1 IBI Group October 11, 2017 DYNAMIC HARD SHOULDER RUNNING Dynamic Hard Shoulder Running Lessons Learned from the US and UK Experience Ryan Gulick, PE David Kamnitzer 1 DYNAMIC HARD SHOULDER RUNNING
24

Dynamic Hard Shoulder Running - Ohio Department of ... 2017_PPT.pdfDYNAMIC HARD SHOULDER RUNNING 1. Conversion of an existing hard shoulder as a running lane, to provide additional

Mar 21, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Dynamic Hard Shoulder Running - Ohio Department of ... 2017_PPT.pdfDYNAMIC HARD SHOULDER RUNNING 1. Conversion of an existing hard shoulder as a running lane, to provide additional

1IBI Group

October 11, 2017DYNAMIC HARD SHOULDER RUNNING

Dynamic Hard Shoulder Running

Lessons Learned from the US and UK Experience

Ryan Gulick, PE David Kamnitzer

1DYNAMIC HARD SHOULDER RUNNING

Page 2: Dynamic Hard Shoulder Running - Ohio Department of ... 2017_PPT.pdfDYNAMIC HARD SHOULDER RUNNING 1. Conversion of an existing hard shoulder as a running lane, to provide additional

2IBI Group

October 11, 2017DYNAMIC HARD SHOULDER RUNNING

• What is Hard Shoulder Running?

• HSR in the US

• Washington State DOT Experience

• HSR in the UK

• Considerations for Implementation in Ohio

2DYNAMIC HARD SHOULDER RUNNING

Overview

Page 3: Dynamic Hard Shoulder Running - Ohio Department of ... 2017_PPT.pdfDYNAMIC HARD SHOULDER RUNNING 1. Conversion of an existing hard shoulder as a running lane, to provide additional

3IBI Group

October 11, 2017DYNAMIC HARD SHOULDER RUNNING

1. Conversion of an existing hard shoulder as a running lane,

to provide additional capacity.

2. An alternative to road widening that provides:

• similar capacity and throughput

• greater trip time reliability

� no loss of safety

� the ability to remotely close lane(s), when needed

� construction and operational cost savings

� environmental benefits (air quality; noise)

� significantly faster deployment (no need for land take)

What is Hard Shoulder Running (HSR)?

3DYNAMIC HARD SHOULDER RUNNING

Page 4: Dynamic Hard Shoulder Running - Ohio Department of ... 2017_PPT.pdfDYNAMIC HARD SHOULDER RUNNING 1. Conversion of an existing hard shoulder as a running lane, to provide additional

4IBI Group

October 11, 2017DYNAMIC HARD SHOULDER RUNNING

Hard Running Shoulder Deployment US

Page 5: Dynamic Hard Shoulder Running - Ohio Department of ... 2017_PPT.pdfDYNAMIC HARD SHOULDER RUNNING 1. Conversion of an existing hard shoulder as a running lane, to provide additional

5IBI Group

October 11, 2017DYNAMIC HARD SHOULDER RUNNING

WSDOT and HSR

Page 6: Dynamic Hard Shoulder Running - Ohio Department of ... 2017_PPT.pdfDYNAMIC HARD SHOULDER RUNNING 1. Conversion of an existing hard shoulder as a running lane, to provide additional

6IBI Group

October 11, 2017DYNAMIC HARD SHOULDER RUNNING

Why This Corridor?

Page 7: Dynamic Hard Shoulder Running - Ohio Department of ... 2017_PPT.pdfDYNAMIC HARD SHOULDER RUNNING 1. Conversion of an existing hard shoulder as a running lane, to provide additional

7IBI Group

October 11, 2017DYNAMIC HARD SHOULDER RUNNING

Components of WSDOT HSR

Civil Infrastructure

• 11’ wide shoulder lane, with

2’ shy distance to barrier

• Narrowing of other lanes to

11’

• Re-striping

• Refuge/Pullout Areas

• Limited paving

Technology

• Four (4) Installations at

½ mile spacing

• Over-Head Lane Control

Sign

• Side Mounted VMS

• Static Signing

• CCTV Cameras

• Vehicle Detection

• UPS

Page 8: Dynamic Hard Shoulder Running - Ohio Department of ... 2017_PPT.pdfDYNAMIC HARD SHOULDER RUNNING 1. Conversion of an existing hard shoulder as a running lane, to provide additional

8IBI Group

October 11, 2017DYNAMIC HARD SHOULDER RUNNING

HSR Software

• Based on existing Active Traffic Management software

Photos Courtesy WSDOT Flickr Site

Page 9: Dynamic Hard Shoulder Running - Ohio Department of ... 2017_PPT.pdfDYNAMIC HARD SHOULDER RUNNING 1. Conversion of an existing hard shoulder as a running lane, to provide additional

9IBI Group

October 11, 2017DYNAMIC HARD SHOULDER RUNNING

Operations and Messaging

Page 10: Dynamic Hard Shoulder Running - Ohio Department of ... 2017_PPT.pdfDYNAMIC HARD SHOULDER RUNNING 1. Conversion of an existing hard shoulder as a running lane, to provide additional

10IBI Group

October 11, 2017DYNAMIC HARD SHOULDER RUNNING

Incident Operations of the HSR

Page 11: Dynamic Hard Shoulder Running - Ohio Department of ... 2017_PPT.pdfDYNAMIC HARD SHOULDER RUNNING 1. Conversion of an existing hard shoulder as a running lane, to provide additional

11IBI Group

October 11, 2017DYNAMIC HARD SHOULDER RUNNING

I-405 Implemented System

Page 12: Dynamic Hard Shoulder Running - Ohio Department of ... 2017_PPT.pdfDYNAMIC HARD SHOULDER RUNNING 1. Conversion of an existing hard shoulder as a running lane, to provide additional

12IBI Group

October 11, 2017DYNAMIC HARD SHOULDER RUNNING

Safety

• CCTV Coverage of entire shoulder

• Video sweep of shoulder prior to opening

• Queue warning, limited sight distance

• Refuge areas

Page 13: Dynamic Hard Shoulder Running - Ohio Department of ... 2017_PPT.pdfDYNAMIC HARD SHOULDER RUNNING 1. Conversion of an existing hard shoulder as a running lane, to provide additional

13IBI Group

October 11, 2017DYNAMIC HARD SHOULDER RUNNING

WSDOT Implementation Results

Travel Time SR522 to I-5

Lane Type

General Purpose

Express Toll Lanes

Without HSR

20 mins

10 mins

With HSR

12 mins

8 mins

Page 14: Dynamic Hard Shoulder Running - Ohio Department of ... 2017_PPT.pdfDYNAMIC HARD SHOULDER RUNNING 1. Conversion of an existing hard shoulder as a running lane, to provide additional

14IBI Group

October 11, 2017DYNAMIC HARD SHOULDER RUNNING

Experience In UK

Experience In UK

Page 15: Dynamic Hard Shoulder Running - Ohio Department of ... 2017_PPT.pdfDYNAMIC HARD SHOULDER RUNNING 1. Conversion of an existing hard shoulder as a running lane, to provide additional

15IBI Group

October 11, 2017DYNAMIC HARD SHOULDER RUNNING

Current and Planned Location

Page 16: Dynamic Hard Shoulder Running - Ohio Department of ... 2017_PPT.pdfDYNAMIC HARD SHOULDER RUNNING 1. Conversion of an existing hard shoulder as a running lane, to provide additional

16IBI Group

October 11, 2017DYNAMIC HARD SHOULDER RUNNING

Controlled Motorways

Managed Motorways:

Dynamic Hard Shoulder

Active Traffic Management

(Pilot)

Smart Motorways:

All Lanes Running

• Introduced in 1995, near

London Heathrow airport

• Opened in 2006 – used to

prove the concept of hard

shoulder use

• Rollout began in 2009: 7 locations

now operational

• First scheme opened 2014. 10

locations now operational, +25 in

design/construction

In total, 240 miles (480 lane miles) of extra capacity by 2020

Evolution of the Design

DYNAMIC HARD SHOULDER RUNNING

Page 17: Dynamic Hard Shoulder Running - Ohio Department of ... 2017_PPT.pdfDYNAMIC HARD SHOULDER RUNNING 1. Conversion of an existing hard shoulder as a running lane, to provide additional

17IBI Group

October 11, 2017DYNAMIC HARD SHOULDER RUNNING

England – Initial Dynamic Hard Shoulder Design

Page 18: Dynamic Hard Shoulder Running - Ohio Department of ... 2017_PPT.pdfDYNAMIC HARD SHOULDER RUNNING 1. Conversion of an existing hard shoulder as a running lane, to provide additional

18IBI Group

October 11, 2017DYNAMIC HARD SHOULDER RUNNING

England - “All Lanes Running” design

Page 19: Dynamic Hard Shoulder Running - Ohio Department of ... 2017_PPT.pdfDYNAMIC HARD SHOULDER RUNNING 1. Conversion of an existing hard shoulder as a running lane, to provide additional

19IBI Group

October 11, 2017DYNAMIC HARD SHOULDER RUNNING

The Dynamic Hard Shoulder design (2009 – 2012)

Physical

Signal gantries every ~800 m

ERA’s co-located with gantries

No additional lighting to be

installed

Technological

Lane specific signalling + VMS

for text

Fixed cameras to check hard shoulder

AID and full PTZ coverage

Operational

Hard shoulder opened when flow trigger

reached

60 mph speed limit when DHS

open

Hard shoulder check before

opening

Page 20: Dynamic Hard Shoulder Running - Ohio Department of ... 2017_PPT.pdfDYNAMIC HARD SHOULDER RUNNING 1. Conversion of an existing hard shoulder as a running lane, to provide additional

20IBI Group

October 11, 2017DYNAMIC HARD SHOULDER RUNNING

Key Results from the Pilot

• Peak hours journey times down 10 - 25%; variability down 22%

• Personal Injury Accidents down 58%

• Emissions down by 10%, fuel consumption down by 4%

• 94% compliance with variable speed limits

• Improved incident management

Page 21: Dynamic Hard Shoulder Running - Ohio Department of ... 2017_PPT.pdfDYNAMIC HARD SHOULDER RUNNING 1. Conversion of an existing hard shoulder as a running lane, to provide additional

21IBI Group

October 11, 2017DYNAMIC HARD SHOULDER RUNNING

Average Journey Time Profile - Before / After Pilot

10

15

20

25

Jo

urn

ey T

ime

(m

in)

5

10

15

20

25

Jo

urn

ey T

ime (

min

)

Page 22: Dynamic Hard Shoulder Running - Ohio Department of ... 2017_PPT.pdfDYNAMIC HARD SHOULDER RUNNING 1. Conversion of an existing hard shoulder as a running lane, to provide additional

22IBI Group

October 11, 2017DYNAMIC HARD SHOULDER RUNNING

Considerations for HSR in Ohio

• Safety and Mobility Benefits

• System Start-Up

• Frequency of Signing

• HSR End Treatments

• Speed Limit Enforcement

• Incident Management

Page 23: Dynamic Hard Shoulder Running - Ohio Department of ... 2017_PPT.pdfDYNAMIC HARD SHOULDER RUNNING 1. Conversion of an existing hard shoulder as a running lane, to provide additional

23IBI Group

October 11, 2017DYNAMIC HARD SHOULDER RUNNING

Questions?

Questions?

Page 24: Dynamic Hard Shoulder Running - Ohio Department of ... 2017_PPT.pdfDYNAMIC HARD SHOULDER RUNNING 1. Conversion of an existing hard shoulder as a running lane, to provide additional

24IBI Group

October 11, 2017DYNAMIC HARD SHOULDER RUNNING

Contact Information

• Ryan Gulick

Manager, Intelligent Systems

[email protected]

(206) 521-9091

• David Kamnitzer

Director

[email protected]

(416) 596-1930