IS-41)

Polyimide is allowed.

Nylon® (polyamide) is allowed if a fire retardant NOT containing

halogen, sulphur or phosphorus.

Pebax: polyether block amides – “legal” in cavern??

Low material budget material (plastics better than metals).

Polyimide: X0 = 29 cm, minimum wall thickness is 0.025 mm.

PEEK: X0 = 31.45 cm, minimum wall thickness is 0.25 mm.

E. Da Riva/M. Gomez Marzoa

Page 25: E. Da Riva/M. Gomez Marzoa1 CFD Meeting - 25th January 2013 ITS Ultra-low-Mass Cooling System Pipe Design: Minimum Inner Diameter calculation & Constructive.

CFD Meeting - 25th January 2013 25

Construction of the tubing

Advantages of a PEEK pipe over polyimide:

Low material budget material.

Polyimide: X0 = 29 cm

PEEK: X0 = 31.45 cm

The U-turn can be shaped and retain the shape.

Extremely stable.

More common in scientific applications than polyimide tubing.

Advantages of a polyimide pipe over PEEK:

Higher radiation hardness: according to CERN-98-01 report.

Wall thickness:

Polyimide minimum wall thickness = 0.025 mm.

PEEK minimum wall thickness = 0.25 mm

E. Da Riva/M. Gomez Marzoa

Page 26: E. Da Riva/M. Gomez Marzoa1 CFD Meeting - 25th January 2013 ITS Ultra-low-Mass Cooling System Pipe Design: Minimum Inner Diameter calculation & Constructive.

E. Da Riva/M. Gomez Marzoa 26CFD Meeting - 25th January 2013

ITS Ultra-low-Mass Cooling System

Pipe Design:

Minimum Inner Diameter calculation

&

Constructive Considerations

Enrico DA RIVA

Manuel GOMEZ MARZOA

CFD Meeting - 25th January 2013