Top Banner
Berth and Quay Crane Allocation Problems: Dynamic Modeling and Nested Tabu Search Alan Erera 1 , Xiaole Han 2 1 School of Industrial and Systems Engineering, Georgia Tech 2 Department of Mechanical Engineering, Shanghai Jiao Tong TSL Workshop 2013
27

Dynamic and Stochastic Berth and Quay Crane Allocation, TSL Workshop, 2013

May 20, 2015

Download

Business

Alan Erera
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Dynamic and Stochastic Berth and Quay Crane Allocation, TSL Workshop, 2013

Berth and Quay Crane Allocation Problems: Dynamic Modeling and Nested Tabu Search

Alan Erera1, Xiaole Han2

1 School of Industrial and Systems Engineering, Georgia Tech 2 Department of Mechanical Engineering, Shanghai Jiao Tong

TSL Workshop 2013

Page 2: Dynamic and Stochastic Berth and Quay Crane Allocation, TSL Workshop, 2013

What to remember

1. Berth and quay crane allocation problems are dynamic and stochastic

2. List-based multi-layer tabu search heuristics fast and effective for dynamic problems

3. Multistage problems with stochastic arrival times can be solved effectively with two-stage rolling horizon approximation models that minimize sample average cost

Page 3: Dynamic and Stochastic Berth and Quay Crane Allocation, TSL Workshop, 2013

Costly, bottleneck resources

• Multiple vessel berthing areas

Page 4: Dynamic and Stochastic Berth and Quay Crane Allocation, TSL Workshop, 2013

Costly, bottleneck resources

• Quay cranes

Page 5: Dynamic and Stochastic Berth and Quay Crane Allocation, TSL Workshop, 2013

Berth and crane allocation

• Assign berthing time, berthing position, and crane assignment to vessels

1 2 3 4 5 6 7 8 9 10

1

2

3

4

5

6

7

Time

Be

rth

Time period

Ber

thin

g a

rea

(dis

cret

ized

) Vessel

1

2

3

Page 6: Dynamic and Stochastic Berth and Quay Crane Allocation, TSL Workshop, 2013

Berth and crane allocation

• Minimize– Total dwell (flow) time – Total vessel delay time

vessel arrival

berthed departed

scheduled depart

dwell (flow) time

delay (non-negative)

Page 7: Dynamic and Stochastic Berth and Quay Crane Allocation, TSL Workshop, 2013

Dynamic BAP: Relative Position MIP

• Pack vessel rectangles in time and space, and ensure no pairwise overlap

Page 8: Dynamic and Stochastic Berth and Quay Crane Allocation, TSL Workshop, 2013

Deterministic Dynamic BAP

• Solving Relative Position MIP– Difficulty arises when vessel arrival times clustered

and when berth length accommodates several heterogeneous length vessels

– Short berth problems remain NP-hard: single machine scheduling problem with release time minimizing total completion (flow) time

– CPLEX for easier problems– Nested Tabu Search (Ak, 2008) for harder problems

Page 9: Dynamic and Stochastic Berth and Quay Crane Allocation, TSL Workshop, 2013

Nested Tabu Search for BAP

• Solution encoding–L : Vessel priority list

–B : Berth location of vessels

(2,1,3,4,5)

Page 10: Dynamic and Stochastic Berth and Quay Crane Allocation, TSL Workshop, 2013

Nested Tabu Search for BAP

• Fast search– Default decoding: first-fit bin packing– Second layer: berth position tweaking only for

primal non-tabu listsInitial Solution

L

B

Move 1

Move 2

Iter

atio

n

1Move 1

Move 2

Ite

rati

on

1

Move 1

Move 2

Ite

rati

on

2Move 1

Move 2

Iter

atio

n

2

LAYER 1: PRIORITY LIST MOVESLAYER 2: BERTH MOVES

Best Solution

First Fit

L P

Page 11: Dynamic and Stochastic Berth and Quay Crane Allocation, TSL Workshop, 2013

Dynamic BAP Results

• Easier instances– 10, 12, 14 vessels– Berth length per avg vessel length: 3– Arrival times in [0, 10], processing times in [1, 6]

• Harder instances– 20, 25, 30 vessels– Berth length per avg vessel length: 6– Arrival times in [0, 20], processing times in [1, 6]

Page 12: Dynamic and Stochastic Berth and Quay Crane Allocation, TSL Workshop, 2013

Dynamic BAP Results

• Easier instances– 69% solved to optimality by CPLEX– Tabu search finds equal or better solutions in every

instance• Harder instances

– None solved to optimality by CPLEX– Best lower bounds found by machine scheduling lower

bounding approach– Tabu search improves initial solutions by ~ 70%, similar

to performance on easier instances

Page 13: Dynamic and Stochastic Berth and Quay Crane Allocation, TSL Workshop, 2013

Dynamic BAP Results

• Tabu search is fast– Computation time in seconds

Page 14: Dynamic and Stochastic Berth and Quay Crane Allocation, TSL Workshop, 2013

Dynamic BQCAP Modeling

• Vessel processing times depend on number of quay cranes assigned– Assume crane assignment fixed for a shift– Completion time for a vessel is equal to start

time plus required crane-time divided by cranes assigned

– Fixed number of cranes available3

4

1

5

6 10

7

2

9

Time

Berth space

k-1 k k+1 k+2 k+3

8

11

12

13

Crane amount

Page 15: Dynamic and Stochastic Berth and Quay Crane Allocation, TSL Workshop, 2013

Dynamic and Stochastic BQCAP

• Decision stages: shifts• Information dynamics

– Vessel arrival times stochastic– Known with certainty as arrival time nears

• Decision dynamics– Berthing time, crane assignment adjustable each

shift– Berth position fixed in advance, for effective

container yard operations

Page 16: Dynamic and Stochastic Berth and Quay Crane Allocation, TSL Workshop, 2013

Dynamic and Stochastic BQCAP

• Assumptions– Vessels arriving, and arrival times, during a shift known– Berth position fixed one shift in advance

3

4

1

5

6 10

7

2

9

Time

Berth space

k-1 k k+1 k+2 k+3

8

11

12

13

A: berthed but unfinished at shift k

B: not berthed at shift k, but will arrive during k

C: uncertain arrival during k+1, k+2, …

num cranes

berth time*, num cranes**

berth pos, time**, cranes**

Decisions

Page 17: Dynamic and Stochastic Berth and Quay Crane Allocation, TSL Workshop, 2013

Modeling approach

• Multi-stage expected cost minimization (dynamic program)

• Approximate solution approach– Rolling horizon (roll-out)– Two-stage sample-average stochastic program

• In each scenario, assume that all arrival times are known at shift k+1

• Note that some actually some will indeed only become known later: approximation!

C Type Vessel

Page 18: Dynamic and Stochastic Berth and Quay Crane Allocation, TSL Workshop, 2013

cA

Two-stage approximation scheme

k k+1 k+m+1

AB ,bB

Par

amet

er AA, bA, sA

CA

1st stage 2nd stage

uB, sB0, cB0

bC

B1 B1,s c C C,s c

Certain info Uncertain scenarios

Fixed decisions

Recourse decisions under each scenario

executed adjustable by scenario

Fixed cost expected recourse cost

dec

isio

ns

Page 19: Dynamic and Stochastic Berth and Quay Crane Allocation, TSL Workshop, 2013

3-Layer Nested Tabu Search

TS1 LcA

uB,sB0,cB0

TS2

TS3

Decode

Re-decode

Pass 1

Pass 2

Supplement

Re-supplement

L

cA,cB0

bC

cA

uB,sB0,cB0

Pass 1

Pass 2 bC

L Pass 2

Pass 2

AA, AB

AA, AB

B1 B1

C C

,

,

s c

s c

B1 B1

C C

,

,

s c

s c

2 ( )L

CB1,A A

B1 C,A A

CB1,A A

B1 C,A A

0k

01k

k

k

k

1k Scenario decision

Executed decision

Best Fit

Sampled scenarios

Certain info &

expected uncertain

info

Page 20: Dynamic and Stochastic Berth and Quay Crane Allocation, TSL Workshop, 2013

3-Layer Nested Tabu Search

• Ideas– Greedy decisions (most cranes, earliest possible

berthing time) are used when decoding– Neighborhoods all variations of swap

• Swap positions of two vessels in priority lists• Swap one or more cranes between two vessels of the

same category that are simultaneously berthed

Page 21: Dynamic and Stochastic Berth and Quay Crane Allocation, TSL Workshop, 2013

Dynamic BQCAP Results

• “Easier” instances than Ak (2008)– Meisel & Bierwirth (2009)– 1000m quay, 10m sections, 1 hr time buckets, 10

quay cranes– 20, 30, 40 vessels per week– Two weeks– Shift length 24 hrs; horizon length 72 hrs– Minor arrival time uncertainty: +/- 3 hrs

Page 22: Dynamic and Stochastic Berth and Quay Crane Allocation, TSL Workshop, 2013

Dynamic BQCAP Results

• CPLEX solvable a posteriori

20 30 400

50

100

150

200

250

300

350

posterior cplex

rolling cplex

one-sample dynamic

calling vessel # per week

tota

l dw

ell

tim

e (

hr)

Page 23: Dynamic and Stochastic Berth and Quay Crane Allocation, TSL Workshop, 2013

Dynamic BQCAP Results

• CPLEX solvable a posteriori

20 30 400

2000

4000

6000

8000

10000

12000

14000

16000

2883

10854

14671

107 94 2931 4 22

posterior cplex

rolling cplex

one-sample dynamic

calling vessel # per week

cp

u r

un

tim

e (

s)

Page 24: Dynamic and Stochastic Berth and Quay Crane Allocation, TSL Workshop, 2013

Dynamic BQCAP Results

• CPLEX solvable a posteriori

20 30 400

2000

4000

6000

8000

10000

12000

14000

16000

2883

10854

14671

107 94 2931 4 22

posterior cplex

rolling cplex

one-sample dynamic

calling vessel # per week

cp

u r

un

tim

e (

s)

Page 25: Dynamic and Stochastic Berth and Quay Crane Allocation, TSL Workshop, 2013

Two-stage outperforms one-stage

• CPLEX solvable a posteriori

20 30 400.00%

1.00%

2.00%

3.00%

4.00%

5.00%

6.00%

1.49%

2.07%

5.31%

2.22%

5.07%

5.67%

0.67% 0.84%

1.70%

rolling cplex-expect

rolling cplex-estimate

30-sample dynamic

calling vessel # per week

op

tim

alit

y g

ap

of

tota

l dw

ell

tim

e

Page 26: Dynamic and Stochastic Berth and Quay Crane Allocation, TSL Workshop, 2013

Dynamic BQCAP Results

• CPLEX cannot solve a posteriori in 16 hours– measure gap to best upper bound

0 20000 40000 60000 800000.00%

1.00%

2.00%

3.00%

4.00%

5.00%

6.00%

7.00%

8.00%

9.00%

10.00%

0.37%

1.90%

9.09%

3.31%

rolling cplex-expect

rolling cplex-estimate

30-sample dynamic

one-sample dynamic

rolling cplex

cpu run time (s)

ga

p o

f to

tal d

we

ll ti

me

Page 27: Dynamic and Stochastic Berth and Quay Crane Allocation, TSL Workshop, 2013

What to remember

1. Berth and quay crane allocation problems are dynamic and stochastic

2. List-based multi-layer tabu search heuristics fast and effective for dynamic problems

3. Multistage problems with stochastic arrival times can be solved effectively with two-stage rolling horizon approximation models that minimize sample average cost