Top Banner
DUNGENESS WATERSHED Demonstration Project Andrew B. Perleberg WSU Extension
25

DUNGENESS WATERSHED Demonstration Project Andrew B. Perleberg WSU Extension.

Dec 20, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: DUNGENESS WATERSHED Demonstration Project Andrew B. Perleberg WSU Extension.

DUNGENESS WATERSHED Demonstration Project

Andrew B. Perleberg

WSU Extension

Page 2: DUNGENESS WATERSHED Demonstration Project Andrew B. Perleberg WSU Extension.

Dungeness Demonstration Project

• Dungeness Watershed one of five USDA focus watersheds for salmon recovery on Pacific Coast– Upland Forest Service Land Problems and Fixes – History of Resource Management Coordination

with stakeholders

Page 3: DUNGENESS WATERSHED Demonstration Project Andrew B. Perleberg WSU Extension.

The Cooperators

Page 4: DUNGENESS WATERSHED Demonstration Project Andrew B. Perleberg WSU Extension.

Family Forest Owners

Page 5: DUNGENESS WATERSHED Demonstration Project Andrew B. Perleberg WSU Extension.
Page 6: DUNGENESS WATERSHED Demonstration Project Andrew B. Perleberg WSU Extension.

Program Purpose

• The Forest Land Enhancement Program (FLEP) was part of Title VIII of the 2002 Farm Bill. FLEP replaces the Stewardship Incentives Program (SIP) and the Forestry Incentives Program (FIP).

• FLEP is voluntary program for non-industrial private forest (NIPF) landowners. It provides for technical, educational, and cost-share assistance to promote sustainability of the NIPF forests.

Page 7: DUNGENESS WATERSHED Demonstration Project Andrew B. Perleberg WSU Extension.

Eligibility

• “Non-Industrial Private Forest Landowner”

• Family Forest Lands

• Private, non-profit ownerships

• Tribal Lands

• Lands owned by company’s w/o issued stock and/ or are not primarily engaged in production of wood products

Page 8: DUNGENESS WATERSHED Demonstration Project Andrew B. Perleberg WSU Extension.

Eligibility

• No Minimum Acreage

• Must Apply for and earn no less than $750

• Own less than 5,000 acres of forestland in WA

• Can receive no more than $20,000 cost-share per federal fiscal year

• Agree to maintain practice for ten years

$100, 000 Available and Wraps up at end of 2005

Page 9: DUNGENESS WATERSHED Demonstration Project Andrew B. Perleberg WSU Extension.

75% Cost-share for

following practice categories:

Page 10: DUNGENESS WATERSHED Demonstration Project Andrew B. Perleberg WSU Extension.

FLEP-1: Forest Stewardship PlansAlternate Plans

Required prior to all practices.

WSU Prepared a Basin-Wide Forest Stewardship Plan

Cost-Share ONLY for 20 Acres or more

Page 11: DUNGENESS WATERSHED Demonstration Project Andrew B. Perleberg WSU Extension.

FLEP-2: Afforestation and Reforestation

Page 12: DUNGENESS WATERSHED Demonstration Project Andrew B. Perleberg WSU Extension.

FLEP-3: Forest Stand Improvement

Page 13: DUNGENESS WATERSHED Demonstration Project Andrew B. Perleberg WSU Extension.

FLEP- 4: Agro-Forestry (Not Currently Offered)

Page 14: DUNGENESS WATERSHED Demonstration Project Andrew B. Perleberg WSU Extension.

FLEP- 5: Water Quality/ Riparian/ Wetland/ Watershed Improvement

Page 15: DUNGENESS WATERSHED Demonstration Project Andrew B. Perleberg WSU Extension.

FLEP-6: Fish and Wildlife Habitat Improvement

Page 16: DUNGENESS WATERSHED Demonstration Project Andrew B. Perleberg WSU Extension.

FLEP-7: Forest Health Improvement

Page 17: DUNGENESS WATERSHED Demonstration Project Andrew B. Perleberg WSU Extension.

FLEP-8: Invasive Species Control

Page 18: DUNGENESS WATERSHED Demonstration Project Andrew B. Perleberg WSU Extension.

FLEP-9: Wildfire Hazard Reduction

Page 19: DUNGENESS WATERSHED Demonstration Project Andrew B. Perleberg WSU Extension.

FLEP-10: Post-Wildfire Restoration

Page 20: DUNGENESS WATERSHED Demonstration Project Andrew B. Perleberg WSU Extension.

On-Site Visit to PropertyOn-Site Visit to Property

Page 21: DUNGENESS WATERSHED Demonstration Project Andrew B. Perleberg WSU Extension.

Develop Tech Spec’s

Page 22: DUNGENESS WATERSHED Demonstration Project Andrew B. Perleberg WSU Extension.

Results

• 14 FLEP Projects in 2004 Implemented

• $40,000 Remaining for Cost-share

• Remaining Funding “For Fish Projects”

Page 23: DUNGENESS WATERSHED Demonstration Project Andrew B. Perleberg WSU Extension.

Before and After

36 inch pipe 12 foot pipe

Page 24: DUNGENESS WATERSHED Demonstration Project Andrew B. Perleberg WSU Extension.
Page 25: DUNGENESS WATERSHED Demonstration Project Andrew B. Perleberg WSU Extension.

QUESTIONS ?

Andy Perleberg

Extension & Dept. Natural Resource Sciences

Washington State University

360-428-4270

[email protected]