Dredging Engineering : Building & Maintaining Underwater Highways Bryan N. Jones, M.S., P.E. Coastal Engineer COLLINS ENGINEERS, INC. Civil, Structural, Water Resources and Underwater Engineering 125-G Wappoo Creek Drive, Charleston, SC 29412 Phone:(843) 406-1300 E-mail: bjones @collinsengr.com www.collinsengr.com
31

Dredging Engineering: Building & Maintaining Underwater Highways Bryan N. Jones, M.S., P.E. Coastal Engineer COLLINS ENGINEERS, INC. Civil, Structural,

Jan 13, 2016

Download

Documents

Brenda Bridges
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Dredging Engineering: Building & Maintaining Underwater Highways Bryan N. Jones, M.S., P.E. Coastal Engineer COLLINS ENGINEERS, INC. Civil, Structural,

Dredging Engineering:Building & Maintaining Underwater Highways

Bryan N. Jones, M.S., P.E.Coastal Engineer

COLLINS ENGINEERS, INC.Civil, Structural, Water Resources and Underwater Engineering

125-G Wappoo Creek Drive, Charleston, SC 29412

Phone:(843) 406-1300 E-mail: [email protected]

www.collinsengr.com

Page 2: Dredging Engineering: Building & Maintaining Underwater Highways Bryan N. Jones, M.S., P.E. Coastal Engineer COLLINS ENGINEERS, INC. Civil, Structural,

COLLINS ENGINEERS, INC.

Introduction

Historical Significance of Waterborne TransportationSafe and Efficient (95% of US trade through ports)Evolution of Ships (larger, wider, faster vessels)Evolution of Shipping (containerization)

Page 3: Dredging Engineering: Building & Maintaining Underwater Highways Bryan N. Jones, M.S., P.E. Coastal Engineer COLLINS ENGINEERS, INC. Civil, Structural,

COLLINS ENGINEERS, INC.

Navigation ChannelsFew rivers or harbors are naturally deep.Channel improvements for ships to enter/leave ports efficiently, quickly and safely.Designing, building, and maintaining channels compared to constructing underwater highways.First US projects in 1789, with congressional approval for lighthouse construction.

Page 4: Dredging Engineering: Building & Maintaining Underwater Highways Bryan N. Jones, M.S., P.E. Coastal Engineer COLLINS ENGINEERS, INC. Civil, Structural,

COLLINS ENGINEERS, INC.

Dredging = Underwater Excavation

Page 5: Dredging Engineering: Building & Maintaining Underwater Highways Bryan N. Jones, M.S., P.E. Coastal Engineer COLLINS ENGINEERS, INC. Civil, Structural,

COLLINS ENGINEERS, INC.

Early Forms of DredgingSpades & Buckets (Nile, Tigris, Euphrates)Agitation Dredging (Indus)Scraper Dredging (1435)Bag & Spoon (Netherlands)Revolving Chain “Mud Mill” (1500’s)

Page 6: Dredging Engineering: Building & Maintaining Underwater Highways Bryan N. Jones, M.S., P.E. Coastal Engineer COLLINS ENGINEERS, INC. Civil, Structural,

COLLINS ENGINEERS, INC.

Dredging ProjectsShort-Term Objective

Construct or maintain channels

Long-Term ObjectiveManagement and operation of disposal areas

Page 7: Dredging Engineering: Building & Maintaining Underwater Highways Bryan N. Jones, M.S., P.E. Coastal Engineer COLLINS ENGINEERS, INC. Civil, Structural,

COLLINS ENGINEERS, INC.

Project Design ConsiderationsLocation and quantitiesSediment properties and characteristicsEvaluate disposal alternativesIdentify social, environmental, and institutional factors

Page 8: Dredging Engineering: Building & Maintaining Underwater Highways Bryan N. Jones, M.S., P.E. Coastal Engineer COLLINS ENGINEERS, INC. Civil, Structural,

COLLINS ENGINEERS, INC.

Selection of Dredge Plant Equipment

Material CharacteristicsQuantitiesDredging DepthDistance to Disposal AreaContamination of SedimentsMethod of Disposal

Page 9: Dredging Engineering: Building & Maintaining Underwater Highways Bryan N. Jones, M.S., P.E. Coastal Engineer COLLINS ENGINEERS, INC. Civil, Structural,

COLLINS ENGINEERS, INC.

Types of Dredges

MechanicalBucketDipper

HydraulicSidecastHopperDustpanCutterhead

Page 10: Dredging Engineering: Building & Maintaining Underwater Highways Bryan N. Jones, M.S., P.E. Coastal Engineer COLLINS ENGINEERS, INC. Civil, Structural,

COLLINS ENGINEERS, INC.

Bucket DredgesAdvantages

Hard/Compact MaterialsPrecise control of excavation

LimitationsDifficult to retain finesLow production ratesRequires scow barges

Page 11: Dredging Engineering: Building & Maintaining Underwater Highways Bryan N. Jones, M.S., P.E. Coastal Engineer COLLINS ENGINEERS, INC. Civil, Structural,

COLLINS ENGINEERS, INC.

Dipper DredgesSame Advantages and Limitations as for Bucket Dredges

Page 12: Dredging Engineering: Building & Maintaining Underwater Highways Bryan N. Jones, M.S., P.E. Coastal Engineer COLLINS ENGINEERS, INC. Civil, Structural,

COLLINS ENGINEERS, INC.

Sidecaster DredgesAdvantages

Self-propelledRapid Response

LimitationsOpen water disposal onlySome material may return to the channel prism

Page 13: Dredging Engineering: Building & Maintaining Underwater Highways Bryan N. Jones, M.S., P.E. Coastal Engineer COLLINS ENGINEERS, INC. Civil, Structural,

COLLINS ENGINEERS, INC.

Dustpan Dredges

AdvantagesSelf-propelledHigh production ratesRapid deployment

LimitationsLoose materials onlyNo open water1000 ft pumping distance

Page 14: Dredging Engineering: Building & Maintaining Underwater Highways Bryan N. Jones, M.S., P.E. Coastal Engineer COLLINS ENGINEERS, INC. Civil, Structural,

COLLINS ENGINEERS, INC.

Hopper DredgesAdvantages

Work in open waterSelf-propelled vesselNo obstruction of trafficEconomical over long distances

LimitationsDeep draftNot continuousNo contaminated sedimentsNot effective around structures

Page 15: Dredging Engineering: Building & Maintaining Underwater Highways Bryan N. Jones, M.S., P.E. Coastal Engineer COLLINS ENGINEERS, INC. Civil, Structural,

COLLINS ENGINEERS, INC.

Cutterhead Pipeline Dredges

AdvantagesMost material typesContinuous operation

LimitationsNo open waterNot self-propelledPipeline is a navigation hazard

Page 16: Dredging Engineering: Building & Maintaining Underwater Highways Bryan N. Jones, M.S., P.E. Coastal Engineer COLLINS ENGINEERS, INC. Civil, Structural,

COLLINS ENGINEERS, INC.

Cutterhead Dredge Operations

Page 17: Dredging Engineering: Building & Maintaining Underwater Highways Bryan N. Jones, M.S., P.E. Coastal Engineer COLLINS ENGINEERS, INC. Civil, Structural,

COLLINS ENGINEERS, INC.

Pipeline Transport of Solids

Page 18: Dredging Engineering: Building & Maintaining Underwater Highways Bryan N. Jones, M.S., P.E. Coastal Engineer COLLINS ENGINEERS, INC. Civil, Structural,

COLLINS ENGINEERS, INC.

Disposal AlternativesOpen-water DisposalConfined Disposal Habitat Development

Page 19: Dredging Engineering: Building & Maintaining Underwater Highways Bryan N. Jones, M.S., P.E. Coastal Engineer COLLINS ENGINEERS, INC. Civil, Structural,

COLLINS ENGINEERS, INC.

Dewatering & Densification

Page 20: Dredging Engineering: Building & Maintaining Underwater Highways Bryan N. Jones, M.S., P.E. Coastal Engineer COLLINS ENGINEERS, INC. Civil, Structural,

COLLINS ENGINEERS, INC.

Long Term Dredge Material Management Plans

50-year typical project lifeDredged material characteristicsIdentification of placement sitesImplementation Plan (Party Responsibilities)Geotechnical ReportCost EstimatesHistoric/Archaeological ConcernsAgency Cooperation/CoordinationReal Estate and Local

Page 21: Dredging Engineering: Building & Maintaining Underwater Highways Bryan N. Jones, M.S., P.E. Coastal Engineer COLLINS ENGINEERS, INC. Civil, Structural,

COLLINS ENGINEERS, INC.

Environmental Challenges:Public Perception IS REALITY!

PastTerminology (spoil, sludge, disposal)Previous History

PresentPollution is a resource that is out of placeBeneficial Uses

Page 22: Dredging Engineering: Building & Maintaining Underwater Highways Bryan N. Jones, M.S., P.E. Coastal Engineer COLLINS ENGINEERS, INC. Civil, Structural,

COLLINS ENGINEERS, INC.

1969 – National Environmental Policy Act (NEPA)Environmental Impact AssessmentsBalance environmental/economic/social needs

1976 – Clean Water ActState & Federal Permitting

Marine Protection Research and Sanctuaries ActOcean placement of material

Endangered Species Act

Environmental Challenges:Legislation

Page 23: Dredging Engineering: Building & Maintaining Underwater Highways Bryan N. Jones, M.S., P.E. Coastal Engineer COLLINS ENGINEERS, INC. Civil, Structural,

COLLINS ENGINEERS, INC.

Time DelaysPermit FeesTesting for Contaminated Sediments Seasonal Restrictions

Environmental Challenges:Permit Requirements

Page 24: Dredging Engineering: Building & Maintaining Underwater Highways Bryan N. Jones, M.S., P.E. Coastal Engineer COLLINS ENGINEERS, INC. Civil, Structural,

COLLINS ENGINEERS, INC.

Beneficial Uses of Dredge Material :Pollution is merely a misplaced resource!

Habitat developmentWetlandsBird IslandsOyster Grounds

Beach nourishmentConstruction

Ports & HarborsHighways & Airports

AgricultureSolid Waste ManagementParks and recreation

MiamiBeach

Page 25: Dredging Engineering: Building & Maintaining Underwater Highways Bryan N. Jones, M.S., P.E. Coastal Engineer COLLINS ENGINEERS, INC. Civil, Structural,

COLLINS ENGINEERS, INC.

What is Involved with Dredging Projects?

EngineeringSurveys & DesignTidal HydraulicsPhysical Sediment Analysis

EnvironmentalLegal ComplianceAssess Needs and ImpactsChemical Analysis of Sediments

Page 26: Dredging Engineering: Building & Maintaining Underwater Highways Bryan N. Jones, M.S., P.E. Coastal Engineer COLLINS ENGINEERS, INC. Civil, Structural,

COLLINS ENGINEERS, INC.

Real EstateRights of EntryReleases from Liability

Local OrdinancesLand Use PlansZoningPublic Policy Issues

Economics (Who pays?)

What is Involved with Dredging Projects?

Page 27: Dredging Engineering: Building & Maintaining Underwater Highways Bryan N. Jones, M.S., P.E. Coastal Engineer COLLINS ENGINEERS, INC. Civil, Structural,

COLLINS ENGINEERS, INC.

Typical Dredging Contracts

Solicitation, Offer, and AwardContract ClausesSpecial Requirements/Restrictions

PermitsSchedules & ProgressShoaling/Additional Work

Plans & Specifications

Page 28: Dredging Engineering: Building & Maintaining Underwater Highways Bryan N. Jones, M.S., P.E. Coastal Engineer COLLINS ENGINEERS, INC. Civil, Structural,

COLLINS ENGINEERS, INC.

Dredging Contracts - SpecificationsGeneral RequirementsSpecial Requirements

PermitsSchedule & ProgressShoaling & Additional WorkFinal Examination & Acceptance

MeetingsQuality ControlEnvironmental Protection

Page 29: Dredging Engineering: Building & Maintaining Underwater Highways Bryan N. Jones, M.S., P.E. Coastal Engineer COLLINS ENGINEERS, INC. Civil, Structural,

COLLINS ENGINEERS, INC.

Site WorkDefinition of Payment ItemsCharacter of MaterialsPlacement of Dredge Material

Site Investigation – Material CharacteristicsLocal Regulations

Dredging Contracts - Specifications

Page 30: Dredging Engineering: Building & Maintaining Underwater Highways Bryan N. Jones, M.S., P.E. Coastal Engineer COLLINS ENGINEERS, INC. Civil, Structural,

COLLINS ENGINEERS, INC.

Measurement & PaymentPlace measure at dredge siteBin measure (Hopper Dredges)Place measure at placement site (very difficult!)Plant Rental/Lump SumPre- and Post-Dredging Hydrographic Surveys

Page 31: Dredging Engineering: Building & Maintaining Underwater Highways Bryan N. Jones, M.S., P.E. Coastal Engineer COLLINS ENGINEERS, INC. Civil, Structural,

COLLINS ENGINEERS, INC.

Dredging Contracts - Drawings“Specifications Govern” ClausePlan & Section Views of ChannelPlan & Section Views of Placement Site