Top Banner
Duct numbering for EE- Wolfgang Funk - CERN CMS 30/07/2004 06.B 06.A 07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B 12.A 13.B 13.A 14.B 14.A 1
14

Duct numbering for EE- Wolfgang Funk - CERN CMS 30/07/2004 06.B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1.

Mar 28, 2015

Download

Documents

Lily Fagan
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Duct numbering for EE- Wolfgang Funk - CERN CMS 30/07/2004 06.B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1.

Duct numbering for EE-

Wolfgang Funk - CERN CMS30/07/2004

06.B

06.A07.B

07.A

08.B

08.A09.B

09.A

10.B

10.A

11.B

11.A

12.B 12.A

13.B13.A

14.B14.A

1

Page 2: Duct numbering for EE- Wolfgang Funk - CERN CMS 30/07/2004 06.B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1.

Wolfgang Funk - CERN CMS30/07/2004

Duct 05.A

Duct 05.B

LV1 4*7.4 (172)LV2 4*6.1 (120)HV 1*15.3 (184)OF 3*4.3X2 (27)signal 1*9 (64)

LV1 4*7.4 (172)LV2 4*6.1 (120)HV 1*15.3 (184)OF 2*4.3X2 (18)signal 1*9 (64)

Bret

OF 15*4.3X2 (129)HV 4*14 (616)Sniff 1*6 (29)

P F

Pret

LV 10*12.2 (1169)CO 1*14 con (154)

Signal 1*10 (79)

CO 1*14 is (314mm**2)CO 1*14 con (154)

N2 1*8 (51)

sn N2

Sum: (1960)

Sum: (1860)

Similar to Duct 03.B

Similar to Duct 03.A

View towards I.P. for EE+

View from I.P. for EE-

Duct 06.B

Duct 06.A

2

Note that the EE HV cables are only the indicated size where there is no space problem. The mantle is cut off elsewhere (curves) and saves almost 60% of cross section.

Page 3: Duct numbering for EE- Wolfgang Funk - CERN CMS 30/07/2004 06.B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1.

Wolfgang Funk - CERN CMS30/07/2004

Duct 04.A

Duct 04.B

LV1 4*7.4 (172)LV2 4*6.1 (120)HV 1*15.3 (184)OF 5*4.3X2 (45) signal 1*9 (64)

LV1 8*7.4 (344)LV2 8*6.1 (240)HV 2*15.3 (368) signal 2*9 (128)

P FP ret

HV 4*14 (616)CO 1*14 is (314)

OF 15*4.3X2 (129)

LV 10*12.2 (1169mm**2)CO 1*14 con (154)

Signal 1*10 (79)

P F Sum: (2149)

Sum: (1987)

Similar to Duct 02.A

Similar to Duct 02.B

Duct 07.B

Duct 07.A

3

Page 4: Duct numbering for EE- Wolfgang Funk - CERN CMS 30/07/2004 06.B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1.

Wolfgang Funk - CERN CMS30/07/2004

Duct 03.A

Duct 03.B

LV1 4*7.4 (172)LV2 4*6.1 (120)HV 1*15.3 (184)OF 5*4.3X2 (45)signal 1*9 (64)

LV1 4*7.4 (172)LV2 4*6.1 (120)HV 1*15.3 (184)OF 3*4.3X2 (27)Signal 1*9 (64)

OF 15*4.3X2 (129)HV 2*14 (308)

LV 10*12.2 (1169)CO 1*14 con (154)

Signal 1*10 (79)

CO 4*10 is (804mm**2)CO 1*14 is (314)CO 1*12 is (255)CO 1*14 con (154)

OESR

P FP ret

BF BF BF BF OESF

FES F

Sum: (1969)

Sum: (2549)

Similar to Duct 05.B

Similar to Duct 05.A

Duct 08.B

Duct 08.A

4

Page 5: Duct numbering for EE- Wolfgang Funk - CERN CMS 30/07/2004 06.B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1.

Wolfgang Funk - CERN CMS30/07/2004

Duct 02.A

Duct 02.B

LV1 4*7.4 (172)LV2 4*6.1 (120)HV 1*15.3 (184)OF 2*4.3X2 (18)signal 1*9 (64)

PE 1*3.6 (10)LV1 8*7.4 (344)LV2 8*6.1 (240)HV 2*15.3 (368)OF 4*4.3X2 (36)signal 2*9 (128)

P FP ret

LV 10*12.2 (1169mm**2)CO 1*14 con (154)

Signal 1*10 (79)

CO 2*14 is (628)Laser 1*10 (79)

OF 15*4.3X2 (129)Co 1*14 (154)

P F

MEM 24*2.2 (92)MEM 4*1.5X2 (12)MEM 6*2X10 (120)

Note: additional cables between MEM and balconies: Hybrid (5V,2.5V Ving, sensing for all) 2*12.3 (238), OF 2*4.3X2 (18) MEM cables (MEM 24*2.2 (92), MEM 4*1.5X2 (12) and MEM 6*2X10 (120) )are only between MEM and Dees

Sum: (2340)

Sum: (2403)

Sum: (2122)

Similar to Duct 04.B

Similar to Duct 04.A

DCS 1*11 (95)DCS 1*7.2 (41)DCS 1*5.8 (26)

Duct 09.B

Duct 09.A

5

P F retB ret

Note: PE is only in in 9A-/2B+ for ES and not in 18A-/11B+

Page 6: Duct numbering for EE- Wolfgang Funk - CERN CMS 30/07/2004 06.B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1.

Wolfgang Funk - CERN CMS30/07/2004

Duct 01.A

CO 1*71 (3960)

Duct 10.B

6

Page 7: Duct numbering for EE- Wolfgang Funk - CERN CMS 30/07/2004 06.B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1.

Wolfgang Funk - CERN CMS30/07/2004

Duct 01.B

CO 1*71 (3960)

Duct 10.A

7

Page 8: Duct numbering for EE- Wolfgang Funk - CERN CMS 30/07/2004 06.B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1.

Wolfgang Funk - CERN CMS30/07/2004

Duct 18.B

LV1 4*7.4 (172)LV2 4*6.1 (120)HV 1*15.3 (184)OF 2*4.3X2 (18)signal 1*9 (64)

P FP ret

LV 10*12.2 (1169mm**2)CO 1*14 con (154)

Signal 1*10 (79)

Sum: (2122)

Similar to Duct 16.B

Duct 11.A

Duct 18.A

CO 2*14 is (628)Co 1*14 (154)

P F

HV 4*14 (616)OF 15*4.3X2 (129)

Sum: (2652)

Similar to Duct 16.A

Duct 11.B

8

P F

LV1 8*7.4 (344)LV2 8*6.1 (240)HV 2*15.3 (368)OF 5*4.3X2 (45)signal 2*9 (128)

DCS 1*11 (95)DCS 1*7.2 (41)DCS 1*5.8 (26)

retB ret

Page 9: Duct numbering for EE- Wolfgang Funk - CERN CMS 30/07/2004 06.B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1.

Wolfgang Funk - CERN CMS30/07/2004

Duct 17.A

LV1 4*7.4 (172) LV2 4*6.1 (120)HV 1*15.3 (184)OF 3*4.3X2 (27)Signal 1*9 (64)

LV 10*12.2 (1169)CO 1*14 con (154)

Signal 1*10 (79)

P FP ret Sum: (1969)

Similar to Duct 15.A

Duct 12.B

Duct 17.B

LV1 4*7.4 (172)LV2 4*6.1 (120)HV 1*15.3 (184)OF 5*4.3X2 (45)signal 1*9 (64)

CO 4*10 is (804mm**2)CO 1*14 is (314)CO 1*12 con (113)CO 1*14 con (154)

OESRBF BF BF BF OES

FSum: (2407)

Similar to Duct 15.B

Duct 12.A

FES R

9

OF 15*4.3X2 (129)HV 2*14 (308)

Page 10: Duct numbering for EE- Wolfgang Funk - CERN CMS 30/07/2004 06.B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1.

Wolfgang Funk - CERN CMS30/07/2004

Duct 16.A

LV1 8*7.4 (344)LV2 8*6.1 ( 240)HV 2*15.3 (368) signal 2*9 (128)

P F Sum: (2139)

Similar to Duct 18.A

Duct 13.B

Duct 16.B

LV1 4*7.4 (172)LV2 4*6.1 (120)HV 1*15.3 (184)OF 5*4.3X2 (45) signal 1*9 (64)

P FP ret

LV 10*12.2 (1169mm**2)CO 1*14 con (154)

Signal 1*10 (79)

Sum: (1987)

Similar to Duct 18.B

Duct 13.A

10

HV 4*14 (616)CO 1*14 is (314)

OF 15*4.3X2 (129)

Page 11: Duct numbering for EE- Wolfgang Funk - CERN CMS 30/07/2004 06.B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1.

Wolfgang Funk - CERN CMS30/07/2004

Duct 15.A

LV1 4*7.4 (172)LV2 4*6.1 (120)OF 2*4.3X2 (18)signal 2*9 (128)

14/23

Pret

LV 10*12.2 (1169)CO 1*14 con (154)

Signal 1*10 (79)

Sum: (1840)

Similar to Duct 17.A

Duct 14.B

Duct 15.B

LV1 2*7.4 (86)LV2 2*6.1 (60)HV 1*15.3 (184)OF 2*4.3X2 (18)signal 1*9 (64)

Bret

HV 6*14 (924)OF 15*4.3X2 (129)

Sniff 1*6 (29)

P F

CO 1*14 is (314mm**2)CO 1*14 con (154)

N2 1*8 (51)

sn

N2Sum: (2126)

Similar to Duct 17.B

Duct 14.A

N2/sniff 1*12 (113)

N2

Note: ES N2 pipe is input on one Dee and output on other Dee (same diameter)

11

Note: in 14B-/15A+ for ES only LV2 2*6.1 and not 4! whereas in 5B-/6A+ LV2 4*6.1 existent

Note: in the ducts 14B-/15A+/5B-/6A+ ES LV1 and ES LV2 all cables run to counting room since used for heating

Page 12: Duct numbering for EE- Wolfgang Funk - CERN CMS 30/07/2004 06.B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1.

History

Wolfgang Funk - CERN CMS30/07/2004 12

1. Move ES services out of 10B-/10A- into 9A-/11B- (no space in ducts with ES pipes).2. Move PF from 7A- to 9A- and from 13B- to 11B- to avoid crossing of cooling pipe over

ring flange bean.3. Move half of OF from 6B-/8B-/13B-/11B- to 7A-/9A-/14A-/12A- to have less crossings.4. Move half of HV from 7A-/9A-/14A-/12A- to 6B-/8B-/13B-/11B- to have less crossings.5. Change of DCS scheme: no DCS cable anymore in 7B-/13A-, but 3 DCS cables in

9B-/11A-, no overall cross section increase.

New version 14/7/03 to avoid crossing of services at EE patch panel area according to Justin’s proposal of patch panel design of spring ’03:

New version 6/8/03 to increase LV cable sets to 20/Quadrant (before 18/Quadrant) because of new “EE-mechatronics’’ design of Tony:

1. 2 more LV EE cables each in ducts 7B-,9B-,11A-,13A- .

New version 11/8/03 to increase space in ducts for ES cooling pipes.

1. Move EE backplate return pipes from 10B-/10A- into 9A-/11B- .

Page 13: Duct numbering for EE- Wolfgang Funk - CERN CMS 30/07/2004 06.B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1.

History(2)

Wolfgang Funk - CERN CMS30/07/2004 13

1. Remove one OF from of 9A-.2. Remove separate LV cables for controls 14A- (are part of standard LV system)

New version 23/9/03 to adapt latest version of ES services:

New version 03/12/03 to adapt latest version of EE/ES services:

1. One ES unit contains now only one signal- (control) cable instead of 2 with exception of duct 14B-.2. One ES LV unit contains now of 4*7.4 and 4*6.1 instead of 6*7.43. MEM services adopted to new information4. EE HV 2*13 mantles/Dee (each has 13/12 coax) replaces single coaxes, changed some positions to equalize filling factors.

New version 2/03/04 to adapt latest version of EE/ES services:

1. In 14B- ES now only 2 LV 6.1mm instead of 4 (but not other Dee (5B-), where are still 4)2. In 14A- ES only 2 LV 6.1mm and 2 LV 7.4mm instead of 4 each before3. Only 4 signal cables/Quadrant for EE instead of 6 before4. One more optical fiber in all ducts where there was a fiber for ES (spare)

Page 14: Duct numbering for EE- Wolfgang Funk - CERN CMS 30/07/2004 06.B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1.

History(3)

Wolfgang Funk - CERN CMS30/07/2004 14

1. 4 less OF spares/ Dee than before.2. Implement 1 OF spare per double MEM3. Implement 1 protection conductor per ES disk

New version 30/7/04 to adapt latest version of ES/EE services: