Drilling Support Equipment Key Advantages Cost Effective and Pioneering Technology One-Stop Turn-key Solution SEBOTECH is the first and only company in KOREA to have developed and successfully supplied BOP Spider Beam and Test Stump. Our extensive research and testing has enabled us to acquire good understanding of the drilling work in order to provide the most value added solution to our customers. Cost Effective and Pioneering Technology Item List Description Item BOP Spider Beam BOP Test Stump BOP Sea Fastening BOP Lifting Frame Moonpool Damping Device To protect BOP equip. from impact between ship and BOP, when BOP is installed on the seabed or retrieved. Used for pressure test of BOP To store BOP equip. when it is not used. Used to lift a BOP equip. Prevents the consumption of more fuel due to low speed of the ships caused by the waves in the moonpool. Regulations & Standards Number Description Codes & Standards NORSOK NORSOK ISO EN Class Regulation Owner’s standards S-002 :ed 2004 M-101 :ed 2000 15614-1 :ed 2004 10204 :ed 2004 DNV.GL-OS-C401 :ed 2015 SONGA, STATOIL, DONG ENERGY, TOTAL, CHEVRON Working Environment for Safety Aluminum Structure Fabrication Welding Procedure Material Certification Scheme Welding Procedure
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Drilling Support Equipment
Key Advantages
Cost Effective and Pioneering Technology
One-Stop Turn-key Solution
SEBOTECH is the first and only company in KOREA to have developed and successfully supplied BOP Spider Beamand Test Stump. Our extensive research and testing has enabled us to acquire good understanding of the drillingwork in order to provide the most value added solution to our customers.
Cost Effective and Pioneering Technology
Item List
DescriptionItem
BOP Spider Beam
BOP Test Stump
BOP Sea Fastening
BOP Lifting Frame
Moonpool Damping Device
To protect BOP equip. from impact between ship and BOP, when BOP is installed on theseabed or retrieved.
Used for pressure test of BOP
To store BOP equip. when it is not used.
Used to lift a BOP equip.
Prevents the consumption of more fuel due to low speed of the ships caused by the waves in the moonpool.
Regulations & Standards
Number DescriptionCodes & Standards
NORSOK
NORSOK
ISO
EN
Class Regulation
Owner’s standards
S-002 :ed 2004
M-101 :ed 2000
15614-1 :ed 2004
10204 :ed 2004
DNV.GL-OS-C401 :ed 2015
SONGA, STATOIL, DONG ENERGY, TOTAL, CHEVRON
Working Environment for Safety
Aluminum Structure Fabrication
Welding Procedure
Material Certification Scheme
Welding Procedure
One-Stop Turn-Key Solution
Service Material Solution Note
Scope
AssemblySolution
Turn KeySolution
Item
Moonpool Cover
Moon pool Flap
Test Stump Handler
Bop Guiding Spider Beam
Bop Lifting Frame and Link
Bop Sea Fastening Device
Engineering & Design
Material Procurement
Fabrication
Installation
Project Management
Project No.
3031/32/34/35
3402
3507/08/09/10
3609/10
3614/17/19/22
3614/17/19/22
Owner
SONGA
HEEREMA
TRANSOCEAN
ODEBRECHT
ATWOOD
ATWOOD
Ship Type
SEMI-SUBMERSIBLE RIG
PIPELAY VESSEL
DRILL SHIP
DRILL SHIP
DRILL SHIP
DRILL SHIP
Class
DNV.GL
LR
DNV.GL
DNV.GL
DNV.GL
DNV.GL
Supply Scope
Assembly Solution
Assembly Solution
Assembly Solution
Assembly Solution
Assembly Solution
Assembly Solution
Provide design, analysis, shop drawings
Provide parts and materials
Provide fabrication
Execute installation
Provide customer integrated project management
Drilling Support Equipment
We have the ability and experience to perform Engineering, Procurement, Fabrication and Installation.
Work Scope
Reference List
Korea & Worldwide
SEBOTECH (Busan)