Beth E. Clarizia, P.E. Beth E. Clarizia, P.E. Agricultural Engineer Agricultural Engineer Drainage Water Drainage Water Management Management
Feb 25, 2016
Beth E. Clarizia, P.E.Beth E. Clarizia, P.E.Agricultural EngineerAgricultural Engineer
Drainage Water Drainage Water ManagementManagement
Drainage in the MidwestDrainage in the Midwest
Where the Nitrogen is…Where the Nitrogen is…
Drainage Water Management Drainage Water Management Practice Standard 554 Practice Standard 554
RequirementsRequirements•Existing drainage systemExisting drainage system•Structure can not restrict Structure can not restrict
drainage when opendrainage when open•Must have 10 feet of solid Must have 10 feet of solid
drainage pipe with an anti-seep drainage pipe with an anti-seep collar attached to structurecollar attached to structure
Structure for Water Control Structure for Water Control Practice Standard 587 Practice Standard 587
RequirementsRequirements•Can not affect neighboring Can not affect neighboring
landowner drainagelandowner drainage
Where do they work?Where do they work? Use where grades are < 1%Use where grades are < 1% Where neighboring land users will Where neighboring land users will
not be affectednot be affected Where structures can be planned on Where structures can be planned on
existing systems (locate and existing systems (locate and determine influence)determine influence)
The water level control device placed in a tile line. The area impacted is a function of the slope of the field. The flatter the field the greater the area impacted.
Ditch
Raised Water Table
Riser Boards (Adjustable)
Tile
The Influence of SlopeThe Influence of Slope
Drainage ManagementDrainage Management(Parallel System and Flat Topography)(Parallel System and Flat Topography)
Field Boundary
main main
late
r als
late
r als
Water level control structure
Raising/ Lowering LevelsRaising/ Lowering Levels
• SpringSpring Lower the water table for plantingLower the water table for planting At least 2 weeks prior to entering fieldAt least 2 weeks prior to entering field
• After planting/summerAfter planting/summer Raise water table to approximately 18 inches for the Raise water table to approximately 18 inches for the
crops to use (or higher?)crops to use (or higher?) Stores some water for draught periodsStores some water for draught periods
• FallFall Lower water table for harvestLower water table for harvest
• WinterWinter After harvest, raise water table to the surface After harvest, raise water table to the surface
Drainage water managementDrainage water management
After planting After harvest
• Before field operations
Boards installed to hold water back when drainage not needed
Boards removed for full drainage capacity
AgriDrain control structure Hancor control structure
Landowner:TBM # and description:
TBM Elevation:
Construction Notes: Follow IN-ENG-30 for polyethylene anti-seep collar details.
I certify that I have installed the water control structure and any tile in accordance with this report and the NRCS
plans and specifications.
Contractor: Signature: Date:
Structure NumberDiameter (in.)
(print name)
NOTES:
Flowline Elevation Ground Elev. Dimensions (in.xin.) Height (ft.)
Drainage Tubing Control Structure
Existing Ground
Water Control Structure
Stop Logs
Flow
Anti-seep Collar
Plan View
Solid Tubing