    Report No 20 of 2006

    Draft Report on the PerformanceAudit on Tsunami Relief,

    Rehabilitation and Reconstructionrelating to the nion Territor! of Andaman and Nicobar "slands

  • 7/24/2019 Draft Report on Performance Audit.doc

    2/70

    #ighlights

    The Andaman and Nicobar Administration (Administration) did not play a proactive role in

    increasing the disaster preparedness and disaster mitigation management either in the pre-

    Tsunami or in the post-Tsunami period. (Para 3.1.1)

    The policy objectives are yet to be suitably amended or better disaster ris! assessment"

    mitigation" prevention and preparedness in case o a uture Tsunami. (Para 3.1.1)

    #ue to non-completion o $oastal Area %apping" demarcating the &No $onstruction 'one and

    & igh Tide *ines " the Administration is unable to identi y the violators o $oastal +egulation

    'one. (Para 3.1.1)

    +e,uirement o unds projected by the Administration or Tsunami relie " rehabilitation and

    reconstruction or!s as unrealistic and highly in lated. (Para 3. .1)

    Absence o $entral Accounting /ystem and poor management o unds resulted in poor utilisation

    o unds leading to surrender o unds. (Para 3. . )

    Pace o relie " rehabilitation and reconstruction or!s in Andaman and Nicobar 0slands (AN0)

    remained slo due to poor utilisation and improper allotment o unds (Para 3. . )

    #epartmental advances o +s 2.1 crore dra n rom % 2 remained unadjusted or periods

    ranging upto 12 months in violation o 4eneral inancial +ules. (Para 3. . )

    +elie unds amounting +s 1.3 la!h ere misutilised or payment o or!ing lunches" purchase

    o /0% cards" recharge cards" mobile phones" revenue stamps" TA" stationery charges etc.

    (Para 3. . )

    +s 5 . la!h and +s 2.65 la!h ere diverted rom % 1 and % or relie and

    rehabilitation or!s. (Para 3. . )

    +s 1 . la!h under the Plan budget o % 2 " meant or enhancing preparedness in managing

    disasters" as dra n as departmental advance and irregularly diverted or other purposes.

    (Para 3. . )

    0n 1 cases" unds rom % 2 and *47s +elie 8und amounting to +s 15.9 crore ere !ept

    in ban! accounts or phased out payment. The ban! accounts ere opened and operated ithout

    prior permission o the %inistry: $4A in violation o the codal provisions.

    (Para 3. . )

    ;ouchers: #etails or amount o +s 2 .6 crore spent by the %inistry o ome A airs (% A)

    out o unds allotted to AN0 or purchase o relie : rehabilitation material ere not available.

    /imilarly" details: vouchers o purchases made by the #eputy +esident $ommissioners at

  • 7/24/2019 Draft Report on Performance Audit.doc

    3/70

    $hennai and

  • 7/24/2019 Draft Report on Performance Audit.doc

    4/70

    The #irectorate o Bducation made purchases orth +s 2 .>9 la!h ithout observance o codal

    ormalities. (Para 3.3.2)

    ?ills or purchases orth +s .66 la!h ere processed by the #irector o Bducation and che,ues

    issued by the PA@ ithout actual receipt o the goods. (Para 3.3.2)

    The Blectricity #epartment procured 2 #4 /ets costing +s >6. 9 la!h ithout obtaining the

    minimum number o bids as prescribed in the 4eneral 8inancial +ules. (Para 3.3.2)

    1> 4ensets procured by the Blectricity #epartment at a cost o +s 16 . 2 la!h and distributed to

    relie camps and 4overnment #epartments ere neither ta!en bac! nor their cost recovered.

    (Para 3.3.2)

    The Blectricity #epartment sought or e=penditure sanction o +s 5.59 crore rom the %inistry o

    Po er to ards purchase o #4 /ets and TC# materials but made part payment o +s 1.26 crore

    ithout a aiting the sanction o the %inistry. (Para 3.3.2)

    TC# materials ere procured by the Blectricity #epartment ithout proper assessment o the

    actual re,uirement resulting in huge stoc! lying idle. (Para 3.3.2)

    The @:o the #eputy $ommissioner (Andaman)" 3 D** C 4/% %obile phones orth +s . 3

    la!h ithout observing any codal ormalities and distributed them mainly to ineligible o icials.

    0n addition call charges or the above phones ere also being paid" hich as irregular.

    (Para 3.3.2)

    Aarding o the or! o reconstruction o 0$#/ $entres to AN00#$@ instead o

    APD#:$PD#:A* D resulted in avoidable e=tra burden in the orm payment o service ees to

    AN00#$@. (Para 3.3. )

    The physical and inancial achievement in implementation o the assistance pac!age to the

    a ected ishermen as very poor and the #irectorate o 8isheries as unable to utiliEe the unds

    allocated. 0n addition" the norms prescribed or assistance to ishermen as also not strictly

    adhered to. (Para 3.3.9)

    #ue to lac! o e ective coordination bet een the Administration and the N4@s" relie and

    rehabilitation materials ere procured ar in e=cess o re,uirement resulting in huge ,uantity o

    items lying idle even a ter a lapse o one year. (Para 3.3.6)

    @ut o schools decided by the Administration to be reconstructed by the N4@s and other

    agencies" only 1 schools have been completed. (Para 3.3.6)

    0nventory Audit Team o the Administration ound that there as no reconciliation o records

    in respect o the relie and rehabilitation materials received and distributed.

    (Para 3.3.5)

  • 7/24/2019 Draft Report on Performance Audit.doc

    5/70

    A Public 0nterest *itigation as iled due to de iciencies on the part o the Administration to

    provide ade,uate e=-gratia: compensation and post-Tsunami +ehabilitation measures.

    (Para 3.3.>)

    The inancial progress o APD# as only .2 per cent in - 9 till #ecember and the

    physical progress as also lagging behind in the +elie : +econstruction activities.

    (Para 3.2. )

    #elay on the issue o construction o Permanent /helters has made uncertain the shi ting o

    a ected population presently housed in 0ntermediate /helters. (Para 3.2. )

    Post haste decision to procure desalination plants" #4 /ets and /%$ Panel Tan!s be ore

    inaliEing their locations and completion o initial base or!s resulted in non-installation o

    desalination plants valued at +s 3 . 1 la!h. (Para 3.2. )

    complete and 29 part pre- abricated structures ere lying unused at ut ?ay.

    (Para 3.2. )

    B,uipment such as ?ulldoEers" tractors etc. ere lying idle or long periods. (Para 3.2. )

    A majority o the ?ailey bridges have not yet been installed de eating the purpose or hich the

    bridges ere to be erected and installed even a ter a lapse o one year rom the date o their

    procurement. (Para 3.2. )

    *ac! o internal control coupled ith lac! o coordination bet een the #ivisions o APD#

    resulted in procurement o materials in e=cess o re,uirements. (Para 3.2. )

    0njudicious procurement o plastic ropes ithout re,uirement resulted in an e=penditure o +s

    1.9 crore being rendered un ruit ul. (Para 3.2. )

    #ue to acceptance o abnormally high rates above the mar!et rate" the APD# incurred an

    avoidable e=tra e=penditure o +s 3.2 la!h in construction o a Tsunami %emorial.

    (Para 3.2. )

    >2.3 %T o $40 /heets ell into the sea hile unloading at .36 la!h to ards cost o the sheets and its transportation. (Para 3.2. )

    #ue to negligence" a ,uantity o 1 metres o cables ere not unloaded at $ampbell ?ay

    resulting in avoidable e=tra liability due to double transportation. (Para 3.2. )

    The inancial and physical progress o A* D as o #ecember as very poor resulting in

    delay o repair" restoration and reconstruction or!s. (Para 3.2. )

    #ue to improper planning" an injudicious e=penditure o +s 35. la!h as incurred to ards

    construction o a temporary jetty at

  • 7/24/2019 Draft Report on Performance Audit.doc

    6/70

    /ystem o assessment o damage and identi ication o bene iciaries as not oolproo .

    (Para 3. .1)

    /ystem prescribed under e=isting 8inancial +ules or payment through Ac,uittance +olls and

    payments made to illiterates on the basis o thumb impressions as not ollo ed. As a result"

    these payments could not be vouchsa ed. (Para 3. .1)

    Procedure or assessment o crop: land loss in Tribal areas in absence o revenue records and

    identi ication o ne=t o !in on the &Tuhet system basis does not have the approval o the

    4overnment o 0ndia. (Para 3. .1)

    As the Andaman and Nicobar *and +egulation Act speci ies that all land vests in 4overnment"

    payment o compensation or land loss to individuals as technically incorrect. %oreover" norms

    or compensation as not ormulated or loss o non- agricultural land.

    (Para 3. . )

    A dra t scheme or $ompassionate Appointments to the dependents o the government servants o

    Administration ho had died: ere missing in Tsunami disaster as sent to the 4overnment o

    0ndia or approval. o ever" appointments under the proposed scheme ere being made ithout

    receipt o the approval o the scheme. (Para 3. .3)

    0nstructions received rom N#%# and incorporated in the #%P are yet to be approved by the

    4overnment o 0ndia. (Para 3.9)

    All the reports on Natural $alamities as prescribed the % A and %@8 ere not being urnished

    by the Administration a ter Fuly . (Para 3.6.1)

    No %onitoring $ell has been constituted to monitor the ongoing relie " rehabilitation and

    reconstruction activities. (Para 3.6. )

  • 7/24/2019 Draft Report on Performance Audit.doc

    7/70

    Recommendations

    The Disaster Management Regulation and Disaster Management Plan may be suitably

    amended with special emphasis on disaster preparedness and disaster management in

    case of a Tsunami.

    Emergency Operation Centres may be set up at the earliest in both Andaman and icobar District for better pre!disaster assessment" forewarning" dissemination and

    mitigation of disasters

    All #ey departments may be imparted orientation training programmes in dissemination

    and e$acuation techni%ues. &n$ol$ement of common people may also be encouraged

    through holding of wor#shops 'seminars' awareness camps etc to increase public

    awareness to disasters.

    Construction of sea!walls" coral reefs" plantation of mangro$es" as well as identification

    and retrofitting of all $ulnerable structures may be ta#en up and completed at the earliest to reduce the impact of damage in future Tsunami disaster.

    Mapping the coastal areas for ha(ards" $ulnerability and ris# analysis alongwith

    demarcation of )*igh Tide +ines, and ) o Construction -ones, may be completed

    e peditiously and inhabitants in these (ones mo$ed' resettled in other areas. &n case of

    shortfall of necessary re$enue land for this purpose" proposal for de!reser$ation of forest

    area may be sent to Ministry of En$ironment and /orests for appro$al. /urther" norms

    for ci$il constructions in coastal areas should be formulated incorporating therein

    Tsunami resistant designs and plans. 0iolators of such norms as well as Coastal -one Regulations should be identified and prosecuted.

    Cases of resettlement due to the change in geomorphology of the islands should be ta#en

    up and land to the affected families should be pro$ided at higher regions" if necessary by

    de!reser$ation of forestland on one!time basis with the appro$al of the Ministry of

    En$ironment and /orests.

    The actual re%uirement of fund for relief" rehabilitation and reconstruction may be re!

    assessed by ta#ing into account the sur$ey reports" studies by technically trained people'

    agencies and realistic inputs in order to pro1ect the actual re%uirement on a realistic

    basis.

    A Central Accounting 2ystem should be put in place with a mechanism of effecti$e

    internal control to monitor the utilisation of the funds so that funds recei$ed from all the

    sources are properly accounted for and allotment of funds to $arious departments are

    also need!based. Ade%uate steps should be also ta#en for a better fund management

  • 7/24/2019 Draft Report on Performance Audit.doc

    8/70

    Effecti$e measures should be underta#en for proper utilisation of the funds recei$ed

    from $arious sources in order to step up the pace of relief" rehabilitation and

    reconstruction wor# as well as to ensure that e !gratia payments are recei$ed by the

    beneficiaries at the earliest.

    &t should be ensured that the funds" which ha$e been allocated for relief" rehabilitation

    and reconstruction acti$ities" are not surrendered but are fruitfully utilised in order to

    fulfill the purpose of allotment of such funds.

    Action may be ta#en up for release of the balance of the consented amount of Rs 34.54

    crore from Member of Parliament +ocal Area De$elopment 2cheme 6MP+AD27. Action

    also needs to be ta#en to e pedite the estimates of the remaining three wor#s and to

    obtain the appro$al of the 8o$ernment of &ndia for all the pro1ects in order to utilise the

    funds recei$ed under MP+AD2 at the earliest for the pro1ects for which such fund was

    released.

    All departmental ad$ances should be ad1usted immediately and it should be ensured that

    funds released under M*!995: are not di$erted for other purposes. 2imilarly" funds from

    other heads should also not be di$erted for relief purposes without the appro$al of the

    competent authority for such di$ersion. All the di$ersions made till date should be

    regularised by e !post facto appro$al of the competent authority. /urther" additional

    re%uirements under any Ma1or *ead should be pro1ected and necessary re!allocations

    made by the appro$al of the competent authority.

    Drawal of departmental ad$ances for deposit wor#s should be stopped forthwith and

    procedure prescribed under Paras ;.: and ;.99 of Ci$il Accounts Manual should be

    strictly followed for transfer of funds in connection with deposit wor#s gi$en to

    Andaman Public udget should particularly ensure that proper procedure is

    followed in issuance of che%ues against bills passed and to effecti$ely monitor the

    ad1ustment of departmental ad$ances drawn.

    &ncorrect payments made from Prime Minister?s Relief /und should be reco$ered at the

    earliest.

  • 7/24/2019 Draft Report on Performance Audit.doc

    9/70

    Money recei$ed from relief funds should not be utilised for purposes other than those for

    which they are pro$ided.

    Details' 0ouchers in respect of e penditure incurred by the Ministry of *ome

    Affairs" Deputy Resident Commissioner" Chennai" Deputy Director of 2hipping

    2er$ices" Chennai and Deputy Resident Commissioner" @ol#ata out of the funds

    under M*!995: may be obtained and properly accounted for.

    The physical and financial progress of the repair" restoration and reconstruction

    acti$ities may be paced up. Proper monitoring mechanism with internal control

    may be setup to ensure completion of all the ci$il wor#s as well as to a$oid losses'

    unnecessary e penditure' in1udicious e penditure due to negligence.

    All the ci$il wor#s which were either completed or ta#en up without obtaining

    sanction of the competent authority may be regularised by obtaining e !post facto

    appro$als

    The issue of construction of Permanent 2helters may be finalised early in

    consultation with the Ministry of rban De$elopment and the wor# of Permanent

    2helters ta#en up an early date so as to shift the affected population presently

    housed in the &ntermediate shelters.

    Effecti$e action may be ta#en for installation of the desalination plants" bailey

    bridges = pre!fabricated structures and for gainful utili(ation of the bulldo(ers"

    tractors" trailers etc. so as to fulfill the purposes for which the abo$e materialswere procured' hired.

    Physical $erification of all the materials procured for rehabilitation and

    reconstruction may be conducted so as to reconcile the discrepancies in the

    $arious store records.

    The entire %uantity of plastic ropes procured may be fruitfully utilised at the

    earliest and in future assessment of re%uirement may be made on realistic basis to

    a$oid unfruitful' wasteful e penditure and' or procurement in e cess of actual

    re%uirement.

    Procurement of materials may be made as per the prescribed procedures and in

    all cases care may be ta#en to ensure that materials are not procured at rates

    higher than the ma imum permissible limit.

  • 7/24/2019 Draft Report on Performance Audit.doc

    10/70

    Codal formalities should in$ariably be followed in all cases of future procurement and

    stoc# registers'records in respect of materials should also be maintained. Records in

    respect of materials already recei$ed should be reconstructed after reconciling the

    %uantities recorded in the ships? manifests" 8odown?s stoc# registers" 2pecial Relief

    Officers? stoc# records and 2ector Officers? records. Materials procured by the

    Administration and those donated by the 8Os should also be segregated and accounted

    for separately.

    Either future claims of Andaman and icobar &slands &ntegrated De$elopment

    Corporation 6A &&DCO7 should be ad1usted against the ad$ance payment of Rs :4.44

    la#h already paid to them or the same may be reco$ered at the earliest

    &rregular payment of Rs B.B4 la#h made to the supplier of bicycles" M's Ambi#a E ports

    P$t. +td." +udhiana" may be reco$ered as the supplier had committed to assemble the

    bicycles at Port >lair at their own cost.

    O$erpayments made to Consumers Co!operati$e 2ociety +td. should be reco$ered

    without further delay.

    Relief funds should not be used for the procurement of items such as mobile phones. E !

    post facto appro$al of the Ministry may be obtained for regularisation of the abo$e

    procurement. /urther" mobile phones pro$ided to ineligible officials should be ta#en bac#

    and payment of call charges stopped immediately .The irregular payments of call charges

    made in respect of ineligible officials may also be reco$ered from such officials.

    &n future" procurement of stores may be made after realistic assessment of the

    re%uirement so as to a$oid idle in$estment of unutilised stores.

    Materials lying in bags" bundles" cartons etc should be opened and articles" which ha$e

    already become time!barred" may be disposed off. Any perishable article should be

    distributed to the people li$ing in intermediate shelters at the earliest before they become

    unusable" particularly in the light of the directions issued by the Circuit >ench of @ol#ata

    *igh Court for continuance of free ration supply beyond 3.34.944:. An Action Plan

    may also be e$ol$ed for fruitful utilisation of all other materials recei$ed for

    relief'rehabilitation.

    Materials such as Tele$isions" >eds etc" which were distributed to the relief camps may

    be located and ta#en bac# to stoc# and stored properly for future use. 2toc# Registers

    showing the receipt and issue of bicycles" +P8 sto$es and sewing machines may be

    reconstructed on the basis of a$ailable records. 2imilarly" utilisation of the items

    transferred from Directorate of 2ocial

  • 7/24/2019 Draft Report on Performance Audit.doc

    11/70

    The gensets distributed to $arious islands may be ta#en bac# from the $illage captains'

    departments or their cost reco$ered from them.

    The entire %uantity of bamboos procured may be fruitfully utilised at the earliest and in

    future assessment of re%uirement may be made on realistic basis to a$oid unfruitful'

    wasteful e penditure and' or procurement in e cess of actual re%uirement.

    All the tent parts of the : tents which are yet to be assembled needs to be located and

    stored properly for future use. Tents already distributed and which are now not re%uired

    for relief purpose should also be ta#en bac# to stoc#.

    Against purchases of Rs ;.;3 crore from Power 8rid Corporation of &ndia +td. 6P8C&+7

    and ational Thermal Power Corporation 6 TPC7" e penditure sanction of the Ministry

    of Power has been sought for Rs ;.;B crore which needs to be reconciled. /urther

    payments to P8C&+ and TPC in respect of the abo$e purchases may be released only

    after receipt of administrati$e appro$al and e penditure sanction of the Ministry of

    Power and after deduction of the amounts already released.

    2ince the awarding of construction wor# to A &&DCO in$ol$es payment of additional

    liability in the form of ser$ice charges' profit margin" the wor#s should be awarded to the

    construction agencies of the 8o$ernment e.g. AP

  • 7/24/2019 Draft Report on Performance Audit.doc

    12/70

    The appro$al of the 8o$ernment of &ndia for identification of tribal beneficiaries on the

    basis of )Tuhet, system may be obtained to regularise the payments made in de$iation of

    the appro$ed guidelines. &n other cases" the system of identification of beneficiaries

    should be made foolproof after ta#ing into account all the prescribed' specified norms in

    order to ensure that the genuine beneficiaries are not left out and irregular payments

    made to the ineligible persons may be reco$ered.

    Appro$al of the 8o$ernment of &ndia should be obtained for the methodology adopted for

    assessment of crop'land loss in tribal areas.

    E !gratia payment'compensation is made by che%ues only to ensure transparency in

    distribution of gratuitous relief amounts

    All payments made through Ac%uittance Rolls including payments made on the basis of

    thumb impressions should be certified by an authorised officer so as to authenticate such

    payments.

    Action may be ta#en to re!issue all the time!barred che%ues and to issue the undisbursed

    che%ues to the concerned persons and to ensure that all eligible beneficiaries are paid

    e !gratia' compensation' enhanced agricultural compensation without any further delay.

    Payment of compensation for land loss to indi$iduals in A & should be regularised" if

    necessary" either by suitably amending the Andaman and icobar &slands +and

    Regulation Act and' or the rele$ant sanction orders. orms may also be formulated for

    compensation of loss of non!agricultural land.

    Compassionate appointments under the proposed scheme should be stopped till appro$al

    of the 8o$ernment of &ndia to the scheme is accorded. The matter may also be ta#en up

    with the 8o$ernment of &ndia for e pediting its appro$al. Any compassionate

    appointments already made under the proposed scheme should also be regularised with

    the appro$al of the 8o$ernment of &ndia.

    Action may be ta#en for the finalisation of the Disaster Management Plan" including

    therein all the guidelines'instructions recei$ed from the 8o$ernment of &ndia" at an early

    date.

    All the prescribed periodical returns to the M*A and 8o$ernment of &ndia may be sent

    timely.

    An effecti$e Monitoring mechanism may be instituted to assess the physical and financial

    progress of the implementation of the $arious acti$ities and to coordinate between the

    $arious implementing agencies in order to increase the efficacy of the relief"

    rehabilitation and reconstruction measures.

  • 7/24/2019 Draft Report on Performance Audit.doc

    13/70

  • 7/24/2019 Draft Report on Performance Audit.doc

    14/70

    Draft Report on the Performance Audit on Tsunami Relief, Rehabilitation and Reconstructionrelating to the nion Territor! of Andaman and Nicobar "slands

    $% "ntroduction

    An earth,ua!e o the magnitude o >.3 on the +ichter scale occurred at 9 > hours 0/T

    on 9.1 . 2 o the coast o /umatra generating a massively destructive Tsunami that hit the

    coastal states o Andhra Pradesh" Tamil Nadu"

  • 7/24/2019 Draft Report on Performance Audit.doc

    15/70

    Audit +ethodolog!

    The Per ormance Audit +evie under the supervision o #irector (AN0) began the revie

    ith an Bntry $on erence on >.11. under the $hairmanship o the $hie /ecretary"

    Andaman and Nicobar Administration (Administration) in hich all the audit objectives ere

    discussed ith the concerned o icers o the various departments o the Administration. The

    Per ormance Audit +evie as ta!en up as per the +evie 4uidelines and covered both the

    #istricts o Andaman and Nicobar 0slands. The indings on all the themes given in the 4uidelines

    ere initially communicated to the Administration through Audit @bservations and the +evie

    as concluded by holding an B=it $on erence on GGGGGGGGGGGGG herein all the Audit 8indings"

    @bservations and +ecommendations ere discussed ith the o icers o the Administration.

    % Audit -indings

    %$ &etting up of "nstitutional +echanism for Disaster +anagement

    A $risis %anagement Plan ($%P) as circulated by the $abinet /ecretary in Fune 1>56"

    hich as subse,uently revised in 1>5>.0n line ith the suggestions o the $%P" the

    Administration constituted a nion Territory *evel #isaster %anagement Authority in November

    1. /ubse,uently" in November 3" the /ecretary (/ecurity)" $abinet /ecretariat in ormed

    the Administration to prepare detailed $ontingency Plans or handling crisis e ectively and in aell planned manner. Accordingly a #isaster %anagement +egulation (#%+) and a #isaster

    %anagement Plan (#%P) ere ormulated. o ever" neither the #%+ nor the #%P listed

    Tsunami as a potential haEard or the Andaman and Nicobar 0slands (AN0) though t o instances

    o Tsunami occurrences in the AN0 ere mentioned in the #%P. As such" no special measures in

    case o a Tsunami disaster ound place either in the #%+ or the #%P. Bven a ter a lapse o one

    year o the Tsunami disaster" the #%+ and the #%P are yet to be suitably amended to de ine the

    policy objectives or disaster ris! assessment" mitigation" prevention and preparedness in case o

    a uture Tsunami.8urther" the ollo ing acts ould indicate that the Administration did not play a pro-

    active role in increasing the disaster preparedness and disaster mitigation management either in

    the pre-Tsunami or in the post-Tsunami periodH-

    a) 0n order to augment the pre-disaster ris! assessment techni,ues" the development o

    Tsunami detection" orecasting and arning dissemination centres ere o immense

  • 7/24/2019 Draft Report on Performance Audit.doc

    16/70

    importance. Although plans or establishment o our &Bmergency @peration $entres

    (B@$) have been approved at an estimated cost o +s. 93.2 la!h but the or! o only

    one B@$ has been ta!en up till date.

    b) Dith a vie to increase preparedness and or mitigating uture disasters" the #%P

    envisaged imparting orientation training to the !ey unctionaries belonging to Police

    8orce" 8ire /ervice" ome 4uard @rganisation" #octors" Bngineers etc. and selected

    members o the public in orecasting" arning" dissemination and evacuation techni,ues

    but no such training programmes had been organised by the Administration till date.

    Bven hen" the National 0nstitute o #isaster %anagement organised a training

    programme on disaster management in Fuly " in hich the Administration as

    re,uired to nominate nodal o icers" members o T: #istrict #isaster %anagement

    $ommittee" /#%s: A#%s" only one o icer as nominated by the Administration or

    the said training.

    c) /i= satellite phones received rom the %inistry o ome A airs (% A) on 6.1 . 2

    ere used or maintaining lin! ith Nicobar #istrict during relie operations. 0n

    8ebruary " the #irector (N#% 000)" % A re,uested the Administration to return the

    phones and to procure ne ones so as to !eep them in readiness or disaster

    management. Although the satellite phones have been returned to the % A a ter relie

    operations but ne ones are yet to be procured.

    d) 199 buildings ere identi ied as vulnerable structures in Port ?lair itsel in the pre

    Tsunami period" but the or! o retro itting as not ta!en up. 0n the post-Tsunami

    period" the or! o identi ication o vulnerable structures is yet to be completed. The?uilding ?ye-*a s have not been revie ed a ter Tsunami. 8urther" the *and se and

    'oning +egulations are yet to be ormulated.

    e) Neither any assessment o damages to coral ree s has been made nor plans or

    construction o location speci ic sea- alls and coral ree s or mitigating uture Tsunami

    disasters have been prepared despite a lapse o more than one year rom the Tsunami

    disaster.

    ) A total o 6199 hectares o land as targetted or coastal belt plantation. o ever" due

    to non-identi ication o areas at many places" only 1 1 hectares ere targetted or plantation during the year - 9 against hich >5. > hectares has been achieved till

    31.1 . .

  • 7/24/2019 Draft Report on Performance Audit.doc

    17/70

    1.1.2 nder /ection 3(1) and 3( ) o the Bnvironment (Protection) Act 1>59" the coastal stretches

    o AN0 ere classi ied under $ategory 0; ($+'I0;). The Act provides that the Administration

    should prepare $oastal 'one %anagement Plans ($'%P) identi ying and classi ying the $oastal

    +egulation 'one ($+') Areas and obtain approval o the %inistry o Bnvironment and 8orest

    there or. The or! o preparation o $'%P in AN0 as initiated only in August 2 in

    pursuance o the directions o the on7ble

  • 7/24/2019 Draft Report on Performance Audit.doc

    18/70

    area may be sent to Ministry of En$ironment and /orests for appro$al. /urther" norms for

    ci$il constructions in coastal areas should be formulated incorporating therein Tsunami

    resistant designs and plans. 0iolators of such norms as well as Coastal -one Regulations

    should be identified and prosecuted.

    f7 Cases of resettlement due to the change in geomorphology of the islands should be ta#en up

    and land to the affected families should be pro$ided at higher regions" if necessary by de!

    reser$ation of forestland on one!time basis with the appro$al of the Ministry of En$ironment

    and /orests.

    %2 Ade.uac! of relief funds

    3. .1 An amount o +s 39 1.21 crore hich as later revised to +s 3539. 9 crore as

    projected by the Administration to the %inistry o ome A airs in Fanuary through a

    &%emorandum on Barth,ua!e: Tsunami #amages as the re,uirement o unds or the purpose o

    relie " rehabilitation and reconstruction. /uch re,uirement as computed on the basis o inputs

    received rom various departments o the Administration.

    /crutiny o the &%emorandum on Barth,ua!e: Tsunami #amages revealed that the

    re,uirement o unds as highly in lated due to the ollo ing reasonsH

    (a) Adoption o di erent mar!et rates to those projected by the concerned

    departments.

    (b) Projection o demand ithout actual survey o losses: damages.

    (c) #uplication o demand.(d) $omputation o re,uirement in e=cess o prescribed norms.

    (e) Projection on purely ad-hoc basis.

    ( ) 0nclusion o projects not connected to relie " rehabilitation and reconstruction.

    8urther" the +ecommendation o the $entral Team during their visit to the 0slands rom

    31. 1. to 1. . as +s. >55.5 crore only against the projected re,uirement o +s.

    3539. 9 crore.

    3. . 8unds or Tsunami +elie " +ehabilitation and +econstruction ere received bythe Administration rom the ollo ing sources during the years 2- and - 9H-

    (a) Prime %inister7s +elie 8und (P%7s +elie 8und)

    (b) *ieutenant 4overnor7s +elie 8und (*47s +elie 8und)

    (c) %ember o Parliament *ocal Area #evelopment /cheme (%P*A#)

    (d) ?udget Allocation under % 2 (+ajiv 4andhi +ehabilitation Pac!age)

  • 7/24/2019 Draft Report on Performance Audit.doc

    19/70

    o ever" complete details o the monetary assistance and relie materials provided by N4@s:

    B=ternal Agencies to the a ected people ere neither available nor accounted or by the

    Administration.

    The utilisation vis-J-vis und received: allotment rom each source as test chec!ed and the

    indings are detailed belo H-

    a/ Prime +inister s Relief -und

    (i) An amount o +s 1" " :- as e=-gratia rom the P%7s +elie 8und or payment to

    the ne=t o !in o identi ied dead and missing persons as announced. Till the end o

    #ecember " the names o 211 cases o identi ied dead and 363 cases o missing

    persons have been or arded by the Administration to the Prime %inister7s @ ice

    rom 8ebruary- %arch on ards or sanction o e=-gratia. $ases o 9 identi ied

    dead and 1 missing persons have not yet been or arded to P%7s @ ice or ant

    o ban! account numbers. $he,ues in the names o the legal heirs are being sent

    directly to the bene iciaries. 0n addition" an amount o +s 1 . 3 crore has also been

    received by the Administration rom the P%7s +elie 8und to ards social

    in rastructure reconstruction in the Tsunami a ected areas. The entire und is yet to

    be utilised.

    (ii) The identi ication o the ne=t o !in in respect o missing persons or payment o e=-

    gratia rom P%7s +elie 8und as incorrectly done in 1 cases in Nicobar #istrict.@ut o this" in 6 cases the e=-gratia as sanctioned and disbursed. @n detection o the

    error" recovery has been e ected in 2 cases but recovery in respect o 3 cases relating

    to

  • 7/24/2019 Draft Report on Performance Audit.doc

    20/70

    #uring - 9" the %embers o Parliament had consented or release o an amount

    o +s. 1.1 crore or nine rehabilitation or!s in Tsunami-a ected areas. @ut o this" only

    +s. 1 .6 crore has been received rom the %embers o Parliament" but no action has been

    ta!en to obtain the remaining amount o +s 1 .2 crore. Dhile estimates or si= projects have

    been sent to 4overnment o 0ndia or approval" the estimates or the remaining three projects

    are still a aited. As such" the entire und o +s 1 .6 crore received or Tsunami related

    rehabilitation or!s remains unutilised.

    d/ 4udget Allocation under +#5 22 7 3Ra*i' andhi Rehabilitation Pac8age/

    The 4overnment o 0ndia had approved a total assistance o +s 5> .19 crore (+s

    5 1.55 crore in 2- and +s 6 . 5 crore in - 9 as additional compensation or

    armers) against hich only +s 6 1.>> crore had been released under the %ajor ead- 2 -

    +elie on Account o Natural $alamities. The unds released and utilisation thereo as o

    @ctober as as underH-

    3Rs in crore/

    -inancial 9ear -unds under +#5 22 7 tilisation as

    of $0:07Plan Non Plan Total

    2- .2> 1 . 1 . 1 1 3. 3- 9 .1 62.35 69.25 12>.29

    TOTAL2%7; 6;;% 0 5 crore as surrendered. @n the other hand" no

    und under % - 2 as allotted in 2- to Port %anagement ?oard (P%?)

    although they ere responsible or the repair and reconstruction o jetties. As a result

    an amount o +s 2. 6 crore had been utilised by P%? by diverting Plan unds rom

  • 7/24/2019 Draft Report on Performance Audit.doc

    21/70

    % - 1 and placing it ith the Andaman *a!shad eep arbour Dor!s (A* D)

    or #eposit Dor!s. Though the Administration had not sought or the entire amount

    o +s . crore announced initially under the special pac!age" Plan unds ere

    diverted or Tsunami related or!. 8urther" unds provided under % - 2 ere also

    not ully utilised.

    (iii) tilisation o und under % - 2 in - 9 till @ctober as also very poor

    as detailed in Anne=ure-0. @nly +s 12>.29 crore as utilised against allotment o +s

    69.25 crore hich translates into .>3 per cent und utilisation. As in 2- " the

    P%? again diverted an amount o +s. 2.13 crore in - 9 also rom % - 1

    (Plan) to ards repairs and rehabilitation projects. 0n vie o the poor utilisation o

    the relie unds" it may be concluded that the pace o relie " rehabilitation and

    reconstruction or! in the Andaman and Nicobar 0slands is very slo .

    (iv) As sho n in Anne=ure-0" t o departments sho ed a high percentage o utilisation o

    unds in - 9" namely P%? (> .2> per cent) and #irectorate o +ural

    #evelopment (51.93 per cent). o ever" they had not actually utilised the unds but

    had merely placed them as deposit or! to other departments i.e." A* D (#eposit

    Dor! o +s 6.1 crore) and 'illa Parishad (#eposit Dor! o +s 1 . crore)

    respectively. The procedure o placement o unds" or deposit or!s" ith the

    e=ecuting agencies through che,ues payments as in violation o the procedure

    prescribed under Paras 5. and 5. o the $ivil Accounts %anual. The utilisation in

    respect o other departments o Administration varied rom . per cent to 25. per

    cent. #ue to allotment o und ar in e=cess o actual re,uirement" seven departmentssurrendered an amount o +s 6 . 2 crore in #ecember .

    (v) #epartmental Advances o +s.5.>2 crore relating to 2- (+s. .1 crore -Plan

    and +s. 5.6> crore -Non-Plan) and +s. 2 .19 crore relating to - 9 (+s. . 3 -

    Plan and +s. 22.93 crore -Non-Plan) ere dra n rom % - 2 . The entire amount

    o Rs 7 %$0 crore " as per Anne=ure-00" dra n during 2- and - 9 remained

    unadjusted or periods ranging upto 12 months though the same ere re,uired to be

    adjusted ithin one month o their dra als. 8urther" @ut o the advances o +s. 5.>2

    crore relating to 2- " +s. .93 crore as dra n in %arch and !ept in currentaccounts in ban! merely to avoid lapse o unds. Non-adjustment o #epartmental

    advances and dra al o unds at the ag end o the inancial year to avoid lapse o

    unds ere in violation o the provisions o 4eneral 8inancial +ules. Test-chec! o

    the e=penditure incurred rom the departmental advances revealed that these unds

    ere incorrectly utilised or payment o or!ing lunches (+s. 2.> la!h)" payment o

  • 7/24/2019 Draft Report on Performance Audit.doc

    22/70

    air ares to pro essors on study tour (+s. 1. 6 la!h)" purchase o /0%:+echarge cards

    or mobile phones and revenue stamps (+s.1. la!h). 0n addition" advances or

    various incidental e=penses (+s. 3. > la!h) ere given to o icials involved in relie

    or!" hich ere also lying unadjusted. 8urther" an amount o +s. 1 la!h out o the

    unds released under the plan budget o % - 2 " meant or enhancing preparedness

    in managing disasters" as dra n as departmental advance and irregularly diverted

    or other purposes.

    (vi) 0n 1 cases" unds rom % - 2 and *47s +elie 8und amounting to +s. 15.9

    crore" as per Anne=ure-000" ere !ept in ?an! accounts or phased out payments"

    hich ere opened and operated ithout prior permission o the %inistry:$ontroller

    4eneral o Accounts ($4A) in violation o the provisions o the +eceipts and

    Payments +ules and $ivil Accounts %anual. /everal irregularities ere noticed in

    the opening and operation o such accounts. T o such cases are cited belo as

    illustrative e=amplesH-

    a) A departmental advance o +s. > "2 " :- as dra n by the Assistant

    $ommissioner (/ettlement) in %arch in connection ith payment o e=-

    gratia:assistance or severely and marginally damaged houses K +s. :- to

    29 amilies. The bill as passed by the PA@-0" Port ?lair and the che,ue or

    the above amount as issued in avour o /yndicate ?an! instead o the ##@"

    or reasons not on record. The Assistant $ommissioner (/ettlement) opened a

    current account (No.>> 3 6 35) on 1 th %arch ith the /yndicate

    ?an! depositing the said che,ue ith them. o ever" prior permission o the%inistry:$4A" as re,uired under +ule 1>1 o the +eceipts and payments +ules

    and Para 19.6 o the $ivil Accounts %anual as not ta!en. $he,ues or the e=-

    gratia payments ere issued rom this account rom 1 st %arch on ards although

    this account as credited ith +s. > "2 " :- only on 3 rd %arch . As the

    account as a current account" the ban! cleared the che,ues issued rom this

    account rom 1 st %arch itsel resulting in the account e=hibiting a minus

    balance till 3 rd %arch " hen the amount o +s. > "2 " :- as actually

    credited. #ue to the over-dra al" the ban! debited the account by +s. 29 .52 ascharges or over-dra al but the debit as subse,uently cancelled. An amount o

    +s. 1.51 (+s. 1>.9 and +s. . 1 in %arch and November

    respectively) as also charged to this account as ban! charges. 0t as also

    noticed that in t o cases" che,ues ere encashed or +s 1" :- and +s "6 :-

    although all the bene iciaries ere sanctioned at the uni orm rate o +s " :-

  • 7/24/2019 Draft Report on Performance Audit.doc

    23/70

    vide the order dated 12. 3. mentioned above. Till date" 2 3 bene iciaries

    had been paid and or the remaining >6 bene iciaries" the balance in the account

    should have been +s 1">2" :-. o ever" due to the above mentioned acts" the

    balance in the account as on date as +s. 1">2" 65.1>. Thus" there as lac! o

    monitoring o the e=-gratia payments in addition to the act that the opening o

    the account itsel as ithout the proper sanction o the %inistry: $ontroller

    4eneral o Accounts merely to avoid lapse o unds.

    b) An amount o +s 2"2 "6> :- as received on 1 . 3. by the #eputy

    $ommissioner (Andaman) rom the *ieutenant 4overnor7s +elie 8und vide

    che,ue no. > 6 22 dated 1 . 3. dra n on /yndicate ?an!" Port ?lair or

    disbursement o e=-gratia relie to small business enterprises in non- residential

    premises. The che,ue as sent to /yndicate ?an!" Port ?lair on 11. 3. ith

    a re,uest to issue a #emand #ra t or +s 11" "6> :- in respect o payments

    relating to %iddle C North Andaman and to open a current account in avour o

    Assistant $ommissioner (/ettlement)" Port ?lair or the balance amount o +s

    23"2 " :-. A current account no. >> 3 6 1> as opened on 1 . 3.

    ithout any approval rom the %inistry: $ontroller 4eneral o Accounts and e=-

    gratia payments ere disbursed rom 12. 3. on ards by issue o che,ues

    rom the said account. @n 6. 2. " a urther amount o +s "2 " :- received

    rom the *ieutenant 4overnor7s +elie 8und or e=-gratia payments as again

    credited to the above current account. /ubse,uently" t o departmental advances"

    aggregating to +s 52"92"122:- ere dra n in Fune rom % 2 andcredited to the current account.

    Thus" an amount o +s 1"3 "22"122:- as credited to the current account

    bet een the period %arch and Fune or various e=-gratia payments

    and the account as operated in violation o the codal provisions.

    (vii) +s 39.1 crore as spent by the % A in 2- rom the allotment under % - 2

    o AN0. @ut o this" +s >.2 crore related to purchase o tents and $40 sheets but

    details o purchases made out o the remaining +s. 9.6 as not on record. 0n

    addition" an amount o +s >. crore as trans erred by the #irectorate o Accounts

    and ?udget" AN0 to % A in - 9. The vouchers or o the entire amount o +s

    2 .6 crore ere not available ith the Administration.

    (viii) /imilarly" details o purchase o relie materials amounting +s 15" 6" 2>:- made by

    the #eputy +esident $ommissioner" $hennai" #eputy #irector o /hipping /ervices"

  • 7/24/2019 Draft Report on Performance Audit.doc

    24/70

    $hennai and #eputy +esident $ommissioner" .9 la!h o the unds allotted to them under % - 2

    remained unutilised.

    (=) 8unds under % - 2 meant or relie and rehabilitation or!s ere utilised or

    other purposes as pointed out in Para 3. . (d) (v) above. 0n other such cases hich

    came to notice" it as seen that the #irectorate o $ivil /upplies" @ ice o the

    #eputy $ommissioner" Nicobar" @ ice o the #eputy $ommissioner" Andaman"

    @ ice o the Assistant $ommissioner" $ampbell ?ay and the #irectorate o

    Bducation had diverted unds amounting to +s. 2 . 6 la!h (/tationery charges- +s

    6.1 la!h" %obile charges" Blectric bills" TA" etc- +s. . > la!h" %obile:D**

    phones- +s. . 3 la!h" Payment o electricity charges- +s. 3. 3 la!h and Purchase o

    ire ighting e,uipments-+s. .36 la!h) rom % - 2 or regular purchases" hich

    as irregular.

    &n $iew of the abo$e" Audit recommends that the following measures be

    adopted for managing the funds in accordance with the prescribed financial rules

    a7 The actual re%uirement of fund for relief" rehabilitation and reconstruction may be re!assessed by ta#ing into account the sur$ey reports" studies by technically trained people'

    agencies and realistic inputs in order to pro1ect the actual re%uirement on a realistic basis.

    b7 A Central Accounting 2ystem should be put in place with a mechanism of effecti$e internal

    control to monitor the utilisation of the funds so that funds recei$ed from all the sources are

    properly accounted for and allotment of funds to $arious departments are also need!based.

    Ade%uate steps should be also ta#en for a better fund management

    c7 Effecti$e measures should be underta#en for proper utilisation of the funds recei$ed from

    $arious sources in order to step up the pace of relief" rehabilitation and reconstruction wor# as well as to ensure that e !gratia payments are recei$ed by the beneficiaries at the earliest.

    d7 &t should be ensured that the funds" which ha$e been allocated for relief" rehabilitation and

    reconstruction acti$ities" are not surrendered but are fruitfully utilised in order to fulfill the

    purpose of allotment of such funds.

  • 7/24/2019 Draft Report on Performance Audit.doc

    25/70

    e7 Action may be ta#en up for release of the balance of the consented amount of Rs 34.54 crore

    from MP+AD2. Action also needs to be ta#en to e pedite the estimates of the remaining three

    wor#s and to obtain the appro$al of the 8o$ernment of &ndia for all the pro1ects in order to

    utilise the funds recei$ed under MP+AD scheme at the earliest for the pro1ects for which such

    fund was released.

    f7 All departmental ad$ances should be ad1usted immediately and it should be ensured that

    funds released under M*!995: are not di$erted for other purposes. 2imilarly" funds from

    other heads should also not be di$erted for relief purposes without the appro$al of the

    competent authority for such di$ersion. All the di$ersions made till date should be

    regularised by e !post facto appro$al of the competent authority. /urther" additional

    re%uirements under any Ma1or *ead should be pro1ected and necessary re!allocations made

    by the appro$al of the competent authority.

    g7 Drawal of departmental ad$ances for deposit wor#s should be stopped forthwith and

    procedure prescribed under Paras ;.: and ;.99 of Ci$il Accounts Manual should be strictly

    followed for transfer of funds in connection with deposit wor#s gi$en to APudget should particularly ensure that proper procedure is

    followed in issuance of che%ues against bills passed and to effecti$ely monitor the ad1ustment

    of departmental ad$ances drawn. 17 &ncorrect payments made from PM?s Relief /und should be reco$ered at the earliest.

    #7 Money recei$ed from relief funds should not be utilised for purposes other than those for

    which they are pro$ided.

    l7 Details' 0ouchers in respect of e penditure incurred by the Ministry of *ome Affairs" Deputy

    Resident Commissioner" Chennai" Deputy Director of 2hipping 2er$ices" Chennai and Deputy

    Resident Commissioner" @ol#ata out of the funds under M*!995: may be obtained and

    properly accounted for.

    % Disaster response mechanism and post5disaster acti'ities

    3.3.1 Dhile rescue activities commenced almost immediately a ter the earth,ua!e and Tsunami but the

    0ntegrated +elie $ommand (0+$) under the $hairmanship o the on7ble *ieutenant 4overnor

    or monitoring relie or!s as constituted only on 31.1 . 2 and became ully unctional rom

  • 7/24/2019 Draft Report on Performance Audit.doc

    26/70

    1. 1. i.e. a ter a lapse o 9 days rom the disaster. +escue and +elie operations ere

    underta!en by the 0+$ under @peration &%addad . 6 +elie $amps ere set up and 29"

    people ere given shelter in them. 0n addition" "6 people ere evacuated to mainland. 13 1

    sorties o 0ndian Air 8orce aircra t ere made bet een 9.1 . 2 to 11. . or rescue and

    relie operations. The % A deployed about para-military personnel in all the islands.

    3.3. The /ecretary ($ivil /upplies) as designated as the +elie $ommissioner (/upplies) o the

    nion Territory on 6 th #ecember 2 and assigned ith the responsibilities o procurement o

    relie materials as ell as to ensure that su icient bu er stoc! o supplies as maintained at all

    the islands. The re,uirement o relie materials ere projected by the +elie $amp-in-charge to

    the /pecial +elie @ icers (/+@s) stationed at the a ected islands ho ould in turn project

    such demand to the /ector @ icers (/@s) stationed at Port ?lair. The /@s ould then place the

    indent to the +elie $ommissioner (/upplies) or their procurement.

    0nitially" no purchase committee as constituted or procurement o the relie materials

    and ,uotations or supply o ten (1 ) items o relie materials ere called or rom only t o co-

    operative societies" namely $onsumer $o-operative /ociety ($$/) and Bllen inengo *imited

    (B *) and compared ith the rates i=ed or such items by the #irectorate o $ivil /upplies and

    $onsumer A airs" AN0 ($/C$A). The rates provided by both $$/ and B * ere the same or

    all the ten items and ere also lo er than the rates i=ed by the $/C$A. 0t as decided that B *

    being a Tribal $ooperative /ociety ould supply or $ar Nicobar only" hereas $$/ ould be

    given supply order or relie materials re,uired or all other a ected islands. T o nodal o icers

    ere appointed as 0n-charge or receipt and despatch o materials at jetties and airstrips.Payments or all the relie materials procured ere to be made by the $/C$A. #uring the years

    2- and - 9 (till 1 : )" the $/C$A has incurred an e=penditure o +s. >. crore

    rom the unds allotted under % - 2 but the total e=penditure on the relie materials procured

    could not be ,uanti ied as all the bills submitted or procurement o relie materials are yet to be

    paid.

    /crutiny o the records o $/C$A revealed the ollo ing shortcomings in procurement

    o : payment or the relie materialsH-

    (a) Though hundreds o items o relie material ere procured locally but rates had been calledor ten (1 ) items only. /upply orders or all the remaining items (e=cept $olour T;s and

    #ish Antennas) ere placed directly on di erent agencies ithout ollo ing any codal

    ormalities or their purchase. Although a Purchase $ommittee as constituted in %arch

    but the system o placing supply orders ithout observing any codal ormalities is

    continuing till date. The 8inance #epartment o the Administration had also observed in Fuly

  • 7/24/2019 Draft Report on Performance Audit.doc

    27/70

    that despite a lapse o more than ive months rom the disaster" purchases ere being

    made ithout observing codal ormalities although there as su icient time to do so. Test

    chec! revealed that in three bills amounting to +s .66 crore" an amount o +s 1.> crore

    being 95. 9 per cent o the billed amounts related to purchases made ithout obtaining any

    rates.

    (b) The Andaman and Nicobar 0sland 0ntegrated #evelopment $orporation *td. (AN00#$@) as

    chosen or supply o vegetables or relie purposes ithout observing any codal ormalities.

    0n %arch " an amount o +s . la!h as paid to AN00#$@ as advance to ards

    supply o vegetables. o ever" it as observed that an amount o +s 1>.>> la!h had been

    paid to AN00#$@ against bills raised by them during the period rom %ay to November

    or supply o vegetables ithout adjustment o the advance against them.

    (c) As a part o rehabilitation measure" the on7ble *ieutenant 4overnor had approved

    procurement o bicycles or distribution in $ar Nicobar and Nanco ry islands. The +elie

    $ommissioner (/upplies) on one hand purchased bicycles K +s 1"991:- rom %:s T0

    $ycles" $hennai in 8ebruary on single tender basis ithout observing any codal

    ormalities and 1 per cent advance amounting to +s 33. la!h as paid to the irm. @n

    the other hand" the #eputy +esident $ommissioner (#+$)"

  • 7/24/2019 Draft Report on Performance Audit.doc

    28/70

    cargo. No such re,uest had been made hile transporting the irst lot o 1 cycles. The cost

    o transportation o these cycles ere yet to be made as o date though it as not on record i

    the same as transported by the 4overnment o Dest ?engal ree o cost. Bven i the cost o

    transportation as to be borne by the ACN Administration" it ould have amounted to +s

    " " :- or the > containers K +s. 5" :- per container. 0t may there ore be concluded

    that had the irst lot o 1 cycles ere also transported in a $:- actually paid or their transportation. #espite the act that the #+$

    had suggested in 8ebruary itsel that transportation o the cycles in $:- (+s "5 " :- O +s. 1 "5 "29>:-) and irregular

    e=penditure o +s. 9"9 " :-.

    (d) 0n 1 cases" payments ere made to $$/ at rates in e=cess o the rates ,uoted by $$/ andaccepted by the Administration resulting in e=cess payment o +s 2.56 la!h.

    3.3.3 +elie :+ehabilitation materials received rom N4@s and % A as ell as those procured by the

    Administration reached AN0 rom 6.1 . 2 on ards. Dhile most o these items ere received

    in Port ?lair" some ere sent directly to the Nicobar district. The materials received in Port ?lair

    via ship as ell as air ere initially !ept in the $entral 4odo n" addo" Port ?lair (4odo n) and

    subse,uently handed over to the /@s or distribution through /+@s posted in various islands. 0t

    as ound that no records o receipt:distribution o relie materials ere maintained upto. 1. . /crutiny o such records maintained rom 9. 1. on ards revealed the

    ollo ing shortcomingsH-

    (a) Although the Administration had issued an order in Fanuary to all concerned o icers to

    maintain stoc! registers as ell as to ollo the e=tant codal provisions in respect o the relie

    materials received by them but it as noticed that there as a ide variation in the ,uantities

  • 7/24/2019 Draft Report on Performance Audit.doc

    29/70

    o relie materials sent as per the ships7 mani ests ith those entered in the 4odo n7s

    registers. /imilar discrepancies ere also ound in the materials sho n as sent by the

    4odo n ith that received by the /+@s.

    (b) No records o receipt and despatch o materials ere maintained till . 1. . Bven

    therea ter" the records did not provide the details as to hich items ere procured by the

    Administration and hich ere donated by N4@s. o ever" the materials procured: received

    ere ar in e=cess o re,uirements as is evident rom the balance in stoc! lying at 4odo n

    even a ter a lapse o more than one year rom the date(s) o their receipt. No alternate use o

    items has yet been decided by the Administration till date. As a result o non-utilisation o

    these materials" the same may deteriorate:become unusable ith passage o time e.g. 39 nos.

    and 133 cartons o mineral ater had become time e=pired due to non-utilisation.

    (c) The materials received in the 4odo n ere accounted or in ?undles" ?ags" $artons" etc and

    as a result it as not possible to chec! hether all the ,uantities ordered or supply ere

    actually received.

    (d) $onsumer durables orth +s. 1" 3" 5 :- ere procured or use in relie camps. 0n addition"

    items hich ere received ree o cost" such as solar lanterns" gensets etc ere also supplied

    to these camps. o ever" a ter closure o the relie camps" the hereabouts o these items

    could not be ascertained in absence o any record there or.

    (e) The #irectorate o /ocial Del are (#/D) as given the responsibility o distribution o

    edible:household items to relie camps in and around Port ?lair as ell as distribution o

    $ycles" *P4 /toves and /e ing %achines to the Tsunami a ected amilies. Dhile the #/D

    !ept a stoc! o the edible:household items supplied but no /toc! +egisters or the cycles"stoves and se ing machines ere maintained though maintenance o the /toc! +egisters is

    mandatory as per 48+s. As a result it could not be ascertained i all the cycles" stoves and

    se ing machines received by them ere actually distributed to the targetted bene iciaries.

    8urther" it as also seen that on the closure o the relie camps" a huge ,uantity o the unused

    edible:household items ere handed over by the #/D to the o ice o the #eputy

    $ommissioner" Andaman but the same as not ta!en into stoc! by them. Thus" it as not

    ascertainable i such items had actually been utilised :distributed.

    ( ) A $entral /tore in the #eputy $ommissioner" Andaman7s o ice as established on3. 1. or storing relie materials be ore their distribution to relie camps in and around

    Port ?lair. %aterials received rom various N4@s and 4odo n ere !ept in the store.

    /crutiny o the store records also revealed that 2 items o stoc!" received by the store

    bet een 9. 1. and 6. 6. and accounted or in bundles" bo=es" cartons etc ere

    lying in stoc! as o @ctober . @ut o these" 3> cartons and 5 jars o mineral ater had

  • 7/24/2019 Draft Report on Performance Audit.doc

    30/70

  • 7/24/2019 Draft Report on Performance Audit.doc

    31/70

    (b) @ut o the above-mentioned purchases o +s 9 .15 la!h" purchases orth +s 2 .>9 la!h

    constituting 9 .52 per cent o the purchases ere made ithout observance o codal

    ormalities as prescribed under the 4eneral 8inancial +ules" hich as highly irregular.

    (c) @rders or supplies orth +s 2.6 la!h to Tsunami a ected schools ere placed directly

    on one supplier in %arch " on the basis o rates accepted by other departments o the

    Administration instead o calling or ,uotations: tenders. The supplier" ho ever" supplied

    articles orth +s 1.>5 la!h only and gave an underta!ing that the remaining items ould be

    supplied by 31st %arch7 " on the basis o hich the #irectorate processed the bills and

    the che,ues thereagainst ere also issued by the Pay and Accounts @ ice ithout actual

    receipt o the goods. The #irectorate ho ever did not issue the che,ues or the remaining

    amount o +s .66 la!h hich have become time-barred and are lying ith the #irectorate

    as the articles are yet to be received even a ter a lapse o 1 months rom the date o

    placement o supply orders. The processing o bills and issue o che,ues thereagainst ithout

    actual receipt o the materials as highly irregular and in contravention o the prescribed

    procedures.

    ?. 0n the post-Tsunami period" the Blectricity #epartment (#epartment) procured #4 /ets

    and various Transmission and #istribution (TC#) materials or restoration o po er supply and

    other rehabilitation measures in AN0. /crutiny o such purchases made by the #epartment

    revealed the ollo ing shortcomingsH-

    a) 0n order to procure 2 M

  • 7/24/2019 Draft Report on Performance Audit.doc

    32/70

    8irm A or the purchase committee had rejected their bid. As a result" the order orth +s >6. 9

    la!h as placed by comparing only t o bids" hich as in violation o the 4eneral 8inancial

    +ules. No proposal or re-tendering due to ant o minimum bids as ound on record.

    b) The #epartment procured 1> 4ensets at a cost o +s 16 . 2 la!h or

    relie and rehabilitation operations. These gensets ere distributed mainly in relie camps and

    government departments. @n closure o the camps the gensets ere retained by the village

    $aptains and the government departments. 0t as ordered in Fuly by the Administration

    that the gensets issued to various captains and to the departments may be ta!en bac! and !ept

    in bu er stoc! or uture use. 0n case" the government department intended to retain the

    gensets" the cost thereo may be recovered rom them. o ever" till date" neither the gensets

    have been ta!en bac! rom the village captains and government departments nor their cost

    recovered.

    c) 0n connection ith restoration o damaged po er supply in rastructure in the Tsunami

    a ected Areas" 2 #4 /ets orth +s 1.13 crore and TC# %aterials orth +s 6.95 crore ere

    procured through National Thermal Po er $orporation *td.(NTP$) and Po er 4rid

    $orporation o 0ndia *td.(P4$0*) respectively. As the e=penditure sanction or the cost o the

    above materials as not ithin the po ers o on7ble *ieutenant 4overnor" a proposal as

    sent to the %inistry o Po er in November or according administrative approval and

    e=penditure sanction or the above purchases. o ever" e=penditure sanction o +s 5.59

    crore as sought or though the materials valued +s 5.51 crore only. 8urther" it as noticed

    that be ore see!ing such sanction" an amount o +s .5 crore had already been paid to

    P4$0* in @ctober as part payment against the above purchases. 0n addition" an amounto +s .96 crore as also released to NTP$ in Fanuary 9 ithout a aiting the e=penditure

    sanction o the %inistry o Po er.

    d) As mentioned above" the TC# items ere procured rom P4$0* or

    immediate restoration o damaged po er supply in rastructure. o ever" e=amination o

    store records o the #epartment revealed that items ere purchased ithout proper

    assessment o the actual re,uirement. A e illustrative cases are given belo H-

    (i) TC# items orth +s 1.61 la!h ere lying unutilised or

    periods ranging rom 5 to > months.(ii) 0t as seen that 2. 2 !m o Aerial ?unched $able I 3 core

    s, mm O s, mm as purchased in the post Tsunami period but only 6. 5 !m

    as issued till 31. 1. 9 leaving a balance o 9.616 !m orth +s 12.53 la!h lying in

    stoc! or a period in e=cess o nine months. The balance stoc! constituted 2>. per

    cent o the procurement.

  • 7/24/2019 Draft Report on Performance Audit.doc

    33/70

    (iii) 0n Fanuary " the #epartment procured nos. o 93

  • 7/24/2019 Draft Report on Performance Audit.doc

    34/70

    3.3.9 The norms prescribed or assistance to ishermen a ected by Tsunami ere issued under % A

    circular 8. No. 3 -1: -N#%.0 dated 2. . . The Administration approached the % A in

    %arch or modi ications in the assistance pac!ages or ishermen hich as duly approved

    by the % A in April . /crutiny o the records o the #irectorate o 8isheries revealed the

    ollo ingH-

    (i) The #irectorate o 8isheries had identi ied 16 3 cases o ishermen a ected by Tsunami" out o

    hich 19 5 ishermen ere made advance payment o subsidy K +s 1 " :- per bene iciary"

    though there ere no norms or such advance payment o assistance.

    (ii) As per % A circular mentioned above" the time limit or grant o subsidy assistance to ishermen

    as 1 days hereas in cases o grant o subsidy as ell as ban! loan" the time limit as 3 days.

    o ever" it is seen that till the end o November " out o 16 3 a ected ishermen" only 519

    cases o assistance have been settled hich translates into only 26.> per cent achievement

    despite a lapse o nearly one year rom the disaster.

    (iii) @ut o the pac!age o +s 1. crore allocated or AN0" amounts o +s 1.6 crore and +s 1>.3

    crore ere allotted to the #irectorate o 8isheries under the % - 2 during the years 2-

    and - 9 respectively or implementation o the various assistance pac!ages or a ected

    ishermen. An amount o +s 3.6 crore has been utilised or providing assistance to ishermen till

    November " hich constitutes only 16.51 percent o the allocation. #ue to such poor

    utilisation o unds" the #irectorate o 8isheries has surrendered an amount o +s 9.9 crore in

    #ecember being 31. > percent o the total pac!age.

    0t is evident rom the acts above thatH-a) The physical and inancial achievement in implementation o the assistance

    pac!age as very poor and the #irectorate as also unable to utilise the unds

    allocated.

    b) The norms prescribed or assistance to ishermen

    ere not strictly adhered to.

    3.3.6 0n the post-Tsunami period" 15 local" 2 national and 6 international N4@s had contributed in

    various relie and rehabilitation measures such as supplying relie materials" development o social in rastructure" providing counseling and cash assistance etc.

    A coordination committee o the N4@s ith #irector (/ocial Del are) as the $hairman

    as constituted in 5. 1. ith a vie to acilitate inter ace and synergies bet een the

    4overnment and the N4@s so as to e ectively implement the relie and rehabilitation or! as

    ell as to avoid the duplication o e orts. Dhile no screening o the N4@s as made" it as

  • 7/24/2019 Draft Report on Performance Audit.doc

    35/70

    stipulated that oreign N4@s not registered in 0ndia ould have to obtain clearance rom the

    4overnment o 0ndia. /crutiny o records relating to relie : rehabilitation measures underta!en by

    the N4@s revealed the ollo ingH -

    a) All the N4@s had supplied various relie and rehabilitation materials" hich could not

    either be ,uanti ied or their value ascertained" as the same ere not segregated rom the relie

    materials purchased by the 4overnment. #ue to lac! o e ective coordination bet een the

    4overnment and the N4@s" the Administration procured relie and rehabilitation material ar

    in e=cess o re,uirement ithout ta!ing into account the materials being provided by the

    N4@s. As a result" huge ,uantity o relie : rehabilitation items ere lying in $entral 4odo n

    at addo as on 31.1 . " i.e." even a ter a lapse o one year rom the Tsunami disaster.

    b) 0n the Tsunami disaster 26 schools ere ashed out

    hile 35 schools ere damaged in AN0. @ut o schools decided by the Administration to

    be reconstructed" the N4@s signed %o s or construction o 21 schools. 0n /eptember "

    the $hie /ecretary re,uested the N4@s to speed up the pace o construction or! so that

    they may be completed by 3 .11. . o ever" it is seen that only 1 schools have been

    completed by one N4@" hich constitutes >. 6 per cent o the targetted number"

    construction o 9 schools ere in progress and 3 schools ere yet to be started. The

    remaining 11 schools" hich ere to be unded rom +ajiv 4andhi National +elie C Del are

    Trust" %P*A# and Punjab $hie %inister7s +elie 8und" ere also yet to be started.

    3.3.5 An 0nventory Audit team as constituted by the Administration in %ay to conduct the

    0nventory Audit o +elie C +ehabilitation materials received and issued in the a!e o Post-Tsunami @peration. The 0nventory Audit team chec!ed the records relating to the materials

    received upto 31. 6. and concluded that reconciliation o records as re,uired.

    3.3.> 0n #ecember " a Public 0nterest *itigation as iled be ore the on7ble igh $ourt" $alcutta

    $ircuit ?ench at Port ?lair regarding de iciencies on the part o the Administration to provide

    ade,uate e=-gratia : compensation and the post-Tsunami rehabilitation measures. The $ircuit

    ?ench issued an interim order on th #ecember directing the 4overnment o 0ndia and the

    Administration to continue supply o ree rations to the Tsunami disaster victims as it as doingtill 31.1 . .

    Audit" therefore" recommends that !

    a7 Codal formalities should in$ariably be followed in all cases of future procurement and stoc#

    registers'records in respect of materials should also be maintained. Records in respect of

  • 7/24/2019 Draft Report on Performance Audit.doc

    36/70

    materials already recei$ed should be reconstructed after reconciling the %uantities recorded

    in the ships? manifests" 8odown?s stoc# registers" 2ROs stoc# records and 2ector Officers?

    records. Materials procured by the Administration and those donated by the 8Os should

    also be segregated and accounted for separately.

    b7 Either future claims of A &&DCO should be ad1usted against the ad$ance payment of Rs

    :4.44 la#h already paid to them or the same may be reco$ered at the earliest

    c7 As the supplier of the bicycles" M's Ambi#a E ports P$t. +td." +udhiana" had committed to

    assemble the bicycles at Port >lair at their own cost" the irregular payment of Rs B.B4 la#h

    may be reco$ered from the supplier.

    d7 O$erpayments made to CC2 +td. should be reco$ered without further delay.

    e7 Relief funds should not be used for the procurement of items such as mobile phones. E !post

    facto appro$al of the Ministry may be obtained for regularisation of the abo$e procurement.

    /urther" mobile phones pro$ided to ineligible officials should be ta#en bac# and payment of

    call charges stopped immediately .The irregular payments of call charges made in respect of

    ineligible officials may also be reco$ered from such officials.

    f7 &n future" procurement of stores may be made after realistic assessment of the re%uirement so

    as to a$oid idle in$estment of unutilised stores.

    g7 Materials lying in bags" bundles" cartons etc should be opened and articles" which ha$e

    already become time!barred" may be disposed off. Any perishable article should be

    distributed to the people li$ing in intermediate shelters at the earliest before they become

    unusable" particularly in the light of the directions issued by the Circuit >ench of @ol#ata

    *igh Court for continuance of free ration supply beyond 3.34.944:. An Action Plan mayalso be e$ol$ed for fruitful utilisation of all other materials recei$ed for relief'rehabilitation.

    h7 Materials such as Tele$isions" >eds etc" which were distributed to the relief camps may be

    located and ta#en bac# to stoc# and stored properly for future use. 2toc# Registers showing

    the receipt and issue of bicycles" +P8 sto$es and sewing machines may be reconstructed on

    the basis of a$ailable records. 2imilarly" utilisation of the items transferred from D2< to the

    O'o the Deputy Commissioner 6Andaman7 may also be ascertained and #ept on record.

    i7 The gensets distributed to $arious islands may be ta#en bac# from the $illage captains'

    departments or their cost reco$ered from them. 17 The entire %uantity of bamboos procured may be fruitfully utilised at the earliest and in

    future assessment of re%uirement may be made on realistic basis to a$oid unfruitful' wasteful

    e penditure and' or procurement in e cess of actual re%uirement.

  • 7/24/2019 Draft Report on Performance Audit.doc

    37/70

    #7 All the tent parts of the : tents" which are yet to be assembled needs to be located and

    stored properly for future use. Tents already distributed and which are now not re%uired for

    relief purpose should also be ta#en bac# to stoc#.

    l7 Against purchases of Rs ;.;3 crore from P8C&+ and TPC" e penditure sanction of the

    Ministry of Power has been sought for Rs ;.;B crore which needs to be reconciled. /urther

    payments to P8C&+ and TPC in respect of the abo$e purchases may be released only after

    receipt of administrati$e appro$al and e penditure sanction of the Ministry of Power and

    after deduction of the amounts already released.

    m7 2ince the awarding of construction wor# to A &&DCO in$ol$es payment of additional liability

    in the form of ser$ice charges' profit margin" the wor#s should be awarded to the

    construction agencies of the 8o$ernment e.g. AP

  • 7/24/2019 Draft Report on Performance Audit.doc

    38/70

    i. The major #ivisions o the APD# engaged in the post-Tsunami activities are located in the

    /outhern 4roup o 0slands and /outh Andaman. The ollo ing activities o the APD # ere

    scrutinised in audit.

    a) Procurement and installation o bailey bridges or immediate repair and renovation o road

    and bridges.

    b) 0nstallation o +everse @smosis (#esalination) Plants and /%$ Tan! under Dater /upply

    /cheme as a %edium Term %easure or restoration o ater supply in di erent islands.

    c) $onstruction o intermediate shelters or Tsunami a ected persons.

    d) $onstruction o oundation o pre abricated structures along ith procurement o

    mechanical parts through #4/C# or restoration o government non-

    residential:residential buildings.

    e) Procurement: receipt o major plant" machineries" e,uipment7s and other stores either

    through direct purchase by APD# or on hire charge basis through % A and their issue to

    the respective units or ultimate utilisation in Tsunami relie or!s.

    ) iring o large e,uipments" machineries rom private parties.

    g) Transportation charges or relie :constructional materials" e,uipments" machineries and

    plants rom mainland to AN0 as ell as transportation ithin the di erent islands.

    ii. The provision o unds vis-J-vis the e=penditure incurred by APD# during

    2- and - 9 (upto #ecember ) are as underQ

    9ear> 200 507 3Rupees in la8h/%ajor ead #escription 8und received B=penditure incurred

    2 I +elie onAccount o Natural$alamities

    8lood and $yclone

    11 >.(consolidated)

    Nil#rin!ing ater supply 2.5+epairs:restoration o damagedroads:buildings

    3.93

    +epair:restoration o damaged 4overnmento ice building

    152.2

    +epairs:restoration todamaged 4ovenmentresidential building

    19 .23

    8or intermediateshelter

    32>.12

    T)TA1 $$7 % 2

    9ear> 2007506 3Rupees in la8h/+a*or #ead Description -und recei'ed ?@penditure

    incurred8lood and $yclone 62 . . >#rin!ing ater supply . 99.32

  • 7/24/2019 Draft Report on Performance Audit.doc

    39/70

    2 I +elie onAccount o Natural$alamities

    +ears:restoration o damagedroads:buildings

    3 . 5 6.9

    +epair:restoration o damaged 4overnmento ice building

    13>>. 922.22

    +epairs:restoration todamaged 4overnmentresidential building

    16 2. 6.9

    8or intermediateshelter

    2>39. 32 .16

    T)TA1 $ 2;;%00

  • 7/24/2019 Draft Report on Performance Audit.doc

    40/70

    $#-000" APD#" Prothrapur 35 1 9 1 .6>P?N#" APD#" Port ?lair 1 5 2 1 > 29. >P?/#" APD#" Port ?lair 15> 1 Nil 195 55.5>/A#" APD#" Port ?lair 11 1 1 Nil .P B#" APD#" Prothrapur 6 1 2 6.12$#" APD#" $ar Nicobar 3> > > 1 . 9$#" APD#" +angat 6> 22 9 > 39.61

    NA$#" APD#"%ayabunder

    23 1> 2 >.3

    $#" APD#" #iglipur 1 15 1 .%0#" APD#" ut ?ay 6 19 3 9 39.11$#" APD#"

  • 7/24/2019 Draft Report on Performance Audit.doc

    41/70

    did not urnish any in ormation on civil or!s" the #ivision at $ampbell ?ay did not urnish

    any o the in ormation though called or. Thus due to absence o proper monitoring" delay in

    ta!ing up o the or!s and delay in inalisation o tendering procedure led to delay in the

    e=ecution o the or!s.

    iv. #ue to devastating Tsunami damages" several lives ere lost and houses

    damaged severely particularly in southern group o islands and in /outh Andaman. As a result"

    several thousands o people ere marooned in these islands" ho ere initially shi ted in the

    relie camps. Administration" subse,uently decided to construct Temporary /helters or their

    immediate accommodation. 8urther" it as decided to construct 0ntermediate /helters instead

    o the Temporary /helters. The li e o these 0ntermediate /helters ere bet een 1 and 2

    months. The a ected amilies ere ultimately to be shi ted to the Permanent /helters to be

    provided by the Administration. The proposed date o commencement o the construction o

    Permanent /helters as @ctober and they ere scheduled to be completed ithin 12

    months. Accordingly" in April " the Administration completed construction o >" 9

    0ntermediate /helters in di erent islands or giving shelters to tribal as ell as non-tribal

    amilies" as detailed belo H

    Name of islands "ntermediatesheltersconstructed

    T!pe of families

    $ar Nicobar 3"599 TribalTeressa" $ho ra C ?amboo!a 5 1 Tribal2 Non-TribalT)TA1 ;,767

    Although" it as subse,uently decided by the Administration to provide incidental

    acilities li!e providing cement concrete looring" approach roads etc." but these have not

    yet been completed. %oreover the incidental civil or!s relating to looring etc. ere to be

    got e=ecuted through labourers rom the tribal amilies. o ever" it could not be veri iedrom records as to hether the said or!s ere actually e=ecuted by the tribals. 8urther"

    construction o Permanent /helters or shi ting the amilies rom the 0ntermediate /helters"

    have not commenced till Fanuary 9. The issue o construction o the Permanent /helters

    is to be decided by the Administration in consultation ith the %inistry o rban

  • 7/24/2019 Draft Report on Performance Audit.doc

    42/70

    #evelopment. Thus" delay on the issue o construction o Permanent /helters has made

    uncertain the shi ting o a ected population presently housed in 0ntermediate /helters.

    v. As per the decision ta!en by the Administration in Fanuary " 1

    desalination plants (reverse osmosis) o 1 litre per hour capacity or desalinisation o

    sea ater" along ith compatible #4 /ets as a compact unit ere to be installed ithin a

    distance o metres rom sea shore. The plants ere to be installed or the bene it o the

    Tsunami a ected amilies in the southern group o islands. %oreover" as per the action

    plan or restoration o ater supply" all the plants ere to be installed ithin > days.

    Accordingly" 1 desalination plants along ith the 2 per cent payment as

    released by $entral 4round Dater ?oard ($4D?) on behal o APD# and balance 1 per

    cent as to be released by Fune or a ter success ul installation and commissioning o

    the plants" hichever as earlier. /ince base or! or all the plants could not be completed

    by APD#" none o the plants could be installed ithin the stipulated period. The $4D?

    stated in Fune that as APD# could not satis y the ormalities to be observed ithin the

    stipulated date" the balance payment ould be released by the $4D? at the ris! and cost o

    APD#" or hich $4D? ould not ta!e responsibility or any uture complication. No

    urther development regarding installation o the plant as on record and all the desalination

    plants ith the #4 /ets had been remaining unused at store at the respective location"

    subjected to ravages o climatic variation in Andaman and Nicobar group o islands. Thus"

    even a ter a lapse o one year" the bene it o e=tending the acility by APD# could not be

    provided to the Tsunami a ected amilies" particularly at the remote locations o southern

    group o islands. Thus" due to post haste decision to procure the desalination plants"

    generating sets and /%$ panel tan!s" be ore inalising the respective location and initial

  • 7/24/2019 Draft Report on Performance Audit.doc

    43/70

    base or!s relating to installation o the plants" APD# could not e=tend the projected

    bene it to the Tsunami a ected people till Fanuary 9" apart rom running the ris! o

    complications or installation o the plants beyond Fune " as per the terms o the contract

    or procurement.

    vi. As per the re,uirements received rom di erent departments in AN0" APD# has

    ta!en up on priority the or! o construction o pre- abricated structures or Agriculture

    #epartment" %edical #epartment" Blectricity #epartment" Police #epartment and Bducation

    #epartment against the unds to be placed ith individual departments under % - 2 " as

    detailed belo H

    Name of the department Number of pre5fabricated structure

    Total

    Blectricity department 131

    2 9Police department 35Agriculture department 26Bducation department 1%edical department 6

    Therea ter" the Police #epartment placed additional re,uirement or 2 structures.

    Thus the total number o pre- abricated structures to be constructed by APD# as 229.

    /tores #ivision" APD#" ho ever" projected the re,uirement o 251 such structures.

    +eason or variation in number o structures re,uired vis-J-vis the projected ,uantity as

    not on record. As o Fanuary 9" the /tores #ivision could supply only 192 structures

    and the remaining materials ere stated to be arriving. The details regarding provision o

    unds placed ith the di erent departments together ith up to date e=penditure incurred

    thereon are not available ith APD#. Though $B" APD# desired completion o

    oundation by November and erection o pre- abricated structures by #ecember

    " the base oundation or!s in none o the islands could be completed till Fanuary

    9" resulting in un-necessary dumping o stores at di erent islands.

    Test chec! o records o %inor 0rrigation #ivision (%0#)" APD# at ut ?ay

    revealed that as per the in ormation urnished by the B=ecutive Bngineer" /tores #ivision"

    APD# at Port ?lair a total o 3> complete set o pre- abricated

    structures have been supplied to the B=ecutive Bngineer" %0#" ut ?ay on 5 th #ecember

    . o ever" the #ivision at ut ?ay received only > complete set o pre- abricated

    structures. The B=ecutive Bngineer" %0#" ut ?ay could not ascertain reason or short

    receipt o 1 complete set o pre- abricated structures. 0n absence o any physical

  • 7/24/2019 Draft Report on Performance Audit.doc

    44/70

    veri ication o the Tsunami relie materials by the /tores #ivision" the actual balance at

    store could not also be reconciled. Thus" cost o 1 Pre- abricated structures valued at +s.

    .3 la!h may become loss to government.

    Apart rom > complete set o pre- abricated structures" the %0# at ut ?ay has also

    received 29 part structure (9 per cent o structures" per cent o 1 structures and

    per cent o 11 structures) as o 31 st Fanuary 9. +eason or supply o part structures o 29

    Pre- abricated structures together ith its value as not on record nor stated by the %0#"

    ut ?ay. The reply urnished by the /tores #ivision did not re lect even any part supply o

    the structures. @nly > pre- abricated structures have been installed by %0# as o 31 st

    Fanuary 9 and none o the balance pre- abricated structures could be installed. All the

    29 partly supplied structures" together ith complete structures have been lying unused

    at stores at ut ?ay. Thus" the purpose or hich the pre- abricated structures have been

    procured by the Administration could also not be achieved.

    vii. @ne bulldoEer orth +s 2.96 la!h as received by the %0# ut ?ay on 3 th %arch

    or utilisation in relie activities. Test chec! o records revealed that only in April

    the bulldoEer as utilised or 6 days and rom %ay to August " it or!ed

    bet een and 1 days respectively per month. /ince /eptember " the bulldoEer

    remained unused at ut ?ay" as there as no re,uisition or it. No attempt as also made by

    the B=ecutive Bngineer" %0# to trans er the bulldoEer to any other units o APD# or its

    gain ul utilisation. Thus" the bulldoEer costing +s 2.96 la!h remained idle or months and

    as sparsely used in the previous months.

    8urther" or Tsunami relie and rehabilitation or!s" the Administration has hired

    earth moving machines" bulldoEers" tractors etc either directly or through the % A or

    utilisation in the e=ecution o or!s. /crutiny o records o the $onstruction #ivision at

    $ar Nicobar revealed that those machines could not be utilised upto optimum level and the

    machines remained idle ithout any or!. The reason or the machines being idle as also

    not recorded in a number o cases. As a result the Administration had to pay e=orbitant hire

    charges amounting to +s. .93 la!h or the period hen the machines remained idle

    bet een %arch and Fanuary 9" e=cluding the orce majure periods.

    viii. 8or replacement:repair o damaged bridges" the /tores #ivision procured 12 bailey

    type bridges at a cost o +s 222.26 la!h and issued to ive di erent #ivisions or installation.

    Accordingly" /tores #ivision APD# issued 12 bailey type bridges" bet een 1> th 8ebruary

    and 3 rd %arch " to ive #ivisions as detailed belo H

  • 7/24/2019 Draft Report on Performance Audit.doc

    45/70

    Di'ision &pan Number

    %0#" ut ?ay 2 7 //1 7 #/+

    9

    $#" $ar Nicobar 1 7 ##+

    $#" $ampbell ?ay 2 7 // 1

    $#" #iglipur 1 7 #/+ 1 7 ##+

    11

    $# 000" Prothrapur 2 7 // 1

    .

    The scrutiny o records at %0#" ut ?ay revealed that although the #ivision

    completed oundation or! o t o 1 7 #/+ bridges at a cost o +s . 3 la!h" the

    #ivision did not receive any 1 7 #/+ bridge but received only si= 2 7 // bailey type

    bridges. Till Fanuary 9" the #ivision could install only 1. number o 2 7 span bridges

    and the balance 2. number o 2 7 span bridges had been remaining unused at store or

    reasons not stated. The oundation or! valued at +s. " 3" >9 could not also be o any

    bene it to the a ected population. Dhile $# 00 installed the bridge at site" $#" #iglipur

    could complete installation o only one 1 7 span bridge but $#" $ar Nicobar could not

    install any o the bridges or reasons not stated. $#" $ampbell ?ay did not urnish any

    in ormation.

    0t ould" thus" emerge that a majority o the bridges have not yet been installed

    de eating the purpose or hich the bridges ere to be erected and installed even a ter a

    lapse o one year rom the date o their procurement.

    i=. There e=ists no system o internal control mechanism either bet een the /tore

    #ivision and other e=ecuting #ivisions o APD# scattered in di erent islands or bet een

    APD# and Administration. No physical veri ication o Tsunami relie " rehabilitation and

    reconstruction materials procured by the /tores #ivision has been conducted or more than

    13 months" since the date o procurement and start o Tsunami relie or!s in Fanuary .

    As a result" reconciliation o bul! o the materials supplied by the /tores #ivision to other