PROJECT : PROPOSED HOUSING PROJECT FOR RELOCATION OF UNDERSERVED
SETTLEMENTS FERGUSON ROAD, COLOMBO- 15
Summary of Technical Query Sheets
Item NoTechnical Query NoDateBrief DescriptionLocation ( Block
No )Reply received
datecomment1CMLMTD/UDA/RUSP/TQS/0017/9/12Discrepancy of Drawings at
Grid 15 A1 & A2Follow the structural
drawings2CMLMTD/UDA/RUSP/TQS/0027/9/12Electrical, Sewer, Waste
water, Clear Water..etc Layout Diagrams need to issueGeneralNot
yet3CMLMTD/UDA/RUSP/TQS/0037/9/12Lift well area pile COL suit to
get Lift well clear height of 1600mmA1 & A28/2/12Received Dwg
No-UDA/RUSP(FR)D/01B 4CMLMTD/UDA/RUSP/TQS/0047/13/12Requesting
drawings for Ground Floor Beams, Columns, GF SlabA1 &
A2Partially1) GF beam drw received on 5/7/12(but need to be
revised- refer TQS/007) 2) Column drw no UDA/RUSP(FR)/D/104A to
106A received on 2/8/12 5CMLMTD/UDA/RUSP/TQS/0057/19/12Requesting
Structural details for Lift well (base slab & wall )A1 &
A28/2/12Received Dwg No-UDA/RUSP(FR)D/57A &
107A6CMLMTD/UDA/RUSP/TQS/0067/27/12Mis-alignment of Beams along at
Grid 7 & 23A1 & A2Not
yet7CMLMTD/UDA/RUSP/TQS/0077/31/12Plinth Beam location dimensions
not enough A1,A2,C1,C2Not
yet8CMLMTD/UDA/RUSP/TQS/0088/10/12Requesting details of the trial
pile using 17m permanent casing. (diameter and
location)9CMLMTD/UDA/RUSP/TQS/0098/21/12Selection of Bored piles
for PIT in the Process of Permanent Casing
Proposal10CMLMTD/UDA/RUSP/TQS/0109/21/12Requesting for detailed
drawing for plinth beam r/f workA1,A2,C1,C2Not
yet11CMLMTD/UDA/RUSP/TQS/0119/24/12To confirm that PIT tests have
to be done only to 20% of total no. of piles as in the contract
documents12CMLMTD/UDA/RUSP/TQS/0129/24/12Clarify details of drawing
UDA/RUSP(FR)/D/164 & 165
C113CMLMTD/UDA/RUSP/TQS/0139/27/12Clarify details of drawing
UDA/RUSP(FR)/D/53A A211/13/12Not necessary to have a r/f mesh.
Thickness can be 75mm with grade 20
concrete.14CMLMTD/UDA/RUSP/TQS/01410/2/12Clarify details of plinth
beam drawing UDA/RUSP(FR)/D/153A
C115CMLMTD/UDA/RUSP/TQS/01510/3/12Clarify details drawings
UDA/RUSP(FR)/D/106A UDA/RUSP(FR)/D/106A A211/13/121) depth should
be 300mm not 600mm 2) Column r/f should reach lift bore only 3)
Refer
detailsCMLMTD/UDA/RUSP/TQS/016CMLMTD/UDA/RUSP/TQS/01711/1/12Clarify
doubt on Block A2/12 (whether to proceed construction or wait until
A2/29 PDA test results)A2CMLMTD/UDA/RUSP/TQS/01811/6/12Clarify
details drawings UDA/RUSP(FR)/D/102A &UDA/RUSP(FR)/D/104A
CMLMTD/UDA/RUSP/TQS/01911/12/12Requesting revised drawings of
plinth beams between grid 1-7 due to pile eccentricity and
underground/embedded service drawings(electrical, plumbing, waste
water, lightening, fireetc)A2CMLMTD/UDA/RUSP/TQS/02011/15/121)
Walls along the grid lines D and E at the ground floor (2100mm wide
passenger area) are not coincide with plinth beam 2) Wall
foundation details where do not have plinth beam below the wall 3)
walls of common area also do not coincide with plinth beam
properly. CMLMTD/UDA/RUSP/TQS/02111/19/12Asking to continue
construction work on A2/41 & A2/81since there beta values of
PIT test are greater than 80%
CMLMTD/UDA/RUSP/TQS/0221/11/13Requesting to carry on work of A2/52
and A2/64A2CMLMTD/UDA/RUSP/TQS/0231/11/13PDA need to arrange on
A2/48. Test on piles A2/63 and A2/89 need to be decided on results
of A2/48A2CMLMTD/UDA/RUSP/TQS/0241/18/13Clarify CEB electrical
layout diagram for each block, required earthing system, Generator
power distribution system, any other relevant services waste water,
fresh water, fire CMLMTD/UDA/RUSP/TQS/0251/21/13Clearance of pile
no A2/52, A2/64, A2/89 with second time testing PIT
resultsA2CMLMTD/UDA/RUSP/TQS/0261/21/13In PIT report No 5 it has
mentioned A/83 instead of
A2/10A2CMLMTD/UDA/RUSP/TQS/0271/22/13Clarification of water
proofing work on lift pit wallsCMLMTD/UDA/RUSP/TQS/0282/6/13clarify
CEB electrical supply layout diagram, generator electrical supply
layout diagramCMLMTD/UDA/RUSP/TQS/0292/6/13clarify manhole layout
of the sewerage system, layout of storm water
systemCMLMTD/UDA/RUSP/TQS/0302/10/13proposing construction joints
for the floor slabs in-between grid
09-10A2CMLMTD/UDA/RUSP/TQS/0312/13/13inform about receiving advance
drawings (drafts) for electrical details on
08/02/13A2CMLMTD/UDA/RUSP/TQS/0322/14/13give the diamension of
plumbing duct,A2CMLMTD/UDA/RUSP/TQS/0332/27/13Submission of
construction joint location and pouring pattern for balance
concrete at 1st floor between grid
6-9A2CMLMTD/UDA/RUSP/TQS/0343/4/13Requsest to reconsiderate on pile
No A1/134, compare to PDA report on
A1/118A1CMLMTD/UDA/RUSP/TQS/0353/4/13Regarding further
investigation on pile No: A2/129, A2/132,
A2/150CMLMTD/UDA/RUSP/TQS/036CMLMTD/UDA/RUSP/TQS/0373/14/13Regarding
further investigation on Pile No: A2/129, A2/150A2
EQ & Material
PROJECT : PROPOSED HOUSING PROJECT FOR RELOCATION OF UNDERSERVED
SETTLEMENTS FERGUSON ROAD, COLOMBO- 15
Summary of Equipment/ Material Submittals
Item NoEquipment/ Material Submittal NoDocument DateBrief
DescriptionLocation ( Block No )Reason for SubmissionSEC/ UDA
comment received dateSEC/ UDA comment N1CML/UDA/EQ/01missing in sec
fileN2CML/UDA/EQ/026/22/12Duty Free Concession For
Cementacceptance7/5/12Cement quality is recommended. Ordering
cement should be scheduled according to the programme (because of
its expiring date)N3CML/UDA/EQ/037/17/12Machinery and formwork
system to be importedacceptanceN4CML/UDA/EQ/047/14/13acceptanceno
attachments only fron pageN5CML/UDA/EQ/057/14/12informationno
attachments only fron pageN6CML/UDA/EQ/067/27/12Calibration reports
for concrete crushing M/Cacceptance7/30/12Calibration report
acceptedN7CML/UDA/EQ/06R110/18/12Submission of calibration report
for 2nd test cube crushing M/Cacceptance10/25/12Calibration report
to be obtained from a reputed organization such as University of
Moratuwa, NBRO, N8CML/UDA/EQ/077/27/12Cement test
reportacceptance7/30/12Only compressive strength is accepted.
Initial setting time Final setting time to be
testedN9CML/UDA/EQ/088/6/12cement test repport (Tokyo
Super)acceptanceN10CML/UDA/EQ/098/8/12Concrete trial mix details
and test reports (with supercrete done on
28/08/2012)acceptancemessy docN11CML/UDA/EQ/098/8/12Concrete mix
design data proposal.acceptancemessy docN12CML/UDA/EQ/108/9/12G30
concrete trial mix with Adcrete and 3days test cube
resultsacceptance7/4/13Test results satisfactory.messy
docN13CML/UDA/EQ/10A8/16/12G30 concrete trial mix with Adcrete and
3days test cube resultsacceptancemessy
docN14CML/UDA/EQ/118/21/12Trail Mix 7days Test Cube Results for G30
(piling) with AdcreteacceptanceN15CML/UDA/EQ/128/27/12Tokyo Super
Cement Test Report ( 2days/28days strength, chemical/physical
tests)referenceN16CML/UDA/EQ/139/7/12Concrete Test Cube Strength
Reports with summary ( 01-08-2012 to 31-08-2012
)acceptance7/4/13Test results
satisfactory.N17CML/UDA/EQ/149/14/12Concrete test cube 28 days
strength report for trial mix with adcrete
(G30)acceptanceN18CML/UDA/EQ/159/21/12Requesting approval for grade
30 trial mix with adcreteacceptance1/10/12Mix design approved.
Admixture "adcrete" can be used as an
alternativeN19CML/UDA/EQ/16missing in sec
fileN20CML/UDA/EQ/1710/15/12Submission of concrete test cube
strength reports with summary ( 01-09-2012 to 30-09-2012
)acceptanceno UDA sealN21CML/UDA/EQ/1810/15/12Submission of rebar
anchoring agent specification of HIT-RE 500
(HILTI)acceptance10/16/12Chemical anchoring system can be
acceptedN22CML/UDA/EQ/1910/16/12Proposing IFE elevators for the
projectacceptance11/8/12speed not complied. Bed lift depth is not
complied. Part experienced should be provided with date of
commission and building floor are to be
specified.N23CML/UDA/EQ/19R11/24/13Proposing Thyssenkrupp
elevator's through Scan Engineering Pvt (Ltd)acceptance2/6/13Please
submit 5years cost proposal for comprehensive operation and
maintenance charges. It is advisable to arrange a witness testing
to check the performance of the
elevator.N24CML/UDA/EQ/19R24/29/13Submission of certified letters
of Thyssenkurupp elevators and bed elevatorsacceptance5/6/13Forward
to UDA architect/ Certified letters of Thyssenkurupp elevators and
bed elevators submitted by lift supplier (SCAN Engineering
(Pvt)Ltd) are checked and
acceptedN25CML/UDA/EQ/2010/17/12Submission of specification of
concrete bonding agent - Barra Emulsion
57Dacceptance10/20/12Bonding agent
approvedN26CML/UDA/EQ/2110/24/12Calibration report for concrete
crushing machineacceptance10/30/12Calibration report
acceptedN27CML/UDA/EQ/2210/30/12Use of offshore sand from SLRDC for
concrete workacceptance/review11/5/12This should be tested at a
reputed laboratoryN28CML/UDA/EQ/2311/13/12Submission of concrete
test cube strength reports with summary ( 01-10-2012 to 31-10-2012
)acceptanceno UDA sealno faliuresN29CML/UDA/EQ/2411/15/12Submission
of Rebar anchoring chemical (alternative proposal technical
details)acceptance/comment11/22/12This can be accepted and the
application to be done by the manufacturer's
specificationsN30CML/UDA/EQ/2511/23/12Submission of course
aggregate and fine aggregate test reportsinformation11/30/12Test
results acceptedN31CML/UDA/EQ/2612/6/12Technical submittal for wall
tiles and floor
tilesacceptance/reviewN32CML/UDA/EQ/26R12/14/12Resubmission of wall
tiles and floor tiles with samples and technical data (12"12"-4nos
8"12"-7nos)acceptance/review12/19/12please submit us the catalog
with details of tiles (thickness etc). All materials be submitting
for approval, to be submitted with material list. Satisfying all
requirements requested.N33CML/UDA/EQ/26R112/24/12Resubmission of
technical submittal of wall tiles and floor tiles
acceptance1/22/13Wall tiles are architecturally accepted.
Specifications to be submitted for the floor tiles
N34CML/UDA/EQ/26R24/24/13Resubmission of technical submittal of
floor tiles acceptance5/2/13catalog marked with the floor tiles
should be submitted along with the specifications. Tile thickness
should be incorporatedN35CML/UDA/EQ/26R35/8/13Resubmit of technical
submittal for floor tilesacceptance5/29/13Technical details of
specifications for the 300,300,7.5mm floor tile is accepted.
Certification to be submittedN36CML/UDA/EQ/26R49/10/13Submission of
alternative wall tiles and floor tile samples with technical
detailsacceptance10/3/13Fowarded to UDA architect Water absorption
is with in the acceptable limit. Not accepted since the coloue of
the given sample not matching with the previous approved tile
colors and toilet fittings N37CML/UDA/EQ/26R510/11/13Resubmission
of new floor tile sample with technical
datasacceptance10/30/13Actual values of the water absorption % by
mass to be correctly given otherwise it has to be locally tested .
Fowarded to UDA architect. Architectuarally accepted as per the
given samples and need to submit the SLS certification.
N38CML/UDA/EQ/2712/10/12Submission of concrete test cube reports
with summery 01/11/12 - 30/11/12acceptanceno UDA sealgiven results
satisfy the requirementsN39CML/UDA/EQ/2812/28/12Requesting for
import of reinforcementacceptance and review1/17/13The test results
are within th acceptable limits(This test is done for some other
project) Therefore test must be done for the consignment brought to
this project. Tensile testing, rebend testing, rib spacing,
transverse rib inclination, height of transverse rib, relative rib
length, relative rib areaN40CML/UDA/EQ/291/3/13Submission of fine
aggregate and course aggregate test report (sample sending date
12/18/2013)acceptance1/7/13This consignment of sand and metal are
satisfying the requirements.N41CML/UDA/EQ/301/4/13Trial mix test
cube results (3day 8day 28day) & mix design details for grade
30 self compacting concrete with Hypercrete (Alternative trial mix
for G30 for super structure)acceptance1/9/13Concrete test cube
results are acceptable for self compacting concrete. It is
important to test the slump to verify the workability. Technical
literature to the super plasticizer must be submitted (It must be
from manufacturer)N42CML/UDA/EQ/30/R11/17/13Submission of the
requested details by SEC on submitted trial mix for self compacting
concrete with Hypercrete (alternative trial mix for Grade 30
superstructure)acceptance1/22/13Does not meet our requirement.
Although flow detail is satisfactory. You are requested to submit
the technical literature with original company details
(manufacturer)N43CML/UDA/EQ/30/R22/14/13Submission of hypercrete
suppliers (Millenium concrete) experiencs in other projects as
requested by the consultantacceptance2/19/13Hypercrete can be used
to produce flowable concrete. Please get the technical literature
to find out the dosage. At the batching plant dosage to be strickly
controlledN44CML/UDA/EQ/30/R32/20/13Reply for SEC comment on
EQ/30R2 regarding hypercrete - requested details already submitted
through early submittalsinformation3/7/13Please follow the previous
instructionsN45CML/UDA/EQ/311/17/13Alternate supplier for
reinforcement steelacceptance1/24/13Tensile testing and rebend test
to be done for each consignment for all the diameters. Also it is
rib steel. Geometry test must be done for all consignments. Rib
spacing, rib height, relative rib area, rib inclination
N46CML/UDA/EQ/321/21/13Submission of concrete test cube strength
report (01/12/12 to
31/12/12)acceptance2/11/13acceptedN47CML/UDA/EQ/331/21/13Submission
of import back fill material test reports from 2 suppliers
(Standard proctor compaction, sieve and hydrometer test
results)acceptance1/24/13test results for the soil sample
acceptedN48CML/UDA/EQ/342/7/13Requesting approval for the use of QT
steel from Ceylon Steel Corporation limited
(Lanwa)acceptance2/8/13Each consignment to be tested tensile test,
rebend test, rib geometry testsame no
repeatN49CML/UDA/EQ/341/31/13Submission of relevant material
specifications for waterproofing for lift well Method statement
already submitted through DOC 119acceptancesame no
repeatN50CML/UDA/EQ/352/8/13Submission of concrete test cube
strength report (01/01/13 to 31/01/13)acceptanceno UDA sealtest
results satisfactoryN51CML/UDA/EQ/361/31/13Submission of relevant
material specifications for waterproofing of lift well (method
statement already submitted through DOC 119)acceptance2/15/13This
can be acceptedN52CML/UDA/EQ/372/13/13Requesting approval for PVC
pipes conduits and fittings form St Anthony's Industries group
(Pvt)Ltdacceptance9/12/13Please submit electrical confuits and
fittings seperately for approval. Samples should be
providedN53CML/UDA/EQ/382/14/13Submission of tensile test report on
steel bars for the reinforcement of concrete report No.
1B/13/045acceptance2/18/13Tensile testing , rebend test and Rib
geometry is acceptable for this
consignmentN54CML/UDA/EQ/392/17/13Requesting approval for electrial
conduits and fittings.acceptance2/19/13sample approvedreceived
4/7/13N55CML/UDA/EQ/402/18/13Approval for wash basin and water
closetacceptance3/20/13product is approved.. To sample to be
submitted for approvaland the shop drawings with all other details
of toilet to be submitted for approval. Color of the toilet
better-white color.N56CML/UDA/EQ/40R15/6/13Resubmit of wash
basinacceptance5/29/13W/C should be close coupled, Need shop
drawings with all the dimensions of fittings and spacing, wash
basin should be pedestal type, samples to be submitted, format of
warrenty certificate to be submitted, make of the fittings to be
mentionedCML/UDA/EQ/40R21/3/14Resubmit of wash
basinacceptance1/13/14Fowarded to UDA architect. Accepted as per
the sample and warrenty
certificateN57CML/UDA/EQ/412/18/13Requesting approval for PVC
pipes, conduits and fittings from Industrial Plastic (Pvt)Ltd . As
alternative supplier.acceptance9/12/13The brand can be accepted.
How ever samples to be submitted to UDA for final
approval.N58CML/UDA/EQ/422/21/13Submission of tensile strength
report on steel bars for the r/f of
concreteacceptance2/28/13Tensile test and rebend test satisfy the
requirement. R.b geometry test to be
done.N59CML/UDA/EQ/42R12/28/13Resubmission of test results on steel
bars (Shyam steel)acceptance3/7/13Tensile testing and rib geometry
satisfy the requirement.N60CML/UDA/EQ/432/28/13submission of fine
aggregate and course aggregate test report (sample sending date
15/02/2013)acceptance3/7/13Fine aggregate satisfy the requirement.
For course aggregate the impact value must be
rechecked.N61CML/UDA/EQ/443/1/13Requesting approval for the use of
QST steel from Melwire Rolling (Pvt)Ltd (Melwa)acceptance3/8/13This
can be used provided each consignment of steel is tested. Tensile
testing, rebend testing, rib geometry.N62CML/UDA/EQ/453/7/13Trial
mix test cube results (3day 8day 28day) & mix design details
for grade 30 self compacting concrete with adcrete and supercrete
(alternative trial mix for grade 30 for super
structure)acceptance3/13/13Trial mix design for G30 concrete is
satisfactory.N63CML/UDA/EQ/463/14/13Submission of concrete test
reports (core test, UPV test and test cube strength) at selected
locations in the 1st floor slab by the
consultantacceptance3/18/13UPV test and concrete core test are
satisfactoryN64CML/UDA/EQ/473/14/13Submission of AIV test report
for coarse aggregate (sample sending date 08/03/2013)
acceptance3/18/13AIV satisfactoryN65CML/UDA/EQ/483/27/13Submission
of concrete test cube strength report (01/02/2013 to
28/02/2013)acceptance7/4/13Test results
satisfactory.N66CML/UDA/EQ/493/29/13Submission of test results on
steel bars (Melwa)acceptance4/1/13Test results satisfactory. This
consignment can be used. Any other consignment to be
tested.N67CML/UDA/EQ/504/3/13Submission of technical details of two
products of non-shrinkage grout for your approval. (for concrete
reparing work) Master flow 810, Mapefill GPacceptance4/9/13Tow
products are approvedN68CML/UDA/EQ/514/5/13Imoporting of safety
netsacceptance4/19/1325,000m2 of safety nets is approved for
shipping. Total quantity could not be used at once hence please
notify us the detail of stage
facilityN69CML/UDA/EQ/524/22/13Requesting approval for PVC pipes,
conduits, and fittings from central industries PLC
(National)acceptanceno UDA sealUPVC pipes and fittings are approved
samples to be submittedN70CML/UDA/EQ/534/26/13Test report for
hollow blocks for 100mm and 150mm thick wallsacceptance5/3/13The
blocks that are to be used must be tested. The results that is
attached is done for prviously produced
blocksN71CML/UDA/EQ/544/28/13Submission of concrete test cube
strength report 01/03/2013 to31/03/2013acceptance5/23/13cube test
results satisfy the requirementN72CML/UDA/EQ/554/30/13Requesting
approval for paint from Nippon and Nipolac
brandacceptance5/13/13Fowardto UDA architect for external painting
primer to be approved with technical literature, Nippolac paint is
accepted as per the given specifications SLS certificate and color
card, For interior Nippolac emulsion brand, For exterior Nippolac
weather proof brand, Compatibility certificate to be issued with
skim coat/primer -warrenty certificates for external surfaces to be
submitted with application details and method statement to be
submittedN73CML/UDA/EQ/55 R16/4/13Resubmission of paint from Nippon
Paint Lanka (Pvt)Ltdacceptance7/10/13forward to UDA architect
Compatibility letter for NIPPOLAC products and skim coat can be
accepted, Given skimcoat application is only up to 3mm thick
surface preperation areas, skim coat approval only for internal
surfacesN74CML/UDA/EQ/55R29/9/13Resubmission of paint from Nippon
paint Lanka (Pvt)Ltdacceptance9/30/13Fowarded to UDA architect
Accepted as per the given spicifications and should be compatible
with paint. Need to do a sample at the
siteN75CML/UDA/EQ/565/10/13Proposed Chemical literature for plinth
beam repairing work (SpECbuild SG15 )acceptance5/14/13for plinth
beam structural repaird thid repair mortar can be used as per
manufacture specificationsN76CML/UDA/EQ/575/10/13Requesting
approval for plumbing fitting from central
agencyacceptance5/17/13can be accepted provided the company
warranty certificates and reference (where it is used in Sri Lanka)
to be attachedN77CML/UDA/EQ/57R17/16/13Resubmission of plumbing
fitting from central agencyacceptance7/23/13Can be accepted sample
should be submitted for approval. Draft warranty certificate main
contractor to be issued. Comments are attached. material schedule
to be accomodatedsee commentsN78CML/UDA/EQ/57R29/10/13Submission of
warrenty certificate for plumbing fitting from Central
Agencyacceptance10/2/13accepted and fowarded to UDA architect.
Warrenty letter for the hand bidet shower should be
submittedN79CML/UDA/EQ/585/14/13Requesting approval for electrical
panel board from K.I.K Eng Co (Pvt) Ltdacceptance5/31/13DB
manufacture is approved. How ever drawings and list of components
used in the panel manufacturing shall be submitted saperately and
obtained approval.N80CML/UDA/EQ/595/14/13Requesting approval for
subcontractor to water proofing from H.E Engineering
(Pvt)Ltdacceptance5/20/13water proofing material K11- flex is
approved for toilets and balconies. For roof slab NILOBIT-PN is
acceptable For water sump and lift pit crystalization type to be
usedN81CML/UDA/EQ/605/14/13Requesting approval for alternative
supplier to reinforcement steelacceptance5/23/13This steel can be
accepted if the following test are carried out at a local approved
testing agency. Tensile testing, rebend test and rib geometry to
BSN82CML/UDA/EQ/615/16/13Submitting of hollow cement block strength
(100mm and 150mm)acceptance7/3/13 Original test report has to be
submittedHollow block compressive strength acceptable -
RajasekaranN83CML/UDA/EQ/61R17/8/13Re submission of hollow cement
block test reportacceptanceno UDA sealtest results satisfactory
CML/UDA/EQ/625/27/13Submission of fine aggregate and course
aggregate test reports (sieve analysis and AIV test)
acceptance6/4/13fine aggregate and course aggregate test results
satisfy the requirement. Can be used for concrete
workN85CML/UDA/EQ/635/20/13Requesting approval to use Anti-Termite
from Lankem Ceylon PLCacceptance6/4/13method statement and material
for treatment is acceptableN86CML/UDA/EQ/645/29/13Requesting
approval to use Anti-Termite from the exterminator's Pvt
Ltdacceptance6/4/13methodology and material proposed by the
contractor are acceptableN87CML/UDA/EQ/655/30/13submission of
concrete test cube strength report
(01/04/13-30/04/13)acceptance7/4/13test results satisfactory.
N88CML/UDA/EQ/666/4/13Requesting approval for low voltage
switchgear and control gear products from Roche Engineering Lanka
(Pvt)Ltd (SIEMENS)acceptance6/12/13The product SIEMENS (Germany)
and th elocal panel board manufacture: Roche Engineering Lanka
(Pvt) Ltd are approved. Approval for shop drawings shall be
obtainedN89CML/UDA/EQ/676/12/13requesting approval for Aluminium
doors and windows from Lanka Aluminum Industries
PLCacceptance6/21/13 N90CML/UDA/EQ/67R19/9/13Requesting approval
for sample board and warranty letter from Lanka Aluminium
Industries PLCacceptance10/1/13Fowarded to UDA architect, draft
warrenty certificate is needed, samples to be checked at the site
as per the wind calculations and specifications
CML/UDA/EQ/67R25/7/14Submission of draft warranty letter for
Anodized Aluminium Extrusions from Lanka Aluminium Industries Plc
for BlockA1acceptanceno UDA sealForward to UDA
ArchitectN91CML/UDA/EQ/686/17/13Requesting approval for paint from
Lankem Ceylon PLC ROBIALACacceptance7/10/13Fowarded to UDA
architect. External wall treatment should be specified. Robialac
paint brand is accepted as per the specification on SLS
certification and color card. For interior - LANKEM ROBIALAC,
compatibility certificate to be issued for internal with skim coat
/ primer N92CML/UDA/EQ/696/18/13submission of concrete test cube
strength report (01/05/2013 to 30/05/2013)acceptance7/4/13Pile 84
to 172 test results comply with the standards. Pile 90 to 112 are
tested after the specified time. How ever the 7 day strengths are
complying (more than the required value) Considering the above
tests this results can be accepted. In future the contractor should
take adequete action to do the test in time
N93CML/UDA/EQ/706/18/13Requesting approval for paint from Causeway
paints Lanka (Pvt)Ltdacceptance7/10/13fowarded to UDA architect.
External wall filler (primer) must have crack bridging properties.
CAUSEWAY paint is accepted as per the given specifications SLS
certificatiom and color card. For interior LUXURY GLO brand.
Compatibility certificate to be issued for internal paint with skim
coat/ primerN94CML/UDA/EQ/716/21/13Request for import of
cementacceptance6/25/13after arrival the following properties to be
tested. Compressive strength, fineness, initial setting and final
setting time, soundness as per BS
requirementN95CML/UDA/EQ/726/21/13Requesting approval for
electrical cables from Sierra cable PLCacceptance7/10/13accepted no
commentN96CML/UDA/EQ/73missing in sec
fileN97CML/UDA/EQ/746/21/13Requesting approval for Aluminium doors
and windows from Hemnette Aluminium Extrusion Company (Pvt)
Ltdacceptance7/2/13clarification needed for load transfer to
mullion (marked on the calculation) Deflection does not comply with
the requirement and an additional member introduced. This is not a
preferable arrangementN98CML/UDA/EQ/74R17/16/13Centre mullion on W2
windowacceptanceno UDA sealForward to UDA architect refer our
previous comment EQ 74 Architecturally
acceptedN99CML/UDA/EQ/74R28/27/13Supplier's (Hemantha Aluminium
entrusion further clarification on EQ 74 for your
information)information9/30/13Applying the load factor 0.75 as
accceptable However there is no change in the design. To satisfy
the structural adequacy a dividing bar has been added. If the
architect is accepting this change this design is acceptable
Fowarded to UDA architect. Elevation of window of W2 is
architecturally acceptable N100CML/UDA/EQ/74R38/29/13Requesting
approval for sample board from Hemmette Aluminium Extrusion Company
(Pvt) Ltdacceptance9/12/13Fowarded to UDA architect. Section
thicknesses should be checked at the site as per wind calculations
given and relavent specifications of each
floorN101CML/UDA/EQ/757/3/13Requesting approval for Electrical
cables from ACL Cables PLC acceptance7/15/13approval for main
feeder cable sizes shall be obtained by submitting current and
voltage drop calculationsCML/UDA/EQ/75R18/9/14Submission of Voltage
drop calculation for ACL cablesacceptance9/2/14*Maximum length of
the largest cable is approximately 100m. Eventhough calculation has
done some distance 4mm2 cable can be
accepted.N102CML/UDA/EQ/767/8/13Requesting approval to use ALAM
steel from Alam steel Lanka (Pvt) Ltdacceptance7/17/13No local test
certificate attached (This should contain tensile testing, rebend
test, Rib geometry as per BS) chemical composition, reference where
it has been used localy (if
available)N103CML/UDA/EQ/76R17/19/13Resubmission of ALAM steel from
Alam steel Lanka (Pvt) Ltdacceptance8/5/13the requested details are
not attached. Also mill certificate for the billerts (raw material
to be provided)N104CML/UDA/EQ/76R28/22/13Resubmission of ALAM steel
from Alam steel Lanka (Pvt) Ltdacceptance9/2/13To use this steel
the following tests to be performed locally tensile test, rebend
test, rib geometry test chemical composition also SLS certificate
to be obtainedN105CML/UDA/EQ/777/12/13Requesting approval for
electrical panel boards from Pubudu Engineering Projects (Pvt)
Ltdacceptance8/15/13Metal enclosures shall not be used for the
Distribution Board (consumer unit), SLS certificates are expired,
Polycarbonate enclosures should be used for the distribution board
of house unitmissing in SEC fileN106CML/UDA/EQ/77
R19/10/13Requesting approval for polycrom enclousures for
electrical panel boards in housing unitsacceptanceno UDA
sealFowarded to UDA QSN107CML/UDA/EQ/787/18/13Requesting approval
for Electrical Inatallation work from EMP projects Lanka (Pvt)
LtdacceptanceN108CML/UDA/EQ/798/12/13Submission of fine aggregate
and course aggregate test report acceptance8/15/13Sieve analysis
for fine agggregate and course aggregate satisfy the requirement.
Also impact value for course aggregate comply with the
requirementN109CML/UDA/EQ/808/14/13Requesting approval for switches
and sockets products from Orange Electricacceptance9/9/13X7
rangeswitches andsocket outlets are approved
N110CML/UDA/EQ/818/19/13Requesting approval for Aluminium doors and
windows accessories from AIM ALU engineers as fabricators of
Hemnette Aluminium ex co (Pvt) Ltdacceptance10/2/13Forwarded to UDA
architect. Some of these accessories are used by SEC. Accepted as
per the given samples and specifications. Letter is needed whether
the aluminium extrusions are compatible with Aluminium accessories.
N111CML/UDA/EQ/81 R18/30/13Requesting approval for sample of
plywoood door and PVC door from AIM ALU Engineeringacceptance?There
should be two submital forms, forwarded to UDA architect, reference
to be given. Acceptance only for bedroom doors. (Plywood doors) For
PVC doors material is accceptable color samples to be submitted.
For selection. Received on 11/27/2013N112CML/UDA/EQ/81
R210/16/13Submission of requested details for Aluminium doors and
windows acessories from AIM ALU Engineering as fabricators of
Hemnette Aluminium Extrusion Company
(Pvt)Ltdacceptance10/30/13fowarded to UDA
architectN113CML/UDA/EQ/828/27/13Submission of concrete test cube
strength results Juneacceptance10/2/13test results
satisfactoryN114CML/UDA/EQ/838/27/13Submission of concrete test
cube strength results Julyacceptance9/2/13test results
satisfactoryN115CML/UDA/EQ/848/28/13Requesting approval to use anti
termite from Ultrakleen (Pvt) Ltdacceptance9/4/13proposed material
is acceptable 10 year warrenty certificate to be
obtainedN116CML/UDA/EQ/84R110/3/13Requesting approval for warrenty
letter of Ultrakleen (Pvt) Ltdacceptance3/10/14This material and
method can be accepted Further to SEC comment, warranty should be
incorporated following & should be included in supplier's
letter head. *Name of the client. Chairman, UDA *Warranty
certificate no & date * Period of warranty offered from. To. *
Areas covered under the warranty *material.
N117CML/UDA/EQ/859/5/13Requesting approval for alternative supplier
to reinforcement steel from metal and general trades (Ceylon)
Limitedacceptanceno UDA sealThis can be accepted provided the
following tests are done locally for each consignment tensiletest
rebend test rib geometry also SLS certificate to be submitted with
valid dates N118CML/UDA/EQ/85R19/17/13Re submission of latest SLS
certificate for Thulsyan steel from metal and general trades
(Ceylon) Limited acceptanceno UDA sealThe SLS certificate is very
uncertain it is only valid for 30 days Therefore it is not
advisable to use this steelN119CML/UDA/EQ/85R210/1/13Re submission
of latest SLS certificate for Thulsyan steel from metal and general
trades (Ceylon) Limitedacceptance10/4/13The attachment is only a
letter addressed to general manager TULSYAN LIMITED It is not the
usual certificateN120CML/UDA/EQ/85R310/11/13Resubmission of SLS
certificate for Tulsyansteel from Metal and General Trades
(Ceylon)Ltdacceptanceno UDA sealSLSI certificate acceptable However
each consignment to be tested as per the BS
standardN121CML/UDA/EQ/869/9/13Requesting approval for all
aluminium accessories from Hirushi construction as fabricator of
Lanka Aluminium PLC acceptance10/2/13Fowarded to UDA architect. Why
there are two parties involved? (supplier and fabricator), given
warrenty certificate should be addressed to UDA, given samples are
accepted, letter is needed whether the aluminium extrusions are
compatible with aluminium
accessoriesN122CML/UDA/EQ/86R111/12/13Resubmission of aluminium
accessories from Hirushi Construction as fabricators of Lanka
Aluminium Industries PLC with requested details (Alternative
supplier)acceptance12/5/13Fowarded to UDA architect. Submittal
documents are not accepted. Following corrections has to be done.
Warrenty certificate to be submitted through main contractor. Need
designation and seal of the authorized person to sign. Spelling
mistakes to be corrected. N123CML/UDA/EQ/879/10/13Requesting
approval for electrical cables from Kelani Cables
PLCacceptance9/30/13Please provide a list of cables used for the
electrical installations with their manufacturing
standardsN124CML/UDA/EQ/87 R110/1/13Resubmission with requested
details for electrical cables from Kelani Cables
PLCacceptance10/11/13Kelani cables are approved. However approval
for sizes of main feeder cables shall be obtained prior to
purchasing by submitting currtent and voltage drop
calculationsN125CML/UDA/EQ/889/11/13Requesting approval for
electrical MCB , RCCB & isolators from Polycrome Electrical
Industries (Pvt)Ltdacceptance9/30/13Please submit copies of
certification for the following manufacturing standards to which
those are manufactored by this manufactureer (IEC 60898, IEC
609473, IEC 61008), country of design shall be mantioned, Where
does isolator usedN126CML/UDA/EQ/88R19/20/13Requesting approval for
electrical MCB, RCCB, and Isolators sample from polycrome
Electrical Industries (Pvt) Ltdacceptance10/2/13Approval shall be
obtained for technical literature before proceeding to sample
approvalN127CML/UDA/EQ/88R210/4/13Resubmission with requested
details for electrical MCB, RCCB from polycrome Electrical
Industries (Pvt) Ltdacceptance10/11/13Certification of confirmity
to IEC 60898 and IEC 61008 is not
availableN128CML/UDA/EQ/88R310/25/13Resubmission with requested
details (clarification of confirmity to IEC 60898) for electrical
MCB, RCCB from polycrome Electrical Industries
(Pvt)Ltdacceptance11/19/13Please provided the details of completed
products which carried and during the last 5 years by the above
electrical MCB, RCCB, from polycrome electrical industries (Pvt)
Ltd N129CML/UDA/EQ/899/11/13Requesting approval to use water meters
from Thahirs (Pvt) Ltdacceptance10/1/13Samples to be approved.
Sample accepted.N130CML/UDA/EQ/909/11/13Requesting approval for
import of reinforcement on Fourth Assignment
acceptance9/17/13103.25 MT of r/f steel bars as per attached
Informa Imv No. PI II ASL 1401/09/2013 is approved for
shippingN131CML/UDA/EQ/919/13/13Submission of fine aggregate and
course aggregate test reportacceptanceno UDA sealTest results for
fine aggregate and course aggregate satisfy the requirement this
can be used for concreteN132CML/UDA/EQ/929/16/13Requesting approval
for kitchen sink from Sealcore Stainless steel Industries (Pvt)Ltd
Under Mason (Pvt)Ltd acceptance9/30/13fowarded to UDA architect.
Accepted as per the sample and specification
givenN133CML/UDA/EQ/939/24/13Requesting approval for junction box
from Kevilton Electrical (Pvt) Ltdacceptance10/2/13Please submit
the reason for changing the previous approval polycrome to
KeviltonN134CML/UDA/EQ/949/24/13Requesting approval for Sunk box
and ceiling rose from orange electricacceptance10/2/13Sample has
not been submitted. Sample has been received to the UDA office
sample can be accepted.N135CML/UDA/EQ/959/27/13Submitting of
cellular cement block strength (150mm width) Reports sample sending
date 18/09/2013acceptance9/30/13test results comply with the
requirementN136CML/UDA/EQ/969/27/13Submission of samples for Sunk
box from Polycrome Electrical Industries (Pvt)Ltd (Alternative
supplyer)acceptance10/3/13N137CML/UDA/EQ/9710/1/13Trial mix test
cube results (7days/30days) mix design details for grade 30
concrete with adcrete and supercrete (alternative trial mix for
grade 30 for superstructure)acceptance10/4/13Mix design is
acceptable However the 7days strength is on a higher side This has
to be adjusted with cement and admixtures Also 28 day strength
results must be addedN138CML/UDA/EQ/9810/1/13Submission of course
aggregaate and fine aggregate test report (sample sending date
18/09/2013)acceptance10/4/13course aggregate and fine aggregate
test results comply with the requirement
N139CML/UDA/EQ/9910/1/13Trial mix test cube results (7days 30days)
mix design details for grade 30 concrete with adcrete (Alternative
trial mix for grade 30 for piling)acceptance10/4/137 days strength
and 30 days strength acceptable. But please make sure the cubes are
tested in 28daysN140CML/UDA/EQ/10010/7/13Requesting approval for
subcontractor to water proofing from V-Tech Engineering (Pvt)
Ltdacceptance10/11/13Material for roof slab and toilets can be
accepted However method of application and number of coats for
toilet and balcony must be as per the specification given in th
edrawing and document. Also the sealent proposed by the contractor
is not acceptableN141CML/UDA/EQ/100R111/12/13Resubmission for
subcontractor to waterproofing from V-tech Engineering (Pvt) Ltd
with requested details. (alternative
supplier)acceptance11/13/13Sealent proposed by the contractor does
not match with our requirement Please refer the drawings and
specificationsCML/UDA/EQ/100R212/4/13Re submission for subconcrator
to water proofing from V-tech Engineering (Pvt)Ltd with requested
details (alternative supplier)acceptance12/9/13TEC POLYSEAL G/P is
accepted for the roof slab mevement
jointsN142CML/UDA/EQ/10110/8/13Submission of cellular cement block
strength (150mm, 100mm width) reportsacceptance10/11/13compressive
strength acceptableN143CML/UDA/EQ/10210/8/13Submission of tensile
test report on steel bars for the reinforcement of concrete
(Tulsyan steel)acceptanceno UDA sealProof/Yield stress ratio to be
clarified from the manufacturer N144CML/UDA/EQ/102
R110/28/13Clarification from the supplier on SEC/UDA comment for EQ
102acceptance10/31/13This brand of steel some of the consignment
has a problem in tensile/proof stress limit. This limit exceed the
compliance criteria. Therefore a full chemical analysis of the
material to be tested locally and a recommendation to be obtained
from an expert metalogist. N145CML/UDA/EQ/102 R211/22/13Submission
of chemical analysis test report on steel bars for the
reinforcement of concrete (Thulsyan steel)acceptance11/27/13This
can not be recommended. Sulpher content is in a higher side. Also a
recommendation must be obtained form a metalogist. Also to use this
steel our previous comments are not properly addressed.
CML/UDA/EQ/102 R312/5/13Resubmission of chemical analysis test
reports on steel bars for the reinforcemen of concrete (Thulsyan
steel)acceptanceno UDA sealFor slabs x/d ratio will vary with
thickness. There is a possibility the condition given in the Prof
Dias report may not satisfy. Therefore it is better to avoid T10,
T12 for slabs. T16 and T20 can be used for columns and beams T10
can be used for shear links. N146CML/UDA/EQ/10310/14/13Submission
of calibration report for compressive strength testing machine
(Renewing)acceptance10/22/13Calibration certificateissued by the
University of Moratuwa is acceptable
N147CML/UDA/EQ/10410/14/13Submission of test report on steel bars
for the reinforcement of concrete (Shyam
steel)acceptance10/22/13Test results for this consignment
satisfactory SLSI certification not
attachedN148CML/UDA/EQ/10510/14/13Requesting approval for Sealcore
wood composite doors and frames from Mascons (Pvt)
Ltdacceptance10/30/13Fowarded to UDA architect. Need test reports
for water restistance, moisture resistance hardness etc. and more
specifications related to materials. Draft warrenty certificate
should be submitted. List of previous projects when the material is
used.N149CML/UDA/EQ/105R111/12/13Submission for sealcore wood
composite doors and frames from Mascons (Pvt) Ltdacceptanceno UDA
sealFowarded to UDA architectN150CML/UDA/EQ/10610/15/13Importing of
GI pipesacceptance10/22/13Chemical composition acceptable also
tensile strength satisfy the final
standardN151CML/UDA/EQ/10710/16/13Requesting approval for Polycrome
Round blockacceptance1/6/14Not required for point
wiringN152CML/UDA/EQ/10810/23/13Requesting approval for an
alternative fan hookacceptance10/31/13This is also an accepted
method. However a load test has to be done. It is better to keep
the hook during concreting. (no UDA seal)For this manufacturer
literature to be
submitted.(11/06/2013)N153CML/UDA/EQ/10910/29/13Requesting approval
for flexible conduits from Akhtar: Industries (Pvt)
Ltdacceptance11/25/13acceptedN154CML/UDA/EQ/11010/30/13Requesting
approval for plumbing valves from Krisho Multi traders
(Pvt)Ltd12/4/13Concealed valve not satisfactory. The valve barral
must project for easy maintenance Also material is very week. Gate
valve doesnot satisfy our standard (European and South African)
refer documentN155CML/UDA/EQ/11111/9/13Submission of tensile test
report on steel bars 32mm diameter for the reinforcement of
concrete (melwire Rolling Pvt Ltd)11/15/13Tensile test, rebend
test, rib geometry comply with the
requirementN156CML/UDA/EQ/11211/9/13Submission of cellular cement
block strength (100mm width) reports11/13/13Test results are
satisfactory. This consignment of blocks can be
usedN157CML/UDA/EQ/11311/9/13Submission of concrete test cube
strength report (01/08/2013-
31/08/2013)acceptance11/15/13Compliance criteria is for 7 days and
28 days therefore cubes should be tested for the compliance .
However the concrete cube results can be accepted. Next timewe are
not accepting this kind of
report.N158CML/UDA/EQ/11411/12/13Submission of test reports for PH
value of fine aggregateacceptance11/15/13PH value is not the only
criteria to verify the sand. Other chemical content also to be
testedCML/UDA/EQ/114R11/9/14Submission of test report for chemical
composition of fineaggregate acceptanceno UDA sealChloride content
and sulphate content are within the acceptable
limitsN159CML/UDA/EQ/11511/15/13Requesting approval for wall tiles
and floor tiles from H & R Johnson
(INDIA)acceptance12/6/13fowarded to UDA architect. Accepted as per
the sample and specification
givenN160CML/UDA/EQ/11611/18/13Requesting approval for cable ladder
and cable trays and fixing accessories. (Ms rods and anchor
bolts)acceptance12/6/13sizes of the cable trays you are using has
to be marked, ladders shall be hot dipped galvanized.
CML/UDA/EQ/116R12/19/14Resubmission with requested details for
cable ladder cable trays and fixing accessories (Ms rods and anchor
bolt)acceptance3/12/14Accepted.N161CML/UDA/EQ/11711/22/13Requesting
approval for TV cablesacceptance12/4/13TV outlet wiring is not
required only the draw wire is sufficient. / Co axial TV cable is
approved to use in Kelani brand (Dayan
EE-SEC)N162CML/UDA/EQ/11811/22/13Requesting approval for copper
tape, copper clip, copper saddle (sample provided) and other
material for earthing and lightening protection
systemacceptance12/6/13Resently conducted ISO certificate should be
submitted for the Micro Power Engineering (Pvt) Ltd. Recently
conducted test reports should be submitted. Submitted test reports
were conducted in 2002. Lightening protection system materials and
components should be complied with relavent BS standards.
CML/UDA/EQ/118R11/28/14Requesting approval for lightening
arrestersacceptance2/26/14No test results. No point of going for
ESE type because the design is for BS
LPSN163CML/UDA/EQ/11911/27/13Requesting approval for Aluminium
accessories from Sevana Builders Holdings (Pvt) Ltd as alternative
fabricator of Lanka Aluminium industries
PLCacceptance12/6/13Fowarded to UDA architect. We do not have any
experience with this contractor. They are asking aluminium
accessories approval. No technical literature submitted. Technical
literature should be submitted to the consultant (SEC) for
commentsCML/UDA/EQ/12011/28/13Requesting approval for PVC pipes and
fittings from Shanko (alternative supplier)acceptance12/4/13Supreme
fitting can be approved for sewer and waste lines. ERA products
reference to be given (places where it has been used) For water
supply SLS PVC pipes to be usedCML/UDA/EQ/120 R1
12/12/13Resubmission with requested detrails (The other project
which is used Era brand) for PVC pipe fittings from
Shankoacceptance12/23/13For sewer and waste lines ERA brand can be
accepted to if this product has the full range of assoceries and
fittingsCML/UDA/EQ/12111/29/13Requesting approval for toilets from
st Anthonies Industries Group (Pvt) Ltdacceptance12/6/13Fowarded to
UDA architect. Warrrenty certificate should be submitted throgh the
main contractor. Submitted SLScertificates are not relevant to the
PVC door. CML/UDA/EQ/121R112/30/13Resubmission with requested
details for PVC doors for toilets from St Anthony's Industries
group (Pvt) Ltdacceptance1/8/14Sample to beapproved by UDA
architect. Certificate acceptedCML/UDA/EQ/12212/4/13Requesting
approval for cement from Ceylon and foreign Traders
PLCacceptance12/23/13If the cement is to be used for structural
work each consignment to be tested. Initial setting time, fineness,
compressive strength, soundness. Provide above details for samples
taken from the site.CML/UDA/EQ/122R11/8/14Resubmission of cement
from Ceylon and Foreign Trades PLCacceptanceno UDA sealThis can be
accepted. But this should be carefully monitered at the
siteCML/UDA/EQ/12312/4/13Submission of insulation board sample with
technical data for roof slab water proofingno UDA sealExternal
polystyrene sample accepted. Fowarded to UDA architect.
CML/UDA/EQ/124CML/UDA/EQ/12512/9/13Requesting approval for panel
boards and switch
gearsacceptance1/31/14acceptedCML/UDA/EQ/12612/13/13Requesting
approval for electrical MCB , RCCB & sunk mounting 12 way
enclousers from OREL corporation (Pvt) Ltd (Orange
brand)acceptance1/13/14Laboratory test certificate issued by a
local institute shall be submitted. Project references for similar
scale works completed shall be submitted.
CML/UDA/EQ/126R12/20/14Resubmission with requested details for
electrical MCB, RCCB & sunk mounting 12 way enclousers from
OREL Corporation (Pvt) Ltd (Orange brand)acceptance3/11/14local
laboratory reports have been submitted shows the compliance with
relevant standards.CML/UDA/EQ/12712/17/13Requesting approval to use
Hega wall putty from Snowplow Industries Pvt
Ltdacceptance12/23/13Forwarded to UDA architect. Reference to be
attached. Technical details and literature should be submitted to
consultant SECfor commencingCML/UDA/EQ/127R11/3/14Resubmission with
requested details. (The other project which is used Hega wall putty
for Hega wall putty from Snowplow Industries Pvt Ltd)acceptanceno
UDA sealThis product can be accepted. Sample to be done and
approved by architect. CML/UDA/EQ/12812/18/13Requesting approval to
use bottle trap from Central Agencyacceptance12/18/13bottle trap
sample from central agency is acceptable for kitchen
sinkCML/UDA/EQ/12912/19/13Requesting approval for door
chimeacceptance1/8/14Ding Dong bell (MP031) is
approvedCML/UDA/EQ/13012/19/13Submission of chemical compossition
of cement from ceylon and foreign trades PLC (physical properties
test report submitted through EQ 122)acceptanceno UDA sealchemical
composition is acceptable. However the comments given in the EQ 122
to be satisfiedCML/UDA/EQ/13112/26/13Submission of concrete test
cube strength report (01/09/13- 30/09/13)acceptance7/7/14Test
results comply with the
requirements.eeCML/UDA/EQ/13212/26/13Approval for tile samples from
H & R Johnson (India)acceptanceno UDA sealForwarded to UDA
architect. CML/UDA/EQ/13312/27/13Submission of course aggregate and
fine aggregate test reports (sample sending date
28/10/2013)acceptance1/6/14Course aggregate sieve analysis and
impact value satisfy the requirement and this can be used. Fine
aggregate sieve analysis satisfy the requirement and this can be
usedCML/UDA/EQ/13412/31/13Requesting approval for parry wear closed
couple water closet from Roca bathroom products private limited,
India acceptance1/17/14Fowarded to UDA architect Dimension should
be checked with the toilet layout. Accepted as per the sample,
specification, and warrenty certificate.
CML/UDA/EQ/13512/31/13Requesting approval for flush panel solid
door panel from Hemmenett Aluminium Extrusion Company (Pvt)
Ltdacceptance1/9/14Self weight with loads on each hinge to be given
Forwarded to UDA architect. Door sash is architecturally accepted
as per the given details and specifications. Refer the consultants
comment for fixingCML/UDA/EQ/1361/2/14Requesting approval for sun
contractor for water proofing from Airow Solutions Pvt
Ltdacceptanceno UDA sealTechnical properties does not satisfy the
specification. We do not have any experience with this contractor.
CML/UDA/EQ/1371/15/14Submission of concrete test cube strength
report. (1/10/13-31/10/13)acceptance2/5/14test results
satisfactoryCML/UDA/EQ/1381/16/14Requesting approval for plywood
door from Hemnette Aluminium Extrusion Company (Pvt) Ltd
Alternative supplieracceptance2/6/14Fowarded to UDA architect,
Already one type of sample approved. Dimension of the plywood sheet
should be compatible with the architectural drawings hinges should
be strength enough withstand with the weight of door sash. Submit
the details of the company profile and history of previous projects
completed by manufacturer for
approvalCML/UDA/EQ/138R12/28/14Resubmission for plywood door from
Hemnette Aluminium Extrusion Company
(Pvt)Ltdacceptance3/11/14Forward to UDA-Architect. This is the 2nd
time approval is requested. Inorder to obtain the approval for
plywood door, past history of work done by the m/s Gamage
Enterprise Lanka(pvt)Ltd to be submitted (Repeat
02)CML/UDA/EQ/138R23/28/14Resubmission for plywood door from
Hemnette Aluminium Extrusion Company (Pvt)Ltd-Alternative
proposalacceptance5/19/141.Forward to UDA-Architect. Samplt to be
approved. 2.Accepted as per the sample
submitted.CML/UDA/EQ/1391/21/14Submission of cellular cement block
(150mm width) acceptanceno UDA sealCompressive strength satisfy the
requirementCML/UDA/EQ/1401/21/14Requesting approval for D1- timber
solid door sash teak or mahogony from Hemenette Aluminium Extrusion
Co (Pvt) Ltd (alternative)acceptance1/31/14No of hinges and the
locations are acceptable. The detail of the frame and the fixing
detail of the frame to wall or column also to be attached. Solid
timber door teak can be accepted. Thickness should be complied as
per the original contract document to fix the door lock.
CML/UDA/EQ/140R12/11/14Submission of fixing details of the D1
timber solid door frame to wall/columnacceptance2/17/14Since there
is a concrete column in the hinge side. This can be stable
arrangement with anchorsCML/UDA/EQ/1411/24/14Requesting approval
for lift well waterproofing from V-Tech engineering (Pvt) Ltd
(Alterative product)acceptance1/28/14This material can be accepted
provided if they can submit past records of this
productCML/UDA/EQ/141R12/20/14Resubmission with requested details
for liftwell water proofing from V-Tech engineering (Pvt)Ltd
(alternative supplier)acceptanceno UDA sealThis product can be used
as per the manufacture specification curing to be done for 7 days
after applying the material. Please strickly follow the
instructions.CML/UDA/EQ/1421/30/14Requesting approval for PVC pipes
and fittingsfrom St Anthony's Industries Group (Pvt)Ltd - Anton
Alternative supplieracceptanceno UDA sealThis product is
acceptableCML/UDA/EQ/1432/9/14Requesting approval for door lock
casement handle and hinges from Hemnette Aluminium Extruction
Company (Pvt)Ltdacceptance2/14/00Forwarded to UDA architect. Main
door lock (UD) casement handle (UD) hinge (3mmthick/UD) can be
architecturally acceptedCML/UDA/EQ/1442/8/14Requesting approval for
solid polycarbonate sheets from TCI Enterprise
(Pvt)Ltdacceptance3/6/14Forwarded to UDA architect. Yellow index to
be specified, Refractive index, also past references to be
submitted. Refer our letter no. URP (CC)/02/con/Gen dated 27th Feb
2014 regarding polycarbonate roofing system over open to sky submit
necessary details as mentioned
there.CML/UDA/EQ/1452/13/14Requesting approval for plaster &
mortar mix from Informax (Pvt) Ltd (Ronace)acceptance3/6/14This
material can be used. A sample to be approved by the architect
before proceeding the work. Sample is architecturally
acceptedCML/UDA/EQ/1462/18/14Requesting approval for sump water
proofing from V-tech engineering (Pvt)Ltdacceptance 2/24/14Internal
and external water proofing material is acceptable. Application to
be done as per manufacturers
apecificationCML/UDA/EQ/1472/19/14Submission of concrete test cube
strength (01/11/2013 to 30/11/2013)acceptanceno UDA sealC1 38 pile
concrete test cube results not complying with the requirement.
Further investigation requiredCML/UDA/EQ/147R15/5/14submission of
additional test cube strength report for C1/38
pileacceptance5/12/14Concrete test results
satisfactory.CML/UDA/EQ/1482/27/14Submission of test report on
steel bars for the reinforcement of concrete (Shyam
steel)acceptance3/4/14Test results for tensile testing, Rebend
test& rib Geometry satisfy the requirement. Therefore this
consingment can be used.CML/UDA/EQ/1492/27/14Submission of course
aggregate and fine aggregate test reports (sample sending date
06/02/2014)acceptance3/4/14fine aggragates, course aggregate comply
with the requirement.CML/UDA/EQ/1503/2/14Submission of field
density test resultsfor Block A2(grid29-23) *Testing date
02/25/2014acceptance3/5/14Test results for dry density and % of
compaction comply with the
requirementCML/UDA/EQ/1513/4/14Requesting approval for PVC doors
for toilets from St. Anthony's Industries Group (Pvt) Ltd (Suit to
revised door opening width of 700mm)acceptanceno UDA sealFowqarded
to UDA architect. Sample to be approved by the
architectCML/UDA/EQ/1523/10/14Requesting approval for switch&
socket products from central industries plc as supplier of walker
acceptance4/21/14*Approved brands for this project shall only be
installed. Test reports were not included. Approved brand should be
used.CML/UDA/EQ/1533/10/14Requesting approval for fire Alarm
control pannel related to fire protection
systemacceptance3/27/14CML/UDA/EQ/1543/10/14Requesting approval for
Landing valve related to fire protection
systemacceptance3/27/14proposed landing valve should be
highlightedCML/UDA/EQ/1553/10/14Requesting approval for Manual call
point related to fire protection
systemacceptance3/27/14CML/UDA/EQ/1563/10/14Requesting approval for
pressure gauges related to fire protection
systemacceptance3/27/14CML/UDA/EQ/1573/10/14Requesting approval for
pressure vassels related to fire protection
systemacceptance3/27/14CML/UDA/EQ/1583/10/14Requesting approval for
gate valves related to fire protection
systemacceptance3/27/14CML/UDA/EQ/1593/10/14Requesting approval for
non-return valve related to fire protection
systemacceptance3/27/14CML/UDA/EQ/1603/10/14Requesting approval for
Jokey pump related to fire protection
systemacceptance3/27/14CML/UDA/EQ/1613/10/14Requesting approval for
Main/ standby pumps (for pump1 & pump2) related to fire
protection systemacceptanceCML/UDA/EQ/1623/10/14Requesting approval
for fire alarm sounder related to fire protection
systemacceptance3/27/14CML/UDA/EQ/1633/18/14Submission of water
quality test report for the water at Hendala Kerawalapitiya well
(report no W2/2014/037)acceptance3/21/14The quality of water comply
with the standards to be used for
concreting.CML/UDA/EQ/1643/18/14Submission of water quality test
report for the water using at site(report no
W2/2014/038)acceptance3/21/14The quality of water comply with the
standards to be used for concreting.CML/UDA/EQ/1653/18/14Submission
of test report for Celluar cement blocks (size 390mmx100mmx190mm)
report no HB/14/008acceptance3/20/14Block work compressive strength
satisfies the requirement. This consigment can be
usedCML/UDA/EQ/1663/18/14Requesting approval for GI heavy duty
pipes related to fire protection systemacceptance4/21/14SLS
certificate has been expired. Valid SLS certificate should be
submitted.CML/UDA/EQ/166R17/25/14Resubmission with requested
details (valid SLS certificate) for heavy duty GI pipes related to
fire protection
system.acceptance8/1/14Accepted.CML/UDA/EQ/1673/21/14Proposed
door/window details (diamentions) for the 11th flooracceptanceno
UDA sealfowarded to UDA-Architect.CML/UDA/EQ/1683/25/14Trial mix
test cube results (7days & 28days)& mix design details for
Grade 30 with Adcrete & supercrete(Alternative trial mix for
grade 30 for superstructure with Ultratect
cement)acceptance3/31/14This is not adequate to varify the quality
of cement. Standard cement test to be done to varify the quality of
cement. 1.compressive strength 2.Initial setting & final
setting time 3.fineness testCML/UDA/EQ/168R15/6/14Resubmission of
trial mix test cube results & mix design details for grade 30
with requested details (quality of Ultra tech cement) (Alternative
trial mix for grade 30 for superstructure with Ultra
tech)acceptance5/9/14Test results given in the report are complying
with the requirement. However the final setting time of the cement
is not tested. This should be done before using this
product.CML/UDA/EQ/168R25/9/14Resubmission trial mix test cube
results & mix design details for grade 30 with requested
details (alternative trial mix for grade 30 for super structure
with ultra tech.acceptance5/16/14Setting time is within the
acceptable limits. This cement can be used for concrete
work.CML/UDA/EQ/1693/27/14Requesting approval for Gully grating
from Krisho Multy Traders(Pvt)Ltdacceptance4/30/141.fowarded to
UDA-Architect. Size acceptable. 2.Accepted as per the given
sample.CML/UDA/EQ/1704/2/14Requesting approval for Doors &
Windows from Sevana Builders Holding(Pvt)Ltd as fabrication of
Lanka Aluminium Industries PLC -(all accessories of doors &
windows)acceptanceno UDA seala). fowarded to UDA -Archittect these
can be conflict with contractors, please clarify. b). Indicate
precisely which block will be allocated for
them.CML/UDA/EQ/170R15/27/14Requesting approval for all accessories
of doors & windows from Sevana Builders
Holding(pvt)Ltd.acceptance6/30/14fowarded to UDA-Architect. Samples
to be submited.CML/UDA/EQ/170R26/18/14Resubmission with sample
board of all accessories of doors and windows from Sevana Builders
Holding (Pvt)Ltd acceptance6/18/141.Fowarded to UDA. 2.As per the
given samples , all accessories for door and windows are accepted
except. A) Huda door lock. B) Handle.CML/UDA/EQ/1714/2/14Requesting
approval for Doors & Windows from Sevana Builders
Holding(Pvt)Ltd as fabrication of Lanka Aluminium Industries PLC-
(Flush pannel solid door pannel)acceptanceno UDA seala). This is
issue with several contractors involved in one job. Please clarify.
Fowarded to UDA-Architect b). Indicate precisely which block will
be allocated for them.CML/UDA/EQ/171R15/27/14Requesting approval
for flush panel solid door from Sevana Builders Holdings (pvt)Ltd
as fabricator of Lanka Aluminium Industries
PLCacceptance6/5/14Fowarded to UDA-Architect. Stress calculation is
acceptable.CML/UDA/EQ/1724/2/14Requesting approval for Doors &
Windows from Sevana Builders Holding(Pvt)Ltd as fabrication of
Lanka Aluminium Industries PLC-(Plywood door)acceptanceno UDA
seala). These can be conflicts with contractors pleas clarify.
Fowarded to UDA-Architect. b). Indicate precisely which block will
be allocated for them. CML/UDA/EQ/172R15/27/14Requesting approval
for Plywood door from Sevana Builders Holdings (pvt)Ltd as
fabricator of Lanka Aluminium industries PLCacceptanceno UDA
sealFowarded to UDA Architect.CML/UDA/EQ/1734/2/14Requesting
approval for Roof water proofing from HE Engineering
(pvt)Ltdacceptance4/10/14This material (4mm tk) is accepted for
roof slab water proofing with protective
screed.CML/UDA/EQ/173R110/30/14Requesting approval for Roof water
proofing from HE Engineering (pvt)Ltd (for the membrane got the
approval through EQ/173 this is only for heat
insulation)acceptance11/7/14waterproofing material & heat
insulation material acceptable.CML/UDA/EQ/1744/4/14Submission of
field density test resultsfor Block A2(grid1-23) &
(grid13-15)acceptanceno UDA sealcompaction
accepted.CML/UDA/EQ/1754/7/14Submission of concrete test cube
strength report (12/1/2013to 12/31/2014)acceptance4/30/14Pile no
C1-38 concrete cube strength does comply with the requirement.
Contractor should give a proposal to justify this results. Other
pile concrete cube results are
satisfactly.CML/UDA/EQ/1764/23/14Submission field density test
result for block A2(G1-9)acceptance4/30/14Compaction test results
satisfactly. CML/UDA/EQ/1774/23/14Submission of specification for
Tec Stop (water plug) for water retaining structures(sump
watertank)acceptance4/30/14This is a new product. It is preferable
to use a product which is commonly used in Srilanka. Otherwise you
may submit the local references.CML/UDA/EQ/177R15/7/14Resubmission
with the other projects which is used Tec Stop for water retaining
structures.acceptance5/16/14This material can be used as water stop
in concrete surface.CML/UDA/EQ/1784/29/14Trial mix test cube result
& mix design for grade 30 with Adcrete & Supercrete for
structure with Holcim cement (Alternative
cement)acceptance5/17/14please submit relevant document for Holcim
cement. (Type of cement OPC or
PLC)CML/UDA/EQ/178R15/21/14resubmission of trial mix test cube
results & mix design details with requested details for
superstructure with Holcim OPC cement (Alternative
cement)acceptance5/21/14Mix design accepted / Holcim OPC ready mix
is accepted. Test results comply with the
requirements.CML/UDA/EQ/1794/30/14Submission of Tokyo Super cement
test report (Physical & Chemeial) report no
551404380acceptance5/8/14Cement test results satosfactly. (chemical
& physical properties)CML/UDA/EQ/1804/29/14Requesting approval
for alternative Aluminium frame profile from Lanka Aluminium
industries plc(block A1)acceptance5/12/14calculation incomplete.
Calculation for stress in the extrusions not
clear.CML/UDA/EQ/180R15/30/14Resubmission of Aluminium frame
profile from Lanka Aluminium industries
PLC(Alternative)acceptance6/24/14calculation for allowable bearing
stress is satisfactory. CML/UDA/EQ/1815/5/14Requesting approval for
fixing arrangement of PVC door handle & barrel bolt *In the
sample there fixed one side of barrel bolt but at the site we
supposed to fixed both side.acceptance5/13/141.forward to UDA
architect. Fixing arrangement to be approved at site. 2.Accepted as
per the given sample. Colour of the PVC door sample should be
changed.CML/UDA/EQ/1825/5/14Requesting approval for sealent at 11th
floor beam /wall seperation jointacceptance5/9/14material can be
accepted. Application to be done as per manufacturs
specification.CML/UDA/EQ/1835/5/14Submission of field density test
report for Block A2(grid 9-14) testing date
29/04/2014acceptance5/12/14Compaction test results satisfactly.
CML/UDA/EQ/1845/5/14Submission of field density test report for
Block A2(grid 10-15) testing date
03/05/2014acceptance5/12/14Compaction test results satisfactly.
CML/UDA/EQ/1854/29/14Requesting approval for "Moeller " switch
gears for main panel boards (As an alternative
brand)acceptance5/23/14Give a reason for proposing an alternative
brand for those items after approving earlier. Previously approved
brands can be used. please donot provide alternative brands again
& again.CML/UDA/EQ/185R16/4/14Requesting approval for
Switchgear in "MOELLER" Brand and "SIEMENS" Brand for main panel
Boards from Pubudu Engineering Projects(Pvt)
Ltd.acceptance6/16/141. Local agent or local suppliers letter shall
be submitted/produced to confirm the unavailability of previously
approved make of breakers. (valid document should be submitted) 2.
Not approved brands can not be used for pannel
manufacturing.CML/UDA/EQ/1865/9/14Submission of cubes strength test
results (1/1/2014 to 1/31/2014)acceptance5/21/14test results
satisfactoryCML/UDA/EQ/1875/22/14Requesting approval to use water
meters from Agri Power Lanka (PVT)Ltd. (Alternative supplier)
acceptance6/3/14Pl. submit a sample &
References.CML/UDA/EQ/187R16/13/14Resubmission with requested
details for Water meters from Agri Power Lanka (Pvt)Ltd
(Alternative supplier)acceptance6/24/141.This can be accepted with
the warranty certificate. 2.Need warranty certificate and past
experience of listing water meter
CML/UDA/EQ/187R27/4/14Resubmission with requested details for Water
meters from Agro Power Lanka (Pvt)Ltd (Alternative
supplier)acceptance7/4/14This can be
accepted.CML/UDA/EQ/1885/19/14Requesting approval for cable ladders
and cable trays.acceptance6/20/14The proposed size of cable tray
& Ladders are approved since the sizes of cable trays &
Ladders in shop drawings are
approved.CML/UDA/EQ/1895/26/14Requesting approval for clear glass
from Hemnette Aluminium Extrusion Co.(Pvt)Ltd.acceptance6/6/14Wind
load calculation for glass to be
addedCML/UDA/EQ/189R18/19/14Resubmission of clear glass from
Henmette Aluminium Extrusion Co.Pvt.ltdacceptance9/5/14Calculation
accepted. As per the contract document you are requested to use 5mm
thk glass.CML/UDA/EQ/1906/14/14Requesting approval for
Waterproofing of water sump area from H.E Engineering (Pvt)
Ltd.(alternative)acceptance6/24/14This crystalline type of
waterproofing can be accepted for internal sump
area.CML/UDA/EQ/1915/28/14Requesting approval for Pumps from
Jinasena (Pvt)Ltdacceptance6/6/14*The pump sizing is acceptable.
Since this is an Imported pump. It is necessary to submit the
references. *Draft warranty certificate shall be provided for the
pumps.*ISO 9001-2008 certificate has been expired (valid until
2011-12-06) Valid certificate shoud be
submitted.CML/UDA/EQ/191R16/16/14Resubmission of requesting
approval for Pumps from Jinasena (Pvt) Ltd.acceptance6/25/14Noted.
This can be accepted.CML/UDA/EQ/1926/2/14Trial mix test cube result
& mix design for grade 20 with Adcrete in Tokyo Super
OPC.acceptance6/24/14Mix design comply with the
requirement.CML/UDA/EQ/1936/4/14Submission of concrete test cube
strength report(01/02/14 to 28/02/14)acceptance6/10/14concrete cube
strength comply with the requirement.CML/UDA/EQ/1946/5/14Requesting
approval for Tap & Fittings from St.Anthony's Hardware (pvt)
Ltdacceptance6/20/14accepted as per the given samples and
details.CML/UDA/EQ/1956/6/14Requesting approval for Fire Hose, Fire
Hose Reel and Nozzelacceptance7/7/14Product brand vs approved &
Mark model products that you willing to
offer.CML/UDA/EQ/195R17/15/14Resubmission of material approval for
fire hose, fire hose reel and nozzleacceptance7/25/14Use standard
Jet/spray diffiser nozzle for 64mm landing valve
outlet.CML/UDA/EQ/1966/4/14Requesting approval for 2kg Gas /CO2
portable existinguisher and 6kg portable
extinguisheracceptance7/8/14water-CO2 product detail submissions
required. 2kg CO2, 6kg ABC. Fire existinguishers are
approved.CML/UDA/EQ/196R17/15/14Resubmission of material approval
for 2kgCO2/Gas, 9 liter water/CO2 and 6kg ABC portable
existinguishers.acceptance7/25/14-CML/UDA/EQ/1976/9/14Requesting
approval for Steel Fire Door from Newgood Door Industry
Co.Ltdacceptanceno UDA seal1. Need specifications, fire test
reports, Details of manufacturer, details of local agent, past
experience, etc. 2.Sample should be
submitted.CML/UDA/EQ/197R17/1/14Resubmisssion of requesting
approval for steel fire door from Newgood door industry Co
Ltd.acceptance7/8/141. steel fire door can be accepted. 2.Accepted
as per the given datas and details.
.CML/UDA/EQ/1986/11/14Requesting approval for Waterproofing of
water tank in Block A2from H.E Engineering (Pvt)
Ltd.acceptance6/24/14material accepted and to be applied as per
manufacturres specifications.CML/UDA/EQ/1996/11/14Requesting
approval for Waterproofing of water tank in Block A1from V-Tech
Engineering (Pvt) Ltd.acceptance6/11/14Technical properties satisfy
the the requirement. We donot have any past experience with this
product used for water tanks. Please ensure strict completion of
technical information given by the manufacturer in the
site.CML/UDA/EQ/199R17/4/14Resubmission with requested details for
waterproofing of water tank in block A1 from V-Tech Engineering
(Pvt)Ltdacceptance7/14/14there is no evedence to prove this
material is used for water tank. This material is used for
toilets.CML/UDA/EQ/2006/16/14Requesting approval for solid
polycarbonate sheets from Civicon Engineering Services
(Pvt)Ltdacceptance6/20/141.Polycarbonate roof sheet calculation is
satisfactory(8mm thk solid). For the framing arrangement member
sizes to be as per the issued drawing UDA/RUSP/(FR)/D/136 2.Clarify
the joint details with shop drawings. Warranty should be submitted
for 8mm the polycarbonate through main contractor warranty for
installation also submitted. if the specified thickness of frame
not available, select section with next higher thickness.
CML/UDA/EQ/200R19/23/14Requesting approval for solid polycarbonate
sheets from Civicon Engineering Services (Pvt)Ltd (Resubmission
with requested details)acceptance9/19/14This sample can be
accepted. (6mm tk)/ we have already given the approval to proceed
with the work with the subcontractor for the submittal no 337R2. I
have instructed to change the frame with to reduce the
.CML/UDA/EQ/2016/26/14Requesting approval for stainless steel
clamp, pvc earth saddle , Brass screw, role plug, and Al strip
(25x3)m related to lightening protection system.acceptance6/26/141.
please submit technical catalogues to show manufacturing standard
of each item, specially for tape & earth electrode. 2.specify
the use of each item in the proposed system. *lightening protection
equipments should be comply with BS50164 proof documents shall be
submitted.CML/UDA/EQ/201R17/7/14Resubmission of material approval
for lightening protection system (Al strip, clamp, saddle,
etc)acceptance7/14/14usage of 25x3mm tare Altape which is marked in
your catalogues is approved to use as down conductors. Accessories
& catalogues for earth rods are not included.
CML/UDA/EQ/2027/1/14Submission of fine aggregate & coarse
aggregate test report (sample sending date 5/20/2014 report no
AT/14/033 & AT/14/033AacceptanceCML/UDA/EQ/2037/1/14Submission
of Holcim Ready flow OPC cement test report (Physical& Chemical
) Report no-SS1408684acceptance7/7/14Holcim ready flow can be used
for structural works.CML/UDA/EQ/2047/7/14Requesting approval for
Aluminium doors and windows from Alumex PLC (Aluminium
extrusions)(Alternative supplier)acceptance7/14/141.Structural
design calculation satisfy the requirement. Forward to UDA-
Architect. 2.Accepted as per the given samples and details. 3.
distance inbetween Aluminium louvers to be given. 4.Door lock to be
provided to D9 door.CML/UDA/EQ/2057/7/14Requesting Approval for
Aluminium Doors and windows accessories from E.S.Enterprises as
fabricator of Aluminium PLC.acceptance7/7/14forward to UDA-
Architects observation. Rubber beading to be sunblast or equalent.
Other accessories are accepted.CML/UDA/EQ/2067/7/14Submission of
concrete test cube strength report (3/1/2014 to
3/31/2014)acceptance7/26/14test results comply with the
requirementCML/UDA/EQ/2077/8/14Requesting approval for breeching
inlet related to fire protection
system.acceptance7/21/14-CML/UDA/EQ/2087/8/14Requesting approval
for pressure reducing valve related to fire protection
system.acceptance7/16/14-CML/UDA/EQ/2097/8/14Requesting approval
for Ball valve related to fire protection
system.acceptance7/16/14-CML/UDA/EQ/2107/8/14Requesting approval
for Flexible coupling related to fire protection
system.acceptance7/16/14-CML/UDA/EQ/2117/8/14Requesting approval
for Air Relief valve/ Air vent related to fire protection
system.acceptance7/16/14-CML/UDA/EQ/2127/8/14Requesting approval
for "Stainer" related to fire protection
system.acceptance7/16/14-CML/UDA/EQ/2137/8/14Requesting approval to
use Generator from Soar Technology (pvt)
Ltd.acceptance7/25/14Generator shall be assembled either ..engine
manufactures assembly plant or in alternator manufacturers assembly
plant. Third party assembled would not be accepted
.CML/UDA/EQ/2147/9/14Requesting approval for paint from JAT
Holdings (pvt)Ltd.acceptance7/17/141.Unless the SLSI certificate is
issued we cannot review the other technical properties. 2.New SLS
certificate for the products and past experience in applying
Highrise buildings.CML/UDA/EQ/2157/15/14Requesting approval for
fire rated cable related to fire detection
systemacceptance7/23/141.Closed loop resistance with the devices
shall be calculated and confirm the given cable sizes
acceptability. 2.Check the confirmation of BS6387 CWZ of your
product.CML/UDA/EQ/215R18/21/14Resubmission with requested details
regarding fire rated cables for fire detection
system.acceptance9/15/14proposed 1.5mm2 & 1mm2 FR cables
manufctured to BS 60331 & BS 6387 , are approved. Size of cable
shall be decided as per manufacturer's recommendation & length
of loop /circuit.CML/UDA/EQ/2167/15/14Requesting approval for
alternative Heat insulation board from H.E Engineering (pvt)
Ltdacceptance7/25/14this can be
acceptedCML/UDA/EQ/2177/21/14Submission of field density test
report for Block A2(Grid 15-21/A-D) testing date
06/202014acceptance7/25/14Dry density & percentage of
compaction satisfactory.CML/UDA/EQ/2187/21/14Submission of field
density test report for Block A2(grid 15-21/E-H) testing date
06/25/2014acceptance7/24/14Dry density & percentage of
compaction satisfactory.CML/UDA/EQ/2197/23/14Submission of field
density test report for Block A2 (grid 15-21/D-E) *testing date
07/21/2014acceptanceno UDA seal% of compaction & dry density
comply with the requirementCML/UDA/EQ/2207/25/14Submission of
concrete test cube Strength report (04/01/2014 to 04/30/2014)
acceptance7/31/14Concrete cube test results satisfy the
requirement.CML/UDA/EQ/2217/28/14Submission of coarse aggregate
& fine aggregate test report (sample sendind date 6/26/2014)
Report No-AT/14/045A & AT/14/045Bacceptanceno UDA sealfine
aggregate & coarse aggregate test results comply with the
requirement.CML/UDA/EQ/2227/28/14Submission of test report for
celluar cement blocks (size 400mmx100mmx2000mm &
400mmx150mmx200mm) report no HB/17/021A &
HB/14/021Bacceptanceno UDA sealcrushing strength comply with the
requirement.CML/UDA/EQ/2237/28/14Requesting approval for Paint from
Asian paints (Lanka)Limitedacceptance8/11/14Accepted Asian paint
only for interior uses. Paint should be compatible with the wall
filler. Respective colour samples should be done for
approval.CML/UDA/EQ/2247/30/14Requesting approval for Paint from
Causeway Paints Lanka (Pvt)Ltd (Alternative supplier for interior
paint)acceptance8/11/14Accepted 'Causeway' paint for interior use.
Paint should be compatible with the wall filler. Respective colour
sample given should be done for
approvals.CML/UDA/EQ/2258/1/14Requesting approval to use Generator
from Trade Promoters Limited acceptance8/11/14250KVA prime rated
genset is approved .However technical specification of locally
fabricated enclosure shall be submitted along with sound pressure
level at 1m away from Generator room. *Fuel base tank capacity
should be provided. Fuel base tank capacity should be enough to run
the Generator throughout the 8hrs in fuel load conditions.That's
mean tank capacity should be
400-450.CML/UDA/EQ/225R18/21/14Resubmission with requested details
and clarification of 250kVA prime rated
generator.acceptance9/2/14Satisfied with UDA requirements.
CML/UDA/EQ/2268/4/14Requesting approval for Kitchen sink from
St.Anthony's hardware (Pvt)Ltd alternative supplier acceptanceno
UDA sealforward to UDA-Architect. Warranty certificate to be
attached.CML/UDA/EQ/2278/12/14Submission of field density test
report for block A1(grid 9-15/E-H) testing date
07/19/2014acceptance8/21/14Compaction to be redone to satisfy the
requirement.CML/UDA/EQ/2288/13/14Submission of field density test
report for block A1(grid 7-10/E-H) & (grid 25-29/A-D) testing
date 08/11/2015acceptance8/21/14Compaction results
satisfactory.CML/UDA/EQ/2298/13/14Submission of concrete test cube
strength report(05/01/14 to 05/31/14)acceptanceno UDA sealtest
results satisfactoryCML/UDA/EQ/2308/18/14Submission of field
density test report for block A1(grid 9-11) testing date
8/14/2014acceptance8/28/14Compaction test results satisfactly.
CML/UDA/EQ/2318/18/14Submission of field density report for Block
A1(grid 24-29) testing date 8/16/2014acceptance8/28/14Compaction
test results satisfactory.CML/UDA/EQ/2328/18/14Submission of field
density test report for Block C2(grid 1-3 & grid
9-3/A-D)acceptance8/28/14Compaction test results satisfactly.
CML/UDA/EQ/2338/26/14Requesting approval for an alternative brand
for Hosereel, Landing valve, breaching inlet, fire hose and fire
existinguishersacceptance16/9/20141.landing valve - bib nose or
oblige type to be selected. (BS 336) 2.fire hoses - BS 336
connection to be used.CML/UDA/EQ/233R19/25/14Resubmission with
requested details for an alternative brand for Hose reel, landing
valve, breaching inlet, fire hose & fire
existinguisher.acceptance10/3/14Approved. *Hose reel should be
19mmx30m as follows * Draw type 2 19(483mm) *Swing manual type
oneCML/UDA/EQ/2348/26/14Requesting approval for paint from Macks
ProDeco Engineers(Pvt) Ltd. (Multilack) for interior & Exterior
(Alternative supplier)acceptanceno UDA sealforward to UDA-Architect
CML/UDA/EQ/2358/26/14Submission of field density test report for
Block A1(Grid 12-15/E-H). Testing with Group Engineering
laboratories testing date 08/12/2014acceptanceno UDA sealpercentage
of compaction at the tested location is
acceptable.CML/UDA/EQ/2368/26/14Submission of field density test
report for Block A1(grid 9-13) testing date 08/23/2014acceptanceno
UDA sealAt Grid 9-10 compaction not satisfied. Other location
percentage of compaction is satisfactory.
CML/UDA/EQ/2378/26/14Submission of Protector compaction test report
for query Dust(for use as a alternative backfill
material)acceptanceCML/UDA/EQ/238Submission of field density test
report for Block C2(grid 1-13) testing
date08/28/2014acceptance10/23/14compaction test results
satisfactoryCML/UDA/EQ/2398/29/14Requesting approval for switch
boards manufactured by Magline switch boards (Pvt)Ltd.
(Alternative)acceptance9/17/14 *Recently conducted test
certificates for RCCB, MCB, MCCB, of LS brands shall be
submtted.CML/UDA/EQ/239R110/1/14Submission of test certificates for
RCCB, MCB, MCCB of "LS" brand as requested in Doc no
Eq/239acceptance10/9/14AcceptedCML/UDA/EQ/2409/3/14Requesting
approval for Roof water proofing membrane (INSUFLEX) from V-Tech
Engineering (pvt)Ltd for block C1 & C2 (Alternative
supplier)acceptanceno UDA sealWe do not have any experience with
this product. Pl submit the reference where this product is used.
Clearly specify the material type (Polyester or Glass
fibre)?CML/UDA/EQ/240R19/15/14Resubmission for roof water proofing
membrane from V-Tech (Insulation) for block C1 & C2
(Alternative product)acceptance9/19/14This material can be
accepted. Application to be done as per the manufacture's
specification.CML/UDA/EQ/2419/3/14Submission of Concrete test cube
strength report (06/01/2014 to 06/30/2014)acceptance9/19/14concrete
test results satisfactoryCML/UDA/EQ/2429/4/14Submission of field
density test report for block A1 (grid 9-14, grid 18-20 & grid
24-25) (testing date 09/03/2014)acceptance9/12/14test results
satisfactoryCML/UDA/EQ/2439/12/14Submission of field density test
report for Block A1 (grid 17-23/H-E) testing date
09/10/2014acceptance9/22/14compaction results comply with the
requirement.CML/UDA/EQ/2449/12/14Submission of field density test
report for Block C2(grid 4-9)acceptance9/22/14compaction result
comply with the requirement.CML/UDA/EQ/2459/16/14Submission of a
sample of surface mounted Distribution Board for house units in
block C1 &
C2.acceptance9/24/14approvedCML/UDA/EQ/2469/16/14Requesting
approval for circuit breakers made by "TECS" for house units in
block C1 & C2.acceptance9/24/14please do not submitt any
alternative proposal for circuit breakers. We have already approved
enough brands for circuit breakers.CML/UDA/EQ/2479/18/14Submission
of double seat Manhole cover (CI) for approval. (For sewer line
& water sump)acceptance9/20/14This cast iron manhole cover can
be used as per the drawings.CML/UDA/EQ/2489/18/14Submission of
field denity test report for block A1 (grid 27-28, 21-23, 22-23
& 14-15) testing date 09/17/2014acceptance9/25/14compaction
test results satisfacly.CML/UDA/EQ/2499/18/14Submission of field
density test report for Block C1 (grid 1-5) testing date
09/17/2014acceptanceno UDA sealcompaction test results
satisfacly.CML/UDA/EQ/2509/23/14Requesting approval for alternative
material to use anti- termite from
Ultrakleen(pvt)ltd.acceptance9/29/14This alternative material is
acceptable.CML/UDA/EQ/2519/24/14Requesting approval for copper
earth bus bar used to connect house earth cable to 70mm2x10
mainearth cable at electrical duct acceptance10/1/14It is difficult
to get idea about looking paper details for this perticular item.
Therefore make necessary arrangements for a mock - up. Inspection .
Please arrange a sample to checkCML/UDA/EQ/2529/25/14submission of
field density test report for block A1 grid(15-17) testing date
09/22/2014acceptance10/6/14compaction test results
satisfactoryCML/UDA/EQ/2539/26/14Requesting approval for lightening
arresters and copper rod supplied by Empire trading Agency
(pvt)Ltd.acceptance11/7/14Insufficient technical literature. ( no
bs standards for Air terminals) All the equipments of lightening
protection system should be complied with the BS 10164. so please
provide the valid reports to prove above
details.CML/UDA/EQ/2549/23/14Submission of field density test
report for block C1 (grid 5-11) testing date
09/22/2014acceptance10/6/14compaction test results
satisfactlyCML/UDA/EQ/2559/30/14Submission of field density test
report for block C1 (grid 12-13 & grid5-6) testing date
09/29/2014acceptance10/3/14compaction test results
satisfactlyCML/UDA/EQ/2569/30/14Submission of field density test
report for block A1 (grid 2-7) & (grid 24-25) testing date
09/29/2014acceptance10/3/14compaction test results
satisfactlyCML/UDA/EQ/25710/2/14Requesting approval for fire pump
panelacceptance10/21/14Control drawing shall be submitted together
with list of materials / components used and their country of
manufacturer for approval & past experience of pannel
manufacture shall be submitted.CML/UDA/EQ/25810/3/14Requesting
approval to use Cement from Lafarge Mahaweli Cement (Pvt) Ltd
(cement bag)acceptance10/3/14This brand can be accepted. First
consigment to be tested.if this is to be used as structural
concrete, such as column, & beam, slabs &
foundation.CML/UDA/EQ/25910/5/14Submission of field density test
report for Block A1 (grid 1-5) & grid (8-9) (testing date
10/02/2014)acceptance10/20/14Compaction test results
satisfactlyCML/UDA/EQ/26010/1/14Submission of documents related to
ATS panelsacceptanceCML/UDA/EQ/26110/9/14Requesting approval for
R.C.C Hume pipe for storm water disposal /(450mm dia x 8ft
long)acceptance10/13/14NP2 can be accepted. Recently done test
results to be submitted.CML/UDA/EQ/26210/13/14Submission of field
density test report for Block C1 (grid4-1) testing date
10/11/2014acceptance10/21/14compaction test results satisfy the
requirementCML/UDA/EQ/26310/15/14Submission of field density test
report for Block A1 (grid 19-22)acceptance10/24/14compaction test
results satisfy the requirementCML/UDA/EQ/26410/14/14Submission of
Concrete test cube strength report (07/10/2014 to
07/31/2014)acceptance10/20/14concrete cube strength comply with the
requirement.CML/UDA/EQ/26511/4/14Submission of field density test
report for Block A2, C2 transformer
roomacceptance11/10/14Compaction within the building is
acceptableCML/UDA/EQ/26611/7/14Submission of concrete test cube
strength report (08/01/2014 to 08/31 2014)acceptance11/14/14test
results comply with the requirementCML/UDA/EQ/26711/9/14Submission
of field density test report for road Sub-base (testing date
11/07/2014)acceptance11/14/14compaction test value marginally
satisfy the requirement.CML/UDA/EQ/26811/10/14Submission of field
density test report for Generator room (testing date
11/05/2014)acceptance11/19/14Compaction test results comply with
the requirementCML/UDA/EQ/26911/10/14Submission of field density
test report for pavement area (grid 29-27) of block A1 (testing
date 11/07/2014)acceptance11/14/14Compaction test results comply
with the requirementCML/UDA/EQ/27011/10/14Requesting approval for
Generator room panel ( Which is devided gen.output to four ATS
pannels) acceptanceCML/UDA/EQ/27111/11/14Submission of field
density test report for road ABC layer (testing date
11/09/2014)acceptance11/27/14percentage of compaction is
satisfactory. However you have to produce the CBR values of the
base courseCML/UDA/EQ/27211/14/14Submission of field density test
report for Block A1 & A2 transformer room (testing date
11/10/2014)acceptance11/27/14Compaction within the Transformer area
satisfy the requirementCML/UDA/EQ/27311/17/14Requesting approval
for exhaust fan to be installed in the lift machine
roomacceptance11/25/14AcceptedCML/UDA/EQ/274Submission of field
density test report for the road Sub base (11/12/2014)acceptanceno
UDA sealpercentage of compaction is satisfactory. However you have
to produce the CBR value for sub
baseCML/UDA/EQ/27511/18/14Submission of field density test report
for the ABC layer of the road (testing date
11/14/2014)acceptance11/27/14percentage of compaction is
satisfactory. However you have to produce the CBR value for base
layer CML/UDA/EQ/27611/27/14Submission of field density test report
for block C1 (grid 4-13) testing date 11/17/2014acceptanceField
density test results are
satisfactoryCML/UDA/EQ/27711/26/14Requesting approval for Concrete
from Access Engineering
(Pvt)LtdacceptanceCML/UDA/EQ/27811/26/14Requesting approval for
concrete from J.J Enterpricesacceptanceno UDA sealcement brand is
not specific for grade 30 concrete slump is too high. For grade 20
concrete w/c is highCML/UDA/EQ/27911/26/14Submission of field
density test reportfor road Sub base between block A1-C1 testing
date 11/23/2014acceptanceno UDA sealpercentage of compaction is
satisfactorilyCML/UDA/EQ/28011/26/14Submission of field density
test report for road Sub base between block A2-C2 testing date
11/21/2014acceptanceno UDA sealPercentage of compaction is
satisfactorilyCML/UDA/EQ/28111/26/14Submission of import Sub base
material test report from Dangalla suppliers (sample location -
Dambadeniya, testing with road development Authority, sample
sending date 11/10/2014)acceptanceCML/UDA/EQ/28211/26/14Submission
of import ABC material test report for road from CMLMTD crusher
plant in Mirigama (testing with road development authority, sample
sending date 11/10/2014)acceptanceno UDA sealAcceptred for base
coarseCML/UDA/EQ/28311/27/14Submission of Asphalt Concrete mix
design for road worksacceptance
SEC/Cy/E/2011-142/0911/11/13Specification and BOQ for fire
protection and alarm systemreviewGas/ CO2 portable extinguisher
capacity should be changed as 2kg in the technical schedule &
6kg dry chimical powder shouldbe included. To the technical
schedule. SEC/Cy/E/2011-142/09 R212/30/13Revised specification,
Technical schedule & BOQ for fire protection system
others12/31/13accepted
16 missing
Drawing SubmittalPROJECT : PROPOSED HOUSING PROJECT FOR
RELOCATION OF UNDERSERVED SETTLEMENTS FERGUSON ROAD, COLOMBO-
15
Summary of Drawing Submittal Forms
Item NoDrawing Submittal NoDocument DateBrief
DescriptionLocation ( Block No )Reason for submissionSEC/ UDA
comment received dateSEC/ UDA comment 114/20/12Request letter
Ref:Test Piles & Company Organization chartA2acceptance/otherNo
Comment22missing in sec file334/25/12Requesting Drawings 7 details
for proceed of the Project & clarification on plinth beam
Drawingsacceptance/otherNo Comment444/27/12Site handing over for
construction-(Reply letter)information554/27/12Establishment of
Existing ground level of possible work premisesacceptance/otherNo
Comment665/2/12Unauthorized construction in front of our
premisesinformationNo Comment77missing in sec
file885/25/12Establishment of Existing ground level by licensed
surveyoracceptance/otherNo Comment995/25/12Concrete cube test
reportacceptance6/1/12To verify 28days strength 4 cubes are
necessary, for 7days 2 cubes are enough.10105/29/12Pile Dynamic
Analysis test reportreview6/1/12PDA test is acceptable. Pile is
sound.11116/20/12Report of Load test on test pile-(600mm
Dia-Pile)reviewNo Comment12126/20/12Concrete mix Design data
Proposal with Grace AdmixturereviewNo Comment13136/21/12Test report
- Report No ss-1204735-creview6/28/12Test results acceptable.
Cement can be used for structural work after checking for fineness
and soundness14146/21/12Test report - Report No
ss-1200593review6/28/12test results acceptable. Cement can be used
for structural and masonry work15156/25/12Concrete cube test
reportacceptanceNo Comment16166/28/12Mix design test results for
piling work using two brands such as Tokyo & Ultra -tech
cementacceptance7/2/12Test results accepted171728/06/201Tensile
test on steel bars for the reinforcement of concrete repot
No.IB/12/175acceptanceTensile test and rebend test satisfying the
requirement1