MRP [Materials Requirement Plan]Popular concept in 1960&1970
Consists of a computer system & a manufacturing information system
Does production scheduling and materials planning
MRP systemMRP systems compute
• Net requirements for each inventory item• Time-phase them
• Determine their proper coverage
2
SUB
ASSEMBLY II SUB ASSEMBLY II
SUB ASSEMBLY I
C2 C5 B2 A5 D5C3 D1 D2 D3 D4A1 A2 B1 C1 C4A3 A4
MAJOR ASSEMBLY
3
ObjectivesEnsure the availability of materials (components & products) for planned production and customer
deliveryMaintain the lowest possible inventory level
Plan • Manufacturing activities
• Delivery schedules• And purchasing activities
4
ScopeMRP System covers inbound logistical area
Key elements of MRP systemMaster Production Schedule
Bill of MaterialsInventory Status Files
MRP ProgramOutputs & Reports
Development First phase is called MRP I [Materials
Requirement Planning] Second phase is called MRP II [Manufacturing
Resources Planning]
5
MRP I [soft ware] is restricted to materials resource only
• Attempts to minimize inventories• Maintain adequate materials for production
process.MRP II includes all resources required in
planning and control of production
6
Process of MRP IMRPI starts with, customer’s demand
[independent demand] and explodes the time and need for components based on the demand for end
product
7
Customers orders
inventory transactions
Forecasts
Engineering
changes
Inventory status file
[finished items, WIP, planned
orders
Master production
schedule[which product to produce, in what quantity & when] Bill of
materials file[product
structure and routing]
MRP ISYSTEM
PLANNED SCHEDULES AND VARIOUS OTHER
REPORTS
8
When does it get applied? The process follows an intermittent system
Demand is dependent Purchasing dept., their suppliers and company’s own manufacturing system is
flexible enough to handle deliveries on weekly basis
Advantages of MRP I1. Improved business results [ROI, profits]
2. Improved manufacturing results3. Better manufacturing control
4. Less inventory
9
5. Time phased ordering of materials6. Less materials obsolescence
7. Higher reliability8. More responsiveness to market demand
9. Reduced production costsDisadvantages of MRP I
1. Due to small lot purchases high material acquisition costs and high ordering costs
2. Stock out costs are more as safety stock protection is low
10
3. A limitation of software as adapting to specific situations is difficult. So modification of the
software is necessary MRP II
MRP I is updated and expanded to include
• Financial, marketing and logistics elements
• Entire set of activities involved in planning and control of production
• It consists of variety of functions like
• Production planning
11
• Resource requirements planning• Master production scheduling
• Materials requirement planning [MRP I]• Shop floor control
• Purchasing
12
Orders [production plan]
Bill of materials Inventory records
Material requirement planning [MRP]
Capacity requirement planning [CRP]
Realistic?
Execute capacity plans
Execute materials plan
yes
No
13
Benefits of MRP IIInventory reductions of one fourth to one third
Higher inventory turn overImproved consistency in on-time customer
deliveryReduction in purchasing costs due to less urgent
purchasesMinimization of workforce overtime
14
DRP is a technique of Distribution Management
DRP concept has evolved in two phases, DRPI (Distribution Requirement Planning) & DRP II
(Distribution Resources Planning) DRP I deals with inventory planning
DRP II covers all resources relevant to distribution
• Warehouse space• Man power levels
• Transport capacity [eg. trucks, rail cars]• Financial flows
15
DRP IApplicable to outbound logistics
Determination of inventory requirement at points of consumption for short spans of time Plan to move inventory in the distribution
channel in response to the above It is a time phased plan, dynamic and flexible
in natureCustomer dependent planning, depends on the