Top Banner
Dredging of Gold Tailings Dam (WA) (HDPE Lined Pond) Material Pumped Gold Tailings Depth Pumped 1-5 m Pump Capacity 4000 L/min (clear water) Slurry Ratio 15% Slurry Pumping Flow Rate 202 m 3 / hr Average slurry extraction 1617 m 3 /day* Average wet solid extraction 242 m 3 /day* Pumping Distance 180 m
1

Dredging of Gold Tailings Dam (WA) (HDPE Lined …...Dredging of Gold Tailings Dam (WA) (HDPE Lined Pond) Material Pumped Gold Tailings Depth Pumped 1-5 m Pump Capacity 4000 L/min

Apr 21, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Dredging of Gold Tailings Dam (WA) (HDPE Lined …...Dredging of Gold Tailings Dam (WA) (HDPE Lined Pond) Material Pumped Gold Tailings Depth Pumped 1-5 m Pump Capacity 4000 L/min

DredgingofGoldTailingsDam(WA)(HDPELinedPond)

Material Pumped Gold Tailings

Depth Pumped 1-5 m

Pump Capacity 4000 L/min (clear water)

Slurry Ratio 15%

Slurry Pumping Flow Rate

202 m3/ hr

Average slurry extraction

1617 m3/day*

Average wet solid extraction

242 m3/day*

Pumping Distance 180 m