DRI Grant impact at the smaller sites Pete Gronbech September 2012 GridPP29 Oxford
23

DRI Grant impact at the smaller sites Pete Gronbech September 2012 GridPP29 Oxford.

Mar 27, 2015

Download

Documents

Diana Barnett
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: DRI Grant impact at the smaller sites Pete Gronbech September 2012 GridPP29 Oxford.

DRI Grant impact at the smaller sites

Pete Gronbech September 2012GridPP29 Oxford

Page 2: DRI Grant impact at the smaller sites Pete Gronbech September 2012 GridPP29 Oxford.

2GridPP29, Oxford

Target Areas

• Internal Cluster networking• Cluster to JANET interconnect• Resilience and redundancy

26/9/12

Page 3: DRI Grant impact at the smaller sites Pete Gronbech September 2012 GridPP29 Oxford.

3GridPP29, Oxford

Cluster Networking

• Most sites clusters have been interconnected at 1Gb/s• As storage servers size increased from ~20TB to 40TB

and even larger 36 bay units with usable capacities of ~70TB the network links had to be increased to cope with the number of simultaneous connections from worker nodes

• Many sites decided to use trunked or bonded 1Gb/s links.

• Work on the basis of roughly one 1Gb/s link per 10TB• This no longer scales for the very large servers having

6 bonded links.• Cost of gigabit networking starts to look high when

you have to divide the number of ports on a switch by 6.

• 10G bit switch prices coming down.26/9/12

Page 4: DRI Grant impact at the smaller sites Pete Gronbech September 2012 GridPP29 Oxford.

4GridPP29, Oxford

DRI Grant

• Has allowed the sites to make the jump to 10Gbit switches in the cluster earlier than they would have planned to do so.

• Has allowed some degree of future proofing by providing enough ports to cover expected cluster expansion over the next few years.

• Replacing bonded gigabit with 10Gbit simplifies and tidies up the cabling and configuration. (Less to go wrong hopefully)

26/9/12

Page 5: DRI Grant impact at the smaller sites Pete Gronbech September 2012 GridPP29 Oxford.

5GridPP29, Oxford

Campus connectivity

• Many Grid Clusters had 1 or 2G/bit connections to the campus WAN.

• Many sites have used grant funding to install routers to allow connectivity to the back bone at 10Gbit.

• If the campus backbone is made up of 10 Gbit links then the danger is that the grid cluster could saturate some of these links so blocking other traffic to the JANET connection.

• Links have to be doubled up on the route to the campus router.

• The JANET connection to the university has to be increased or the Grid link capped to allow both Grid traffic and Campus traffic to flow un hindered

• The alternative is to install a by-pass link directly to the JANET router.26/9/12

Page 6: DRI Grant impact at the smaller sites Pete Gronbech September 2012 GridPP29 Oxford.

6GridPP29, Oxford

Resilience

• Where network upgrades were able to be purchased at a cost less than anticipated some funds where used to upgrade critical service nodes or infrastructure.

• Storage server head nodes, caching servers, UPS or improved firewalls were items chosen by different institutes.

• All sites were allocated some funds to purchase monitoring nodes. Originally intend to run Gridmon but the plan changed to use PerfSonar.

• The end result is that the Grid clusters at the sites are in a much stronger position than before and will provide robust

26/9/12

Page 7: DRI Grant impact at the smaller sites Pete Gronbech September 2012 GridPP29 Oxford.

7GridPP29, Oxford

Careful planning required!

26/9/12

Page 8: DRI Grant impact at the smaller sites Pete Gronbech September 2012 GridPP29 Oxford.

8GridPP29, Oxford26/9/12

Site Cluster Networking switches

Campus Switches comments

Birmingham Dell Force 10 S4810 and S60 switches plus NICS

Fibres provided to bypass the campus backbone to a separate 10Gbit JANET connection

Main Grid cluster will have 10Gbit connection to the PP part of the shared cluster.

Bristol Cisco switches Fibres and connections

Brunel Cisco Nexus 5596UP 10GE switches, and CISCO 3750E 1Gbit switches allowing 2 channel bonds to WNs

4Gb/s of 10Gbit JANET connection. CMS Site. A 72TB cache server purchased to act as a buffer between pool nodes and WNs

Cambridge Dell 8024F switches used to provide 10Gbps to SE head and pool nodes.

Full 10Gbps connectivity to JANET via new fibres

Durham HP 5412 gigabit switches with 8 10Gbps ports.

ECDF IBM BNT G8264R CISCO?

Page 9: DRI Grant impact at the smaller sites Pete Gronbech September 2012 GridPP29 Oxford.

9GridPP29, Oxford26/9/12

Site Cluster Networking switches

Campus Switches comments

Glasgow Extreme Summit X670V & X460-48t

Mainly concentrated on cluster infrastructure

Imperial 10Gb/s infrastructure for storage, connects to 40Gb/s college connection

Lancaster Force 10 Z9000 & S4810

Liverpool Force 10 S4810 & S55, SolarFlare NICs

Manchester Dell 8024 10Gbit campus connection

Oxford Force 10 S4810 Cisco 4900M Campus LAN switches

10Gbit JANET link throttled to 5Gbps

Page 10: DRI Grant impact at the smaller sites Pete Gronbech September 2012 GridPP29 Oxford.

10GridPP29, Oxford

Edinburgh

26/9/12

Page 11: DRI Grant impact at the smaller sites Pete Gronbech September 2012 GridPP29 Oxford.

11GridPP29, Oxford

Glasgow

26/9/12

Page 12: DRI Grant impact at the smaller sites Pete Gronbech September 2012 GridPP29 Oxford.

12GridPP29, Oxford

Lancaster

26/9/12

That Network Upgrade...

The mad scramble network uplift plan for

Lancaster took a 3-pronged approach.

1. Upgrade & Shang-hai the University's back up link. 10G (mostly) just for us.

2. Increase connectivity to campus backbone & thus between the two "halves" of the grid cluster and the local HEP cluster.

3. Add capacity for 10G networking to our cluster using a pair of Z9000 core switches &

half a dozen S4810 rack switches.

4. This free's up some of the current switches that can be retasked to improve the HEP cluster networking.

Page 13: DRI Grant impact at the smaller sites Pete Gronbech September 2012 GridPP29 Oxford.

13GridPP29, Oxford

Liverpool

26/9/12

Page 14: DRI Grant impact at the smaller sites Pete Gronbech September 2012 GridPP29 Oxford.

14GridPP29, Oxford

Oxford

26/9/12

Page 15: DRI Grant impact at the smaller sites Pete Gronbech September 2012 GridPP29 Oxford.

15GridPP29, Oxford

QMUL

26/9/12

Page 16: DRI Grant impact at the smaller sites Pete Gronbech September 2012 GridPP29 Oxford.

16GridPP29, Oxford

RHUL

26/9/12

• Now have 2x1Gb/s links to Janet, trunked. Second link added 7th March. Could not be utilised until old 1Gb/s firewall replaced.

• Network upgraded from 8x Dell PC6248 (1Gb/s) stack, to 2xF10 S4810 10Gb/s spine with PC6248s attached as leaves by 2x10Gb/s to each F10.

• Old 1Gb/s firewall out of warranty/support, to be replaced soon with Juniper SRX650 (7 Gb/s max).

Page 17: DRI Grant impact at the smaller sites Pete Gronbech September 2012 GridPP29 Oxford.

17GridPP29, Oxford

Sheffield

26/9/12

Page 18: DRI Grant impact at the smaller sites Pete Gronbech September 2012 GridPP29 Oxford.

18GridPP29, Oxford

Sussex

• 4 36-port Infiniband switches• Arranged IB switches in Fat Tree topology

26/9/12

Page 19: DRI Grant impact at the smaller sites Pete Gronbech September 2012 GridPP29 Oxford.

19GridPP29, Oxford

Common Themes

• Well planned cluster networking, balanced and future proof

• Vast improvement from ad hoc cost limited designs they replaced.

• Have brought tangible benefits..

26/9/12

Page 20: DRI Grant impact at the smaller sites Pete Gronbech September 2012 GridPP29 Oxford.

20GridPP29, Oxford

FTS Transfer Rates

• To Oxford

26/9/12

• From Oxford

Page 21: DRI Grant impact at the smaller sites Pete Gronbech September 2012 GridPP29 Oxford.

21GridPP29, Oxford26/9/12

Page 22: DRI Grant impact at the smaller sites Pete Gronbech September 2012 GridPP29 Oxford.

22GridPP29, Oxford

Benefits

• August 2012 Transfers of files to Oxford hitting 5Gbit rate cap for several hours.

26/9/12

Page 23: DRI Grant impact at the smaller sites Pete Gronbech September 2012 GridPP29 Oxford.

23GridPP29, Oxford

Performance Tuning / Future

• Now need to concentrate on improving FTS transfers to the remaining slow sites

• Good Monitoring required both locally and nationally• PerfSonar being installed across the sites (See next

talk)• Work with JANET and site networking to increase

JANET connectivity where required.

26/9/12