Top Banner
B-5 Drum Logsheets HR30I39I
100

Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

Mar 31, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

B-5

Drum Logsheets

HR30I39I

Page 2: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

D Surface Soil Page 1 oD Subsurface Soil By C. WechD SedimentC3 Lagoon/PondG3 Other Drum Sample

Project Site Name Jack's Creek______;____ Project Site Number 37-1S-3L2W______NUS Source No. 2567______________ Source Location JC-DR-01

Sample Method:Shovel, Trowel

Depth Sampled:N/A

Sample Date & Time:8/1/91 1405* 10/24/91 0755

Sampled By:

Walt Koehler

Type of SampleQ /B Low ConcentrationO Medium ConcentrationD Grab12 Composite

Grab-Composite

Analysis

Total Metals and Cyanide

Reactive Sulfide & Cyanide

TCLP/TAL Metals

Pesticides, PCB's

PH

*TCL/Pesticides,PCB's

Composite Sample Data

Sample Time

,--

Color/Description

Sample Data

Color

GravVolume

2-8 oz jars

4-8 oz jars

6-8 oz jars

4-8 ozjars

1-8 ozjar

2-8 ozjars

Description: (Sand, Clay, Dry, Moist, Wet, etc.)

Ash-like with Purple StainsTraffic Report #

MCDG74

6607C-CC46

6554C-04-DD15

CHB82

N/A

N/A

Tag#

3-1193019 , 3-1193020

3-1 193032 thru 3-1 193035

3-1193025 thru 3-1193030

3-1193021 thru 3-1193024

3-1193031

3-1257030, 3-1257031

NOTES: Do QC

• •• ;SAS!;:<irr,eAfe:if;|:|l:ii;i;'

16890

6607C

6554C-04

16945

N/A

* N/A .

0552974284

0552974262

0552975146

0552974273

0552974251

0552975695

::;';; ; coc # : ':%$$3-13535 WEYER

3-13533 KEYTX

3-13532 KEYTX

3-13534 RECMD

3-13531 CRL

3-12543 CRL

Date Shipped

8/2/91

8/2/91

8/5/91

8/5/91

8/5/91

10/24/91

; Time Shipped

1700

1700

1700

1700

1700

1700

AR30I392

Page 3: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

D Surface Soil Page 1 of ID Subsurface Soil By C. WechD SedimentO Lagoon/Pond13 Other Drum Sample

Project Site Name Jack's Creek___________ Project Site Number 37-15-3L2W____________NUS Source No. 2567_______________ Source Location JC-DR-01A

Sample Method:Shovel, Trowel

Depth Sampled:N/A

Sample Date & Time:8/1/91 1410

Sampled By:Walt Koehler

Type of Sample

IS Low ConcentrationD Medium ConcentrationD Grab53 CompositeD Grab-Composite

Analysis

Total Metals and Cyanide

Reactive Sulfide & Cyanide

TCLP/TAL Metals

Pesticides, PCB's

pH

II

Composite Sample DataSample Time Color/Description

Sample Data ______Color

GravVolume

1-8 oz jar

2-8 ozjars

3-8 ozjars

2-8 ozjars

1-8 ozjar

Description: (Sand, Clay, Dry, Moist, Wet, etc.) H

Ash-like with Purple StainsTraffic Report #

MCDG75

6607C-CC47

6554C-04-DD16

CHB83

N/A

NOTES: Field DuplicateofJC-DR-01

SASorCASEt

16890

6607C

6554C-04

16945

N/A

|: ' 'V AiiWBWI^. .0552974284

0552974262

0552975146

0552974273

0552974251

coc #3-13535

3-13533

3-13532

3-13534

3-13531

Tag#

3-1193036

3-1193043 thru 3-1 193044

3-1193039 thru 3-1 193041

3-1193037 , 3-1193038

3-1193042

Lab

WEYER

KEYTX

KEYTX

RECMD

CRL

Date Shipped Time Shipped

8/2/91 1700

8/2/91 1700

B/fol 1700

8/5/91 1700 ^

8/5/91 1700 1

1flR30i393

Page 4: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

D Surface Soil Page 1 of.D Subsurface Soil By C. WechD SedimentD Lagoon/Pond13 Other Blank

Project Site Name Jack's Creek___________ Project Site Number 37-1S-3L2W________NUS Source No. 2567______________ Source Location JC-DR-01B

Sample Method:Pour from Bottle

Depth Sampled:

N/A

Sample Date & Time:

8/1/91 1300

Sampled By:Walt Koehler

Type of Sample

13 Low ConcentrationD Medium Concentration__ GrabO CompositeD Grab-Composite

AnalysisTotal Metals and Cyanide

Pesticides, PCB's

Composite Sample Data

Sample Time Color/Description

Sample DataColorN/A

Volume2-1 1 polys

2-80 ozjars

Description: (Sand, Clay, Dry, Moist, Wet, etc.)N/A

Traffic Report #MCDG76

CHB84

NOTES: Field Blank

:•. •; SA&;Q*f& %*f»g16890

16945

:jjjiiijjiii!$0552974284

0552974273

COC#

3-13535

3-13534

' '• ••i&.;--WEYER

RECMD

Tag#3-1193045, 3-1193046

3-1193047, 3-1193048

: Date Shipped Time Shipped

8/2/91 1700

8/5/91 1700

Page 5: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

D Surface Soil Page 1 of.D Subsurface Soil By C. WechD SedimentD Lagoon/PondS Other Blank,

Project Site Name Jack's Creek___________ Project Site Number 37-15-3L2W__________NUS Source No. 2567_______________ Source Location JC-DR-01C

Sample Method:

Pour from Bottle

Depth Sampled:

N/A

Sample Date & Time:8/1/91 1310

Sampled By:Walt Koehler

Type of Sample

01 Low ConcentrationD Medium Concentrationffl GrabD CompositeD Grab-Composite

Analysis

Total Metals and Cyanide

Pesticides, PCB's

Composite Sample Data ]|

Sample Time Color/Description

^Sample Data ____•

Color

N/AVolume

2-1 1 polys

2-80 ozjars

Description: (Sand, Clay, Dry, Moist, Wet, etc.) 81N/A II

Traffic Report if

MCDG77

CHB85

Tag » 1• 3-1193049, 3-1193050

3-1193051, 3-1193052

NOTES: Rinsate Blank f

SASorCASE#

16890

16945

IN'- -'•&$&&;•••> '

0552974284

0552974273

COC #

3-13535

3-13534

Lat>:.: /-

WEYER

RECMD

h Date Shipped; Time Shipped |

8/2/91 1700 1

8/5/91 1700 1

——— 1AR30I395

Page 6: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

D Surface Soil Page 1 of 1D Subsurface Soil By C. WechD SedimentO Lagoon/PondQ Other Drum Sample

Project Site Name Jack's Creek___________ Project Site Number 37-1S-3L2W__________NUS Source No. 2567_______________ Source Location JC-DR-02

Sample Method:Shovel, Trowel

Depth Sampled:N/A

Sample Date & Time:

8/1/91 1420

Sampled By:Walt Koehler

Type of Sample

13 Low ConcentrationD Medium ConcentrationD Grab5) CompositeD Grab-Composite

AnalysisTotal Metals and Cyanide

Reactive Sulfide & Cyanide

TCLP/TAL Metals

Pesticides, PCB's

pH

NOTES:

r . V;;Vl.v'SAS|

16*90

6607C

6554C-04

16945

N/A

Composite Sample Data

Sample Time Color/Description

Sample Data

ColorGrav

Volume1-8 ozjar

2-8 ozjars

3-8 ozjars

2-8 oz jars

1-8 ozjar

Description: (Sand, Clay, Dry, Moist, Wet, etc.)like Concrete Mix

Traffic Report #

MCDG78

6607C-CC48

6554C-04-DD17

CHB86

N/A

Tag*3-1193053

3-1193056, 3-1193057

3-1193058 thru 3-1 193060

3-1193054, 3-1193055

3-1193061

IlislliiH ililli:

0552974284

0552974262

0552975146

0552974273

0552974251

$£'•• COC *3-13535

3-13533

3-13532

3-13534

3-13531

' -::|II|!l!'WEYER

KEYTX

KEYTX

RECMD

CRL

Date Shipped ¥ Time Shipped

8/2/91 1700

8/2/91 1700

8/5/91 1700

8/5/91 1700

8/5/91 1700

Page 7: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

D Surface Soil Page 1 of 1D Subsurface Soil By C. Wech____yD SedimentD Lagoon/Pond13 Other Drum Sample

Project Site Name Jack's Creek______________ Project Site Number 37^15-3L2W________NUS Source No. 2567_______________ Source Location JC-DR-03

Sample Method:

Shovel, Trowel

Depth Sampled:N/A

Sample Date & Time:8/1/91 1430

Sampled By:Walt Koehler

Type of Sample

H Low ConcentrationO Medium ConcentrationD GrabG3 CompositeD Grab-Composite

Analysis

Total Metals and Cyanide

Reactive Sulfide & Cyanide

TCLP/TAL Metals

Pesticides, PCB's

PH

Composite Sample Data

Sample Time Color/Description

1

—————————— 1Sample Data __•_

ColorOranee/Grav

Volume1-8 ozjar

2-8 ozjars

3-8 ozjars

2-8 oz jars

1-8 ozjar

mDescription: (Sand, Clay, Dry, Moist, Wet, etc.) Hdirt-like/fine II

Traffic Report #MCDG83

6607C-CC49

6554C-04-DD18

CHB91

N/A

Tag # 13-1193424 1

3-1193431, 3-1193432

3-1193427 thru 3-1 193429

3-1193425, 3-1193426

3-1193430

NOTES:

"SAS'or.CASE P- ;''-:

16890

6607C

6554C-04

16945

N/A

i:i^)i|':-0552974284

0552974262

0552975146

0552974273

0552974251

-'•' COC# . - Labi C3-13535 WEYER

3-13533 KEYTX

3-13532 KEYTX

3-13534 RECMD

3-13531 CRL

Date Shipped Time Shipped

8/2/91 1700 I

8/2/91 1700

8/5/91 1700

8/5/91 1700

8/5/91 1700 |

1AR30I397

Page 8: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

D Surface Soil Page 1 oD Subsurface Soil By C. WechD SedimentO Lagoon/PondH Other Drum Sample

Project Site Name Jack's Creek____________ Project Site Number 37-15-3L2W_____NUS Source No. 2567_______________ Source Location JC-DR-04

Sample Method:Shovel, Trowel

Depth Sampled:N/A

Sample Date & Time:

8/1/91 1450* 10/24/91 0800

Sampled By:

Walt Koehler

Type of Samplen ;a Low ConcentrationO Medium ConcentrationD Graba Composite

Grab-Composite

AnalysisTotal Metals and Cyanide

Reactive Sulfide & Cyanide

TCLP/TAL Metals

Pesticides, PCB's

PH

*TCL/Pesticides,PCB's

Composite Sample Data

Sample Time Color/Description

Sample Data

Color

GrayVolume

1-8 ozjar

2-8 ozjars

3-8 ozjars

2-8 ozjars

1-8 ozjar

2-8 ozjars

Description: (Sand, Clay, Dry, Moist, Wet, etc.)

Orange Coating over Gray MaterialTraffic Report #

MCDG84

6607C-CC50

6554C-04-DD19

CHB92

N/A

N/A

NOTES:• : . / ,•:... v, •,!',!

'• «•'_•'•«•''••'• •' • -HC '-1- JVJ-Tt' J:'ii:X'i'!:&'>i'i'fc '• ' '•'•'•

16890

6607C

6554C-04

16945

N/A

* N/A

0552974284

0552974262

0552975146

0552974273

0552974251

0552975695

b-:;cocf3-13535

3-13533

3-13532

3-13534

3-13531

3-12543

Tag*

3-1193416

3-1193422, 3-1193423

3-1193419 thru 3-1193421

3-1193417, 3-1193418

3-1105225

3-1257032, 3-1257033

•::,<:gmWEYER

KEYTX

KEYTX

RECMD

CRL

CRL

Date Shipped : Time Shipped

8/2/91 1700

8/2/91 1700

8/5/91 1700

8/5/91 1700

8/5/91 1700

10/24/91 1700

1398

Page 9: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

D Surface Soil Page 1 of.D Subsurface Soil By C. WechD SedimentHI Lagoon/Pond13 Other Drum Sample

Project Site Name Jack's Creek____________ Project Site Number 37-15-3L2W______NUS Source No. 2567_______________ Source Location JC-DR-05

Sample Method:

Shovel, Trowel

Depth Sampled:

N/A

Sample Date & Time:

8/1/91 1645

Sampled By:

Walt Koehler

Type of Sample

H Low ConcentrationD Medium Concentrationn GrabGJ CompositeD Grab-Composite

AnalysisTotal Metals and Cyanide

Reactive Sulfide & Cyanide

TCLP/TAL MetalsPesticides, PCB's

pH

Composite Sample Data

Sample Time Color/Description

Sample Data ______Color

Grevish blackVolume1-8 ozjar

2-8 oz jars

3-8 ozjars2-8 ozjars

1-8 oz jar

Description: (Sand, Clay, Dry, Moist, Wet, etc.) BlHard material (NOT ash-like)

Traffic Report #MCDG79

6607C-CC51

6554C-04-DD20

CHB87

N/A

Tag#3-1193065

3-1193072, 3-1193073

3-1193067 thru 3-1 193069

3-1193066, 3-1193070

3-1193071

NOTES:

SASorCASE*16890

6607C

6554C-04

16945

N/A

',., ;;S:Airbill¥:.: .:•../

0552974284

0552974262

0552975146

0552974273

0552974251

COC# Lab3-13535 WEYER

3-13533 KEYTX

3-13532 KEYTX

3-13534 RECMD

3-13531 CRL

Date Shipped Time Shipped

8/2/91 1700

8/2/91 1700

8/5/91 1700

8/5/91 1700

8/5/91 1700 _J

——— "3R30I399

Page 10: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

D Surface Soil Page 1 ofD Subsurface Soil By C. WechD SedimentD Lagoon/Pond13 Other Drum Sample

Project Site Name Jack's Creek___________ Project Site Number 37-15-3L2W______NUS Source No. 2567______________ Source Location JC-DR-06

Sample Method:Shovel, Trowel

Depth Sampled:N/A

Sample Date & Time:

8/1/91 1605

Sampled By:Walt Koehler

Type of Sample

13 Low ConcentrationD Medium ConcentrationD Grab13 CompositeO Grab-Composite

Analysis

Total Metals and Cyanide

Reactive Sulfide & CyanideTCLP/TAL Metals

Pesticides, PCB's

PH

Composite Sample DataSample Time Color/Description

Sample DataColorBlack

Volume1-8 ozjar

2-8 ozjars3-8 ozjars

2-8 ozjars

1-8 oz jar

Description: (Sand, Clay, Dry, Moist, Wet, etc.)Sandy materials with Blue and Yellow Chunks

Traffic Report #

MCDG80

6607C-CC526554C-04-DD21

CHB88

N/A

Tag*3-1193074

3-1193081, 3-11930823-1193077 thru 3-1193079

3-1193075, 3-1193076

3-1193080

NOTES:

; ".' . SASi'WcA E'iitllllif16890

6607C

6554C-04

16945

N/A

0552974284

0552974262

0552975146

0552974273

0552974251

! cocr3-13535

3-13533

3-13532

3-13534

3-13531

:fif$miij&WEYER

KEYTX

KEYTX

RECMD

CRL

|D4t|i Siupp>d: : Time Shipped

8/2/91 1700

8/2/91 1700

8/5/91 1700

8/5/91 1700

8/5/91 1700

AR30UOQ

Page 11: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

D Surface Soil Page 1 of.D Subsurface Soil By C. WechD SedimentD Lagoon/Pond13 Other Drum Sample

Project Site Name Jack's Creek___________ Project Site Number 37-15-3L2W_____NUS Source No. 2567_______________ Source Location JC-DR-07

Sample Method:Shovel, Trowel

Depth Sampled:N/A

Sample Date & Time:8/1/91 1630

Sampled By:Walt Koehler

Type of Sample

Q Low ConcentrationD Medium ConcentrationD Grab13 CompositeO Grab-Composite

Analysis

TCLP/TCL Organics

Total Metals and Cyanide

Reactive Sulfide & Cyanide

TCLP/TAL Metals

Pesticides, PCB's

pHNOTES: Do QC

SASorCASEf:

6574C-02

16890

6607C

6554C-04

16945

N/A

Composite Sample Data

Sample Time Color/Description

Sample Data BColorWhite

Volume6-8 ozjars

1-8 ozjar

2-8 ozjars

3-8 ozjars

2-8 ozjars

1-8 oz jar

Description: (Sand, Clay, Dry, Moist, Wet, etc.) Bl

Limestone-like (Fine and Powdery)Traffic Report #

6574C-02-EE05

MCDG81

6607C-CC53

6554C-04-DD22

CHB89

N/A

Tag*3-1193092 thru 3-1 193097

3-1193083

3-1193090, 3-1193091

3-1193086 thru 3-1 193088

3-1193084. 3-1193085

3-1193089

ii, Airbill*0552974240

0552974284

0552974262

0552975146

0552974273

0552974251

COC* Lab

3-13537 WADSPA

3-13535 WEYER

3-13533 KEYTX

3-13532 KEYTX

3-13534 RECMD

3-13531 CRL

; Date Shipped Time Shipped

8/2/91 1700

8/2/91 1700

8/2/91 1700

8/5/91 1700

8/5/91 1700 |

8/5/91 1700 B

||

AR30UOI

Page 12: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

Q Surface Soil Page I of.D Subsurface Soil By C. WechD SedimentD Lagoon/Pond13 Other Drum Sample______

Project Site Name Jack's Creek___________ Project Site Number 37-1S-3L2W_________NUS Source No. 2567_______________ Source Location JC-DR-08

Sample Method:Shovel/Trowel

Depth Sampled:N/A

Sample Date & Time:8/1/91 1530

Sampled By:Walt Koehler

Type of Sample

a Low ConcentrationD Medium ConcentrationD Grab13 CompositeD Grab-Composite

AnalysisTotal Metals and Cyanide

Reactive Sulfide +Reactive Cyanide

TCLP/TAL Metals

Pesticides, PCBs

pH

Composite Sample DataSample Time Color/Description

Sample DataColorWhite/Black

Volume1-8 oz jar

2-8 ozjars

3-8 ozjars

2-8 ozjars

1-8 ozjar

Description: (Sand, Clay, Dry, Moist, Wet, etc.)Sand-like w/greenish layer on drum bottom

Traffic Report*MC9&82

6607C-CC54

6554C-04-DD23

CHB90

N/A

Notes:

SAS or CASE *

16890

6607C-03

6554C-04

16945

N/A

Airbill *

0552974284

0552974262

9552975146

05529742730552974251

coc*3-13535

3-13533

3-13532

3-13534

3-13531

Tag*3-1193098

3-1193405, 3-1193406

3-1193401 thru 3-1193403

3-1193099, 3-1193100

3-1193404

Lab

Weyer

KEYTX

KEYTX

RECMD

CRL

Date Shipped Time Shipped

8/2/91 1700

8/2/91 1700

8/5/91 1700

8/5/91 17008/5/91 1700

flRSOIlfOZ

Page 13: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

D Surface Soil Page 1 of.D Subsurface Soil By C. WechD SedimentD Lagoon/Pond13 Other Drum Sample______

Project Site Name Jack's Creek___________ Project Site Number 37-1S-3L2W_______NUS Source No. 2567_______________ Source Location JC-DR-09

Sample Method:Shovel/Trowel

Depth Sampled:N/A

Sample Date & Time:8/2/91 0855

Sampled By:Walt Koehler

Type of Sample

a Low 'Concentrationd Medium ConcentrationD Grab13 CompositeD Grab-Composite

AnalysisReactive Sulfide +Reactive Cyanide

TCLP/TAL Metals

pH

AComposite Sample Data

Sample Time Color/Description

Sample Data __•ColorWhite and Yellow

Volume2-8 ozjars

3-8 ozjars

1-8 ozjar

Description: (Sand, Clay, Dry, Moist, Wet, etc.) ^Powdery material

Traffic Report #6607C-CC55

6554C-04-DD24

N/A

Tag*3-1193414, 3-1193415

3-1 193419 thru 3-1 193412

3-1193413

Notes:

SAS or CASE #

6607C

6554C-04

N/A

Airbill *

0552974262

0552975146

0552974251

COG # Lab

3-13533 KEYTX

3-13532 KEYTX

3-13531 CRL

Date Shipped Time Shipped

8/2/91 1700

8/5/91 1700

8/5/91 1700 1

™———— 1

IflR30U03

Page 14: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

D Surface Soil Page 1 ofD Subsurface Soil By C. WechO SedimentCI Lagoon/PondH Other Drum Sample

Project Site Name Jack's Creek___________ Project Site Number 37-15-3L2W______NUS Source No. 2567_______________ Source Location JC-DR-10

Sample Method:Shovel/Trowel

Depth Sampled:N/A

Sample Date & Time:8/2/91 0920

Sampled By:Walt Koehler

Type of Sample

a Low ConcentrationD Medium ConcentrationDGrab13 CompositeO Grab-Composite

AnalysisReactive Sulfide +Reactive Cyanide

TCLP/TAL Metals

PH

Composite Sample DataSample Time Color/Description

Sample DataColorWhite

Volume2-8 ozjars

3-8 oz jars

1-8 ozjar

Description: (Sand, Clay, Dry, Moist, Wet, etc.)Crumbly crystals

Traffic Report *6607C-CC56

6554C-04-DD25

N/A

Notes:

SAS or CASE *

6607C

6554C-04

N/A

Airbill *

0552974262

0552975146

0552974251

coc*3-13533

3-13532

3-13531

Tag*

3-1193440, 3-1193441

3-1193436 thru 3-1193438

3-1193439

Lab

KEYTX

KEYTX

CRL

Date Shipped Time Shipped

8/2/91 1700

8/5/91 1700

8/5/91 1700

Page 15: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

D Surface Soil Page 1 ofD Subsurface Soil By C. WechD SedimentD Lagoon/PondQ Other Drum Sample

Project Site Name Jack's Creek____________ Project Site Number 37-15-3L2W_____NUS Source No. 2567_______________ Source Location JC-DR-11

Sample Method:Shovel/Trowel

Depth Sampled:N/A

Sample Date & Time:8/1/91 0940

Sampled By:Walt Koehler

Type of Sample

HI Low'ConcentrationD Medium ConcentrationD Grab13 CompositeD Grab-Composite

Analysis

Total Metals and Cyanide

Reactive Sulfide +Reactive Cyanide

TCLP/TAL Metals

Pesticides, PCBs

pH

Composite Sample DataSample Time Color/Description

—————————I

—IISample Data H

Color

Red/Brown/GreenVolume1-8 ozjar

2-8 ozjars

3-8 ozjars

2-8 ozjars1-8 ozjar

Description:' m

(Sand, Clay, Dry, Moist, Wet, etc.) BfII

Material in plastic bags in the drumsTraffic Report*MCDG87

6607C-CC57

6554C-04-DD26

CHB95

N/A

Notes:

SAS or CASE *

16890

6607C-03

6554C-04

16945

N/A

Airbill *

05529742840552974262

9552975146

0552974273

0552974251

COG*

3-13535

3-13533

3-13532

3-13534

3-13531

Tag*3-1193442

3-1193449, 3-1193450

3-1193445 thru 3-1193447

3-1193443, 3-1193444 1

3-1193448

Lab

WeyerKEYTX

KEYTX

RECMD

CRL

Date Shipped Time Shipped

8/2/91 1700

8/2/91 1700

8/5/91 1700 |

8/5/91 1700 1

8/5/91 1700 |

Page 16: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

9 Surface Soil Pagen Subsurface Soil Bv C. Wech______n SedimentD Lagoon/Pondx Other Drum Sample______

Project Site Name Jack's Creek___________ Project Site Number 37-15-3L2WNUS Source No. 2567______________ Source Location JC-DR-12

Sample Method:Shovel/Trowel

Depth Sampled:

N/A

Sample Date & Time:8/2/91 1015

Sampled By:Walt Koehler

Q Type of SampleaA Low ConcentrationQ Medium Concentrationr_ Grabx Composite

Grab-Composite

AnalysisReactive Sulfide + ReactiveCyanideTCLP/TAL Metals

Pesticides, PCBs

pH

Total Metals + Cyanide

Composite Sample Data

Sample Time Color/Description

Sample DataColor

Grevish White

Volume2-8 ozjars

3-8 ozjars

2-8 ozjars

1-8 ozjar

1-8 ozjar

Description: (Sand, Clay, Dry, Moist, Wet, etc.)Fine material

Traffic Report #6607C-CC58

6554C-04-DD27

CHB96

N/A

MCDG88

Tag*3-1193458, 3-1193459

3-1 193454 thru 3-1 193456

3-1193452, 3-1193453

3-1193457

3-1193451

Notes:

SAS or CASE *

6607C

6554C-04

16945

«-tfij_il_T/V }\

16945

Airbill*

0552974262

0552975146

0552974273

05529742510552974236

COC # Lab

3-13533 KEYTX

3-13532 KEYTX

3-13534 RECMD

3-13531 CRL

3-13543 Skinner

Date Shipped Time Shipped

8/2/91 1700

8/5/91 1700

8/5/91 1700

8/5/91 1700

8/6/91 1700

AR30|l*06

Page 17: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

O Surface SoilD Subsurface SoilD SedimentD Lagoon/Pond13 Other Drum Sample

Project Site Name Jack's CreekNUS Source No. 2567

Sample Method:Shovel/Trowel

Depth Sampled:N/A

Sample Date & Time:8/2/91 1300

Sampled By:Walt Koehler

Type of Sample

a Low/ConcentrationD Medium ConcentrationD Grab13 CompositeD Grab-Composite

AnalysisTCLP/TAL Metals

PH

Reactive Sulfide +Reactive Cyanide

Project Site NumberSource Location J(

Page 1 of 1Bv C. Wech ^

37-15-3L2W:-DR-13

Composite Sample DataSample Time Color/Description

1Sample Data H.

ColorGreenish/Yellow

Volume3-8 ozjars

1-8 ozjar

2-8 ozjars

Description: (Sand, Clay, Dry, Moist, Wet, etc.) BII

Dust mixed in metal chipsTraffic Report*6554C-04-DD28

N/A

6607C-CC59

Notes:

SAS or CASE *

6554C-04

N/A

6607C

•—N/A —— - ———

Airbill *

0552975146

0552974251

9552974192

—— tfei4W742$r=

COC*

3-13532

3-13531

3-13541

— - 3*13531

Tag*3-1 193463 thru 3-1 193465

3-1193466

3-1193467 3-11934068

Lab

KEYTX

CRL

KEYTX

- - CRL —

Date Shipped Time Shipped

8/5/91 1700

8/5/91 1700

8/6/91 1700

—— 8/5><9i —— ——— 1700 -0-

___ fl~

AR30U07

Page 18: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

D Surface Soil Page _1 of 1D Subsurface Soil By C. WechQ SedimentD Lagoon/Pond13 Other Drum Sample_____

Project Site Name Jack's Creek___________ Project Site Number 37-1S-3L2W________NUS Source No. 2567______________ Source Location JC-DR-14

Sample Method:

Shovel/Trowel

Depth Sampled:N/A

Sample Date & Time:8/2/91 1215

Sampled By:Walt Koehler

Type of Sample

a Low ConcentrationO Medium ConcentrationD GrabO CompositeD Grab-Composite

AnalysisTCLP/TAL Metals

pHReactive Sulfide +Reactive Cyanide

Composite Sample Data

Sample Time Color/Description

Sample Data

ColorWhite/Grev

Volume3-8 ozjars

1-8 ozjar

2-8 oz jars

Description: (Sand, Clay, Dry, Moist, Wet, etc.)Fine material

Traffic Report *ks? H ~MC/r>rj§ = clM«u»trtrs,y

N/A

6607C-CC60

Notes:

SAS or CASE *

6554C-04

N/A

6607C

Airbill *

0552975146

0552974251

9552974192

COG*

3-13532

3-13531

3-13541

Tag*3-1193472 thru 3-1193474

3-1193475

3-1193476, 3-1193477

Lab

KEYTX

CRL

KEYTX

Date Shipped Time Shipped

8/5/91 1700

8/5/91 1700

8/6/91 1700

flR30|!»08

Page 19: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

D Surface Soil Page 1 of 1D Subsurface Soil By C, Wech___D SedimentO Lagoon/Pond13 Other Drum Sample

Project Site Name Jack's Creek___________ Project Site Number 37-1S-3L2W_______NUS Source No. 2567_______________ Source Location JC-DR-15

Sample Method:Shovel/Trowel

Depth Sampled:N/A

Sample Date & Time:8/2/91 1230

Sampled By:Walt Koehler

Type of Sample

a Low /ConcentrationO Medium ConcentrationD Grab13 CompositeD Grab-Composite

Analysis

TCLP/TAL Metals

Pesticides, PCBs

PH

Reactive Sulfide +Reactive Cyanide

Total Metals + Cyanide

Composite Sample Data fl

Sample TimeR

Color/Description II

——————————————————

Sample Data HColor

BrownVolume

3-8 ozjars

2-8 ozjars

1-8 ozjar

2-8 ozjars

1-8 oz jar

HDescription: (Sand, Clay, Dry, Moist, Wet, etc.) ^ 1

^ HCoarse sandy materialTraffic Report #

6554C-04-DD30

CHB99

N/A

6607C-CC61

MCDG91

Tag*

3-1193481 thru 3-1 193483

3-1193479 3-1193480

3-1193484

3-1193485, 3-1193586

3-1193478

Notes:

SAS or CASE *

6554C-04

16945

N/A

46943= fotC-T-C

-M*r/feW5

Airbill *

0552975146

0552974273

9552974 '

0552974ff»

0552974 ^

COC # Lab

3-13536 KEYTX

3-13542 RECMD

3-13540 CRL

3-1354Z / - .Bv " it- ' /V iv *~J

3-1354T- > 6RL

Date Shipped Time Shipped8/5/91 1700

8/5/91 1700

8/5/91 1700 m

8/ 1 1700 ]

8/1/91 1700 |

Page 20: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

Sample Log SheetPage 2Location: JC-DR-15

^ -""" -. ' .. ' x6607C

16945 --~

0552974192

"""" 0552974236

3-13541

3-13543

KEYTX.

Skinner8/6/91

8/6/91

1700

1700

AR30IUO

Page 21: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

D Surface Soil Page 1 oD Subsurface Soil By C. WechO SedimentD Lagoon/Pond(3 Other Drum Sample _____

Project Site Name Jack's Creek____________ Project Site Number 37-15-3L2W_____NUS Source No. 2567______________ Source Location JC-DR-16

Sample Method:Shovel/Trowel

Depth Sampled:N/A

Sample Date & Time:8/2/91 1240

Sampled By:Walt Koehler

Type of Sample

3 Low' ConcentrationD Medium ConcentrationO Grab13 CompositeD Grab-Composite

Analysis

TCLP/TCL Organics

TCLP/TAL Metals

Pesticides, PCBs

PH

Reactive Sulfide +Reactive Cyanide

Total Metals + Cyanide

Composite Sample Data ||

Sample Time Color/Description ||

Sample Data HlColor

Volume3-8 ozjars

3-8 ozjars

2-8 ozjars

1-8 ozjar

2-8 ozjars

1-8 ozjar

Description:Sand-like

Traffic

(Sand, Clay, Dry, Moist, Wet, etc.) W

Report*6574C-02-EE06

6554C-04-DD31

CHD01

N/A

6607C-CC62

MCDG92

Notes:

SAS or CASE *

6574C-02

6554C-04

16945

N/A

6607C

Airbill *

0552974240

0552975146

9552974173

0552974251

0552974192

COG*

3-13537

3-13536

3-13542

3-13540

3-13541

Tag*3-1 193496 thru 3-1 193498

3-1193490 thru 3-1193492

3-1193488, 3-1193489

3-1193493

3-1193494, 3-1193495

3-11934$"

Lab

WADSPA

KEYTX

RECMD

CRL

Lf YTX

Date Shipped Time Shipped

8/2/91 1700

8/5/91 1700

8/5/91 1700 |

8/5/91 1700

8/6/91 1700 1

x:

AR30UI I

Page 22: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

Sample Log SheetPage 2Location: JC-DR-16

16945 0552974236 3-13543 Slander 8/6/91 1700

AR30IM2

Page 23: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

D Surface Soil Page 1 of.D Subsurface Soil By C. WechD SedimentD Lagoon/Pond13 Other Drum Sample_____

Project Site Name Jack's Creek___________ Project Site Number 37-1S-3L2W _____NUS Source No. 2567_______________ Source Location JC-DR-17

k

^

Sample Method:Shovel/Trowel

Depth Sampled:N/A

Sample Date & Time:8/5/91 1105

Sampled By:Walt Koehler

Type of Sample

a Low/ConcentrationD Medium ConcentrationO Grab13 CompositeD Grab-Composite

Analysis

PH

Reactive Sulfide +Reactive Cyanide

Total Metals + Cyanide

TCLP/TAL Metals

Pesticides, PCBs

Composite Sample Data

Sample Time Color/Description

—————————————————— 1IISample Data tm

Color

Volume

1-8 ozjar

2-8 ozjars

1-8 ozjar

3-8 ozjars

2-8 ozjars

Description: (Sand, Clay, DrSoil, computer chips, polaroic

Traffic Report #

N/A

6607C-CC63

MCDG93

6554C-04-DD32

CH#02D

f, Moist, Wet, etc.) 1pictures

Tag*

3-1105205

3-1105206, 3-1105207

3-1193499

3-1 105202 thru 3-1 105204

3-1193500, 3-1105201

Notes: 1

SAS or CASE #

N/A

6607C

16945

6554C-04

169,5

Airbill *

0552974181

0552974192

9552974236

0552974203

0552974170

COC # Lab

3-13546 CRL

3-13541 KEYTX

3-13543 Skuyfer

3-13548 KEYTX

3-13549 RECMD

Date Shipped Time Shipped

8/6/91 1700

8/6/91 1700————— 2H8/6/91 1700 |__________ ^H

8/6/91 1700

8/6/91 1700 |j

AR30IM3

Page 24: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

D Surface Soil Page 1 of 1D Subsurface Soil By C. Wech_____Q SedimentO Lagoon/Pond13 Other Drum Sample_____

Project Site Name Jack's Creek___________ Project Site Number 37-15-3L2W__________NUS Source No. 2567______________ Source Location JC-DR-18

Sample Method:Shovel/Trowel

Depth Sampled:N/A

Sample Date & Time:8/5/91 1115

Sampled By:Walt Koehler

Type of Sample

C3 Low ConcentrationO Medium ConcentrationO Grab13 CompositeD Grab-Composite

Analysis

PHReactive Sulfide +Reactive Cyanide

Total Metals + Cyanide

TCLP/TAL Metals

Pesticides, PCBs

Composite Sample Data

Sample

Color

Volume

1-8 ozjar

2-8 ozjars

1-8 oz jar

3-8 ozjars

2-8 ozjars

Time Color/Description

Sample Data

Description: (Sand, Clay, Dry, Moist, Wet, etc.)Boil Easers mixed w/soil

Traffic Report #N/A

6607C-CC64

MCDG94

6554C-04-DD33

CH/Q3

D

Tag*3-1105214

3-1105215, 3-1105216

3-1105208

3-1105211 thru 3-1105213

3-1105209, 3-1105210

Notes:

SAS or CASE *

N/A

6607C

16945

6554C-04

16945

Airbill *

0552974181

0552974192

9552974236

0552974203

0552974170

COC # Lab

3-13546 CRL

3-13541 KEYTX

3-13543 Skin/er

3-13548 KEYTX

3-13549 RECMD

Date Shipped Time Shipped

8/6/91 1700

8/6/91 1700

8/6/91 1700

8/6/91 1700

8/6/91 1700

AR301UU

Page 25: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

D Surface Soil Page 1 oD Subsurface Soil By C. WechD SedimentO Lagoon/Pond13 Other Drum Sample____„

Project Site Name Jack's Creek___________ Project Site Number 37-15-3L2W_____NUS Source No. 2567_______________ Source Location JC-DR-19

Sample Method:Shovel/Trowel

Depth Sampled:N/A

Sample Date & Time:8/5/91 1125

Sampled By:Walt Koehler

Type of Sample

a Low 'ConcentrationO Medium ConcentrationD Grab13 CompositeD Grab-Composite

AnalysispH

Reactive Sulfide +Reactive Cyanide

Total Metals + Cyanide

TCLP/TAL Metals

Pesticides, PCBs

^pH -- ——ta.— ————

Notes:

SAS or CASE #

N/A

6607C

16945

6554C-04

16945

Composite Sample Data

Sample Time Color/Description

ColorGrev

Volume1-8 ozjar

2-8 ozjars

1-8 ozjar

3-8 ozjars

2-8 ozjars1 fl JiT \»r

Airbill *

0552974181

0552974192

9552974236

0552974203

0552974170

Description: (Sand, Clay, Dry, Moist, Wet, etc.) ^II

Ash with white + yellowish materialTraffic Report #

N/A

6607C-CC65

MCDG95

6554C-04-DD34

CHD04

- — Sfc

COG # Lab

3-13546 CRL

3-13541 KEYTX

3-13543 SkWer3-13548 KEYTX

3-13549 RECMD

Tag*3-1105223

3-1105224, 3-1105226

3-1105217

3-1105220 thru 3-1 105222

3-1105218, 3-1105219

— * 3*1193404

Date Shipped Time Shipped

8/6/91 1700

8/6/91 1700 ^

8/6/91 1700 •

8/6/91 1700 ~~f

8/6/91 1700 1

AR30IM5

Page 26: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

B-6

Groundwater Logsheets

AR30IM6

Page 27: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G3 Monitoring Well Data Page _1_ ofd Domestic Well Data By RJGD Other •

Project Site Name Jack's Creek______________________ Project Site Number 37-1S-3L2WUS Source No. 2567___________________________ Source Location JC-GMW-200I

Total Well Depth: 165.8 ft BTOC

Well Casing Size & Depth:

6-inch, 165.8 ft BTOC

Static Water Level:27.3 ft BTOC

One Casing Volume:207.75 gal

Start Purge (hrs.):1529

End Purge (hrs.):1605

Total Purge Time (min.):36

Total Amount Purged (gal.):623.2S

Monitoring Reading:

Purge Method:submersible pump

Sample Mcthod:stainlcss steel bailer

Depth Sampled:28.3 ft BTOC

| Sample Date & Time:

7-31-91, 1640

Sampled By:Maria McGinnis

Type of Sample

E3 Low ConcentrationD High ConcentrationB GrabD CompositeD Grab-Composite

1 Analysis

Total Metals

Cyanide

Dissolved Metals

Sulfate, chloride

Nitrate! TSS,TDS,Alkalinity,Acidity

II VOA| BNA.Pesticide.PCB

SAS or CASE *

16890

6465C-02

6574C-01

16890

Preservative

HNO3

NaOH

HNO3

nonenone

none

HC1none

Purge Data

Volume(gallons)

PHS.C.

(millimho/cm) Tcmp.(°C)

Sample Data

pH

7.77

Airbill*

0552974391

0552974354

0552974343

0552974380

0552974365

Volume

1X1 liter

1x1 liter

1x1 liter

1x1 liter

1x1 liter

2x1 liter

3 x 40 ml2 x 80 oz

S.C.(millimho/cm)

0.326

COC#

3 13520

3 13524

3 13525

3 13522

3 13521

Traffic Report #

MCDG 56

MCDG 56

MCDG 57

CHB64

Temp.(°C)

14.2

Lab

WEYER

WADSPA

CRL

RECNY

CLAYTN

D.O.(mg/1)

3.39

Date Shipped

8-1-91

8-1-91

8-1-91

8-1-91

8-1-91

Color &Turbidity

Color &Turbidity(NTU)

brown, 60

Time Shipped

1700

1700

1700

1700

1700

Tag#

3-1193594,3-1193595

3-1193594,3-1193595

3-1193596

3-1193604

3-1193606

3-1193602,3-1193603

3-1 193597 thru 3-1 1935993-1193600,3-1193601

A R 3 0 I U I 7

Page 28: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data Page J_E Domestic Well Data By RJGD Other _______

Project Site Name Jack's Creek____________________ Project Site Number 37-15-3L2WNUS Source No. 2567_________________________ Source Location JC-GMW-200I-D

Total Well Depth:

Well Casing Size & Depth:

Static Water Level:

One Casing Volume:

Start Purge (hrs.):

End Purge (hrs.):

Total Purge Time (min.):

Total Amount Purged (gal.):

Monitoring Reading:

Purge Method: ,

Sample Method:from DI water

Depth Sampled:

Sample Date & Time:

8-1-91, 0800

Sampled By:Marit McGinnis

, Type of Sample

13 Low ConcentrationD High ConcentrationOJ GrabO CompositeD Grab-Composite

Analysis

VOA

'

SAS or CASE *

6574C-01

Preservative

HC1

Purge Data

Volume(gallons)

PHS.C.

(millimho/cm) Temp.CC)Color &Turbidity

AW

Sample Data ^ r

pH

Airbill*

0552974380

Volume

3 X 40 ml

S.C.(millimho/cm)

COC#

3 13522

Traffic Report #

Temp.CC)

Lab

RECNY

D.O.(mg/1)

Date Shipped

8-1-91

Color &Turbidity(NTU)

Time Shipped

1700

—————— — —————— 13-1193016 thru 3-1193018

^ . \

•*'

AR30IM8

Page 29: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

Q Monitoring Well Data ' Page J_ ofj_n Domestic Well Data By RJG_______D Other _ ____

iject Site Name Jack's Creek____________________ Project Site Number 37-15-3L2WUS Source No. 2567________________________ Source Location JC-GMW-200SI

J Total Well Depth:44 ft BGS

Well Casing Size & Depth:

2-inch, 44.8 ft BTOC

Static Water Level:30 ft BTOC

One Casing Volume:2.96 gal

Start Purge (hrs.): 1650

End Purge (hrs.): 1712

1 Total Purge Time (min.):22

1 Total Amount Purged (gal.):8.88

1 Monitoring Reading:

1 .Purge Method:stainless steel bailer11 Sample Method:stainless steel bailer1| Depth Sampled:31.3 ft BTOC• —————————————————————————————| Sample Date & Time:

7-25-91, 1725

1 Sampled By.Emily Olds

Type of Sample

H Low ConcentrationD High Concentration13 Grab

1 D CompositeD Grab-Composite

Analysis

Total Metals

Cyanide

Dissolved Metals

Sulfate, chloride

J Nitrate

J TSS,TDS,Alkalinity,Acidity

SAS or CASE *

16855

6465C-02

Preservative

HN03

NaOH

HN03

none

none

none

Purge Data

Volume(gallons) ,

PHS.C.

(millimho/cm) Temp.CC)Color &Turbidity(NTU)

Sample Data

pH

7.93

Airbill*

0552974542

0552974520

0552974505

Volume

1x1 liter1x1 liter1x1 liter

1x1 liter

1x1 liter

2x1 liter

S.C.(millimho/cm)

0.250

COC#

3 13999

3 13509

3 13507

Traffic Report tf

MCDG 44

MCDG 44

MCDG 45

Temp.CC)

15.7

Lab

SKINER

WADSPA

CRL

D.O.(mg/1)

8.73

Date Shipped

7-26-91

7-26-91

7-26-91

Color &Turbidity(NTU)

>200

Time Shipped

1700

1700

1700

Tag*

3-1193552,3-1193553

3-1193552,3-1193553

3-1193554

3-1193557

3-1193558

3-1193555,3-1193556

AR30UI9

Page 30: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

Q Monitoring Well Data Page J_ of J_E Domestic Well Data By JUG________D Other;______

Project Site Name Jack's Creek_____________________ Project Site Number 37-IS-3L2W_________NUS Source No. 2567__________________________ Source Location JC-GMW-201I

Total Well Depth:76 ft BGS

Well Casing Size & Depth:

2-inch, 78 ft BTOC

Static Water Level:21.3 ft BTOC

One Casing Volume: 11. 34 gal

Start Purge (hrs.):0834

End Purge (hrs.):0911

Total Purge Time (min.):37

Total Amount Purged (gal.):34.02

Monitoring Reading:

Purge Method:Fultz pump

Sample Method:stainless steel bailer

Depth Sampled:21.3 ft BTOC

Sample Date & Time:

7-24-91, 0925

Sampled By: Emily Olds

Type of Sample

H Low ConcentrationD High Concentration13 GrabD CompositeD Grab-Composite

Analysis

Total Metals

Cyanide

Dissolved Metals

Sulfate.chloride

Nitrate

TSS.TDS.Alkalinity.Acidity

SAS or CASE #

16855

6465C-02

Preservative

HNO3

NaOH

HNO3

none

none

none

Purge Data

Volume '(gallons)

PH

pH

8.3

Airbill*

0552974564

0552974601

0552974586

Volume

1x1 liter

1x1 liter

1x1 liter

1x1 liter

1x1 liter

2x1 liter

S.C.(millimho/cm)

0.245

COC#

3 13994

3 13992

3 13993

Traffic Report #

MCDG 21

MCDG 21

MCDG 22

S.C.(millimho/cm)

Sample Data

Temp.CC)

13.2

Lab

SKINER

WADSPA

CRL

Temp.CC)Color &Turbidity(NTU)

^W

D.O.(mg/1)

5.2

Date Shipped

7-25-91

7-25-91

7-25-91

Color &Turbidity(NTU)

grey ,66

Time Shipped

1700

1700

1700

Tag#

3-1188445,3-1188446

3-1188445,3-1188446

3-1188447

3-1188450

3-1188451

3-1188448,3-1188449 ^ B^

AR30U20

Page 31: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

Q Monitoring Well Data Page J_ of J_1-1 Domestic Well Data By RJG_____D Other ______

Project Site Name Jack's Creek ____„______________ Project Site Number 37-15-3L2WUS Source No. 2567___________________________ « Source Location JC-GMW-201SI

1 Total Well Depth:30 ft BGS

Well Casing Size & Depth:

2-inch, 32.45 ft BTOC

Static Water Level:21.2 ft BTOC

One Casing Volume:5.25 gal

Start Purge (hrs.):1645

End Purge (hrs.): 1700

Total Purge Time (min.):15

Total Amount Purged (gal.):6,75

Monitoring Reading:

Purge Method:stainless steel bailer

| Sample Method:staimess steel bailer

j Depth Sampled:21.25 ft BTOC

Sample Date & Time:

7-22-91, 1715

Sampled By:Emily Olds

Type of Sample

C3 Low ConcentrationD High Concentration0 GrabD CompositeD Grab-Composite

Analysis

Total Metals

Cyanide

Dissolved Metals

Sulfatc, chloride

Nitrate

I TSS.TDS, Alkalinity .Acidity11 TOUF™ —————

SAS or CASE *

16855

6465C-02

6463C-01

Preservative

HNO3

NaOH

HN03

none

none

none

JiCl

Purge Data

Volume(gallons)

PH

pH

8.2

Airbill*

0552974730

0552974704

0552974715

0552974671

Volume

1x1 liter

1x1 liter

1x1 liter

1x1 liter

1 x 1 liter

2 x 1 liter

1x1 liter

S.C.(millimho/cm)

0.315

COC*

3 13979

3 13501

3 13981

3 13982

Traffic Report *

MCDG 24

MCDG 24

MCDG 25

S.C.(millimho/cm) Temp.(°C)

Color &Turbidity(NTU)

Sample Data

Temp.CC)

13.6

Lab

SKINER

WADSPA

CRL

WADSPA

D.O.(mg/1)

7.16

Date Shipped

7-23-91

7-24-91

7-24-91

7-24-91

Color &Turbidity(NTU)'

>200

Time Shipped

1700

1700

1700

1700

Tag#

3-1188452,3-1188453

3-1188452,3-1188453

3-1188454

3-1188457

3-1188458

3-1188455,3-1188456

3-1188459

«

*AR30U2

Page 32: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

B Monitoring Well Data Page J_ of _2_C3 Domestic Well Data By RJG______D Other ______

Project Site Name Jack's Creek_____________________ Project Site Number 37-15-3L2W_________NUS Source No. 2567__________________________ Source Location JC-GMW-202I

Total Well Depth:18.5 ft BGS

Well Casing Size & Depth:

2-inch, 20.9 ft BTOC

Static Water Level:7.9 ft BTOC

One Casing Volume:2.6 gal

Start Purge (hrs.):1420

End Purge (hrs.):1447

Total Purge Time (min.):27

Total Amount Purged (gal.):7.8

Monitoring Reading:

2.5 ppm upon opening well

Purge Method: ultz pump

Sample Method:stainless steel bailer

Depth Sampled:8 ft BTOC

Sample Date & Time:

7-29-91, 1603

Sampled By:Emily Olds

Type of Sample

13 Low ConcentrationD High ConcentrationH GrabD CompositeO Grab-Composite

Analysis

Total Metals

CyanideDissolved Metals

Sulfatc, chloride

NitrateTSS ,TDS .Alkalinity .Acidity

VOABNA.Pesticide.PCB

SAS or CASE #

16890

6465C-02

6574C-01

16890

Preservative

HNO3

NaOH

HN03

none

nonenoneHC1none

Purge Data

Volume(gallons)

PHS.C.

(millimho/cm) Temp.CC)Color &Turbidity

_E~Sample Data ^ ^

PH

6.55

Airbill*

0552974446

0552974413

0552974402

0552974376

0552974435

Volume

2x1 liter

2x1 liter2x1 liter

1x1 liter

1 x 1 liter

2x1 liter

9 x 40 ml

6 x 80 oz

S.C.(millimho/cm)

0.475

COC*

3 13514

3 13516

3 13517

3 13519

3 13518

Traffic Report #

MCDG 58

MCDG 58

MCDG 59

CHB 65

Temp.CC)

17.1

Lab

WEYER

WADSPA

CRL

RECNY

CLAYTN

D.O.(mg/1)

2.05

Date Shipped

7-31-91

7-31-91

7-31-91

7-31-91

7-31-91

Color &Turbidity(NTU)

clear, 108

Time Shipped

1700

1700

1700

1700

1700

Tag#

3-1193607 thru 3-1193610

3-1193607 thru 3-1193610

3-1193611,3-1193612 !

3-1193627 <

3-1193629 ^ ^

3-1193625,3-1193626 ^ P3-1193613-3-1193618.3-1193742-3-1193744

3-1193619-3-1193622.3-1193745.3-1193746

AR30U22

Page 33: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

1BNA.Pesticide.PCB none 2 x 8p oz CHB 66 3-1 193623.3-1193624

'AR30U23

Page 34: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

Q Monitoring Well Data . Page J_ °f_l_C3 Domestic Well Data By RJG________D Other ______

Project Site Name Jack's Creek___________________ Project Site Number 37-1S-3L2WNUS Source No. 2567___________________________ Source Location JC-GMW-202I-A

Total Well Depth: 18.5 ft BGS

Well Casing Size & Depth:

2-inch, 20.9 ft BTOC

Static Water Lcvel:7.9 ft BTOC

One Casing Volume:2.6 gal

Start Purge (hrs.):1420

End Purge (hrs.): 1447

Total Purge Time (min.):27

Total Amount Purged (gal.):7.8

Monitoring Reading:

2.5 ppm upon openinp well

Purge Method:Fultz pump

Sample Method:stainless steel bailer

Depth Sampled:8 ft BTOC

Sample Date & Time:

7-29-91, 1630

Sampled ByrEmily Olds

Type of Sample

[2 Low ConcentrationD High Concentration13 GrabO CompositeD Grab-Composite

Analysis

Total Metals

CyanideDissolved Metals

VOA

BNA.Pesticide.PCBBNA.Pesticide.PCB

SAS or CASE *

16890

6574C-01

16890

Preservative

HN03

NaOH

HN03

HC1

nonenone

Purge Data

Volume(gallons)

PH

6.55

Airbill*

0552974446

0552974376

0552974435

Volume

1X1 liter

1x1 liter

1x1 liter

3 x 40 ml

2 x 80 oz

2 x 80 oz

PH

S.C.(millimho/cm)

0.475

COG*

3 13514

3 13519

3 13518

Traffic Report *

MCDG 60

MCDG 60

MCDG 61

CHB67

CHB68

S.C.(millimho/cm)

Sample Data

Temp.CC)

17.1

Lab

WEYER

RECNY

CLAYTN

Temp.CC)

D.O.(mg/1)

2.05

Date Shipped

7-31-91

7-31-91

7-31-91

Color &Turbidity

"-•-Color &Turbidity(NTU)

clear, 108

Time Shipped

1700

1700

1700

Tag*

3-1193630,3-1193631

3-1193630,3-1193631

3-1193632

3-1193633 thru 3-1193635

3-1193638,3-1193639 ^

3-1193640,3-1193641 ^ B^

AR30U21*

Page 35: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

Q Monitoring Well Data Page J_ of J_E Domestic Well Data By RJG______D Other ______

'roject Site Name Jack's Creek_____________________. Project Site Number 37-15-3L2WUS Source No. 2567__________________________ Source Location JC-GMW-202I-B

Total Well Depth:

Well Casing Size & Depth:

Static Water Level:

One Casing Volume:

Start Purge (hrs.):

End Purge (hrs.):

Total Purge Time (min.):

Total Amount Purged (gal.):

Monitoring Reading:

1 Purge Method: ,

1 Sample Method: from DI water

| Depth Sampled:

I Sample Date & Time:

7-29-91, 1437

Sampled By:Emily Olds

Type of Sample

[3 Low ConcentrationD High Concentration(3 GrabD CompositeD Grab-Composite

1 Analysis

Total Metals

vanide

V

esticide.PCB

>

SAS or CASE *

16890

6574C-01

16890

Preservative

HNO3

NaOH

HC1

none

Purge Data

Volume(gallons)

PHS.C.

(millimho/cm) Temp.(°C)Color &Turbidity(NTU)

Sample Data

pH

Airbill*

0552974446

0552974376

0552974435

Volume

1 X 1 liter

1 x 1 liter

3 x 40 ml

2 x 80 oz '

S.C.(millimho/cm)

COC*

3 13514

3 13519

3 13518

Traffic Report *

MCDG 62

MCDG 62

CHB69

Temp.CC)

Lab

WEYER

RECNY

CLAYTN

D.O.(mg/1)

Date Shipped

7-31-91

7-31-91

7-31-91

Color &Turbidity(NTU)

Time Shipped

1700

1700

1700

Tag*

3-1193642,3-1193643

3-1193642,3-1193643

3-1193644 thru 3-1193646

3-1193647,3-1193648

-

AR30IU25

Page 36: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

Q Monitoring Well Data Page J_ of.E Domestic Well Data By RJGD Other ______

Project Site Name Jack's Creek______________________ Project Site Number 37-15-3L2WNUS Source No. 2567__________________________ Source Location JC-GMW-202I-C

Total Well Depth:

Well Casing Size & Depth:

Static Water Level:

One Casing Volume:

Start Purge (hrs.):

End Purge (hrs.):

Total Purge Time (min.):

Total Amount Purged (gal.):

Monitoring Reading:

Purge Method: ,/

Sample Method:from DI water

Depth Sampled:

Sample Date & Time:

7-29-91, 1519

Sampled By:Emily Olds

Type of Sample

13 Low ConcentrationD High Concentration[3 GrabD CompositeD Grab-Composite

Analysis

Total Metals

Cyanide

VOA

BNA.Pesticide.PCB

SAS or CASE *

16890

6574C-01

16890

Preservative

HNO3

NaOH

HC1

none

Purge Data

Volume(gallons)

pHS.C.

(millimho/cm) Temp.CC)Color &Turbidity(NTU)

A .W

Sample Data ^ ^

pH

Airbill*

0552974446

0552974376

0552974435

Volume

1X1 liter

1x1 liter

3 x 40 ml

2 X 80 oz

S.C.(millimho/cm)

COC*

3 13514

3 13519

3 13518

Traffic Report *

MCDG 63

MCDG 63

CHB70

Temp.CC)

Lab

WEYER

RECNY

CLAYTN

D.O.(mg/1)

Date Shipped

7-31-91

7-31-91

7-31-91

Color &Turbidity(NTU)'

Time Shipped

1700

1700

1700

Tag*

3-1193649,3-1193650

3-1193649,3-1193650

3-1193651 thru 3-1193653

3-1193654,3-1193655^

B

AR30U26

Page 37: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

Q Monitoring Well Data Page J_ of J_E Domestic Well Data By RJG________D Other ______

Project Site Name Jack's Creek___________________. Project Site Number 37-1S-3L2WUS Source No. 2567________________________ Source Location JC-GMW-202I-D

Total Well Depth:

Well Casing Size & Depth:

Static Water Level:

One Casing Volume:

Start Purge (hrs.):

End Purge (hrs.):

Total Purge Time (min.):

Total Amount Purged (gal.):

Monitoring Reading:

Purge Method:

1 Sample Method:from DI water

_ Depth Sampled:

f Sample Date & Time:

7-29-91, 1500

Sampled By -.Emily Olds

Type of Sample

[3 Low ConcentrationD High Concentration13 GrabD CompositeD Grab-Composite

Analysis

VOA

r — •1 ——— —— ——— -

SAS or CASE *

6574C-01

Preservative

HC1

Purge Data

Volume(gallons)

PHS.C.

(millimho/cm) Temp.CC)Color &Turbidity(NTU)

Sample Data

PH

Airbill*

0552974376

Volume

3 X 40 ml

S.C.(millimho/cm)

COC*

3 13519

Traffic Report *

Temp.CC)

Lab

RECNY

D.O.(mg/1)

Date Shipped

7-31-91

Color &Turbidity(NTU)

Time Shipped

1700

Tag*

3-1193656 thru 3-1193658

<AR30U27

Page 38: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

Q Monitoring Well Data Page ___ of J_E Domestic Well Data By RJG________D Other ______

Project Site Name Jack's Creek_____________________ Project Site Number 37-15-3L2W_______NUS Source No. 2567________________________ Source Location JC-GMW-203I

Total Well Depth:52.5 ft BGS

Well Casing Size & Depth:

2-inch, 55 ft BTOC

Static Water Level:27.8 ft BTOC

One Casing Volume:5.44 gal

Start Purge (hrs.):1500

End Purge (hrs.):1546

Total Purge Time (min.):46

Total Amount Purged (gal.): 16. 32

Monitoring Reading:

Purge Method:stainless steel bailer

Sample Method:stainless steel bailer

Depth Sampled:28 ft BTOC

Sample Date & Time:

7-22-91, 1602

Sampled By:Emily Olds

Type of Sample

13 Low ConcentrationD High Concentration13 GrabD CompositeD Grab-Composite

Analysis

Total MetalsCyanide

Dissolved Metals

Sulfate.chlorideNitrate

TSS.TDS.Alkalinity.Acidity

TPH

SAS or CASE *

16855

6465C-02

6463C-01

Preservative

HNO3

NaOH

HNO3

nonenone

none

HC1

Purge Data

Volume(gallons)

PH

7.85

Airbill*

0552974730

0552974704

0552974715

0552974671

Volume

1x1 liter

1x1 liter

1x1 liter

1 x 1 liter1x1 liter

2x1 liter

1x1 liter

PH

S.C.(millimho/cm)

0.684

COC*

3 13979

3 13501

3 13981

3 13982

Traffic Report *

MCDG 20

MCDG 20

MCDG 27

S.C.(millimho/cm)

-

Sample Data

Temp.CC)

16.3

Lab

SKINER

WADSPA

CRL

WADSPA

Temp.CC)

D.O.(mg/1)

3.70

Date Shipped

7-23-91

7-24-91

7-24-91

7-24-91

Color &Turbidity(NTU)

Color & jTurbidity(NTU)

>200

Time Shipped

1700

1700

1700

1700

Tag*

3-1188427.3-1188428

3-1188427,3-1188428

3-1188429

3-1188432

3-1188443 ^

3-1188430,3-1188431 ^ p

3-1188442

AR30ll»28

Page 39: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

E3 Monitoring Well Data - Page J_ ofn Domestic Well Data By RJGD Other ______

'reject Site Name Jack's Creek_____________________ Project Site Number 37-1S-3L2WUS Source No. 2567___________________________ Source Location JC-GMW-204I-A

Total Well Dcpth:41 ft BGS

Well Casing Size & Depth:

2-inch, 43.8 ft BTOC

Static Water Level:29.4 ft BTOC

One Casing Volume:2.88 gal

Start Purge (hrs.):1144

End Purge (hrs.): 1208

Total Purge Time (min.):24

Total Amount Purged (gal.):9

Monitoring Reading:

Purge Method: stainless steel bailer—————————— 7 —————————————| Sample Method:stainless steel bailer

I Depth Sampled:29.55 ft BTOC

] Sample Date & Time:

7-22-91, 1255

Sampled By:Emily Olds

Type of Sample

13 Low ConcentrationO High ConcentrationH GrabD CompositeD Grab-Composite

Analysis

Total Metals

CyanideDissolved Metals

Sulfate.chloride

I Nitrate

I TSS.TDS.Alkalinity.Acidity11 TDHPH ————————

SAS or CASE *

16855

6465C-02

6463C-01

Preservative

HNO3

NaOH

HNO3

none

none

none

HC1

Purge Data

Volume(gallons)

PHS.C.

(millimho/cm) Temp.CC)Color &Turbidity(NTU)

Sample Data

PH

7.75

Airbill*

0552974730

0552974704

0552974715

0552974671

Volume

1x1 liter

1x1 liter

1x1 liter1x1 liter

1 x 1 liter

2 x 1 liter

1x1 liter

S.C.(millimho/cm)

0.56

COC*

3 13979

3 13501

3 13981

3 13982

Traffic Report #

MCDG 17

MCDG 17

MCDG 26

Temp.CC)

15

Lab

SKINER

WADSPA

CRL

WADSPA

D.O.(mg/1)

3.41

Date Shipped

7-23-91

7-24-91

7-24-91

7-24-91

Color &Turbidity(NTU)

>200

Time Shipped

1700

1700

1700

1700

Tag*

3-1188414,3-1188415

3-1188414,3-1188415

3-1188444

3-1188418

3-1188436

3-1188416,3-1188417

3-1188437

AR30U29

Page 40: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

Q Monitoring Well Data Page J_ ofE Domestic Well Data By RJGD Other._______

Project Site Name Jack's Creek_______________________ Project Site Number 37-1S-3L2WNUS Source No. 2567_______________________ Source Location JC-GMW-204I-C

Total Well Depth:

Well Casing Size & Depth:

Static Water Level:

One Casing Volume:

Start Purge (hrs.):

End Purge (hrs.):

Total Purge Time (min.):

Total Amount Purged (gal.):

Monitoring Reading:

Purge Method:

Sample Method:

Depth Sampled:

Sample Date & Time:

7-22-91, 1255

Sampled By: Emily Olds

Type of Sample

[3 Low ConcentrationD High Concentration[3 GrabD CompositeD Grab-Composite

Analysis

Total Metals

Cyanide

Sulfate, chlorideNitrate

Alkalinity, Acidity

TPH

SAS or CASE *

16855

6465C-02

6463C-01

PreservativeHN03NaOH

nonenone

none

HC1

Purge Data

Volume(gallons)

pHS.C.

(millimho/cm) Temp.CC)Color &Turbidity(NTU)

^Sample Data (r

PH

Airbill*

0552974730

0552974704

0552974715

0552974671

Volume

1 X 1 liter

1x1 liter

1 x 1 liter

1x1 liter

1 x 1 liter

1x1 liter

S.C.(millimho/cm)

COC*

3 13979

3 13501

3 13981

3 13982

Traffic Report *

MCDG 19

MCDG 19

Temp.CC)

Lab

SKINER

WADSPA

CRL

WADSPA

D.O.(mg/1)

Date Shipped

7-23-91

7-24-91

7-24-91

7-24-91

Color &Turbidity(NTU)

Time Shipped

1700

1700

1700

1700

Tag*

3-1188423,3-1188424

3-1188423,3-1188424

3-1188426

3-1188440

3-1188425 ^

3-1188441 ^ B^

Page 41: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

Q Monitoring Well Data Page J_ ofj_E Domestic Well Data By RJG______D Other ______

iject Site Name Jack's Creek____________________ Project Site Number 37-1S-3L2WUS Source No. 2567________________________ Source Location JC-GMW-20SI

Total Well Depth:32 ft BGS

Well Casing Size & Depth:

2-inch, 35 ft BTOC

Static Water Level: 12.9 ft BTOC

One Casing Volume:4.42 gal

Start Purge (hrs.):0951

End Purge (hrs.):1019

Total Purge Time (min.):28

Total Amount Purged (gal.):13.26

Monitoring Reading:

Purge Method:stainless steel bailer

Sample Method: stainless steel bailer

Depth Sampled: 13 ft BTOC

| Sample Date & Time:

7-23-91, 1030

Sampled By:Emily Olds

Type of Sample

[3 Low ConcentrationD High Concentration13 GrabD CompositeD Grab-Composite

Analysis

Total Metals

I Cyanide

Dissolved Metals

Sulfate.chloride

Nitrate

1 TSS,TDS,Alkalinity,Acidity11 TDU

SAS or CASE *

16855

6465C-02

6463C-01

Preservative

HNO3

NaOH

HN03

none

none

none

HC1

Purge Data

Volume(gallons)

PHS.C.

(millimho/cm)

Sample Data

PH

7.45

Airbill*

0552974730

0552974704

0552974715

0552974671

Volume

1x1 liter

1x1 liter

1x1 liter

1x1 liter

1x1 liter

2x1 liter

1x1 liter

S.C.(millimho/cm)

0.660

COG*

3 13504

3 13501

3 13981

3 13982

Traffic Report *

MCDG 28

MCDG 28

MCDG 29

Temp.CC)

14.5

Lab

SKINER

WADSPA

CRL

WADSPA

Temp.(°C)Color &Turbidity(NTU)

D.O.(mg/1)

3.7

Date Shipped

7-23-91

7-24-91

7-24-91

7-24-91

Color &Turbidity(NTU)

>200

Time Shipped

1700

1700

1700

1700

Tag*

3-1188460,3-1188461

3-1188460,3-1188461

3-1188462

3-1188465

3-1188466

3-1188463,3-1188464

3-1188467

AR30U31

Page 42: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data Page J_ of 2E Domestic Well Data By RJG_____D Other ______

Project Site Name Jack's Creek_____________________ Project Site Number 37-15-3L2W_______NUS Source No. 2567________________________ Source Location JC-GMW-206I

Total Well Depth: 15.25 ft BGS

Well Casing Size & Depth:

2-inch, 17 ft BTOC

Static Water Level:6.1 ft BTOC

One Casing Volume:2.18 gal

Start Purge (hrs.):1741

End Purge (hrs.): 1752

Total Purge Time (min.):ll

Total Amount Purged (gal.):6.46

Monitoring Reading:

Purge Method:Fultz pump

Sample Method:stainless steel bailer

Depth Sampled:6.1 ft BTOC

Sample Date & Time:

7-29-91, 1822

Sampled By:Emily Olds

Type of Sample

[3 Low ConcentrationD High Concentration[3 GrabD CompositeD Grab-Composite

Analysis

Total Metals

Cyanide

Dissolved Metals

Sulfate,chlorideNitrate

TSS ,TDS .Alkalinity .Acidity

VOABNA.Pesticide.PCB

SAS or CASE #

16890

6465C-02

6574C-01

16890

Preservative

HNO3

NaOH

HNO3

nonenone

noneHC1none

Purge Data

Volume(gallons)

PHS.C.

(millimho/cm) Temp.CC)Color &Turbidity

i

__^ !

Sample Data ^ r

pH

7.28

Airbill*

0552974446

0552974413

0552974402

0552974376

0552974435

Volume

1 X 1 liter

1 x 1 liter

1x1 liter

1 x 1 liter1x1 liter

2 x 1 liter3 x 40 ml2 x 80 oz

S.C.(millimho/cm)

0.712

COC*

3 13514

3 13516

3 13517

3 13519

3 13518

Traffic Report *

MCDG 66

MCDG 66

MCDG 67

CHB 71

Temp.CC)

19.1

Lab

WEYER

WADSPA

CRL

RECNY

CLAYTN

D.O.(mg/1)

2.18

Date Shipped

7-31-91

7-31-91

7-31-91

7-31-91

7-31-91

Color &Turbidity(NTU)

49 1

Time Shipped

1700

1700

1700

1700

1700

Tag*

3-1193659,3-1193660

3-1193659,3-1193660

3-1193661

3-1193671

3-1193672 ^

3-1193669,3-1193670 ^ V

3-1193662 thru 3-11937643-1193665.3-1193666

AR30U32

Page 43: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

BNA. Pesticide PCB none £ x 80 oz CHB 72 3-1193667.3-1193668

AR30U33

Page 44: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

Q Monitoring Well Data • Page _l_of.d Domestic Well Data By RJGD Other ______

Project Site Name Jack's Creek_____________________ Project Site Number 37-15-3L2W________NUS Source No. 2567__________________________ Source Location JC-GMW-207I

Total Well Depth:39.5 ft BGS

Well Casing Size & Depth:

2-inch, 38.7 ft BTOC

Static Water Level:20.5 ft BTOC

One Casing Volume:3.64 gal

Start Purge (hrs.):1340

End Purge (hrs.):1357

Total Purge Time (min.):17

Total Amount Purged (gal.):10.92

Monitoring Reading:

Purge Method:stainless steel bailer/

Sample Method:stainless steel bailer

Depth Sampled:20.6 ft BTOC

Sample Date & Time:7-23-91, 1357

Sampled By:Emily Olds

Type of Sample

[3 Low ConcentrationD High Concentration13 GrabO CompositeD Grab-Composite

Analysis

Total Metals

CyanideDissolved Metals

Sulfate.chloride

Nitrate

TSS.TDS.Alkalinity .AcidityTPH

SAS or CASE *

16855

6465C-02

6463C-01

Preservative

HNO3

NaOH

HNO3

none

none

none

HC1

Purge Data

Volume(gallons)

PHS.C.

(millimho/cm) Temp.CC)Color &Turbidity(NTU)

_ASample Data ^ ^

PH

7.17

Airbill*

0552974634

0552974704

0552974715

0552974671

Volume

1x1 liter1x1 liter1x1 liter

1x1 liter

1x1 liter

2x1 liter1x1 liter

S.C.(millimho/cm)

1.020

COC*

3 13989

3 13505

3 13981

3 13982

Traffic Report #

MCDG 32

MCDG 32

MCDG 33

Temp.CC)

16.2

Lab

SKINER

WADSPA

CRL

WADSPA

D.O.(mg/1)

2.85

Date Shipped

7-24-91

7-24-91

7-24-91

7-24-91

Color &Turbidity(NTU)

brown,>200

Time Shipped

1700

1700

1700

1700

Tag*

3-1188476,3-1188477

3-1188476,3-1188477 I

3-1188478 1

3-1188481 1

3-1188482 ^ 13-1188479,3-1188480 ^Jp 1

3-1188483 I•

AR30|l*3tf

Page 45: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

Q Monitoring Well Data Page J_ of.E Domestic Well Data By RJGD Other ______

•oject Site Name Jack's Creek_____________~________ Project Site Number 37-15-3L2WUS Source No. 2567__________________________ Source Location JC-GMW-208I

Total Well Depth:43.5 ft BGS

Well Casing Size & Depth:

2-inch, 42.45 ft BTOCStatic Water Level:24.6 ft BTOC

One Casing Volume:3.57 gal

Start Purge (hrs.): 1135

End Purge (hrs.):1149

Total Purge Time (min.):14

Total Amount Purged (gal.): 10.71

Monitoring Reading:

Purge Method:stainless steel bailer

Sample Method:stainless steel bailer

H)epth Sampled:24.6 ft BTOC

iample Date & Time:

7-23-91, 1204

Sampled By:Emily Olds *

Type of Sample

(3 Low ConcentrationD High Concentration13 Grab

ID CompositeD Grab-Composite

Analysis

Total Metals

Cyanide

Dissolved Metals

Sulfate.chloride

| Nitrate

1 TSS,TDS,Alkalinity,Acidity

I TPH1

SAS or CASE *

16855

6465C-02

6463C-01

Preservative

HNO3

NaOH

HNO3

none

none

none

HC1

Purge Data

Volume(gallons)

PHS.C.

(millimho/cm)

Sample Data

PH

9.22

Airbill*

0552974634

0552974704

0552974715

0552974671

Volume

1 x 1 liter

1x1 liter

1x1 liter

1 x 1 liter

1 x 1 liter

2x1 liter

1x1 liter

S.C.(millimho/cm)

0.534

COC*

3 13989

3 13501,13505

3 13981

3 13982

Traffic Report *

MCDG 30

MCDG 30

MCDG 31

Temp.CC)

18

Lab

SKINER

WADSPA

CRL

WADSPA

Temp.CC)

D.O.(mg/1)

4.65

Date Shipped

7-24-91

7-24-91

7-24-91

7-24-91

Color &Turbidity(NTU)

Color &Turbidity(NTU)

brown, >200

Time Shipped

1700

1700

1700

1700

Tag*

3-1188468,3-1188469

3-1188468,3-1188469

3-1188476

3-1188473

3-1188474

3-1188471,3-1188472

3-1188475

AR30|l»35

Page 46: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

Q Monitoring Well Data Page J_ ofj_O Domestic Well Data By RJG_____D Other _______

Project Site Name Jack's Creek_____________________ Project Site Number 37-15-3L2W______NUS Source No. 2567 _________________________ Source Location JC-GMW-209I

Total Well Depth: 18 ft BGS

Well Casing Size & Depth:

2-inch, 18.5 ft BTOC

Static Water Level:5.5 ft BTOC

One Casing Volume:2.60 gal

Start Purge (hrs.):1023

End Purge (hrs.):1032

Total Purge Time (min.):9

Total Amount Purged (gal.):7.8

Monitoring Reading:

Purge Method:F.ultz pump

Sample Method: stainless steel bailer

Depth Sampled:5.5 ft BTOC

Sample Date & Time:

7-30-91, 1053

Sampled By:Emily Olds

Type of Sample

[3 Low ConcentrationD High Concentration[3 GrabD CompositeD Grab-Composite

Analysis

Total Metals

Cyanide

Dissolved Metals

Sulfate, chloride

Nitrate

TSS.TDS.Alkalinity.Acidity

VOABNA.Pesticide.PCB

SAS or CASE #

16890

6465C-02

6574C-01

16890

Preservative

HNO3 .

NaOH

HN03

nonenone

none

HC1none

Purge Data

Volume(gallons)

PHS.C.

(millimho/cm) Temp.CC)Color &Turbidity

A

Sample Data ^ F

PH

9.12

Airbill*

0552974446

0552974413

0552974402

0552974376

0552974435

Volume

1X1 liter

1 x 1 liter

1x1 liter

1x1 liter

1x1 liter2x1 liter

3 x 40 ml

2 x 80 oz

S.C.(millimho/cm)

0.289

COC*

3 13514

3 13516

3 13517

3 13519

3 13518

Traffic Report *

MCDG 64

MCDG 64

MCDG 65

CHB73

Temp.CC)

14.5

Lab

WEYER

WADSPA

CRL

RECNY

CLAYTN

D.O.(mg/1)

2.10

Date Shipped

7-31-91

7-31-91

7-31-91

7-31-91

7-31-91

Color &Turbidity(NTU)'

>200

Time Shipped

1700

1700

1700

1700

1700

Tag*

3-1193676,3-1193677

3-1193676,3-1193677

3-1193678

3-1193686

3-1193687 ^

3-1193684,3-1193685 H*^

3-1193679 thru 3-1193781

3-1193682,3-1193683

AR30U36

Page 47: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G3 Monitoring Well Data Page J_ of J.Q Domestic Well Data By RJG______n Other '

>ject Site Name Jack's Creek_____________________ Project Site Number 37-15-3L2WUS Source No. 2567__________________;______ 'Source Location JC-GMW-210I

Total Well Depth:25.5 ft BGS

Well Casing Size & Depth:

2-inch, 27 ft BTOC

Static Water Level: 14.5 ft BTOC

One Casing Volume: 2. 5 gal

Start Purge (hrs.):1152

End Purge (hrs.): 1207

Total Purge Time (min.):15

Total Amount Purged (gal.):7.5

Monitoring Reading:

1700 ppm at TOC during purpe

Purge Method :Fultz pump/

Sample Method: stainless steel bailer

L Depth Sampled: 15 ft BTOC

f Sample Date & Time:

7-24-91, 1239

1 Sampled By:Emily Olds

Type of Sample

(3 Low ConcentrationD High Concentration13 GrabD CompositeD Grab-Composite

Analysis

Total Metals

Cyanide

Dissolved Metals

Sulfate, chloride

1 Nitrate

1 TSS.TDS.Alkalinity.Acidity

P* ——————————————| BNA.Pesticide.PCB

SAS or CASE *

16855

6465C-02

16855

Preservative

HNO3

NaOH

HNO3

none

none

none

HC1none

Purge Data

Volume(gallons)

PH

8.64

Airbill*

0552974564

0552974601

0552974586

0552974575

Volume

1 x 1 liter1 x 1 liter

1 x 1 liter

1x1 liter

1 x 1 liter

2x1 liter

6 x 40 ml4 x 80 oz

pH

S.C.(millimho/cm)

1.332

COC*

3 13994

3 13992

3 13993

3 13995

Traffic Report *

MCDG 36

MCDG 36

MCDG 37

CHB 60CHB60

S.C.(millimho/cm)

Sample Data

Temp.CC)

16.4

Lab

SKINER

WADSPA

CRL

RECNY

Temp.CC)

D.O.(mg/1)

0.85

Date Shipped

7-25-91

7-25-91

7-25-91

7-25-91

Color &Turbidity(NTU)

Color &Turbidity(NTU)

brown, >200

Time Shipped

1700

1700

1700

1700

Tag*

3-1188499,3-1188500

3-1188499,3-1188500

3-1188492

3-1193501

3-1193502

3-1188493,3-1188494

3-1193528 thru 3-11935373-1193528 thru 3-1193537

AR301U37

Page 48: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

Q Monitoring Well Data Page J_ ofE Domestic Well Data By RJGD Other ______

Project Site Name Jack's Creek ____________________ Project Site Number 37-15-3L2W________NUS Source No. 2567_________________________ Source Location JC-GMW-210I-B_______

Total Well Depth:

Well Casing Size & Depth:

Static Water Level:

One Casing Volume:

Start Purge (hrs.):

End Purge (hrs.):

Total Purge Time (min.):

Total Amount Purged (gal.):

Monitoring Reading:

Purge Method: f>

Sample Method: from DI water

Depth Sampled:

Sample Date & Time:

7-24-91, 1136

Sampled By:Emily Olds

Type of Sample

[3 Low ConcentrationO High Concentration13 GrabD CompositeD Grab-Composite

Analysis

VGABNA.Pesticide.PCB

SAS or CASE *

16855

Preservative

HC1none

Purge Data

Volume(gallons)

PHS.C.

(millimho/cm) Temp.CC)Color &Turbidity(NTU)

_ASample Data ^ ^

pH

Airbill*

0552974575

Volume

3 x 40 ml

2 x 80 oz

S.C.(millimho/cm)

COC*

3 13995

Traffic Report #

CHB61

CHB61

Temp.CC)

Lab

RECNY

D.O.(mg/1)

Date Shipped

7-25-91

Color &Turbidity(NTU)

!

Time Shipped

1700

Tag*

3-1193538 thru 3-1193542

3-1193538 thru 3-1193542

———————————— •-

AR30U38

Page 49: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data . Page J_ of J_E Domestic Well Data By RJG_____O Other ______

iject Site Name Jack's Creek____________________ Project Site Number 37-15-3L2WSource No. 2567__________________________, Source Location JC-GMW-210I-C

Total Well Depth:

Well Casing Size & Depth:

Static Water Level:

One Casing Volume:

Start Purge (hrs.):

End Purge (hrs.):

Total Purge Time (min.):

Total Amount Purged (gal.):

Monitoring Reading:

Purge Method:

Sample Method:from DI water

{ Depth Sampled:

| Sample Date & Time:7-24-91, 1310

Sampled By: Emily Olds

Type of Sample

03 Low ConcentrationD High Concentration(3 GrabD CompositeO Grab-Composite

tAnalysis

VOA

BNA,Pesticide,PCB

———— : ————

SAS or CASE *

16855

Preservative

HC1

none

Purge Data

Volume(gallons)

pHS.C.

(millimho/cm) Temp.(°C)Color &Turbidity(NTU)

Sample Data

PH

Airbill*

0552974575

Volume

3 x 40 ml

2 x 80 oz

S.C.(millimho/cm)

COG*

3 13995

Traffic Report *

CHB62

CHB62

Temp.CC)

Lab

RECNY

D.O.(mg/1)

Date Shipped

7-25-91

Color &Turbidity(NTU)

Time Shipped

1700

Tag*

3-1193543 thru 3-1193547

3-1193543 thru 3-1 193547

AR30|l*39

Page 50: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data Page __d Domestic Well Data By RJGD Other;________

Project Site Name Jack's Creek_____________________ Project Site Number 37-1S-3L2WNUS Source No. 2567_________________________ Source Location JC-GMW-210I-D

Total Well Depth:

Well Casing Size & Depth:

Static Water Level:

One Casing Volume:

Start Purge (hrs.):

End Purge (hrs.):

Total Purge Time (min.):

Total Amount Purged (gal.):

Monitoring Reading:

Purge Method: ,/

Sample Method: from DI water

Depth Sampled:

Sample Date & Time:

7-24-91, 1600

Sampled By:Emily Olds

Type of Sample

[3 Low ConcentrationD High Concentration13 GrabEH CompositeD Grab-Composite

Analysis

VOA

SAS or CASE *

16855

Preservative

HC1

Purge Data

Volume(gallons)

pHS.C.

(millimho/cm)

Sample Data

pH

Airbill*

0552974575

Volume

3 x 40 ml

S.C.(millimho/cm)

COC*

3 13995

Traffic Report *

CHB63

Temp.CC)

Lab

RECNY

Temp.CC)Color &Turbidity(NTU)

AwD.O.(mg/1)

Date Shipped

7-25-91

Color &Turbidity(NTU)

Time Shipped

1700

t

Tag*

3-1193548 thru 3-1193550

^

•^

AR30IHO

Page 51: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data Page J_ ofj_n Domestic Well Data By RJG_____D Other ______

iject Site Name Jack's Creek_____________________ Project Site Number 37-1S-3L2WUS Source No. 2567________________________ Source Location JC-GMW-211I

Total Well Depth:29 ft BGS

Well Casing Size & Depth:

2-inch, 31.3 ft BTOC

Static Water Level:17.8 ft BTOC

One Casing Volume:2.7 gal

Start Purge (hrs.): 1047

End Purge (hrs.): 1100

Total Purge Time (min.):13

Total Amount Purged (gal.):9

Monitoring Reading:0.0 ppm upon open

1 . 1 ppm from purge water

Purge Method:Fultz pump

I Sample Method: stainless steel bailer1| Depth Sampled: 18.8 ft BTOC

1 Sample Date & Time:

7-24-91, 1118

Sampled By:Emily Olds

Type of Sample

13 Low ConcentrationD High Concentration[3 GrabD CompositeD Grab-Composite

Analysis

Total Metals

Cyanide

Dissolved Metals

Sulfate.chloride

| Nitrate

f TSS.TDS.Alkalinity.Acidity

II TDW

PH ————————

SAS or CASE *

16855

6465C-02

6463C-01

Preservative

HNO3

NaOH

HN03

none

nonenone

HC1

Purge Data

Volume(gallons)

pHS.C.

(millimho/cm) Temp.CC)Color &Turbidity(NTU)

Sample Data

pH

8.75

Airbill*

0552974564

0552974601

0552974586

0552974590

Volume

1x1 liter

1 x 1 liter1x1 liter

1 x 1 liter

1 x 1 liter

2x1 liter

1x1 liter

S.C.(millimho/cm)

1.721

COC*

3 13994

3 13992

3 13993

3 13991

Traffic Report *

MCDG 38

MCDG 38

MCDG 39

Temp.CC)

14

Lab

SK1NER

WADSPA

CRL

WADSPA

D.O.(mg/1)

0.53

Date Shipped

7-25-91

7-25-91

7-25-91

7-26-91

Color &Turbidity(NTU)

brown, >200

Time Shipped

1700

1700

1700

1700

Tag*

3-1193503,3-1193504

3-1193503,3-1193504

3-1193505

3-1193508

3-1193509

3-1193506,3-1193507

3-1193510

A R 3 0 I U U I

Page 52: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data Page J_ ofj_D Domestic Well Data By RJG______D Other ______

Project Site Name Jack's Creek___________________ Project Site Number 37-15-3L2W______NUS Source No. 2567_________________________ Source Location JC-GMW-212I

Total Well Depth:44 ft BGS

Well Casing Size & Depth:

2-inch, 46.1 ft BTOC

Static Water Level: 12.3 ft BTOC

One Casing Volume:6.76 gal

Start Purge (hrs.):1450

End Purge (hrs.):1517

Total Purge Time (min.):27

Total Amount Purged (gal.):20.28

Monitoring Reading:

Purge Method:stainless steel bailer/

Sample Method:stainless steel bailer

Depth Sampled: 12.5 ft BTOC

Sample Date & Time:

7-23-91, 1530

Sampled By:Emily Olds

Type of Sample

13 Low ConcentrationD High Concentration[3 GrabD CompositeD Grab-Composite

Analysis

Total Metals

CyanideDissolved Metals

Sulfate, chloride

Nitrate

TSS ,TDS .Alkalinity .AcidityTPH

SAS or CASE *

16855

6465C-02

6463C-01

Preservative

HN03

NaOH

HN03

nonenonenoneHCI

Purge Data1

Volume(gallons)

pHS.C.

(millimho/cm) Temp.CC)Color &Turbidity(NTU)

4*< V

Sample Data ^

PH

6.87

Airbill*

0552974634

0552974704

0552974715

0552974671

Volume

1x1 liter1x1 liter1x1 liter

1 x 1 liter1x1 liter2x1 liter

1x1 liter

S.C.(millimho/cm)

2.400

COC*

3 13989

3 13505

3 13981

3 13982

Traffic Report *

MCDG 34

MCDG 34

MCDG 35

Temp.CC)

14.6

Lab

SKINER

WADSPA

CRL

WADSPA

D.O.(mg/1)

2.34

Date Shipped

7-24-91

7-24-91

7-24-91

7-24-91

Color &Turbidity(NTU)

grey ,> 200

Time Shipped

1700

1700

1700

1700

Tag*

3-1188484,3-1188485

3-1188484,3-1188485

3-1188486

3-1188489

3-1188490 ^ k 1

3-1188487,3-1188488 ^ F 1

3-1188491 •

™ —————— , —————————————————————— 1

AR30IH2

Page 53: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data Page J_ of _2_Ll Domestic Well Data . o By RJG_______D Other ______

Project Site Name Jack's Creek ____________________ Project Site Number 37-15-3L2WNUS Source No. 2567__________________________ Source Location JC-GMW-302I

Total Well Depth:91.3 ft BGS

Well Casing Size & Depth:

4-inch, 94.6 ft BTOCStatic Water Level:6.4 ft BTOC

One Casing Volume:70.56 gal

Start Purge (hrs.): 1517

End Purge (hrs.):1527

Total Purge Time (min.):10

Total Amount Purged (gal.):211.68

Monitoring Reading:

I 30.9 ppm upon opening well

1 Purge Method:submersible pump

1 Sample Method:stainless steel bailer

J Depth Sampled: 17 ft BTOC

Sample Date & Time:

7-30-91, 1555

Sampled By:Emily Olds

Type of Sample

[3 Low ConcentrationD High Concentration[3 GrabD CompositeD Grab-Composite

Analysis

Total Metals

Cyanide

Dissolved Metals

Sulfate, chloride

Nitrate

1 TSS,TDS,Alkalinity,Acidity

LXQA ______________| BNA.Pesticide.PCB

SAS or CASE *

16890

6465C-02

6574C-01

16890

Preservative

HNO3

NaOH

HNO3

none

none

none

HC1none

Purge Data

Volume(gallons)

pH

8.79

Airbill*

0552974446

0552974413

0552974402

0552974376

0552974435

Volume

1 X 1 liter

1x1 liter

1x1 liter

1 x 1 liter

1x1 liter

2x1 liter

1 T 40 ml2 x 80 oz

pH

S.C.(millimho/cm)

0.971

COC*

3 13523

3 13516

3 13517

3 13519

3 13518

Traffic Report *

MCDG 00

MCDG 00

MCDG 03

CHB74

S.C.(millimho/cm)

Sample Data

Temp.CC)

16.5

Lab

WEYER

WADSPA

CRL

RECNY

CLAYTN

Temp.CC)

D.O.(mg/1)

2.81

Date Shipped

7-31-91

7-31-91

7-31-91

7-31-91

7-31-91

Color &Turbidity

Color &Turbidity(NTU)

clear ,5.1

Time Shipped

1700

1700

1700

1700

1700

Tag*

3-1193688,3-1193689

3-1193688,3-1193689

3-1193690

3-1193700

3-1193701

3-1193698,3-1193699

3-1 193691 thru 3-1193693

3-1193694,3-1193695

IAR30UU3

Page 54: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data ' Page J_ of,n Domestic Well Data By RJGD Other ______

Project Site Name Jack's Creek_______________________ Project Site Number 37-15-3L2W_______NUS Source No. 2567____________________________ Source Location JC-GMW-303I

Total Well Depth:91 ft BGS

Well Casing Size & Depth:

2-inch, 92 ft BTOC

Static Water Level:27.9 ft BTOC

One Casing Volume:12.82 gal

Start Purge (hrs.): 0828

End Purge (hrs.): 0943

Total Purge Time (min.):75

Total Amount Purged (gal.):38.46

Monitoring Reading:

0.0 ppm upon opening well

Purge Method:stainless steel bailer/

Sample Method:stainless steel bailer

Depth Sampled:27.5 ft BTOC

Sample Date & Time:

8-2-91, 0950

Sampled By:Emily Olds

Type of Sample

13 Low ConcentrationG High Concentration[3 GrabO CompositeO Grab-Composite

Analysis

Total Metals

Cyanide

Dissolved MetalsSulfate, chloride

Nitrate

TSS.TDS.Alkalinity .Acidity

SAS or CASE *

16890

6465C-02

Preservative

HN03

NaOH

HN03

none

none

none

Purge Data

Volume(gallons)

pH

8.02

Airbill*

0552974284

0552974225

0552974214

Volume

1X1 liter

1x1 liter

1x1 liter

1x1 liter

1x1 liter

2x1 liter

pH

S.C.(millimho/cm)

0.245

COC*

3 13535,13544

3 13545

3 13547

Traffic Report *

MCDG 42

MCDG 42

MCDG 43

S.C.(millimho/cm)

Sample Data

Temp.CC)

17.2

Lab

WEYER

WADSPA

CRL

Temp.CC)

D.O.(mg/1)

6.77

Date Shipped

8-2-91

8-2-91

8-5-91

Color &Turbidity

•Color &Turbidity(NTU)

14.2

Time Shipped

1700

1700

1700

Tag*

3-1193521,3-1193522

3-1193521,3-1193522

3-1193523

3-1193526

3-1193527 B|

3-1193524,3-1193525 ^ F

Page 55: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data • Page _1_ ofE Domestic Well Data By RJGD Other ______

project Site Name Jack's Creek_____________________ Project Site Number 37-15-3L2WUS Source No. 2567__________________________ Source Location JC-GMW-303I-A

Total Well Depth:91 ft BGS

Well Casing Size & Depth:

2-inch, 92 ft BTOC

Static Water Level:27.9 ft BTOC

One Casing Volume: 12.82 gal

Start Purge (hrs.):0828

End Purge (hrs.):0943

Total Purge Time (min.):75

Total Amount Purged (gal.):38.46

Monitoring Reading:0.0 ppm upon openinp well

Purge Method:stainless steel bailer

1 Sample Method:stainless steel bailer

1 Depth Sampled:27.5 ft BTOC

I Sample Date & Time:

8-2-91, 0950

Sampled By:Emily Olds

Type of Sample

13 Low ConcentrationD High Concentration13 GrabD CompositeD Grab-Composite

Analysis

Sulfate.chloride

Nitrate

TSS.TDS.Alkalinity .Acidity

—————————| —————————1 —————————

SAS or CASE *

6465C-02

Preservative

none

none

none

Purge Data

Volume(gallons)

PH

'

S.C.(millimho/cm) Temp.CC)

Color &Turbidity

Sample Data

PH

8.02

Airbill*

0552974225

0552974214

Volume

1x1 liter

1x1 liter

2x1 liter

S.C.(millimho/cm)

0.245

COC*

3 13545

3 13547

Traffic Report *

Temp.CC)

17.2

Lab

WADSPA

CRL

D.O.(mg/1)

6.77

Date Shipped

8-2-91

8-5-91

Color &Turbidity(NTU)

14.2

Time Shipped

1700

1700

tag*

3-1105235

3-1105238

3-1105231,3-1105232

AR30|l*l*5

Page 56: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

Q Monitoring Well Data Page J_ ofD Domestic Well Data By JUG___D Other ______

Project Site Name Jack's Creek___________________ Project Site Number 37-15-3L2WNUS Source No. 2567__________________________ Source Location JC-GMW-303I-B

Total Well Depth:

Well Casing Size & Depth:

Static Water Level:

One Casing Volume:

Start Purge (hrs.):

End Purge (hrs.):

Total Purge Time (rain.):

Total Amount Purged (gal.):

Monitoring Reading:

Purge Method: /

Sample Method:from DI water

Depth Sampled:

Sample Date & Time:

8-2-91, 1130

Sampled By:Emily Olds

Type of Sample

[3 Low ConcentrationD High Concentration[3 GrabD CompositeD Grab-Composite

Analysis

Sulfate, chlorideNitrate

Alkalinity, Acidity

SAS or CASE *

6465C-02

Preservative

none

none

none

Volume(gallons)

PH

Airbill*

0552974225

0552974214

Volume

1x1 liter1x1 liter

1x1 liter

PH

S.C.(millimho/cm)

COC*

3 13545

3 13547

Traffic Report *

Purge Data

S.C.(millimho/cm)

Sample Data

Temp.CC)

Lab

WADSPA

CRL

3-1105236

3-1105239

3-1105233

Temp.CC)

D.O.(mg/1)

Date Shipped

8-2-91

8-5-91

Tag*

Color &Turbidity

h^

Color &Turbidity(NTU)

Time Shipped

1700

1700

^

P

AR30IH6

Page 57: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data Page J_ ofd Domestic Well Data By RJGD Other ______

'roject Site Name Jack's Creek__________________- Project Site Number 37-15-3L2WUS Source No. 2567________________________ Source Location JC-GMW-303I-C

Total Well Depth:

Well Casing Size & Depth:

Static Water Level:

One Casing Volume:

Start Purge (hrs.):

End Purge (hrs.):

Total Purge Time (min.):

Total Amount Purged (gal.):

Monitoring Reading:

Purge Method: ;

Sample Method: from DI water

| Depth Sampled:

Sample Date & Time:

8-2-91, 1127

Sampled By:Emily Olds

Type of Sample

[3 Low ConcentrationD High Concentration[3 GrabD CompositeD Grab-Composite

Analysis

Sulfate, chloride

Nitrate

Alkalinity , Acidity

—————————1

SAS or CASE *

6465C-02

Preservative

none

none

none

Purge Data

Volume(gallons)

pHS.C.

(millimho/cm) Temp.CC)Color &Turbidity

Sample Data

PH

Airbill*

0552974225

0552974214

Volume

1 x 1 liter

1x1 liter

1 x 1 liter

S.C.(millimho/cm)

COC*

3 13545

3 13547

Traffic Report *

Temp.CC)

Lab

WADSPA

CRL

D.O.(mg/1)

Date Shipped

8-2-91

8-5-91

Color &Turbidity(NTU)

Time Shipped

1700

1700

Tag*

3-1105237

3-1105240

3-1105234

j

AR30UU7

Page 58: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data Page J_ ofE Domestic Well Data By RJGC3 Other ______

Project Site Name Jack's Creek___________________ Project Site Number 37-15-3L2W_________NUS Source No. 2567_________________________ Source Location JC-GMW-305I

Total Well Depth:92 ft BGS

Well Casing Size & Depth:

4-inch, 94.7 ft BTOC

Static Water Level: 15 ft BTOC

One Casing Volume:63.76 gal

Start Purge (hrs.): 1033

End Purge* (hrs.): 1043

Total Purge Time (min.):10

Total Amount Purged (gal.):191.28

Monitoring Reading:

0.0 opm durinp purpe

Purge Method:submersible pump/

Sample Method:stainless steel bailer

Depth Sampled: 16.5 ft BTOC

Sample Date & Time:

7-25-91, 1127

Sampled By:Emily Olds

Type of Sample

H Low ConcentrationQ High Concentration[3 GrabO CompositeD Grab-Composite

Analysis

Total MetalsCyanideDissolved Metals

Sulfate.chlorideNitrate

TSS,TDS,Alkalinity,Acidity

SAS or CASE *

16855

6465C-02

Preservative

HNO3

NaOH

HNO3

nonenonenone

Purge Data

Volume(gallons)

PHS.C.

(millimho/cm) Temp.CC)Color &Turbidity(NTU)

'•

*Sample Data ^ ^

pH

8.11

Airbill*

0552974542

0552974520

0552974505

Volume

1x1 liter

1x1 liter

1x1 liter

1x1 liter

1x1 liter

2x1 liter

S.C.(millimho/cm)

0.651

COC*

3 13999

3 13509

3 13507

Traffic Report *

MCDG 46

MCDG 46

MCDG 47

Temp.CC)

16.6

Lab

SKINER

WADSPA

CRL

D.O.(mg/1) .

5.15

Date Shipped

7-26-91

7-26-91

7-26-91

Color &Turbidity(NTU)

clear,5.7

Time Shipped

1700

1700

1700

Tag*

3-1193559,3-1193560

3-1193559,3-1193560

3-1193561

3-1193564

3-1193565 ^

3-1193562,3-1193563 ^ P

AR30IH8

Page 59: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data ' Page J_ of 2G Domestic Well Data By RJG_______D other ______

Yoject Site Name Jack's Creek____________________ Project Site Number 37-15-3L2WUS Source No. 2567________________________ Source Location JC-GMW-306I

Total Well Depth:89 ft BGS

Well Casing Size & Depth:

4-inch, 93 ft BTOC

Static Water Level:7.3 ft BTOC

One Casing Volume: 68. 56 gal

Start Purge (hrs.):1629

End Purge (hrs.): 1639

Total Purge Time (min.):10

Total Amount Purged (gal.):205.68

Monitoring Reading:

0.0 ppm upon opening well

.Purge Method:submcrsible pump

Sample Method:stainless steel bailer

Hlepth Sampled:8.9 ft BTOC

ample Date & Time:

7-30-91, 1714

Sampled By: Emily Olds

Type of Sample

[3 Low ConcentrationD High Concentration13 GrabD CompositeD Grab-Composite

Analysis

Total Metals

Cyanide

Dissolved Metals

Sulfate.chloride

Elitrate

'SS.TDS.Alkalinity.Acidity

I VOA1 BNA.Pesticide.PCB

SAS or CASE *

16890

6465C-02

6574C-01

16890

Preservative

HN03

NaOH

HN03

none

none

none

HC1

none

Purge Data

Volume(gallons)

PHS.C.

(millimho/cm) Temp.CC)Color &Turbidity

Sample Data

pH

7.72

Airbill*

0552974446

0552974413

0552974402

0552974376

0552974435

Volume

1x1 liter

1 x 1 liter

1x1 liter

1 x 1 liter

1x1 liter

2x1 liter

3 x 40 ml2 x 80 oz

S.C.(millimho/cm)

0.535

COC*

3 13523

3 13516

3 13517

3 13519

3 13518

Traffic Report *

MCDG 68

MCDG 68

MCDG 69

CHB76

Temp.CC)

17.6

Lab

WEYER

WADSPA

CRL

RECNY

CLAYTN

D.O.(mg/1)

2.34

Date Shipped

7-31-91

7-31-91

7-31-91

7-31-91

7-31-91

Color &Turbidity(NTU)

clear,3.5

Time Shipped

1700

1700

1700

1700

1700

Tag*

3-1193702,3-1193703

3-1193702,3-1193703

3-1193704

3-1193714

3-1193715

3-1193712,3-1193713

3-1193705 thru 3- 193707

3-1193708,3-1193709

Page 60: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data Page _2_ ofG Domestic Well Data By RJGD Other _______

Project Site Name Jack's Creek_____________________ Project Site Number 37-15-3L2WNUS Source No. 2567________________________ Source Location JC-GMW-306I

Total Well Depth:89 ft BGS

Well Casing Size & Depth:

4-inch, 93 ft BTOC

Static Water Level:7.3 ft BTOC

One Casing Volume:68.56 gal

Start Purge (hrs.): 1629

End Purge (hrs.):1639

Total Purge Time (min.):10

Total Amount Purged (gal.):205.68

Monitoring Reading:

0.0 ppm upon opening well

Purge Method submersible pump

Sample Method:stainless steel bailer

Depth Sampled:8.9 ft BTOC

Sample Date & Time:

7-30-91, 1714

Sampled By:Emily Olds

Type of Sample

[3 Low ConcentrationD High Concentration03 GrabD CompositeD Grab-Composite

Analysis

BNA.Pesticide.PCB

1

SAS or CASE *

16890

Preservative

none

Purge Data

Volume(gallons)

PH

PH

7.72

Airbill*

0552974306

Volume

2 x 80 oz

S.C.(millimho/cm)

0.535

COC*

3 13528

Traffic Report *

CHB77

S,C.(millimho/cm) Temp.CC)

Color &Turbidity

'

A_

Temp.CC)

17.6

Lab

CLAYTN

D.O.(mg/1)

2.34

Date Shipped

8-1-91

Color &Turbidity(NTU)

clcar.3.5

Time Shipped

1700

Tag*

3-1193710,3-1193711

^

AR30U50

Page 61: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data Page J_ o f _2_D Domestic Well Data By RJG_____D Other ______

'reject Site Name Jack's Creek________________" Project Site Number 37-1S-3L2WUS Source No. 2567________________________ Source Location JC-GMW-309I

Total Well Depth:90.5 ft BGS

Well Casing Size & Depth:

4-inch, 93.7 ft BTOC

Static Water Level:4.8 ft BTOC

One Casing Volume:71.12 gal

Start Purge (hrs.):1152

End Purge (hrs.): 1200

Total Purge Time (min.):8

Total Amount Purged (gal.):213.36

Monitoring Reading:

1000 ppm inside riser upon opening well

Purge Method:submersible pump/

Sample Method:stainless steel bailer

] Depth Sampled:6.4 ft BTOC

| Sample Date & Time:

7-30-91, 1229

11 Sampled By: Emily Olds

Type of Sample

(3 Low ConcentrationD High Concentration13 GrabD CompositeD Grab-Composite

Analysis

Total Metals

Cyanide

Dissolved Metals

Sulfate.chloride

| Nitrate

* TSS,TDS,Alkalinity,AcidityTj ———————— - —— * ———— * —I VOA1 BNA,Pesticide,PCB

SAS or CASE *

16890

6465C-02

6574C-01

16890

Preservative

HN03

NaOH

HN03

none

none

none

HC1none

Purge Data

Volume(gallons)

PH

PH

7.11

Airbill*

0552974446

0552974413

0552974402

0552974376

0552974435

Volume

1 x 1 liter

1x1 liter

1x1 liter

1 x 1 liter1x1 liter

2x1 liter

3 x 40 ml2 x 80 oz

S.C.(millimho/cm)

1.554

COC*

3 13523

3 13516

3 13517

3 13519

3 13518

Traffic Report *

MCDG 70

MCDG 70

MCDG 71

CHB78

S.C.(millimho/cm)

Sample Data

Temp.CC)

15.3

Lab

WEYER

WADSPA

CRL

RECNY

CLAYTN

Temp.CC)Color &Turbidity

D.O.(mg/1)

2.06

Date Shipped

7-31-91

7-31-91

7-31-91

7-31-91

7-31-91

Color &Turbidity(NTU)

clear, 80

Time Shipped

1700

1700

1700

1700

1700

Tag*

3-1193716,3-1193717

3-1193716,3-1193717

3-1193718

3-1193728

3-1193729

3-1193726,3-1193727

3-1 193719 thru 3-1 1937213-1193722,3-1193723

AR30U5I

Page 62: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

Q Monitoring Well Data Page _2_ of 2_d Domestic Well Data By RJG_____D Other ______

Project Site Name Jack's Creek_____________________ Project Site Number 37-15-3L2W________NUS Source No. 2567__________________________ Source Location JC-GMW-309I

Total Well Depth:90.5 ft BGS

Well Casing Size & Depth:

4-inch, 93.7 ft BTOC

Static Water Level:4.8 ft BTOC

One Casing Volume:71.12 gal

Start Purge (hrs.): 1152

End Purge (hrs.):1200

Total Purge Time (min.):8

Total Amount Purged (gal.):213.36

Monitoring Reading:

1000 ppm inside riser upon opening well

Purge Method:submersible pump

Sample Method:stainless steel bailer

Depth Sampled:6.4 ft BTOC

Sample Date & Time:

7-30-91, 1229

Sampled By: Emily Olds

Type of Sample

[3 Low ConcentrationD High Concentration[3 GrabD CompositeO Grab-Composite

Analysis

BNA.Pesticide.PCB

SAS or CASE *

16890

Preservative

none

Purge Data

Volume(gallons)

PHS.C.

(millimho/cm) Temp.CC)Color &Turbidity

A

Sample Data 81

pH

7.11

Airbill*

0552974306

Volume

2 x 80 oz

S.C.(millimho/cm)

1.554

COC*

3 13528

Traffic Report *

CHB79

Temp.CC)

15.3

Lab

CLAYTN

D.O.(mg/1)

2.06

Date Shipped

8-1-91

Color &Turbidity(NTU)

clear.80

Time Shipped

1700

Tag*

3-1193724,3-1193725

-• 1— — — 4

AR30|l»52

Page 63: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET —

Q Monitoring Well Data Page J_ of J_d Domestic Well Data By RJG______D Other ______

iject Site Name Jack's Creek___________________. ,Project Site Number 37-15-3L2WUS Source No. 2S67__________________________ Source Location JC-GWR-OH

Total Well Depth:

Well Casing Size & Depth:

Static Water Level:One Casing Volume:

Start Purge (hrs.): 1208

End Purge (hrs.): 1218

Total Purge Time (min.):10

Total Amount Purged (gal.):

Monitoring Reading:

Purge Method:

| Sample Method: from outside spicketJ^ Depth Sampled:

I Sample Date & Time:

7-29-91, 1219

Sampled By:Emily Olds

Type of Sample

13 Low ConcentrationD High Concentration{3 GrabD CompositeD Grab-Composite

Analysis

Total Metals

Cyanide

Dissolved Metals

Sulfatc.chloride

I Nitrate

P TSS.TDS.Alkalinity .Acidity

I VOA1 BNA.Pesticide.PCB

SAS or CASE *

16890

6465C-02

6574C-01

16890

Preservative

HNO3

NaOH

HN03

nonenone

none

HC1

none

Purge Data

Volume(gallons)

pH

7.36

Airbill*

0552974446

0552974413

0552974402

0552974376

0552974435

Volume

1x1 liter

1 x 1 liter1 x 1 liter

1x1 liter

1x1 liter

2x1 liter

3 x 40 ml

2 x 80 oz

pH

S.C.(millimho/cm)

0.404

COC*

3 13514

3 13516

3 13517

3 13519

3 13518

Traffic Report *

MCDG 72

MCDG 72

MCDG 73

CHB80

S.C.(millimho/cm)

Sample Data

Temp.CC)

13.5

Lab

WEYER

WADSPA

CRL

RECNY

CLAYTN

Temp.CC)

D.O.(mg/1)

4.94

Date Shipped

7-31-91

7-31-91

7-31-91

7-31-91

7-31-91

Color &Turbidity

Color &Turbidity(NTU)

0.28

Time Shipped

1700

1700

1700

1700

1700

, Tag*

3-1193730,3-1193731

3-1193730,3-1193731

3-1193732

3-1193740

3-1193741

3-1193738,3-1193739

3-1193733 thru 3-1 1937353-1193736,3-1193737

•AR30ll*53

Page 64: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

D Monitoring Well Data - Page _LQ Domestic Well Data By RJGD Other ______

Project Site Name Jack's Creek_____________________ Project Site Number 37-15-3L2W___________NUS Source No. 2567__________________________ Source Location JC-GWR-02I

Total Well Depth:

Well Casing Size & Depth:

Static Water Level:

One Casing Volume:

Start Purge (hrs.): 1422

End Purge (hrs.): 1432

Total Purge Time (min.):10

Total Amount Purged (gal.):

Monitoring Reading:

Purge, Method: r-i

Sample Method: from tap

Depth Sampled:

Sample Date & Time:

7-25-91, 1438

Sampled By:Emily Olds

Type of Sample

[3 Low ConcentrationO High Concentration13 GrabD CompositeD Grab-Composite

Analysis

Total Metals

CyanideDissolved Metals

Sulfate.chloride

NitrateTSS,TDS,Alkalinity,Acidity

SAS or CASE *

16855

6465C-02

Preservative

HNO3

NaOH

HNO3

nonenone

none

Purge Data

Volume(gallons)

pHS.C.

(millimho/cm) Temp.CC)Color &Turbidity(NTU)

ASample Data ^ ^

PH

7.27

Airbill*

0552974542

0552974520

0552974505

Volume

1x1 liter1x1 liter1x1 liter

1x1 liter

1x1 liter

2x1 liter

S.C.(millimho/cm)

0.389

COC*

3 13999

3 13509

3 13507

Traffic Report #

MCDG 48

MCDG 48

MCDG 49

Temp.CC)

13.6

Lab

SKINER

WADSPA

CRL

D.O.(mg/1)

4.51

Date Shipped

7-26-91

7-26-91

7-26-91

Color &Turbidity(NTU)

clear.0.15

Time Shipped

1700

1700

1700

Tag*

3-1193566,3-1193567

3-1193566,3-1193567

3-1193568

3-1193571

3-1193572 jj

3-1193569,3-1193570 ^ P |^ |

AR30U5U

Page 65: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

D Monitoring Well Data Page J_ of _LG Domestic Well Date By RJG_______D Other _______

iject Site Name Jack's Creek________________- Project Site Number 37-15-3L2WUS Source No. 2567___________________________ Source Location JC-GWR-03I

Total Well Depth:

Well Casing Size & Depth:

Static Water Level:

One Casing Volume:

Start Purge (hrs.):1500

End Purge (hrs.): 1510

Total Purge Time (min.):10

Total Amount Purged (gal.):

Monitoring Reading:

Purge Method: (

1 Sample Method: from tapj| Depth Sampled:

I Sample Date & Time:

7-25-91, 1519

1 Sampled By:Emily Olds

Type of Sample

[3 Low ConcentrationD High Concentration[3 GrabD CompositeD Grab-Composite

Analysis

Total Metals

Cyanide

Dissolved Metals

Sulfate.chloride

I Nitrate

r TSS.TDS, Alkalinity .Acidity

1 —————————

SAS or CASE *

16855

6465C-02

Preservative

HN03

NaOH

HNO3

none

nonenone

Purge Data

Volume(gallons)

PHS.C.

(millimho/cm) Temp.CC)Color &Turbidity(NTU)

Sample Data

pH

7.38

Airbill*

0552974542

0552974520

0552974505

Volume

1x1 liter

1x1 liter

1x1 liter

1x1 liter

1x1 liter

2x1 liter

S.C.(millimho/cm)

0.403

COC*

3 13999,13510

3 13509

3 13507

Traffic Report *

MCDG 50

MCDG 50

MCDG 51

Temp.CC)

16

Lab

SKINER

WADSPA

CRL

D.O.(mg/1)

4.13

Date Shipped

7-26-91

7-26-91

7-26-91

Color &Turbidity(NTU)

clear,0.19

Time Shipped

1700

1700

1700

Tag*

3-1193573,3-1193574 .

3-1193573,3-1193574

3-1193575

3-1193578

3-1193579

3-1193576,3-1193577

11*55

Page 66: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

D Monitoring Well Data Page _l_ ofG Domestic Well Data By RJGD Other _______

Project Site Name Jack's Creek_____________________ Project Site Number 37-15-3L2W___________NUS Source No. 2567_____________________ Source Location JC-GWR-04I

Total Well Depth: 160 ft BTOC

Well Casing Size & Depth:

6-inch, 160 ft BTOC

Static Water Level:36.2 ft BTOC

One Casing Volume: 185.7 gal

Start Purge (hrs.): 1432

End Purge (hrs.): 1502

Total Purge Time (min.):30

Total Amount Purged (gal.):557.1

Monitoring Reading:

Purge Method: ubmersible pump

Sample Method:stainless steel bailer

Depth Sampled:50 ft BTOC

Sample Date & Time:

7-24-91, 1525

Sampled By: Emily Olds

Type of Sample

13 Low ConcentrationD High ConcentrationH GrabQ CompositeO Grab-Composite

Analysis

Total Metals

CyanideDissolved Metals

Sulfate, chloride

Nitrate

TSS,TDS,Alkalinity,Acidity

SAS or CASE *

16855

6465C-02

Preservative

HNO3

NaOH

HNO3

none

none

none

Purge Data

Volume(gallons)

pHS.C.

(millimho/cm) Temp.CC)Color &Turbidity(NTU)

Sample Data

pH

8.27

Airbill*

0552974564

0552974601

0552974586

Volume

1x1 liter

1x1 liter1x1 liter

1x1 liter

1x1 liter

2x1 liter

S.C.(millimho/cm)

0.214

COC*

3 13996

3 13992

3 13993

Traffic Report #

MCDG 40

MCDG 40

MCDG 41

Temp.CC)

15

Lab

SKINER

WADSPA

CRL

D.O.(mg/1)

5.19

Date Shipped

7-25-91

7-25-91

7-25-91

Color &Turbidity(NTU) i

yellow. > 200

Time Shipped

1700

1700

1700

ITag * 1

3-1193514,3-1193515 I3-1193514,3-1193515 I

3-1193516 1

3-1193519 I

3-1193520 jjlJL I

3-1193517,3-1193518 ^ F 1

—————————————————————————————— 1

AR30II*56

Page 67: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

D Monitoring Well Data Page _1_ of.Q Domestic Well Data By RJGD Other _______

Iproject Site Name Jack's Creek____________________ Project Site Number 37-15-3L2W_________________IUS Source No. 2567__________________________ ' Source Location JC-GWR-OSI

Total Well Depth:

Well Casing Size & Depth:

Static Water Level:

One Casing Volume:

Start Purge (hrs.):0814

End Purge (hrs.): 0824

Total Purge Time (min.):10

Total Amount Purged (gal.):

Monitoring Reading:

Purge Method:

Sample Method: from tap

1 Depth Sampled:

3 Sample Date & Time:

7-26-91, 0831

Sampled By:Emily Olds

Type of Sample

[3 Low ConcentrationQ High ConcentrationQ GrabD CompositeD Grab-Composite

Analysis

Total Metals

Cyanide

Dissolved Metals

Sulfate.chloride| Nitrate

| TSS.TDS, Alkalinity .Acidity

1

SAS or CASE *

16855

6465C-02

Preservative

HNO3

NaOH

HNO3

none

none

none

Purge Data

Volume(gallons)

PHS.C.

(millimho/cm) Temp.CC)Color &Turbidity(NTU)

Sample Data

PH

7.26

Airbill*

0552974542

0552974520

0552974505

Volume

1x1 liter

1x1 liter

1x1 liter

1 x 1 liter

1x1 liter

2x1 liter

S.C.(millimho/cm)

0.598

COC *

3 13510

3 13509

3 13507

Traffic Report *

MCDG 52

MCDG 52

MCDG 53

Temp.CC)

17

Lab

SKINER

WADSPA

CRL

D.O.(mg/1)

2.36

Date Shipped

7-26-91

7-26-91

7-26-91

Color &Turbidity(NTU)

clear, 13. 6

Time Shipped

1700

1700

1700

Tag*

3-1193580,3-1193581

3-1193580,3-1193581

3-1193582

3-1193585

3-1193586

3-1193583,3-1193584

AR30U57

Page 68: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

D Monitoring Well Data Page J_ of J_G Domestic Well Data By RJG_______D Other ______

Project Site Name Jack's Creek_____________________ Project Site Number 37-15-3L2W____________NUS Source No. 2567_________________________ Source Location JC-GWR-06I

Total Well Depth:

Well Casing Size & Depth:

Static Water Level:

One Casing Volume:

Start Purge (hrs.): 083 7

End Purge (hrs.):0849

Total Purge Time (min.):12

Total Amount Purged (gal.):

Monitoring Reading:

Purge Method: .

Sample Mcthod:from tap

Depth Sampled:

Sample Date & Time:

7-26-91, 0853

Sampled By:Emily Olds

Type of Sample

13 Low ConcentrationD High Concentration[3 GrabD CompositeD Grab-Composite

Analysis

Total MetalsCyanideDissolved Metals

Su'fatc.chloride

NitrateTSS.TDS.Alkalinity .Acidity

SAS or CASE *

16855

6465C-02

Preservative

HNO3

NaOH

HN03

nonenonenone

Purge Data

Volume(gallons)

pH

PH

7.58

Airbill*

0552974542

0552974520

0552974505

Volume

1 x 1 liter

1x1 liter

1 x 1 liter

1x1 liter1x1 liter

2x1 liter

S.C.(millimho/cm)

0.427

COG*

3 13510

3 13509

3 13507

Traffic Report #

MCDG 54

MCDG 54

MCDG 55

S.C.(millimho/cm) Temp.CC)

Color &Turbidity(NTU)

-m

Sample Data ^ ^

Temp.CC)

13.9

Lab

SKINER

WADSPA

CRL

D.O.(mg/1)

5.90

Date Shipped

7-26-91

7-26-91

7-26-91

Color &Turbidity(NTU)

clear,0.33

Time Shipped

1700

1700

1700

Tag* I

3-1193587,3-1193588 1

3-1193587,3-1193588 1

3-1193589 1

3-1193592 I

3-1193593 ^ 1

3-1193590,3-1193591 ^ B 1—— - —— -jAR30U58

Page 69: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

Q Monitoring Well Data • Page J_ ofd Domestic Well Data By RJGD Other '

>jcct Site Name Jack's Creek ______ '' ^ Project Site Number 37-1S-3L2WS Source No. 2567________________________" *Source Location JC-GMW-201II

Total Well Depth:76 ft BGS

Well Casing Size & Depth:

2-inch, 77.7 ft BTOC

Static Water Level:23.1 ft BTOC

One Casing Volume: 10. 92 gal

Start Purge (hrs.): 1040

End Purge (hrs.): 1130

Total Purge Time (min.):50

Total Amount Purged (gal.):32.76

Monitoring Reading:

Purge Method:Fultz pump1 /1 Sample Method:stainless steel bailer

|L Depth Sampled:23.1 ft BTOC

W Sample Date & Time:

10-9-91, 1135

Sampled By: Roger Myers

Type of Sample

[3 Low ConcentrationO High Concentration[3 GrabD CompositeD Grab-Composite

Analysis

Nitrate

Nitrite

11

SAS or CASE *

6573C-02

Preservative

H2SO4

none

Purge Data

Volume(gallons)

PHS.C.

(millimho/cm) Temp.CC)Color &Turbidity(NTU)

Sample Data

pH

7.31

Airbill*

0552973153

Volume

1x1 liter

1x1 liter

S.C.(millimho/cm)

0.299

COC*

3 12539

Traffic Report *

Temp.CC)

11.7

Lab

SKINER

D.O.(mg/1)

3.75

Date Shipped

10-9-91

Color &Turbidity(NTU)

clear

Time Shipped

1700

Tag*

3-1257159,3-1257160

3-1257159,3-1257160

AR30U59

Page 70: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data Page J_ of.G Domestic Well Data By RJGD Other ______

Project Site Name Jack's Creek_____________________ Project Site Number 37-15-3L2W_______NUS Source No. 2567________________________ Source Location JC-GMW-201SII

Total Well Depth:30 ft BGS

Well Casing Size & Depth:

2-inch, 32.5 ft BTOC

Static Water Level:23.1 ft BTOC

One Casing Volume: 1.88 gal

Start Purge (hrs.):1105

End Purge (hrs.):1113

Total Purge Time (min.):8

Total Amount Purged (gal.):5.64

Monitoring Reading:

Purge Method:Fultz pump/

Sample Method:stainless steel bailer

Depth Sampled:23.15 ft BTOC

Sample Date & Time:

10-9-91, 1115

Sampled By:Roger Myers

Type of Sample

[3 Low ConcentrationD High Concentrationf3 GrabD CompositeD Grab-Composite

Analysis

Nitrate

Nitrite

SAS or CASE *

6573C-02

Preservative

H2S04

none

Purge Data

Volume(gallons)

PHS.C.

(millimho/cm) Temp.CC)Color &Turbidity(NTU)

-•*B

Sample Data ^ ^

PH

7.31

Airbill*

0552973153

Volume

1x1 liter

1x1 liter

S.C.(millimho/cm)

0.323

COC*

3 12539

Traffic Report *

Temp.CC)

13.0

Lab

SKINER

D.O.(mg/1)

6.28

Date Shipped

10-9-91

Color &Turbidity(NTU)

brown

Time Shipped

1700

Tag*

3-1257157,3-1257158

3-1257157.3-1257158

——————————— *1

AR30U60

Page 71: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data Page J_ of J_O Domestic Well Data By RJG______d Other ______

Project Site Name Jack's Creek____________________ Project Site Number 37-15-3L2WUS Source No. 2567________________________ Source Location JC-GMW-204II

Total Well Depth:41 ft BGS

Well Casing Size & Depth:

2-inch, 44 ft BTOC

Static Water Lcvcl:31.2 ft BTOC

One Casing Volume:2.56 gal

Start Purge (hrs.):1225

End Purge (hrs.): 1245

Total Purge Time (min.):20

Total Amount Purged (gal.):7.68Monitoring Reading:

Purge Method:Fultz pump

Sample Method:stainless steel bailer

Depth Sampled:32.15 ft BTOC

| Sample Date & Time:

10-9-91, 1250

I Sampled By:Roger Myers

Type of Sample

[3 Low ConcentrationD High ConcentrationC3 GrabD CompositeD Grab-Composite

I AnalysisllNitrate

Nitrite

——————————————————

1

SAS or CASE *

6573C-02

Preservative

H2SO4

none

Purge Data

Volume(gallons)

pHS.C.

(millimho/cm) Temp.CC)Color &Turbidity(NTU)

Sample Data

pH

7.35

Airbill*

0552973153

Volume

1x1 liter

1x1 liter

S.C.(millimho/cm)

0.535

COG*

3 12539

Traffic Report #

Temp.CC)

14

Lab

SKINER

D.O.(mg/1)

2.3

Date Shipped

10-9-91

Color &Turbidity(NTU)

brown

Time Shipped

1700

Tag*

3-1257161 3-1257163

3-1257161,3-1257163

AR30IU6I

Page 72: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data Page J_ ofO Domestic Well Data By RJGD Other ______

Project Site Name Jack's Creek_____________________ Project Site Number 37-15-3L2W_______NUS Source No. 2567________________________ Source Location JC-GMW-205II

Total Well Depth:32 ft BGS

Well Casing Size & Depth:

2-inch, 34.2 ft BTOC

Static Water Level: 13 .45 ft BTOC

One Casing Volume:4.15 gal

Start Purge (hrs.):1147

End Purge (hrs.): 1207

Total Purge Time (min.):20

Total Amount Purged (gal.):12.45

Monitoring Reading:

Purge Method:Fultz pump

Sample Method:stainless steel bailer

Depth Sampled: 13. 5 ft BTOC

Sample Date & Time:

10-9-91, 1210

Sampled By:Roger Myers

Type of Sample

[3 Low ConcentrationD High Concentration[3 GrabD CompositeD Grab-Composite

Analysis

Nitrate

Nitrite

SAS or CASE *

6573C-02

Preservative

H2S04

none

Purge Data

Volume(gallons)

PHS.C.

(millimho/cm) Temp.(°C)Color &Turbidity(NTU)

-Sample Data ^ _J

PH

7.21

Airbill*

0552973153

Volume

2x1 liter2x1 liter

S.C.(millimho/cm)

0.749

COG*

3 12539

Traffic Report #

Temp.(°C)

13.4

Lab

SKINER

D.O.(mg/1)

2.09

Date Shipped

10-9-91

Color &Turbidity(NTU)

clear

Time Shipped

1700

Tag*

3-1257151 thru 3-1257154

3-1257151 thru 3-1257154

fe^

AR30U62

Page 73: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data Page _1_ of 1n Domestic Well Data By RJG_____n Other _______

'reject Site Name Jack's Creek____________________ Project Site Number 37-1S-3L2WUS Source No. 2567_____________________' ' Source Location JC-GMW-205II-A

Total Well Depth:32 ft BGS

Well Casing Size & Depth:

2-inch, 34.2 ft BTOC

Static Water Level: 13. 45 ft BTOC

One Casing Volume:4.15 gal

Start Purge (hrs.):1147

End Purge (hrs.):1207

Total Purge Time (min.):20

Total Amount Purged (gal.): 12.45

Monitoring Reading:

Purge Method:Fultz pump

Sample Method: stainless steel bailer

Depth Sampled: 13. 5 ft BTOC

I Sample Date & Time:

10-9-91, 1215

Sampled By:Roger Myers

Type of Sample

Q Low ConcentrationD High Concentration[3 GrabD CompositeD Grab-Composite

Analysis

Nitrate

Nitrite

—————————F==if

SAS or CASE *

6573C-02

Preservative

H2SO4none

Purge Data

Volume(gallons)

PHS.C.

(millimho/cm) Temp.CC)Color &Turbidity(NTU)

Sample Data

PH

7.21

Airbill*

0552973153

Volume

1x1 liter

1x1 liter

S.C.(millimho/cm)

0.749

COC*

3 12539

Traffic Report #

Temp.CC)

13.4

Lab

SKINER

D.O.(mg/1)

2.09

Date Shipped

10-9-91

Color &Turbidity(NTU)

clear

Time Shipped

1700

Tag*

3-1257165,3-1257166

3-1257165,3-1257166

<IU63

Page 74: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

Q Monitoring Well Data ' Page _1_ of.E Domestic Well Data By RJGD Other ______

Project Site Name Jack's Creek___________________ Project Site Number 37-15-3L2WNUS Source No. 2567_______________________ Source Location JC-GMW-205II-B

Total Well Depth:

Well Casing Size & Depth:

Static Water Level:

One Casing Volume:

Start Purge (hrs.):

End Purge (hrs.):

Total Purge Time (min.):

Total Amount Purged (gal.):

Monitoring Reading:

Purge. Method:/

Sample Method:

Depth Sampled:

Sample Date & Time:

10-9-91, 1000

Sampled By:Roger Myers

Type of Sample

13 Low ConcentrationD High Concentration03 GrabD CompositeD Grab-Composite

Analysis

Nitrate

Nitrite

SAS or CASE *

6573 C-02

Preservative

H2S04

none

Purge Data

Volume(gallons)

pHS.C.

(millimho/cm)

Sample Data

PH

Airbill*

0552973153

Volume

Ixl liter

1x1 liter

S.C.(millimho/cm)

COC*

3 12539

Traffic Report #

Temp.CC)

Lab

SKINER

Temp.CC)Color &Turbidity(NTU)

mD.O.(mg/1)

Date Shipped

10-9-91

Color &Turbidity(NTU)

Time Shipped

1700

Tag*

3-1257167,3-1257168

3-1257167,3-1257168

A————— 9L\

Page 75: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data Page J_ of J_E Domestic Well Data By RJG_______D Other ______

'reject Site Name Jack's Creek__________________' Project Site Number 37-15-3L2WUS Source No. 2567___________________________ Source Location JC-GMW-205II-C

Total Well Depth:

Well Casing Size & Depth:

Static Water Level:

One Casing Volume:

Start Purge (hrs.):

End Purge (hrs.):

Total Purge Time (min.):

Total Amount Purged (gal.):

Monitoring Reading:

Purge Method:

1 Sample Method: from DI waterI1 Depth Sampled:

I Sample Date & Time:

10-9-91, 1005

Sampled By:Roger Myers

Type of Sample

13 Low ConcentrationD High Concentration[3 GrabD CompositeD Grab-Composite

Analysis

Nitrate

Nitrite

————i1 ——————

SAS or CASE *

6573C-02

Preservative

H2SO4

none

Purge Data

Volume(gallons)

pHS.C.

(millimho/cm) Temp.CC)Color &Turbidity(NTU)

Sample Data

pH

Airbill*

0552973153

Volume

1x1 liter

1 x 1 liter

S.C.(millimho/cm)

COC*

3 12539

Traffic Report *

Temp.CC)

Lab

SKINER

D.O.(mg/1)

Date Shipped

10-9-91

Color &Turbidity(NTU)

Time Shipped

1700

Tag*

3-1257162,3-1257164

3-1257162,3-1257164

AR30U65

Page 76: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

Q Monitoring Well Data Page J_ ofE Domestic Well Data By RJGD Other ______

Project Site Name Jack's Creek_____________________ Project Site Number 37-15-3L2W_________NUS Source No. 2567__________________________ Source Location JC-GMW-200II

Total Well Depth: 165.8 ft BTOC

Well Casing Size & Depth:

6-inch, 165.8 ft BTOC

Static Water Level:27.8 ft BTOC

One Casing Volume:207.75 gal

Start Purge (hrs.):1100

End Purge (hrs.):1130

Total Purge Time (min.):30

Total Amount Purged (gal.):620

Monitoring Reading:

Purge Method:submersible pump

Sample Method:stainless steel bailer

Depth Sampled:30.4 ft BTOC

Sample Date & Time:

8-20-91, 1205

Sampled By:Emily Olds

p Type of SampleDQ Low ConcentrationQ_ High ConcentrationQJ Grab

CompositeGrab-Composite

Analysis

Total Metals

Cyanide

Dissolved Metals

Sulfate chlorideNitrateNitriteTSS.TDS.Alkalinitv.Aciditv

VOA

SAS or CASE*

17001

6573C-02

6612C

Preservative

HNO3

NaOH

HN03

none

H2SO4

none

none

HC1

Purge Data

Volume(gallons)

PHS.C.

(millimho/cm)

Sample Data

PH

7.40

Airbill*

0552973584

0552973621

0552973606

05529736100552973573

Volume

1x1 liter1 x 1 liter

1x1 liter

1x1 liter

1x1 liter

1x1 liter

2x1 liter

3 x 40 ml

S.C.(millimho/cm)

0.359

COG*

3 12503

3 12507

3 12505

3 12506

3 12502

Traffic Report*

MCJC 01

MCJC 01

MCJC 02

n r> t*i

Temp.(°C)

12.4

Lab

SKINER

CRL

SKINER

CRL

RECNY

Temp.CC)Color &Turbidity

^ ^ j

D.O.(mg/1)

3.16

Date Shipped

8-21-91

8-21-91

8-21-91

8-21-91

8-21-91

Color &Turbidity(NTU)'

brown, 58

Time Shipped

1700

1700

1700

1700

1700

Tag*

3-1194226,3-1194227

3-1194226,3-1194227

3-1194228

3-1194236

3-1194237,3-1194238 -*3-1194237,3-1194238

3-1194234.3-1194235

,-3-1194229 .thru 3-1194231H n o u I 4 b b

Page 77: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data Page _2_ of _2_E Domestic Well Data By RJG_______D Other ______

Project Site Name Jack's Creek_____________________. Project Site Number 37-15-3L2WUS Source No. 2S67________________________ Source Location JC-GMW-200II

» Total Well Depth: 165. 8 ft BTOC

Well Casing Size & Depth:

6-inch, 165.8 ft BTOCStatic Water Level:27.8 ft BTOC

One Casing Volume:207.75 gal

Start Purge (hrs.): 1100

End Purge (hrs.): 1130

Total Purge Time (min.):30

Total Amount Purged (gal.):620

Monitoring Reading:

Purge Method:submersible pump

Sample Method:stainless steel bailer

1 Depth Sampled:30.4 ft BTOC

| Sample Date & Time:

8-20-91, 1205

Sampled By:Emily Olds

1_] Type of SampleD[-j Low Concentration_] High Concentration03 Grab

CompositeGrab.-Composite

Analysis

BNA,Pesticide,PCB

—————————11 —————————

SAS or CASE#

17001

Preservative

none

Purge Data

Volume(gallons)

PHS.C.

(millimho/cm) Temp.CC)Color &Turbidity

Sample Data

PH

7.40

Airbill*

0552973595

Volume

2 x 80 oz

S.C.(millimho/cm)

0.359

COC*

3 12504

Traffic Report #

CHD 62

Temp.CC)

12.4

Lab

LANCAS

D.O.(mg/1)

3.16

Date Shipped

8-21-91

Color &Turbidity(NTU)

brown, 58

Time Shipped

1700

Tag*

3-1194232,3-1194233

AilOU

Page 78: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data Page J_ of.E Domestic Well Data By RJGn Other ______

Project Site Name Jack's Creek___________________ Project Site Number 37-15-3L2W_______NUS Source No. 2567__________________________ Source Location JC-GMW-20QSII

Total Well Depth:44 ft BGS

Well Casing Size & Depth:

2-inch, 44.2 ft BTOC

Static Water Levcl:30.5 ft BTOC

One Casing Volume:2.74 gal

Start Purge (hrs.): 1335

End Purge (hrs.): 1350

Total Purge Time (min.):15

Total Amount Purged (gal.): 8. 22

Monitoring Reading:

1.6 ppm upon opening well

Purge Method:Fultz pump/

Sample Method:stainless steel bailer

Depth Sampled:31 ft BTOC

Sample Date & Time:

8-15-91, 1410

Sampled By:Walt Koehler

[_J Type of SampleDQ Low ConcentrationQ High Concentration__ Grab

CompositeGrab-Composite

Analysis

Total MetalsCyanideDissolved Metals

Sulfate chloride

NitrateNitrite

TSS .TDS . Alkalinity . Aciditv

SAS or CASE#

16967

6573C-02

Preservative

HNO3

NaOH

HNO3

none

H2S04

none

none

Purge Data

Volume(gallons)

pH

7.34

Airbill*

0552973750

0552973761

0552973853

0552973772

Volume

1x1 liter

1x1 liter

1x1 liter

1 x 1 liter

1 x 1 liter

1x1 liter

1x1 liter

PH

S.C.(millimho/cm)

0.234

COC*

3 13584

3 13585

3 13583

3 13586

Traffic Report #

MCDM 98

MCDM 98

MCDM 99

S.C.(millimho/cm)

Sample Data

Temp.CC)

16

Lab

SKINER

CRL

SKINER

CRL

Temp.CC)

D.O.(mg/1)

7.61

Date Shipped

8-15-91

8-15-91

8-15-91

8-15-91

Color &Turbidity(NTU)

^

P

Color &Turbidity(NTU)

brown,>200

Time Shipped

1700

1700

1700 1

1700 1

Tag* 1

3-1194218,3-11942193-1194218,3-1194219

3-1194220

3-1194223--•t3-1194224,3-1194225 ^__BV

3-1194224,3-1194225 ^

3-1194221.3-1194222

AR30|l*68

Page 79: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data • Page J.C3 Domestic Well Data By RJGD Other '

'reject Site Name Jack's Creek__________________• Project Site Number 37-15-3L2WSource No. 2567________________________ Source Location JC-GMW-201II

Total Well Depth:76 ft BGS

Well Casing Size & Depth:

2-inch, 77.7 ft BTOC

Static Water Level:22 ft BTOC

One Casing Volume: 11. 14 gal

Start Purge (hrs.): 1323

End Purge (hrs.): 1339

Total Purge Time (min.):16

Total Amount Purged (gal.):34

Monitoring Reading:

59,1 ppm inside riser upon opening wellPurge MethodrFultz pump

j Sample Method: stainless steel bailer

\ Depth Sampled:22 ft BTOC

Sample Date & Time:

7-24-91, 1350

v

• ——— ...J.V-.M,

Grab-Composite

Analysis

Total Metals

Cyanide

Dissolved Metals

Sulfate chloride

1 Nitrate

I Nitrite

TSS TDS Alkalinity Aciditv

I] ———————————————————

SAS or CASE*

16967

6567C-02

Preservative

HNO3

NaOH

HN03

none

H2SO4

none

none

Purge Data

Volume(gallons)

PHS.C.

(millimho/cm) Temp.CC)Color &Turbidity(NTU)

Sample Data

PH

7.93

Airbill*

0552973805

0552973820

0552973842

0552973816

Volume

1 x 1 liter

1x1 liter

1x1 liter

1 x 1 liter

1x1 liter

1x1 liter

1x1 liter

S.C.(millimho/cm)

0.231

COG*

3 13582

3 13597

3 13596

3 13599

Traffic Report #

MCDM 84

MCDM 84

MCDM 85

Temp.CC)

14.3

Lab

SKINER

CRL

SKINER

CRL

D.O.(mg/1)

4.93

Date Shipped

8-15-91

8-15-91

8-15-91

8-15-91

Color &Turbidity(NTU)

clear, 15

Time Shipped

1700

1700

1700

1700

Tag*

3-1194158,3-1194159

3-1194158,3-1194159

3-1194160

3-1194163

3-1194432,3-1194164

3-1194432,3-1194164

3-1194161.3-1194162_***«.»... .• —

i

Page 80: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data Page j_ ofE Domestic Well Data By RJG_____D Other __________

Project Site Name Jack's Creek___________________________ Project Site Number 37-15-3L2W_______NUS Source No. 2567__________________________ Source Location JC-GMW-201SII

Total Well Depth:30 ft BGS

Well Casing Size & Depth:

2-inch, 32.5 ft BTOC

Static Water Level:22 ft BTOC

One Casing Volume:2.1 gal

Start Purge (hrs.):0932

End Purge (hrs.):0944

Total Purge Time (min.):12

Total Amount Purged (gal.):7

Monitoring Reading:54.1 ppm inside riser

0.0 ppm from purge water

Purge Method:stainless steel bailer

Sample Method:stainless steel bailer

Depth Sampled:22.1 ft BTOC

Sample Date & Time:

8-14-91, 1000

Sampled By: Walt Koehler

Q_ Type of Samplen12 Low Concentration[_] High ConcentrationQ_ Grab

CompositeGrab-Composite

Analysis

Total Metals

Cyanide

Dissolved Metals

Sulfate.chlorideNitrateNitrite

TSS .TDS . Alkalinity . Acidity

TPH

SAS or CASE*

16967

6573C-02

6554C-01

Preservative

HNO3

NaOH

HNO3

noneH2SO4

none

none

HC1

Purge Data

Volume(gallons)

pHS.C.

(millimho/cm) Temp.CC)Color &Turbidity(NTU)

AW

Sample Data ^

PH

7.43

Airbill*

0552973805

0552973820

0552973842

0552973816

0552973831

Volume

1x1 liter

1x1 liter

1x1 liter

1x1 liter1x1 liter1x1 liter2x1 liter

1 X 80 oz

S.C.(millimho/cm)

0.238

COC*

3 13582

3 13597

3 13596

3 13599

3 13598

Traffic Report #

MCDM 86

MCDM 86

MCDM 87

Temp.CC)

14.2

Lab

SKINER

CRL

SKINER

CRL

WADSPA

D.O.(mg/1)

6.86

Date Shipped

8-15-91

8-15-91

8-14-91

8-15-91

8-15-91

Color &Turbidity(NTU)

160

Time Shipped

1700

1700

1700

1700

1700

Tag*

3-1194165,3-1194166

3-1194165,3-1194166

3-1194167

3-1194170

3-1194172,3-1194173 Hfc

3-1194172,3-1194173 ^

3-1194168.3-1194169

3-1194171

Page 81: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data Page J_ of _2_n Domestic Well Data By RJG______Q Other ______

iject Site Name Jack's Creek__________;______; - Project Site Number 37-1S-3L2WUS Source No. 2567________________________ Source Location JC-GMW-202II

Total Well Depth: 18.5 ft BGS

Well Casing Size & Depth:

2-inch, 21 ft BTOCStatic Water Level:8.3 ft BTOC

One Casing Volume:2.54 gal

Start Purge (hrs.):1155

End Purge (hrs.):1210

Total Purge Time (min.):15

Total Amount Purged (gal.):8.4

Monitoring Reading:

93 ppm upon opening well

1 Purge Method: stainless steel bailer

1 Sample Method: stainless steel bailer

^ Depth Sampled:8 ft BTOC

Sample Date & Time:

8-19-91, 1240

Sampled By: Emily Olds

__ Type of SampleDQ Low Concentration__ High Concentration__ Grab

CompositeGrab-Composite

Analysis

Total Metals

Cyanide

Dissolved Metals

1 Sulfate chloride

1 Nitrate

I] Nitrite

II TSS TDS Alkalinity Acidity

11 VGA

SAS or CASE#

17001

6573C-02

6612C

Preservative

HNO3

NaOH

HNO3

none

H2SO4

nonenoneHC1

Purge Data

Volume(gallons)

pH

6.37

Airbill*

0552973746

0552973724

0552973735

0552973713

0552973632

Volume

2x1 liter

2x1 liter

2x1 liter

1x1 liter

1x1 liter

1 x 1 liter2x1 liter9 x 40 ml

PH

S.C.(millimho/cm)

0.556

COC *

3 13591

3 13589

3 13590

3 13588

3 12501

Traffic Report *

MCJC 03

MCJC 03

MCJC 04

a norH it O U

S.C.(millimho/cm)

Sample Data

Temp.CC)

19.1

Lab

SKINER

CRL

SKINER

CRL

RECNY

Temp.CC)

D.O.(mg/1)

1.93

Date Shipped

8-20-91

8-20-91

8-19-91

8-20-91

8-20-91

Color &Turbidity

Color &Turbidity(NTU)

brown. 50

Time Shipped

1700

1700

1700

1700

1700

Tag #

3-1194239 thru 3-1194242

3-1194239 thru 3-1194242

3-1194243,3-1194244

3-1194262

3-1194263,3-1194264

3-1194263,3-11942643-1194260.3-1194261I-H94245 thru 3-11942531 4 / i

Page 82: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

Q Monitoring Well Data Page _2_ of _2_O Domestic Well Data By RJG______D Other ______

Project Site Name Jack's Creek_____________________ Project Site Number 37-15-3L2W__________NUS Source No. 2567__________________________ Source Location JC-GMW-202II

Total Well Depth: 18.5 ft BGS

Well Casing Size & Depth:

2-inch, 21 ft BTOC

Static Water Level:8.3 ft BTOC

One Casing Volume:2.54 gal

Start Purge (hrs.):1155

End Purge (hrs.): 1210

Total Purge Time (min.):l5

Total Amount Purged (gal.):8.4

Monitoring Reading:

93 ppm upon opening well

Purge Method:stainless steel bailer

Sample Method:stainless steel bailer

Depth Sampled:8 ft BTOC

Sample Date & Time:

8-19-91, 1240

Sampled By:Emily Olds

Q_ Type of SampleDQ Low Concentration_] High Concentration{7j Grab

CompositeGrab-Composite

Analysis

BNA.Pesticide.PCB

SAS or CASE*

17001

Preservative

none

Purge Data

Volume(gallons)

PHS.C.

(millimho/cm) Temp.CC)Color &Turbidity

ASample Data ^ ^

pH

6.37

Airbill*

0552973702

Volume

6 x 80 oz

S.C.(millimho/cm)

0.556

COC*

3 13593

Traffic Report #

CHD63

Temp.CC)

19.1

Lab

LANCAS

D.O.(mg/1)

1.93

Date Shipped

8-20-91

Color &Turbidity(NTU)

brown, 50

Time Shipped

1700

Tag*

3-1194254 thru 3-1 194459

h

^

n r f*\ *•-« • i " \

Att JU I m <L

Page 83: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data Page _1_ of _1_E Domestic Well Data By RJG______D Other ______

['reject Site Name Jack's Creek_____________________ Project Site Number 37-1S-3L2W'4US Source No. 2567___________________________ Source Location JC-GMW-202II-A

Total Well Depth: 18. 5 ft BGS

Well Casing Size & Depth:

2-inch, 21 ft BTOC

Static Water Level:8.3 ft BTOC

One Casing Volume:2.54 gal

Start Purge (hrs.): 1155

End Purge (hrs.):1210

Total Purge Time (min.):15

Total Amount Purged (gal.):8.4

Monitoring Reading:93 ppm upon opening well

Purge Method:stainle s steel bailer

1 Sample Method: stainless steel bailer

\ Depth Sampled:8 ft BTOC

I Sample Date & Time:

8-19-91, 1300

Sampled By:Emily Olds

~_ Type of SamplenQ Low Concentrationr_| High Concentration_j Grab

CompositeGrab-Composite

Analysis

Total Metals

Cyanide

Dissolved Metals

VGA '

1 BNA.Pesticide.PCB

|

1

SAS or CASE*

17001

6612C

17001

Preservative

HNO3

NaOH

HNO3

HC1

none

Purge Data

Volume(gallons)

pHS.C.

(millimho/cm)

Sample Data

PH

6.37

Airbill*

0552973746

0552973632

0552973702

Volume

1x1 liter

1 x 1 liter

1x1 liter

3 x 40 ml

2x1 liter

S.C.(millimho/cm)

0.556

COC*

3 13591

3 12501

3 13593

Traffic Report #

MCJC 05

MCJC 05

MCJC 06

CHD64

Temp.CC)

19.1

Lab

SKINER

RECNY

LANCAS

Temp.CC)

D.O.(mg/1)

1.93

Date Shipped

8-20-91

8-20-91

8-20-91

Color &Turbidity

Color &Turbidity(NTU)

brown, 50

Time Shipped

1700

1700

1700

Tag*

3-1194273,3-1194279

3-1194273,3-1194279

3-1194278

3-1194275 thru 3-1194277

3-1194272,3-1194274

AR30I4/3

Page 84: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data ' Page J_ ofE Domestic Well Data By RJGd Other ______

Project Site Name Jack's Creek_____________________ Project Site Number 37-15-3L2WNUS Source No. 2567__________________________ Source Location JC-GMW-202H-B

Total Well Depth:

Well Casing Size & Depth:

Static Water Level:

One Casing Volume:

Start Purge (hrs.):

End Purge (hrs.):

Total Purge Time (min.):

Total Amount Purged (gal.):

Monitoring Reading:

Purge Method: r>/

Sample Method:from DI water

Depth Sampled:

Sample Date & Time:

8-19-91, 1200

Sampled By:Emily Olds

[_ Type of SampleDQ Low ConcentrationQ High ConcentrationQ Grab

CompositeGrab-Composite

Analysis

Total MetalsCyanide

VOA

BNA.Pesticide.PCB

SAS or CASE*

17001

6612C

17001

Preservative

HNO3

NaOH

HC1

none

Purge Data

Volume(gallons)

pHS.C.

(millimho/cm) Temp.CC)Color &Turbidity(NTU)

1

(

)

_*«W

Sample Data ^

PH

Airbill*

0552973746

0552973632

0552973702

Volume

1 X 1 liter

1x1 liter

3 x 40 ml

2 x 80 oz

S.C.(millimho/cm)

COC*

3 13591

3 12501

3 13593

Traffic Report #

MCJC 07

MCJC 07

CHD65

Temp.CC)

Lab

SKINER

RECNY

LANCAS

D.O.(mg/1)

Date Shipped

8-20-91

8-20-91

8-20-91

Color &Turbidity(NTU)

Time Shipped !

1700 |

1700

1700

.

—————— — —————3-1194265,3-1194271

3-1194265,3-1194271

3-1194268 thru 3-1194271

3-1194266,3-1194267 ||m \————— 5J_______H K J U i 4/4

Page 85: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

Q Monitoring Well Data " Page J_ ofLl Domestic Well Data By RJGD Other ______

iroject Site Name Jack's Creek_______________~ Project Site Number 37-15-3L2WUS Source No. 2567__________________________ Source Location JC-GMW-202II-C

Total Well Depth:

Well Casing Size & Depth:

Static Water Level:

One Casing Volume:

Start Purge (hrs.):

End Purge (hrs.):

Total Purge Time (min.):

Total Amount Purged (gal.):

Monitoring Reading:

I Purge Method: /11 Sample Method: from DI water

1 Depth Sampled:W , ,.,. ,. ——— „, ..Sample Date Sc. Time:

8-19-91, 1120

Sampled By:Emily Olds

D Type of Samplea_j Low Concentration_] High ConcentrationQ Grab

CompositeGrab-Composite

Analysis

Total Metals

Cyanide

VOA

I BNA.Pesticide.PCB

f ———————————————— "

1=

SAS or CASE*

17001

6612C

17001

Preservative

HNO3

NaOH

HC1

none

Purge Data

Volume(gallons)

PHS.C.

(millimho/cm) Temp.CC)Color Sc.Turbidity(NTU)

Sample Data

pH

Airbill*

0552973746

0552973632

0552973702

Volume

1x1 liter

1x1 liter

3 x 40 ml

2 x 80 oz

S.C.(millimho/cm)

COG*

3 13591

3 12501

3 13593

Traffic Report #

MCJC 08

MCJC 08

CHD 66

Temp.CC)

Lab

SKINER

RECNY

LANCAS

D.O.(mg/1)

Date Shipped

8-20-91

8-20-91

8-20-91

Color &Turbidity(NTU)

Time Shipped

1700

1700

1700

Tag*

3-1194280,3-1194286

3-1194280,3-1194286

3-1194283 thru 3-1194285

3-1194281,3-1194282

flruu i 4/D

Page 86: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data Page J_ ofd Domestic Well Data By RJGD Other

Project Site Name Jack's Creek_____________________ Project Site Number 37-1S-3L2WNUS Source No. 2567_______________________ Source Location JC-GMW-202II-D

Total Well Depth:

Well Casing Size & Depth:

Static Water Level:

One Casing Volume:

Start Purge (hrs.):

End Purge (hrs.):

Total Purge Time (min.):

Total Amount Purged (gal.):

Monitoring Reading:

Purge Method: /

Sample Method: from DI water

Depth Sampled:

Sample Date & Time:

8-19-91, 0945

Sampled By:Emily Olds

fj Type of Samplen_g Low Concentration_] High Concentration_j Grab

CompositeGrab-Composite

Analysis

VOA

SAS or CASE*

6612C

Preservative

HC1

Volume(gallons)

PH

Airbill*

0552973632

Volume

3 X 40 ml

pH

S.C.(millimho/cm)

COG*

3 12501

Traffic Report #

Purge Data

S.C.(millimho/cm)

Sample Data

Temp.CC)

Lab

RECNY

3-1194287 thru

a

Temp.CC)

D.O.(mg/1)

Date Shipped

8-20-91

Tag*

3-1194289

R 3 fl 1 L 7

Color &Turbidity(NTU)

^

P

Color &Turbidity(NTU)

Time Shipped

1700

^

P

-

Page 87: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

Q Monitoring Well Data • Page _1_ of 1E Domestic Well Data By RJG_____D Other ______

^ JUiject Site Name Jack's Creek_____________________ Project Site Number 37-15-3L2W

NUS Source No. 2567___________________________ Source Location JC-GMW-203II

Total Well Depth:52.5 ft BGS

Well Casing Size & Depth:

2-inch, 56 ft BTOCStatic Water Level:29 ft BTOC

One Casing Volume:5.4 gal

Start Purge (hrs.):1545

End Purge (hrs.): 1610

Total Purge Time (min.):25

Total Amount Purged (gal.): 16.2

Monitoring Reading:2.9 ppm upon opening well

I Purge Method:Fultz ump

1 Sample Method:stainless steel bailer

I Depth Sampled:29 ft BTOCBSample Date & Time:

8-19-91, 1400

Sampled By:Rocco Giampaolo

~_ Type of SampleD_j Low ConcentrationQ High Concentration_j Grab

CompositeGrab-Composite

Analysis

Total Metals

Cyanide

Dissolved Metals

1 Sulfate.chloride\f Nitrate

1 NitriteTSS TDS Alkalinitv.Aciditv

II TPH

SAS or CASE*

17001

6573 C-02

6554C-01

Preservative

HNO3

NaOH

HNO3

noneH2SO4

nonenone

HC1

Purge Data

Volume(gallons)

PH

7.13

Airbill*

0552973746

0552973724

0552973735

0552973713

0552973551

Volume

1x1 liter

1x1 liter

1 x 1 liter

1 x 1 liter1x1 liter

1 x 1 liter1x1 liter

1 x 80 oz

PHS.C.

(millimho/cm)

Sample Data

S.C.(millimho/cm)

0.532

COC*

3 13591

3 13589

3 13590

3 13588

3 12508

Traffic Report *

MCJC 21

MCJC 21

MCJC 22

Temp.CC)

14

Lab

SKINER

CRL

SKINER

CRL

WADSPA

Temp.CC)

D.O.(mg/1)

3.68

Date Shipped

8-20-91

8-20-91

8-19-91

8-20-91

8-20-91

Color &Turbidity(NTU)

Color &Turbidity(NTU)

100

Time Shipped

1700

1700

1700

1700

1700

Tag*

3-1194368,3-1194376

3-1194368,3-1194376

3-1194375

3-1194372

3-1194370,3-1194371

3-1194370,3-11943713-1194373.3-11943743-11943fi9n OH 1 1. 11

H t l O W I * ° ? f 1

Page 88: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data Page J_ of J_d Domestic Well Data By RJG_______D Other ______

Project Site Name Jack's Creek_____________________ Project Site Number 37-15-3NUS Source No. 2567________________________ Source Location JC-GMW-203II*2

Total Well Depth:52.5 ft BGS

Well Casing Size & Depth:

2-inch, 56 ft BTOC

Static Water Level:28.89 ft BTOC

One Casing Volume:5.4 gal

Start Purge (hrs.):

End Purge (hrs.):

Total Purge Time (min.):

Total Amount Purged (gal.): 16.2

Monitoring Reading:

Purge Method:sUinless steel bailer

Sample Method:stainless steel bailer

Depth Sampled:28.89 ft BTOC

Sample Date & Time:

8-20-91, 1615

Sampled By:Rocco Giampaolo

rj Type of SamplearJj Low ConcentrationQ High Concentration£_ Grab

CompositeGrab-Composite

Analysis

TPH

SAS or CASE*

6554C-01

Preservative

HC1

Purge Data

Volume(gallons)

pHS.C.

(millimho/cm) Temp.CC)Color &Turbidity(NTU)

mSample Data

pH

Airbill*

0552973481

Volume

1 x 80 oz

S.C.(millimho/cm)

COC*

3 12515

Traffic Report #

Temp.CC)

Lab

WADSPA

D.O.(mg/1)

Date Shipped

8-21-91

Color &Turbidity(NTU)

Time Shipped

1700

Tag*

3-1194445

B

^

noon i i. TOf-t IV U U 1 *t / VJ

Page 89: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

Q Monitoring Well Data Page _l_ ofE Domestic Well Data By RJG_____n Other '

iject Site Name Jack's Creek____________________ Project Site Number 37-15-3L2WUS Source No. 2567__________________________ Source Location JC-GMW-204II

Total Well Depth:41 ft BGS

Well Casing Size & Depth:

2-inch, 44 ft BTOC

Static Water Level:30.3 ft BTOC

One Casing Volume:2.74 gal

Start Purge (hrs.): 1022

End Purge (hrs.): 1045

Total Purge Time (min.):23

| Total Amount Purged (gal.):8.5

Monitoring Reading:

I 172 ppm inside riser upon opening well

| Purge Method:stainle s steel bailer

Sample Method:stainless steel bailer

| Depth Sampled:30.9 ft BTOC• —————————————————————————————Sample Date & Time:

8-14-91, 1100

Sampled By:Walt Koehler

__ Type of Samplearjj Low ConcentrationQ High Concentration[3 Grab

CompositeGrab-Composite

Analysis

Total Metals

Cyanide

Dissolved Metals

Sulfate.chloride

| Nitrate

I Nitrite

I) TSS TDS Alkalinity Acidity

11 TPH

SAS or CASE*

16967

6573C-02

6554C-01

Preservative

HNO3

NaOH

HNO3

none

H2SO4

nonenone

HC1

Purge Data

Volume(gallons)

pHS.C.

(millimho/cm) Temp.CC)Color &Turbidity(NTU)

Sample Data

pH

7.54

Airbill*

0552973805

0552973820

0552973842

0552973816

055297383J

Volume

1x1 liter

1x1 liter

1 x 1 liter

1x1 liter

1x1 liter

1 x 1 liter2x1 liter

1 x 80 oz

S.C.(millimho/cm)

0.425

COC #

3 13582

3 13597

3 13596

3 13599

3 13598

Traffic Report #

MCDM 82

MCDM 82

MCDM 83

Temp.CC)

15

Lab

SKINER

CRL

SKINER

CRL

WADSPA

D.O.(mg/1)

4.36

Date Shipped

8-15-91

8-15-91

8-14-91

8-15-91

8-15-91

Color &Turbidity(NTU)

>200

Time Shipped

1700

1700

1700

1700

1700

Tag*

3-1194149,3-1194150

3-1194149,3-1194150

3-1194151

3-1194154

3-1194156,3-1194157

3-1194156,3-11941573-1194152.3-1194153

3-1194155

•AR30U79

Page 90: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data ' Page _1_ of J_C3 Domestic Well Data By RJG______D Other ______

Project Site Name Jack's Creek___________________ Project Site Number 37-15-3L2W________NUS Source No. 2567___________________________ Source Location JC-GMW-20SII

Total Well Depth:32 ft BGS

Well Casing Size & Depth:

2-inch, 34.2 ft BTOC

Static Water Level: 13 ft BTOC

One Casing Volume:4.24 gal

Start Purge (hrs.):ll51

End Purge (hrs.): 1230

Total Purge Time (min.):39

Total Amount Purged (gal.):12.72

Monitoring Reading: 5000 ppm inside riser

0.0 ppm from purge water

Purge Method:stainless steel bailer

Sample Method:stainless steel bailer

Depth Sampled: 13 ft BTOC

Sample Date & Time:

8-14-91, 1230

Sampled By: Walt Koehler

__ Type of SampleaQ Low Concentration[_J High Concentration(3 Grab

CompositeGrab-Composite

Analysis

Total Metals

CyanideDissolved Metals

Sulfate chloride

Nitrate

Nitrite

TSS TDS Alkalinity Aciditv

TPH

SAS or CASE*

16967

6573C-02

6554C-01

Preservative

HN03

NaOH

HN03

none

H2SO4

nonenone

HC1

Purge Data

Volume(gallons)

pHS.C.

(millimho/cm) Temp.CC)Color &Turbidity(NTU)

mprSample Data

PH

7.55

Airbill*

0552973805

0552973820

0552973842

0552973816

0552973831

Volume

2x1 liter

2x1 liter2x1 liter2x1 liter

2x1 liter

2x1 liter2x1 liter

1 x 80 oz

S.C.(millimho/cm)

0.593

COC*

3 13582

3 13597

3 13596

3 13599

3 13598

Traffic Report #

MCDM 76

MCDM 76

MCDM 77

Temp.CC)

15.4

Lab

SKINER

CRL

SKINER

CRL

WADSPA

D.O.(mg/1)

4.88

Date Shipped

8-15-91

8-15-91

8-14-91

8-15-91

8-15-91

Color &Turbidity(NTU)

>200

Time Shipped

1700

1700

1700

1700

1700

Tag*

3-1194095 thru 3-1194098

3-1194095 thru 3-1194098

3-1194115,3-1194116

3-1194119,3-1194120 —

3-1194122 thru 3-1194125 ^ R

3-1194122 thru 3-1194125

3-1194117.3-1194118

3-1194121

AR30U80

Page 91: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data Page J_ ofn Domestic Well Data By RJGD Other ______

reject Site Name Jack's Creek____________________ Project Site Number 37-1S-3L2WUS Source No. 2567__________________________ Source Location JC-GMW-20SII-A

Total Well Depth:32 ft BGS

Well Casing Size & Depth:

2-inch, 34.2 ft BTOC

Static Water Level: 13 ft BTOC

One Casing Volume:4.24 gal

Start Purge (hrs.):1151

End Purge (hrs.): 1230

Total Purge Time (min.):39

Total Amount Purged (gal.): 12.72

Monitoring Reading:5000 ppm inside riser

O.O ppm from purge water

, Purge Method:stainless steel bailer

Sample Method:stainless steel bailer

S Depth Sampled: 13 ft BTOC

Sample Date & Time:

8-14-91, 1240

Sampled By:Walt Koehler

_] Type of SamplenQ Low Concentration_] High ConcentrationQ Grab

CompositeGrab-Composite

Analysis

Total Metals

CyanideDissolved Metals

I Sulfate chloride

1 Nitrate

I Nitrite|||| TSS TDS Alkalinitv.Aciditv

II TPH

SAS or CASE*

16967

6573C-02

6554C-01

Preservative

HN03

NaOH

HNO3

none

H2S04

'nonenoneHC1

Purge Data

Volume(gallons)

PHS.C.

(millimho/cm) Temp.CC)Color &Turbidity(NTU)

Sample Data

pH

7.55

Airbill*

0552973805

0552973820

0552973842

0552973816

0552973831

Volume

1x1 liter

1x1 liter

1 x 1 liter

1x1 liter

1x1 liter

1 x 1 liter2x1 liter1 x 80 oz

S.C.(millimho/cm)

0.593

COC*

3 13582

3 13597

3 13596

3 13599

3 13598

Traffic Report #

MCDM 78

MCDM 78

MCDM 79

Temp.CC)

15.4

Lab

SKINER

CRL

SKINER

CRL

WADSPA

D.O.(rag/D

4.88

Date Shipped

8-15-91

8-15-91

8-14-91

8-15-91

8-15-91

Color &Turbidity(NTU)

>200

Time Shipped

1700

1700

1700

1700

1700

Tag*

3-1194126,3-1194127

3-1194126,3-1194127

3-1194128

3-11941313-1194133,3-1194134

3-1194133,3-1194134

3-1194129.3-1194130.3rl 194132

ttilJU | 4U 1

Page 92: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

Q Monitoring Well Data Page J_ of J_B Domestic Well Data By RJG_______D Other ______

Project Site Name Jack's Creek_____________________ Project Site Number 37-15-3L2WNUS Source No. 2567_________________________ Source Location JC-GMW-205II-B

Total Well Depth:

Well Casing Size & Depth:

Static Water Level:

One Casing Volume:

Start Purge (hrs.):

End Purge (hrs.): '

Total Purge Time (min.):

Total Amount Purged (gal.):

Monitoring Reading:

Purge Method: f

Sample Method:from DI water

Depth Sampled:

Sample Date & Time:

8-14-91, 1305

Sampled By:Walt Koehler

__ Type of SampleDr_| Low Concentration_] High ConcentrationQ Grab

CompositeGrab-Composite

Analysis

Total Metals

Cyanide

Sulfate.chloride

Nitrate

Nitrite •

Alkalinity, Acidity

TPH

SAS or CASE*

16967

6573C-02

6554C-01

Preservative

HN03

NaOH

noneH2S04

none

none

HC1

Purge Data

Volume(gallons)

pHS.C.

(millimho/cm) Temp.CC)Color &Turbidity(NTU)

m" fSample Data

pH

Airbill*

0552973805

0552973820

0552973842

0552973816

0552973831

Volume

1x1 liter

1x1 liter

1x1 liter

1x1 liter

1x1 liter

1 x 1 liter

1 x 80 oz

S.C.(millimho/cm)

COC*

3 13582

3 13597

3 13596

3 13599

3 13598

Traffic Report #

MCDM 80

MCDM 80

Temp.CC)

Lab

SKINER

CRL

SKINER

CRL

WADSPA

D.O.(mg/1)

Date Shipped

8-15-91

8-15-91

8-14-91

8-15-91

8-15-91

Color &Turbidity(NTU)

Time Shipped

1700

1700

1700

1700

1700

Tag*

3-1194135,3-1194136

3-1194135,3-1194136

3-1194138

3-1194140,3-1194141 —

3-1194140,3-1194141 ^ B i

3-1194137

3-1194139

AR30U82

Page 93: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data . Page J_ ofE Domestic Well Dtta By RJGD Other ________

'reject Site Name Jack's Creek___________________ Project Site Number 37-1S-3L2WUS Source No. 2567________________________ Source Location JC-GMW-20SII-C

Total Well Depth:

Well Casing Size & Depth:

Static Water Level:

One Casing Volume:

Start Purge (hrs.):

End Purge (hrs.):

Total Purge Time (min.):

Total Amount Purged (gal.):

Monitoring Reading:

Purge Method: /

Sample Method:from DI water

| Depth Sampled:

Sample Date & Time:

8-14-91, 1135

Sampled By:Walt Koehler

~_ Type of SampleDQ Low Concentration__ High ConcentrationQ_ Grab

CompositeGrab-Composite

Analysis

Total Metals

Cyanide

Sulfate.chloride

Nitrate

| Nitrite

| Alkalinity, Acidity

II TDM

SAS or CASE*

16967

6573C-02

6554C-01

Preservative

HN03

NaOH

none

H2SO4

none

noneHC1

Purge Data

Volume(gallons)

pHS.C.

(millimho/cm)

Sample Data

PH

Airbill*

0552973805

0552973820

0552973842

0552973816

0552973831 J

Volume

1x1 liter

1x1 liter

1x1 liter

1x1 liter

1x1 liter

1x1 liter1 x 80 oz

S.C.(millimho/cm)

COG*

3 13582

3 13597

3 13596

3 13599

3 13598

Traffic Report #

MCDM 81

MCDM 81

Temp.CC)

Lab

SKINER

CRL

SKINER

CRL

WADSPA

Temp.CC)

D.O.(mg/1)

Date Shipped

8-15-91

8-15-91

8-14-91

8-15-91

8-15-91

Color Sc.Turbidity(NTU)

Color &Turbidity(NTU)

Time Shipped

1700

1700

1700

1700

1700

Tag*

3-1194142,3-1194143

3-1194142,3-1194143

3-1194145

3-1194147,3-1194148

3-1194147,3-1194148

3-1194144

3-1194146

AR30U83

Page 94: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data Page J_ ofE Domestic Well Data By RJGD Other _______

Project Site Name Jack's Creek___________________ Project Site Number 37-15-3L2W_______NUS Source No. 2567__________________________ Source Location JC-GMW-206II

Total Well Depth: 15.25 ft BGS

Well Casing Size & Depth:

2-inch, 16.8 ft BTOC

Static Water Level:6.3 ft BTOC

One Casing Volume:2.1 gal

Start Purge (hrs.): 1355

End Purge (hrs.): 1405

Total Purge Time (min.):10

Total Amount Purged (gal.):6.3

Monitoring Reading:

2.8 ppm upon opening well

Purge- Method:Eultz pump

Sample Method: stainless steel bailer

Depth Sampted:7.5 ft BTOC

Sample Date & Time:

8-19-91, 1425

Sampled By:Emily Olds

fj Type of SampleDQ Low ConcentrationC] High Concentration[3 Grab

CompositeGrab-Composite

Analysis

Total Metals

Cyanide

Dissolved Metals

Sulfate chloride

Nitrate

NitriteTSS .TDS .Alkalinity . Acidity

VGA

SAS or CASE#

17001

6573C-02

6612C

Preservative

HNO3

NaOH

HNO3

none

H2SO4

nonenone

HC1

Purge Data

Volume(gallons)

pHS.C.

(millimho/cm) Temp.CC)Color &Turbidity

mSample Data

PH

7.02

Airbill*

0552973746

0552973724

0552973735

0552973713

0552973632

Volume

1x1 liter

1x1 liter

1x1 liter

1x1 liter

1x1 liter

1x1 liter2x1 liter

3 x 40 ml

S.C.(millimho/cm)

0.814

COC*

3 13591

3 13589

3 13590

3 13588

3 12501

Traffic Report *

MCJC 09

MCJC 09

MCJC 10

Temp.CC)

22.4

Lab

SKINER

CRL

SKINER

CRL

RECNY

D.O.(mg/1)

1.66

Date Shipped

8-20-91

8-20-91

8-20-91

8-20-91

8-20-91

Color &Turbidity(NTU)

36

Time Shipped

1700

1700

1700

1700

1700

Tag*

3-1194290,3-1194291

3-1194290,3-1194291

3-1194292

3-1194300 ^

3-1194301,3-1194302 ^ B

3-1194301,3-1194302

3-1194298 thru 3-1194299

3-1194293 thru 3-1194295

AR30U8I*

Page 95: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data ' Page _2_ of _2_O Domestic Well Data By RJG_______D Other ______

'roject Site Name Jack's Creek________________._____ Project Site Number 37-1S-3L2WUS Source No. 2567___________________________ Source Location JC-GMW-206II

Total Well Depth: 15.25 ft BGS

Well Casing Size & Depth:

2-inch, 16.8 ft BTOC

Static Water Level:6.3 ft BTOC

One Casing Volume:2.1 gal

Start Purge (hrs.): 1355

End Purge (hrs.): 1405

Total Purge Time (min.):10

Total Amount Purged (gal.):6.3

Monitoring Reading:2.8 ppm upon opening well

Purge Method:Fultz pump

| Sample Method:stainless steel bailer

| Depth Sampled:7.5 ft BTOC

I Sample Date Sc. Time:

8-19-91, 1425

Sampled By: Emily Olds

C] Type of Samplen_j Low Concentration_] High Concentration[3 Grab

CompositeGrab-Composite

Analysis

BNA.Pesticide.PCB

1 ________\

——————————————————II ——————————————————

SAS or CASE*

17001

Preservative

none

Purge Data

Volume(gallons)

pHS.C.

(millimho/cm)

Sample Data

pH

7.02

Airbill*

0552973702

Volume

2 x 80 oz

S.C.(millimho/cm)

0.814

COC*

3 13593

Traffic Report #

CHD 68

Temp.CC)

22.4

Lab

LANCAS

Temp.CC)Color &Turbidity

D.O.(mg/1)

1.66

Date Shipped

8-20-91

Color &Turbidity(NTU)

36

Time Shipped

1700

Tag*

3-1194296,3-1194297

H n 0 U 1 4 d D

Page 96: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

Q Monitoririg Well Data Page J_ of.d Domestic Well Data By RJG_____D Other ______

Project Site Name Jack's Creek__________________ Project Site Number 37-15-3L2W_______NUS Source No. 2567__________________________ Source Location JC-GMW-207II

Total Well Depth:39.5 ft BGS

Well Casing Size & Depth:

2-inch, 38.8 ft BTOC

Static Water Level:21.5 ft BTOC

One Casing Volume:3.46 gal

Start Purge (hrs.): 1235

End Purge (hrs.): 1250

Total Purge Time (min.):15

Total Amount Purged (gal.): 10. 38

Monitoring Reading:

0.0 ppm upon opening well

Purge Method:r]Ultz pump

Sample Method:stainless steel bailer

Depth Sampled:21.5 ft BTOC

Sample Date & Time:

8-15-91, 1300

Sampled By:Walt Koehler

Q Type of SampleDQ Low Concentration[_ High Concentration_g Grab

CompositeGrab-Composite

Analysis

Total Metals

Cyanide

Dissolved Metals

Sulfate chloride

Nitrate

Nitrite

TSS .TDS . Alkalinity . AciditvTPH

SAS or CASE*

16967

6573C-02

Preservative

HNO3

NaOH

HN03

none

H2SO4

none

noneHC1

Purge Data

Volume(gallons)

PHS.C.

(millimho/cm)

Sample Data

pH

7.05

Airbill*

0552973750

0552973761

0552973853

0552973772

Volume

1x1 liter

1x1 liter

1 X 1 liter

1x1 liter

1x1 liter

1x1 liter

2x1 liter1 x 80 oz

S.C.(millimho/cm)

0.950

COC*

3 13584

3 13585

3 13583

3 13586

Traffic Report *

MCDM 90

MCDM 90

MCDM 91

Temp.CC)

13.3

Lab

SKINER

CRL

SKINER

CRL

Temp.CC)Color &Turbidity(NTU)

m• TD.O.(mg/1)

2.84

Date Shipped

8-15-91

8-15-91

8-15-91

8-15-91

Color &Turbidity(NTU)

clear,48

Time Shipped

1700

1700

1700

1700

Tag*

3-1194183,3-1194184

3-1194183,3-1194184

3-1194185

3-1194188 ^ ^

3-1194190,3-1194191 ^ B

3-1194190,3-11941913-1194186.3-1194187

3-1194189n n 0 n 1 1. 0 £Mh JU 1 4UU

Page 97: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

Q Monitoring Well Data Page J_ of 1d Domestic Well Data By RJG______D Other ______

reject Site Name Jack's Creek____________________ Project Site Number 37-1S-3L2W____________NUS Source No. 2567_____________________' Source Location JC-GMW-208II

Total Well Depth:43.5 ft BGS

Well Casing Size & Depth:

2-inch, 43 ft BTOC

Static Water Level:25.5 ft BTOC

One Casing Volume: 3. 5 gal

Start Purge (hrs.):0930

End Purge (hrs.):1020

Total Purge Time (min.):50

Total Amount Purged (gal.): 10.5

Monitoring Reading:

Purge Method:staintyss steel bailer

Sample Method: stainless steel bailer

I Depth Sampled:25.5 ft BTOC

Sample Date Sc. Time:

8-15-91, 1030

Sampled By:Walt Koehler

p Type of Samplea_j Low ConcentrationQ High Concentration_j Grab

CompositeGrab-Composite

Analysis

Total Metals

Cyanide

Dissolved Metals

Isulfate chloride

Nitrate

NitriteTSS, TDS Alkalinity Acidity

TPH

SAS or CASE*

16967

6573C-02

6554C-01

Preservative

HN03

NaOH

HNO3

none

H2S04

nonenone

HC1

Purge Data

Volume(gallons)

pHS.C.

(millimho/cm) Temp.CC)Color &Turbidity(NTU)

Sample Data

pH

7.85

Airbill*

0552973750

0552973761

0552973853

0552973772

0552973783

Volume

1 x 1 liter

1x1 liter

1 x 1 liter1 x 1 liter

1x1 liter

1x1 liter2x1 liter

1 x 80 oz

S.C.(millimho/cm)

0.595

COG*

3 13584

3 13585

3 13583

3 13586

3 13587

Traffic Report *

MCDM 88

MCDM 88

MCDM 89

Temp.CC)

13.7

Lab

SKINER

CRL

SKINER

CRL

WADSPA

D.O.(mg/1)

3.66

Date Shipped

8-15-91

8-15-91

8-15-91

8-15-91

8-15-91

Color &Turbidity(NTU)

brown,>200

Time Shipped

1700

1700

1700

1700

1700

Tag*

3-1194174,3-1194175

3-1194174,3-1194175

3-1194176

3-1194179

3-1194180,3-1194181

3-1194180,3-11941813-1194177.3-1194178

3-1194182

AR30U87

Page 98: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

Q Monitoring Well Data Page J_ of _2_E Domestic Well Data By RJG_______D Other ______

Project Site Name Jack's Creek_____________________ Project Site Number 37-15-3L2W_________NUS Source No. 2567_________________________ Source Location JC-GMW-209II

Total Well Depth:18 ft BGS

Well Casing Size & Depth:

2-inch, 20 ft BTOC

Static Water Level:5.5 ft BTOC

One Casing Volume:2.90 gal

Start Purge (hrs.):1440

End Purge (hrs.): 1500

Total Purge Time (min.):20

Total Amount Purged (gal.):8.7

Monitoring Reading:

0.0 ppm upon opening well

Purge Method : ultz pump

Sample Method:stainless steel bailer

Depth Sampled:5.5 ft BTOC

Sample Date & Time:

8-19-91, 1510

Sampled By:Rocco Giampaolo

[_ Type of SampleDQ Low Concentration__ High ConcentrationQ Grab

CompositeGrab-Composite

Analysis

Total Metals

Cyanide

Dissolved Metals

Sulfate chlorideNitrate

Nitrite

TSS .TDS . Alkalinitv . AciditvVOA

SAS or CASE#

17001

6573C-02

6612C

Preservative

HNO3

NaOH

HN03

noneH2SO4

none

noneHC1

Purge Data

Volume(gallons)

pHS.C.

(millimho/cm) Temp.CC)Color &Turbidity

"•• ^Sample Data

PH

7.41

Airbill*

0552973746

0552973724

0552973735

0552973713

0552973632

Volume

1x1 liter

1x1 liter

1x1 liter

1x1 liter

1x1 liter

1x1 liter

2x1 liter3 x 40 ml

S.C.(millimho/cm)

0.408

COG*

3 13591

3 13589

3 13590

3 13588

3 12501

Traffic Report #

MCJC 11

MCJC 11

MCJC 12

Temp.CC)

15

Lab

SKINER

CRL

SKINER

CRL

RECNY

D.O.(mg/1)

1.14

Date Shipped

8-20-91

8-20-91

8-20-91

8-20-91

8-20-91

Color &Turbidity(NTU)

88

Time Shipped

1700

1700

1700

1700 1

1700 |

Tag* 1

3-1194303,3-1194304 1

3-1194303,3-1194304 1

3-1194305 1

3-1194313 ^ 1

3-1194314,3-1194315 ^^V 1

3-1194314,3-1194315 13-1194311.3-1194312 1

3-1 194306 thru 3-1 194308 II

Page 99: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data Page _2_ ofE Domestic Well Data By RJGG Other ______

Project Site Name Jack's Creek_____________________ Project Site Number 37-IS-3L2W'NUS Source No. 2567__________________________ Source Location JC-GMW-209II

Total Well Depth: 18 ft BGS

Well Casing Size & Depth:

2-inch, 20 ft BTOC

Static Water Level:5.5 ft BTOC

One Casing Volume:2.90 gal

Start Purge (hrs.): 1440

End Purge (hrs.):1500

Total Purge Time (min.):20

Total Amount Purged (gal.):8.7

Monitoring Reading:

0.0 ppm upon opening well

Purge Method:Fultz, pump

Sample Method:stainless steel bailer

(Depth Sampled:5.5 ft BTOC

Sample Date & Time:

8-19-91, 1510

Sampled By:Rocco Giampaolo

_] Type of SampleDQ Low ConcentrationQ High Concentration_g Grab

CompositeGrab-Composite

Analysis

BNA,Pesticide,PCB

'.

————————— : ————————

1

I)

SAS or CASE*

17001

Preservative

none

Purge Data

Volume(gallons)

pHS.C.

(millimho/cm) Temp.CC)Color &Turbidity

Sample Data

PH

7.41

Airbill*

0552973702

Volume

2 x 80 oz

S.C.(millimho/cm)

0.408

COC*

3 13593

Traffic Report *

CHD 69

Temp.CC)

15

Lab

LANCAS

D.O.(mg/1)

1.14

Date Shipped

8-20-91

Color &Turbidity(NTU)

88

Time Shipped

1700

Tag*

3-1194309,3-1194310

M F"S f*l *

HKJUtft'87 " " •"

Page 100: Drum Logsheets · SAMPLE LOG SHEET D Surface Soil Page 1 of I D Subsurface Soil By C. Wech D Sediment O Lagoon/Pond 13 Other Drum Sample Project Site Name Jack's Creek_____ Project

SAMPLE LOG SHEET

G Monitoring Well Data " Page __E Domestic Well Data By RJGD Other ______

Project Site Name Jack's Creek__________________________ Project Site Number 37-15-3L2W_______NUS Source No. 2567___________________________ Source Location .JC-GMW-2101I

Total Well Depth:25.5 ft BGS

Well Casing Size & Depth:

2-inch, 26.8 ft BTOC

Static Water Level: 15 ft BTOC

One Casing Volume:2.36 gal

Start Purge (hrs.):0900

End Purge (hrs.):0912

Total Purge Time (min.):12

Total Amount Purged (gal.):7.08

Monitoring Reading:

0.0 ppm upon opening well

Purge Method:Fultz pump/

Sample Method:stainless steel bailer

Depth Sampled: 17.6 ft BTOC

Sample Date & Time:

8-15-91, 0920

Sampled By:Walt Koehler

r_| Type of SampleD[~j Low ConcentrationQ High ConcentrationQ Grab

CompositeGrab-Composite

Analysis

Total Metals

Cyanide

Dissolved Metals

Sulfate,chloride

Nitrite

TSS ,TDS .Alkalinity .AcidityVOABNA.Pesticide.PCB

SAS or CASE*

16967

6573C-02

16967

Preservative

HNO3

NaOH

HNO3

none

none

noneHC1none

Purge Data

Volume(gallons)

pH

\

8.51

Airbill*

0552973750

0552973761

0552973853

0552973772

0552973665

Volume

1x1 liter

1x1 liter1x1 liter

1x1 liter1x1 liter

2x1 liter3 x 40 ml2 x 80 oz

PH

S.C.(millimho/cm)

14.480

COG*

3 13584

3 13585

3 13583

3 13586

3 12500

Traffic Report *

MCDM 94

MCDM 94

MCDM 95

CHD 74CHD 74

S.C.(millimho/cm)

Sample Data

Temp.CC)

14.5

Lab

SKINER

CRL

SKINER

CRL

LANCAS

Temp.CC)

D.O.(mg/1)

1.96

Date Shipped

8-15-91

8-15-91

8-15-91

8-15-91

8-16-91

Color &Turbidity(NTU)

^

^

Color &Turbidity(NTU)

grey ,0.5 8

Time Shipped

1700

1700

1700

1700

1700

Tag*

3-1194201,3-1194202

3-1194201,3-1194202

3-1194203

3-1194206

3-1194208 | B

3-1194204,3-1194205 ^

3-1194437 thru 3-1194441

3-1 194437 thru 3-1194441

AR30U90