DTS Experiences at Minnesota Power Tom Chambers 2008 EMS Users Conference Atlanta, GA
41

DTS Experiences at Minnesota Power

Mar 16, 2016

Download

Documents

Leah Davis

DTS Experiences at Minnesota Power. Tom Chambers 2008 EMS Users Conference Atlanta, GA. Credits to…. Matt Novitzki Programmer Analyst Senior Paul Koskela Engineer Senior Mark Pinney Operations Trainer Rick Liljegren System Operations Manager Vendor Personnel. Today…. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: DTS Experiences         at Minnesota Power

DTS Experiences at Minnesota Power

Tom Chambers2008 EMS Users Conference

Atlanta, GA

Page 2: DTS Experiences         at Minnesota Power

Credits to…• Matt Novitzki

– Programmer Analyst Senior• Paul Koskela

– Engineer Senior• Mark Pinney

– Operations Trainer• Rick Liljegren

– System Operations Manager• Vendor Personnel

Page 3: DTS Experiences         at Minnesota Power

Today…• About Minnesota Power• Implementation • Experiences• Case Studies• In-house Restoration Drill (detail)• Observations• Questions

Page 4: DTS Experiences         at Minnesota Power

Minnesota Power• Small/Medium size (1700 MW Load)• Service Territory is Northeast MN• Duluth, MN• Large Industrial Loads• Large flows N to S and W to E• DC, Phase Shifters, SVC

Page 5: DTS Experiences         at Minnesota Power

Implementation• Spring 2006 – Upgraded to Rel. 8.1+

– Hardware Upgrades– Enternet Control (Java webapp based UI)– PNA to TSM– DTS (again)

Page 6: DTS Experiences         at Minnesota Power

Pre-Upgrade• TSM In-house Workshop

– 1 week with Vendor Engineer– Set up system to take advantage of TSM features

not in PNA– Resolved Model Problems– Problem Solving– Basic User/Admin Training– TSM Configuration– Produced model for TSM/DTS upgrade

Page 7: DTS Experiences         at Minnesota Power

Pre-Upgrade• DTS Factory Acceptance Tests

– System Level Tests– Simulation Initialization Tests– Power System Simulator Tests– Simulation Event Processor Tests– Conditional Event Tests– Data Acquisition and Control Tests

Page 8: DTS Experiences         at Minnesota Power

Post-Upgrade• Reran FAT In-house (SAT)• Generated, Installed Fixes and Tested

many Problem Reports

Page 9: DTS Experiences         at Minnesota Power

Post-Upgrade• DTS In-house Workshop

– 1 week with Vendor Engineer– Basic User/Admin Training– DTS Configuration– Problem Discovery and Resolution– Sample Scenario Building

• DTS In-house Instructor Training• DTS In-house User Training

Page 10: DTS Experiences         at Minnesota Power

Post-Upgrade• Converted our System One Line

Displays to have Apps and Power System Simulator Views.

• Matt and Paul Attended the Vendor Power System Applications Users Seminar in Fort Collins, CO

Page 11: DTS Experiences         at Minnesota Power

Post-Upgrade• Internal Model Verification

– Vendor Visualization Method• db2gml.sh and db2gml_bus.sh scripts• yED

– Results compared verses One-Line diagrams and model notes

Page 12: DTS Experiences         at Minnesota Power
Page 13: DTS Experiences         at Minnesota Power

Experiences

Page 14: DTS Experiences         at Minnesota Power

Operator Training Held• MISO Restoration Drill

– Two Sessions in Fall 2006– Day 1: Scenarios (basic training)– Day 2: Blackstart (from Hydro)

• MP Restoration Drill– Three Sessions in Spring 2007– Day 1: Scenarios (Case Studies)– Day 2: Blackstart (from Hydro)

Page 15: DTS Experiences         at Minnesota Power

Operator Training Held• MISO Restoration Drill

– Three Sessions in Fall 2007– Day 1: Scenarios (more advanced: DC single pole

operation, SVS – runback scheme)– Day 2: Blackstart (two island scenario)

• No Drill in Spring 2008• MP Restoration Drill (Planned)

– Three Sessions in Fall 2008– Day 1: Scenarios– Day 2: Blackstart (Sept. 18th 2007 separation)

Page 16: DTS Experiences         at Minnesota Power

MP Model…• ~250 Internal Busses• ~1000 External Busses

• Features– DC Line– Seasonal Limits– Special Protection and Runback Schemes– Automatic Contingency List

Page 17: DTS Experiences         at Minnesota Power

DTS Staff…• System Operations Trainers(2)• System Performance Engineer• ITS EMS Support Programmer/Analyst

• None are full time DTS!

Page 18: DTS Experiences         at Minnesota Power

Problems up front…• System crashed during Simulation

Preparation• Controlling a non-modeled point

crashed DTS• Reloading snapshots failed• Could not restart a simulation from a

Simulation Data Collection Snapshot

Page 19: DTS Experiences         at Minnesota Power

Tips…• Get DTS Experience before first FAT• DTS is only as good as the Model• Create a DTS Station/Points

– Points can be used for execution of blocks of predefined events immediately through conditional events

– Points can be used as flags and/or pseudo timers with conditional events

Page 20: DTS Experiences         at Minnesota Power

Tips…• Be creative

– Sequential Control– Custom Applications

• Do not reinvent the wheel– Scenarios vs. Power System Functionality

• Script the Scenarios (Library of Scenarios)– Setup, execution and expected results

• Trainer implemented vs scheduled Scenarios

Page 21: DTS Experiences         at Minnesota Power

During the past year…• Internal Model Improvements• Updates to External Model• Problem Resolutions• Promoted use of DTS and TSM• Release 10 Upgrade with DTS

enhancements• Added 345KV Tie Line with Phase Shifter• Used DTS to validate External Model and

simulate new 345KV line before in-service

Page 22: DTS Experiences         at Minnesota Power

Next up…• Refine Boundary Model with Telemetry• Continue Problem Resolution• Continue Promoting use of DTS and TSM• System wide dynamic display• Additional Frequency mappings into DTS• Fall 2008 Vendor Apps Users Group• Phasor Measurements?

Page 23: DTS Experiences         at Minnesota Power

Case StudyDay 1: Restoration Drill

Page 24: DTS Experiences         at Minnesota Power
Page 25: DTS Experiences         at Minnesota Power

Case Study: Restoration Drill• TSM 101

– Basic TSM Training• Execution and TSM Display Review

– Provides a means to view system conditions of the snapshot used for the scenarios

Page 26: DTS Experiences         at Minnesota Power

Case Study: Restoration Drill• Scenario 1: Bad Measurement

– TSM State Estimator Bad Measurement Summary• Scenario 2: Most Severe Contingency

– TSM Contingency Analysis: Contingency Case Report

– TSM Study Case– Apps View – What-if Analysis– TSM Summaries (Limit Violations)

Page 27: DTS Experiences         at Minnesota Power

Case Study: Restoration Drill• Scenarios 3-5: Special Alarms

– Breaker Low Air Pressure– Breaker Low Gas Pressure

• Breaker Blocked after delay

– RTU Failure

– Review Alarm Book– Discuss Impacts– Call Company Experts

Page 28: DTS Experiences         at Minnesota Power

Case Study: Restoration Drill• Scenario 6: Bus/Transformer Lockout

Page 29: DTS Experiences         at Minnesota Power
Page 30: DTS Experiences         at Minnesota Power
Page 31: DTS Experiences         at Minnesota Power
Page 32: DTS Experiences         at Minnesota Power
Page 33: DTS Experiences         at Minnesota Power
Page 34: DTS Experiences         at Minnesota Power
Page 35: DTS Experiences         at Minnesota Power
Page 36: DTS Experiences         at Minnesota Power
Page 37: DTS Experiences         at Minnesota Power

Case Study: Restoration Drill• Scenario 7: Loss of Communications

– Alarm Book• Scenario 8: Tie Line Fault

– Discuss procedures for restoring a tie line with another company

Page 38: DTS Experiences         at Minnesota Power

Case Study: Restoration Drill• Scenario 9: Most Severe Contingency

– Part II – Event happens– Implement TSM Plan developed earlier– Check for new Most Severe Contingency

Page 39: DTS Experiences         at Minnesota Power

Case StudyDay 2: Blackstart

Page 40: DTS Experiences         at Minnesota Power

Observations• DTS has finally matured• DTS Requires Significant Support

– Engineering– Programming– Training

• Powerful Tool– Real life results can be achieved– Accepted by Operators

Page 41: DTS Experiences         at Minnesota Power

Questions?