Program Budget Draft March 21st, 2008 FY 2009
Program Budget
DraftMarch 21st,
2008
FY 2009
FY 2009 SANDAG BUDGET
(INCLUDING THE OVERALL WORK PROGRAM)
DRAFT
March 21, 2008
The SANDAG Budget and OWP is scheduled for adoption by the SANDAG Board of Directors on May 23, 2008.
The Overall Work Program (OWP) is designed to meet the comprehensive planning requirements
of the United States Department of Transportation and the California Department of Transportation.
Some of the research in the OWP is to assist others with data gathering and other information for their individual work products and studies. Such efforts are supported with funding from other
public or private agencies. Findings and conclusions of those studies are those of the authors and do not necessarily reflect the official position or policies of SANDAG or its Board of Directors.
401 B Street, Suite 800 San Diego, CA 92101-4231 (619) 699-1900
www.sandag.org
ii
BOARD OF DIRECTORS
The 18 cities and county government are SANDAG serving as the forum for regional decision-making. SANDAG builds consensus; plans, engineers, and builds public transit; makes strategic plans; obtains and allocates
resources; and provides information on a broad range of topics pertinent to the region’s quality of life.
CHAIR Hon. Mary Teresa Sessom
FIRST VICE CHAIR Hon. Lori Holt Pfeiler
SECOND VICE CHAIR Hon. Jerome Stocks
EXECUTIVE DIRECTOR Gary L. Gallegos
CITY OF CARLSBAD Hon. Matt Hall, Councilmember (A) Hon. Bud Lewis, Mayor (A) Hon. Ann Kulchin, Mayor Pro Tem CITY OF CHULA VISTA Hon. Cheryl Cox, Mayor (A) Hon. Jerry Rindone, Deputy Mayor (A) Hon. John McCann, Councilmember CITY OF CORONADO Hon. Phil Monroe, Councilmember (A) Hon. Carrie Downey, Mayor Pro Tem (A) Hon. Al Ovrom, Councilmember CITY OF DEL MAR Hon. Crystal Crawford, Deputy Mayor (A) Hon. David Druker, Mayor (A) Hon. Richard Earnest, Councilmember CITY OF EL CAJON Hon. Mark Lewis, Mayor (A) Hon. Jillian Hanson-Cox, Councilmember CITY OF ENCINITAS Hon. Jerome Stocks, Mayor (A) Hon. Teresa Barth, Councilmember CITY OF ESCONDIDO Hon. Lori Holt Pfeiler, Mayor (A) Hon. Ed Gallo, Councilmember (A) Hon. Sam Abed, Mayor Pro Tem CITY OF IMPERIAL BEACH Hon. Jim Janney, Mayor (A) Hon. Patricia McCoy, Mayor Pro Tem (A) Hon. Mayda Winter, Councilmember CITY OF LA MESA Hon. Art Madrid, Mayor (A) Hon. David Allan, Councilmember (A) Hon. Mark Arapostathis, Councilmember CITY OF LEMON GROVE Hon. Mary Teresa Sessom, Mayor (A) Hon. Jerry Jones, Councilmember (A) Hon. Jerry Selby, Mayor Pro Tem CITY OF NATIONAL CITY Hon. Ron Morrison, Mayor (A) Hon. Frank Parra, Vice Mayor (A) Hon. Louie Natividad, Councilmember CITY OF OCEANSIDE Hon. Jim Wood, Mayor (A) Hon. Jerry Kern, Councilmember (A) Hon. Jack Feller, Councilmember CITY OF POWAY Hon. Mickey Cafagna, Mayor (A) Hon. Robert Emery, Deputy Mayor
(A) Hon. Don Higginson, Councilmember
CITY OF SAN DIEGO Hon. Jerry Sanders, Mayor Hon. Jim Madaffer, Councilmember (A) Hon. Anthony Young, Council President Pro Tem (A) Hon. Scott Peters, Council President CITY OF SAN MARCOS Hon. Jim Desmond, Mayor (A) Hon. Hal Martin, Vice Mayor (A) Hon. Rebecca Jones, Councilmember
CITY OF SANTEEHon. Jack Dale, Councilmember (A) Hon. Hal Ryan, Councilmember (A) Hon. John Minto, Councilmember CITY OF SOLANA BEACH Hon. Lesa Heebner, Councilmember (A) Hon. Dave Roberts, Deputy Mayor (A) Hon. Mike Nichols, Councilmember CITY OF VISTA Hon. Judy Ritter, Councilmember (A) Hon. Bob Campbell, Councilmember (A) Hon. Steve Gronke, Councilmember COUNTY OF SAN DIEGO Hon. Greg Cox, Chairman (A) Hon. Pam Slater-Price, Chair Pro Tem (A) Hon. Ron Roberts, Supervisor Hon. Dianne Jacob, Vice Chairwoman (A) Hon. Bill Horn, Supervisor IMPERIAL COUNTY (Advisory Member) Hon. Victor Carrillo, Supervisor (A) Hon. David Ouzan, Councilmember CALIFORNIA DEPARTMENT OF TRANSPORTATION (Advisory Member) Will Kempton, Director (A) Pedro Orso-Delgado, District 11 Director METROPOLITAN TRANSIT SYSTEM (Advisory Member) Harry Mathis, Chairman (A) Hon. Jerry Rindone, Vice Chairman (A) Hon. Robert Emery, Chair Pro Tem NORTH COUNTY TRANSIT DISTRICT (Advisory Member) Hon. Ed Gallo, Chairman (A) Hon. Jerome Stocks, Planning Committee Chair (A) Hon. Chris Orlando, Monitoring Committee Chair U.S. DEPARTMENT OF DEFENSE (Advisory Member) CAPT Steve Wirsching, USN, CEC, Southwest Division Naval Facilities Engineering Command (A) CAPT Robert Farley, USN, CEC Southwest Division Naval Facilities Engineering Command SAN DIEGO UNIFIED PORT DISTRICT (Advisory Member) Laurie Black, Commissioner (A) Michael Najera, Commissioner SAN DIEGO COUNTY WATER AUTHORITY (Advisory Member) Marilyn Dailey, Commissioner (A) Mark Muir, Commissioner (A) Gary Croucher, Commissioner SOUTHERN CALIFORNIA TRIBAL CHAIRMEN’S ASSOCIATION (Advisory Member) Chairman Robert Smith (Pala), SCTCA Chair (A) Chairman Allen Lawson (San Pasqual) MEXICO (Advisory Member) Hon. Remedios Gómez-Arnau Cónsul General of Mexico
As of March 19, 2008
iii
ABSTRACT
TITLE: FY 2009 SANDAG Budget (including Overall Work Program)
AUTHOR: San Diego Association of Governments (SANDAG)
SUBJECT: The San Diego Region’s Budget and Overall Work Program
DATE: March 21, 2008
LOCAL PLANNING AGENCY: San Diego Association of Governments
SOURCE OF COPIES: San Diego Association of Governments 401 B Street, Suite 800 San Diego, CA 92101
ABSTRACT: The SANDAG Budget and Overall Work Program contains a description of the SANDAG work program on a project-by-project basis for the Fiscal Year 2009, as well as other budget components.
FUNDING: This program is financed with federal funds from the Federal Transit Administration and Federal Highway Administration; state funds from the California Department of Transportation; and transportation sales tax and local funds from SANDAG member jurisdictions.
iv
ACKNOWLEDGEMENTS
The following staff of the San Diego Association of Governments had primary responsibility for the preparation of this document:
Gary L. Gallegos, Executive Director
Diane Eidam, Chief Deputy Executive Director
Renee Wasmund, Director of Finance
Leslie Campbell, Director of Administration
Jack Boda, Director of Mobility Management and Project Implementation
Bob Leiter, Director of Land Use and Transportation Planning
Kurt Kroninger, Director of Technical Services
Virginia Perrett, Business Services Supervisor
Colleen Windsor, Communications Director
Tim Watson, Manager, Program Budgets
Mark Woodall, Principal Research Analyst
Gwen Kruger, Document Processing Specialist
v
TABLE OF CONTENTS
Chapter 1 OVERVIEW
Introduction ...................................................................................................................................... 1-1
Overall Authority.............................................................................................................................. 1-2
Operational....................................................................................................................................... 1-3
FY 2009 Major Integrated Work...................................................................................................... 1-4
Organizational Structure ................................................................................................................. 1-6
Committees and Working Groups................................................................................................... 1-7
Local, State, and Federal Agency Participation.............................................................................. 1-14
Coordination of Work Efforts.......................................................................................................... 1-14
Public Involvement ........................................................................................................................... 1-14
Federal Certification Process............................................................................................................ 1-15
SANDAG Budget and Overall Work Program................................................................................. 1-15
Components of the FY 2009 Budget ............................................................................................... 1-16
Planning Emphasis Areas ................................................................................................................. 1-17
California Planning Emphasis Areas for Fiscal Year 2009 Overall Work Program ....................... 1-17
FY 2009 Revenue and Expenditure Summary................................................................................. 1-19
Chapter 2 DETAILED WORK ELEMENT DESCRIPTIONS
OWP Project Descriptions ................................................................................................................ 2-1
Agency Mandates............................................................................................................................. 2-1
Inter-Agency Commitments............................................................................................................. 2-2
Priorities ............................................................................................................................................ 2-5
Section 1. Implementation
11091 Project Development and Oversight .......................................................................... 2-7 1109203 I-15 Violation Enforcement System Study .................................................................. 2-9 11093 Regional Arterial Management System ..................................................................... 2-11 11095 Traveler Information Service – 511 .............................................................................. 2-13 11102 TransNet Financial Management ............................................................................... 2-15 11103 TransNet Public Information Program ........................................................................ 2-17 11390 Independent Taxpayer Oversight Program ................................................................ 2-20
Section 2. Technical Services
20001 Information Systems Management ............................................................................ 2-21 20002 PC, Internet, and Database Applications .................................................................... 2-23 20003 Transportation Model Application and Development .............................................. 2-25 20004 Census and Product Coordination .............................................................................. 2-27 20005 Demographic and Economic Forecasts ....................................................................... 2-29 20006 Geographic Information Systems Services .................................................................. 2-31 20007 Assistance to Transit Operations and Planning ......................................................... 2-33
vi
TABLE OF CONTENTS (CONT’D)
Chapter 2 DETAILED WORK ELEMENT DESCRIPTIONS (CONT’D)
Section 2. Technical Services (cont’d)
20009 Performance Indicator Data Management ................................................................ 2-35 20011 Regional Economic and Municipal Finance Services ................................................. 2-37 20014 Regional Criminal Justice Research and Clearinghouse ............................................ 2-39 20019 CJ – Youth Evaluation Projects (20019, 41, 46, 47, 54, 57, 59) .................................. 2-41 20026 CJ – Substance Abuse Monitoring .............................................................................. 2-43 20031 Creative Services Program ........................................................................................... 2-44 20036 CJ – Public Health Projects (20023, 36, 38, 39, 58) ..................................................... 2-46 20055 CJ – Adult Criminal Justice Projects (20055, 60) ......................................................... 2-48 21002 I-PLACE3S Modeling for Community Sustainability ................................................... 2-50 21003 Crime Patterns at Transit Stations .............................................................................. 2-52 22001 ARJIS: Maintenance and Support ............................................................................... 2-53 22002 ARJIS: Project Management and Enhancements ....................................................... 2-55 22004 ARJIS: Border Safe III/RISC............................................................................................. 2-57 22005 ARJIS: Enterprise System .............................................................................................. 2-59 22006 ARJIS: SRFERS II Grant .................................................................................................. 2-60 22007 ARJIS: Regional Interoperability and Communications ............................................. 2-62 22009 ARJIS: Domestic Violence Communications Systems ................................................. 2-64 22011 ARJIS: Officer Notification and Smart Alerting System.............................................. 2-66 22012 ARJIS: Tactical Identification System ........................................................................... 2-67 22013 ARJIS: SmartSearch........................................................................................................ 2-69
Section 3. Planning
30002 RCP Planning and Implementation (3000206, 3000207, 3000208)............................ 2-71 30004 Regional Mobility and Transportation Planning ....................................................... 2-76 30008 Nonmotorized Transportation Planning and Project Development (3000801)........ 2-78 30009 Goods Movement Planning ......................................................................................... 2-82 30023 Regional Short-Range Transit Service Planning (3002301, 3002303) ........................ 2-84 30026 Regional Housing and Smart Growth Development ................................................. 2-89 30027 Natural Resource Planning and Coordination ........................................................... 2-91 30028 Regional Shoreline Management (3002801)............................................................... 2-93 30030 Regional Energy Planning (3003001, 3003002) .......................................................... 2-96 30032 Borders Planning and Coordination ........................................................................... 2-100 30039 Subregional Transportation Planning and Coordination ......................................... 2-102 30051 San Diego - Riverside Interregional Partnership – Phase III (3005101)...................... 2-104 30055 San Diego & Arizona Eastern Railway Gateway Feasibility and
Improvements Study ..................................................................................................... 2-108 3006201 Transit Priority Measures Planning Grant ................................................................... 2-110 30063 Implementation of Otay Mesa-Mesa de Otay Binational Corridor Strategic Plan... 2-112
vii
TABLE OF CONTENTS (CONT’D)
Chapter 2 DETAILED WORK ELEMENT DESCRIPTIONS (CONT’D)
Section 3. Planning (cont’d)
30071 State Route 11 and East Otay Mesa Port of Entry Planning ..................................... 2-114 30072 Quality of Life Planning and Funding Strategies ...................................................... 2-116 30073 Regional Multimodal Airport Planning....................................................................... 2-118
Section 4. Programming, Project Monitoring and Oversight
40001 Transit Planning Administration and Coordination (4000101, 03, 06, 07) .............. 2-121 40005 Transportation Funding Administration .................................................................... 2-125 40006 Regional Transportation Improvement Program ...................................................... 2-127 40007 Develop and Enhance Tools for Transportation Performance Monitoring ............. 2-129 40008 Asset Evaluation and Management............................................................................. 2-131
Section 5. Project Development
50003 Encinitas Pedestrian Crossings Study .......................................................................... 2-133 50004 Intermodal Transportation Management System ..................................................... 2-134 50019 SANDAG Rail, Bus Rapid Transit, and Bus Transit Design Criteria ............................ 2-136 50020 Intelligent Transportation System Operations .......................................................... 2-138
Section 6. Systems Management
60001 Transportation Demand Management (6000109) ..................................................... 2-141 60002 I-15 FasTrak® Value Pricing Program .......................................................................... 2-144 60003 Freeway Service Patrol ................................................................................................. 2-146 60004 San Diego Station Car Pilot Program Study – Phases I and II .................................... 2-148 60007 Compass Card Program ................................................................................................ 2-150 60008 San Diego Smart Parking Pilot Project ....................................................................... 2-152 60009 Transit Configuration Management System............................................................... 2-154
Section 7. Program Management and External Relations
70001 Interagency Coordination and OWP Program Management ................................... 2-155 70003 Intergovernmental Review Processing ....................................................................... 2-158 70004 Public Involvement Program ....................................................................................... 2-160 70006 Tribal Government Liaison (7000601) ......................................................................... 2-163 70009 Government Relations ................................................................................................. 2-167 70011 Regional Environmental and Public Facilities Planning and Coordination ............ 2-169 70013 Regional Intelligent Transportation Systems Program Management (7001301) .... 2-171 70018 Marketing Coordination and Implementation .......................................................... 2-174 75000 Service Bureau .............................................................................................................. 2-176 75056 Service Bureau – Border Master Plan........................................................................... 2-178
viii
TABLE OF CONTENTS (CONT’D)
Chapter 3 SOURCE AND APPLICATION OF FUNDS
Overview ........................................................................................................................................... 3-1
Program Revenues (Sources of Funds) ............................................................................................ 3-2
Program Expenditures (Application of Funds) ............................................................................... 3-6
Chapter 4 MULTI-YEAR PROJECTS – FUNDS SOURCES AND APPLICATIONS
List of OWP Work Elements............................................................................................................. 4-1
Chapter 5 PENDING DISCRETIONARY GRANTS
Listing of FY 2009 OWP Work Elements Pending Discretionary Grants ....................................... 5-1
Chapter 6 CERTIFICATIONS/ASSURANCES AND RESOLUTIONS
Statement of Certifications and Assurances................................................................................... 6-1
Resolution ......................................................................................................................................... 6-6
Chapter 7 REGIONALLY SIGNIFICANT TRANSPORTATION PLANNING BY OTHER AGENCIES
Introduction ...................................................................................................................................... 7-1
FY 2008/2009 Planning Activities Within The SANDAG Region – Information Element ............. 7-3
Chapter 8 ADMINISTRATION AND BOARD BUDGETS
Overview ........................................................................................................................................... 8-1
Administration Budget..................................................................................................................... 8-2
Administration Budget Detail ......................................................................................................... 8-3
Board of Directors Budget ............................................................................................................... 8-4
Board Budget Detail......................................................................................................................... 8-5
Chapter 9 CAPITAL BUDGET
Capital Budget Summary Information............................................................................................ 9-1
TransNet Early Action Program ....................................................................................................... 9-7
Major Transit Capital Projects.......................................................................................................... 9-35
Chapter 10 TransNet PROGRAM
TransNet Program Budget ............................................................................................................... 10-1
ix
TABLE OF CONTENTS (CONT’D)
Chapter 11 MEMBER AGENCY ASSESSMENTS
Overview ........................................................................................................................................... 11-1
Member Agency Assessments.......................................................................................................... 11-2
ARJIS Member Assessments and Other Revenue Sources.............................................................. 11-3
ARJIS Ex-Officio Member Assessments............................................................................................ 11-4
Chapter 12 PERSONNEL AND ORGANIZATION STRUCTURE
Organization Charts ......................................................................................................................... 12-1
Personnel Cost Summary.................................................................................................................. 12-3
Authorized Staff by Position ........................................................................................................... 12-4
Position Classification Range Table................................................................................................. 12-6
APPENDICES
Appendix A FY 2009 Contracted Services.................................................................................... A-1
Appendix B Policy Committee Involvement ............................................................................... B-1
Appendix C Glossary..................................................................................................................... C-1
Appendix D Milestones in SANDAG Regional Decision-Making ............................................... D-1
Appendix E RTP Major Projects ................................................................................................... E-1
1-1
INTRODUCTION The 18 cities and county government are SANDAG, the San Diego Association of Governments. This public agency serves as the forum for regional decision-making. SANDAG builds consensus; makes strategic plans; obtains and allocates resources; plans, engineers, and builds public transportation; and provides information on a broad range of topics pertinent to the region’s quality of life. On January 1, 2003, a new state law (California Senate Bill 1703) consolidated all of the roles and responsibilities of SANDAG with many of the transit functions of the Metropolitan Transit Development Board (now Metropolitan Transit System (MTS)) and the North San Diego County Transit Development Board (now North County Transit District (NCTD)). The consolidation allowed SANDAG to assume transit planning, funding allocation, project development, and construction in the San Diego region, in addition to its ongoing transportation responsibilities and other regional roles. SANDAG is governed by a Board of Directors composed of mayors, councilmembers, and county supervisors from each of the region's 19 local governments (with two representatives each from the city of San Diego and the county of San Diego). Voting is based on membership and the population of each jurisdiction, providing for a more accountable and equitable representation of the region’s residents. Supplementing these voting members are advisory representatives from Imperial County, California Department of Transportation (Caltrans), MTS, NCTD, the U.S. Department of Defense, San Diego Unified Port District, San Diego County Water Authority (SDCWA), the Southern California Tribal Chairmen’s Association (SCTCA), and Mexico. The Board of Directors is assisted by a professional staff including planners, engineers, and research specialists. The highest priorities for SANDAG during FY 2009 are:
Transportation Project Implementation – Early delivery of transportation projects, utilizing TransNet and Proposition 1B funds, while aggressively pursuing matching funds, particularly for goods movement projects.
New Border Crossing/State Route (SR) 11 – Preparation of plans and investment strategies to implement third border crossing and connecting highway improvements in East Otay Mesa.
Quality of Life Funding Program – Development of planning strategies, funding strategies, and implementation strategies for regional infrastructure investments in the areas of habitat conservation, water quality, shoreline preservation, public transportation, and other potential infrastructure areas.
Airport Planning – Collaboration with airport authority on implementation of Senate Bill 10 through Air/Rail Network Planning Study and other related planning efforts.
Sustainable Development (Climate Change) Planning – Planning efforts to address energy and the impacts of transportation and land use on greenhouse gas emissions, pursuant to Assembly Bill 32.
Other areas of continued emphasis include: Employing new technologies and methodologies to develop a fully integrated modeling system; implementing sustainable Transportation Demand Management (TDM) programs, utilizing performance measures to ensure effective transportation network management; pursuing innovative financing and joint development of transportation projects; continuing collaborative efforts among SANDAG, Caltrans, and local jurisdictions to address future transportation needs; continuing Interregional Planning efforts between SANDAG, Caltrans, and partner agencies in neighboring counties, Mexico, and tribal nations; and implementing smart growth concepts contained in the RCP.
1-2
SANDAG Board and policy advisory committee meetings provide the public forums and decision points for significant regional issues such as growth, transportation and public transit, environmental management, housing, open space, air quality, energy, fiscal management, economic development, and public safety. SANDAG Directors establish policies, adopt plans, allocate transportation funds, and develop programs to address regional issues. Citizens and representatives from community, civic, environmental, education, business, other special interest groups, and other agencies are involved in the planning and approval process by participating in committees, as well as by attending workshops and public hearings. During the past year, SANDAG continued to make progress in the areas of energy, regional planning, traffic management, regional model development, and public safety collaboration, while continuing to provide regional leadership in the areas of transportation and public transit, housing, open space, and growth management. These interdependent and interrelated responsibilities provide a more streamlined, comprehensive, and coordinated approach without the need to create costly new government. In addition, SANDAG has established a Service Bureau that consolidates the services and expertise formerly offered through the Local Technical Assistance program (for SANDAG member agencies), SourcePoint (for non-member agencies and the public), and Assistance to Transit Operators and Planning (ATOP) under one umbrella. Services include compiling and analyzing demographic and economic information, custom mapping, transportation modeling and analysis projects, and survey design and analysis. The Board of Directors carries out a variety of responsibilities which are either mandated by federal or state law or regulation or delegated to SANDAG through local agreement. Some of the most important designa-tions and most critical responsibilities are listed below. OVERALL AUTHORITY San Diego Regional Consolidated Agency (State)
Senate Bill 1703 created a consolidated agency on January 1, 2003, to strengthen how regional public policy decisions are made. The law mandates membership in the consolidated agency from the area’s 18 cities and county government. It consolidates transit planning, programming, project development, and construction into the new agency, leaving responsibilities for day-to-day operations with the existing transit agencies. Assembly Bill 361 called for the preparation of an RCP. Council of Governments (COG)
This designation provides the public forum for regional decision-making among the area’s 18 incorporated cities and county government, relating to a broad range of topics pertinent to the region’s quality of life. Some of the regional topics include strategic planning, allocation of resources, and the creation of accurate, timely, and useful demographic, economic, transportation, planning, borders, environmental, and public safety information.
Regional Transportation Planning and Funding Allocation Agency (State)
As the Regional Transportation Planning Agency (RTPA), SANDAG adopts the Regional Transportation Plan (RTP – long-range plan) and Regional Transportation Improvement Program ((RTIP) five-year programming of state and federal transportation funds). The agency also allocates Transportation Development Act (TDA) funds (¼ percent sales tax for transportation, approximately $120 million per year).
1-3
Metropolitan Planning Organization (Federal)
This authority allows SANDAG to allocate federal transportation revenues and meet comprehensive planning requirements of the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) in order to be eligible for funds. More than $140 million a year are directly allocated by SANDAG. San Diego County Regional Transportation Commission (State and Voter Approval)
SANDAG is the designated commission and administers the local ½ percent sales tax, TransNet, (approximately $250 million per year) for transportation purposes. Congestion Management Agency (State and Local)
All 18 cities and the county government have designated SANDAG as the Congestion Management Agency responsible for adopting a congestion management plan, overseeing preparation of deficiency plans, and monitoring local agency compliance. Co-lead Agency for Air Quality Planning (Federal and State)
SANDAG and the San Diego County Air Pollution Control Board (APCB) carry out air quality planning mandates and determine conformity of transportation projects with air quality plans. Integrated Waste Management Task Force (State and Local)
SANDAG recommends actions to member agencies regarding the major elements of the state-mandated Integrated Waste Management Plan. Housing (State)
SANDAG determines each jurisdiction’s share of the regional housing needs. Areawide Clearinghouse (Federal and State)
SANDAG reviews projects with regional impacts under California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA). Manages and Administers the North County Multiple Habitat Conservation Program (Local)
Undertaken on behalf of the seven North County cities, SANDAG serves as the policy body for the program. Other (Local)
Regional Criminal Justice Clearinghouse; ARJIS; Regional Census Data Center; Regional Information System development and maintenance; local planning activities pursuant to agreements with U.S. Department of Defense, Caltrans, State Office of Planning and Research, MTS, NCTD, Air Pollution Control District (APCD), SDCWA, San Diego County Regional Airport Authority (SDCRAA), cities and the county, and others; and SourcePoint/Service Bureau.
1-4
OPERATIONAL San Diego County Regional Transportation Commission (State and Voter Approval)
Construct TransNet sales tax highway and public transit projects and fund local street and bicycle projects. Freeway Service Patrol Administration (State and Local)
Provide service for stranded motorists on all major highways in the region. Regional Transportation Demand Management Program Administration (Local)
Provide and administer a regional program (RideLink) consisting of carpool, vanpool, and transit programs, guaranteed ride home, bike locker program, and others. I-15 Congestion Pricing and Transit Development Program (State)
Implement the FasTrak® program to allow single-occupant vehicles in I-15 Managed Lanes for a fee. Fees support additional bus rapid transit services in the corridor. Regional Beach Sand Replenishment Program (Local)
Administer the regional program in coordination with federal, state, and local agencies. FY 2009 MAJOR INTEGRATED WORK
Regional Comprehensive Plan (RCP) On July 23, 2004, SANDAG adopted the RCP for the San Diego region. The RCP provides an overall vision and policy framework for better connecting transportation and land use within our region. A number of activities are underway to implement components of the RCP. A fundamental component of the RCP is the "Smart Growth Concept Map." The map was approved by SANDAG in June 2006 to provide the framework for developing the transportation system in the RTP. In 2008 SANDAG completed a technical update to the Smart Growth Concept Map. The map will be used to determine which projects in the region are eligible for smart growth incentive funding. SANDAG also has assembled a “planning toolbox” that includes visual simulation and sketch planning tools (I-PLACE3S) to assist local jurisdictions in smart growth planning. New planning tools will be developed during FY 2009; these include Smart Growth Design Guidelines and a Smart Growth Trip Generation Rates and Parking Study.
A basic principle in the RCP is that coordinated, regional planning for smart growth development should be encouraged through the use of monetary incentives. In September 2005 SANDAG approved 14 local projects to receive $19 million in funding as part of the agency’s Smart Growth Incentive Program. In August 2006 two additional projects were funded. In 2008 a longer-term smart growth incentive program, totaling $280 million, will be funded through the TransNet Extension. The RCP incorporates performance indicators to track and monitor progress in implementing the plan. Directors accepted the RCP Baseline Report for Performance Monitoring in October 2006 and have approved annual monitoring reports each year as a mechanism to track progress on implementing the RCP. The Regional Planning Committee, Regional Planning Technical Working Group, and the previous Regional Planning Stakeholders Working Group developed a set of 39 performance indicators to monitor the region’s progress toward achieving the plan’s goals and objectives.
1-5
Regional Transportation Plan (RTP) SANDAG continues to implement the $57 billion RTP, known as 2030 San Diego Regional Transportation Plan: Pathways for the Future. The 2007 update of the RTP includes new work focused on its integration with the RCP and the Smart Growth Concept Map to more effectively tackle the regional interrelated issues of land use, housing, and transportation. The vision is to provide more convenient, efficient, and safer travel choices for public transit, private vehicles, ridesharing, walking, biking, and freight. Expansion and/or improvement projects for every major highway in San Diego County are called for in the plan. As part of the RTP update, SANDAG undertook an Independent Transit Planning Review to evaluate the regional transit plan based on best practices in use around the world. Approved by SANDAG in June 2006, the study includes a peer review panel of transit and land use experts who have worked on projects in the United States and Canada. During FY 2009 efforts to implement the RTP will include financial analyses for regional transportation facilities; development of more detailed corridor plans for key regional highway and arterial corridors; completion of the 2008 Congestion Management Program; and the integration of transportation policies into the regional Climate Change Action Plan. TransNet Sales Tax Extended to 2048 In November 2004 67 percent of San Diego County voters approved Proposition A, extending the TransNet ½ percent sales tax for transportation through 2048. The local sales tax extension will generate $14 billion for transportation improvements. In January 2005 SANDAG voted unanimously to approve an aggressive Early Action Program (EAP) to begin implementing a list of high-priority transportation improvements. Even though the TransNet Extension does not take effect until April 2008, through a revenue bond program, projects already are underway.EAP projects include Interstates (I-)5, 15, and 805; State Routes (SR) 76 and 52; the SPRINTER; the Mid-Coast Corridor Transit Project (Trolley extension); the SuperLoop Transit Project to help stem growing traffic congestion; and upgrades to stations and vehicles serving the Trolley’s Blue and Orange Lines. Progress also is being made on the Environmental Mitigation Program and the Smart Growth Incentive Program. The public continues to monitor progress on TransNet projects through the interactive TransNet Dashboard Web site.
TransNet Independent Taxpayer Oversight Committee (ITOC) The ITOC, tasked with monitoring and evaluating SANDAG management of the $14 billion TransNet extension, is operating in high gear and meets on a monthly basis. The ITOC has published annual reports about the TransNet program and its performance since October 2006. Beginning in 2008, the ITOC assumed responsibility for annual independent audits. Future annual reports will include results, findings, and recommendations coming out of the annual fiscal audit process.
Partnering with Our Neighbors The SANDAG Borders Committee continues its commitment to enhance borders planning through several initiatives underway among San Diego, Riverside, Imperial, and Orange Counties, as well as local tribal governments and Baja California, Mexico. The I-15 Interregional Partnership (IRP) is a voluntary partnership among elected officials representing communities along I-15 to address housing, transportation, and economic issues along the corridor. SANDAG, the Western Riverside Council of Governments (WRCOG), and partner agencies are working to address the imbalance between jobs and housing that has caused increasing traffic congestion between San Diego and Riverside Counties.
1-6
As of January 1, 2007, a representative from the SCTCA serves as an advisory member on the SANDAG Board of Directors, and Transportation, Regional Planning, Public Safety, and Borders Committees. The decision to include representatives of this intertribal council as advisory members on the SANDAG Board and its policy committees strengthens the growing cooperation and collaboration among the region’s jurisdictions and tribal governments.
511 Advanced Traveler Information System Since its launch in February 2007, the 511 free telephone and Web-based service that provides commuters with up-to-the-minute freeway driving times, traffic maps, toll rates, transit route and rideshare information, roadside assistance, and much more has received over one million calls and Web site hits. The service stems from a collaborative partnership among SANDAG, Caltrans, MTS, NCTD, and the San Diego County Service Authority for Freeway Emergencies (San Diego SAFE). SANDAG will work closely with its partners to expand and improve the robust 511 service. Environmental Resource Planning The Environmental Mitigation Program is being implemented as part of the TransNet Extension Ordinance and Expenditure Plan. This effort includes: (1) administering the “Transportation Project Mitigation Fund” for direct mitigation, management, and monitoring of habitat impacts of qualifying regional and local transportation projects; (2) administering the “Regional Habitat Conservation Fund” for regional habitat acquisition, management, and monitoring activities to implement the Multiple Species Conservation Program (MSCP) and the Multiple Habitat Conservation Program (MHCP); (3) providing staff support to a regional entity or entities to allocate and coordinate mitigation and conservation funds for land acquisition, habitat management, and biological monitoring; (4) pursuing subarea plan amendments and take permits for 2030 RTP projects pursuant to MSCP and MHCP standards; and (5) developing guidelines for expedited processing of take permits.
ARJIS Enterprise System ARJIS is a complex criminal justice enterprise network that supports 74 justice agencies representing local, state, and federal government within San Diego and Imperial Counties. Chartered with supporting a regional Web-based secure network that contains the region’s crime data (including cases, arrests, citations, field interviews, traffic accidents, fraudulent documents, photographs, gang information, and stolen property), more than 11,000 officers, investigators, and analysts use ARJIS each day. SANDAG and ARJIS have initiated the development of Enterprise ARJIS. Initial efforts focus on: (1) documenting and prioritizing user requirements; (2) documenting the existing technical framework; (3) exploring enterprise solutions; (4) developing project plan and timeline; (5) conducting a privacy and security assessment; and (6) securing a vendor to develop the software program. SANDAG approved a regional interoperability and communications framework to improve coordination and interoperability among public safety agencies in the county. Key successes include wireless access to public safety information from the field, an enhanced publicly accessible crime mapping system, and bringing more than $2 million in additional resources into the region.
1-7
ORGANIZATIONAL STRUCTURE The SANDAG Board of Directors is the governing body responsible for establishing all of the agency’s policies and programs. Directors are elected officials — either a mayor, city councilmember, or county supervisor — selected by their peers from each of the region’s 18 incorporated cities and the county government. Voting is based upon both membership and the population of each jurisdiction, providing for a more accountable and equitable representation of the region’s residents. Representatives from Imperial County, Caltrans, the U.S. Department of Defense, the San Diego Unified Port District, the SDCWA, MTS, NCTD, SCTCA, and the Consul General from Mexico serve on the Board as non-voting, advisory members.
The weighted vote distribution (as of July 2007) is:
Carlsbad 3 Escondido 5 Poway 2
Chula Vista 7 Imperial Beach 1 San Marcos 2
Coronado 1 La Mesa 2 Santee 2
County of San Diego 16 Lemon Grove 1 Solana Beach 1
Del Mar 1 National City 2 Vista 3
El Cajon 3 Oceanside 6 San Diego 40
Encinitas 2
COMMITTEES AND WORKING GROUPS SANDAG is continually evolving its policy advisory committee structure and working groups to provide for more opportunities for public involvement. SANDAG has five policy advisory committees. The committees are described below. In general, these committees make policy recommendations to the full SANDAG Board of Directors.
All of the agency’s other involved groups fall into the category of “working groups.” Interested individuals and organization representatives on the working groups offer their suggestions, advice, and work products to a particular policy committee for the elected officials’ review. The policy committees then, in turn, can offer policy recommendations to the SANDAG Board of Directors. However, this process does not preclude a working group representative or individual member from offering public testimony directly to the SANDAG Board of Directors during the monthly meetings.
Some existing working groups operate under either a “committee,” “council,” or “task force” label because that is how they are known to the public with which they work and serve. SANDAG continues to evolve and enhance its public participation process and actively seeks ways to improve opportunities for individuals and organizations to become involved in our regional work. Information on all SANDAG committees and working groups can be found at www.sandag.org/committees. Flow charts depicting committee structure and function follow on pages 9 – 12.
1-8
SANDAG has established five policy committees, with elected officials serving on one or more of the following, along with other designated representatives: Executive Committee
This six-member committee develops the monthly SANDAG Board of Directors agendas, reviews budgets and legislative proposals, and gives staff policy direction in preparing items for Board consideration. Transportation Committee
This nine-member committee advises the Board on transportation-related policy matters, including TransNet project decisions, consolidated transportation responsibilities, and the implementation of the RTP. Regional Planning Committee
This six-member committee provides oversight for implementation of the RCP, including regional infrastructure financing strategies, advises the Board on regional planning policies, and helps to direct public outreach efforts. Borders Committee
This seven-member committee engages in oversight of planning and programming activities that affect the San Diego region’s borders with Orange, Riverside, and Imperial Counties, Tribal governments, and Mexico. Public Safety Committee
This 20-member committee (15 voting, 5 advisory) provides oversight and advice to SANDAG on public safety issues relating to the functions of ARJIS and the Criminal Justice Division. The goals of this committee include improving the quality of life in the region by promoting public safety and justice through collaboration, information-sharing, effective interoperable technology, and objective monitoring and assessment. The SANDAG Staff
Staff support the Board of Directors, policy advisory committees, and working groups by organizing functions into the Executive Office and into the following five departments: Administration, Finance, Technical Services, Land Use and Transportation Planning, and Mobility Management and Project Implementation.
1-9
Committee Structure
SANDAG Board of Directors
Makes regional public policy
Executive Committee
Transportation Committee
Regional Planning
Committee
Borders Committee
Public Safety Committee
Sets agenda; oversight for budget and work
program; reviews grant applications; makes recommend-ations on legislative
proposals and agency policies
Policy recommendations on
planning and programming; strong
focus and commit-ment to meet public
transit needs
Policy recommendations
on Regional Comprehensive Plan
development and implementation
Policy recommendations on
binational, inter-regional, and tribal
programs and projects
Policy recommendations to enhance public safety
and thwart crime
1-10
Bicycle-Pedestrian Advisory Working GroupCities/County Transportation Advisory CommitteeRegional Transit Fare Structure Task ForceRegional Transit Planning Working Group
San Diego Region Conformity Working GroupSan Diego Regional Traffic Engineers’ CouncilSocial Services Transportation Advisory CouncilTransit Access Advisory Committee
STA
ND
ING
ELE
CTE
D O
FFIC
IALS
Board of Directors
Transportation Committee
Bayshore Bikeway Working Group
1-11
AD
HO
CELE
CTE
D O
FFIC
IALS Board of Directors
Regional Planning Committee
Regional PlanningStakeholders
Working Group
Shoreline Preservation
Working Group
Regional HousingWorking Group
Regional EnergyWorking Group
Smart Growth Urban Design Guidelines
Ad Hoc Working Group
Environmental Mitigation Program
Working Group
SPRINTERSmart Growth
Working Group
1-12
AD
HO
CSTA
ND
ING
ELE
CTE
DO
FFIC
IALS
Committee onBinational Regional
Opportunities
Board of Directors
Borders Committee
I-15Interregional PartnershipJoint Policy Committee
STA
ND
ING Chief’s/Sheriff’s
Management Committee
Board of Directors
Public Safety Committee
ELE
CTE
DO
FFIC
IALS
ARJIS
Business Working GroupTechnical Working Group
Enterprise Core Working GroupCrime Analysis Working Group
AD
HO
CSTA
ND
ING
ELE
CTE
DO
FFIC
IALS
Committee onBinational Regional
Opportunities
Board of Directors
Borders Committee
I-15Interregional PartnershipJoint Policy Committee
AD
HO
CSTA
ND
ING
ELE
CTE
DO
FFIC
IALS
Committee onBinational Regional
Opportunities
Committee onBinational Regional
Opportunities
Board of Directors
Borders Committee
I-15Interregional PartnershipJoint Policy Committee
STA
ND
ING Chief’s/Sheriff’s
Management Committee
Board of Directors
Public Safety Committee
ELE
CTE
DO
FFIC
IALS
ARJIS
Business Working GroupTechnical Working Group
Enterprise Core Working GroupCrime Analysis Working Group
STA
ND
ING Chief’s/Sheriff’s
Management CommitteeChief’s/Sheriff’s
Management Committee
Board of Directors
Public Safety Committee
ELE
CTE
DO
FFIC
IALS
ARJIS
Business Working GroupTechnical Working Group
Enterprise Core Working GroupCrime Analysis Working Group
Interagency TechnicalWorking Group on
Tribal Transportation Issues
Interagency TechnicalWorking Group on
Tribal Transportation Issues
1-13
LOCAL, STATE, TRIBAL, AND FEDERAL AGENCY PARTICIPATION SANDAG recognizes the value of direct work participation by local, state, and federal agency staff. One of the ways to accomplish this is to have agency staff work together on various programs. This direct involvement means better coordination and assurance of the best local technical expertise available. It also results in plans which more accurately reflect local needs and foster support when completed. As just described, many of the work element described in this Program Budget and Overall Work Program (OWP) utilize working groups and task forces composed of citizens, special interest groups, and community organizations with federal, state, and local staff participation.
COORDINATION OF WORK EFFORTS Agency consultation, cooperation, and coordination with major federal, state, Tribal, and regional work efforts are carried out primarily through the areawide clearinghouse responsibilities. The Governor has designated SANDAG as the sole federal and state grant clearinghouse for the San Diego region.
Through working agreements with federal, state, and local agencies, the consolidated agency and its member local governments have the opportunity to measure the consistency of individual agency plans and programs with affected local plans and programs.
Establishment of memoranda of agreement (MOA) allows for specific agreements among SANDAG and other major areawide agencies. MOAs are presently in force in the San Diego region for a wide variety of functions and are designed to complement areawide programs and projects through:
• Organizational and procedural arrangements for coordinating activities, procedures for joint reviews of projected activities, policies, and information exchange;
• Cooperative arrangements for sharing resources (funds, personnel, facilities, and services); and
• Agreed-upon database, statistics, and projections (social, economic, demographic) as the basis for which planning in the area will proceed.
PUBLIC INVOLVEMENT The SANDAG regional work program is based upon the premise that “the goals for planning originate with the people.” SANDAG uses a mix of committees, working groups, public hearings, workshops, attitude surveys, Web-based information, and publications to inform, gauge, and respond to public concerns regarding regional issues. The direct involvement of citizens and organizations that all segments of the population – including ethnic, racial, elderly, disabled, disadvantaged, and low-income groups, and consultation with American Tribal Governments – is encouraged to ensure that plans and programs reflect the diverse interests within the region.
SANDAG also communicates with citizens and groups through the local news media, agency publications, and special presentations. Newsletters, report summaries, and news releases are used to present technical and policy issues in plain terms to a broad audience. Through the SANDAG Speakers Bureau, staff members regularly make presentations on specific issues to local community, civic, and business groups. During the past fiscal year, staff made hundreds of presentations. Additional information on individual topics and copies of full reports are made available on request through the agency’s Public Information Office or via the SANDAG Web site at www.sandag.org.
1-14
FEDERAL CERTIFICATION PROCESS Federal urban transportation planning regulations require that SANDAG annually certify that its planning process is being carried out in conformance with all applicable federal requirements. In essence, the certification finding is based upon five factors. The agency must be officially designated as the metropolitan planning organization (MPO) for the San Diego region..1 SANDAG must have an adopted RTP,1 RTIP,1 and OWP1 which meet the necessary federal requirements. Finally, the RTP and RTIP must be found to be consistent with the regionally adopted air quality plan.2
As the basis for determining the adequacy of compliance, SANDAG provides to Caltrans and maintains on file, copies of the appropriate documents and endorsements. Annually, as a part of the Program Budget and OWP adoption process, the Board of Directors makes the required certification finding, which is transmitted to Caltrans, the Federal Highway Administration (FHWA), and the Federal Transit Administration (FTA). Caltrans notifies SANDAG if there are any deficiencies in the planning process which would result in conditional certification. In such a case, the corrective actions and the date by which they must be taken are specified in an agreement between SANDAG and Caltrans. SANDAG PROGRAM BUDGET AND OVERALL WORK PROGRAM The SANDAG Program Budget is a comprehensive financial summary of all of the activities of the organization. The Capital Improvement Program is a component of the Program Budget, directly resulting from the state legislation that made SANDAG the responsible agency for regional transit facilities. The TransNet program itemizes the funds that SANDAG manages as the administrator of TransNet funds for local roads, highways, and transit improvements. Other components detailed in this document include the Administrative Budget, the Board of Directors Budget, and Member Agency Assessments. The OWP is an inventory of the work which will be accomplished during the fiscal year (July 1, 2008 through June 30, 2009). It provides the list of jobs to be done in the region, which conforms to state and federal requirements, and is considered necessary by locally elected officials and the citizens they represent. To ensure that planning efforts are focused on the right areas, the SANDAG Executive Committee confirmed the following strategic goals, to which each work element was matched:
1. Improve mobility by providing better public transportation services and implementing TransNet EAP projects, TDM, and traveler information services.
2. Encourage quality of life improvements, as characterized by a strong economy, healthy environment, public safety, and more housing choices, consistent with the RCP strategic initiatives and other mandates.
3. Enhance organizational effectiveness, both internally and externally through continuous improvements.
The OWP includes a summary of local, state, and federal funding sources to support these work efforts. In addition, it reflects consideration of the regional goals and objectives to be accomplished during the next two decades and beyond.
1 23 U.S.C. 134, 49 U.S.C. 1607.
2 Sec. 174 and 176(c) and (d) of the Clean Air Act.
1-15
How Does SANDAG Use The OWP As A Management Tool?
Because the OWP outlines the proposed work activities, it serves as a management tool for policy advisory committees, working groups, and staff. It provides local and state agencies a focal point for improving regional coordination and reducing duplication of work efforts at all levels. As part of the process, SANDAG will monitor its effectiveness in achieving the objectives outlined in the OWP. By developing and updating the OWP annually, SANDAG improves its ability to identify the needs of the region and the specific programs to meet those needs. How Do Citizens, Policymakers, And Other Officials Use The OWP?
The adopted OWP becomes a blueprint of those agreed-upon regional programs and projects to be conducted during the fiscal year. It is the reference used by citizens, elected officials, and planners throughout the year to understand SANDAG objectives and how they will be met through the regional comprehensive planning program. How Can You Obtain A Copy Of The OWP And Budget Document?
Citizens, civic leaders, business people, elected officials, and public agency staff can obtain a copy or any section of the OWP and Budget at www.sandag.org/owp or by calling the Public Information Office at (619) 699-1950. The SANDAG Web site includes: a brief summary of the agency’s functions and its history; the current list of Board of Directors and the agencies they represent; directions on how to get to the downtown San Diego office; a publications list; transportation service information (511 and RideLink); transportation, regional planning, and public safety information about SANDAG interregional planning efforts and regional information systems; and information about the SANDAG Service Bureau. There is up-to-date information concerning meeting agendas, requests for consultant proposals, public workshops, and any job openings at the agency. SANDAG publications and reports and most of SANDAG demographic and economic databases (Data and Profile Warehouse), along with our geographic information system layers and interactive mapping applications, can be accessed from our Web site. COMPONENTS OF THE FY 2009 BUDGET Overall Work Program – The Overall Work Program documents all regional planning and program management efforts eligible for federal, state, and local planning funds.
Administrative Budget – The indirect administrative expense budget provides for the general services necessary to produce the following programs and activities:
Board Budget – Budgeted expenses relating to the Board of Directors’ functions.
Capital Program – As the consolidated transportation agency, transit-related regional capital improvements are programmed, funded, and constructed through SANDAG.
TransNet Program – As regional administrator of TransNet funds, this program manages and administers funding for local roads, highways, and transit improvements.
Member Agency Assessments – As members of SANDAG, the 18 cities and county government are assessed a fee according to population as a means to fund the Board expenses, criminal justice reporting, and other regional planning efforts.
1-16
PLANNING EMPHASIS AREAS (PEAS) The FTA and the FHWA have identified key provisions in SAFETEA-LU, the most recently enacted federal transportation law. SANDAG staff has incorporated these additional provisions and areas of emphasis into upcoming transportation planning efforts where federal funding is involved. For both the long-range RTP (OWP work element 30004) and the five-year RTIP (OWP work element 40006), due consideration has been given to adhere to the new areas of emphasis identified in the legislation, including:
Planning factors for metropolitan transportation planning, with particular attention to promoting consistency between plans, as well as expanded environmental, safety, and security features;
Using inflation rates for project cost estimates and thorough documentation of systems operations and maintenance costs in the next RTIP;
Enhanced consultation process that will be sure to include federal, state and tribal land management, wildlife, and regulatory agencies;
Revisions to the congestion management process requirements; and
Development of a more-extensive public participation plan for comment on transportation plans. CALIFORNIA PLANNING EMPHASIS AREAS FOR FISCAL YEAR 2009 OVERALL WORK PROGRAM 1. Financial Planning
Consistent with federal and state law, the SANDAG long-range RTP includes a revenue-constrained financial scenario. The 2030 RTP update was completed in late 2007 and contains the required financially constrained plan, which totals approximately $40 billion. In addition, the SANDAG short-range RTIP is fiscally constrained pursuant with federal and state laws. In addition, SANDAG continues to work closely with Caltrans, FHWA and FTA representatives to be sure existing and future plans are consistent with emerging financial planning guidelines, including:
• Annual Revenues – Provide a consistent methodology for the determination of appropriate annual revenue sources and forecasting techniques as part of the programming process.
• Cost Estimation – work with the FHWA Resource center’s framework for developing and managing cost estimates during the planning and programming phases of project development.
• Operations and Maintenance costs will be developed and updated throughout a project’s expected operation period.
2. Congestion
State says: mitigating congestion is a topic that cannot be ignored. The planning process also mandates that MPOs shall include operations and management strategies to relieve congestion in their transportation plans, In your OWP, please include work program elements that address these issues and be prepared to provide additional detail on the topic during the annual meeting. SANDAG is working with its member cities, county government, transit operators, Caltrans, and the FHWA on developing a comprehensive ITS program. The overall program will be governed by the region’s new strategic plan, which will focus on the delivery of mobility services, performance measurement, and sustainable operations. These services will be delivered through creative
1-17
multimodal and public private partnership solutions that address comprehensive management of the regional network, recognizing the dependencies across highways, roads, and transit. SANDAG efforts under this area include OWP work elements: 70013, Regional ITS Program Management; 50020, ITS Operations; 11095, Traveler Information Service - 511; 50004, Intermodal Transportation Management System; 60001, TDM, and 30004, Regional Mobility and Transportation Planning, where the RTP is implemented and analysis is conducted for the annual Congestion Management Program update. The culmination of these efforts places a major emphasis on decreasing congestion through the RTP implementation, decreasing peak time demand through TDM efforts, and increasing the efficiency of the traffic network system through various ITS measures.
3. Performance Measures SANDAG efforts under this area for FY 2009 are included in OWP work elements: 30002, RCP Planning and Implementation; 20009 – Performance Indicator Data Management; and 40007, Develop and Enhance Tools for Transportation Performance Monitoring. The process for monitoring the region’s progress in implementing the RCP is explained in Chapter 8 of the plan. Performance monitoring is mandated by Assembly Bill 361. The objectives of this task in OWP work element 30002, RCP Planning and Implementation, are to: (1) incorporate long-term and short-term targets for indicators that come out of other planning processes, such as the 2007 RTP; (2) collect and analyze data for the second annual performance monitoring report; and (3) publish the report and present it to key stakeholders. In FY 2008 SANDAG released the latest RCP performance monitoring report, which consisted of a baseline and initial targets for selected indicators, using mandates and goals from existing laws or adopted plans OWP work element 20009, Performance Indicator Data Management, combines performance indicator data management for two major subject areas: indicators for the RCP and other regional reports and indicators related to performance of the regional transportation network. The objectives of this work element are to: (1) update and maintain performance monitoring data for the RCP, State of the Commute report, and the Sustainable Competitiveness Index; (2) enhance the Performance Indicator Information System; and (3) research, obtain, and report travel indicators for various modes of transportation, including trip generation rates, traffic counts, travel times, bicycle and pedestrian counts, and a vehicle occupancy surveys. Emphasis in FY 2009 is to: (1) update and document performance indicators; (2) evaluate the data from arterial and transit Performance Monitoring System PeMS (APeMS and TPeMS); and (3) determine how to incorporate those new data sets into the travel time estimates for the RCP Monitoring and State of the Commute reports. The objective of the transportation performance monitoring OWP work element 40007, Develop and Enhance Tools for Transportation Performance Monitoring, for FY 2009 is to continue development of a multimodal freeway and highway PeMS in conjunction with Caltrans and U.C. Berkeley. Emphasis in FY 2009 is to undertake a pilot testing of the multimodal PeMS along key regional arterial and transit route corridors. The pilot testing will focus on integrating the application of the arterial-PeMS and transit-PeMS modules into the PeMS system.
4. Project Listing
SANDAG maintains two key OWP work elements to ensure compliance with the RTIP and to provide financial management of key funding sources. OWP work elements 40005, Transportation Funding Administration, and 40006, RTIP, are central to the fulfillment of sufficient project listing information, including: funding authorizations or project-level conformity determinations; project
1-18
detail information so that compliance with federal requirements can be determined; descriptive material to identify project phases; and determination of funding eligibility and timing of funds relative to project completion. Projects are categorized according to federal and non-federal funding types, and lead as well as co-sponsoring agencies are noted. In addition, efforts are made to create consistency between the TIP, 2030 RTP, and NEPA documents, including air quality conformity analysis.
1-19
SAN DIEGO ASSOCIATION OF GOVERNMENTS
FY 2009 REVENUE AND EXPENDITURE SUMMARY
Line Description OWP Capital TransNet Reserve, Board Total Program Page #Item # Projects Projects Program Exp. & Other Budget Reference
REVENUE SUMMARY
1 Federal Grants $22,281,992 89,971,000 - - $112,252,992 3-42 State Grants 6,048,190 234,994,000 - - 241,042,190 3-53 TransNet Sales Tax Revenue (incl. debt proceeds) 316,381,000 246,012,773 - 562,393,773 10-24 Inter-fund TransNet Transfers 3,039,988 - - 5,691,500 8,731,488 10-15 Transportation Development Act Funds 8,042,586 3,960,000 - 12,002,586 3-46 Member Agency Assessments 2,459,800 - - 191,500 2,651,300 11-17 Other Local Funds 12,789,282 4,859,241 - 17,648,523 3-48 Prepaid Fare Media Sales - - - 36,500,000 36,500,000 See Note #8 below
9 Interest Income - - 1,500,000 - 1,500,000 10-1
TOTAL REVENUES $54,661,838 $650,165,241 $247,512,773 $42,383,000 $994,722,852
EXPENDITURE SUMMARY
10 Direct Personnel Costs $15,253,821 $4,591,391 - - $19,845,212 3-711 Administrative (Indirect) Costs 7,004,178 2,245,559 - - 9,249,737 8-112 Direct Project Costs 31,365,669 643,328,291 - - 674,693,960 3-713 Board Related Functions - - - 383,000 383,000 8-314 Pass Through Expenditures 1,038,170 - - 1,038,17015 TransNet : 10-116 TransNet Admin. Fees to SANDAG - - 2,460,128 - 2,460,128 10-117 TransNet Bicycle Facilities - - 4,920,255 - 4,920,255 10-118 TransNet ITOC - - 323,930 - 323,930 10-119 TransNet Major Corridor - - 101,042,787 - 101,042,787 10-120 TransNet New BRT/Rail Operations - - 19,302,985 - 19,302,985 10-121 TransNet Transit System Improvement - - 39,320,896 - 39,320,896 10-122 TransNet Local System Improvement - - 78,641,792 - 78,641,792 10-123 Other Pass Through - - 1,500,000 42,000,000 43,500,000 3-7, Note #23
TOTAL EXPENDITURES $54,661,838 $650,165,241 $247,512,773 $42,383,000 $994,722,852
Notes to Line Items
1 Multiple grant sources - see Program Revenues, chapter 3.
2 Multiple grant sources - see Program Revenues, chapter 3.
3
3,4 TransNet fund revenue shown at 100% of receipts; not net of interfund transfers, which are itemized on Line #4.
6
8, 23
ACTIVITIES
TransNet is both a funding source and a programmed expenditure on Major Transportation Corridors, New Bus Rapid Transit (BRT) Rail operations, Transit System Improvement, Local Roads System Improvement, and Program Administration.
Member Agency Assessments are the total of member dues resulting from SANDAG membership ($547,426), Criminal Justice Clearinghouse ($200,000), and ARJIS ($1,903,875) = $2,651,300. See chapter 11.
Prepaid Fare Media Sales - SANDAG collects and redistributes the revenue from the sales of regional monthly transit passes (Other Pass Through) back to the various transit agencies based upon actual usage.
ch 2
Detailed Work Element
Descriptions
511— Traffic, Transit, & Travel Information
2-1
OWP PROJECT DESCRIPTIONS
The project descriptions contained in this chapter address the specific planning activities for each work element. Tasks, products, and completion dates are identified to indicate how and when the work element objectives will be accomplished. Progress on each task and product is monitored throughout the year. Percent of effort approximates to the share of budget necessary to accomplish each task. Level of mandate indicates the extent to which each task meets an Agency Mandate, an Inter-agency Commitment, or supports an annual Area of emphasis for FY 2009. The table below explains the abbreviations used for mandates, commitments, and areas of emphasis. The template shown on page 2-6 further describes the meaning of each section of the project descriptions.
Agency Mandates
AQ Co-Lead Agency for Air Quality Planning (Federal and State)
Both SANDAG and the San Diego County Air Pollution Control Board (APCB) carry out air quality planning mandates and determine conformity of transportation projects with air quality plans.
ARJIS Automated Regional Justice Information System – Local
The purpose of the ARJIS Joint Powers Agency is to produce state-of-the-art criminal justice information technology that provides its members with seamless, cross-jurisdictional access to essential, accurate real-time data via a secure criminal justice enterprise network. As the convening agency for regional justice technology, ARJIS services enhance both officer and public safety for the public agencies and other members.
CEQA Areawide Clearinghouse (Federal and State)
SANDAG reviews projects with regional impacts under the California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA).
CJ Regional Criminal Justice Clearinghouse – Local
The Clearinghouse provides the means to seek and secure research funds from state and federal sources to assess the effectiveness and efficiency of crime control programs. Assistance to member agencies occurs through various avenues: publishing crime and arrest reports, sharing resources and information, quality assurance studies of crime-related data, impact assessments of crime-reduction strategies, long-term evaluations of critical issues, and grant writing assistance for agencies seeking state and federal funding. Through the Clearinghouse, staff also conducts analyses of offender drug use.
CMA Congestion Management Agency (State and Local) All 18 cities and the county government have designated SANDAG as the Congestion Management Agency responsible
for adopting a congestion management program (CMP), overseeing preparation of deficiency plans, and monitoring local agency compliance with the CMP.
COG Council of Governments This designation provides the public forum for regional decision-making among the area’s 18 incorporated cities and
county government, relating to a broad range of topics pertinent to the region’s quality of life. Some of the regional topics include strategic planning, allocation of resources, and the creation of accurate, timely, and useful demographic, economic, transportation, planning, borders, environmental, and public safety information.
IWMTF Integrated Waste Management Task Force (State and Local) SANDAG recommends actions to member agencies regarding the major elements of the state-mandated Integrated
Waste Management Plan. MHCP North County Multiple Habitat Conservation Program (Local Management and Administration) Undertaken on behalf of the seven North County cities, SANDAG serves as the policy body for the program.
2-2
Agency Mandates (cont’d)
MPO Metropolitan Planning Organization (Federal) This authority allows SANDAG to allocate federal transportation revenues and meet comprehensive planning
requirements of federal omnibus transportation legislation know as Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) in order to be eligible for certain federal funds.
RCDC Regional Census Data Center – Local
The Regional Census Data Center (RCDC) was established to increase the accuracy, availability, and use of census data by coordinating with the Census Bureau, the State Census Data Center network, and local agencies in all aspects of census planning and data analysis.
RHNA Housing (State) SANDAG determines each jurisdiction’s share as part of the Regional Housing Needs Assessments and establishes
performance criteria for self-certification of housing elements.
RTPA Regional Transportation Planning Agency (State) As the Regional Transportation Planning Agency (RTPA), SANDAG adopts the Regional Transportation Plan (RTP – long-
range plan) and Regional Transportation Improvement Program (RTIP), the five-year programming of state and federal transportation funds. The agency also allocates Transportation Development Act (TDA) funds (¼ cent sales tax for transit support, approximately $118 million per year).
T 1703 San Diego Regional Consolidated Agency (State) (SB1703) Senate Bill (SB) 1703 created a consolidated agency on January 1, 2003, to strengthen how regional public policy
decisions are made. The law mandates membership in the consolidated agency from the area’s 18 cities and county government. It consolidates transit planning, programming, project development, and construction into the new agency, leaving responsibilities for day-to-day operations with the existing transit operators. Assembly Bill 361 called for preparation and ongoing monitoring of a Regional Comprehensive Plan (RCP).
SDRTC San Diego County Regional Transportation Commission (State and Voter Approval) SANDAG is the designated commission and administers the local ½ percent sales tax, TransNet, (approximately $250
million per year) for transportation purposes.
Agency Commitments
BEACH Regional Beach Sand Replenishment Program (Local) Administer the regional program in coordination with federal, state, and local agencies.
FASTRAK I-15 Congestion Pricing and Transit Development Program (State) Implement FasTrak® program to allow single-occupant vehicles in I-15 express lanes for a fee. Fees support
additional bus services in corridor.
FFS Fee For Services
A memorandum of understanding (MOU) or contractual agreement where SANDAG agrees to perform specific services in exchange for fees, which provide the funding for the applicable task or product budgeted.
FGC Federal Grant Conditions Multi-year, project-specific federal grant agreement where reimbursement of costs is conditioned upon the
completion of applicable activities, tasks, or products
FSP Freeway Service Patrol Administration (State and Local) Provide service for stranded motorists on all major highways in the region.
2-3
Agency Commitments (cont’d)
IGR Intergovernmental Review SANDAG serves as the clearinghouse for the review of regionally significant projects that may impact the
implementation of the RTP or the RCP. The review ensures these projects are coordinated appropriately with local jurisdictions, Caltrans, the San Diego County Air Pollution Control District (APCD), and other agencies.
ITS Intelligent Transportation System (Federal) Federal Transportation Administration (FTA) and SAFETEA-LU regulations requiring an ITS Architecture and master
plan to be adopted in order to continue to qualify for ITS funding
LGC Local Grant Conditions Multi-year, project-specific local grant agreement where reimbursement of costs is conditioned upon the
completion of applicable activities, tasks, or products
MOUC MOU With Caltrans Multi-year commitment through a MOU between SANDAG and Caltrans District 11
MOUM MOU With Member Agency(ies) Multi-year commitment through a MOU between SANDAG and one or more of the member agencies
MOUT MOU With MTS And NCTD Multi-year commitment through a MOU between SANDAG and one of the transit agencies
OWP Overall Work Program Requirements (Federal & State) The provision of services and information necessary to meet the funding and regulations required for the
approval of the annual OWP
RCP Regional Comprehensive Plan Development State Legislation created the obligation for SANDAG to produce an RCP and coordinate regional implementation
and monitoring of the progress on the key strategic initiatives
RIS Regional Information Service (Development and Maintenance)
RTIP Regional Transportation Improvement Program SANDAG is responsible for coordinating the RTIP, which is a planning and fund programming document that is
updated every two years and can be amended periodically
RTP Regional Transportation Plan Development One of the commitments as part of the designation as the RTPA is to develop a RTP in conjunction with state and
federal regulations
SB SANDAG Service Bureau – Local
Technical Services provided by SANDAG on a fee for service basis to member agencies and consultants working for them
SB 10 San Diego County Regional Airport Authority Reform Act of 2007 (State)
SB 10 defines the responsibilities of SANDAG and the San Diego County Regional Airport Authority (SDCRAA) regarding aviation and surface transportation planning. SANDAG is required to review the scope and content of the Authority’s Regional Aviation Strategic Plan (RASP) and coordinate with the Authority on the RASP. SANDAG also is required to prepare an Airport Multimodal Accessibility Plan (AMAP) by December 31, 2013, that identifies multimodal transportation investments to improve access to airports in San Diego County and adjacent regions, and periodically update the AMAP as needed. SB 10 also requires SANDAG to conduct a public outreach process for the AMAP.
2-4
Agency Commitments (cont’d)
SGC State Grant Conditions Multi-year, project-specific state grant agreement where reimbursement of costs is conditioned upon the
completion of applicable activities, tasks, or products
TDA Transportation Development Act (State) State legislation created the RTPA, which gives SANDAG the authority and is accountable for the allocation of the
1/4 percent sales tax collected in the County.
TDM Regional Transportation Demand Management Program Administration (Local)
Provide and administer regional program (RideLink) consisting of carpool, vanpool, and transit programs, guaranteed ride home, bike locker program, and others.
TNET TransNet Ordinance Commitments As part of TransNet passed in November 2004, SANDAG agreed to deliver certain services, projects, and
programs.
Areas of Emphasis
AIRPORT PLANNING Airport Planning Collaboration with airport authority on implementation of SB 10 through Air/Rail Network Planning
Study and other related planning efforts.
COMMUNICATION Internal and External Communication Improvements Strategic efforts to improve communications within SANDAG, as well as with member and partner
agencies and the general public
CONGESTION MGMT Congestion Management Program/Corridor Studies Collaborative planning efforts among SANDAG, Caltrans, and local jurisdictions to address future
transportation needs in congested corridors and develop financing strategies to implement needed projects
FINANCING TRANS Innovative Financing and Joint Development of Transportation Projects Development of financing strategies to provide for cost-effective development of transportation
facilities, including transit stations and parking facilities
IMPLEMENT TransNET Transportation Project Implementation Early delivery of transportation projects, utilizing TransNet and Proposition 1B funds, while
aggressively pursuing matching funds, particularly for goods movement projects
INTERREGIONAL PLAN Interregional Planning Collaborative efforts between SANDAG, Caltrans, and partner agencies in neighboring counties,
Mexico, and tribal nations to address transportation and other related planning issues
MODELING Modeling Employ new technologies and methodologies to develop a fully integrated modeling system that
allows multidirectional data flow among all elements (transportation, land use, demographic, economic) and equips SANDAG to more comprehensively address complex policy issues today and into the future
NEW BORDER CROSSING New Border Crossing/State Route (SR) 11 Preparation of plans and investment strategies to implement a third border crossing and connecting
highway improvements in East Otay Mesa
2-5
Areas of Emphasis (cont’d)
QUALITY OF LIFE FNDG Quality of Life Funding Program Development of planning strategies, funding strategies, and implementation strategies for regional
infrastructure investments in the areas of habitat conservation, water quality, shoreline preservation, public transportation, and other potential infrastructure areas
SMART GROWTH DESIGN Smart Growth Planning Initiatives Development of design guidelines to assist regional and local planning agencies in implementing
smart growth concepts contained in the RCP and development of a regional bikeway master plan to facilitate nonmotorized transportation in the region
SUSTAINABLE DEV Sustainable Development (Climate Change) Planning Planning efforts to address energy and the impacts of transportation and land use on greenhouse
gas emissions, pursuant to Assembly Bill 32
TDM Transportation Demand Management Implement sustainable programs and services to maximize transportation network efficiency, manage
customer demand for transportation services, and utilize performance measures to ensure the network is managed toward outcomes and that best value investments are made
2-6
Key to Detailed Work Element Project Descriptions
MANDATED/COMMITTED: ALL
DEDICATED FUNDING: PARTIAL
PROGRAM WORK ELEMENT: 11091 TITLE: PROJECT DEVELOPMENT AND OVERSIGHT
FY 2009 BUDGET: $XXX,XXX STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE Description of the objectives for the overall project, with more specific statement of what will be emphasized in the
coming fiscal year
PREVIOUS ACCOMPLISHMENTS Describes the highlights of accomplishments for the annual recurring or multi-year project
Committee(s): Transportation Committee
Working Group(s): Cities/County Transportation Advisory Committee
Project Manager: José Nuncio
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / COMPLETION DATE
SDRTC SGC 1 40 Task Description: Monitor progress on project design, right-of-way acquisition, and construction activities including cost, scope, and schedule, and report to the Board of Directors on a regular basis.
Product: Quarterly progress reports to the Board
Completion Date: 6/30/2009
Project budget details are referenced in Chapter 3.
Based on number of tasks with agency mandates or comments.
ALL = 80% to 100% of tasks are mandated/committed
PARTIAL = 40% to 80% of tasks are mandated/committed
MINIMAL = 0% to 40% of tasks are mandated/committed
Dedicated funding is based on a ratio of dedicated funds to the project budget shown in Chapter 3.
ALL = 80% to 100% of FY 2009 budget uses dedicated project funds
PARTIAL = 40% to 80% of FY 2009 budget uses dedicated project funds
MINIMAL = .01% to 40% of FY 2009 budget uses dedicated project funds
NONE = 0% of FY 2009 budget uses dedicated funds
Supports 1 of 3 strategic goals described in more detail in Chapter 1, page 1-15.
See list of committees and working groups in Chapter 1, pages 1-9 and a list of policy committee involvement
by OWP work element in Appendix B.
Approximate level of staff resources and other services needed relative to project total.
Agency mandate or inter-agency commitment that is supported by the associated task. See list of descriptions
beginning on page 2-1. Tasks supporting mandates and/or commitments receive preferential funding consider-
ation.
Areas of Emphasis are developed as part of each year’s budget process. Tasks that support one of the annual
emphasis areas receive preferential funding treatment. See list of Areas of Emphasis on page 2-4.
CHAPTER 2 – DETAILED WORK ELEMENT DESCRIPTIONS SECTION 1 – IMPLEMENTATION
2-7
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 11091 TITLE: PROJECT DEVELOPMENT AND OVERSIGHT
FY 2009 BUDGET: $691,370 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
This objective of this work element is to provide ongoing coordination and liaison activities with sponsors of projects funded in the State Transportation Improvement Program-Regional Improvement Program (STIP-RIP); State Proposition 1-B (Senate Bill 1266 – Highway Safety, Traffic Reduction, Air Quality, and Port Security Fund of 2006); Federal Surface Transportation Program (STP); Congestion Mitigation and Air Quality (CMAQ) programs; the TransNet program; and other federal, state, and local programs. This will include ongoing tracking and monitoring of expenditures of San Diego-Coronado Bridge toll revenues. General oversight will be exercised to ensure that the projects stay on schedule, keep within scope and budget, and meet all relevant federal, state, and local requirements regarding the timely use of funds. Emphasis in FY 2009 will continue to include review of environmental documents, monitoring of design and construction activities, administration of consultant contracts, and tracking of project expenditures and schedules to help ensure timely delivery of projects. Additional emphasis will be: (1) implementation of the TransNet Early Action Program (EAP) projects; and (2) implementation of State Proposition 1-B projects.
PREVIOUS ACCOMPLISHMENTS
SANDAG is responsible for programming STIP-RIP, STP, CMAQ, TransNet, and other funds for transportation improvement projects and programs. Environmental clearance, design engineering, right-of-way certification, construction engineering, right-of-way capital, and construction capital costs are the responsibility of the project sponsors and are programmed in the Regional Transportation Improvement Program (RTIP). SANDAG tracks project scope, schedule, and costs on an ongoing basis to ensure that budgets and schedules are being met. SANDAG works with project sponsors to ensure that state and federal funding deadlines are met so those funds are not lost to the region.
Committee(s): Transportation Committee
Working Group(s): Cities/County Transportation Advisory Committee
Project Manager: Jose Nuncio Cantera
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
SDRTC SGC IMPLEMENT TRANSNET
1 40 Task Description: Monitor progress on project design, right-of-way acquisition, and construction activities including cost, scope, and schedule and report to the SANDAG Board of Directors (BOD) on a regular basis.
Product: Quarterly progress reports to the BOD
Completion Date: 6/30/2009
2-8
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
SGC IMPLEMENT TRANSNET
2 25 Task Description: Review and comment on environmental documents, engineering reports, plans, and estimates prepared by project sponsors to ensure consistency with the Regional Transportation Plan and RTIP.
Product: Completed reviews (as needed)
Completion Date: 6/30/2009
SGC INTER-REGIONAL
PLAN
3 10 Task Description: Prepare transportation project agreements between SANDAG, Caltrans, Metropolitan Transit System, North County Transit District, and jurisdictions.
Product: Memorandums of understanding (as needed)
Completion Date: 6/30/2009
RTPA IMPLEMENT TRANSNET
4 5 Task Description: Work with local, state, federal agencies, and others to improve project delivery process for projects.
Product: Technical memo documenting coordination efforts
Completion Date: 6/30/2009
MOUM 5 10 Task Description: Project oversight and coordination of the Encinitas Pedestrian Crossing final project study report and final design.
Product: Project study report and final design
Completion Date: 6/30/2009
SDRTC MOUM 6 5 Task Description: Process claims and conduct audits for toll funds from City of Coronado pursuant to the settlement agreement.
Product: Audit results (as needed)
Completion Date: 6/30/2009
OTHER FINANCING TRANS
7 5 Task Description: Develop a strategy for identifying and pursuing private/public partnership opportunities.
Product: Strategy report (as needed)
Completion Date: 6/30/2009
FUTURE ACTIVITIES
With the implementation of TransNet and approval by voters of State Proposition 1-B, as projects become more complex with multiple sources of funds, work with Caltrans to identify and implement specific actions to improve reporting of expenditures. Some of these can include implementation of periodic program and phase-specific expenditure reports. Ongoing activities will continue.
2-9
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 1109203 TITLE: I-15 VIOLATION ENFORCEMENT SYSTEM (VES) STUDY
FY 2009 BUDGET: $1,029,641 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objective of this work element is to deploy and test state-of-the-art violation enforcement systems and strategies for the FasTrak® value pricing and high occupancy vehicle (HOV) lanes. This project is a systems engineering effort and builds upon the I-15 Managed Lanes Toll Collection System that is being deployed on the Interstate 15 Managed Lanes between State Route (SR) 163 and SR 78. In FY 2009 emphasis will be on completing proof-of-concept testing of viable VES technology products and monitoring and evaluation of product performance for possible future Managed Lanes deployment.
PREVIOUS ACCOMPLISHMENTS
SANDAG began work in FY 2006 on the VES study for the Managed Lanes. In FY 2007 technology trade studies were completed to identify the range of products and solutions in existing automated and manual enforcement of HOV and managed lanes. In FY 2007 a VES strategy analysis also was prepared that identified a preferred enforcement approach for the opening of the I-15 Managed Lanes FasTrak® system scheduled for mid-2008. In FY 2008 SANDAG completed public outreach to gauge the public opinion of HOV enforcement and to gauge public support for the planned enforcement system and strategy. In FY 2008 SANDAG also issued a request for information to identify available products and solutions that respond to the planned enforcement strategy.
Committee(s): Transportation Committee
Working Group(s): I-15 Project Management Team
Project Manager: Derek Toups
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
FGC TDM 1 5 Task Description: Pre-deployment vendor contract mobilization (product development and prototyping).
Product: Installation and test plans
Completion Date: 7/31/2008
FGC TDM 2 5 Task Description: Installation and start-up system operational testing.
Product: Encroachment permit(s)and test system certification
Completion Date: 8/31/2008
FGC TDM 3 10 Task Description: Recruiting of patron participants for in-vehicle product evaluation and testing.
Product: Participant recruitment and survey materials
Completion Date: 8/31/2008
2-10
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
FGC TDM 4 50 Task Description: Proof-of-concept testing monitoring and evaluation.
Product: Monitoring and test reports
Completion Date: 1/31/2009
FGC TDM 5 20 Task Description: Final VES system engineering (requirements and environmental review).
Product: Final VES requirements and environmental report
Completion Date: 6/30/2009
FGC TDM 6 10 Task Description: Close-out/reporting.
Product: Field operational test final report(s)
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Following the completion of testing of VES technology products in FY 2009, SANDAG will complete VES systems engineering for any product(s) that pass the proof-of-concept phase.
2-11
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 11093 TITLE: REGIONAL ARTERIAL MANAGEMENT SYSTEM
FY 2009 BUDGET: $546,501 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The purpose of this project is to enhance the traffic signal systems used by each of the San Diego Regional Traffic Engineers Council (SANTEC) member cities, the County, and Caltrans to ensure that the existing systems become interconnected, enabling each city or agency to work cooperatively on achieving regional arterial management performance goals and performance objectives.
The outcome from this work element is to provide upgraded software and a limited communications network for the demonstration phase for the purpose of developing inter-jurisdictional timing plans along major arterial corridors.
PREVIOUS ACCOMPLISHMENTS
The Regional Arterial Management System (RAMS) has previously delivered a regionalized communications network, security software, and the first two builds of the QuicNet4+ software to the three partner cities and agencies participating in the RAMS project.
The project development cities have undertaken "Floating Car Surveys" to be used in validating the performance objectives of the software.
Committee(s): Transportation Committee
Working Group(s): San Diego Traffic Engineers' Council; Intelligent Transportation System CEOs Policy Management Working Group
Project Manager: Peter Thompson
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA SANTEC TDM 1 30 Task Description: Complete migration readiness plan for each of the existing signal systems for 13 cities.
Product: QuicNet4+ migration readiness plan
Completion Date: 12/31/2008
RTPA SANTEC TDM 2 30 Task Description: Migrate existing city, agency, and county traffic signal inventories to the new QuicNet4+ software platform and perform regression testing for all interconnected signalized inter-section.
Product: Functional traffic signal management software
Completion Date: 12/31/2008
2-12
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA SANTEC TDM 3 10 Task Description: Establish and facilitate regular QuicNet4+ regional users group forums for SANTEC member cities and agencies.
Product: Regional collaboration
Completion Date: 6/30/2009
RTPA SANTEC TDM 4 10 Task Description: Provide ongoing training for regionalized use of the QuicNet4+ software application.
Product: Optimized use of regional capability
Completion Date: 6/30/2009
RTPA SANTEC TDM 5 20 Task Description: Integrate QuicNet4+ into Intermodal Transportation Management System (IMTMS).
Product: QuicNet4+ interface to IMTMS
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Future activities include the deploying the final build of QuicNet4+ and integrating the RAMS with other transportation management systems.
2-13
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 11095 TITLE: ADVANCED TRAVELER INFORMATION SERVICE - 511
FY 2009 BUDGET: $946,125 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objective of this work element is to maintain, operate, and enhance the advanced traveler information system (ATIS/511) for the region. During FY 2009 emphasis will on: (1) operating and maintaining the 511 telephone, Web and TV broadcast services; (2) implementing the business service and revenue plan; (3) improving and expanding relationships with partner agencies; (4) developing additional 511 services; and (5) marketing the regional ATIS/511 system. The 511 service includes telephone, Web-based, and TV broadcast information services that deliver real-time travel information for freeways and transit, roadside assistance, and a wide range of other transportation-related information using various media sources (e.g., television, telephone, cell phone, Internet, wireless Internet, e-mail, and text messaging).
PREVIOUS ACCOMPLISHMENTS
In FY 2008 SANDAG implemented the 511 ATIS for the region and launched the 511 service for telephone, Web, and CommunityView.
Committee(s): Transportation Committee
Working Group(s): Intelligent Transportation System CEOs Policy Management Working Group
Project Manager: Thomas Bruccoleri
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RIS TDM 1 25 Task Description: Conduct project management and coordination for the ATIS/511 project, review and process monthly progress reports (MPRs) and payments, and implement and coordinate marketing plan.
Product: MPRs and payment for reimbursement
Completion Date: 6/30/2009
RIS TDM 2 15 Task Description: Identify and deploy Intelligent Transportation System management tools that will provide added services to the commercial vehicle industry.
Product: CVO telephone, Web, and TV broadcast design plan
Completion Date: 6/30/2009
RIS TDM 3 10 Task Description: Implement business plan to supplement ongoing 511 maintenance, operation, and enhanced features.
Product: Business plan
Completion Date: 6/30/2009
2-14
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RIS TDM 4 10 Task Description: Implement break-a-link feature to address road closure function (this is an additional funding request and was identified as an issue during the Wildfires).
Product: Software update
Completion Date: 6/30/2009
RIS TDM 5 10 Task Description: Implement telephone routing service during disasters (this is an additional funding request and was identified as an issue during the Wildfires).
Product: Call center agreement
Completion Date: 6/30/2009
RIS TDM 6 30 Task Description: Implement a Spanish version of the 511 services (this request is pending Caltrans grant award).
Product: Deployed Spanish 511 phone system
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Future activities include completing the development of applications for the ATIS/511 for commercial vehicle operations for the Southern California ITS Priority Corridor and activating the service. Also, special emphasis will be given to determine how to best sustain the ATIS/511 services through the development of public-private partnerships to enable commercialization of the travel information program.
2-15
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 11102 TITLE: TRANSNET FINANCIAL MANAGEMENT
FY 2009 BUDGET: $987,439 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objective of this work element is to manage and administer the local transportation sales tax funds in order to efficiently implement the TransNet Ordinance and Expenditure Plan. Activities include policy development, revenue forecasting, cash flow analysis and financial planning, bonding evaluation, fund investments, disbursements, program and fiscal accounting, reporting, and legal services. Emphasis in FY 2009 will be on continuing the accelerated implementation of the TransNet Extension consistent with the Plan of Finance for the Early Action Program (EAP), including utilization of the proceeds of the first major bond issue under the new TransNet Extension and the performance of the first triennial performance audit for the program.
PREVIOUS ACCOMPLISHMENTS
This job has been an ongoing responsibility of SANDAG since the passage of the current TransNet program in 1987 and its extension by voters in November 2004. Efforts to implement the new TransNet Extension were initiated in the second half of FY 2005 and have continued through FY 2008, with an emphasis on the development of the Plan of Finance for the EAP and the entire program and associated financing mechanisms. The refinement and implementation of the Plan of Finance will be an ongoing effort as part of this work element to provide guidance regarding the cash flow needs of the TransNet program and the structure, sizing, and timing of potential debt financings needed to complete TransNet projects.
Committee(s): Transportation Committee; Independent Taxpayer Oversight Committee
Working Group(s): None
Project Manager: Charles “Muggs” Stoll
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
SDRTC TNET IMPLEMENT TRANSNET
1 10 Task Description: Determine annual ongoing cash flow requirements for member agencies.
Product: Monthly cash flow by recipient for FY 2009
Completion Date: 6/30/2009
SDRTC TNET IMPLEMENT TRANSNET
2 10 Task Description: Work with other transportation sales tax “self-help” counties on common issues of concern, such as improved project delivery efforts and legislative issues.
Product: Monthly meetings/annual conference
Completion Date: 6/30/2009
2-16
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
SDRTC TNET IMPLEMENT TRANSNET
3 20 Task Description: Implement debt financing mechanisms, as needed, based upon the updated TransNet Plan of Finance and cash flow needs from all agencies using bond proceeds from spring 2008 and Commercial Paper (CP) program.
Product: Plan for bond funds/ongoing CP draws
Completion Date: 6/30/2009
SDRTC TNET IMPLEMENT TRANSNET
4 10 Task Description: Provide updated revenue forecasts and develop and refine guidelines, as necessary, for the ongoing implementa-tion of the TransNet programs.
Product: Major annual update by February 2009 and revisions as needed
Completion Date: 6/30/2009
SDRTC TNET IMPLEMENT TRANSNET
5 20 Task Description: Conduct the annual audits required of each recipient of transportation sales tax revenue.
Product: Annual audit reports for each recipient
Completion Date: 6/30/2009
SDRTC TNET IMPLEMENT TRANSNET
6 10 Task Description: Initiate efforts to develop or refine program guidelines to implement new program components related to the TransNet Extension.
Product: New/revised guidelines as needed
Completion Date: 6/30/2009
SDRTC TNET IMPLEMENT TRANSNET
7 20 Task Description: Implement database to track TransNet cash flows, including sales tax allocations among programs, disbursements, and allocation of debt service principal, interest, and issuance costs.
Product: Database enhancements
Completion Date: 4/30/2009
FUTURE ACTIVITIES
This job is a continuing requirement of the TransNet Program.
2-17
MANDATED/COMMITTED: PARTIAL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 11103 TITLE: TRANSNET PUBLIC INFORMATION PROGRAM
FY 2009 BUDGET: $335,073 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objective of the TransNet Public Information Program is to provide an accurate, timely, accessible, and consistent flow of easily understood information on the progress of the local transportation sales tax program. The program is designed to heighten awareness among audiences and stakeholders about how their ½ percent transportation sales tax dollars are being spent to improve this region’s highway, transit, local roads, and bicycle and pedestrian systems. During FY 2009 emphasis will be placed on providing the public with information about TransNet and the Early Action Program (EAP) projects.
PREVIOUS ACCOMPLISHMENTS
Public information is an integral part of the local transportation sales tax program and helps to maintain awareness in the San Diego region on how critical the sales tax dollars are to the transportation system. In FY 2008 the public information efforts included keeping the public informed about the EAP. The innovative, interactive TransNet Dashboard located at www.KeepSanDiegoMoving.com continued to provide the public with up-to-date information on transportation projects underway in the San Diego region that are funded by the TransNet ½ percent sales tax. The Web site will be enhanced and updated in the next fiscal year. Other outreach tools, such as newsletters, fact sheets and brochures, Board actions, a speakers’ bureau media contact, and citizen working groups, help inform the public of planned improvements to transportation facilities and services. Using a combination of traditional printed materials and the Keep San Diego Moving Web site and TransNet Dashboard, information is more effectively and efficiently provided to the public. The TransNet Public Information Program provides important methods for citizens to voice their views about their local transportation sales tax program.
Public information techniques are directed toward achieving the following program objectives: complement and support the SANDAG Board of Directors, serving as the San Diego County Regional Transportation Commission, in its administrative and programming activities; prepare and coordinate public information activities with the region’s local governments and transit operators, as well as local, state, and federal transportation agencies; and encourage consistent news media coverage of TransNet-funded activities.
Committee(s): Transportation Committee
Working Group(s): None
Project Manager: Colleen Windsor
2-18
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
SDRTC IMPLEMENT TRANSNET
1 5 Task Description: Research, evaluate, identify, and update the program’s activities and selected audiences, and gauge the effectiveness of the public information program on a periodic basis.
Product: List of new audiences
Completion Date: 1/15/2009
SDRTC IMPLEMENT TRANSNET
2 10 Task Description: Publish TransNet information via the monthly “rEgion” e-mail newsletter and printed materials on a periodic basis and maintain and update fact sheets.
Product: Monthly rEgion e-mail newsletter and project fact sheets
Completion Date: 6/30/2009
SDRTC COMMUNI-CATION
3 10 Task Description: Provide public information on TransNet to increase public awareness through a variety of sources, including media and the Web and coordinate the TransNet Speakers Bureau.
Product: Speakers Bureau presentation log
Completion Date: 6/30/2009
SDRTC IMPLEMENT TRANSNET
4 20 Task Description: Coordinate public involvement, advertising, and marketing efforts for TransNet projects with SANDAG, Caltrans, Metropolitan Transit System (MTS), and North County Transit District (NCTD).
Product: Meeting agenda/summaries as needed and copies of ads purchased
Completion Date: 6/30/2009
COMMUNI-CATION
5 10 Task Description: Encourage continued news media coverage of TransNet activities to increase public awareness.
Product: Log of media hits
Completion Date: 6/30/2009
IMPLEMENT TRANSNET
6 5 Task Description: Participate in informational workshops prior to major capital facilities/services improvements in local communities.
Product: Log of workshops attended
Completion Date: 6/30/2009
SDRTC COMMUNI-CATION
7 10 Task Description: Maintain and update the Keep San Diego Moving Web site to increase public awareness and continued support of how TransNet tax dollars are being used.
Product: Updated Keep San Diego Moving content
Completion Date: 12/15/2008
COMMUNI-CATION
8 10 Task Description: Participate in the planning and coordination of special events, such as ground-breaking and ribbon-cutting ceremonies and news conferences.
Product: Log of special events
Completion Date: 6/30/2009
IMPLEMENT TRANSNET
9 5 Task Description: Update the interactive presentation about the TransNet Program.
Product: TransNet PowerPoint presentation
Completion Date: 12/31/2008
IMPLEMENT TRANSNET
10 5 Task Description: Maintain regional media clipping file and digests of Commission actions.
Product: Clip file and digests
Completion Date: 6/30/2009
2-19
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
SDRTC IMPLEMENT TRANSNET
11 5 Task Description: Produce annual TransNet update brochure.
Product: TransNet brochure
Completion Date: 1/31/2009
SDRTC IMPLEMENT TRANSNET
12 5 Task Description: Monitor Independent Taxpayer Oversight Committee (ITOC) actions and assist in producing annual report, press releases, fact sheets, and other materials.
Product: ITOC annual report, fact sheets, and press releases
Completion Date: 6/30/2009
FUTURE ACTIVITIES
The TransNet Public Information Program is refined and updated on an annual basis to help communicate how local transportation sales tax revenues are being expended to improve the regional transportation system and to meet the requirements of the SANDAG Board of Directors, serving as the San Diego County Regional Transportation Commission. SANDAG will be involved with promotion of TransNet projects and coordinating efforts with SANDAG, Caltrans, MTS, and NCTD. In FY 2009 public information will focus on the accelerated TransNet EAP projects.
2-20
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 11390 TITLE: NEW - INDEPENDENT TAXPAYER OVERSIGHT COMMITTEE PROGRAM
FY 2009 BUDGET: $323,930 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objective of this project is to fulfill the requirements of the TransNet Extension Ordinance, authorizing the Independent Taxpayer Oversight Committee (ITOC) to perform a number of functions relating to independent oversight of the TransNet program. Objectives for FY 2009 include management and oversight of independent audits and development of a work program for the ITOC itself.
PREVIOUS ACCOMPLISHMENTS
This work element is new to FY 2009.
Committee(s): Independent Taxpayer Oversight Committee; Transportation Committee
Working Group(s): None
Project Manager: Charles “Muggs” Stoll
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
SDRTC TNET IMPLEMENT TRANSNET
1 70 Task Description: Continue staff support for the ongoing meetings of the ITOC and the development of the ITOC work program.
Product: Monthly meeting agendas and reports to Transportation Committee, Regional Planning Committee, and Board of Directors
Completion Date: 6/30/2009
SDRTC TNET IMPLEMENT TRANSNET
2 30 Task Description: Perform first triennial performance audit on TransNet program and present to ITOC, Transportation Committee and Board of Directors.
Product: Triennial performance audit
Completion Date: 12/31/2008
FUTURE ACTIVITIES
Future activities include continuation of financial performance audits and further development of future ITOC responsibilities.
CHAPTER 2 – DETAILED WORK ELEMENT DESCRIPTIONS
SECTION 2 – TECHNICAL SERVICES
2-21
MANDATED/COMMITTED: ALL DEDICATED FUNDING: MINIMAL
PROGRAM WORK ELEMENT: 20001 TITLE: INFORMATION SYSTEMS MANAGEMENT
FY 2009 BUDGET: $917,599 STRATEGIC GOAL: ENHANCE ORGANIZATIONAL EFFECTIVENESS
OBJECTIVE
The objectives of this work element are to: (1) provide computer hardware, software, network, Internet, and information systems support for the Overall Work Program and administrative and financial functions; (2) ensure strong network security to protect those systems and the information stored and processed therein; and (3) optimize the delivery and accessibility of information to member agencies, partners, the public, and SANDAG staff. Emphasis in FY 2009 is to: (1) implement and test a business continuity plan; (2) improve security infrastructure; and (3) improve geographic information system (GIS) architecture.
PREVIOUS ACCOMPLISHMENTS
As technologies evolve and new needs emerge, information systems are upgraded in a manner that maximizes their contribution to the accomplishment of SANDAG’s mission and minimizes the negative impacts of change on system users. Prior to FY 2009, we upgraded SharePoint 2003 to SharePoint 2007, upgraded all Office versions to Office 2007, upgraded Exchange 2003 to Exchange 2007, implemented Positive Pay (a Web-based check/Automatic Clearing House (ACH) fraud prevention and account reconciliation system), and created a framework to secure data for Senate Bill 618 San Diego Prisoner Re-entry Program and the 2010 Decennial Census LUCA Program.
Committee(s): None
Working Group(s): Local Agencies Information Technology Managers Group
Project Manager: William Mount
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RIS COMMUNI-CATION
1 1 Task Description: Coordinate and staff the Local Agencies Information Technology Managers Group (bi-monthly).
Product: Information Systems forum
Completion Date: 6/30/2009
RIS 2 33 Task Description: Address systems administration, including adding/modifying/removing of accounts, e-mail, and permissions.
Product: Functional information services
Completion Date: 6/30/2009
RIS 3 33 Task Description: Carry on system operations of network and Internet functionality, troubleshooting, and resolution of servers and workstations.
Product: Functional information services
Completion Date: 6/30/2009
2-22
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RIS 4 2 Task Description: Maintain documentation of the computer/net-work system and interfaces.
Product: Network infrastructure documents
Completion Date: 6/30/2009
RIS 5 5 Task Description: Execute Information security audit and recommend countermeasures and implement countermeasures where appropriate.
Product: Information security audit report
Completion Date: 9/5/2008
RIS 6 5 Task Description: Provide training and support to end users.
Product: Technologically proficient workforce
Completion Date: 6/30/2009
RIS 7 3 Task Description: Research, test, deploy, and monitor an intrusion prevention and detection system.
Product: Intrusion prevention and detection system
Completion Date: 3/31/2009
RIS 8 13 Task Description: Implement business continuity plan and test.
Product: Business continuity plan
Completion Date: 11/30/2008
RIS 9 2 Task Description: Investigate, purchase, and deploy a Web filtering solution to reduce legal liability, improve productivity, and reduce the threat of spyware and malicious Web sites.
Product: Web filtering software
Completion Date: 5/31/2009
RIS COMMUNI-CATION
10 3 Task Description: Improve GIS architecture for development of applications that deliver valuable and meaningful information to member agencies, partners, and the public via the Internet.
Product: Flexible GIS architecture
Completion Date: 8/31/2009
FUTURE ACTIVITIES
The activities conducted in this work element are crucial to the success of our agency. The Internet has increasingly become the medium of choice for presenting information, interacting with data, and connecting far-flung partners. At the same time, security threats such as viruses, worms, and “phishing” attacks have proliferated. As SANDAG’s reliance upon and use of the Internet increase, emphasis will be on providing the maximum protection for these information transactions in a manner that is transparent to the user.
2-23
MANDATED/COMMITTED: PARTIAL DEDICATED FUNDING: MINIMAL
PROGRAM WORK ELEMENT: 20002 TITLE: PC, INTERNET, AND DATABASE APPLICATIONS
FY 2009 BUDGET: $631,542 STRATEGIC GOAL: ENHANCE ORGANIZATIONAL EFFECTIVENESS
OBJECTIVE
The objectives of this work element are to improve work and productivity through the application of database and programming technologies and to increase the accessibility of the Regional Information System by developing, enhancing, and documenting custom software and database solutions for the Overall Work Program, Finance, and Administrative functions. We also provide direct, comprehensive technical support to Transit.511sd.com, RideLink, ARJIS and SANDAG Web sites, and the SANDAG Intranet. Emphasis for FY 2009 is to: (1) re-develop the Project Accounting and Master Budget Model into a single application integrating project and budget planning; (2) develop an application for the Human Resources division to centralize and manage various types of employee data; and (3) develop Web-based applications that improve the dissemination of SANDAG's Regional Information System, including ArcGIS mapping and data downloading capabilities.
PREVIOUS ACCOMPLISHMENTS
Previous accomplishments include: database design; application development; and programming support for contracting, criminal justice, creative services, transit planning, and administration, including the transit passenger counting and San Diego Trolley Ridership Estimation programs, all SANDAG Web sites, the public transportation trip planning application, and the SANDAG Intranet. We also provide technical assistance to SANDAG Finance staff to develop queries and summary reports for the agency’s financial software application (IFAS).
Committee(s): None
Working Group(s): SDCommute Web Committee
Project Manager: Timothy Sutherland
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RIS COMMUNI-CATION
1 40 Task Description: Provide direct, comprehensive technical support and enhancements to the SANDAG, RideLink, ARJIS, and Transit.511sd.com Web sites and the SANDAG Intranet.
Product: Operational, up-to-date Web sites
Completion Date: 6/30/2009
COMMUNI-CATION
2 33 Task Description: Rewrite the Master Budget Model with a new, maintainable code-base compatible and integrated with the PA09 work program planning application and databases.
Product: Unified OWP planning and budgeting application
Completion Date: 10/31/2008
2-24
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RIS COMMUNI-CATION
3 10 Task Description: Provide direct support for the development and maintenance of interactive mapping applications and desktop database applications.
Product: Applications (REDI, DEMS, CSPT, CD, and CLIPPER)
Completion Date: 6/30/2009
4 7 Task Description: Develop an application for the Human Resources division to centralize and manage various types of employee data.
Product: HR database application
Completion Date: 10/1/2008
SB1703 5 10 Task Description: Update the MMPI construction contract management system software to current technology including programming for IFAS interface and workflow per SANDAG policies and procedures.
Product: Improved/new software, training
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Future activities include developing, refining, and updating software and database products to enhance internal client productivity and the representation of regional data to external clients.
2-25
MANDATED/COMMITTED: PARTIAL DEDICATED FUNDING: NONE
PROGRAM WORK ELEMENT: 20003 TITLE: TRANSPORTATION MODEL APPLICATION AND DEVELOPMENT
FY 2009 BUDGET: $897,644 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objectives of this work element are to: (1) improve SANDAG’s transportation modeling procedures and maintain up-to-date documentation; (2) support travel demand forecasts for the Regional Transportation Improvement Program (RTIP), other SANDAG planning and implementation studies, and studies conducted for outside agencies through the Service Bureau; (3) analyze and disseminate travel demand information; and (4) evaluate new technologies for storing, processing, and presenting transportation model information. In FY 2009 emphasis will be given to: (1) starting development work on the next-generation transportation model; (2) finishing the commercial vehicle model component; (3) creating a framework for the implementation of an interactive regional traffic count database system; and (4) documenting procedures, innovations, and performance of the transportation model.
PREVIOUS ACCOMPLISHMENTS
SANDAG’s transportation modeling procedures are being continuously enhanced and upgraded to improve the accuracy and responsiveness of the models. The following enhancements were added last year: (1) truck model development started with conclusion estimated for end of calendar year 2008; and (2) new model parameters developed from the 2006 travel behavior survey were incorporated. We continued to investigate the feasibility of integrating traffic simulation results into modeling procedures by testing a new micro-simulation package, TransModeler. SANDAG’s transportation models were applied in a wide range of transportation planning studies. Last year the major focus was on providing information for the 2008 RTIP, the Southbay Bus Rapid Transit Small Starts project, and a number of transit and planning studies. Model documentation and outreach were important functions. Last year the extremely popular Traffic Forecast Information Center was updated with 2007 Regional Transportation Plan model results. Monthly meetings with SANDAG staff and staff from outside agencies were conducted to resolve modeling issues. Assistance to local agency and Caltrans staff was provided to facilitate model implementation and advance work on TransNet Early Action Program projects.
Committee(s): None
Working Group(s): None
Project Manager: Richard Curry
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
MODELING 1 35 Task Description: Prepare an request for proposal (RFP) for an activity-based model and execute a multi-year consultant contract and start development work by processing survey information.
Product: RFP and associated contract
Completion Date: 6/30/2009
2-26
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA RTP MODELING 2 20 Task Description: Modify transportation model code to coordinate with new TransCAD software releases, new standards for Federal Transportation Administration New Starts, and meet standards for RTIP, RTP, and Air Quality conformity.
Product: Updated source code and scripts
Completion Date: 6/30/2009
COG RIS INTER-REGIONAL
PLAN
3 15 Task Description: Coordinate transportation model development to ensure integration of the needs of the Overall Work Program, Service Bureau, Caltrans, local jurisdictions, and other metropolitan planning organizations.
Product: Updated source code and scripts
Completion Date: 6/30/2009
RTPA MODELING 4 10 Task Description: Complete integration of a commercial vehicle component into the TransCAD model procedures.
Product: Updated TransCAD procedures
Completion Date: 6/30/2009
COMMUNI-CATION
5 2 Task Description: Prepare a framework for implementation of a regional traffic count database.
Product: Technical memo discussing framework
Completion Date: 3/31/2009
RIS COMMUNI-CATION
6 5 Task Description: Update current year traffic count data and vehicle miles traveled (VMT) estimates and publish traffic information on SANDAG Web site.
Product: Updated average daily traffic (ADT) report
Completion Date: 6/30/2009
COMMUNI-CATION
7 5 Task Description: Prepare a transportation network white paper to detail the innovative strategy used at SANDAG and present white paper at national meetings such as Transportation Research Board and ESRI.
Product: Transportation network white paper
Completion Date: 9/30/2008
RTPA MODELING 8 5 Task Description: Write a transportation model validation report to characterize the level of accuracy at which the model replicates base year conditions.
Product: Validation report
Completion Date: 3/31/2009
RTPA MODELING 9 3 Task Description: Update Series 11 transportation model procedure documentation to reflect changes made during FY 2008.
Product: Transportation model documentation
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Future activities include developing a next-generation, activity-based transportation model that will be fully integrated with a land economics-based urban model being developed under OWP work element 20005, Demographic and Economic Forecasts. We will examine techniques and tools for improving the efficiency in database design to increase model efficiency. In addition, models will be refined and updated with new technologies for storing, processing, and presenting transportation model information. Implement the regional interactive traffic count database mapping application.
2-27
MANDATED/COMMITTED: PARTIAL DEDICATED FUNDING: NONE
PROGRAM WORK ELEMENT: 20004 TITLE: CENSUS AND PRODUCT COORDINATION
FY 2009 BUDGET: $259,357 STRATEGIC GOAL: ENHANCE ORGANIZATIONAL EFFECTIVENESS
OBJECTIVE
The objectives of this work element are to ensure a coordinated approach to product design and development in the Technical Services Department and to increase efficiencies in data analysis and dissemination to support effective decision making. The agency’s technical workshops and the functions and responsibilities of the Regional Census Data Center (RCDC) program are included in this work element. Through the RCDC, we increase the accuracy, availability, and use of census data by coordinating with the Census Bureau, the State Census Data Center network, and local agencies in all aspects of census planning and data analysis.
Emphasis in FY 2009 is to: (1) deliver products and prepare tools that make the vast amount of information we create and maintain easy to access and understand; (2) increase member agency and public understanding of the proper use of census and other demographic data; (3) coordinate local Census Bureau 2010 Census planning activities; and (4) present technical workshops to educate SANDAG and member agency staff in the use of personal computer (PC)-based tools to access and use this information.
PREVIOUS ACCOMPLISHMENTS
Previous accomplishments include: (1) responding to member agency, public, and local community group requests for information about SANDAG/census data; (2) giving presentations about SANDAG/census data and the Web tools to access the data; (3) preparing data products like infos and fact sheets; (4) making SANDAG/census data available on the Web; (5) hosting the annual technical workshops, and (6) working with the Census Bureau to coordinate the decennial census.
Committee(s): None
Working Group(s): 2010 Census Statistical Areas Working Group
Project Manager: Kristen Rohanna
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RIS COMMUNI-CATION
1 25 Task Description: Coordinate product development in the Technical Services Department.
Product: Fact sheets, infos, and other data products
Completion Date: 6/30/2009
COMMUNI-CATION
2 5 Task Description: Prepare informational data product that presents American Community Survey (ACS) data for all jurisdic-tions in the region.
Product: "Give-away" data product
Completion Date: 2/28/2009
2-28
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
COMMUNI-CATION
3 15 Task Description: Educate local agencies, the public, and nonprofits about using SANDAG's data and the SANDAG Web site.
Product: Presentations and respond to informational requests
Completion Date: 6/30/2009
RCDC RIS COMMUNI-CATION
4 15 Task Description: Process, analyze, and make census data (including the new ACS available through the Regional Informa-tion System and the Internet.
Product: Census presentations and educational materials
Completion Date: 6/30/2009
RCDC RIS COMMUNI-CATION
5 25 Task Description: Coordinate with the Census Bureau, jurisdictions, and the State Census Data Center to plan for the 2010 Census, including Participant Statistical Areas Program and other programs
Product: Updated statistical areas and complete Count Comm
Completion Date: 6/30/2009
COMMUNI-CATION
6 15 Task Description: Conduct technical workshops for internal staff, member agencies, Caltrans, and transit operators.
Product: Technical workshops
Completion Date: 5/31/2009
FUTURE ACTIVITIES
In the coming years, this work element will continue to ensure a coordinated approach to product design and development in the Technical Services Department to: educate people and groups in the region about SANDAG/census data and how to access it; and conduct annual technical workshops for member agencies, Caltrans, and the transit agencies. As the RCDC, we will continue to work with the Census Bureau, the State Census Data Center, and local agencies to plan for the 2010 Census and ACS data releases.
2-29
MANDATED/COMMITTED: ALL DEDICATED FUNDING: NONE
PROGRAM WORK ELEMENT: 20005 TITLE: DEMOGRAPHIC AND ECONOMIC FORECASTS
FY 2009 BUDGET: $1,005,447 STRATEGIC GOAL: ENHANCE ORGANIZATIONAL EFFECTIVENESS
OBJECTIVE
The objectives of this work element are to: (1) develop, maintain, and document a set of models for estimating and forecasting demographic and economic activity within the San Diego region; (2) produce a series of annual demographic and economic estimates for the San Diego region; (3) as needed, produce the Regional Growth Forecast; (4) identify and research national, state, and regional demographic and economic trends that affect the San Diego region; and (5) provide demographic and economic expertise to the SANDAG Board of Directors, other elected officials, and the public. Emphasis in FY 2009 will be: (1) continue the task of modernizing SANDAG’s forecasting models; (2) ensure that the new, small area Production Exchange and Consumption Allocation System (PECAS) model integrates with the regional Demographic and Economic Forecasting Model; and (3) working with the transportation modelers, develop linkages between the outputs of the PECAS model and inputs to the transportation models.
PREVIOUS ACCOMPLISHMENTS
During FY 2008 SANDAG initiated a three-year contract with HBA Specto, Inc. to assist staff in designing and developing a San Diego PECAS model. Most efforts to date have focused on identifying and obtaining the databases needed for model development. We anticipate a prototype model will be running and calibrated within FY 2008.
Committee(s): Regional Planning Committee
Working Group(s): Regional Planning Technical Working Group
Project Manager: Edward Schafer
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RIS MODELING 1 5 Task Description: Negotiate with HBA Specto, Inc. on a task order of the standard services agreement for developing the 2nd generation of the San Diego PECAS model.
Product: Task order
Completion Date: 8/1/2008
COG RIS 2 15 Task Description: Develop and release the January 1, 2008, population and housing estimates.
Product: 2008 population and housing unit database
Completion Date: 8/1/2008
RIS MODELING 3 5 Task Description: Refine the PECAS design diagram for the 2nd iteration of the model and increase the geographic, industrial, and household detail of the model.
Product: Design diagram and documentation
Completion Date: 8/15/2008
2-30
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
COG RIS 4 10 Task Description: Complete the January 1, 2008, household income estimates.
Product: 2008 household income database
Completion Date: 8/31/2008
RIS MODELING 5 10 Task Description: Expand the demographic data categories of the synthetic population synthesizer.
Product: A more detailed synthetic population of the region
Completion Date: 3/1/2009
RIS MODELING 6 5 Task Description: Negotiate a contract with Itron to create data linkages between subregional PECAS and regionwide DEFM models that ensure consistent forecast outputs between the two models.
Product: Contract with Itron
Completion Date: 6/30/2009
RIS MODELING 7 10 Task Description: Research, identify and obtain ancillary data needed to enhance the San Diego PECAS model.
Product: Databases and data documentation
Completion Date: 6/30/2009
RIS MODELING 8 40 Task Description: Develop, calibrate, and evaluate the 2nd-generation PECAS model described in task two and present 2nd-generation model to advisory committee.
Product: Model, documentation, and evaluation report
Completion Date: 6/30/2009
FUTURE ACTIVITIES
During FY 2009 we expect to concentrate our efforts on completing a project-level PECAS model capable of providing forecasts for the next Regional Transportation Plan. In addition, this model will have a selected set of policy analysis capabilities, which will be determined in consultation with the Executive Team and the agency's decision-makers.
2-31
MANDATED/COMMITTED: ALL DEDICATED FUNDING: NONE
PROGRAM WORK ELEMENT: 20006 TITLE: GEOGRAPHIC INFORMATION SYSTEMS SERVICES
FY 2009 BUDGET: $787,491 STRATEGIC GOAL: ENHANCE ORGANIZATIONAL EFFECTIVENESS
OBJECTIVE
The objectives of this work element are to: (1) create, update, document, and disseminate geographic information system (GIS) databases, imagery, and applications for staff use and to support many of SANDAG’s work programs; (2) coordinate GIS projects with federal, state, and local agencies to reduce data redundancy while optimizing funding and inter-agency planning efforts; (3) provide technical support, data services, and cartography for the new, small area Production Exchange and Consumption Allocation System (PECAS) forecasting model, the I-PLACE³S sketch planning tool, and our transportation models; and (4) improve and expand the use of visualization tools for analysis and presentations. During FY 2009 emphasis will be placed on modifying our Land Information System (LIS) to accommodate requirements of the PECAS forecasting model, the I-PLACE³S sketch planning tool, and transportation models. We also will strive to expand the use of animation, 3D, and time-series visualization tools to evaluate model results and to enhance presentations.
PREVIOUS ACCOMPLISHMENTS
Previous accomplishments include providing GIS support and data for the Regional Transportation Plan (RTP), Regional Comprehensive Plan (RCP), Regional Growth Forecast, Service Bureau programs, and Public Safety programs. We have led several successful data development partnerships which have cost effectively created many important databases for the region. We also coordinated GIS activities between federal, state, and local agencies, including the San Diego Geographic Information Source (SanGIS), the San Diego Regional GIS Council (SDRGC), the California Geographic Information Association (CGIA), and the United States Geological Survey (USGS). During FY 2008 GIS data and technical support were provided for the PECAS forecasting model and I-PLACE³S sketch planning model; detailed parcel-level GIS databases were acquired or updated as needed; we improved and expanded the use of animation and 3D tools for presentations; we created an improved interface for public access to SANDAG's geospatial data; and we acquired aerial imagery for 2007.
Committee(s): None
Working Group(s): San Diego Regional GIS Council
Project Manager: Susan Carnevale
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RIS COMMUNI-CATION
1 15 Task Description: Coordinate GIS and imagery projects with federal, state, and local agencies, including the SDRGC, CGIA, USGS, and SanGIS.
Product: 2008/2009 aerial imagery
Completion Date: 6/30/2009
2-32
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RIS MODELING 2 25 Task Description: Investigate, evaluate, and integrate new detailed parcel-level data and synthetic population data into LIS to support the PECAS forecasting and the I-PLACE³S planning models.
Product: Detailed land and economic data and synthetic population estimate
Completion Date: 5/31/2009
RTPA RTP MODELING 3 15 Task Description: Develop utilities to integrate GIS data into our LIS to support PECAS and I-PLACE³S, population estimates, transportation models, RCP, RTP, and Service Bureau projects.
Product: Modified LIS to support PECAS and I-PLACE³S
Completion Date: 5/31/2009
COG RIS COMMUNI-CATION
4 20 Task Description: Maintain a comprehensive, up-to-date system of GIS databases, software, and documentation to support efficient and easy access to GIS data for all of SANDAG’s work programs.
Product: Updated databases, documentation, and map templates
Completion Date: 6/30/2009
RIS COMMUNI-CATION
5 5 Task Description: Develop and distribute customized GIS data for other divisions (ARJIS), outside agencies (SanGIS and CWA), and the general public via Internet and general publications.
Product: Customized GIS databases and updated data on Internet
Completion Date: 6/30/2009
RIS COMMUNI-CATION
6 10 Task Description: Coordinate inter-departmental demand for GIS data and imagery, including the Service Bureau, and provide technical assistance to staff to support use of GIS in the work program.
Product: Response to requests for GIS assistance
Completion Date: 6/30/2009
RIS COMMUNI-CATION
7 10 Task Description: Expand visualization (3D and animations) capabilities to effectively illustrate tendencies and trends in spatial data and to evaluate PECAS model results.
Product: Updated paper on SANDAG visualization applications
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Improved computer performance, data storage, data availability, and GIS capabilities permit increasingly complex databases and spatial analyses to be developed and provide more cost-effective ways to maintain our GIS system. We will continue to evaluate and incorporate new GIS technologies and data and convert older applications when beneficial to the agency or our clients, placing particular emphasis on:
• identifying sources for and integrating more detailed data into our LIS to support the PECAS forecasting model and the I-PLACE³S sketch planning model;
• developing desktop and Internet applications to allow GIS access to a wider group of individuals not specifically trained in GIS; and
• forming partnerships to obtain higher-resolution databases and imagery for local and regional projects.
2-33
MANDATED/COMMITTED: PARTIAL DEDICATED FUNDING: NONE
PROGRAM WORK ELEMENT: 20007 TITLE: ASSISTANCE TO TRANSIT OPERATIONS AND PLANNING
FY 2009 BUDGET: $1,353,762 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objectives of this work element are to: (1) conduct primary data collection that will be used for planning, marketing, and operations decision-making; (2) provide technical support on transit-related projects identified in this work element; and (3) provide technical assistance and training on SANDAG data and analysis tools. During FY 2009 emphasis will be placed on increasing the functionality of the Passenger Counting Program (PCP) and documenting how the transit system is being used by conducting a regionwide survey of transit passengers.
PREVIOUS ACCOMPLISHMENTS
Previous accomplishments include monitoring transit ridership characteristics through the PCP and the Trolley and SPRINTER Ridership Estimation Programs. A telephone survey of San Diego County residents was conducted to aid in transit service planning and marketing. In FY 2008 a new PCP software application was implemented which expands our ability to analyze and report transit ridership information. SANDAG also completed the Regional Travel Behavior Survey (TBS). TBS data is used to analyze travel behavior in the region and calibrate travel demand forecasting models.
Committee(s): None
Working Group(s): Transit Research Working Group
Project Manager: Jeffrey Martin
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA 1 50 Task Description: PCP, automatic and manual.
Product: Passenger count reports
Completion Date: 6/30/2009
RTPA 2 2 Task Description: Monthly Trolley Ridership Estimation Program and quarterly SPRINTER Ridership Estimation Program.
Product: Monthly ridership reports
Completion Date: 6/30/2009
SB1703 3 3 Task Description: Design questionnaire and develop sampling plan for 2009 Regional Onboard Transit Passenger Survey.
Product: Questionnaire and sampling plan technical memo
Completion Date: 8/15/2008
SB1703 4 35 Task Description: Perform onboard survey data collection and begin editing and quality control checks and preliminary analysis.
Product: Survey database
Completion Date: 6/30/2009
2-34
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
COMMUNI-CATION
5 10 Task Description: Conduct Transit Research Working Group meeting and provide technical support and training on SANDAG data and analysis tools.
Product: Data and technical memos as needed
Completion Date: 6/30/2009
FUTURE ACTIVITIES
The Assistance to Transit Operations and Planning (ATOP) Program will continue to monitor system ridership characteristics through surveys, the PCP, and monthly ridership estimation for the Trolley and SPRINTER. Expanded use of automatic passenger counters will be a focus to reduce PCP costs and increase the amount and improve the reliability of PCP data. The ATOP Program will continue to investigate and implement new ways to make relevant data easily accessible to transit agency staff and provide it in a format that supports analysis and reporting.
2-35
MANDATED/COMMITTED: ALL DEDICATED FUNDING: NONE
PROGRAM WORK ELEMENT: 20009 TITLE: PERFORMANCE INDICATOR DATA MANAGEMENT
FY 2009 BUDGET: $120,108 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
This work element combines performance indicator data management for two major subject areas: indicators for the Regional Comprehensive Plan (RCP) and other regional reports and indicators related to performance of the regional transportation network. The objectives of this work element are to: (1) update and maintain performance monitoring data for the RCP, State of the Commute Report, and Sustainable Competitiveness Index; (2) enhance the Performance Indicator Data Management System; and (3) research, obtain, and report travel indicators for various modes of transportation, including trip generation rates, traffic counts, travel times, bicycle and pedestrian counts, and vehicle occupancy surveys.
Emphasis in FY 2009 is to: (1) update data and documentation in the Performance Indicator Data Management System; (2) evaluate the data from arterial and transit PeMS (APeMS and TPeMS); and (3) determine how to incorporate those new data sets into the travel time estimates for the RCP Monitoring and State of the Commute reports.
PREVIOUS ACCOMPLISHMENTS
Previous work includes developing the Performance Indicator Database application, collecting and incorporating indicator data into the system, and providing the system to staff for use. We also developed a methodology for estimating corridor travel times and produced 2001-2006 travel time estimates for corridors with monitoring stations during those years. We also completed the Vehicle Occupancy Survey in FY 2008.
Ongoing work includes routine data updates and database maintenance for the Performance Indicator Database, reporting for the various publications (RCP Monitoring report, State of the Commute report, Sustainable Competitiveness Index, and other publications), and maintaining travel time information for the RCP Monitoring and State of the Commute reports. Periodically, vehicle occupancy and vehicle classification surveys are conducted as part of this work.
Committee(s): None
Working Group(s): None
Project Manager: Beth Jarosz
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RIS 1 10 Task Description: Evaluate data from APeMS and TPeMS system.
Product: Memorandum on data validation
Completion Date: 12/31/2008
2-36
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RIS 2 10 Task Description: Develop methodology, including corridor details, for incorporating APeMS and TPeMS into travel time estimates.
Product: Methodology memorandum
Completion Date: 1/31/2009
COG RCP 3 35 Task Description: Update RCP indicator data, including State of the Commute information and documentation.
Product: Updated database and documentation
Completion Date: 5/31/2009
COG RIS 4 15 Task Description: Update all other indicator data and documentation in Performance Monitoring Data System.
Product: Updated database and documentation
Completion Date: 5/31/2009
RTPA RTP TDM 5 15 Task Description: Produce auto and transit travel time estimates for major transportation corridors in the Regional Transportation Plan based on PeMS system.
Product: Annual estimates
Completion Date: 6/30/2009
COG RCP 6 15 Task Description: Coordinate with Planning Department to produce tables and charts and verify data in RCP Monitoring report.
Product: Revisions to RCP Monitoring report
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Ongoing future activities include updating and maintaining the Performance Monitoring Data System (data, application, and documentation).
Future activities also include implementing a long-term, ongoing: travel time data collection system that incorporates data for arterials and transit routes; and a bicycle and pedestrian data collection system.
2-37
MANDATED/COMMITTED: NONE DEDICATED FUNDING: MINIMAL
PROGRAM WORK ELEMENT: 20011 TITLE: REGIONAL ECONOMIC AND MUNICIPAL FINANCE SERVICES
FY 2009 BUDGET: $486,117 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
OBJECTIVE
The objectives of this work element are to: (1) provide economic and fiscal analysis to support SANDAG projects and programs, including implementation of the Regional Comprehensive Plan (RCP), Regional Transportation Plan (RTP), and TransNet; (2) periodically update the San Diego Regional Economic Prosperity Strategy (REPS), the San Diego Regional Indicators of Sustainable Competitiveness, the San Diego Regional Employment Lands Inventory; and the San Diego Regional Employment Clusters; and (3) provide technical assistance and support to local jurisdictions, economic development organizations, and other agencies to address issues that impact the regional and local economies and that impact municipal budgets and financial conditions. Emphasis in FY 2009 is on: (1) outreach and implementation of recently updated REP’s actions; (2) continue to complete the employment lands inventory, including expanding the inventory to residential land; (3) analyze possible funding sources and strategies to close the RTP funding gap; and (4) investigating innovative financing strategies for implementing the RCP, including a potential Quality of Life initiative and other regional infrastructure components.
PREVIOUS ACCOMPLISHMENTS
SANDAG produced a REPS in 1992 and updated the strategy in 1998, and more recently, in 2008. REPS is an element of the RCP, focused on strategies and actions designed to increase the rate of growth in the region’s standard of living. SANDAG regularly produces a Sustainable Competitiveness Index that compares the performance of the San Diego region’s economy, environment, and social equity against similar regions across the nation. The Index was completed in 2002 and updated in 2005.
In 1998 SANDAG produced the Employment Lands Inventory and Market Analysis and updated this information during 2000. SANDAG will be updating the data during FY 2008 and FY 2009. The report provides a comprehensive inventory of the land available for non-retail employment (e.g., commercial, industrial, and office) development. This information has served as the backbone for the Regional Economic Development Information (REDI) system. The most recent update effort will be expanded to include residential land.
On an ongoing basis, SANDAG evaluates the region’s ability to finance major infrastructure, as well as changes that could be made to improve the state-local government fiscal relationship by identifying ways to create financial incentives to achieve common policy goals and objectives. Also, SANDAG has provided analysis of fiscal issues identified in SANDAG plans, projects, and programs, including the RCP, the RTP, TransNet, and the Environmental Mitigation Program. On an ongoing basis, SANDAG provides technical support to local jurisdictions on issues related to local economics and municipal finance, such as a quarterly forecast of sales tax revenue to assist with budget requirements.
Committee(s): Transportation Committee; Regional Planning Committee; Borders Committee
Working Group(s): Regional Economic Prosperity Strategy Working Group; Sustainable Competitiveness Working Group; Employment Lands Inventory Working Group
Project Manager: Marney Cox
2-38
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
FINANCING
TRANPOR-
TATION
1 15 Task Description: Prepare economic analyses (EA) of 2030 RTP components and reports on potential project/programs financing mechanisms (FMs)
Product: Reports summarizing EAs and FMs (as needed)
Completion Date: 6/30/2009
2 10 Task Description: Support outreach and implementation of the RCP Economic Prosperity’s strategic goals and recommended actions.
Product: Reports summarizing implementation strategies for the next steps for REPS
Completion Date: 6/30/2009
QUALITY OF LIFE FUNDING
3 25 Task Description: Support implementation of the RCP Integrated Regional Infrastructure Strategy goals and objectives, including Quality of Life initiative.
Product: Report on potential financing strategies (as needed)
Completion Date: 6/30/2009
IMPLEMENT TRANSNET
4 20 Task Description: Support TransNet program.
Product: Revenue projection models and estimates (as needed) and assist with maintaining Plan of Finance
Completion Date: 6/30/2009
5 10 Task Description: Provide technical assistance and support to other local agencies on economic and fiscal issues including fiscal reform.
Product: Reports and studies (as needed)
Completion Date: 6/30/2009
6 20 Task Description: Complete employment and residential lands inventory.
Product: Final employment and residential lands inventory report
Completion Date: 3/31/2009
FUTURE ACTIVITIES
Future activities include: implementing and monitoring the implementation of the REPS; maintaining the REDI system; and regularly updating TransNet revenue projections.
2-39
MANDATED/COMMITTED: ALL DEDICATED FUNDING: NONE
PROGRAM WORK ELEMENT: 20014 TITLE: CJ – REGIONAL CRIMINAL JUSTICE RESEARCH AND CLEARINGHOUSE
FY 2009 BUDGET: $193,434 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
OBJECTIVE
The objectives of this Criminal Justice (CJ) work element are to: (1) support local criminal justice planning and policy-making by providing analyses of crime and other public safety statistics; (2) maintain current and historical information about crime and public safety strategies; (3) serve as the infrastructure for developing research designs to evaluate the effectiveness of crime prevention and reduction strategies; and (4) support the Public Safety Committee (PSC). During FY 2009 emphasis will be placed on seeking funding to support initiatives of regional interest and informing and supporting regional gang task forces and gang prevention and intervention strategies.
PREVIOUS ACCOMPLISHMENTS
Previous accomplishments include responding to daily requests for crime-related information from elected officials, criminal justice administrators, community-based agencies, the public, and the media; maintaining crime-related databases and criminal justice-related information resources for the community’s access; compiling, assessing for quality, and analyzing crime and arrest data from 20 public safety agencies; identifying, summarizing, and disseminating a list of available private, state, and federal funds to regional public safety and public health agencies; participating as members on the San Diego Gang Commission, Methamphetamine Strike Force, Comprehensive Strategy Taskforce, San Diego Regional Domestic Violence Council, San Diego Re-entry Roundtable; analyzing and disseminating data from OWP work element, 20026, Substance Abuse Monitoring (SAM); and providing staff support to manage the PSC.
Committee(s): Public Safety Committee
Working Group(s): None
Project Manager: Cynthia Burke
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
CJ MOUM COMMUNI-CATION
1 25 Task Description: Prepare CJ faxes, bulletins, and other products such as SAM outcomes, regional crime and arrest data, and other regional public safety information.
Product: Eight CJ Bulletins, twelve CJ Faxes
Completion Date: 6/30/2009
CJ MOUM COMMUNI-CATION
2 15 Task Description: Manage and staff the PSC.
Product: Agenda, reports, and follow-up materials
Completion Date: 6/30/2009
2-40
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
CJ MOUM 3 20 Task Description: Gather, manage, and quality control databases on crime-related information.
Product: Current and historical databases
Completion Date: 6/30/2009
CJ MOUM 4 15 Task Description: Identify, summarize, and respond to requests for proposals.
Product: Minimum of three grant proposals
Completion Date: 6/30/2009
CJ MOUM COMMUNI-CATION
5 15 Task Description: Serve on intergovernmental committees, task forces, and pertinent state and national groups.
Product: Committee memberships
Completion Date: 6/30/2009
CJ MOUM COMMUNI-CATION
6 10 Task Description: Present to policy-makers and practitioners on crime-related and SAM data.
Product: Minimum of two presentations
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Future activities include continuing to monitor the safety of the region and explore ways to enhance the justice system’s accountability to the public and serving as a reliable resource for criminal justice information and partner in grant applications to assist local jurisdictions and community agencies in bringing additional funds to the region to address public safety issues.
2-41
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
GROUP PROGRAM WORK ELEMENT (WE): 20019 GROUP TITLE: CJ – YOUTH EVALUATION PROJECTS
FY 2009 BUDGET: $509,981 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
WE # PROJECT TITLE FY 2009 BUDGET
20019 JUVENILE JUSTICE CRIME PREVENTION $321,097
20041 YOUTH OFFENDERS RE-ENTRY EVALUATION $10,209
20046 PROBATION INSTITUTION STUDY $15,318
20047 MULTI-SYSTEM THERAPY PROGRAM EVALUATION $11,556
20054 FAMILY SERVICE ENHANCEMENT $6,618
20057 DISPROPORTIONATE MINORITY CONTACT $65,664
20059 JUVENILE MENTALLY ILL OFFENDERS $79,519
OBJECTIVE
The objectives of this Criminal Justice (CJ) work element are to: (1) conduct within local, state, and federal guidelines, impact and process evaluations of programs that provide services for at-risk juveniles in San Diego County; (2) assist contracted partners, including the San Diego County Probation Department, community-based organizations, and school districts, in meeting their grant reporting requirements by acting as an outside program evaluator; (3) design effective research methodologies to document implementation and outcome deliverables; and (4) analyze and summarize evaluation results on a quarterly, bi-annual, and annual basis as dictated by the specific project. Emphasis in FY 2009 will be on completing annual and final reports that provide useful information to local practitioners and policy-makers regarding the most effective strategies in addressing juvenile crime.
PREVIOUS ACCOMPLISHMENTS
For numerous years, the Criminal Justice Research Division (CJRD) has partnered with the San Diego County Probation Department to evaluate many of their programs ranging from prevention to graduated sanctions for adjudicated youth. Ongoing program evaluations conducted in FY 2008 included the Juvenile Justice Crime Prevention Act (JJCPA) - comprising five different program interventions; and quality control study of two local juvenile detention centers. The CJRD also has developed partnerships with other youth-serving entities (i.e., Phoenix House, San Diego Unified School District) in the region as they provide innovative juvenile justice prevention and interventions to youth, including drug and mental health treatment. Evaluation activities include meeting regularly with program staff, designing data collection instruments, conducting interviews and surveys of program participants and family members, collecting criminal histories, and documenting client characteristics.
Committee(s): Public Safety Committee
Working Group(s): None
Project Manager: Sandra Keaton
2-42
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
LGC 1 40 Task Description: Design and implement research methodologies, including collecting data from variety of sources.
Product: Data protocol, instruments, and databases
Completion Date: 6/30/2009
LGC 2 10 Task Description: Hold regular meetings with staff.
Product: Meeting minutes and action items
Completion Date: 6/30/2009
LGC 3 50 Task Description: Analyze and summarize outcome results.
Product: Four annual reports/updates and three final reports
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Future activities are contingent upon future state and local funding.
2-43
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 20026 TITLE: CJ – SUBSTANCE ABUSE MONITORING
FY 2009 BUDGET: $111,983 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
OBJECTIVE
The objectives of this Criminal Justice (CJ) work element are to: (1) measure drug use and other behavior trends among arrested adults and juveniles; and (2) conduct interviews with adults booked into three San Diego County detention facilities and juveniles booked into San Diego County’s Juvenile Hall on a bi-annual basis about their alcohol and drug use history. Emphasis during FY 2009 is to conduct at least 800 interviews.
PREVIOUS ACCOMPLISHMENTS
SANDAG has conducted interviews with adult and juvenile arrestees since 1987. When federal funding for these interviews was discontinued in 2003-04, local funding sources were secured. San Diego is the only location nationwide that collects data from recent arrestees and maintains the possibility for longitudinal analysis of local drug trends. Locally, this information is used to assess drug use trends and identify potential drug epidemics and treatment needs. This project also has served as a platform for other research with the inclusion of questions related to methamphetamine and intravenous drug use, gang involvement, and domestic violence.
Committee(s): Public Safety Committee
Working Group(s): None
Project Manager: Cynthia Burke
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
LGC 1 100 Task Description: Conduct interviews with and collect urine specimens from adult and juvenile arrestees.
Product: Completed interviews
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Local funding has been established for the foreseeable future, enabling this project to continue.
2-44
MANDATED/COMMITTED: PARTIAL DEDICATED FUNDING: NONE
PROGRAM WORK ELEMENT: 20031 TITLE: CREATIVE SERVICES PROGRAM
FY 2009 BUDGET: $497,559 STRATEGIC GOAL: ENHANCE ORGANIZATIONAL EFFECTIVENESS
OBJECTIVE
This element provides a full range of graphics and printing support services for the agency’s plans, programs, and projects. The services include in-house graphic design and production of maps, business and display graphics, brochures, photography, Web-based products, and other printed, as well as audio/visual materials. Graphics and related support services are essential to the quality, understanding, and readability of the agency’s reports, presentations, and public communications. Maps and artwork, together with appropriate layouts and graphic illustrations, help to explain complex technical and policy issues. In-house graphics maximize product quality control and efficiency. Emphasis in FY 2009 will be to continue to obtain work order agreements for large tasks, charging graphics support directly to the requesting job.
PREVIOUS ACCOMPLISHMENTS
During the previous year, the Creative Services Program has continued to enhance its capabilities, publications’ quality and production process, and interactive audio/visual presentation products. The costs of graphics and documents to be produced by outside vendors continue to be budgeted within individual work elements.
Committee(s): None
Working Group(s): SANDAG Intranet Working Group
Project Manager: Pamela Albers
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
COMMUNI-CATION
1 10 Task Description: Graphics program coordination of large jobs.
Product: 511, FasTrak®, and RideLink.
Completion Date: 6/30/2009
COMMUNI-CATION
2 5 Task Description: Provide graphics support services to technical services products.
Product: Brochures, newsletters, etc.
Completion Date: 6/30/2009
RCP COMMUNI-CATION
3 10 Task Description: Provide graphics support services to planning /land use products (reports, workshops, etc.).
Product: Graphics, workshop materials, public information/educa-tion
Completion Date: 6/30/2009
2-45
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
COMMUNI-CATION
4 25 Task Description: Provide graphics support services to mobility products.
Product: Maps, brochures, presentations, and public information/ education
Completion Date: 6/30/2009
TNET COMMUNI-CATION
5 35 Task Description: Provide graphics support services to communi-cations products.
Product: Newsletters, brochures, postcards, and presentations
Completion Date: 6/30/2009
COMMUNI-CATION
6 5 Task Description: Provide general graphics support services to all other agency activities.
Product: Meeting support, graphics, photography, and communication pieces
Completion Date: 6/30/2009
COMMUNI-CATION
7 5 Task Description: Provide graphics support services to Web-based products.
Product: Images for Web sites
Completion Date: 6/30/2009
COMMUNI-CATION
8 5 Task Description: Provide graphics support services to 3d Studio Max visualization projects for transportation and land use improvements.
Completion Date: 6/30/2009
FUTURE ACTIVITIES
During the next year, Creative Services will be involved designing and producing collateral for RideLink, 3d simulation, 511, FasTrak®, Freeway Service Patrol, Compass Card, Super Loop, and various other projects.
2-46
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
GROUP PROGRAM WORK ELEMENT (WE): 20036 GROUP TITLE: CJ – PUBLIC HEALTH PROJECTS
FY 2009 BUDGET: $64,682 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
WE # PROJECT TITLE FY 2009 BUDGET
20036 PUBLIC HEALTH PROJECTS $4,072
20023 SYRINGE EXCHANGE PROGRAM EVALUATION $19,338
20038 HIV MPOWERMENT EVALUATION $14,719
20039 HIV BEHAVIOR CAMPAIGN $17,021
20058 PROMOTING RESPONSIBLE FATHERHOOD $9,532
OBJECTIVE
The objectives of this Criminal Justice (CJ) work element are to: (1) assist the Family Health Centers of San Diego (FHCSD) to meet all federal reporting requirements for three health prevention projects targeting men at risk for Human Immunodeficiency Virus (HIV) or Hepatitis; (2) provide technical assistance for evaluation considerations related to other public health-related efforts; (3) assist Vista Community Clinic (VCC) in evaluating a project aimed at promoting responsible fatherhood; and (4) analyze and summarize results in written reports. During FY 2009 emphasis will be placed on continuing to provide useful and timely feedback to the program partners.
PREVIOUS ACCOMPLISHMENTS
The Criminal Justice Research Division (CJRD) has partnered with FHCSD for the past six years on their implementation of public health programs. VCC also has been a partner on other projects on which the CJRD has worked .
Committee(s): Public Safety Committee
Working Group(s): None
Project Manager: Sandra Keaton
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
LGC 1 15 Task Description: Meet regularly with staff.
Product: Meeting minutes
Completion Date: 6/30/2009
LGC 2 35 Task Description: Implement research methodologies to inform and measure marketing outreach efforts.
Product: Data collection instruments and databases
Completion Date: 6/30/2009
2-47
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
LGC 3 40 Task Description: Analyze and summarize evaluation results.
Product: Five reports for the funding agencies
Completion Date: 6/30/2009
LGC 4 10 Task Description: Provide evaluation technical assistance for other public health-related efforts.
Product: Recommendations as required
Completion Date: 6/30/2009
FUTURE ACTIVITIES
One of these projects will end in FY 2009, three in FY 2010, and one in FY 2011.
2-48
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
GROUP PROGRAM WORK ELEMENT (WE): 20055 GROUP TITLE: ADULT CRIMINAL JUSTICE PROJECTS
FY 2009 BUDGET: $800,481 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
WE # PROJECT TITLE FY 2009 BUDGET
20055 ADULT CRIMINAL JUSTICE PROJECTS $714,993
20060 NORTH COUNTY GANG ENFORCEMENT COLLABORATION $85,488
OBJECTIVE
The objectives of this work element are to conduct both process and impact evaluations of: (1) a re-entry program targeting non-violent adult offenders exiting the state prison system; and (2) a coordinated effort in North County to target gang crime across a variety of jurisdictions. During FY 2009 emphasis will be placed on following ex-offenders as they begin to exit the prison system and to implement a thorough research design for the gang project.
PREVIOUS ACCOMPLISHMENTS
The Criminal Justice Research Division (CJRD) has previously evaluated a number of adult and juvenile re-entry evaluations and has been involved in local efforts to better understand where ex-offenders are returning to in our communities. SANDAG also has conducted projects related to youth gang and violence prevention.
Committee(s): Public Safety Committee
Working Group(s): None
Project Manager: Cynthia Burke
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
LGC 1 20 Task Description: Meet with program staff on a weekly/monthly basis to assess progress on adult crime reduction research projects.
Product: Meeting minutes
Completion Date: 6/30/2009
LGC 2 50 Task Description: Implement research methodologies, including the creation, collection, and quality control of data.
Product: Data collected
Completion Date: 6/30/2009
LGC 3 30 Task Description: Analyze and summarize outcome results.
Product: Two bi-annual reports and quarterly statistics
Completion Date: 6/30/2009
2-49
FUTURE ACTIVITIES
Both projects are currently funded through FY 2009. Future activities are contingent on the receipt of additional funding.
2-50
MANDATED/COMMITTED: ALL DEDICATED FUNDING: NONE
PROGRAM WORK ELEMENT: 21002 TITLE: I-PLACE³S MODELING FOR COMMUNITY SUSTAINABILITY
FY 2009 BUDGET: $122,560 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
OBJECTIVE
SANDAG’s Regional Comprehensive Plan (RCP) calls for planning activities that lead to greater sustainability—a balance between economic prosperity, environmental health, and social equity—in the San Diego region. Toward this end, SANDAG has done the initial technical implementation of the I-PLACE³S model, a Web-based urban planning tool that enables residents, planners, elected officials, and stakeholders to analyze and create "what if" planning scenarios for their communities and the region. This interactive tool helps communities better understand how land use, zoning, and transportation infrastructure decisions impact measures of sustainability. The emphasis in FY 2009 is to: (1) provide member agency planning professionals with the I-PLACE³S interactive tool to assess the land use, transportation, energy, and air quality implications of planning proposals and scenarios at regional and neighborhood scales; (2) further customize the I-PLACE³S model for use in the San Diego region with special emphasis given to transportation and energy outcomes based upon changing land uses; and (3) refresh the I-PLACE³S database with new information as it is made available.
PREVIOUS ACCOMPLISHMENTS
In FY 2008 we completed three I-PLACE³S projects with three different jurisdictions. These projects included training for the local staffs, customizing the I-PLACE³S program for each jurisdiction, and providing ongoing support during the projects. Overall, we received positive feedback from the jurisdictions on the usefulness of the software in local planning applications.
Committee(s): Regional Planning Committee
Working Group(s): Regional Planning Stakeholders Working Group; Regional Planning Technical Working Group
Project Manager: Edward Schafer
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RCP MODELING 1 60 Task Description: Conduct routine maintenance on underlying data and base layers used in the I-PLACE³S model.
Product: Updated I-PLACE³S database and geographic information system layers
Completion Date: 6/30/2009
RCP MODELING 2 10 Task Description: Coordinate with SANDAG planning staff to provide technical support for use of the I-PLACE³S model in RCP implementation.
Product: I-PLACE³S model usable by all member agencies
Completion Date: 6/30/2009
2-51
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RCP MODELING 3 30 Task Description: Provide assistance to the implementation of the energy module in the I-PLACE³S Model.
Product: Usable parameters for energy demand in the region
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Future activities will focus on the application of I-PLACE³S for energy planning. This will be heavily dependent on the completion of the energy module by the California Office of Energy.
2-52
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 21003 TITLE: CRIME PATTERNS AT TRANSIT STATIONS
FY 2009 BUDGET: $37,397 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
OBJECTIVE
The objectives of this work program are to: (1) obtain a better understanding of crimes and crime patterns at transit stations; (2) improve crime prevention techniques to increase transit ridership; and (3) create a geographic information system (GIS)-based crime analysis methodology that will be replicable by transit agencies throughout the state of California to evaluate and monitor their own transit systems.
This project's final analysis and written report will be completed in FY 2009. The findings will be presented, and methods training will be offered to law enforcement agencies in FY 2009 as well.
PREVIOUS ACCOMPLISHMENTS
Work began on this project by establishing a technical group in spring 2007. Crime and land use data have been gathered. Station design data will be gathered in the middle of the current fiscal year (FY 2008). Consultant and project staff are currently working on a methodology for analyzing crime clustering. A retrospective crime analysis will be undertaken in the latter part of FY 2008, with a draft report due in August 2008.
Committee(s): Public Safety Committee
Working Group(s): Technical Group
Project Manager: Kristen Rohanna
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
SGC COMMUNICATION
1 5 Task Description: Conduct technical group meetings. Product: Technical group meetings
Completion Date: 10/31/2008
SGC COMMUNICATION
2 45 Task Description: Prepare final report. Product: Final report
Completion Date: 10/31/2008
SGC COMMUNICATION
3 20 Task Description: Distribute and present report and method-ology. Product: PowerPoint presentation
Completion Date: 10/31/2008
SGC COMMUNICATION
4 30 Task Description: Facilitate training classes. Product: Training hand-outs
Completion Date: 11/30/2008
FUTURE ACTIVITIES
The final project report will be completed in late 2008 (FY 2009).
2-53
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 22001 TITLE: ARJIS: MAINTENANCE AND SUPPORT
FY 2009 BUDGET: $2,623,813 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
OBJECTIVE
The objective of this work element is to provide ongoing support and maintenance for the ARJISNET network and applications used by ARJIS agencies. Included is customer support for these initiatives via help desk services, troubleshooting, problem tracking and reporting, and minor system and program modifications. Ongoing emphasis and priorities include support of: (1) the secure network known as ARJISNET, with nodes at 72 ARJIS agency sites; (2) the ARJIS legacy application that provides real-time law enforcement data to 11,000 law enforcement users and the Crime Analysis Statistical System (CASS) used for statistics, crime analysis, and crime reporting; (3) the Domestic Violence Communication System (DVCS) that provides crime case information to law enforcement and domestic violence treatment providers; (4) ARJIS Web-based applications, such as Cal-Photo (statewide mugshots and Department of Motor Vehicles (DMV) photos) and crime mapping for the public and law enforcement users; and (5) support 25+ servers with service and network monitoring and reporting, periodic backups, hardware and software configuration and upgrades, and disaster recovery.
PREVIOUS ACCOMPLISHMENTS
ARJIS has a fixed-price contract with San Diego Data Processing Corporation (SDDPC) for network and legacy system maintenance to support the ARJIS applications. Maintenance tasks are performed as specified in the service-level agreement or as directed by ARJIS staff. ARJIS staff responds daily to requests for justice-related information from police officers, investigators, support personnel, criminal justice administrators, the public, and the media. Requests include network maintenance and support, security administration, legacy system support, and ARJIS application support, such as Cal-Photo, DVCS, and crime mapping. Weekly metrics and status reports are generated for approved tasks and projects. Monthly project reviews are conducted to ensure adherence to budget, timelines, and stated deliverables.
Committee(s): Public Safety Committee; Chiefs'/Sheriff's Management Committee
Working Group(s): ARJIS Business Working Group; ARJIS Technical Working Group; ARJIS Crime Analysis Working Group
Project Manager: Audrey Radi
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
ARJIS 1 20 Task Description: Perform maintenance tasks on a regular basis in support of the ARJISNET network, servers, and ARJIS applications.
Product: Functional network and applications
Completion Date: 6/30/2009
2-54
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
ARJIS 2 15 Task Description: Respond to law enforcement and public requests for crime and justice information and support.
Product: Written and verbal reports as requested
Completion Date: 6/30/2009
ARJIS 3 15 Task Description: Provide monthly updates of regional crime statistics and other appropriate criminal justice information on the ARJIS Web site.
Product: Updated crime data and mapping application
Completion Date: 6/30/2009
ARJIS 4 15 Task Description: Review weekly and monthly status reports of contractors to ensure adherence to project deliverables, budget, and timeline.
Product: Semi-annual status reports to users
Completion Date: 6/30/2009
ARJIS 5 20 Task Description: Maintain the ARJIS Security Center of over 11,000 active users, validate current users, reset passwords, and provide exception reports of unused accounts.
Product: Secure computer system
Completion Date: 6/30/2009
ARJIS 6 15 Task Description: Prepare project reviews to include budget and timelines.
Product: Semi-annual management and financial reports
Completion Date: 6/30/2009
FUTURE ACTIVITIES
This project will continue to provide real-time, accurate, and timely information to justice personnel. Network, system, and application support will remain a top priority, with a focus on streamlining, automating, and employing cost-effective maintenance and support options. The project to employ VMWare to consolidate existing servers through the use of virtual machines will continue. This will retire some existing hardware and simplify the management of the remaining servers and databases.
2-55
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 22002 TITLE: ARJIS: PROJECT MANAGEMENT AND ENHANCEMENTS
FY 2009 BUDGET: $1,482,584 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
OBJECTIVE
The objective of this work element is to enhance ARJIS systems according to priorities set by the Public Safety Committee (PSC) and Chief’s/Sheriff’s Management Committee (CSMC). This element also includes project management and executive oversight for the ARJIS program and staffing the PSC, CSMC, and other working groups that help guide ARJIS. Specific tasks and projects will be developed, prioritized, and approved by the CSMC and PSC in September 2008 and could include eWatch public mapping, enhancement to the Regional Data Exchange (RDex) federal information-sharing project to include the exchange of structured data elements, and continued development of data input and export interfaces.
PREVIOUS ACCOMPLISHMENTS
ARJIS staff continues to manage and provide oversight for the development of new systems and applications that enhance information-sharing and provide accurate, timely, and relevant information to justice personnel. The projects are consistent with the ARJIS Strategic Plan and are evaluated for their impact on public safety and the region. All projects undergo a detailed project assessment, project plan, and development, implementation, and evaluation cycles. ARJIS provides staff support monthly to the PSC, the CSMC, and ARJIS Business, Technical, Users, and Crime Analysis working groups, and other justice committees. In FY 2006 we developed the prototype RDex interface, in conjunction with the Federal Bureau of Investigation (FBI), to share unstructured federal data (including FBI narrative reports and Bureau of Prisons custody data) with ARJIS users. We also began exchanging crime data with the State Parole to aid in the tracking of sex offenders using global positioning system (GPS) ankle bracelets and implemented an enhanced crime-mapping application for both law enforcement and the public.
Committee(s): Public Safety Committee; Chiefs'/Sheriff's Management Committee
Working Group(s): ARJIS Business Working Group; ARJIS Technical Working Group; ARJIS Users Working Group
Project Manager: Audrey Radi
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
ARJIS 1 10 Task Description: Provide oversight and to staff the various committees that help guide ARJIS.
Product: Meetings and corresponding reports
Completion Date: 6/30/2009
ARJIS 2 25 Task Description: Interactive crime mapping for the law enforcement community.
Product: Law enforcement mapping application
Completion Date: 6/30/2009
2-56
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
ARJIS 3 25 Task Description: Develop CAL-photo interface for global query.
Product: XML-compliant interface
Completion Date: 6/30/2009
ARJIS 4 20 Task Description: Develop Web-enable officer notification system entry.
Product: Online officer notification application
Completion Date: 6/30/2009
ARJIS 5 20 Task Description: Develop regional eWatch.
Product: Citizen-accessible, countywide crime map subscription service
Completion Date: 6/30/2009
FUTURE ACTIVITIES
This work element will continue to focus on an enterprise approach for disseminating public safety information. It will address the needs of public safety personnel through ongoing evaluation of public safety initiatives and new technologies and opportunities identified by the CSMC and PSC. Policies will be developed to facilitate information-sharing while ensuring privacy. Future activities also will include strengthening ARJIS’ leadership as the premier technology resource in the region and continued expansion of ARJIS capabilities to meet its 2009 vision and goals.
2-57
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 22004 TITLE: ARJIS: BORDER SAFE III/RISC
FY 2009 BUDGET: $365,668 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
OBJECTIVE
This work element is funded from the Department of Homeland Security. Their direction for expenditures of these funds is to ensure greater access to information for Customs and Border Protection (CBP) and Immigration and Customs Enforcement (ICE) agents in the field, while continuing to enhance information-sharing among the state and local law enforcement agencies in San Diego and Imperial counties. There are several objectives in this work element. The first is to continue in the progress of law enforcement incident information-sharing, specifically between federal and local justice agencies in San Diego and Imperial Counties via the COPLINK node expansion. The second relates to the increased ability of the ARJIS wireless project to access external law enforcement databases, such as the Immigration and Customs Enforcement ‘ICE-PIC’ data source. The third objective is to explore the science of biometrics, notably in the field of fingerprinting, for authentication purposes and use the results to further the development of fingerprint identification. Lastly, this work element intends to enhance the current public safety alert and notification system by migrating the current application, known as Situational Awareness Team Reporting (STAR), into all mobile personal digital assistants (PDAs) overseen by ARJIS.
This project originally ended on December 31, 2007; however, proposals for additional funding have been submitted. The outcome of these proposals will not be known until March 2008.
PREVIOUS ACCOMPLISHMENTS
Over 400 wireless handsets were purchased for law enforcement personnel, enabling them to remotely track and identify suspects. An application was developed and tested that checks the wing numbers on airplanes and matches it to a national database. This prototype was successfully tested at Montgomery Field and will continue to be used by the Department of Homeland Security. Information-sharing agreements were executed between ARJIS and Orange County, Imperial County, and Tucson. Agreements are pending with the Los Angeles County Sheriff and the Los Angeles Police Department.
Committee(s): Public Safety Committee; Chiefs’/Sheriff’s Management Committee
Working Group(s): ARJIS Business Working Group; ARJIS Technical Working Group
Project Manager: Pam Scanlon
2-58
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
ARJIS 1 25 Task Description: The Imperial County Law Enforcement Coordination Center COPLINK node will be installed and connected to allow sharing of law enforcement data between their dispatch database and ARJIS COPLINK database in support of the regional data-sharing across the southern counties of California.
Product: COPLINK node expansion
Completion Date: 3/1/2009
ARJIS 2 25 Task Description: To deliver PDA access to external databases, such as ICE-PIC from Department of Homeland Security.
Product: Reverse Geo-coding, improved tabbed browser component
Completion Date: 3/1/2009
ARJIS 3 25 Task Description: To test fingerprinting scanners and tie in results with global query.
Product: 30 pilot devices, manufactured by Cogent Systems, to be deployed by summer 2008
Completion Date: 6/30/2009
ARJIS 4 25 Task Description: Migration of the STAR application into all ARJIS PDAs.
Product: Architecture of STAR application migration
Completion Date: 5/31/2009
FUTURE ACTIVITIES
With continued funding, the refinements and development of a regional wireless vision positions ARJIS to continue as a national test bed for both the Department of Homeland Security and the National Institute of Justice, while providing the most accurate, timely, and useful information to the public safety officers in this region consistent with federal, state, and local statutes and civil law.
2-59
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 22005 TITLE: ARJIS: ENTERPRISE SYSTEM
FY 2009 BUDGET: $1,939,365 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
OBJECTIVE
The objective of this work element is the replacement of the legacy ARJIS system and development of the ARJIS Enterprise System. Emphasis in FY 2009 is to: (1) upgrade the server, network, and security infrastructure of ARJIS; (2) begin to implement enterprise-enabling database, portal, and Web services; (3) continue to explore and recommend technical enterprise solutions; (4) procure the first phase of enterprise applications as identified in the 2007 strategic solution; and (5) continue to monitor system security.
PREVIOUS ACCOMPLISHMENTS
Previous accomplishments include the completion of the ARJIS Enterprise System strategic solution, assistance in gaining consensus with the user community in identifying business needs, identification of a phased timeline for the acquisition of technology to build out the ARJIS Enterprise, and assistance in procuring the first phase of enterprise applications, such as disk arrays. Staff also planned for the upgrade and expansion the existing infrastructure through network security upgrades, SQL database enhancements, and server upgrades. Consultants managed the request for information process to obtain information on Portal, Identity Access Management, and Middleware projects.
Committee(s): Public Safety Committee; Chiefs'/Sheriff's Management Committee
Working Group(s): ARJIS Business Working Group; ARJIS Technical Working Group; ARJIS Users Working Group
Project Manager: Pam Scanlon
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
ARJIS OWP 1 50 Task Description: Procure enterprise applications.
Product: Implement Portal, Access Management, and Middleware projects.
Completion Date: 6/30/2009
ARJIS OWP 2 50 Task Description: Develop mainframe migration strategy.
Product: Plan to migrate uniform crime reporting and other components.
Completion Date: 6/30/2009
FUTURE ACTIVITIES
This project will continue as the ARJIS Enterprise is implemented. Additional phases of work identified in the strategic solution will be completed in the following years, including the use of interactive mapping tools.
2-60
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 22006 TITLE: ARJIS: SRFERS II GRANT
FY 2009 BUDGET: $552,178 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
OBJECTIVE
The objective of this National Institute for Justice (NIJ) grant is to continue developing and implementing the State Regional and Federal Enterprise Retrieval System (SRFERS). The goal of the SRFERS project is to develop the infrastructure, applications, interstate governance, and policies to enable data-sharing between multi-jurisdictional public safety agencies in the western region of the United States. Emphasis in FY 2009 is to: (1) continue adding new data sources to include driver’s license photos from New Mexico, Washington, Arizona, Nevada, and Montana; (2) develop State Implementation Plans (SIPS) for each new states; (3) continue privacy impact assessments, security assessments, and other documentation for the SRFERS toolkit; and (4) maintain the SRFERS Web portal for the SRFERS toolkit (the portal will allow other information-sharing initiatives to access the artifacts in the SRFERS toolkit, such as technical specifications and model memorandums of understanding, and will allow users to share lessons learned and best practices).
PREVIOUS ACCOMPLISHMENTS
Phase I of this project established a secure network connection from ARJIS to National Law Enforcement Telecommunications System (NLETS) and developed Extensible Mark-up Language (XML) schemas and prototypes for interstate sharing of booking photos and license plate reader information. ARJIS developed, documented, and prioritized an initial set of operational requirements through a series of focus group sessions and surveys. Privacy and security assessments were completed, along with interagency communications standards and information-sharing policies. A multi-state policy advisory committee was established that may serve as a governance model for the interstate sharing of public safety information.
The SRFERS team has collaborated with the NLETS Interstate Sharing of Photos (NISP) project, an East Coast information-sharing initiative. The goal is to expand on the types of photos being shared to include driver’s license photos. The technical specifications for this task currently are being developed. Policy issues are being addressed with the Departments of Motor Vehicles (DMV) from the participating states. SRFERS and NISP teams have held several joint meetings to address technical and political boundaries.
Committee(s): Public Safety Committee; Chiefs'/Sheriff's Management Committee
Working Group(s): ARJIS Business Working Group; ARJIS Technical Working Group; ARJIS Users Working Group
Project Manager: Katherine Mugg
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
ARJIS FGC 1 35 Task Description: Add new data souces and regions.
Product: Memorandums of understanding and shared application with neighboring states
Completion Date: 6/30/2009
2-61
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
ARJIS FGC 2 15 Task Description: Update privacy assessment and security assessments on new data sources.
Product: Updated privacy impact assessment
Completion Date: 6/30/2009
ARJIS FGC 3 15 Task Description: Maintain SRFERS toolkit web portal and provide monthly support and updates.
Product: Updated SRFERS portal with current documentation
Completion Date: 6/30/2009
ARJIS FGC 4 20 Task Description: Develop state implementation plans for each new region.
Product: State implementation plans for New Mexico, Idaho, and Montana
Completion Date: 4/1/2009
ARJIS FGC 5 15 Task Description: Final report for NIJ.
Product: Final report
Completion Date: 6/30/2009
FUTURE ACTIVITIES
The plan is to transition these capabilities to the respective states, therefore, we don't envision additional grant funding.
2-62
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 22007 TITLE: ARJIS: REGIONAL INTEROPERABILITY AND COMMUNICATIONS
FY 2009 BUDGET: $50,000 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
OBJECTIVE
The Public Safety Committee (PSC) and the Chiefs'/Sheriff's Management Committee have identified inter-operability as one of four key priorities for the region's public safety agencies. The PSC was recently involved in three workshops focused on interoperability opportunities and issues. The outcome of the workshops was the development of an action plan with short- and long-term deliverables to enhance public safety in the region. In FY 2009 the PSC, in partnership with the Unified Disaster Council (UDC), will oversee the execution of the interoperability action plan. The Department of Homeland Security and other federal agencies also have made interoperability their top priority.
PREVIOUS ACCOMPLISHMENTS
This work program will focus on the continued implementation of the interoperability action plan to include obtaining resources to assist with implementing the action plan, as well as the development and operation of the clearinghouse identified in the action plan. Tasks included in the execution of the action plan are:
update clearinghouse resource needs assessment;
implement business aspects of clearinghouse;
update funding assessment;
assist with outreach and communications;
prioritize initial initiatives based on funding, staffing, and regional need;
define scope of work; and
create and publish charter.
Committee(s): Public Safety Committee; Chiefs’/Sheriff’s Management Committee
Working Group(s): None
Project Manager: Pam Scanlon
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
ARJIS 1 20 Task Description: Facilitate quarterly updates from the Regional Technology Clearinghouse (RTC) to the PSC.
Product: Quarterly reports and Presentations
Completion Date: 6/3/0/2009
ARJIS 2 30 Task Description: Assist with the development and implement-ation of the Technology Advisory Council to advise the RTC and PSC on technology-related issues and opportunities.
Product: Technology Advisory Council membership, roles, and responsibilities
Completion Date: 6/30/2009
2-63
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
ARJIS 3 25 Task Description: Present public safety proposals for Homeland Security funding to the PSC and UDC for prioritization.
Product: Funding Proposals
Completion Date: 6/30/2009
ARJIS 4 25 Task Description: Participate in the execution of the interoper-ability outreach and communications plan.
Product: Outreach/communications plan
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Because this interoperability and communications has been identified by the Public Safety Committee as their highest priority, additional phases focused on enhanced regional efforts will be identified.
2-64
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 22009 TITLE: ARJIS: DOMESTIC VIOLENCE COMMUNICATIONS SYSTEMS
FY 2009 BUDGET: $53,688 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
OBJECTIVE
The purpose of this work element is to enhance the San Diego Domestic Violence Communication System (DVCS). Since its implementation in 2002, the DVCS has enabled agencies in the San Diego region to share information about domestic violence crime case reports for public safety purposes. The emphasis in FY 2009 is to enhance the current application by: (1) finishing the development of a medically mandated reporting component to the system (this component will allow health practitioners to electronically submit reports to the law enforcement agencies when they suspect that a patient has an injury that was the result of a domestic violence assault); (2) enhancing the current reporting program to track offender statistics (ARJIS will collaborate with the Probation Department to enhance the program that pulls statistics from the DVCS Treatment Provider Progress Reports to an track offender’s program status); and (3) finishing the work started in 2008 to link the DVCS to the Family Justice Center new intake system.
PREVIOUS ACCOMPLISHMENTS
The goal of the DVCS is to promote information-sharing between law enforcement domestic violence units, courts, shelters for victims, treatment providers, probation, prosecution, and Child Protective Services (CPS). During the first phase of this project, emphasis was placed on establishing the links and infrastructure to share information between the providers described above. Since 2002 Phase 1 accomplishments have included developing system components to automate treatment progress reports and providing the ability for shelters, treatment providers, and victim advocates to have limited access to domestic violence case report information for safety purposes. These groups were previously unable, and for the most part, unwilling to share critical information to enhance services for domestic violence victims, offenders, and affected families.
Committee(s): Chiefs'/Sheriff's Management Committee; Public Safety Committee
Working Group(s): ARJIS Business Working Group; ARJIS Technical Working Group; ARJIS Users Working Group
Project Manager: Katherine Mugg
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
ARJIS FGC 1 20 Task Description: Finalize the medically mandated reporting tool.
Product: Medically mandated reporting tool
Completion Date: 8/31/2008
ARJIS FGC 2 20 Task Description: Enhance the reporting program that tracks offender statistics.
Product: Enhanced offender statistics
Completion Date: 6/30/2009
2-65
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
ARJIS FGC 3 20 Task Description: Finish developing the link between the DVCS and the Family Justice Center new intake system.
Product: Data interface
Completion Date: 8/31/2008
ARJIS FGC 4 40 Task Description: Prepare final report to National Institute for Justice (NIJ).
Product: Final NIJ report
Completion Date: 10/31/2008
FUTURE ACTIVITIES
Future activities include continuing to seek grant funding for further DVCS enhancements. Enhancements include: (1) expanding the medically mandated reporting application to additional hospitals in the region; (2) interfacing with the courts; and (3) encouraging the use of the above systems.
2-66
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 22011 TITLE: ARJIS: OFFICER NOTIFICATION AND SMART ALERTING SYSTEM
FY 2009 BUDGET: $359,453 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
OBJECTIVE
The objective of this work element is to provide officers and investigators with an easy, automated means for cross-jurisdictional information-sharing of time-sensitive and critically needed information through a single interface.
PREVIOUS ACCOMPLISHMENTS
This is a new work element for FY 2009.
Committee(s): Public Safety Committee; Chiefs'/Sheriff's Management Committee
Working Group(s): ARJIS Business Working Group; ARJIS Crime Analysis Working Group; ARJIS Technical Working Group
Project Manager: Pam Scanlon
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
ARJIS FGC 1 25 Task Description: Develop technical specifications based on CONOPS and user req's developed in FY 2008.
Product: Technical specifications documentation
Completion Date: 9/30/2008
ARJIS 2 25 Task Description: Oversee development of the CAD data import interface and associated documentation.
Product: CAD 911 interace
Completion Date: 11/1/2008
ARJIS 3 35 Task Description: Develop business rules and "watcher" to poll data sources for queries and results.
Product: Alert component or “watcher”
Completion Date: 3/1/2009
ARJIS 4 15 Task Description: Execute proof-of-concept testing and evaluation and prepare final report.
Product: Final report
Completion Date: 6/30/2009
FUTURE ACTIVITIES
xxx
2-67
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 22012 TITLE: ARJIS: TACTICAL IDENTIFICATION SYSTEM
FY 2009 BUDGET: $415,509 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
OBJECTIVE
The objective of this work element, sponsored by the National Institute for Justice (NIJ), is to develop a Web service which will allow an officer in the field to take a photo and upload it to a server, which will then match it against over 800,000 San Diego booking photos. Positive matches then will be processed on the server side, and a proposed photo line up will be sent back to the law enforcement agent for comparison and the ability to run additional queries based on a name and date-of-birth standard search.
PREVIOUS ACCOMPLISHMENTS
This is a new work element for FY 2009.
Committee(s): Public Safety Committee; Chiefs'/Sheriff's Management Committee
Working Group(s): ARJIS Business Working Group; ARJIS Crime Analysis Working Group; ARJIS Technical Working Group
Project Manager: Katherine Mugg
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
ARJIS FGC 1 20 Task Description: Conduct a market research assessment of commercially available facial recognition products to determine the best products to use in the development of facial recognition platform
Product: Market research report
Completion Date: 7/31/2008
ARJIS FGC 2 30 Task Description: Develop a market research platform with a database of existing booking photos.
Product: Photo database
Completion Date: 9/30/2008
ARJIS FGC 3 30 Task Description: Develop a web service component for inter-action between the users and server-side identity matching component and query agent.
Product: Web service
Completion Date: 12/31/2008
ARJIS FGC 4 10 Task Description: Provide an operational assessment of the Tactical Identification System by performing field tests with existing PDA users.
Product: Evaluation metrics and report
Completion Date: 3/31/2009
2-68
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
ARJIS FGC 5 10 Task Description: Prepare final report for NIJ.
Product: Final report
Completion Date: 6/30/2009
FUTURE ACTIVITIES
The outcome of the Phase 1 prototype will determine whether additional grant funding and associated phases are warranted.
2-69
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 22013 TITLE: ARJIS: SMARTSEARCH
FY 2009 BUDGET: $171,564 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
OBJECTIVE
ARJIS was awarded a grant from the National Institute of Justice (NIJ) to develop SmartSearch, an application which will allow law enforcement officers to identify subjects and solve cases more quickly and efficiently. To conduct effective and thorough investigations, law enforcement officers are faced with extremely time-consuming and burdensome queries of different databases and systems, using separate log-ins and passwords for each search. To address these issues, SmartSearch will programmatically select the appropriate system(s) that will return the most relevant results to the officers and provide a means to add new data sources without having to incur significant programming costs and delays in implementing these new sources. SmartSearch will save agencies time and resources, while enhancing the efficiency and effectiveness of law enforcement operations.
PREVIOUS ACCOMPLISHMENTS
This is a new work element for FY 2009.
Committee(s): Public Safety Committee; Chiefs'/Sheriff's Management Committee
Working Group(s): ARJIS Business Working Group; ARJIS Technical Working Group; ARJIS Users Working Group
Project Manager: Katherine Mugg
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
ARJIS FGC 1 20 Task Description: Determine architect approach and test theories.
Product: Technical specifications and document
Completion Date: 7/31/2008
ARJIS FGC 2 30 Task Description: Build prototype client, service brokers, and Smartsearch engine to include ISE.
Product: Smart Search software engine
Completion Date: 10/31/2008
ARJIS FGC 3 5 Task Description: Organize User conference to discuss new search paradigms and user interface approaches.
Product: User conference
Completion Date: 11/30/2008
ARJIS FGC 4 30 Task Description: Build universal client application with various user interface elements.
Product: Smart Search application
Completion Date: 3/1/2009
2-70
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
ARJIS FGC 5 5 Task Description: Demonstrate capabilities
Product: Field test with documented results
Completion Date: 3/31/2009
ARJIS FGC 6 10 Task Description: Prepare final report for NIJ.
Product: Final report
Completion Date: 6/30/2009
FUTURE ACTIVITIES
A designated period will be established for member agencies to test the prototype in operational settings. Feedback sessions will be held with users to assess the effectiveness of the prototype and to solicit input on modifications and enhancements to the prototype. ARJIS plans to submit a grant for additional funding that will allow for the production of the prototype into the existing ARJIS applications.
CHAPTER 2 – DETAILED WORK ELEMENT DESCRIPTIONS
SECTION 3 – PLANNING
2-71
MANDATED/COMMITTED: ALL DEDICATED FUNDING: NONE
PROGRAM WORK ELEMENT: 30002 TITLE: REGIONAL COMPREHENSIVE PLAN PLANNING AND IMPLEMENTATION
FY 2009 BUDGET: $1,224,383 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
OBJECTIVE
The objective of this work element is to implement key strategic initiatives of the Regional Comprehensive Plan (RCP) for the San Diego region. The RCP strengthens the integration of the local and regional plans for land use, transportation systems, infrastructure needs, and public investments within a regional framework of smart growth and sustainability. Emphasis in FY 2009 will be to provide cutting-edge planning tools to assist local jurisdictions in implementing smart growth and sustainable development in the areas identified on the "Smart Growth Concept Map." Major work activities include the completion of the smart growth visualization simulations and their electronic link to the Web-based Smart Growth Concept Map, the preparation of the Smart Growth Design Guidelines, completion of the Smart Growth Trip Generation Rates and Parking Study, the production of the 2008 RCP Monitoring Report, and the implementation of the California Regional Blueprint Planning Grant. In addition, the Planning Department will prepare a Strategic Business Plan, which will include the development of work program for a comprehensive update of the RCP and administer two other planning grants, City Heights Walks to School! and Access to Community Medical Transportation.
PREVIOUS ACCOMPLISHMENTS
As required by Senate Bill 1703, SANDAG initiated the preparation of the RCP in early 2002. The RCP was developed over a two-year period, working with member agencies, stakeholders, and the public. In July 2004 the SANDAG Board of Directors adopted the RCP for the San Diego region.
During FY 2008 SANDAG accomplished the following RCP implementation activities: developed a Smart Growth Toolbox consisting of a public education program, visualization tools, and several I-PLACE3S pilot projects; completed a technical update of the Smart Growth Concept Map; initiated the preparation of the smart growth design guidelines and the smart growth trip generation rates/parking study; obtained and integrated input from the Regional Planning Stakeholders Working Group (SWG) into RCP implementation activities and the update of the 2030 Regional Transportation Plan (RTP); completed the 2007 RCP Performance Monitoring report; and completed a status report on the implementation of RCP strategic initiatives.
This FY 2009 work element coordinates the continuing implementation of the RCP with a variety of other work elements in the OWP. The Regional Planning Technical Working Group (TWG) (the region’s planning and community development directors) makes recommendations to the Regional Planning Committee and the Board of Directors on this work. A SPRINTER Smart Growth Working Group was formed in 2007 to coordinate on subregional land use and transportation issues in North County related to the SPRINTER.
Committee(s): Regional Planning Committee
Working Group(s): Regional Planning Technical Working Group; SPRINTER Smart Growth Working Group
Project Manager: Carolina Gregor
2-72
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RCP SMART GROWTH DESIGN
1 20 Task Description: Enhance Smart Growth Planning Toolbox to facilitate local-level smart growth implementation of the Smart Growth Concept Map.
Product: I-PLACE3S, visualization tools, educational program, and periodic Smart Growth Concept Map updates
Completion Date: 6/30/2009
RCP SMART GROWTH DESIGN
2 20 Task Description: Complete smart growth design guidelines.
Product: Smart growth design guidelines
Completion Date: 6/30/2009
RCP SMART GROWTH DESIGN
3 15 Task Description: Prepare smart growth trip generation/parking study for use in updating the SANDAG traffic generator manual and as input to the Smart Growth Design Guidelines.
Product: Smart growth trip generation rates and parking study
Completion Date: 12/31/2008
SB1703 RCP SUSTAINABLE DEVELOP-
MENT
4 10 Task Description: Complete 2008 RCP Monitoring report and begin preparation of the 2009 report.
Product: RCP Monitoring reports
Completion Date: 6/30/2009
MPO RCP
COMMUNI-CATION
5 15 Task Description: Prepare a strategic business plan for the SANDAG Planning Department, including a work program for a comprehensive update of the RCP.
Product: Strategic business plan
Completion Date: 12/31/2008
RCP 6 5 Task Description: Continue implementation and dissemination of social equity and environmental justice guidelines to be used in SANDAG plans and programs, including Title VI Compliance.
Product: Title VI compliance report
Completion Date: 12/31/2008
RCP 7 15 Task Description: Provide support to policy committees and working groups; receive training; and provide administrative support to the Land Use section.
Product: Meetings, agendas, evaluations, and quarterly reports
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Future activities include continued implementation of RCP Strategic Initiatives focused on smart growth and sustainability. This includes coordinating activities of local jurisdictions, the private sector, infrastructure providers, environmental groups, academic institutions, and others to implement the various RCP initiatives.
2-73
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 3000206 TITLE: BLUEPRINT PLANNING PROGRAM GRANT
FY 2009 BUDGET: $339,208 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
OBJECTIVE
The objective of this work element is to assist in the implementation of key strategic initiatives in the Regional Comprehensive Plan (RCP). Emphasis in FY 2009 will be on focused on staff support for developing a regional infrastructure funding strategy and consultant services for the preparation of the Smart Growth Design Guidelines. These two efforts fit into SANDAG's larger vision of implementing the RCP.
PREVIOUS ACCOMPLISHMENTS
The California Regional Blueprint Planning Program has provided an opportunity for SANDAG to enhance and advance implementation of RCP strategic initiatives already underway. To support implementation of the Board-adopted Smart Growth Concept Map, first- and second-year grants resulted in the use of an advanced analytical tool called “I-PLACE3S” by local planners to create and compare Second-year funding also allowed consultant work to begin on the Smart Growth Urban Design Guidelines, which will provide added guidance to local staffs and community members on how smart growth development can be designed to meet both community and regional needs.
In support of the 2030 Regional Transportation Plan Update, second-year Blueprint Planning Program funding also allowed SANDAG to participate in a Goods Movement Action Plan for Southern California that recommends strategies to address the recent increase in truck traffic on regional highways. Blueprint Planning Program grant funding also supported initial work toward implementing the Integrated Regional Infrastructure Strategy, a strategy to address regional infrastructure needs identified in the RCP.
Committee(s): Regional Planning Committee
Working Group(s): Regional Planning Technical Working Group
Project Manager: Andrea Groves
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
SGC SMART GROWTH DESIGN
1 100 Task Description: Implement Caltrans Blueprint Planning Program grant focused on staff support for regional infrastructure funding strategy and pass-through funding for consultant services for design guidelines.
Product: Infrastructure funding strategy and smart growth design guidelines
Completion Date: 6/30/2009
FUTURE ACTIVITIES
SANDAG has submitted a request to the State for third-year Blueprint Planning Program grant funding to continue to enhance and advance RCP implementation efforts already underway, specifically in the areas of infrastructure funding (building upon current infrastructure efforts) and other innovative financing mechanisms to implement the RCP, including public-private partnerships.
2-74
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 3000207 TITLE: GRANT ADMINISTRATION FOR “ACCESS TO COMMUNITY MEDICAL TRANSPORTATION SERVICES” PROJECT
FY 2009 BUDGET: $1,307 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objective of this work element is to identify the cause and effect of utilizing emergency transportation and associated vehicles and medical equipment for non-emergency situations. All Congregations Together (ACT) will conduct surveys and focus groups to assess the full range of community members' social norms, economic status, medical practices, and transportation needs/available transportation to determine the specific reasons for this behavior, the social and economic impact on the overall community, and what can and should be done to affect this trend. ACT will utilize the acquired data to develop recommendations and activities for use elsewhere where similar situations exist throughout the state of California and beyond.
PREVIOUS ACCOMPLISHMENTS
SANDAG applied for a Caltrans transportation planning grant for this project in October 2005. Funds for this project are passed through SANDAG to the subrecipient, ACT. Work completed in FY 2007 included hiring a consultant, engaging partners, hiring and training community members to engage the public, surveys, focus groups, regional meetings, project management and meeting preparation, and additional tasks as assigned under the contract.
Committee(s): None
Working Group(s): None
Project Manager: Shelby Tucker
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
SGC 1 100 Task Description: Administer the Caltrans "Access to Community Medical Transportation Services Project" grant.
Product: Grant applications, materials, and progress reports
Completion Date: 4/30/2009
FUTURE ACTIVITIES
Future activities include the preparation of study and final reports.
2-75
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 3000208 TITLE: GRANT ADMINISTRATION “CITY HEIGHTS WALK TO SCHOOL!” PROJECT
FY 2009 BUDGET: $1,358 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
OBJECTIVE
The objective of this work element is to conduct outreach to parents, children, officials, community stakeholders, and residents to plan for 'safe routes to school' (SR2S) in City Heights, revolving around National Walk to School Day events in October. City Heights is one of the oldest, most diverse, and underserved communities in the San Diego region. The community has a critical unmet transportation need that qualifies it for an environmental justice planning grant; many streets are unsafe for children to walk to and from school. This grant proposes to create and/or update SR2S maps for each school with input from community members and city officials. A needs assessment will be done for each school that identifies deficiencies, solutions, and costs of implementing pedestrian safety improvements around local schools. This project fits into SANDAG's larger vision of promoting walkable communities to encourage smart growth development, especially in the denser urban core. The key objectives for FY 2009 are for the community group to organize one National Walk to School day event, initiate maps and assessments for nine schools, and conduct outreach to parents regarding pedestrian safety.
PREVIOUS ACCOMPLISHMENTS
xxxxxx
Committee(s): None
Working Group(s): None
Project Manager: Shelby Tucker
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
SGC 1 100 Task Description: Administer pass-through grant to City of San Diego and City Heights CDC.
Product: Maps and assessment for nine schools
Completion Date: 6/30/2009
FUTURE ACTIVITIES
There are not future activities as the project will be completed in FY 2009.
2-76
MANDATED/COMMITTED: ALL DEDICATED FUNDING: NONE
PROGRAM WORK ELEMENT: 30004 TITLE: REGIONAL MOBILITY AND TRANSPORTATION PLANNING
FY 2009 BUDGET: $452,033 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objective of this work element is to improve regional mobility and air quality by: (1) implementing the 2030 Regional Transportation Plan (RTP); (2) coordinating regionally with federal and state (Caltrans) agencies on highway planning, along with local agencies (including the San Diego County Regional Airport Authority) and tribal governments on arterial and ground access planning; (3) monitoring the Congestion Management Program (CMP) network; and (4) complying with state and federal requirements for coordination of transportation and land use activities to improve the region’s air quality. This element of the overall work program (OWP) includes implementation of the 2030 RTP, interaction with OWP element 30002 (Regional Comprehensive Plan (RCP) Implementation), and air quality conformity analysis for amendments to the Regional Transportation Improvement Program (RTIP). Efforts include conducting transportation and emissions analyses for the RTIP in support of conformity determinations, implementing the federal standard for 8-Hour Ozone, and complying with updates to transportation conformity rules and procedures. This work element is prepared in accordance with state and federal guidelines.
PREVIOUS ACCOMPLISHMENTS
Previous work includes adoption of the 2030 RTP. The regional arterial network was updated in FY 2007, as were the transportation project evaluation criteria as part of the development of the 2030 RTP. SANDAG has conducted several air quality conformity determinations for the RTP and the RTIP since the passage of the federal Clean Air Act Amendments in 1990. Transportation Conformity Procedures have been adopted as required by that legislation. The SANDAG Transportation Control Measures (TCM) Plan for Air Quality was approved by the Air Pollution Control Board in 1992 as part of the state-required Regional Air Quality Strategy. The implementation of TCMs is undertaken in other OWP work elements, including: 60001, Transportation Demand Management (TDM); 11091, Project Development and Oversight; and 40006, Regional Transportation Improvement Program.
The San Diego region was reclassified as “maintenance/attainment” for carbon monoxide (CO) in 1998. SANDAG participated with the California Air Resources Board (CARB) in the development of the 2004 CO Maintenance Plan update. Also, SANDAG participated in the development of the 2002 1-Hour Ozone Maintenance Plan, which was approved as a State Implementation Plan (SIP) revision by the U.S. Environmental Protection Agency (EPA) in 2003. Both these plans include new emissions budgets for CO and ozone precursors that are the applicable budgets for conformity. In addition, SANDAG collaborated in the preparation of the 8-Hour Ozone Attainment Plan, which was submitted to the U.S. EPA in June 2007.
In FY 2008, SANDAG prepared the draft air quality conformity analysis for the 2008 RTIP.
Committee(s): Transportation Committee; Regional Planning Committee
Working Group(s): San Diego Region Conformity Working Group; Cities/County Transportation Advisory Committee; Regional Planning Technical Working Group
Project Manager: Elisa Arias
2-77
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
MPO RTIP IMPLEMENT TRANSNET
1 10 Task Description: Conduct emissions analyses to determine conformity of the 2008 RTIP and amendments and 2030 RTP amendments, as needed and develop documentation, including modeling procedures.
Product: Draft and/or final conformity findings and documents
Completion Date: 6/30/2009
MPO RTIP IMPLEMENT TRANSNET
2 10 Task Description: Continue the consultation provisions of the adopted Transportation Air Quality Conformity Procedures and comply with provisions of the revised EPA Transportation Con-formity Rule.
Product: Consultations and conformity procedure updates
Completion Date: 6/30/2009
MPO RTP IMPLEMENT TRANSNET
3 20 Task Description: Coordinate, develop, and refine the highway and arterial system planning work for the RTP, RCP, and RTIP.
Product: Refined highway and arterial system plan
Completion Date: 6/30/2009
MPO RTP IMPLEMENT TRANSNET
4 5 Task Description: Provide staff support for the San Diego Region Conformity Working Group.
Product: Agendas, minutes, and actions
Completion Date: 6/30/2009
CMA RTP CONGESTION MANAGE-
MENT
5 10 Task Description: Complete 2008 Congestion Management Program (CMP) update.
Product: Draft and final CMP reports
Completion Date: 10/31/2008
MPO RTP SUSTAINABLE DEVELO-PMENT
6 20 Task Description: Provide staff support in the development of the regional Climate Change Action Plan.
Product: Progress reports
Completion Date: 6/30/2009
RTPA RTP FINANCING TRANSNET
7 15 Task Description: Conduct analysis of financing strategies for regional transportation facilities and services.
Product: Report documenting methodology and findings
Completion Date: 3/31/2009
RTPA RTP 8 10 Task Description: Provide administrative support for section staff, receive training, and oversee grants.
Product: Staff meetings, evaluations, and quarterly reports
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Provide general coordination with state and local agencies and governments on regional system planning. Federal law requires continuing coordination on transportation activities regulated by the Clean Air Act and Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users.
2-78
MANDATED/COMMITTED: ALL DEDICATED FUNDING: NONE
PROGRAM WORK ELEMENT: 30008 TITLE: NONMOTORIZED TRANSPORTATION PLANNING AND PROJECT DEVELOPMENT
FY 2009 BUDGET: $114,344 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objective of this work element is to support the agency's efforts to improve mobility and access by providing more travel choices through coordinated nonmotorized transportation planning and project development activities. This work element will focus on completing the San Diego Regional Bicycle Plan, developing new program guidelines, making annual recommendations for bicycle, pedestrian, and neighborhood projects funded by the TransNet and Transportation Development Act (TDA) programs, and providing oversight of regional bikeway development projects.
PREVIOUS ACCOMPLISHMENTS
SANDAG’s nonmotorized transportation program is updated annually based upon input from each of the region’s jurisdictions represented on the Bicycle-Pedestrian Working Group (BPWG). Each year the BPWG makes recommendations to the Transportation Committee and Board of Directors on annual allocations of TransNet and TDA funds for nonmotorized transportation projects. SANDAG also provides ongoing oversight and assistance with regional bikeway project development, including efforts to complete the remaining sections of the Bayshore Bikeway, the Coastal Rail Trail, and the Inland Rail Trail.
The Western Salt project on the Bayshore Bikeway was prepared for construction in FY 2007. Completing construction of that project and beginning development of new projects will continue in FY 2008.
Committee(s): Transportation Committee
Working Group(s): Bicycle-Pedestrian Working Group; Bayshore Bikeway Working Group
Project Manager: Christopher Kluth
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA TNET IMPLEMENT TRANSNET
1 40 Task Description: Administer the bicycle and pedestrian and neighborhood safety program by developing program guidelines and recommending projects.
Product: FY 2009 criteria, application, and funding allocation
Completion Date: 6/30/2009
RTP IMPLEMENT TRANSNET
2 40 Task Description: Assist and oversee efforts to complete unfinished sections of the Bayshore Bikeway, Coastal Rail Trail, Inland Rail Trail, and other regional bikeways.
Product: Bayshore Bikeway project and status report
Completion Date: 6/30/2009
2-79
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
SMART GROWTH DESIGN
3 20 Task Description: Provide technical assistance and participate in discussions regarding nonmotorized transportation and staff support of the BPWG.
Product: Meetings, agendas, and letters
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Future activities include: implementing the Regional Bicycle Plan; providing input regarding legislation related to nonmotorized transportation; and completing the Bayshore Bikeway and other regional bikeway projects.
2-80
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 3000801 TITLE: REGIONAL BICYCLE PLAN
FY 2009 BUDGET: $175,915 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The San Diego Regional Bicycle Plan will be a component of the San Diego Association of Government’s (SANDAG’s) Regional Transportation Plan. The San Diego Regional Bicycle Plan will represent the combined efforts of SANDAG staff, SANDAG’s Regional Bicycle and Pedestrian Working Group (BPWG), local jurisdictions, local agencies, advocacy groups, and citizens in the San Diego region. This plan is regional in focus and concentrates on broader policies and programs, while providing a framework for local decision-makers to determine specific local routes and facilities. The San Diego Regional Bicycle Plan will accomplish the following:
(1) Define a network of regionally significant bicycle routes, facilities, and necessary support programs;
(2) Identify gaps in the network and recommend specific improvements needed to fill the gaps;
(3) Develop cost estimates to complete construction of the regional network;
(4) Develop a funding strategy to build and maintain the regional bike network;
(5) Provide a design manual focusing on bicycle-friendly designs for all streets and roadways through new technologies, standards, guidelines, and innovative treatments on all new roadways and multi-use paths; and
(6) Provide policy direction and identify programs to assist local jurisdictions in improving safety, education, and awareness about bicycle travel.
PREVIOUS ACCOMPLISHMENTS
In 2007 SANDAG received funding from a Caltrans Community Based Transportation Planning Grant to develop the San Diego Regional Bicycle Plan.
Committee(s): Transportation Committee; Independent Taxpayer Oversight Committee
Working Group(s): Bicycle-Pedestrian Working Group
Project Manager: Christopher Kluth
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA TNET SMART GROWTH DESIGN
1 100 Task Description: Complete Regional Bicycle Plan.
Product: Staff reports and Regional Bicycle Plan
Completion Date: 6/30/2009
2-81
FUTURE ACTIVITIES
Future activities include: implementing the Regional Bicycle Plan; creating a process and program for SANDAG to be the lead agency in the development of regional bicycle facilities; establishing SANDAG as the regional clearinghouse for bicycle-related planning tools and information; and exploring the potential benefits of a bike sharing program that expands the transit service area and reduces local vehicle miles traveled.
2-82
MANDATED/COMMITTED: ALL DEDICATED FUNDING: MINIMAL
PROGRAM WORK ELEMENT: 30009 TITLE: GOODS MOVEMENT PLANNING
FY 2009 BUDGET: $500,626 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objectives of this work element are to: (1) collaborate with interregional, state, and federal agencies and goods movement organizations to coordinate the development, operations, funding, and legislation for goods movement transportation systems; (2) coordinate with the region’s freight agencies to continue development and implementation of the regional freight strategy as outlined in the 2030 Regional Transportation Plan (RTP); and (3) complete the evaluation of the potential operation of trucks on the high occupancy vehicle (HOV)/Managed Lanes system in the region.
PREVIOUS ACCOMPLISHMENTS
Completed work in FY 2008 includes the adoption of the San Diego Regional Goods Movement Action Plan (GMAP) in the 2030 RTP. In FY 2008 SANDAG also, as a partner in the Southern California Multi-County Goods Movement Action Plan (MCGMAP), worked with the state of California on the development of its statewide Goods Movement Action Plan and continued to participate in the West Coast Corridor Coalition (WCCC). In 2008 SANDAG also completed team development of a Proposition 1B Trade Corridor Infrastructure application and coordinated Proposition 1B proposals for Goods Movement Emissions Reduction funds. Local studies include improved ground access to both the Tenth Avenue and National City marine terminals by the San Diego Unified Port District (SDUPD). SANDAG is preparing a Border Master Plan, and both the San Diego County Regional Airport Authority and the Port of San Diego are updating their facility master plans.
Committee(s): Transportation Committee
Working Group(s): None
Project Manager: Christina Casgar
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
MPO IMPLEMENT TransNet
1 5 Task Description: Collaborate with state and federal agencies to coordinate legislation, planning, policy, and funding for goods movement.
Product: Quarterly progress reports
Completion Date: 6/30/2009
MPO IMPLEMENT TransNet
2 5 Task Description: Collaborate with gateway regions and other metropolitan planning organizations to develop a coordinated California Goods Movement Strategy.
Product: Quarterly progress reports
Completion Date: 6/30/2009
2-83
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
MPO RTP IMPLEMENT TRANSNET
3 35 Task Description: Evaluate the feasibility of special freeway truck lanes and/or trucks using the Managed Lanes system to define a regional trucking system plan and improve overall regional mobility.
Product: Draft and final report
Completion Date: 12/31/2008
MPO RTP IMPLEMENT TransNet
4 30 Task Description: Coordinate with the Port of San Diego and regional freight agencies on planning, operations, and implementation of the GMAP and the freight/intermodal component of the RTP.
Product: Quarterly progress reports
Completion Date: 6/30/2009
RTP 5 15 Task Description: Update the regional freight strategy to reflect the updated regional economic prosperity strategy and any updates to modal master plans, Regional Comprehensive Plan elements, and technology planning.
Product: Draft and final report
Completion Date: 6/30/2009
RTP 6 5 Task Description: Provide staff support for SANDAG's Trade Corridor Improvement Fund (TCIF) working groups on infra-structure and emissions.
Product: Agendas, minutes, and actions
Completion Date: 6/30/2009
OTHER IMPLEMENT TransNet
7 5 Task Description: Provide staff freight policy support to the West Coast Corridor Coalition.
Product: Meeting notes and quarterly progress reports
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Future activities include ongoing development of region’s freight planning activities as required and the continued coordination with the West Coast Corridor Coalition, members of the MCGMAP, and other California freight planning agencies.
2-84
MANDATED/COMMITTED: ALL DEDICATED FUNDING: NONE
PROGRAM WORK ELEMENT: 30023 TITLE: REGIONAL SHORT-RANGE TRANSIT SERVICE PLANNING
FY 2009 BUDGET: $270,118 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The purpose of this work element is to provide the blueprint for the short-range development of the region's transit system through short-range transit planning, fare setting, and coordination of human service transportation. The objectives of this work element are to: (1) manage the Senior Mini-Grant Program and monitor the performance of grantees, (2) provide transit planning assistance and support for North County Transit District (NCTD) and Metropolitan Transit System (MTS); (3) develop and administer the regional transit fare structure, levels, and policy; (4) manage and deliver SANDAG's program for transportation for seniors and persons with disabilities; (5) monitor transit system performance and recommend improvements in compliance with Transportation Development Act (TDA) requirements; (6) conduct sub-area transit analysis as required; (7) provide transit performance operations planning for major capital projects being developed by SANDAG; and (8) coordinate the Social Services Transportation Advisory Council (SSTAC).
PREVIOUS ACCOMPLISHMENTS
Previous accomplishments include annual preparation of the Regional Short-Range Transit Plan (RSRTP) and coordination of transit operator planning initiatives. The annual RSRTP process incorporates mandated TDA requirements, including establishment of cost recovery goals for the transit operators and the Performance Improvement Plan (PIP). Work is ongoing on developing a new, fully integrated regional fare structure. In FY 2008 work included completion of the combined RSRTP and Coordinated Plan and operation of ongoing Short-Range Transit Planning and Regional Fare Working Groups.
Committee(s): Transportation Committee
Working Group(s): Social Services Transportation Advisory Council
Project Manager: Daniel Levy
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
SB1703 MOUT 1 25 Task Description: Prepare the annual update to the RSRTP in consultation with transit agencies, the Coordinated Transportation Services Agency, and human services organizations.
Product: Final report
Completion Date: 4/30/2009
RTPA TDA 2 15 Task Description: Monitor transit system performance on a quarterly and annual basis and prepare an annual review of transit system performance to determine eligibility for TDA grants.
Product: Final report
Completion Date: 6/30/2009
2-85
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
SB1703 MOUT 3 15 Task Description: Provide planning services/resources for MTS and NCTD, including efforts related to Title VI and other programs and the "Before and After" study for the SPRINTER.
Product: Planning services and resources
Completion Date: 6/30/2009
SB1703 MOUT 4 10 Task Description: Conduct sub-area transit planning studies as required.
Product: Subarea study reports
Completion Date: 6/30/2009
SB1703 MOUT 5 15 Task Description: Develop and administer regional transit fare structures and policy which include U-Pass programs, working w/Mobility and operators to develop Interstate 15 products, and monitoring effectiveness.
Product: Periodic updates to regional transit fare policy
Completion Date: 6/30/2009
RTPA SGC 6 20 Task Description: Manage and deliver SANDAG programs for transportation for seniors and persons with disabilities, oversee the Coordinated Transportation Services Agemcu; coordinate SSTAC, and manage the Senior Mini-Grant Program.
Product: Program status reports
Completion Date: 6/30/2009
FUTURE ACTIVITIES
This is an ongoing work element to plan, monitor, coordinate, and improve the operation of regional transit services and to manage specific activities related to TDA and the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users funding programs.
2-86
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 3002301 TITLE: SHORT-RANGE TRANSIT PLAN – NEW FREEDOM AND JARC
FY 2009 BUDGET: $242,166 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objective of this work element is to implement the provisions of the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) delegated to SANDAG by the Governor of California with the goal of improving mobility through improving transportation coordination in the region. The work covers development of the Coordinated Plan, as well as administration of the competitive funding process and monitoring of grantees of Job Access and Reverse Commute (JARC) and New Freedom funds. The Coordinated Plan provides a short-range blueprint for implementing the concepts, goals and principles of the Regional Comprehensive Plan (RCP) and Regional Transportation Plan (RTP) by improving coordination among the different transportation modes and service types available.
PREVIOUS ACCOMPLISHMENTS
The first Coordinated Plan was approved by SANDAG in August 2007. Competitive processes to award grant funds were held in November 2006 and November 2007 and project monitoring is expected to begin by the last quarter of FY 2008.
Committee(s): Transportation Committee
Working Group(s): Social Services Transportation Advisory Council
Project Manager: Daniel Levy
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
MPO FGC 1 50 Task Description: Update Coordinated Public Transit and Human Services Transportation Plan as required by state designation.
Product: Updated Coordinated Plan
Completion Date: 4/30/2009
MPO FGC 2 25 Task Description: Monitor the performance of the grantees for JARC and New Freedom projects.
Product: Performance reports and approved invoices
Completion Date: 6/30/2009
MPO FGC 3 25 Task Description: Conduct competitive process and score applications to award grants under 5310, the 5316 JARC, and 5317 New Freedom sections of SAFETEA-LU.
Product: Agenda report to Transportation Committee and Board of Directors
Completion Date: 12/1/2008
2-87
FUTURE ACTIVITIES
This series of tasks will be ongoing as long as SAFTEA-LU is in effect and as long as the authority vested in SANDAG by the Govenor remains valid.
2-88
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 3002303 TITLE: GRANT ADMINISTRATION FOR “RESULTS OF MARKET-BASED PLANNING FOR THE COMPREHENSIVE OPERATIONS ANALYSIS PROJECT”
FY 2009 BUDGET: $87,205 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The Metropolitan Transit System (MTS) recently implemented the Comprehensive Operational Analysis (COA). This project will evaluate the results of the COA restructuring program, continue to optimize services and resources, as well as share successful techniques and strategies with other transit districts. MTS will conduct the study; SANDAG will provide administrative oversight of grant.
PREVIOUS ACCOMPLISHMENTS
Submitted grant to Caltrans on behalf of MTS.
Committee(s): None
Working Group(s): None
Project Manager: Daniel Levy
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
MOUT Accountability 1 100 Task Description: Pass-through of grant monies to MTS; SANDAG only provides administrative oversight.
Product: Final report from MTS
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Future activities include using results of the analysis to consider future operational improvements.
2-89
MANDATED/COMMITTED: ALL DEDICATED FUNDING: NONE
PROGRAM WORK ELEMENT: 30026 TITLE: REGIONAL HOUSING AND SMART GROWTH DEVELOPMENT
FY 2009 BUDGET: $372,559 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
OBJECTIVE
The objectives of this work element are to implement SANDAG’s housing and smart growth-related strategic planning in the Regional Comprehensive Plan (RCP) in order to assist in the provision of a variety of housing choices for residents of all income levels in the San Diego region and to continue work on integrating land use, housing, and transportation activities. The emphasis in FY 2009 will be on implementing the TransNet Smart Growth Incentive Program (SGIP) and other financing strategies, assisting local jurisdictions in obtaining additional housing-related resources for the region from Proposition 1C and other sources, providing support for housing and smart growth development at transit stations, monitoring local progress toward meeting housing element goals, undertaking the 2010-2015 Regional Housing Needs Assessment process, and collaborating with other organizations in the region to undertake housing-related public education activities.
PREVIOUS ACCOMPLISHMENTS
SANDAG’s housing-related activities over the past ten years have included: the establishment of a pilot housing element self-certification program; the creation of a Regional Housing Task Force in May 2000 (recently renamed the Regional Housing Working Group (RHWG)); educational activities, such as the publication of two brochures about the region’s housing crisis and housing forums; the preparation of reports on state and federal housing legislation; the development and adoption of the Regional Housing Needs Assessment (RHNA) for the five-year housing element cycles as required by state law (1999-2004 and 2005-2010); and the provision of housing-related information to the public and member agencies.
During FY 2008 staff worked on ensuring that the region was positioned to receive its fair share of the housing and smart growth funds from Proposition 1C. SANDAG’s housing and smart growth development activities support and are integrated into work being performed in a number of other OWP work elements, all of which support SANDAG’s focus on improving the connection between land use and transportation.
Committee(s): Regional Planning Committee
Working Group(s): Regional Housing Working Group
Project Manager: Susan Baldwin
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
TNET FINANCING TransNet
1 20 Task Description: Implement the TransNet Smart Growth Incen-tive Program.
Product: SGIP first cycle projects and monitoring reports
Completion Date: 6/30/2009
2-90
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RCP
FINANCING TransNet
2 30 Task Description: Provide technical support and assistance in development of housing and smart growth projects at transit stations.
Product: Periodic status reports on projects and financing toolbox
Completion Date: 6/30/2009
RCP
SMART GROWTH DESIGN
3 5 Task Description: Monitor housing element status, affordable housing production, and share of state funding sources (including Prop. 1C) available for housing and smart growth in the region.
Product: Reports for working groups/committees/Board of Directors
Completion Date: 6/30/2009
RHNA RCP 4 30 Task Description: Complete work on the Regional Housing Needs Assessment (RHNA) for the 2010-2015 housing element cycle).
Product: RHNA Working Group, reports, workshop(s), and final RHNA
Completion Date: 6/30/2009
RCP 5 5 Task Description: Provide support to the RHWG and information to the public on SANDAG housing and smart growth programs.
Product: Meetings, reports, letters, and one public forum
Completion Date: 6/30/2009
RCP 6 10 Task Description: Review and assist in the preparation of reports on state and federal housing- and smart growth-related legislation in accordance with SANDAG’s legislative program.
Product: Legislative reports
Completion Date: 6/30/2009
FUTURE ACTIVITIES
This work element is an ongoing activity whose purpose is to help implement the housing strategies in the RCP and to help the member jurisdictions meet the housing needs of the region.
2-91
MANDATED/COMMITTED: ALL DEDICATED FUNDING: NONE
PROGRAM WORK ELEMENT: 30027 TITLE: NATURAL RESOURCE PLANNING AND COORDINATION
FY 2009 BUDGET: $89,616 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
OBJECTIVE
The first objective of this work element is to administer the Environmental Mitigation Program (EMP) as outlined in the TransNet Extension Ordinance and Expenditure Plan. This effort includes: (1) administering the Transportation Project Mitigation Fund; (2) administering the Regional Habitat Conservation Fund; and (3) coordinating with the Department of Mobility Management and Project Implementation (MMPI) on take permits for MOBILITY 2030 projects pursuant to Multiple Species Conservation Program (MSCP) and Multiple Habitat Conservation Program (MHCP) standards and developing guidelines for expedited processing of take permits.
The second objective of this work element is advanced planning and implementation of the region’s habitat preserve system through assisting in the development and implementation of the regional conservation plans pursuant to the Regional Comprehensive Plan. The third objective is to pursue funding through federal, state, and/or regional sources to meet the long-term requirements for various environmental programs, including the potential quality of life funding measure(s).
PREVIOUS ACCOMPLISHMENTS
Previous accomplishments include administering the EMP as outlined in the TransNet Extension Ordinance and Expenditure Plan. This includes working on a memorandum of agreement (MOA) for proceeding with the mitigation of TransNet projects, specific agreement to establish the delivery of Regional Transportation Plan projects, and the development of mitigation banks and similar implementing tools. Staff supports an EMP Working Group which provides recommendations to the RPC and Board of Directors on the EMP program. Staff continues to work with the EMP Working Group on future proposed allocation of funding for acquisition, management, and monitoring, including: (1) a regional habitat needs assessment; (2) a strategic five-year management and monitoring recommendations with annual recommendations for specific tasks; and (3) assistance with development of a regional funding measure(s) for habitat conservation as required by the TransNet Extension Ordinance. Staff also will work with Caltrans and the local jurisdictions to establish their transportation mitigation needs and mitigation banks for their use. Other activities include working with local, state, and federal agencies to enable the protection of a regional habitat preserve system. Planning activities include reviewing and supporting state legislation designed to protect, fund, and manage the regional habitat preserve system, reviewing potential local funding opportunities, and identifying ways to coordinate implementation of the habitat conservation planning efforts.
SANDAG also is a member of the California Biodiversity Council (CBC). The CBC is a statewide council established to design a strategy to preserve biological diversity and coordinate implementation of this strategy through regional and local institutions. The CBC holds quarterly meetings around the state to improve coordination among state and federal land management agencies and local interests. Recent activities of CBC have included seeking binational strategies for mitigation along the border and addressing increase demand for off-highway vehicleS on native habitats.
Committee(s): Regional Planning Committee; Transportation Committee; Independent Taxpayer Oversight Committee
2-92
Working Group(s): Environmental Mitigation Program Working Group
Project Manager: Keith Greer
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA TNET 1 10 Task Description: Staff the EMP Working Group and prepare the EMP agenda items for the EMP Working Group, Regional Planning Committee, and the SANDAG Board.
Product: Agendas and meeting materials
Completion Date: 6/30/2009
RTPA TNET IMPLEMENT TRANSNET
2 10 Task Description: Identification of activities management and monitoring funding for FY 2009.
Product: Board of Director approval of activities
Completion Date: 3/31/2009
RTPA TNET IMPLEMENT TRANSNET
3 15 Task Description: Manage contracts to implement EMP program as approved.
Product: Contracts and status reports
Completion Date: 6/30/2009
RTPA TNET IMPLEMENT TRANSNET
4 10 Task Description: Complete annual report on the use and effectiveness of the TransNet EMP funds in implementing the goals of the regional habitat conservation plans.
Product: Board of Directors approval of report
Completion Date: 6/30/2009
COG QUALITY OF LIFE FUNDING
5 15 Task Description: Continue participation in statewide and inter-regional efforts, such as on the Multiple Habitat Conservation Program, Natural Communities Conservation Program five-county funding group, and the CBC.
Product: Meeting notes and quarterly progress reports
Completion Date: 6/30/2009
RTPA TNET IMPLEMENT TRANSNET
6 20 Task Description: Implement the TransNet EMP Program goals of early acquisition of land through identification of mitigation lands and development of agreements with wildlife agencies.
Product: Project-specific Agreement for State Route 76 and mitigation banks
Completion Date: 6/30/2009
QUALITY OF LIFE FUNDING
7 20 Task Description: Work on Quality of Life Measure(s) to assist in meeting the requirement for SANDAG Board of Directors to act on a regional measure(s) for habitat management.
Product: Recommendation from EMP Working Group on measures
Completion Date: 6/30/2009
FUTURE ACTIVITIES
SANDAG will continue to implement the TransNet Regional Habitat Conservation Fund and the Transportation Project Mitigation Fund. Staff will support the EMP Working Group to allocate monies generated in the Regional Habitat Conservation Fund for acquisition, management, and monitoring. Staff will establish mitigation banking procedures with the Army Corps of Engineers and the U.S. Fish and Wildlife Service. Staff will contract and monitor the progress on regional acquisition, management, and monitoring, including helping to develop an overall strategy for the monitoring framework and support the recently established state database hub.
2-93
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 30028 TITLE: REGIONAL SHORELINE MANAGEMENT
FY 2009 BUDGET: $750,201 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
OBJECTIVE
The objectives of this work element are to: (1) implement the restoration of regional beaches through large-scale and opportunistic replenishment programs; (2) continue the implementation of the Regional Shoreline Monitoring Program; and (3) continue the work of the Shoreline Preservation Working Group.
PREVIOUS ACCOMPLISHMENTS
Work on the second Sand Compatibility and Opportunistic Use Program (SCOUP), which is a component of the California Coastal Sediment Management Master Plan, was continued and finalized in FY 2008. The SCOUP project calls for the preparation of an environmental documentation sufficient to successfully obtain permits for the placement of compatible opportunistic sand on regional beaches. The cities of Coronado, Encinitas, Imperial Beach, and Solana Beach are participating in SCOUP2. The first SCOUP was completed in Oceanside as a pilot program for the State of California.
Work continued on the Regional Shoreline Monitoring Program. The program provides physical measurements of the region’s beaches essential to the design and evaluation of efforts to replenish beaches and manage the region’s shoreline. Funding for the basic monitoring portion of the program has been provided by the region’s coastal cities since 1996.
The region was awarded a grant from the California Department of Boating and Waterways in 2007 for the development of a Coastal Regional Sediment Management Plan. This Plan calls for the development of a comprehensive guidance and policy document discussing how regional sediment management targeting coastal erosion is to be implemented in an expeditious, cost-effective, and resource-protective manner throughout the region. Work will be completed by fall 2008.
Shoreline Preservation Working Group prepared a Feasibility Study that examines the economic feasibility of implementing a project similar to the 2001 Regional Beach Sand Project. This Feasibility Study was submitted to the California Department of Boating and Waterways for their consideration of potential regional beach sand replenishment project funding in FY 2009. Additionally, the local jurisdictions committed to funding preliminary planning activities that are needed for implementation of a regional beach sand replenishment project. A procurement for the preparation of the investigation of offshore sand sources and preliminary engineering/design was completed and work should be finalized in fall 2008.
Committee(s): Regional Planning Committee
Working Group(s): Shoreline Preservation Working Group
Project Manager: Shelby Tucker
2-94
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
BEACH QUALITY OF LIFE FUNDING
1 65 Task Description: Work toward implementation of a specific regional beach sand replenishment project.
Product: Project deliverables per agreement
Completion Date: 6/30/2009
BEACH 2 20 Task Description: Provide administrative support and assistance to the Shoreline Preservation Working Group.
Product: Agendas, reports, memos, and additional materials
Completion Date: 6/30/2009
BEACH 3 5 Task Description: Continue the Regional Shoreline Monitoring Program for evaluating beach erosion and replenishment.
Product: Annual report
Completion Date: 6/30/2009
BEACH QUALITY OF LIFE FUNDING
4 5 Task Description: Encourage, coordinate, and facilitate oppor-tunistic beach sand replenishment.
Product: Management plan completion
Completion Date: 12/31/2008
BEACH QUALITY OF LIFE FUNDING
5 5 Task Description: Participate as members of the American Shore and Beach Preservation Association and California Coastal Coalition.
Product: Membership
Completion Date: 6/30/2009
FUTURE ACTIVITIES
As part of this ongoing work element over the next five years, the Regional Shoreline Management Program, through the Shoreline Preservation Working Group, will work toward implementation of regional beach nourishment, specifically a project similar to the 2001 Regional Beach Sand Project.
2-95
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 3002801 TITLE: COASTAL REGIONAL SEDIMENT MANAGEMENT PLAN
FY 2009 BUDGET: $10,000 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
OBJECTIVE
The Coastal Regional Sediment Management Plan is intended to formulate consensus-driven regional sediment management guidance and policy in order to: (1) restore and maintain coastal beaches and other critical areas of sediment deficit or excess; (2) reduce the proliferation of protective shoreline structures; (3) sustain recreation and tourism; (4) enhance public safety and access; and (5) restore coastal sandy habitats.
PREVIOUS ACCOMPLISHMENTS
This grant was issued in spring 2007. Through work completed from fall 2007 to spring 2008, a draft plan has been prepared and released for public review.
Committee(s): Regional Planning Committee
Working Group(s): Shoreline Preservation Working Group
Project Manager: Shelby Tucker
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
MPO BEACH QUALITY OF LIFE FUNDING
1 100 Task Description: Prepare Coastal Regional Sediment Manage-ment Plan for the San Diego region.
Product: Coastal Regional Sediment Management Plan
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Future activities include the completion of the final plan. Additionally, staff will seek funding from with the California Department of Boating and Waterways for the next phase of the project, which will include the preparation of a programmatic Environmental Impact Report (EIR) specific to the San Diego region. This EIR will address the majority of issues expected to arise thruogh regional sediment management activities.
2-96
MANDATED/COMMITTED: NONE DEDICATED FUNDING: PARTIAL
PROGRAM WORK ELEMENT: 30030 TITLE: REGIONAL ENERGY PLANNING
FY 2009 BUDGET: $230,562 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
OBJECTIVE
The objectives of this work element are to: (1) coordinate implementation of the Regional Energy Strategy; (2) work with federal and state energy planning and regulating agencies to help the region attain its energy goals; (3) integrate transportation energy planning issues into regional energy planning efforts; and (4) develop and implement a strategy to mitigate climate change caused by regional energy use.
PREVIOUS ACCOMPLISHMENTS
SANDAG established the Energy Working Group (EWG) under the Regional Planning Committee, which began the process of developing the coordination and implementation of the Regional Energy Strategy in April 2004. The Regional Energy Strategy is incorporated into the Regional Comprehensive Plan (RCP) and is implemented through this work element. In FY 2007 SANDAG established a full-time senior energy planning position. FY 2007 work included development of a transportation energy issue paper for the 2007 RTP and guidance to San Diego Gas & Electric (SDG&E) in its development of a long-term resource plan. Staff was successful in securing a two-year, $400,000 revenue agreement with the California Energy Commission that will extend through the end of FY 2009. Work has begun on the Regional Energy Strategy update in FY 2008, in cooperation with the EWG. In addition, staff has engaged in strategic planning related to climate change response, including the formation of a Regional Climate Change Learning Network. Finally, staff has commented on a number of State-level policy activities, including the 2007 Integrated Energy Policy Report and legislative items such as Senate Bill (SB) 451 and SB 375.
Committee(s): Regional Planning Committee
Working Group(s): Regional Energy Working Group
Project Manager: Susan Freedman
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
SUSTAINABLE DEVELOP-
MENT
1 25 Task Description: Provide staff support to the EWG to assist in its activities to promote implementation of the Regional Energy Strategy and coordination of energy planning.
Product: Agendas and meeting materials
Completion Date: 6/30/2009
SUSTAINABLE DEVELOP-
MENT
2 15 Task Description: Continue update of the Regional Energy Strategy (last updated in 2003).
Product: Regional Energy Strategy update
Completion Date: 2/1/2009
2-97
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
SUSTAINABLE DEVELOP-
MENT
3 15 Task Description: Review and comment on regulatory and legislative issues.
Product: Recommendations to the RegIonal Planning Committee/ Executive Committee/Board of Directors
Completion Date: 6/30/2009
SUSTAINABLE DEVELOP-
MENT
4 10 Task Description: Engage state and/or federal agencies to incorporate energy interests of the San Diego region and provide written and verbal comments as necessary.
Product: Participation in California Energy Commission/California Public Utilities Commission/California Air Resources Board meetings
Completion Date: 6/30/2009
RCP SUSTAINABLE DEVELOP-
MENT
5 10 Task Description: Coordinate with SANDAG member agencies to promote participation in energy-saving programs offered by SDG&E and California Center for Sustainable Energy.
Product: Presentations on available energy programs
Completion Date: 6/30/2009
RCP SUSTAINABLE DEVELOP-
MENT
6 5 Task Description: Coordinate with California Energy Commission to complete the I-PLACE3S energy module and define data needs to make the module functional for SANDAG use.
Product: I-PLACE3S energy module and list of data needs
Completion Date: 10/31/2008
SUSTAINABLE DEVELOP-
MENT
7 5 Task Description: Conduct workshop series to educate stake-holders on relevant energy planning topics for the San Diego region.
Product: Four workshops
Completion Date: 6/30/2009
SUSTAINABLE DEVELOP-
MENT
8 15 Task Description: Develop and implement a strategy to mitigate climate change impacts caused by regional energy, transportation, and land use activities.
Product: Regional Climate Action Plan
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Pending funding availability, the Energy Planning Program will continue to participate in state energy planning activities on behalf of the region and further integrate energy considerations into land use and transportation planning activities. In addition, the EWG will continue to monitor and evaluate the implementation of the Regional Energy Strategy, assist in the coordination of regional energy planning in and around the San Diego region, and assist in the development of SANDAG climate change strategy.
2-98
MANDATED/COMMITTED: ALL DEDICATED FUNDING: NONE
PROGRAM WORK ELEMENT: 3003001 TITLE: ENERGY EFFICIENT BUILDINGS GRANT
FY 2009 BUDGET: $6,337 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
OBJECTIVE
The objective of this work element is to update the Regional Energy Strategy (RES) and determine the feasibility of all new construction being built to exceed the Title 24 2005 Energy Efficiency Building Standards.
PREVIOUS ACCOMPLISHMENTS
This is a new grant to complete the task outlined below.
Committee(s): Regional Planning Committee
Working Group(s): Regional Energy Working Group
Project Manager: Susan Freedman
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
SGC SUSTAINABLE DEVELOP-
MENT
1 100 Task Description: Implement California Energy Commission Rebuild America Grant.
Product: Quarterly reports and RES strategy chapter
Completion Date: 2/1/2009
FUTURE ACTIVITIES
Future activities include implementing the grant requirements.
2-99
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 3003002 TITLE: CALIFORNIA ENERGY COMMISSION PLANNING GRANT
FY 2009 BUDGET: $184,452 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
OBJECTIVE
The objective of this work element is to develop plans and resources for SANDAG and its member agencies to utilize in addressing energy and climate change.
PREVIOUS ACCOMPLISHMENTS
Continue work on the 2030 Regional Energy Strategy (RES) update, Regional Climate Action Plan, Sustainable Communities Program, and the Alternative Fuels Toolkit.
Committee(s): Regional Planning Committee
Working Group(s): Regional Energy Working Group
Project Manager: Susan Freedman
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
SGC SUSTAINABLE DEVELOP-
MENT
1 100 Task Description: Implement California Energy Commission Energy Planning Grant.
Product: Quarterly reports, RES, and climate change action plan
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Future activities include completing the: 2030 RES update, Regional Climate Action Plan, Sustainable Communities Program, and the Alternative Fuels Toolkit.
2-100
MANDATED/COMMITTED: PARTIAL DEDICATED FUNDING: MINIMAL
PROGRAM WORK ELEMENT: 30032 TITLE: BORDERS PLANNING AND COORDINATION
FY 2009 BUDGET: $377,819 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
OBJECTIVE
The objectives of this work element are to: (1) plan, coordinate, and oversee activities that impact the borders of the San Diego region (Orange, Riverside, and Imperial Counties, as well as Mexico and the Native American tribal governments); (2) strengthen collaboration with agencies and entities in a binational and interregional context; and (3) coordinate the Borders Committee and its working groups. Emphasis in FY 2009 will be on continuing to strengthen existing partnerships with neighboring jurisdictions following the Borders Strategic Initiatives of the Regional Comprehensive Plan (RCP) and continuing efforts toward the implementation of an effective binational planning partnership with Tijuana and other jurisdictions.
PREVIOUS ACCOMPLISHMENTS
SANDAG’s Borders Committee provides policy oversight for planning activities that impact the borders of the San Diego region – Riverside, Orange, and Imperial Counties, Tribal Governments, and Mexico. The Borders Committee advises the SANDAG Board of Directors on major binational and interregional planning policy-level matters. This is an ongoing work element that supports strengthening existing partnerships while developing new ones with neighboring jurisdictions from a binational and interregional perspective and government-to-government relations with tribes in the San Diego region. Key planning areas are described in the Borders Chapter of the RCP.
Binational Activities: The Committee on Binational Regional Opportunities (COBRO) supports the Borders Committee in the area of binational planning and collaboration. To date, COBRO has supported the organization of ten binational conferences, workshops, and mobile tours. Staff will continue to work on the implementation of the Otay Mesa – Mesa de Otay Binational Corridor Strategic Plan (work element 30063, Implementation of Otay Mesa-Mesa de Otay Binational Corridor Strategic Plan). Also, staff will continue to collaborate with the California Biodiversity Council (CBC) on binational environmental issues.
Interregional and Tribal Activities: The Borders Committee will continue to serve as the San Diego policy liaison for the I-15 Interregional Partnership (I-15 IRP) Policy Committee through this work element. The Joint Policy Committee will meet twice a year to discuss new developments, while agency staff will continue to pursue collaborative actions in the areas of transportation, economic development, and housing. To strengthen collaboration with Imperial County, SANDAG will continue to work with Caltrans and the Imperial Valley Association of Governments (IVAG) to address transportation and other planning issues between the two regions. Orange County is represented and participates in the Borders Committee, and staff will continue to meet with staff of the Orange County Transportation Authority (OCTA) to discuss topics of joint interest. Through a separate work element (70006, Tribal Government Liaison), SANDAG developed a government-to-government framework for relations with the 17 tribal nations in the region. The Southern California Tribal Chairmen’s Association (SCTCA) has joined the SANDAG Board of Directors and its other policy advisory committees (PACs) as advisory members. SANDAG and the SCTCA will pursue the mutually agreed-upon agenda through the PACs.
2-101
Committee(s): Borders Committee
Working Group(s): Committee on Binational Regional Opportunities
Project Manager: Hector Vanegas
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
SB1703 INTER-REGIONAL
PLAN
1 50 Task Description: Provide staff support to SANDAG’s Borders Committee and COBRO and conduct policy committee meetings with Imperial, Riverside, and Orange Counties.
Product: Agendas, follow up activities, and recommendations
Completion Date: 6/30/2009
RCP COMMUNI-CATION
2 10 Task Description: Continue collaboration with local agencies and external stakeholders.
Product: Progress reports and update BorderBase Web site
Completion Date: 6/30/2009
RCP COMMUNI-CATION
3 10 Task Description: Coordinate and facilitate the participation of officials from northern Baja California/Mexico in SANDAG’s border related events and activities.
Product: Participation in events
Completion Date: 6/30/2009
INTER-REGIONAL
PLAN
4 5 Task Description: Identify and pursue funding opportunities to support SANDAG’s border-related objectives, as identified in the RCP, Regional Transportation Plan, and other regional plans and policies.
Product: Grant applications and awards
Completion Date: 6/30/2009
RCP INTER-REGIONAL
PLAN
5 5 Task Description: Prepare briefing papers on borders-related subjects and technical assistance to member agencies and other organizations on border-related issues, as needed.
Product: Briefing papers
Completion Date: 6/30/2009
INTER-REGIONAL
PLAN
6 10 Task Description: Conduct annual SANDAG Binational event in coordination with OWP work element 30063, Implementation of Otay Mesa-Mesa de Otay Binational Corridor Strategic Plan.
Product: Summary and recommendations from annual event
Completion Date: 6/30/2009
INTER-REGIONAL
PLAN
7 5 Task Description: Participate in Caltrans/IVAG Interstate 8 Corridor Strategic Plan.
Product: Periodic progress reports
Completion Date: 6/30/2009
8 5 Task Description: Perform section administration tasks, including staff meetings and receiving training.
Product: Meeting agendas, evaluations, and quarterly reports
Completion Date: 6/30/2009
FUTURE ACTIVITIES
This is an ongoing work element.
2-102
MANDATED/COMMITTED: ALL DEDICATED FUNDING: NONE
PROGRAM WORK ELEMENT: 30039 TITLE: SUBREGIONAL TRANSPORTATION PLANNING AND COORDINATION
FY 2009 BUDGET: $407,864 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objective of this work element is to coordinate SANDAG’s Regional Comprehensive Plan (RCP), Regional Transportation Plan (RTP), and Congestion Management Program (CMP) with the local land use and transportation planning processes in the 18 cities and the County of San Diego, transit agencies, Caltrans, and others. This work element provides for the staff hours required to prepare project scopes and budgets and to oversee subregional and corridor studies (e.g., Interstate 8, State Route 78). Funds required to conduct subregional and corridor studies will need to be secured on a case-by-case basis in accordance with agency policies and amended into this work element.
PREVIOUS ACCOMPLISHMENTS
The RCP calls for strengthening the connection between local and regional land use and transportation plans. This includes working with local jurisdictions, infrastructure providers, state and federal agencies, and others through a collaborative planning approach to implement the goals and policy objectives of the RCP.
SANDAG has established subregional planning teams, which include both land use and transportation planning staff members responsible for the following geographic areas: North County, South County, Central County, and East County. In FY 2007 the subregional teams worked with local jurisdictions to develop a work program for a subregional study in the South County along south Interstate 5. In FY 2008 the subregional teams continued to coordinate with local jurisdictions on local land use and transportation plan updates, prepared a scope of work for a subregional study for the western end of Interstate 8.
Committee(s): Regional Planning Committee; Transportation Committee
Working Group(s): Regional Planning Technical Working Group; Cities/County Transportation Advisory Committee
Project Manager: Heather Werdick
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
CMA RTP CONGESTION MANAGE-
MENT
1 20 Task Description: Coordinate regional transportation planning with local agency land use development and plans.
Product: Progress reports
Completion Date: 6/30/2009
CMA RTP CONGESTION MANAGE-
MENT
2 50 Task Description: Initiate corridor studies focusing on deficient CMP facilities, such as I-8 and SR 78.
Product: Progress reports
Completion Date: 6/30/2009
2-103
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
CMA RTP CONGESTION MANAGE-
MENT
3 10 Task Description: Assess the outstanding CMP deficiencies identified in the 2030 RTP and develop a work program to prepare any necessary deficiency plans.
Product: Deficiency plan progress report
Completion Date: 9/30/2008
CEQA IGR 4 20 Task Description: Collaborate with Centre City Development Corporation in the development of Downtown I-5 studies.
Product: Provide data and comment letters on draft documents
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Future activities include continuing to conduct corridor studies for deficient CMP corridors.
2-104
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 30051 TITLE: SAN DIEGO - RIVERSIDE INTERRREGIONAL PARTNERSHIP – PHASE III
FY 2009 BUDGET: $135,471 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
OBJECTIVE
The primary objective of the I-15 Interregional Partnership (IRP) is to develop collaborative, interregional strategies in transportation, economic development, and housing that will improve the quality of life of residents in both counties. The objectives for Phase III, which begins in FY 2009 and will continue through FY 2010, include collaboration with interregional partner agencies on the development of: (1) an Interregional Strategic Implementation Plan for short-term improvements to the corridor system; (2) an interregional economic development action plan based on employment clusters; and (3) transit-oriented strategies, including the development of a smart growth concept map for southwestern Riverside and workforce housing for northern San Diego. This overall project includes OWP work element 3005101, Interregional Vanpool Buspool Study.
PREVIOUS ACCOMPLISHMENTS
Phase I of the I-15 IRP was funded by a grant from the State Department of Housing and Community Development. The focus of the first phase, based on a three-year work plan, was to: (1) develop a policy structure and mechanism for technical support; (2) explore existing conditions; (3) understand the interregional commuter problem; (4) identify current programs to resolve interregional issues; (5) forecast commute conditions; (6) develop strategies to better balance jobs and housing; and (7) establish an implementation and monitoring process.
Phase II, funded by a grant from Caltrans, sought to strengthen and expand the scope of the interregional institutional arrangement between SANDAG and Western Riverside Council of Governments (WRCOG). The emphasis was to extend the interregional planning agenda into the area of economic development through the implementation of an employment cluster study. The purpose of the agreement was to test the capabilities of the two regions to collaborate on major projects affecting both jurisdictions that are compatible with the principles and framework of SANDAG’s Regional Comprehensive Plan (RCP) and WRCOG’s Growth Visioning Plan. The Phase II work program focused on the implementation of specific economic development, transportation, and housing strategies identified in Phase I and performance monitoring efforts. During FY 2006 and FY 2007 studies were conducted for the following: (1) employment cluster study; (2) county line transportation study; and (3) a study on affordable housing incentive programs applicable to the SPRINTER corridor in northern San Diego County.
Committee(s): Borders Committee
Working Group(s): I-15 Interregional Joint Policy Committee
Project Manager: Jane Clough-Riquelme
2-105
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
MPO SGC INTER-REGIONAL
PLAN
1 15 Task Description: The partner agencies (WRCOG/SANDAG) will set up, staff, coordinate, and facilitate all aspects of meetings related to Phase III of the I-15 IRP.
Product: Meeting agendas/attendance/minutes
Completion Date: 6/30/2009
MPO SGC INTER-REGIONAL
PLAN
2 20 Task Description: Collaborate with WRCOG on the development of a strategic action plan for cooperative economic development based on traded clusters, including support for a interregional workshop.
Product: Meeting agendas/minutes from Economic Development Ad Hoc Working Group
Completion Date: 6/30/2009
RTPA SGC INTER-REGIONAL
PLAN
3 25 Task Description: Collaborate with Riverside County Transporta-tion Commission/WRCOG/Riverside Transit Agency on the develop-ment of a strategic transportation implementation plan for the I-15 interregional corridor.
Product: Meeting agendas/minutes
Completion Date: 6/30/2009
RHNA SGC INTER-REGIONAL
PLAN
4 40 Task Description: Collaborate on smart growth housing including, developing a workforce housing pilot project along the SPRINTER line and work with Riverside on a smart growth concept map.
Product: Workshop (1) and workforce housing gant proposal
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Phase III will continue into FY 2010. Principal activities will include: (1) support for the completion of a strategic transportation implementation plan for transportation in the I-15 corridor for short-term improvements to the system at the border; (2) completion of OWP work element 3005101, Interregional Vanpool Buspool Study; (3) the development of an agreement among key stakeholders for a workforce housing initiative in northern San Diego and the development of a draft smart growth concept map for selected cities in southwestern Riverside; and (4) a draft and final report for Phase III of the I-15 IRP.
2-106
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 3005101 TITLE: I-15 INTERREGIONAL VANPOOL AND BUSPOOL STUDY
FY 2009 BUDGET: $121,043 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objective of this work element is to improve interregional transportation alternatives and to increase transit ridership. This study would fund research into determining origins and destinations of interregional commutes between Riverside and San Diego counties, analyze the data, and design effective alternatives to single-occupancy driving patterns by recommending vanpool, buspool, bus rapid transit, or other rideshare options. The study also will identify how best to serve major activity centers in this corridor.
PREVIOUS ACCOMPLISHMENTS
This project represents one element of Phase III of the I-15 Interregional Partnership (I-15 IRP). In FY 2005 SANDAG received a $240,000 grant from Caltrans for Phase II of the I-15 IRP. The Phase II work program was focused on the implementation of specific economic development, transportation, and housing strategies identified in Phase I and performance monitoring efforts. During FY 2006 and FY 2007 studies were conducted for the following: (1) employment cluster study; (2) county line transportation study; and (3) a study on affordable housing incentive programs applicable to the SPRINTER corridor in northern San Diego County.
Committee(s): Borders Committee
Working Group(s): I-15 Joint Policy Committee
Project Manager: William Emerson
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA 1 25 Task Description: Provide management, administration, and oversight for the study and identify roles and responsibilities.
Product: Execute agreements and memorandums of understanding
Completion Date: 6/30/2009
RTPA SGC 2 10 Task Description: Document existing conditions and review existing data, including origin and destination information.
Product: Existing conditions and data inventory reports
Completion Date: 6/30/2009
RTPA SGC INTER-REGIONAL
PLAN
3 10 Task Description: Data collection – data to include commuter surveys and origins and destination data.
Product: Data summary report
Completion Date: 08/31/2008
2-107
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA SGC INTER-REGIONAL
PLAN
4 10 Task Description: Determine service approach for various commute markets, including vanpools, buspools, and bus rapid transit (BRT).
Product: Service proposals for vanpools, buspools, and BRT
Completion Date: 12/31/2008
RTPA SGC INTER-REGIONAL
PLAN
5 10 Task Description: Develop preliminary stop location and service level proposals.
Product: Preliminary stop and service level proposals
Completion Date: 2/1/2009
RTPA SGC INTER-REGIONAL
PLAN
6 15 Task Description: Develop transit alternatives – develop transit service proposals, including level and frequency of service based upon budgetary constraints.
Product: Service proposals
Completion Date: 4/1/2009
RTPA SGC INTER-REGIONAL
PLAN
7 10 Task Description: Select preferred transit service proposal to serve current and future ridership.
Product: Preferred transit service proposal
Completion Date: 6/1/2009
RTPA SGC INTER-REGIONAL
PLAN
8 10 Task Description: Promote transit services, vanpool, and buspool programs.
Product: Prepare and distribute promotional material
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Future activities include implementing key elements of the study.
2-108
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 30055 TITLE: SDA&E RAILWAY GATEWAY FEASIBILITY AND IMPROVEMENTS STUDY
FY 2009 BUDGET: $876,280 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objectives of this study are to: (1) assess the economic viability and role of the San Diego & Arizona Eastern (SD&AE) Railway and San Ysidro Intermodal Facilities as an international trade gateway; (2) scope and oversee a crossborder freight forecast study; (3) develop preliminary engineering and obtain environmental clearance for initial improvements at the San Ysidro Intermodal Yard; (4) prepare a long-term strategy and improvement program for the San Diego Region's gateway intermodal freight facilities (rail, border, and port) to interface with the San Ysidro Intermodal Yard; and (5) prepare a plan of finance.
PREVIOUS ACCOMPLISHMENTS
The gateway funding was secured under TEA 21. In 2007 through 2008 some early engineering assessment work was completed, and a project study report was developed on the San Ysidro Yard in preparation for Transportation Corridor Improvement Funds.
Committee(s): Transportation Committee
Working Group(s): None
Project Manager: Christina Casgar
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
FGC IMPLEMENT TransNet
1 10 Task Description: Assess the potential role and economic viability of the SD&AE Railway and San Ysidro Intermodal Facilities within context of the San Diego region to serve as a global gateway.
Product: Scoping document for gateway study
Completion Date: 1/31/2009
FGC IMPLEMENT TransNet
2 30 Task Description: Oversee a crossborder freight forecast study.
Product: Cross border freight forecast study
Completion Date: 5/31/2009
FGC IMPLEMENT TransNet
3 25 Task Description: Refine and follow up on preliminary engineering and support environmental clearance for initial improvements at the San Ysidro Intermodal Yard.
Product: Meeting agendas and notes
Completion Date: 6/30/2009
FGC IMPLEMENT TransNet
4 20 Task Description: Interview freight stakeholders and synthesize findings.
Product: Meeting notes
Completion Date: 6/30/2009
2-109
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
FGC 5 15 Task Description: Launch a long-term strategy for integrated intermodal improvements related to the San Ysidro Yard, including operation improvements and financial plan.
Product: Study scope document
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Using SD&AE Gateway Feasibility Study funds has positioned SANDAG to oversee a long-term development strategy for the gateway. In anticipation of Proposition 1B funds, which will leverage other investments, construction of gateway improvements will begin in 2013.
2-110
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 3006201 TITLE: TRANSIT PRIORITY MEASURES PLANNING GRANT
FY 2009 BUDGET: $120,874 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
For freeway shoulders, the objectives of this work element are to: (1) evaluate the performance of the initial shoulder facility in terms of travel time, patron and driver perception, operating safety, and cost benefit; (2) evaluate the feasibility of site-specific strategies for transit priority treatments (including shoulder lanes, bus stop relocation, signage, driver training, queue jumps, and signal priority) and identify the most effective and feasible sites and treatments to advance; (3) develop standard design criteria in conjunction with Caltrans; (4) develop conceptual and/or preliminary designs of priority treatment for identified sites; and (5) establish a permanent freeway shoulder lane program in conjunction with Caltrans District 11 and Sacramento headquarters through appropriate legislation.
This project has improved existing transit operations, provides facilities for future Transit First services, and gives SANDAG, Caltrans, Metropolitan Transit Service (MTS), and the local jurisdictions the opportunity to test and evaluate various transit priority measures for broader applications.
PREVIOUS ACCOMPLISHMENTS
For the freeway shoulder lane program during 2006, a demonstration project was implemented along a section of State Route 52 and Interstate 805. This demonstration project has continued into late 2007. At this point SANDAG and Caltrans District 11 have petitioned Caltrans headquarters to pursue permanent implementation of the facility. In FY 2007 and 2008, in addition to monitoring the demonstration project, work was begun to identify and evaluate other project corridors and develop a set of criteria for determining where shoulder lane projects are justified. An extension of the demo project has been submitted to Caltrans, and legislation to create a permanent program has been initiated.
Committee(s): Transportation Committee
Working Group(s): None
Project Manager: William Emerson
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
SGC CONGESTION MANAGE-
MENT
1 20 Task Description: Continue "Freeway Transit Lane Monitoring Program" per agreement with Caltrans. Activities include evaluation of travel time, perception, operations, safety, and cost benefit
Product: Grant close-out report
Completion Date: 6/30/2009
2-111
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
SGC CONGESTION MANAGE-
MENT
2 10 Task Description: Continue analysis of high-potential freeway shoulder lane segments with Caltrans to evaluate capital improvements, costs, and safety issues.
Product: Priority list of potential shoulder locations
Completion Date: 6/30/2009
SGC CONGESTION MANAGE-
MENT
3 10 Task Description: Complete development of project criteria for freeway shoulder lane improvements (request from Caltrans' Sacramento office).
Product: Shoulder lane project criteria
Completion Date: 10/31/2008
SGC CONGESTION MANAGE-
MENT
4 60 Task Description: Pursue project development activities on high-priority candidate locations.
Product: Status reports or implementation for each project
Completion Date: 6/30/2009
FUTURE ACTIVITIES
This strategy will be established as an ongoing program with a continuous review (in conjunction with the transit operators) of the operating environment and reassessment of the priority of locations. A capital budget to fund, or in some cases, contribute to Caltrans highway improvement projects will be established.
2-112
MANDATED/COMMITTED: ALL DEDICATED FUNDING: NONE
PROGRAM WORK ELEMENT: 30063 TITLE: IMPLEMENTATION OF OTAY MESA-MESA DE OTAY BINATIONAL CORRIDOR STRATEGIC PLAN
FY 2009 BUDGET: $112,160 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
OBJECTIVE
The objectives of this work element are to: (1) continue efforts toward the implementation of an effective binational planning partnership with Tijuana and Baja California; and (2) continue the implementation of early actions and other initiatives identified in the Otay Mesa-Mesa de Otay Binational Corridor Strategic Plan.
PREVIOUS ACCOMPLISHMENTS
The Regional Comprehensive Plan (RCP), adopted in July 2004, identified key issues in Otay Mesa and its relationship to Tijuana’s Mesa de Otay. In addition, recommendations from SANDAG’s 2004 Binational Conference pointed to the need for focusing on specific binational planning and implementation strategies, in addition to ongoing collaboration efforts. The Committee on Binational Regional Opportunities (COBRO) and the Borders Committee identified Otay Mesa as an ideal focus area due to its current and significant planned growth on both sides of the border. During FY 2006 two binational workshops were held. In FY 2007 staff developed the Otay Mesa-Mesa de Otay Binational Corridor Early Action Plan and Strategic Plan. In FY 2008 staff completed the Otay Mesa-Mesa de Otay Binational Corridor Strategic Plan, which was approved by the SANDAG Board of Directors and the City of Tijuana City Council. The final report also was translated to Spanish.
Committee(s): Borders Committee
Working Group(s): Committee on Binational Regional Opportunities
Project Manager: Ronald Saenz
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RCP INTER-REGIONAL
PLAN
1 70 Task Description: Implement selected strategic initiatives for transportation, economic development, housing, and environ-mental issues identified in the Binational Corridor Strategic Plan.
Product: Report on implementation of strategic initiatives
Completion Date: 6/30/2009
RCP INTER-REGIONAL
PLAN
2 10 Task Description: Collaborate with the City of San Diego on the Otay Mesa Community Plan Update (transportation implications on potential conversion of industrial to residential uses).
Product: Review and comment on draft community plan
Completion Date: 12/31/2008
RCP INTER-REGIONAL
PLAN
3 20 Task Description: Coordinate with Tijuana's Municipal Planning Institute on the implementation of selected strategic initiatives in Tijuana.
Product: Progress reports
Completion Date: 6/30/2009
2-113
FUTURE ACTIVITIES
Implementation of strategies identified in the Otay Mesa-Mesa de Otay Binational Corridor Strategic Plan will continue. Some highlights include: (1) collaboration with the California Biodiversity Council's Las Californias Working Group in exploring opportunities and developing mechanisms for binational habitat conservation; (2) activities to promote water quality and habitat conservation in the portion of the Tijuana River Watershed surrounding the Tijuana Estuary; (3) collaboration with Instituto Municipal de Planeación (IMPlan) and the Urban Land Institute (ULI) on sharing resources, planning techniques, and strategies as they relate to smart growth planning; (4) collaboration with Caltrans, U.S. General Services Administration, and Customs and Border Patrol on short-term operational and capital improvements at the Otay Mesa-Mesa de Otay passenger port of entry (POE), and (5) support of planning efforts to improve pedestrian and intermodal transportation facilities in the vicinity of the Otay Mesa-Mesa de Otay POE.
2-114
MANDATED/COMMITTED: ALL DEDICATED FUNDING: PARTIAL
PROGRAM WORK ELEMENT: 30071 TITLE: STATE ROUTE 11 AND EAST OTAY MESA PORT OF ENTRY PLANNING
FY 2009 BUDGET: $576,560 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objective of this work element is to continue efforts toward the implementation of strategies approved in the Otay Mesa-Mesa de Otay Binational Corridor Strategic Plan related to advancing the future State Route (SR) 11 and the proposed Otay Mesa East Port of Entry (POE). Work will focus on the evaluation of innovative financing mechanisms and investment strategies and options within a public toll financing framework, as well as coordination and collaboration with the County of San Diego, Caltrans, the U.S. General Services Administration (GSA), and counterpart agencies in Mexico that are leading planning and environmental studies.
PREVIOUS ACCOMPLISHMENTS
The Economic Impacts of Border Delays study estimated the significant economic opportunities lost by California-Baja California due to excessive wait times at the San Diego-Tijuana border crossings. The Otay Mesa-Mesa de Otay Binational Corridor Strategic Plan, which was approved by the SANDAG Board of Directors in FY 2008, identified several initiatives to advance the implementation of the future SR 11 and the proposed Otay Mesa East POE to expand needed crossborder transportation facilities. Also in FY 2008, staff continued the evaluation of the feasibility of implementing these facilities through tolls or fees and collaborated in the preparation of the U.S. GSA's Otay Mesa East Feasibility Study and Caltrans' Programmatic Environmental Impact Report/Environmental Impact Statement for SR 11 and the Otay Mesa East POE and Presidential permit application.
Committee(s): Borders Committee, Transportation Committee
Working Group(s): Committee on Binational Regional Opportunities
Project Manager: Elisa Arias
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
SGC NEW BORDER CROSSING
1 60 Task Description: Continue the evaluation of innovative financing mechanisms for the Otay Mesa East-Otay II POE and connecting roads and conduct feasibility analyses (financial, benefit-cost).
Product: Feasibility analysis report
Completion Date: 6/30/2009
RTP NEW BORDER CROSSING
2 20 Task Description: Coordinate with stakeholders on POE functionality, environmental documents, Border Liaison Mechanism POE Commission, County of San Diego land use development, and presidential permit.
Product: Comment letters
Completion Date: 6/30/2009
2-115
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTP NEW BORDER CROSSING
3 20 Task Description: Evaluate investment strategies and options within a public toll financing framework to support preparation of project development and financing plans.
Product: Assessment of investment strategies
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Planning activities to implement SR 11 and the Otay Mesa East POE will continue in FY 2010.
2-116
MANDATED/COMMITTED: PARTIAL DEDICATED FUNDING: NONE
PROGRAM WORK ELEMENT: 30072 TITLE: QUALITY OF LIFE PLANNING AND FUNDING STRATEGIES
FY 2009 BUDGET: $530,305 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
OBJECTIVE
The objective of this work element is to develop and implement a quality of life infrastructure strategy to meet regional needs to fund habitat conservation plans, beach sand nourishment activities, water quality improvements, and transit service enhancements (beyond what is already funded). This also would include one comprehensive survey and six focus groups. The strategy would meet goals outlined in the Regional Comprehensive Plan (RCP) and improve quality of life in the region.
PREVIOUS ACCOMPLISHMENTS
This work element continues work that was initiated in FY 2008. SANDAG held workshops with SANDAG Board of Directors in FY 2007 and FY 2008 to focus individually on habitat preservation, beach sand replenishment and water quality improvements. SANDAG also held a Policy Board meeting where the Board provided direction to staff to address these issues and present a work program at the 2008 SANDAG Board retreat.
Committee(s): Regional Planning Committee, Transportation Committee
Working Group(s): Regional Planning Technical Working Group
Project Manager: Robert Rundle
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
QUALITY OF LIFE FUNDING
1 20 Task Description: Update projects, estimates, and funding options to be incorporated into expenditure plan based on continued Board of Directors’ input.
Product: Report
Completion Date: 8/31/2008
TNET QUALITY OF LIFE FUNDING
2 40 Task Description: Refine expenditure plan options for infrastructure types.
Product: Meetings and reports
Completion Date: 6/30/2009
QUALITY OF LIFE FUNDING
3 10 Task Description: Work with state delegation to refine SANDAG's authority to generate revenue for quality of life infrastructure.
Product: Meetings and legislative action
Completion Date: 6/30/2009
QUALITY OF LIFE FUNDING
4 15 Task Description: Staff support to ad hoc working group for quality of life efforts.
Product: Meeting and meeting notes
Completion Date: 6/30/2009
2-117
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
QUALITY OF LIFE FUNDING
5 15 Task Description: Conduct public opinion research and focus groups.
Product: Research results
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Future activities include continued implementation of the RCP and the Regional Transportation Plan, with an emphasis on identifying funding mechanisms for quality of life priorities outlined in the RCP.
2-118
MANDATED/COMMITTED: PARTIAL DEDICATED FUNDING: NONE
PROGRAM WORK ELEMENT: 30073 TITLE: REGIONAL MULTIMODAL AIRPORT PLANNING
FY 2009 BUDGET: $310,965 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
Senate Bill 10 (Kehoe) calls for SANDAG and the San Diego County Regional Airport Authority (SDCRAA) to work together on regional aviation and multimodal transportation plans. The initial component of the work is an air-rail network study that would address the following objectives: (1) identify ways to better utilize regional airports with excess capacity to relieve San Diego International Airport (SDIA) to be connected via high-speed rail; and (2) identify ways to increase airport capacity at congested airports by shifting short-haul air traffic to moderate or high-speed rail. Study partners will include the SDCRAA, Southern California Association of Governments, Riverside County Transportation Commission, and the California High-Speed Rail Authority (HSRA). In FY 2009 this work effort will focus on finalizing a scope of work seeking outside funding for the study, complete work on Phase I of the study (initial air-rail assessments, Tasks 2 through 4 below), and begin Phase 2 work (I-15 feasibility, Task 5 below). This will lead to future preparation of the Airport Multimodal Access Plan (AMAP).
PREVIOUS ACCOMPLISHMENTS
Initial planning and scope of work development are to be completed in FY 2008.
Committee(s): Transportation Committee
Working Group(s): None
Project Manager: Linda Culp
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
SB 10 AIRPORT PLANNING
1 20 Task Description: Working Group – Develop an agency coordi-nation group with the agencies mentioned above and other interested parties.
Product: Establish working group, schedule meetings, and agendas
Completion Date: 6/30/2009
SB 10 AIRPORT PLANNING
2 20 Task Description: Institutional Assessment – Assess interest of various regional airports to cooperate as a reliever airport for San Diego to serve San Diego’s future air passenger and cargo needs.
Product: Interest assessment report
Completion Date: 9/30/2008
SB 10 AIRPORT PLANNING
3 20 Task Description: Aviation Evaluation – Evaluate airport master plans for interested airports to assess capacity and opportunities/ constraints regarding establishing a regional air-rail network.
Product: Capacity evaluation report
Completion Date: 12/31/2008
2-119
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
SB 10 AIRPORT PLANNING
4 20 Task Description: Initial Alternatives Assessment – Determine initial alignments and stations based on interest of the individual airports, and conduct initial feasibility assessment.
Product: Alternative assessment report
Completion Date: 3/31/2009
SB10 AIRPORT PLANNING
5 10 Task Description: Participate with California HSRA on assessing I-15 corridor feasibility, alignment, and stations)
Product: Feasibility analysis
Completion Date: 6/30/2009
AIRPORT PLANNING
6 10 Task Description: Identify Funding and Next Steps Scope of Work – Based on results above, outline next steps and seek additional funding to complete, including federal, state, and other regional sources.
Product: Grant application, including scope of work
Completion Date: 12/31/2008
FUTURE ACTIVITIES
An OWP amendment for consultant study would be made to undertake phase 2 planning and engineering analysis of HSRA feasibility/conceptual engineering assuming a successful completion of the Phase 1 feasibility work outlined in the task listings. Preparation of AMAP also would be undertaken.
CHAPTER 2 – DETAILED WORK ELEMENT DESCRIPTIONS
SECTION 4 – PROGRAMMING, PROJECT MONITORING AND OVERSIGHT
2-121
MANDATED/COMMITTED: PARTIAL DEDICATED FUNDING: MINIMAL
PROGRAM WORK ELEMENT: 40001 TITLE: TRANSIT PLANNING ADMINISTRATION AND COORDINATION
FY 2009 BUDGET: $246,130 STRATEGIC GOAL: ENHANCE ORGANIZATIONAL EFFECTIVENESS
OBJECTIVE
The objectives of this work element are to: (1) provide administrative, coordination, and supervisory support for the Transit Planning Division; (2) act as liaison with member agencies, various federal and state agencies, transit operators, and other interested groups to advance transit projects and programs; (3) provide coordination and collaboration on transit policy with Metropolitan Transit System (MTS) and North County Transit District (NCTD) regarding transit planning matters; and (4) undertake small-scale studies, as needed, for transit planning projects.
PREVIOUS ACCOMPLISHMENTS
Previous accomplishments include coordination, management, administrative, and supervisory responsibilities to assist in the delivery of regional transit projects and plans through the Transportation Committee structure.
Committee(s): Transportation Committee
Working Group(s): None
Project Manager: Dave Schumacher
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
1 40 Task Description: Provide administrative support to the Transit Planning Division and receive training.
Product: Performance evaluations and meetings
Completion Date: 6/30/2009
SB1703 2 20 Task Description: Work with other agencies regarding transit planning issues and coordinate with transit operators on planning studies.
Product: Joint meetings and planning documents
Completion Date: 6/30/2009
SB1703 RTP 3 40 Task Description: Collaboration and assistance with MTS and NCTD on transit planning studies and agenda items that come before the SANDAG Transportation Committee and the MTS and NCTD Boards.
Product: Agenda reports
Completion Date: 6/30/2009
FUTURE ACTIVITIES
The coordination and advancement of transit planning activities is an ongoing effort.
2-122
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 4000101, 40000103 TITLE: SAN DIEGO TRANSIT PLANNING INTERNSHIP PROGRAM FY 06-10
FY 2009 BUDGET: $61,351 STRATEGIC GOAL: ENHANCE ORGANIZATIONAL EFFECTIVENESS
OBJECTIVE
The objective of this work element is to manage the Transit Planning Internship program that provides professional development opportunities for interns in the Masters in City Planning graduate program at San Diego State University. This grant-funded program continues in FY 2009 with the FY 08 -10 phase upon the completion of grant funded internship from the previous program (4000101).
PREVIOUS ACCOMPLISHMENTS
Continuation of successful internship program
Committee(s): Transportation Committee
Working Group(s): None
Project Manager: Linda Culp
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
MOUT ACCOUNTABILITY 1 100 Task Description: Manage Internship program. Product: End-of-year report
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Future internship program support is subject to additional grant funding.
2-123
MANDATED/COMMITTED: NONE DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 4000106 TITLE: LOSSAN INTERCITY AND HIGH-SPEED RAIL
FY 2009 BUDGET: $60,461 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objectives of this work element are to coordinate planning and project development along the Los Angeles to San Diego (LOSSAN) rail corridor. SANDAG is the lead coordinating agency, with all agencies along the corridor contributing funding to this effort to reimburse SANDAG administrator costs. SANDAG also coordinates with the California High-Speed Rail Authority (HSRA) to coordinate planning efforts in the proposed statewide high-speed rail system.
PREVIOUS ACCOMPLISHMENTS
SANDAG has been the lead agency for the LOSSAN rail corridor agency for many years, providing staff support toward the multi-agency agreement to increase service and capacity in this rail corridor.
Committee(s): Transportation
Working Group(s): None
Project Manager: Linda Culp
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK #% OF
EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
Accountability 1 90 Task Description: Staff LOSSAN Technical Advisory Committee and Joint Powers Board.
Product: Quarterly reports
Completion Date: 6/30/2009
Accountability 2 10 Task Description: Coordinate with HSRA on alignment and environmental tasks with San Diego County Segment.
Product: Quarterly report
Completion Date: 6/30/2009
FUTURE ACTIVITIES
SANDAG will continue to participate as a member of the LOSSAN rail corridor agency and provide staff support.
2-124
MANDATED/COMMITTED: ALL DEDICATED FUNDING: NONE
PROGRAM WORK ELEMENT: 4000107 TITLE: SAN DIEGO INTERNATIONAL AIRPORT MASTER PLAN ASSISTANCE
FY 2009 BUDGET: $231,303 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objective of this work element is to work with the San Diego County Regional Airport Authority (SDCRAA) to prepare a vision plan for San Diego International Airport (SDIA). The vision plan would address the costs and benefits of improvements to SDIA, including terminals, runways, and on- and off-airport access improvements. This work program is the initial step in completing the requirements of Senate Bill (SB) 10. The vision plan should be completed during FY 2009 and lead to the development of a scope of work for a long-range master plan for SDIA.
PREVIOUS ACCOMPLISHMENTS
Previous accomplishments include: (1) adoption of the 2030 Regional Transportation Plan aviation section; (2) review and comment on the 2015 Airport Master Plan and environmental impact report; (3) SDCRAA's preparation of an airport transit plan; (4) scoping the air-rail network plan study; (5) coordination with policy-makers of the Transportation Committee and SDCRAA Board; and (6) preparation of reports to the Transportation Committee.
Committee(s): Transportation Committee
Working Group(s): None
Project Manager: Miriam Kirshner
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
SB 10 Airport Planning
1 15 Task Description: Short-Term Improvements – Coordinate with the SDCRAA on planned 2015 improvements and their impact on the transit and highway system.
Product: None
Completion Date: 12/31/2009
SB 10 Airport Planning
2 25 Task Description: Airport Transit Study and Improvements – Assist the SDCRAA in the preparation of a short-term transit study and potential pilot projects designed to increase airport transit mode share.
Product: Comments on draft plans
Completion Date: 6/30/2009
SB 10 Airport Planning
3 60 Task Description: Long-Term Vision Plan – Serve on the advisory committee to provide assistance for the studies that will develop a long-term vision and master plan for SDIA.
Product: Comments on draft work products
Completion Date: 6/30/2009
FUTURE ACTIVITIES Future activities include continued staff participation in refinement and implementation of the Airport Master Plan.
2-125
MANDATED/COMMITTED: ALL DEDICATED FUNDING: PARTIAL
PROGRAM WORK ELEMENT: 40005 TITLE: TRANSPORTATION FUNDING ADMINISTRATION
FY 2009 BUDGET: $279,227 STRATEGIC GOAL: ENHANCE ORGANIZATIONAL EFFECTIVENESS
OBJECTIVE
The objectives of this work element are to: (1) administer the various funding sources available to the region for transportation purposes; and (2) provide assistance to the local jurisdictions and transit operators on transportation funding issues. This assistance includes the provision of revenue forecasts to be used by the local and transit agencies in the development of their operating and capital budgets. The intent of this work element is to help improve the effectiveness, efficiency, and economic viability of transportation systems. The funding sources and respective administrative responsibilities include, but are not limited to, the state Consolidated Planning Grants (CPGs), the Transportation Development Act (TDA), State Transit Assistance (STA), TransNet, Federal Transit Administration (FTA) programs, and Federal Highway Administration (FHWA) programs. This work element includes conducting the required annual fiscal audit for TDA and STA programs.
PREVIOUS ACCOMPLISHMENTS
Previous accomplishments include providing annual apportionments and short-term revenue projections to assist agencies in developing their operating and capital budgets. SANDAG has the overall responsibility for the various funding programs for the region, including ensuring that the annual fiscal audit requirements are met for all TDA and STA claimants.
Committee(s): Transportation Committee
Working Group(s): Cities/County Transportation Advisory Committee
Project Manager: Sookyung Kim
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA TDA IMPLEMENT TransNet
1 15 Task Description: Provide annual apportionments and five-year revenue projections to transit operators and local jurisdictions consistent with OWP 40006, Regional Transportation Improvement Program and the Transit Capital Improvement Project (CIP).
Product: Revenue report to Transportation Committee and Board of Directors aligned with transit CIP report to Transportation Committee and Board of Directors
Completion Date: 2/28/2009
RTPA TDA FINANCING TransNet
2 30 Task Description: Conduct annual fiscal audits of all TDA and STA claimants.
Product: Fiscal audits
Completion Date: 3/31/2009
SDRTC TNET IMPLEMENT TransNet
3 20 Task Description: Update TransNet Plan-related programs.
Product: Plan of finance
Completion Date: 6/30/2009
2-126
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
MPO FGC 4 10 Task Description: Continue to undertake actions necessary to ensure compliance of all local, state, and federal programs.
Completion Date: 6/30/2009
RTPA TDA 5 15 Task Description: Review/analyze TDA and STA claims for conformance with legislative requirements and assure funding of approved claims.
Product: Annual claims for Transportation Committee and Board of Directors
Completion Date: 6/30/2009
MPO MOUC 6 10 Task Description: Submit CPG invoice on a quarterly basis and year-reconciliation.
Product: Invoices
Completion Date: 6/30/2009
FUTURE ACTIVITIES
The administration of the CPG, TDA, TransNet, and the federal programs is a continuing activity.
2-127
MANDATED/COMMITTED: ALL DEDICATED FUNDING: MINIMAL
PROGRAM WORK ELEMENT: 40006 TITLE: REGIONAL TRANSPORTATION IMPROVEMENT PROGRAM
FY 2009 BUDGET: $200,814 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objective of this work element is the biennial preparation, adoption, and amendment, as needed, of a multi-year program of major transportation projects in the region. As the metropolitan planning organization (MPO) for the San Diego region, SANDAG is required to develop the Regional Transportation Improvement Program (RTIP), which implements the long-range Regional Transportation Plan (RTP). The RTIP includes projects funded with federal, state, and local funds, including TransNet.
PREVIOUS ACCOMPLISHMENTS
Previous accomplishments include the biennial updates to the RTIP since 1976 in accordance with state and federal guidelines. The 2008 RTIP is scheduled to be adopted by the SANDAG Board in June/July 2008. There are several key elements to the RTIP, including consistency with the State Transportation Improvement Program (STIP) and the RTP, demonstrating fiscal constraint, assuring public participation, and air quality conformity analysis. TransNet Ordinance requires all TransNet Program of Projects be incorporated as part of the RTIP. The STIP is developed as part of OWP work element 11091, Project Development and Oversight. The RTIP air quality conformity is conducted as part of OWP work element 30004, Regional Mobility and Transportation Planning. The TransNet financial planning is part of OWP work element 11102, TransNet Financial Management. The SANDAG RTIP and all amendments are incorporated as part of the Federal State Transportation Improvement Program (FSTIP).
Committee(s): Transportation Committee; Independent Taxpayer Oversight Committee
Working Group(s): Cities/County Transportation Advisory Committee; San Diego Region Conformity Working Group
Project Manager: Sookyung Kim
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
MPO RTIP IMPLEMENT TRANSNET
1 25 Task Description: Continue to streamline the use of Projecttrak for RTIP, TransNet payments, and other uses as appropriate.
Product: Manual and annual training
Completion Date: 6/30/2009
MPO RTIP IMPLEMENT TRANSNET
2 25 Task Description: Process on a quarterly basis or, as needed, amendments to the RTIP.
Product: Notifications and biennial workshop
Completion Date: 6/30/2009
MPO RTIP COMMUNI-CATION
3 5 Task Description: Monitor status and implementation of programmed projects and provide assistance, as necessary.
Completion Date: 6/30/2009
2-128
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
MPO RTIP COMMUNI-CATION
4 15 Task Description: Participate in various statewide meetings and hearings, as well as regional committees.
Completion Date: 6/30/2009
MPO FGC 5 15 Task Description: Produce and publish the annual listing of obligated federally funded projects pursuant to SAFETEA-LU.
Product: Annual listing of obligated projects
Completion Date: 12/31/2008
MPO FGC 6 15 Task Description: Submit to state and the Federal Highway Administration, an annual Congestion Mitigation Air Quality (CMAQ) report identifying the air quality emissions benefits for CMAQ-funded projects.
Product: Report
Completion Date: 11/30/2008
FUTURE ACTIVITIES
The RTIP and associated programming elements are a continuing activity.
2-129
MANDATED/COMMITTED: ALL DEDICATED FUNDING: PARTIAL
PROGRAM WORK ELEMENT: 40007 TITLE: DEVELOP AND ENHANCE TOOLS FOR TRANSPORTATION PERFORMANCE MONITORING
FY 2009 BUDGET: $491,184 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objective of this work element is to continue development of a multimodal freeway and highway Performance Monitoring System (PeMS) in conjunction with Caltrans and U.C. Berkeley. Emphasis in FY 2009 is undertake a pilot testing of the multimodal PeMS along key regional arterial and transit route corridors. The pilot testing will focus on integrating the application of the Arterial-PeMS and Transit-PeMS modules into the PeMS system. Focus also will be on developing a State of the Commute report using data collected from the A-PeMS and T-PeMS modules.
PREVIOUS ACCOMPLISHMENTS
In the past, PeMS has provided input on key performance monitoring efforts including the Regional Comprehensive Plan and State of the Commute presentation to SANDAG’s TransNet Independent Taxpayer Oversight Committee (ITOC). PeMS is a joint effort by Caltrans, U.C. Berkeley, Partners for Advanced Transit and Highways, and Berkeley Transportation Systems. SANDAG has partnered with these agencies in the past to expand the capabilities of PeMS to provide transportation performance data tailored to the San Diego region, including the development of the A-PeMS and T-PeMS prototypes and ramp metering module.
Committee(s): Transportation Committee
Working Group(s): San Diego Traffic Engineers' Council
Project Manager: Alex Estrella
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA MOUC CONGESTION MANAGE-
MENT
1 45 Task Description: Based on A-PeMS and T-PeMS prototype efforts, review/identify available technologies for undertaking A-PeMS and T-PeMS pilot testing and develop pilot testing report.
Product: Pilot testing report
Completion Date: 6/30/2009
RTPA MOUC CONGESTION MANAGE-
MENT
2 45 Task Description: Conduct an on-site field inventory of proposed A-PeMS and T-PeMS pilot testing sites – this effort will provide key input and background on the necessary system and equipment.
Product: On-site field inventory report
Completion Date: 6/30/2009
RTPA MOUC CONGESTION MANAGE-
MENT
3 10 Task Description: Complete State of the Commute report using data collected from the A-PeMS and T-PeMS modules.
Product: State of the Commute report
Completion Date: 6/30/2009
2-130
FUTURE ACTIVITIES
Future activities include developing a multimodal PeMS implementation report that will outline future A-PeMS and T-PeMS deployment locations. The report will provide a framework that will identify key performance monitoring efficiencies, functionalities, and limitations if more regional arterial and transit routes are incorporated in the PeMS automated performance monitoring system. Complete pilot testing will be performed. A State of the Commute report using PeMS and corresponding A-PeMS and T-PeMS enhance-ments also will be developed.
2-131
MANDATED/COMMITTED: ALL DEDICATED FUNDING: PARTIAL
PROGRAM WORK ELEMENT: 40008 TITLE: ASSET EVALUATION AND MANAGEMENT
FY 2009 BUDGET: $127,120 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
This objective of this work element is to evaluate the Metropolitan Transit System (MTS) light rail, fixed capital assets in order to rationally schedule replacement or rehabilitated as future capital improvement projects by SANDAG. The project would allow SANDAG to determine the existing state of MTS rail assets and develop a program for inspection and priority list that would lead to replacement or rehabilitation these assets to preserve the reliability and safety of the transit system.
PREVIOUS ACCOMPLISHMENTS
This work element is new for FY 2009.
Committee(s): Transportation Committee
Working Group(s): None
Project Manager: John Haggerty
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
MOUT FINANCING TRANS
1 20 Task Description: Develop a list of safety and operationally critical light rail infrastructure elements in an inspection program.
Product: Listing of infrastructure elements by category and item
Completion Date: 10/31/2008
2 60 Task Description: Prepare inspection procedures, checklists, and condition rating criteria/system for each element and set up electronic documentation system.
Product: Procedures, forms, and electronic document storage system
Completion Date: 3/31/2009
3 20 Task Description: Enter bridge inspection data into the system from the bridge inspection Capital Improvement Project and evaluate data and rate bridges.
Product: Bridge data entry and rating
Completion Date: 6/15/2009
FUTURE ACTIVITIES
This work element would result in a plan for programmed inspection of fixed infrastructure. Implementation of the inspection plan would be proposed in a future multi-year work element.
CHAPTER 2 – DETAILED WORK ELEMENT DESCRIPTIONS
SECTION 5 – PROJECT DEVELOPMENT
2-133
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 50003 TITLE: ENCINITAS PEDESTRIAN CROSSINGS STUDY
FY 2009 BUDGET: $765,632 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objective of this work element is to work with the City of Encinitas in the development and analysis of alternatives for grade-separated, pedestrian crossings of the Coastal Rail corridor. Major products of this study include alternatives analysis; final plans, specifications, and estimates; and an environmental document that provides the needed approvals for the construction phase under a separate project. In FY 2009 emphasis will be on initiating and completing final project study report and final design.
PREVIOUS ACCOMPLISHMENTS
The Coastal Rail Corridor in the area of Encinitas currently has a single-track main line that traverses the city at grade. The 2030 Regional Transportation Plan (RTP) plans for double-tracking the corridor from San Diego to Oceanside. The City of Encinitas and the North County Transit District (NCTD) determined that grade-separated, pedestrian crossings along the rail corridor would better facilitate future double-tracking, as well as improve pedestrian safety. In FY 2007 and 2008 the focus of this study was on completing background technical and environmental analyses, preparing an analysis of alternative grade-separated, pedestrian crossing solutions, soliciting public input, and preparing the final environmental and project study report documents.
Committee(s): Transportation Committee
Working Group(s): Encinitas Pedestrian Crossing Study Project Development Team
Project Manager: Alex Estrella
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA MOUM CONGESTION MANAGE-
MENT
1 30 Task Description: Submit final project study report.
Product: Final project study report
Completion Date: 12/31/2008
RTPA MOUM CONGESTION MANAGE-
MENT
2 70 Task Description: Complete final design.
Product: Final design documents
Completion Date: 6/30/2009
FUTURE ACTIVITIES
In early FY 2009 final design documents will be submitted to the City of Encinitas, and it is expected that construction will be initiated on at least one crossing. In FY 2008 a total $5 million has been programmed for FY 2010 consisting of Transportation Congestion Relieve Program, IIP, and local funding. It is estimated that $5 million is needed for construction of one crossing.
2-134
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 50004 TITLE: INTERMODAL TRANSPORTATION MANAGEMENT SYSTEM
FY 2009 BUDGET: $942,191 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objective of the Intermodal Transportation Management System (IMTMS) work element is to develop a comprehensive regional transportation management system consistent with our Regional Intelligent Transportation System (ITS) architecture. The goals of this work element are to: (1) enhance Caltrans District 11's freeway management system; and (2) develop and implement software/hardware systems connecting various modal management systems, including freeway traffic management, arterial management, incident management, and transit management so that the data from the systems can be aggregated into a comprehensive management tool and feed into the region's 511 Advanced Traveler Information System.
This project seeks to serve the needs of the local agencies’ traffic operations; provide Caltrans with freeway management tools; equip local law enforcement with incident management tools; and provide unified systems to transit operators. The emphasis in FY 2009 is to bring additional partner agency systems online and to further enhance the operational capabilities of the 511 Advanced Traveler Information System.
PREVIOUS ACCOMPLISHMENTS
In September 1997 SANDAG adopted a 20-year ITS Strategic Plan, including the development of a Regional Intermodal Transportation Management System to link the local agencies and coordinate the region’s transportation management systems. In 1998 SANDAG received federal ITS funding to begin work on the IMTMS. Later, SANDAG allocated Congestion Management and Air Quality (CMAQ) funds to further develop the regional integration and freeway management system improvements. In FY 2007 SANDAG took delivery of the region’s first operational IMTMS and its modal management subsystems. The deployed system will require SANDAG to develop ongoing support and maintenance strategies to ensure its operation and data feed to the region's 511 Advanced Traveler Information System.
Committee(s): Transportation Committee
Working Group(s): Intelligent Transportation System CEO Working Group
Project Manager: Peter Thompson
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RIS TDM 1 10 Task Description: Prepare contracts and amendments and manage the Regional IMTMS.
Product: Properly managed vendor and customer relations
Completion Date: 6/30/2009
RIS TDM 2 60 Task Description: Contractors will design, develop, and implement enhancements to existing systems and applications.
Product: Expand IMTMS network and enhancement of software
Completion Date: 6/30/2009
2-135
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RIS TDM 3 30 Task Description: Provide staff support, reports, and resources.
Product: Committee reports, minutes, and agendas
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Future activities will include ongoing refinement and further development of the IMTMS applications, integration, and traveler information support in order to achieve the level of transportation systems management specified in the 2030 Regional Transportation Plan. New project needs and management functions may be indicated as the IMTMS is actively used by local agencies and Internet service providers.
(1) implement closed-circuit television control w/priority
(2) implement changeable message sign control w/priority
(3) upgrade regional Web page to allow for layering, segments, snapshots, and video clips
(4) implement network redundancy
(5) deliver a regional “change management” portal for regional partner agencies
2-136
MANDATED/COMMITTED: ALL DEDICATED FUNDING: NONE
PROGRAM WORK ELEMENT: 50019 TITLE: SANDAG RAIL, BUS RAPID TRANSIT, AND BUS TRANSIT DESIGN CRITERIA
FY 2009 BUDGET: $72,407 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objective of this work element is to produce foundation documents for the planning, design, and implementation of transit capital projects by SANDAG. The products would be transit design criteria for the region and standard transit specifications for transit elements specific to the region.
The SANDAG design criteria document(s) would serve as guidance for conceptual, preliminary, and final design of regional transit capital projects. The criteria would be the primary resource for preparation of designs for transit projects developed by SANDAG and its design consultants. The criteria would document desired and minimum requirements for typical project elements and describe procedures for development and approval of unique or special project elements.
SANDAG engineering projects rely, to the extent possible, on Caltrans, American Railway Engineering Maintenance-Of-Way Association, and San Diego regional plans and specifications to reduce design time and conform to regional and national standards. However, existing standards do not cover certain transit design elements, which are unique to the transit systems and repeated from project to project. In addition, SANDAG projects include electronic and data communications elements that need to be included in the design standards to increase compatibility and reduce maintenance. Examples of the special transit design standards include: trolley contact wire and traction power; train signaling; bus queue jumper layout and signaling; rail and bus rapid transit (BRT) station layout; closed-circuit television field elements; and fare collection systems.
These documents would be developed from existing Metropolitan Transit System and North County Transit District rail and bus design and construction documents and include additional criteria for BRT design, bus priority design, and electronic and data communications elements.
PREVIOUS ACCOMPLISHMENTS
Rail and bus design criteria and standards were initially funded in FY 2008 and started in FY 2008 and will continue in FY 2009.
Committee(s): Transportation Committee
Working Group(s): None
Project Manager: John Haggerty
2-137
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
OTHER IMPLEMENT TRANSNET
1 40 Task Description: Criteria: execute work plan including existing material review; develop revised and new language; review draft language; and publish draft criteria document.
Product: Draft criteria document
Completion Date: 1/28/2009
OTHER IMPLEMENT TRANSNET
2 30 Task Description: Specifications: execute work plan including existing material review; develop revised and new specifications and plans; and publish draft standards documents.
Product: Draft specifications document
Completion Date: 5/31/2009
OTHER IMPLEMENT TRANSNET
3 20 Task Description: Review and collect comments to draft; circulate second draft; and prepare and publish final document.
Product: SANDAG design criteria
Completion Date: 6/30/2009
OTHER IMPLEMENT TRANSNET
4 10 Task Description: Review and collect comments to draft; circulate second draft; and post standard specification electronically for use.
Product: initiate review of draft standard specifications
Completion Date: 6/30/2009
FUTURE ACTIVITIES
In FY 2009 transit design criteria would be advanced to final draft and approved or ready for approval in early FY 2010. In FY 2010 the anticipated the work would include completing the standard specifications.
2-138
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 50020 TITLE: INTELLIGENT TRANSPORTATION SYSTEMS OPERATIONS
FY 2009 BUDGET: $1,717,748 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objective of this work element is to address the ongoing operations, system administration, communications, and maintenance needs of regional Intelligent Transportation Systems (ITS) deployments. SANDAG has deployed several programs and systems, such as 511 Advanced Traveler Information System, Intermodal Transportation Management System (IMTMS), Compass Card, Regional Arterial Management System, Freeway Service Patrol (FSP), Regional Automatic Vehicle Location (RAVL), and regional communications network that are transitioning from implementation into normal or pilot operations. These systems require ongoing support for operations, administration, and maintenance to ensure that the systems perform as expected and deliver mobility services to the public.
PREVIOUS ACCOMPLISHMENTS
In September 1997 SANDAG adopted a 20-year ITS Strategic Plan, including the development of a Regional Intermodal Transportation Management System to link the local agencies and coordinate the region’s transportation management systems. In 1998 SANDAG received federal ITS funding to begin work on the IMTMS. Later, SANDAG allocated Congestion Management and Air Quality (CMAQ) funds to further develop the regional integration and Freeway Management System improvements. In FY 2007 SANDAG took delivery of the region’s first operational IMTMS, its modal management subsystems, Compass Card, and delivered the region's 511 Advanced Traveler Information System. Delivery of the related services, the underlying systems, and regional communications network require establishment of a work element for ongoing operations and systems management.
Committee(s): Transportation Committee
Working Group(s): Intelligent Transportation Systems CEO Working Group
Project Manager: Peter Thompson
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RIS TDM 1 20 Task Description: Provide operations staff in support of mobility sServices, including 511 Advanced Traveler Information System.
Product: Hire limited-term employees to staff Traffic Management Center operations
Completion Date: 6/30/2009
RIS TDM 2 10 Task Description: Implement technical staffing plan in support of SANDAG-operated systems, such as Compass Card, 511 Advanced Traveler Information System, IMTMS, Freeway Service Patrol and regional network.
Product: Hire employees to perform system administration
Completion Date: 6/30/2009
2-139
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RIS COMMUNI-CATION
3 35 Task Description: Implement software maintenance and technical support contracts with vendors in support of SANDAG-operated systems.
Product: Implement software maintenance and support contracts
Completion Date: 6/30/2009
RIS COMMUNI-CATION
4 35 Task Description: Implement and maintain communication lines, servers, and services that comprise the regional network and support regional ITS applications and 511 Advanced Traveler Information System delivery.
Product: Implement and maintain regional network
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Future activities will include ongoing support and maintenance of mobility services network, applications, and users.
CHAPTER 2 – DETAILED WORK ELEMENT DESCRIPTIONS
SECTION 6 – SYSTEMS MANAGEMENT
2-141
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 60001 TITLE: TRANSPORTATION DEMAND MANAGEMENT
FY 2009 BUDGET: $4,789,527 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objective of this work element is to manage peak-period demand on the regional transportation system by providing commuter and employer programs and services aimed at promoting use of alternatives to driving alone. Activities are carried out in cooperation with Caltrans, the Air Pollution Control District, transit providers, and local jurisdictions. Activities include promotion of vanpooling, Guaranteed Ride Home, employer and school district outreach, marketing, and self-service to allow greater information distribution to the general public. In FY 2009 special emphasis will be placed on public/private partnerships that promote awareness and participation in ridesharing, expanding participation in the regional vanpool program, implementing an online carpool ridematching system, and introducing Transportation Demand Management (TDM) products designed for the Spanish-speaking population.
PREVIOUS ACCOMPLISHMENTS
Previous accomplishments include program management and coordination, commuter services, employer and school services, promotion of TDM services, and vanpool services. SANDAG manages the regional RideLink program, which offers ridematching, transportation information, and assistance to employers and school districts. SANDAG staffs RideLink.
Committee(s): Transportation Committee
Working Group(s): Intelligent Transportation System CEOs Policy Management Working Group
Project Manager: Thomas Bruccoleri
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA TDM TDM 1 15 Task Description: Administer the regional TDM program, (including the annual work program and budget, managing contracts, seeking new grant funds, and developing new self-service programs).
Product: Overall Work Program, budget, strategic plan, grant applications
Completion Date: 6/30/2009
RTPA RTP TDM 2 10 Task Description: Provide ridematching and TDM information services introducing new online self-service (Caltrans grant pending to supplement full development of on-line program).
Product: Request for proposal for on-line regional trip planner
Completion Date: 6/30/2009
2-142
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA RTP TDM 3 10 Task Description: Continue support on mobility marketing programs, including development of marketing materials for the Spanish-speaking population, educational materials, and Web site in support of the 511 Advanced Traveler Information System.
Product: Marketing plan, program brochures, posters
Completion Date: 6/30/2009
RTPA TDM TDM 4 60 Task Description: Administer the Regional Vanpool Program, complete annual national transit (NTD) database report to the Federal Transit Administration, and modify subsidy to allow additional growth.
Product: NTD database report and plan to modify subsidies
Completion Date: 6/30/2009
RTPA RTP TDM 5 5 Task Description: Introduce regional self-help services, including introducing online bike map and modernizing the Bicycle Locker program to include self-service and e-lock bike lockers.
Product: Online bike map and new bike locker policies
Completion Date: 6/30/2009
FUTURE ACTIVITIES
The regional TDM Program is a continuing work element.
2-143
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 6000109 TITLE: SHORT DISTANCE VANPOOL FEASIBILITY STUDY
FY 2009 BUDGET: $134,740 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objective of this work element is to evaluate the feasibility, efficiency, and effectiveness of using short-distance vanpools or similar transportation services in conjunction with regional bus services, commuter rail, and/or other express transit services which lack convenient, connecting feeder service to connect with employment centers. The project will evaluate the first and last mile of service.
PREVIOUS ACCOMPLISHMENTS
Previous accomplishments included the development of a request for proposal for consulting assistance and project management meetings with the Metropolitan Transit System (MTS).
Committee(s): Transportation Committee
Working Group(s): Intelligent Transportation System CEOs Policy Management Working Group
Project Manager: Thomas Bruccoleri
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA RTP 1 100 Task Description: In partnership with MTS, study first- and last-mile options for short-distance vanpools as potential alternatives to a circulator service and implement pilot program
Product: Short-distance vanpool study
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Future activities include preparing a final report and close out the project.
2-144
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 60002 TITLE: I-15 FASTRAK® VALUE PRICING PROGRAM
FY 2009 BUDGET: $3,546,247 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objectives of this work element are to: (1) sell excess capacity of the high occupancy vehicle (HOV) expressway on Interstate 15 (I-15) and provide a premium commuter service to single-occupant vehicle (SOV) drivers who pay a per-trip fee to use the HOV lanes; (2) manage a high-quality, customer-driven, and cost-efficient customer service center; (3) collect toll revenue and fees from FasTrak® customers enrolled with SANDAG and interoperable agencies; (4) maintain a minimum level of service (LOS) "C" or better in the HOV lanes to ensure reliable commute times for I-15 commuters who carpool, vanpool, take transit, or use FasTrak®; and (5) increase throughput of the HOV lanes through effective transportation systems management (TSM).
PREVIOUS ACCOMPLISHMENTS
In 1993 SANDAG secured state legislation (Section 149.1 of the Streets & Highways Code) and approval by the Federal Highway Administration (FHWA) to implement congestion pricing on an existing eight-mile, reversible HOV expressway on I-15. SANDAG operated the facility under a pilot project from December 1996 to December 1999, and the I-15 FasTrak® program became self supporting in January 2000. Since that time SANDAG has expanded the program to provide direct service to over 15,000 accounts representing more than 26,000 commuters. SANDAG operates a FasTrak® customer service center (CSC) in Kearny Mesa and will begin operating a new FasTrak® electronic toll collection system (ETCS) and violation enforcement system (VES) in FY 2009. Additionally, SANDAG contracts with the California Highway Patrol (CHP) to provide enforcement services on the HOV Lanes.
Committee(s): Transportation Committee
Working Group(s): I-15 Project Management Team
Project Manager: Derek Toups
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
FASTRAK TDM 1 50 Task Description: Project management, including overseeing CSC operations, consultant and contractor work, and making periodic progress reports to working groups and committees.
Product: Periodic progress reports
Completion Date: 6/30/2009
FASTRAK TDM 2 10 Task Description: Launch new I-15 FasTrak® CSC and violations processing center (VPC) marketing promotions.
Product: I-15 FasTrak® CSC grand re-opening
Completion Date: 9/30/2008
2-145
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
FASTRAK TDM 3 10 Task Description: Oversee contractor transition from I-15 reversible lanes to Managed Lanes, including new customer policies and standard operating procedures.
Product: Updated CSC operations plan and business rules
Completion Date: 9/30/2008
FASTRAK TDM 4 10 Task Description: Deploy SANDAG FasTrak® IVR and online account management system as a component of SANDAG 511 Advanced Traveler Information System Web and phone system.
Product: FasTrak® secure eBusiness applications
Completion Date: 12/31/2008
FASTRAK TDM 5 5 Task Description: Implement FasTrak business plan and strategic plan recommendations (business plan/strategic plan will be completed in Q3-4 FY 2008).
Product: Improved FasTrak® operations
Completion Date: 6/30/2009
MOUM TDM 6 5 Task Description: Oversee CHP enforcement of FasTrak® pricing and HOV lane operations.
Product: Enforcement memorandum of understanding (MOU) with CHP and reports
Completion Date: 6/30/2009
MOUC CONGESTION MGMT
7 5 Task Description: Collaborate with Caltrans traffic operations maintenance and traffic management center on I-15 Managed Lanes movable barrier operations.
Product: Cooperative agreement, subject to funding availability
Completion Date: 6/30/2009
MOUM TDM 8 5 Task Description: Pass-through surplus toll revenue to Metropolitan Transit System for I-15 corridor transit operations.
Product: MOU with MTS, subject to funding availability
Completion Date: 6/30/2009
FUTURE ACTIVITIES
During FY 2009 emphasis will be on completing the transition from the existing SANDAG FasTrak® organization to the new SANDAG FasTrak® organization that will manage an expanded CSC and VPC for the I-15 Managed Lanes Value Pricing program.
2-146
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 60003 TITLE: FREEWAY SERVICE PATROL
FY 2009 BUDGET: $4,072,430 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objective of this program is to reduce freeway congestion by providing a roving motorist assistance service that patrols designated urban freeways and removes stranded or disabled vehicles during peak commute hours. The Freeway Service Patrol (FSP) is an ongoing effort operated by SANDAG in coordination with Caltrans and the California Highway Patrol (CHP). In FY 2009 emphasis will be placed on continued support for ongoing FSP towing services, including completion of a service fleet operational analysis to determine possible FSP program expansion and possible expansion of the roving service trucks. Other efforts will include initiation of new FSP towing services along the Interstate 15 (I-15) Managed Lanes construction projects.
PREVIOUS ACCOMPLISHMENTS
The FSP program was established in March 1993 through the enactment of the FSP Act of 1992. In 2000 the demonstration program expiration date was removed, and the FSP program was established as an ongoing activity supported by the state budget. SANDAG currently contracts with local tow operators to provide FSP program service on 225 miles of the region’s busiest freeways. A fleet of 7 full-time pick-up and 25 regular tow trucks patrol sections of Interstates 5, 8, 15, 805, and State Routes 52, 54, 56, 78, 94, 125, 163, and 905 during peak commute hours.
Committee(s): Transportation Committee
Working Group(s): Freeway Service Patrol Management Team
Project Manager: Alex Estrella
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
MPO FSP CONGESTION MGMT
1 60 Task Description: Provide FSP motorist services and operations program oversight, including liaison with local and state FSP program representatives.
Product: FSP motorist services
Completion Date: 6/30/2009
MPO FSP CONGESTION MGMT
2 5 Task Description: Administer existing contracts and procure new services if additional FSP funds are received.
Product: Potential new contracts
Completion Date: 6/30/2009
MPO FSP CONGESTION MGMT
3 15 Task Description: Monitor and evaluate FSP services system performance, including the roving truck demonstration project.
Product: Periodic performance reports
Completion Date: 6/30/2009
2-147
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
MPO FSP CONGESTION MGMT
4 10 Task Description: Develop quarterly FSP system progress reports and provide periodic reports to SANDAG and other local and regional committees as needed.
Product: OWP quarterly reports
Completion Date: 6/30/2009
MPO FSP CONGESTION MGMT
5 10 Task Description: Complete FSP service fleet operational analysis and implementation plan.
Product: Service fleet operational. analysis and implementation plan
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Future activities include: (1) reviewing, evaluating, and supporting FSP data reporting and fleet management monitoring systems to ensure long-term system efficiency and operations; and (2) pursuing funding and/or legislative action to support expansion of regional FSP services intended to meet or surpass the region’s goals of improved incident response and clearance times and reduced congestion and delay resulting from incidents.
2-148
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 60004 TITLE: SAN DIEGO STATION CAR PILOT PROGRAM STUDY – PHASES I AND II
FY 2009 BUDGET: $184,850 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objective of this work element is to establish a pilot project that demonstrates car-sharing as an extension of transit service for the Coaster commuter rail and Trolley light rail service. Phase I activities include market assessment and public outreach and development of an operations plan for implementing a two-year pilot program. The Phase II project activities are similar, with a focus on expanding the demonstration project service area to include additional Coaster and Trolley stations, as well as developing an integrated service package that combines car-sharing with transit services. In FY 2009 emphasis will be on initiating the on-street parking demonstration for car-sharing vehicles.
PREVIOUS ACCOMPLISHMENTS
In the fall of 2002 SANDAG was awarded a statewide transit planning grant from Caltrans for the San Diego Station Car Pilot Program Planning Study. In early 2004 the car-sharing organization was hired, and the demonstration project was launched. In mid 2004 San Diego State University was awarded grant funding from U.C. Berkeley’s Partners for Advanced Transit and Highways (PATH) to collaborate with SANDAG to study the effectiveness of the Mobility Pass.
Committee(s): Transportation Committee
Working Group(s): Regional Car Sharing Working Group
Project Manager: Thomas Bruccoleri
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA SGC TDM 1 20 Task Description: Oversee management of carsharing grant, including coordination with Metropolitan Transit System, North County Transit District, Caltrans, Centre City Development Corporation (CCDC), and the City of San Diego and prepare periodic technical memos an reports as needed.
Product: Grant progress report
Completion Date: 6/30/2009
RTPA SGC TDM 2 30 Task Description: Coordinate, implement. and monitor the on-street car-sharing spaces in the City of San Diego CCDC area.
Product: Memorandum of understanding with CCDC and City of San Diego
Completion Date: 6/30/2009
RTPA SGC TDM 3 50 Task Description: Consultant preparation of State of the Region car-sharing report.
Product: Car-sharing report
Completion Date: 6/30/2009
2-149
FUTURE ACTIVITIES
Future activities include coordination of regional carsharing as an ongoing activity of the Regional Transportation Demand Management Program and as part of the first- and last-mile solution.
2-150
MANDATED/COMMITTED: ALL DEDICATED FUNDING: PARTIAL
PROGRAM WORK ELEMENT: 60007 TITLE: COMPASS CARD PROGRAM
FY 2009 BUDGET: $1,528,471 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objectives of this work element are to: (1) continue the Compass Card Program, including centralized and consolidated fare payment management for the San Diego region and its transit operators; (2) provide a transition path from the manual pass sales system to an automated system; (3) continue to fund a regional customer account management service center for Compass Card customers; (4) further the effort to develop brand identity, adoption of the Compass Card, and recognition of the new card; and (5) create a platform for creating a universal transportation account to include transit, toll, parking, and public-private ventures.
PREVIOUS ACCOMPLISHMENTS
Under the Automated Fare Collection (AFC) project (Capital Improvement Project 1145700), SANDAG has procured and implemented a back office system for the management of regional fare collection devices, including ticket vending machines, regional buses, and ticket office locations. The delivered system needs continued staffing, promotion, and continued transition from the existing manual system. This work element builds upon the equipment and system procurements previously accomplished under the AFC project and the creation of a program office under fiscal year 2008 operational budget.
Committee(s): Transportation Committee
Working Group(s): Joint Committee on Regional Transit; Intelligent Transportation System CEOs Policy Management Working Group
Project Manager: James Dreisbach-Towle
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
SB1703 MOUT TDM 1 60 Task Description: Manage customer accounts and assist in transition of manual pass sales administration to the automated Compass Card program.
Product: Customer account records
Completion Date: 6/30/2009
SB1703 MOUT TDM 2 10 Task Description: Manage services contract for Compass Card and other media distribution.
Product: Consultant agreement(s)
Completion Date: 6/30/2009
SB1703 MOUT TDM 3 25 Task Description: Implement marketing, customer education, and outreach efforts with regional partners and potentially with public private ventures.
Product: Ongoing and potential joint venture agreement(s)
Completion Date: 6/30/2009
2-151
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
SB1703 MOUT TDM 4 5 Task Description: Establish an ongoing services agreement(s) for software maintenance.
Product: Consultant agreement(s)
Completion Date: 9/30/2008
FUTURE ACTIVITIES
This system will allow SANDAG to establish a universal transportation account system, manage transportation demand, and provide a potential for public-private ventures that could offset operational costs.
2-152
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 60008 TITLE: SAN DIEGO SMART PARKING PILOT PROJECT
FY 2009 BUDGET: $329,029 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objectives of this work element are to: (1) examine the use of modern technologies as a cost-effective solution for improving parking management; (2) enhance transit services by providing customers access to real-time parking availability; (3) conduct ongoing evaluation of user acceptance of paid and preferential-based parking strategies; and (4) evaluate parking pricing business models as a means to generate alternative funding sources for increasing parking supply and enhanced parking facilities. The objectives are intended to serve as the framework for determining if smart parking systems can be expanded to other transit facilities and to establish the core components of a regional parking management system.
PREVIOUS ACCOMPLISHMENTS
SANDAG seeks to build upon a smart parking system research project conducted in the San Francisco Bay Area through the completion of a pilot project. Through this project, SANDAG will investigate the use of modern technologies to collect parking data, provide real-time information to COASTER customers, and examine innovative parking pricing methods. The study area and corresponding data collection, analysis, and initial feasibility assessment phase will be based on information gathered at the COASTER rail stations. Completion of the project is anticipated for summer 2010.
Committee(s): Transportation Committee
Working Group(s): Intelligent Transportation System CEO Working Group
Project Manager: Alex Estrella
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA FINANCING TRANS
1 10 Task Description: Perform pilot project feasibility assessment.
Product: Feasibility assessment findings
Completion Date: 7/31/2008
RTPA FINANCING TRANS
2 10 Task Description: Develop smart parking management strategies (information provided will be based on feasibility assessment findings).
Product: Smart parking management strategies
Completion Date: 9/30/2008
RTPA FINANCING TRANS
3 80 Task Description: Pilot project implementation and ongoing project management oversight.
Product: Pilot project Implementation and oversight
Completion Date: 6/30/2009
2-153
FUTURE ACTIVITIES
Future activities will include continued pilot project oversight and coordination with regional and local agency project partners, including North County Transit District and Caltrans. Efforts will include review and documentation of the entire process and background work for developing, implementing, and operating the smart parking system. SANDAG anticipates that the results from the pilot project implementation will provide keen insight to other agencies interested in establishing a smart parking system as a tool to help better manage parking demand and as a means for implementing a parking pricing strategy. For the San Diego region, pilot project outcomes will serve as the framework for determining if smart parking systems can be expanded to other transit facilities as a means to increase transit mode-share and create an ongoing revenue stream.
2-154
MANDATED/COMMITTED: ALL DEDICATED FUNDING: NONE
PROGRAM WORK ELEMENT: 60009 TITLE: TRANSIT CONFIGURATION MANAGEMENT SYSTEM
FY 2009 BUDGET: $32,114 STRATEGIC GOAL: ENHANCE ORGANIZATIONAL EFFECTIVENESS
OBJECTIVE
The objective of this work element is to create a transit configuration management system (TCMS) that will store or track, and allow retrieval of the latest configuration and previous configurations of various safety-critical (SC), as-built plans and records for transit facilities including civil, structural, and systems elements.
PREVIOUS ACCOMPLISHMENTS
xxx
Committee(s): Transportation Committee
Working Group(s): None
Project Manager: John Haggerty
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
MOUT IMPLEMENT TRANSNET
1 30 Task Description: Determine the required SC elements to be subject to configuration management and the related documents to be included and track using configuration management.
Product: List of elements and documents
Completion Date: 9/28/2008
MOUT IMPLEMENT TRANSNET
2 55 Task Description: Develop procedures for initiation and storage of any changes to a SC element and develop a system that stores or tags and tracks listed documents electronically.
Product: Procedures and electronic filing method and location
Completion Date: 3/20/2009
MOUT IMPLEMENT TRANSNET
3 15 Task Description: Initiate the procedures and electronic system and train design and operator staff and consultants.
Product: Training material and meetings
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Input the existing system configuration information into the system and update information in accordance with the TCMS. These activities would be capital costs.
CHAPTER 2 – DETAILED WORK ELEMENT DESCRIPTIONS
SECTION 7 – PROGRAM MANAGEMENT AND EXTERNAL RELATIONS
2-155
MANDATED/COMMITTED: PARTIAL DEDICATED FUNDING: MINIMAL
PROGRAM WORK ELEMENT: 70001 TITLE: INTERAGENCY COORDINATION AND OWP PROGRAM MANAGEMENT
FY 2009 BUDGET: $1,050,805 STRATEGIC GOAL: ENHANCE ORGANIZATIONAL EFFECTIVENESS
OBJECTIVE
This objective of this work element is to provide the overall development, management, coordination, and direction for carrying out the Overall Work Program (OWP). The OWP is a required document outlining the regional planning efforts coordinated by SANDAG to ensure the continuation of various metropolitan planning organization (MPO) planning funds. Development and monitoring of the OWP ensures that planned activities are completed effectively and efficiently, with continued emphasis on the use of technology and the coordination of activities, both within SANDAG and with other agencies, based upon approved Board policy. Emphasis in FY 2009 will be to continue to improve methods to implement regional planning, programming, project development, and construction priorities outlined in the SANDAG Budget, including the OWP. Renewed emphasis will be placed on internal and external communications to accomplish these regional priorities, including staff support of the Transit Access Advisory Committee (TAAC), Cities/County Transportation Advisory Committee (CTAC), and San Diego Regional Traffic Engineers Council (SANTEC).
PREVIOUS ACCOMPLISHMENTS
Interagency Coordination and OWP Program Management is a recurring annual function that provides the direction for and coordination of the SANDAG Budget and OWP. Previous work includes redevelopment of the budgeting software tools and accompanying processes to allow for the upward flow of proposals that can be prioritized and summarized for Executive-level decision making.
Committee(s): Executive Committee
Working Group(s): San Diego Traffic Engineers' Council; Transit Access Advisory Committee; Cities/County Transportation Advisory Committee
Project Manager: Timothy Watson
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
OWP COMMUNI-CATION
1 10 Task Description: Printing and distribution of the FY 2009 Final Program Budget and OWP.
Product: FY 2009 Final Program Budget and OWP
Completion Date: 7/31/2008
OWP COMMUNI-CATION
2 10 Task Description: Identification of program priorities, changes, and clarifications to the process.
Product: Budget guidelines document
Completion Date: 11/30/2008
2-156
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
OWP COMMUNI-CATION
3 10 Task Description: Quarterly and annual project status reports for review by SANDAG Executive Team and submission of progress reports to Caltrans, as applicable.
Product: Project Accounting (PA) quarterly report
Completion Date: 6/30/2009
COMMUNI-CATION
4 5 Task Description: Semi-annual progress reports to the Executive Committee/Board on the agency’s effectiveness in meeting objectives in the OWP.
Product: Executive Committee agenda report in September 2008 and March 2009.
Completion Date: 6/30/2009
OWP COMMUNI-CATION
5 20 Task Description: Develop draft FY 2010 Program Budget and OWP.
Product: Draft FY 2010 Program Budget and OWP
Completion Date: 3/1/5/2009
COMMUNI-CATION
6 10 Task Description: Develop draft FY 2010 Program Budget and OWP, including capital, administrative, and Board budget items.
Product: Draft FY 2010 Program Budget and OWP
Completion Date: 4/30/2009
OWP COMMUNI-CATION
7 10 Task Description: Development and approval of the final FY 2010 Program Budget and OWP.
Product: Board approval of final FY 2010 Program Budget and OWP
Completion Date: 6/30/2009
SB1703 8 5 Task Description: Maintenance and enhancement support of SANDAG's financial system (IFAS).
Product: Improved reports and completed punch list
Completion Date: 6/30/2009
COMMUNI-CATION
9 10 Task Description: Executive-level coordination of multi-agency programs among cities, transit agencies, and others.
Product: Memorandums of understanding on various topics as needed
Completion Date: 6/30/2009
MPO RTP COMMUNI-CATION
10 5 Task Description: Provide administrative support for CTAC and SANTEC.
Product: Agendas, minutes, and follow-up action items
Completion Date: 6/30/2009
MOUC INTER-REGIONAL
PLAN
11 0 Task Description: Evaluate funding needs for the State Route 125 toll road and potential amendments to the franchise agreement between California Transportation Ventures and the state.
Product: Transportation Committee/Board of Directors report
Completion Date: 4/30/2009
SB1703 MOUT COMMUNI-CATION
12 5 Task Description: Administration of the Transit Access Advisory Committee to assist with Americans with Disabilities Act (ADA) compliance.
Product: Agendas, minutes, and responses on ADA issues
Completion Date: 6/30/2009
FUTURE ACTIVITIES
This work element will continue to be responsible for the annual coordination of all Budget and OWP activities, including transition of planning projects into capital development. Other areas of emphasis
2-157
include: continuous improvement of the effectiveness of the development and monitoring processes; improved coordination with the funding agencies; and sharing best practices with other MPOs and Councils of Government.
2-158
MANDATED/COMMITTED: ALL DEDICATED FUNDING: NONE
PROGRAM WORK ELEMENT: 70003 TITLE: INTERGOVERNMENTAL REVIEW PROCESSING
FY 2009 BUDGET: $385,020 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objective of this work element is to manage SANDAG’s intergovernmental review (IGR) processing, local development review functions, and a portion of the Congestion Management Plan (CMP), all systems that require coordination with local jurisdictions, along with Caltrans, the County Air Pollution Control District (APCD), Metropolitan Transit System (MTS), North County Transit District (NCTD), and other agencies, in the review of plans and development projects affecting the implementation of the Regional Transportation Plan (RTP) and the Regional Comprehensive Plan (RCP). During FY 2009 the IGR and local development review process will move toward greater use of automated project tracking and clearinghouse functions and in providing regional policy guidance.
PREVIOUS ACCOMPLISHMENTS
Previous accomplishments include maintaining the areawide clearinghouse and coordinating the region’s IGR process pursuant to the requirements of the federal government and the State of California. (Note: actual review of plans and projects occurs primarily through OWP work element 30039, Subregional Transportation Planning and Coordination.)
Committee(s): Transportation Committee; Regional Planning Committee
Working Group(s): Regional Planning Technical Working Group
Project Manager: Coleen Clementson
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
CEQA IGR 1 20 Task Description: Coordinate areawide clearinghouse and IGR processing.
Product: Updated project tracking log and checklists
Completion Date: 6/30/2009
MOUT 2 25 Task Description: Conduct local development review in coordination with transit providers, MTS and NCTD.
Product: MTS and NCTD comment letters and annual reports
Completion Date: 6/30/2009
CMA RTP 3 20 Task Description: Coordinate CMP comments on development projects and plans.
Product: Updated tracking log and CMP comment letters
Completion Date: 6/30/2009
2-159
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
IGR 4 35 Task Description: Coordinate with subregional teams and provide comments to other agencies on regionally significant projects and plans.
Product: IGR comment letters and meetings
Completion Date: 6/30/2009
FUTURE ACTIVITIES
SANDAG will continue to refine and update the IGR processes and support them as required.
2-160
MANDATED/COMMITTED: PARTIAL DEDICATED FUNDING: NONE
PROGRAM WORK ELEMENT: 70004 TITLE: PUBLIC INVOLVEMENT PROGRAM
FY 2009 BUDGET: $295,576 STRATEGIC GOAL: ENHANCE ORGANIZATIONAL EFFECTIVENESS
OBJECTIVE
The objectives of this work element are to: (1) inform and involve citizens in the agency’s various programs, projects, and work activities; (2) actively seek the involvement of interested citizens and stakeholders in SANDAG work-through public workshops, fully noticed public hearings, and ongoing broad citizen/organization involvement in the planning and decision-making process; (3) implement a comprehensive media relations program, including regular press release and media advisory distribution about SANDAG issues, press conferences, and news media briefing sessions; (4) provide easy access to meeting notices and agendas, reports, and other information via the SANDAG Web site; (5) develop and produce written or Web-based reports, newsletters, press releases, and other publications; (6) work with member agencies to coordinate public information, public involvement, customer, community and inter-governmental relations, marketing, advertising, and Web site management; and (7) ensure meaningful involvement of low-income, minority, disabled, senior, tribal nations, and other traditionally underrepresented communities. During FY 2009 emphasis will be on collaborating with Caltrans, Metropolitan Transit System (MTS), and North County Transit District (NCTD) on regional transportation and transit events and projects and providing ongoing support of FasTrak®, Compass Card, and other Intelligent Transportation System (ITS) initiatives.
PREVIOUS ACCOMPLISHMENTS
Previous accomplishments include: (1) maintaining consistent contacts with the news media on SANDAG projects and initiatives; (2) making presentations to various leadership, civic, and community groups about population growth, transportation, environmental projects, public safety programs, and other regional topics; (3) providing information to the general public, interested organizations, public officials and agencies, and news media; (4) editing technical reports for readability; (5) preparing non-technical summaries of key issues; (6) assisting with public presentations; (7) updating and enhancing the SANDAG Web site; and (8) coordinating with SANDAG staff and transportation agencies on projects such as 511 phone and Web-based Advanced Traveler Information System, ground-breaking ceremonies, and other events.
Committee(s): None
Working Group(s): None
Project Manager: Anne Steinberger
2-161
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
MPO COMMUNI-CATION
1 5 Task Description: Enhance the effectiveness of the public involvement process to ensure adequate opportunity for low-income and minority groups in the regional decision-making process.
Product: Analysis of outreach involvement
Completion Date: 2/15/2009
MPO COMMUNI-CATION
2 15 Task Description: Conduct a public information program to familiarize and involve various audiences with SANDAG programs, services, and functions, especially the Regional Transportation Plan, Regional Comprehensive Plan, and new Intelligent Transport-ation System programs.
Product: Public involvement plans and reports
Completion Date: 6/30/2009
MPO COMMUNI-CATION
3 20 Task Description: Produce and/or distribute a variety of public information publications, including monthly Board action digests, press releases, rEgion, newsletters, and other publications.
Product: Board Actions, press releases and other publications
Completion Date: 6/30/2009
COMMUNI-CATION
4 5 Task Description: Assist Board members and staff with the scheduling of and preparation for SANDAG-sponsored workshops and other public forums.
Product: Brochures, fact sheets and reports
Completion Date: 6/30/2009
CONGESTION MANAGE-
MENT
5 5 Task Description: Assist Board members and staff with the preparation of speeches, audio/visual materials, and public docu-ments.
Product: PowerPoint shows and speaking points
Completion Date: 6/30/2009
COMMUNI-CATION
6 20 Task Description: Encourage news media coverage of agency activities and regional issues.
Product: Press releases and media briefings
Completion Date: 6/30/2009
MPO COMMUNI-CATION
7 5 Task Description: Provide information on SANDAG programs and services to members of the public, elected officials, the media, and other stakeholders and coordinate SANDAG Speakers Bureau.
Product: Board actions, press releases, and other publications
Completion Date: 6/30/2009
MPO COMMUNI-CATION
8 5 Task Description: Proactively solicit public presentations to civic organizations, including minorities, persons with disabilities, and populations underserved by public transportation.
Product: Log of events attended
Completion Date: 6/30/2009
MPO COMMUNI-CATION
9 5 Task Description: Report on disposition of comments received from the public during public comment periods for various plans and programs and assist with proper noticing of public hearings/meetings.
Product: Web postings of comments received
Completion Date: 1/15/2009
2-162
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
MPO COMMUNI-CATION
10 15 Task Description: Maintain an updated Web site with pertinent information on SANDAG programs and services and broadcast Board meetings via the SANDAG Web site.
Product: Updated SANDAG Web site content
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Future activities include pursuing options for expanding access to information about SANDAG programs and projects using Web-based public involvement/input activities.
2-163
MANDATED/COMMITTED: ALL DEDICATED FUNDING: NONE
PROGRAM WORK ELEMENT: 70006 TITLE: TRIBAL GOVERNMENT LIAISON
FY 2009 BUDGET: $119,980 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
OBJECTIVE
The objectives of this work element are to: (1) strengthen government-to-government relationships between SANDAG and the 17 federally recognized sovereign tribal governments in the region; (2) consult with tribal governments on major transportation and regional planning initiatives to ensure their timely and meaningful input into the decision-making process; (3) coordinate on land use and transportation planning activities of mutual concern; (3) facilitate the involvement of the South California Tribal Chairmen’s Association (SCTCA) in the SANDAG policy-making structure; and (4) coordinate tribal-related planning grants, including the Tribal Transportation Demand Management Outreach partnership with the Reservation Transportation Authority (RTA).
PREVIOUS ACCOMPLISHMENTS
The San Diego region is home to 18 Native American reservations governed by 17 federally recognized tribal governments, the most in any county in the United States. Federal and state planning regulations mandate timely and meaningful consultation with tribal governments in regional and transportation planning activities, including the development of the Regional Transportation Plan (RTP) and the Regional Transportation Improvement Plan (RTIP).
Over the past several years SANDAG has been building a relationship with the tribal nations in the region. It held its first tribal summit in FY 2003. In FY 2004 SANDAG designated a tribal liaison to improve communica-tion and coordination with the region’s tribal governments. In partnership with Caltrans and the RTA, SANDAG also produced a map of tribal lands in the region. Caltrans and SANDAG partnered in FY 2005 to conduct a tribal transportation needs survey with the support of the RTA and the SCTCA, involving all the tribal nations in the region. Through a Caltrans environmental justice grant to the RTA, coordination with the tribal governments intensified in FY 2006. The SCTCA joined the Borders Committee as an advisory member in June 2005. The SCTCA co-hosted the 2006 San Diego Regional Tribal Summit with SANDAG in March 2006. A coordinated work plan was developed, including a set of transportation strategies which were included in the comprehensive update of the RTP. In January of 2007 the SCTCA and SANDAG signed a memorandum of understanding (MOU) in which the SCTCA joined the SANDAG Board of Directors and its policy advisory committees (PACs), including Transportation, Regional Planning, and Public Safety, as advisory members.
In FY 2007 SANDAG and the RTA received an environmental justice grant to strengthen the participation of tribal nations in the San Diego region in the SANDAG Transportation Demand Management (TDM) program. SANDAG, the RTA, the SCTCA, and the transit agencies are collaborating on an assessment of the needs of tribal employers; developing a strategy which meets their needs; and providing technical assistance to set up a tribal Transportation Management Association (TMA) that would collaborate with the SANDAG TDM program. The tribal TMA, a private, nonprofit, member-controlled organization will provide the institutional framework for the recommended TDM programs and services that are developed as a result of the study.
2-164
In FY 2008 the tribal representatives of the SCTCA participated in all of the SANDAG PACs. They developed a list of policy issues that they would like to pursue through the PAC mechanism, including public safety, transportation, and environmental issues. In addition, the Interagency Technical Working Group on Tribal Transportation Issues completed its first transportation planning project – the Tribal Transit Feasibility Study. Through this forum a collaborative grant application was submitted to the Federal Transportation Administration for the Tribal Transit Program Fund, based on the recommendations in this collaborative transit planning study.
Committee(s): Borders Committee
Working Group(s): Interagency Technical Working Group on Tribal Transportation Issues
Project Manager: Jane Clough-Riquelme
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
MOUM INTER-REGIONAL
PLAN
1 15 Task Description: Facilitate effective and equitable involvement of tribal nations in the regional and transportation planning process through outreach and consultation to individual govern-ments.
Product: Four presentations to tribal/intertribal councils
Completion Date: 6/30/2009
MOUM INTER-REGIONAL
PLAN
2 40 Task Description: Support SCTCA advisory members to SANDAG to develop agenda items and reports to the Borders and other PACs on relevant tribal issues, and coordinate technical workshops.
Product: Three agenda reports/quarter; workshop agenda
Completion Date: 6/30/2009
MOUM INTER-REGIONAL
PLAN
4 15 Task Description: Coordinate with federal, state, and local government agencies regarding tribal consultation for regional and transportation planning activities.
Product: Two presentations and two conferences/meetings
Completion Date: 6/30/2009
MOUM INTER-REGIONAL
PLAN
5 30 Task Description: Oversee and provide complex administrative staff support for the Interagency Technical Working Group on Tribal Transportation Issues.
Product: Quarterly meeting agendas/minutes/participant list
Completion Date: 6/30/2009
FUTURE ACTIVITIES
This is an ongoing work element to facilitate the effective and equitable involvement of the 17 federally recognized tribal governments in the regional and transportation planning process based on a government-to-government framework.
2-165
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 7000601 TITLE: TRIBAL TRANSPORTATION DEMAND MANAGEMENT OUTREACH PROGRAM
FY 2009 BUDGET: $66,192 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objective of this work element is to partner with the Reservation Transportation Authority (RTA) to strengthen the participation of tribal nations in the San Diego region in the regional Transportation Demand Management (TDM) program. SANDAG, the RTA, and the Southern California Tribal Chairmen’s Association (SCTCA) will: (1) collaborate on an assessment of the needs of tribal employers; (2) develop a strategy which meets their needs; and (3) assist the RTA in setting up a tribal Transportation Management Association (TMA) that would collaborate with SANDAG’s TDM program (Ridelink). The tribal TMA, a private, non-profit, member-controlled organization would provide the institutional framework for the recommended TDM programs and services that are developed as a result of the study.
PREVIOUS ACCOMPLISHMENTS
SANDAG and the RTA signed a memorandum of understanding (MOU) that outlined the roles and responsi-bilities of each agency in the implementation of this project. The project was kicked off through the Interagency Technical Working Group on Tribal Transportation Issues, which includes representatives of all area tribes and public agencies involved in transportation planning. RTA received training in TDM manage-ment and outreach through a series of workshops conducted by SANDAG's on call consultant, Inland Transportation. A project development team was formed including representatives from RTA, area tribes, SANDAG TDM staff, Caltrans, and transit staff. A TDM draft marketing plan for a tribal TMA was developed and initial assessments conducted with area tribes. The RTA initiated employee surveys with several tribal enterprises who expressed interest in participating in the program.
Committee(s): Borders Committee, Transportation Committee
Working Group(s): Interagency Technical Working Group on Tribal Transportation Issues
Project Manager: Jane Clough-Riquelme
PRODUCTS, TASKS, AND SCHEDULES
SGC INTER-REGIONAL
PLAN
1 15 Task Description: Provide project administration for Caltrans Environmental Justice (EJ) Grant, "Tribal TDM Outreach Program".
Product: Quarterly EJ reports
Completion Date: 2/28/2009
SGC INTER-REGIONAL
PLAN
2 50 Task Description: Complete outreach and data collection for tribal employment centers.
Product: Six completed survey sets
Completion Date: 10/1/2008
SGC INTER-REGIONAL
PLAN
3 30 Task Description: Develop RTA-SANDAG collaborative tribal TDM strategy, including financing strategy and draft MOU.
Product: Draft and final collaborative strategy report
Completion Date: 12/31/2008
2-166
SGC INTER-REGIONAL
PLAN
4 5 Task Description: Provide periodic updates and draft results to the Interagency Technical Working Group on Tribal Transportation Issues, the SCTCA, and RTA Board of Directors, as well as the SANDAG Borders Committee.
Product: Meeting agendas and PowerPoint presentations
Completion Date: 3/31/2009
FUTURE ACTIVITIES
Future activities include ongoing implementation of the activities outlined in this work element.
2-167
MANDATED/COMMITTED: PARTIAL DEDICATED FUNDING: MINIMAL
PROGRAM WORK ELEMENT: 70009 TITLE: GOVERNMENT RELATIONS
FY 2009 BUDGET: $683,065 STRATEGIC GOAL: ENHANCE ORGANIZATIONAL EFFECTIVENESS
OBJECTIVE
The objective of this work element is to manage federal and state legislative activities in accordance with the SANDAG Legislative Program.
PREVIOUS ACCOMPLISHMENTS
Previous accomplishments include pursuing SANDAG-sponsored legislation and other policy and/or admin-istrative changes to better implement agency plans and programs; monitoring and responding to pending state and federal legislation; developing a joint federal transportation appropriations agenda with Metropolitan Transit System (MTS) and North County Transit District (NCTD); monitoring the progress of agency consolidation and preparing periodic progress reports; and participating on statewide and national organizations to advance common legislative and policy interests consistent with the SANDAG mission.
Committee(s): Executive Committee
Working Group(s): None
Project Manager: Kim Kawada
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
NEW BORDER CROSSING
1 20 Task Description: Develop annual SANDAG Legislative Program (draft November 08 and final December 08)
Product: Final 2008 Legislative Program
Completion Date: 12/31/2008
MPO 2 40 Task Description: Monitor and respond to key state and federal legislation and policy changes.
Product: Legislative reports to the Executive Committee (monthly) and letters (as needed)
Completion Date: 6/30/2009
MOUT CONGESTION MGMT
3 20 Task Description: Develop annual joint federal transportation agenda with MTS and NCTD and seek federal appropriations requests for the San Diego region.
Product: 2008 Federal Transportation agenda
Completion Date: 2/28/2009
COMMUNI-CATION
4 5 Task Description: Liaison with officials and staff from the cities and county and transit agencies.
Product: Summaries in Executive Committee legislative reports (as needed)
Completion Date: 6/30/2009
2-168
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
COMMUNI-CATION
5 5 Task Description: Represent SANDAG on state and federal organizations (e.g., CTA, California Consensus Group on the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users, CALCOG, NARC, APTA) to advance SANDAG policy and programs.
Product: Summaries in Executive Committee legislative reports (as needed)
Completion Date: 6/30/2009
SB1703 6 10 Task Description: Prepare 2008 progress report on agency consolidation as required under SB 1703.
Product: 2008 progress report on consolidation
Completion Date: 1/31/2009
FUTURE ACTIVITIES
This work element to manage state and federal legislative activities is an ongoing annual effort. Development of the required progress report on consolidation occurs biennially in even-numbered years.
2-169
MANDATED/COMMITTED: ALL DEDICATED FUNDING: NONE
PROGRAM WORK ELEMENT: 70011 TITLE: REGIONAL ENVIRONMENTAL AND PUBLIC FACILITIES PLANNING AND COORDINATION
FY 2009 BUDGET: $95,041 STRATEGIC GOAL: ENHANCE ORGANIZATIONAL EFFECTIVENESS
OBJECTIVE
The objectives of this work element are to: (1) coordinate the Environmental and Public Facilities section of the Land Use and Transportation Department, including regularly scheduled section meetings, one-on-one staff meetings, and performance evaluations; (2) coordinate with project managers on transit and highway development and implementation projects to determine the type of environmental documentation required for project approval; (3) determine the scope of the environmental document that is required pursuant to the California Environmental Quality Act (CEQA); (4) coordinate with federal agencies on National Environmental Policy Act (NEPA) documentation; (5) coordinate with state and federal resource agencies to streamline environmental review processes; and (6) prepare monitoring and reporting programs per environmental permit requirements.
PREVIOUS ACCOMPLISHMENTS
Previous accomplishments include: (1) creation of notice of exemption/determination templates; (2) procure-ment of general on-call consultants; (3) assistance on various Mobility Management and Project Implement-ation projects, as well as completion of transit planning projects; and (4) review and research of new environmental implications of the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users and how it will impact future updates to SANDAG’s Regional Transportation Plan.
Committee(s): Regional Planning Committee; Transportation Committee
Working Group(s): Cities/County Transportation Advisory Committee; Regional Planning Technical Working Group
Project Manager: Robert Rundle
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RCP 1 15 Task Description: Coordinate Environmental and Public Facilities and Planning and Coordination section of the Land Use and Transportation Department.
Product: Section meetings and performance evaluations
Completion Date: 6/30/2009
RTPA TNET IMPLEMENT TransNet
2 15 Task Description: Work with project managers to identify CEQA/ NEPA compliance requirements for projects.
Product: Initial studies
Completion Date: 6/30/2009
RTPA TNET 3 25 Task Description: Prepare or assist in preparation of environ-mental documents for projects identified in Overall Work Program.
Product: Environmental documents and notices
Completion Date: 6/30/2009
2-170
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
TNET IMPLEMENT TransNet
4 35 Task Description: Prepare or assist with the preparation of task orders to carry out projects identified in the Capital Improvement Project, specifically the TransNet Early Action Program.
Product: Completed task orders
Completion Date: 6/30/2009
RTPA TNET IMPLEMENT TransNet
5 10 Task Description: Conduct monitoring for the Del Mar Bluffs Project 2, prepare the annual monitoring report. and submit it to the California Coastal Commission.
Product: Annual monitoring report
Completion Date: 5/1/2009
FUTURE ACTIVITIES
Future activities include regularly scheduled meetings with section staff, completion of performance evaluations, and continued development of in-house expertise to prepare CEQA/NEPA documentation and reduce reliance upon consulting services, as appropriate. Additional monitoring and reporting programs may be prepared. Annual monitoring reports will be prepared.
2-171
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 70013 TITLE: REGIONAL INTELLIGENT TRANSPORTATION SYSTEMS PROGRAM MANAGEMENT
FY 2009 BUDGET: $853,028 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objectives of this work element are to: (1) provide ongoing management support for the region’s Intelligent Transportation Systems (ITS) program and provide for the development of and begin implementation of on a new strategic plan; (2) act as liaison and explore development opportunities with federal, state, and local agencies, such as the Federal Transit (FTA) and Federal Highway Administration (FHWA), Caltrans, SANDAG member agencies and other peer agencies; and (3) provide oversight over the region’s various ITS deployments, ensuring consistency and compliance with our Regional ITS Architecture and federal mandates. Strategic planning, project management, and regional integration and collaboration are core to SANDAG’s mission in fulfilling the region’s vision and required resource allocations.
PREVIOUS ACCOMPLISHMENTS
Previous accomplishments include oversight and management of SANDAG’s ITS program, strategic planning, research, implementation, and operation of regional ITS components. In September 1997 SANDAG adopted a 20-year ITS Strategic Plan, including the development of a Regional Intermodal Transportation Management System. Since that time, SANDAG and its regional partners have worked with the FTA, FHWA, Caltrans, and member agencies to develop our regional ITS architecture and initiate deployment of several ITS elements. SANDAG’s role as the region’s metropolitan planning organization and regional transportation planning agency includes ongoing responsibility for maintaining the region’s strategic plan and architecture; assisting and/or managing the implementation/deployment of ITS-related projects to ensure compliance with federal funding mandates; building consensus and operational agreements among the region’s transportation agencies; and facilitating and/or directing the integration of the various ITS elements to achieve the region’s vision of maximizing system efficiency.
Committee(s): Transportation Committee
Working Group(s): Intelligent Transportation System CEO Working Group
Project Manager: James Dreisbach-Towle
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA RTP CONGESTION MANAGE-
MENT
1 30 Task Description: Perform program management activities, including development and implementation of a strategic plan for technology deployments, management structure, and business models.
Product: ITS Strategic Plan
Completion Date: 6/30/2009
2-172
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA RTP CONGESTION MANAGE-
MENT
2 10 Task Description: Facilitate regional ITS working groups, manage project development teams, perform technology assessments, and provide oversight management of SANDAG ITS deployment projects.
Product: Agendas, minutes, and action items
Completion Date: 6/30/2009
RTPA RTP CONGESTION MANAGE-
MENT
3 10 Task Description: Assist the local agencies with the planning, implementation, and ongoing management of transportation-related technology deployments.
Product: Meeting minutes and action items
Completion Date: 6/30/2009
RTPA MOUC CONGESTION MANAGE-
MENT
4 50 Task Description: Initiation and completion of the I-805 Corridor System Management Plan (CSMP).
Product: CSMP
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Future activities will include continued implementation of the strategic plan and further needs identification for SANDAG’s ITS program, including ongoing systems management and maintenance and ongoing refine-ment and further development of the region’s vision for ITS program. New project needs and management functions may be identified as part of the strategic plan as the systems are deployed for operational use and as funding mandates change. A key outcome of successful ITS technology deployments is that they provide the platform for monitoring, managing, and operating the region’s transportation system. These are key elements that are fundamental to the development of system management plans. The development of the I-805 CSMP will be SANDAG’s first attempt that will examine ITS and other transportation strategies on a systemwide and unified effort for improving system mobility and efficiency. Future activities also include development of a detailed scope of work and consultant solicitation for completion of the I-805 CSMP. The I-805 CSMP will be completed by FY 2010.
2-173
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 7001301 TITLE: DEVELOPMENT OF I-805 CORRIDOR SYSTEM MANAGEMENT PLAN
FY 2009 BUDGET: $473,295 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
A key outcome of successful Intelligent Transportation System technology deployments (see OWP work element 70013, Regional Intelligent Transportation Systems Program Management) is that they provide the platform for monitoring, managing, and operating the region’s transportation system. These are key elements that are fundamental to the development of system management plans. The development of the Interstate (I-)805 Corridor System Management Plan (CSMP) will be SANDAG’s first attempt that will examine ITS and other transportation strategies on a systemwide and unified effort for improving system mobility and efficiency. The I-805 CSMP will be completed by FY 2010.
PREVIOUS ACCOMPLISHMENTS
This work element is new as of mid-FY 2008.
Committee(s): Transportation Committee
Working Group(s): Intelligent Transportation System CEOs Policy Management Working Group
Project Manager: Alex Estrella
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA MOUC CONGESTION MANAGE-
MENT
1 20 Task Description: Review of existing corridor documentation and stakeholder feedback.
Product: Existing corridor documentation memorandum
Completion Date: 6/30/2009
RTPA MOUC CONGESTION MANAGE-
MENT
2 15 Task Description: Corridor transportation network inventory.
Product: Corridor network inventory memorandum
Completion Date: 6/30/2009
RTPA MOUC CONGESTION MANAGE-
MENT
3 15 Task Description: Development of CSMP analytical strategy.
Product: CSMP analytical strategy
Completion Date: 6/30/2009
RTPA MOUC CONGESTION MANAGE-
MENT
4 50 Task Description: CSMP data collection and performance assess-ment framework.
Product: Data collection plan and performance assessment
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Future activities are to be determined pending outcome of the I-805 plan.
2-174
MANDATED/COMMITTED: NONE DEDICATED FUNDING: NONE
PROGRAM WORK ELEMENT: 70018 TITLE: MARKETING COORDINATION AND IMPLEMENTATION
FY 2009 BUDGET: $78,622 STRATEGIC GOAL: ENHANCE ORGANIZATIONAL EFFECTIVENESS
OBJECTIVE
The objectives of this work element are to develop and implement a marketing program to support major work efforts such as 511, FasTrak®, Interstate (I-)15 Bus Rapid Transit (BRT) Service and Joint Station Developments, Compass Card, SuperLoop, South Bay BRT, coordination of marketing efforts among the Caltrans and SANDAG corridor directors, the agency’s Service Bureau, and other projects.
These efforts include: (1) update and expand the strategic marketing program to include outreach to new audiences; (2) coordinate resources (staff, budgets, potential consultants) to deliver marketing programs among marketing teams, creative services, project managers, and other staff or agencies as appropriate; (3) continue to work with on-call resources to enhance SANDAG staff support to provide creative services, graphics and design, advertising, video/visual simulation production, branding, and other needs. These marketing efforts will support and complement ongoing SANDAG media, communications, and public involvement efforts.
PREVIOUS ACCOMPLISHMENTS
During FY 2008 SANDAG secured consultant assistance to use computer simulations of new programs and projects to market to new audiences.
Committee(s): Executive Committee; Transportation Committee
Working Group(s): None
Project Manager: Anne Steinberger
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
COMMUNI-CATION
1 20 Task Description: Update and expand implementation of overall marketing program for SANDAG.
Product: Overall marketing program
Completion Date: 10/15/2008
COMMUNI-CATION
2 20 Task Description: Produce advertising copy, develop print, broad-cast, and/or outdoor advertising programs, Web advertising, brochures, videos, and other marketing products.
Product: Brochures, video, and advertising
Completion Date: 6/30/2009
COMMUNI-CATION
3 20 Task Description: Coordinate with project managers to implement marketing programs for 511, FasTrak®, I-15 service/ stations, Compass Card, Service Bureau, TransNet, and other projects and services.
Product: Meeting agendas and summaries (as needed)
Completion Date: 6/30/2009
2-175
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
COMMUNI-CATION
4 20 Task Description: Coordinate marketing efforts among Caltrans, Metropolitan Transit Service, North County Transit District to promote TransNet Early Action Program, Smart Parking, and other projects and hold annual retreat with agency marketing/communi-cations staffs.
Product: Meeting agendas and summaries (as needed)
Completion Date: 6/30/2009
COMMUNI-CATION
5 20 Task Description: Maximize marketing efforts by promoting programs on SANDAG and other Web sites:
www.sandag.org, www.511sd.com, www.RideLink.org www.KeepSanDiegoMoving.com, and others.
Product: Updated Web site content (as needed)
Completion Date: 6/30/2009
FUTURE ACTIVITIES
Future activities include implementing marketing program to expand awareness of SANDAG programs, products, and services to existing and new audiences.
2-176
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 75000 TITLE: SERVICE BUREAU
FY 2009 BUDGET: $485,411 STRATEGIC GOAL: ENHANCE ORGANIZATIONAL EFFECTIVENESS
OBJECTIVE
The SANDAG Service Bureau is a fee-based operation that provides informational and technical services to member agencies, non-member government agencies, and private organizations and individuals. The objective of this work element is to make our data and professional and technical services available to public and private sector clients, while generating revenue to help maintain and enhance the Regional Information System (RIS). The RIS is a long-standing, valuable resource to our member agencies, decision makers, and the public. Emphasis in FY 2009 is to: (1) provide professional services to our established and new clients; (2) implement marketing strategies identified in the Service Bureau Strategic Marketing Plan; (3) focus specifically on economic services as a growth area; and (4) expand our customer base and retain current clients to ensure continued growth of the Service Bureau.
PREVIOUS ACCOMPLISHMENTS
The Service Bureau was formed in 2005 to generate revenues to help cover the cost of maintaining and enhancing the RIS and to improve efficiency and effectiveness by integrating staff resources and streamlining administrative functions. In FY 2008 efforts focused on: (1) implementing the Service Bureau Strategic Marketing Plan; (2) educating our established client base and potential new clients about the Service Bureau; and (3) developing relationships with new clients to expand our client base. With this in mind, the Service Bureau held its first open house to increase awareness of our products and services. Over 130 people (including about 50 from SANDAG) attended the event.
Our primary service areas in FY2007-08 continued to be geographic information system (GIS) mapping and analysis, transportation modeling and analysis, survey design and analysis, and demographic and economic studies. Ongoing work on larger projects includes the California-Baja California Border Master Plan, the Salt Works Study, and the Bayshore Bikeway project.
Committee(s): Executive Committee
Working Group(s): None
Project Manager: Cheryl Mason
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
FFS COMMUNI-CATION
1 75 Task Description: Offer data products and professional services that meet the needs of public agencies and private organizations and individuals.
Product: Products and services
Completion Date: 6/30/2009
2-177
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
SB 2 10 Task Description: Implement additional strategies in the Strategic Marketing Plan to expand our client base and maximize sales in the most feasible and appropriate areas, focusing on economic services.
Product: Expanded client base and revenue
Completion Date: 6/30/2009
SB COMMUNI-CATION
3 5 Task Description: Plan and hold a Service Bureau open house to increase awareness of our products and services.
Product: Open house
Completion Date: 6/30/2009
SB 4 5 Task Description: Monitor and evaluate the Service Bureau to ensure an efficient and effective program that actively promotes the Service Bureau’s capabilities and resources.
Product: Enhanced Service Bureau Web pages and other tools
Completion Date: 6/30/2009
SB 5 5 Task Description: Develop and implement measurement tools to determine the effectiveness of specific marketing strategies.
Product: Performance measurement tools and results
Completion Date: 3/30/2009
FUTURE ACTIVITIES
The Service Bureau function is to make our data and professional and technical services available to public and private sector clients, while generating revenue to help maintain and enhance the RIS, which is a valuable resource to our member agencies, decision makers, and the public. Future efforts will be focused on implementing strategies to expand our client base, retain existing customers, and provide products and services that keep pace with the needs of our clients. In particular, Service Bureau will hold its second open house to increase awareness of our products and services.
2-178
MANDATED/COMMITTED: ALL DEDICATED FUNDING: ALL
PROGRAM WORK ELEMENT: 75056 TITLE: SERVICE BUREAU – BORDER MASTER PLAN
FY 2009 BUDGET: $43,979 STRATEGIC GOAL: ENHANCE ORGANIZATIONAL EFFECTIVENESS
OBJECTIVE
The U.S./Mexico Joint Working Committee provided funds to Caltrans to coordinate with the State of Baja California’s Secretariat of Infrastructure and Urban Development (SIDUE) and jointly undertake the development of a Border Master Plan. The Border Master Plan will establish a process to institutionalize dialogue among local, state, and federal stakeholders in the United States and Mexico. Key objectives of the Border Master Plan are to: (1) improve the understanding of how federal, state, regional, and local agencies plan for ports of entry (POE) and related transportation facilities; (2) identify POE and transportation infrastructure needs; (3) develop criteria that can be used to prioritize POE and transportation projects; and (4) rank the projects submitted by the Border Master Plan participants. Emphasis in FY 2009 includes preparing the final report and presenting it to the Border Master Plan Policy Advisory Committee (PAC).
PREVIOUS ACCOMPLISHMENTS
This is a multi-year contract with Caltrans that began January 2007. Work toward this contract includes conducting regular meetings of the technical working group and PAC, collecting data and information from the technical working group about current planning processes and short-, mid-, and long-term POE and transportation projects.
Committee(s): Executive Committee
Working Group(s): None
Project Manager: Elisa Arias
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE MANDATED COMMITTED EMPHASIS AREA
TASK # % OF EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
FFS 1 100 Task Description: Prepare final California Baja-California Border Master Plan report and present report at binational meetings.
Product: Agenda materials and final report
Completion Date: 6/30/2009
FUTURE ACTIVITIES
FY 2009 activities will focus on preparing the final California-Baja California Border Master Plan and presenting it to the PAC and other binational committees for approval. The report will be submitted to Caltrans as a final deliverable.
Overview This chapter provides a financial summary of the work elements described in Chapter 2. Beginning with the Program Revenues, each work element is shown in numerical order, with the various sources of funding identified for each project. The Notes refer to the Program Revenue Notes (page 3-5) for a more specific description of Federal, State, or Local funding source. Projects with two extra digits (ending in 01 to 09) are subprojects broken out separately to identify discrete grant funding. Also identified are the projects that have multi-year budgets, which signify additional funding in other years. Chapter 4 contains the complete funding picture for these multi-year projects. Immediately following the Program Revenue Notes page is the application of funds, where the more detailed project budgets are shown by expense category. Page numbers at the far right are provided for each project as a reference back to their associated Objectives, Tasks, Products, and Completion Dates in Chapter 2. Furthermore, details to each Contracted Services budget can be found in Appendix A, which shows the ongoing or new scope for services that are necessary to complete each work element. Chapter 3 provides a cross reference of funding sources for the federal and state agencies (primarily FHWA, FTA, and Caltrans) to manage their funding programs and assure that OWP planning funds are being channeled and used appropriately.
3-1
FY 2009 OWP Funding
CHAPTER 3
SOURCE AND APPLICATION OF FUNDS
SAN DIEGO ASSOCIATION OF GOVERNMENTSFY 2009 OVERALL WORK PROGRAMPROGRAM REVENUES (PRELIMINARY)
STATE
OWP # PROJECT TITLETOTAL
FUNDINGTOTAL
FUNDING
FTA (5303) MPO
PLANNING
FTA (5307) TRANSIT
PLANNING
FY 06/07 RETRO FTA
5303 PLANNING
FY 09 FHWA
PLANNING CMAQFEDERAL-
OTHER NO
TES
STATE-OTHER N
OTE
S TDA PLANNING/
ADMIN TransNet NO
TES MEMBER
ASSESS-MENTS N
OTE
S
LOCAL- OTHER N
OTE
S
1 - IMPLEMENTATION
11091 Project Development and Oversight 691,370 691,370 - - - - - - 681,370 S1 - - - 10,000 L151109203 I-15 Violation Enforcement Study (VES) 1,029,641 1,029,641 - - - - - 719,522 F7 - - 118,100 T2 - 192,019 L111093 Regional Arterial Management System 546,501 546,501 - - - - 483,818 - 62,684 S2 - - - - 11095 Traveler Information Service - 511 946,125 946,125 - - - - 837,604 - - - 108,521 T2 - - 11102 TransNet Financial Management 987,439 987,439 - - - - - - - - 987,439 T1 - - 11103 TransNet Public Information Program 335,073 335,073 - - - - - - - - 335,073 T1 - - 11390 NEW - Independent Taxpayers Oversight Committee Program 250,000 250,000 - - - - - - - - 250,000 T3 - -
SUB-TOTAL 4,786,150 4,786,150 - - - - 1,321,422 719,522 744,054 - 1,799,132 - 202,019
2 - TECHNICAL SERVICES
20001 Information Systems Management 917,599 917,599 - 340,000 29,258 300,000 - - - 124,171 124,171 T1 - - 20002 PC, Internet, and Database Applications 631,542 631,542 - 250,000 30,000 75,000 - - - 138,271 138,271 T1 - - 20003 Transportation Model Application and Development 897,644 897,644 - 400,000 - - - - - 497,644 - - - 20004 Census and Product Coordination 259,357 259,357 208,697 - - - - - 50,660 - - - 20005 Demographic and Economic Forecasts 1,005,447 1,005,447 230,000 100,000 - 160,000 - - - 515,447 - - - 20006 Geographic Information Systems Services 787,491 787,491 150,000 100,000 - 100,000 - - - 437,491 - - - 20007 Assistance to Transit Operations and Planning 1,353,762 1,353,762 - 1,083,009 - - - - - 270,752 - - - 20009 Performance Indicator Data Management 120,108 120,108 - 50,000 - 50,000 - - - 20,108 - - - 20011 Regional Economic and Municipal Finance Services 486,117 486,117 - - - 223,712 - - - 131,203 131,203 T1 - - 20014 CJ - Regional Criminal Justice Research and Clearinghouse 193,434 193,434 - - - - - - - - - 193,434 CJ - 20019 CJ - Juvenile Justice Crime Prevention 321,097 321,097 - - - - - - - - - 6,566 CJ 314,531 L920023 CJ - Syringe Exchange Program Evaluation 19,338 19,338 - - - - - - - - - - 19,338 L420026 CJ - Substance Abuse Monitoring 111,983 111,983 - - - - - - - - - 18,000 S 93,983 L3,L620031 Creative Services Program 497,559 497,559 - 150,000 - 100,000 - - - 247,559 - - - 20036 CJ - HEP Prevention 4,072 4,072 - - - - - - - - - - 4,072 L420038 CJ - HIV Mpowerment Evaluation 14,719 14,719 - - - - - - - - - - 14,719 L420039 CJ - HIV Behavior Campaign 17,021 17,021 - - - - - - - - - - 17,021 L420041 CJ - Youth Offenders Re-Entry Evaluation 10,209 10,209 - - - - - - - - - - 10,209 L1720046 CJ - Probation Institution Study 15,318 15,318 - - - - - - - - - - 15,318 L920047 CJ - Multi-System Therapy Program Evaluation 11,556 11,556 - - - - - - - - - - 11,556 L1420054 CJ - Family Service Enhancement 6,618 6,618 - - - - - - - - - - 6,618 L1720055 CJ - SB 618 Re-Entry Project Evaluation 714,993 714,993 - - - - - - - - - - 714,993 L920057 CJ - DMC 65,664 65,664 - - - - - - - - - - 65,664 L920058 CJ - Promoting Responsible Fatherhood 9,532 9,532 - - - - - - - - - - 9,532 L1620059 CJ - Juvenile Mentally Ill Offenders 79,519 79,519 - - - - - - - - - - 79,519 L920060 CJ - North County Gang Enforcement Collaborative 85,488 85,488 - - - - - - - - - - 85,488 L621002 I-PLACE³S Modeling for Community Sustainability 122,560 122,560 - 40,000 - 40,000 - - - 17,560 - - 25,000 L2021003 Crime Patterns at Transit Stations 37,397 37,397 - - - - - 33,107 F5 - 4,289 - - - 22001 ARJIS: Maintenance and Support 2,623,813 2,623,813 - - - - - - - - - 104,953 A 2,518,860 L522002 ARJIS: Project Management and Enhancements 1,482,584 1,482,584 - - - - - - - - - 1,482,584 A - 22004 ARJIS: Border Safe III/RISC 365,668 365,668 - - - - - 365,668 F6 - - - - 22005 ARJIS: Enterprise System 1,939,365 1,939,368 - - - - - - - - - 266,338 A 1,673,030 L522006 ARJIS: SRFERS II Grant 552,178 552,178 - - - - - 552,178 F6 - - - - - 22007 ARJIS: Regional Interoperability and Communications 50,000 50,000 - - - - - - - - - 50,000 A - 22009 ARJIS: Domestic Violence Communications Systems 53,688 53,688 - - - - - 53,688 F4 - - - - - 22011 NEW - ARJIS: Officer Notification and Smart Alerting System 359,453 359,453 - - - - - 359,453 F4 - - - - - 22012 NEW - ARJIS: Tactical Identification System 415,509 415,510 - - - - - 415,509 F4 - - - - - 22013 NEW - ARJIS: SmartSearch 171,564 171,564 - - - - - 171,564 F4 - - - - -
SUB-TOTAL 16,810,967 15,864,445 588,697 2,513,009 59,258 1,048,712 - 1,004,641 - 2,455,157 393,644 2,121,875 5,679,451
LOCAL FUNDINGFEDERAL FUNDING
02/29/2008 6:20 PM
SAN DIEGO ASSOCIATION OF GOVERNMENTSFY 2009 OVERALL WORK PROGRAMPROGRAM REVENUES (PRELIMINARY)
STATE
OWP # PROJECT TITLETOTAL
FUNDINGTOTAL
FUNDING
FTA (5303) MPO
PLANNING
FTA (5307) TRANSIT
PLANNING
FY 06/07 RETRO FTA
5303 PLANNING
FY 09 FHWA
PLANNING CMAQFEDERAL-
OTHER NO
TES
STATE-OTHER N
OTE
S TDA PLANNING/
ADMIN TransNet NO
TES MEMBER
ASSESS-MENTS N
OTE
S
LOCAL- OTHER N
OTE
S
LOCAL FUNDINGFEDERAL FUNDING
3 - PLANNING
30002 RCP Planning and Implementation 1,224,383 1,224,383 250,000 100,000 - 359,708 - - - 514,675 - - - 3000206 Blueprint Planning Grant 339,208 339,208 - - - - - - 300,301 S4 38,907 - - - 3000207 Access to Community Medical Transportation Services 1,307 1,307 - - - - - - 1,307 S6 - - - - 3000208 City Heights Walk to School! 1,358 1,358 - - - - - - 1,358 S6 - - - - 30004 Regional Mobility and Transportation Planning 452,033 452,033 50,000 50,000 - 50,000 - - - 302,033 - - - 30008 Nonmotorized Transportation Planning and Project Development 114,344 114,344 - - - - - - - 114,344 - - - 3000801 Regional Bike Plan 175,915 175,915 - - - - - - 140,732 S8 35,183 - - - 30009 Goods Movement Planning 500,626 500,626 200,000 - - 125,200 - - - 125,426 - - 50,000 L1130023 Regional Short-Range Transit Service Planning 270,118 270,118 - 136,081 - - - - - 134,037 - - - 3002301 SRTP-New Freedom and JARC 242,166 242,166 - - - - - 242,166 F10 - - - - - 3002303 Results of Market-Based Planning for Comprehensive Ops Analysis 87,205 87,205 - - - - - - 87,205 S5 - - - - 30026 Regional Housing and Smart Growth Development 372,559 372,559 - - - 329,826 - - - 42,732 - - - 30027 Natural Resource Planning and Coordination 89,616 89,616 - - - 79,337 - - - 10,279 - - - 30028 Regional Shoreline Management 750,201 750,201 - - - - - - - - - 121,226 S 628,975 L113002801 Coastal Regional Sediment Management Plan 10,000 10,000 - - - - - - 10,000 S9 - - - - 30030 Regional Energy Planning 230,562 230,562 - - - - - - - 52,781 - 52,781 S 125,000 L73003001 Energy Efficient Buildings Grant 6,337 6,337 - - - - - - 6,337 S7 - - - - 3003002 California Energy Commission Planning Grant 184,452 184,452 - - - - - - 184,452 S7 - - - - 30032 Borders Planning and Coordination 377,819 377,819 - - - 334,483 - - - 43,336 - - - 30039 Subregional Transportation Planning and Coordination 407,864 407,864 - - - - - - - 407,864 - - - 30051 San Diego - Riverside Interrregional Partnership - Phase 3 135,471 135,471 - - - - - - - 15,000 - - 120,471 L183005101 Interregional Vanpool Buspool Study 121,043 121,043 - - - - - - 107,159 S5 13,884 - - - 30055 SD&AE Railway Gateway Feasibility and Improvements Study 876,280 876,280 - - - - - 701,024 F9 - - - - 175,256 L103006201 Transit Planning Grant 120,874 120,874 - - - - - 107,010 F5 - - - - 13,864 L1330063 Implem. of Otay Mesa-Mesa de Otay Binational Corridor Strategic Plan 112,160 112,160 - - - - - - - 112,160 - - - 30071 State Route 11 and East Otay Mesa Port of Entry Planning 576,560 576,560 - - - - - 140,000 F1 312,919 S3 123,641 - - - 30072 Quality of Life Planning and Funding Strategies 530,305 530,306 - - - 300,000 - - - 230,305 - - - 30073 NEW - Regional Airport Multi-Modal Airport Planning 310,965 310,965 - - - 175,000 - - - 135,965 - - -
SUB-TOTAL 8,621,731 8,310,767 500,000 286,081 - 1,753,555 - 1,190,200 1,151,770 2,316,588 - 174,007 1,113,566
4 - PROGRAMMING, PROJECT MONITORING, AND OVERSIGHT
40001 Transit Planning Administration and Coordination 246,130 246,130 - 185,950 - - - - - 46,488 - - 13,692 L194000101 San Diego Transit Service Planning Internship 61,351 61,351 - - - - - 54,314 - 7,037 - - - 4000106 LOSSAN Intercity & High Speed Rail 60,461 60,461 - - - - - - - 11,461 - - 49,000 L214000107 NEW - San Diego International Airport Master Plan 231,303 231,303 - - - 5,692 - - - 225,611 - - - 40005 Transportation Funding Administration 279,227 279,227 - - - - - - - 139,614 139,614 T1 - - 40006 Regional Transportation Improvement Program 200,814 200,814 - 74,644 - 22,000 - - - 52,086 52,085 T1 - - 40007 Develop and Enhance Tools for Transportation Performance Monitoring 491,184 491,184 - - - 169,255 - - 300,000 S12 21,929 - - - 40008 Asset Evaluation & Management 127,120 127,120 - 80,000 - - - - - 47,120 - - -
SUB-TOTAL 1,697,591 1,697,591 - 340,594 - 196,947 - 54,314 300,000 551,345 191,698 - 62,692
5 - PROJECT DEVELOPMENT
50003 Encinitas Pedestrian Crossings Study 765,632 765,632 - - - - - - - - - - 765,632 L850004 Intermodal Transportation Management System 942,191 942,191 - - - - 834,122 - 108,069 S11 - - - - 50019 SANDAG Rail, BRT, and Bus Transit Design Criteria 72,407 72,407 - - - - - - - 72,407 - - - 50020 Intelligent Transportation Systems Operations 1,717,748 1,717,748 - - - - 1,520,722 - - - 197,026 T2 - -
SUB-TOTAL 3,497,978 3,497,978 - - - - 2,354,844 - 108,069 72,407 197,026 - 765,632
02/29/2008 6:20 PM
SAN DIEGO ASSOCIATION OF GOVERNMENTSFY 2009 OVERALL WORK PROGRAMPROGRAM REVENUES (PRELIMINARY)
STATE
OWP # PROJECT TITLETOTAL
FUNDINGTOTAL
FUNDING
FTA (5303) MPO
PLANNING
FTA (5307) TRANSIT
PLANNING
FY 06/07 RETRO FTA
5303 PLANNING
FY 09 FHWA
PLANNING CMAQFEDERAL-
OTHER NO
TES
STATE-OTHER N
OTE
S TDA PLANNING/
ADMIN TransNet NO
TES MEMBER
ASSESS-MENTS N
OTE
S
LOCAL- OTHER N
OTE
S
LOCAL FUNDINGFEDERAL FUNDING
6 - SYSTEMS MANAGEMENT
60001 Transportation Demand Management 4,789,527 4,789,527 - - - - 4,789,527 - - - - - - 6000109 Short Distance Vanpool Feasibility Study 134,740 134,740 - - - - - 119,285 F5 - 15,455 - - - 60002 I-15 FasTrak® Value Pricing Program 3,546,247 3,546,247 - - - - - - - - - - 3,546,247 L1, L1260003 Freeway Service Patrol 4,072,430 4,072,430 - - - - - 724,000 F2 3,211,430 S2 - - - 137,000 L1560004 San Diego Station Car Pilot Program Study - Phases I and II 184,850 184,850 - - - - - 147,880 F5 - 36,970 - - - 60007 Compass Card Program 1,528,471 1,528,471 - - - - - - - 740,000 - - 788,471 L1560008 San Diego Smart Parking Pilot Project 329,029 329,029 - - - - - 329,029 F7 - - - - - 60009 Transit Configuration Management System 32,114 32,114 - - - - - - - 32,114 - - -
SUB-TOTAL 14,617,408 14,256,265 - - - - 4,789,527 991,166 3,211,430 792,425 - - 4,471,718
7 - PROGRAM MANAGEMENT AND EXTERNAL RELATIONS
70001 Interagency Coordination and OWP Program Management 1,050,805 1,050,805 - 125,400 - 127,821 60,000 - - 456,552 117,114 T1 163,918 S - 70003 Intergovernmental Review Processing 385,020 385,020 - - - - - - - 385,020 - - - 70004 Public Involvement Program 295,576 295,576 - - - - - - - 295,576 - - - 70006 Tribal Government Liaison 119,980 119,980 - - - 106,218 - - - 13,762 - - - 7000601 Tribal TDM Outreach Program 66,192 66,192 - - - - - - 59,573 S6 6,619 - - - 70009 Government Relations 683,065 683,065 - - - - - - - 439,533 243,531 T1 - - 70011 Regional Environmental & Public Facilities Planning & Coordination 95,041 95,041 - - - 84,140 - - - 10,901 - - - 70013 Regional Intelligent Transportation Systems Program Management 853,028 853,028 - - - - 755,186 - - - 97,842 T2 - - 7001301 Development of I-805 Congestion System Management Plan 473,295 473,295 - - - - - 473,295 S3 - - - - 70018 Marketing Coordination and Implementation 78,622 78,622 - - - - - - - 78,622 - - - 75000 SB - Border Master Plan 43,979 43,979 - - - - - - - - - - 43,979 O175056 SB - Border Master Plan 43,979 43,979 - - - - - 35,183 F8 - - - - 8,796 O1
SUB-TOTAL 4,188,582 4,188,582 - 125,400 - 318,179 815,186 35,183 532,867 1,686,586 458,488 163,918 52,775
TOTAL PROJECT FUNDING 54,220,406 54,220,412 1,088,697 3,265,085 59,258 3,317,392 9,280,979 5,270,581 6,048,190 8,042,586 3,039,988 2,459,800 12,347,853
Deposit to Contingency Reserve (0) (0) Total Funding Sources 54,220,406 54,220,412 8,042,586
02/29/2008 6:20 PM
SAN DIEGO ASSOCIATION OF GOVERNMENTSFY 2009 Overall Work Program Revenue Sources
Notes to Dedicated Funds shown in Federal-Other, State-Other, and Local-Other Columns
FEDERAL OTHER: STATE OTHER: LOCAL OTHER:(F1) FHWA Partnership Planning (S1) Caltrans STIP PPM Program (L1) FasTrak Revenues(F2) RSTP Funds (S2) Caltrans Freeway Service Patrol Funds (L2) County, Air Pollution Control Board(F3) FHWA ITS (S3) Caltrans Public Transportation Account (PTA) (L3) CA Border Alliance Group and County of San Diego(F4) U.S. Department of Justice (S4) State Blueprint Grant (L4) Family Health Centers(F5) FTA Section 5305 [formerly 5313(b)] (S5) Statewide Transit Planning Grant (L5) ARJIS Fees, including Reserves(F6) Dept. of Homeland Security (S6) Environmental Justice Transportation Planning (L6) County of San Diego(F7) FHWA Congestion/Value Pricing Program (S7) California Energy Commission (L7) San Diego Gas & Electric(F8) Caltrans State Planning & Research (S8) Community Based Transportation Planning (L8) City of Encinitas(F9) SAFETEA-LU Earmark Grant (S9) CA Dept of Boating and Waterways (L9) County Dept. of Probation
(F10) JARC/New Freedom SAFETEA-LU (5316/7) (S10) Trade Corridors Improvement Fund (L10) San Diego & Arizona Eastern Railway Reserve Fund(F11) FHWA PL Retroactive funds from FY 06 (S11) STIP (L11) Contribution from Local Cities or Member Agencies(F12) FTA 5303 Retroactive funds from FY 06 (S12) State Planning & Research (L12) Violation Fines & Forfeitures
(L13) Local Billboard Revenue sharingTRANSNET SALES TAX REVENUE (L14) San Diego Unified School District
(T1) 1% for Program Administration (L15) Other Local fundsSERVICES TO OTHER AGENCIES: (T2) TransNet Highway/Major Corridor (L16) Vista Community Clinic
(O1) SANDAG Service Bureau Fees (T3) TransNet ITOC set aside (L17) Phoenix House of San Diego(O2) SourcePoint Retained Earnings (L18) West Riverside Council of Governments Pass Through
(L19) Reimbursement from West Coast Corridor CoalitionMEMBER ASSESSMENTS (L20) SANDAG Service Bureau
[A] Automated Regional Justice Information (L21) Contribution from LOSSANS Member Agencies[CJ] Criminal Justice[S] SANDAG
Other Dedicated Funds CMAQ Congestion Management & Air Quality Program - Federal funds contained in TEA-21 for projects and activities that
contribute to a reduction in traffic congestion and improvement in air quality. Administered by FHWA & Caltrans.
TransNet Highway and Transit Funds As part of the TransNet program, recipients sometimes transfer specific Highway and Transit funds back to SANDAG to perform specific, agreed-upon planning or project development efforts.
Flexible Funds - Explanations FEDERAL FLEXIBLE FUNDS
FTA (5303) MPO PLANNING This group of funds are allocated to Metropolitan Planning Organizations (MPOs) based on Federal Transit Act formula,FTA (5307) TRANSIT PLANNING used for regional transportation planning efforts, subject to confirmation by federal and state funding agencies.
FY 07/08 RETROACTIVE PLANNING FTA and FHWA Planning funds from previous years, released retroactively for FY 2009.
Regional transportation planning funds administered by the Federal Highway Administration & Caltrans, allocated FY 09 FHWA PLANNING to MPOs according to the requirements of 23 U.S.C 134 and 135, as amended by the Safe, Accountable, Flexible, Efficient
Transportation Act: A Legacy for Users (SAFETEA-LU) of 2005.
LOCAL FLEXIBLE FUNDSTDA PLANNING/ADMINISTRATION
TRANSNET
MEMBER ASSESSMENTS
The voter approved TransNet Ordinance provides administrative funding for SANDAG (1% of total receipts) to administer the TransNet Program, undertake related planning efforts, and distribute funds for the various expenditure categories under the Ordinance. See Chapter 10
SANDAG assesses fees to member agencies for the provision of regional planning services. The Criminal Justice division of SANDAG assesses fees to member agencies for on-going criminal justice research. The Automated Regional Justice Information Services division assesses fees to members for the maintenance and distribution of crime information.
The Transportation Development Act passed by the state allocates a portion of the local 1/4 cent sales tax revenue to MPOs for transportation planning and programming purposes and for the administration of TDA
SAN DIEGO ASSOCIATION OF GOVERNMENTSFY 2009 DRAFT OVERALL WORK PROGRAMPROGRAM EXPENSES
OWP #ANNUAL OR MULTI-YEAR PROJECT TITLE
FY 09 TOTAL PROJECT BUDGET
SALARIES, BENEFITS, INDIRECT
OTHER DIRECT COSTS
CONTRACT EMPLOYEES
CONTRACT SERVICES
MATERIALS & EQUIPMENT
PASS THROUGH
1 - IMPLEMENTATION11091 Annual Project Development and Oversight 691,370 506,370 25,000 - 160,000 - - 2- 71109203 Multi-Yr I-15 Violation Enforcement Study (VES) 1,029,641 76,328 25,000 - 928,313 - - 2- 911093 Multi-Yr Regional Arterial Management System 546,501 38,297 11,824 - 470,380 26,000 - 2- 1111095 Multi-Yr Traveler Information Service - 511 946,125 261,125 207,000 - 478,000 - - 2- 1311102 Annual TransNet Financial Management 987,439 729,679 17,000 - 240,760 - - 2- 1511103 Annual TransNet Public Information Program 335,073 305,573 29,500 - - - - 2- 1711390 Annual NEW - Independent Taxpayers Oversight Committee Program 250,000 - - - 250,000 - - 2- 20
SUB-TOTAL 4,786,150 1,917,373 315,324 - 2,527,453 26,000 - 2 - TECHNICAL SERVICES20001 Annual Information Systems Management 917,599 917,599 - - - - - 2- 2120002 Annual PC, Internet, and Database Applications 631,542 626,542 2,000 - - 3,000 - 2- 2320003 Annual Transportation Model Application and Development 897,644 722,644 25,000 - 150,000 - - 2- 2520004 Annual Census and Product Coordination 259,357 246,857 12,500 - - - - 2- 2720005 Annual Demographic and Economic Forecasts 1,005,447 579,447 93,000 - 333,000 - - 2- 2920006 Annual Geographic Information Systems Services 787,491 760,641 26,850 - - - - 2- 3120007 Annual Assistance to Transit Operations and Planning 1,353,762 485,262 - - 868,000 500 - 2- 3320009 Annual Performance Indicator Data Management 120,108 120,108 - - - - - 2- 3520011 Annual Regional Economic and Municipal Finance Services 486,117 486,117 - - - - - 2- 3720014 Annual CJ - Regional Criminal Justice Research and Clearinghouse 193,434 192,571 863 - - - - 2- 3920019 Multi-Yr CJ - Juvenile Justice Crime Prevention 321,097 319,091 2,006 - - - - 2- 4120023 Multi-Yr CJ - Syringe Exchange Program Evaluation 19,338 19,206 132 - - - - 2- 4620026 Multi-Yr CJ - Substance Abuse Monitoring 111,983 78,763 16,000 - 17,220 - - 2- 4320031 Annual Creative Services Program 497,559 476,759 20,800 - - - - 2- 4420036 Multi-Yr CJ - HEP Prevention 4,072 4,072 - - - - - 2- 4620038 Multi-Yr CJ - HIV Mpowerment Evaluation 14,719 14,683 36 - - - - 2- 4620039 Multi-Yr CJ - HIV Behavior Campaign 17,021 16,865 156 - - - - 2- 4620041 Multi-Yr CJ - Youth Offenders Re-Entry Evaluation 10,209 10,173 36 - - - - 2- 4120046 Multi-Yr CJ - Probation Institution Study 15,318 15,168 150 - - - - 2- 4120047 Multi-Yr CJ - Multi-System Therapy Program Evaluation 11,556 11,506 50 - - - - 2- 4120054 Multi-Yr CJ - Family Service Enhancement 6,618 6,568 50 - - - - 2- 4120055 Multi-Yr CJ - SB 618 Re-Entry Project Evaluation 714,993 709,419 5,574 - - - - 2- 4820057 Multi-Yr CJ - DMC 65,664 65,399 265 - - - - 2- 4120058 Multi-Yr CJ - Promoting Responsible Fatherhood 9,532 9,441 91 - - - - 2- 4620059 Multi-Yr CJ - Juvenile Mentally Ill Offenders 79,519 79,106 413 - - - - 2- 4120060 Multi-Yr CJ - North County Gang Enforcement Collaborative 85,488 85,098 390 - - - - 2- 4821002 Annual I-PLACE³S Modeling for Community Sustainability 122,560 57,560 - - 65,000 - - 2- 5021003 Multi-Yr Crime Patterns at Transit Stations 37,397 30,897 - - 6,500 - - 2- 5222001 Annual ARJIS: Maintenance and Support 2,623,813 141,746 - 72,160 2,409,907 - - 2- 5322002 Multi-Yr ARJIS: Project Management and Enhancements 1,482,584 188,665 191,321 402,860 614,738 85,000 - 2- 5522004 Multi-Yr ARJIS: Border Safe III/RISC 365,668 65,668 - - 150,000 150,000 - 2- 5722005 Multi-Yr ARJIS: Enterprise System 1,939,365 263,789 - - 1,175,576 500,000 - 2- 5922006 Multi-Yr ARJIS: SRFERS II Grant 552,178 26,178 20,000 140,000 356,000 10,000 - 2- 6022007 Multi-Yr ARJIS: Regional Interoperability and Communications 50,000 - - - 50,000 - - 2- 6222009 Multi-Yr ARJIS: Domestic Violence Communications Systems 53,688 15,288 - - 38,400 - - 2- 6422011 Multi-Yr NEW - ARJIS: Officer Notification and Smart Alerting System 359,453 12,408 7,300 - 314,000 25,745 - 2- 6622012 Multi-Yr NEW - ARJIS: Tactical Identification System 415,509 111,733 7,320 - 177,432 119,024 - 2- 6722013 Multi-Yr NEW - ARJIS: SmartSearch 171,564 27,244 9,760 - 124,560 10,000 - 2- 69
SUB-TOTAL 16,810,967 8,000,282 442,063 615,020 6,850,333 903,269 -
PAGE #
03/21/2008 8:21 AM
3-6
SAN DIEGO ASSOCIATION OF GOVERNMENTSFY 2009 DRAFT OVERALL WORK PROGRAMPROGRAM EXPENSES
OWP #ANNUAL OR MULTI-YEAR PROJECT TITLE
FY 09 TOTAL PROJECT BUDGET
SALARIES, BENEFITS, INDIRECT
OTHER DIRECT COSTS
CONTRACT EMPLOYEES
CONTRACT SERVICES
MATERIALS & EQUIPMENT
PASS THROUGH PAGE #
3 - PLANNING30002 Annual RCP Planning and Implementation 1,224,383 979,383 12,000 - 233,000 - - 2- 713000206 Multi-Yr Blueprint Planning Grant 339,208 109,208 - - 230,000 - - 2- 733000207 Multi-Yr Access to Community Medical Transportation Services 1,307 1,157 150 - - - - 2- 743000208 Annual City Heights Walk to School! 1,358 1,358 - - - - - 2- 7530004 Annual Regional Mobility and Transportation Planning 452,033 350,033 42,000 - 60,000 - - 2- 7630008 Annual Nonmotorized Transportation Planning and Project Development 114,344 110,744 3,600 - - - - 2- 783000801 Multi-Yr Regional Bike Plan 175,915 55,915 - - 120,000 - - 2- 8030009 Annual Goods Movement Planning 500,626 338,581 12,045 - 150,000 - - 2- 8230023 Annual Regional Short-Range Transit Service Planning 270,118 255,818 14,300 - - - - 2- 843002301 Multi-Yr SRTP-New Freedom and JARC 242,166 207,166 5,000 - 30,000 - - 2- 863002303 Multi-Yr Results of Market-Based Planning for Comprehensive Ops Analysis 87,205 - - - - - 87,205 2- 8830026 Annual Regional Housing and Smart Growth Development 372,559 367,109 5,450 - - - - 2- 8930027 Annual Natural Resource Planning and Coordination 89,616 76,116 13,500 - - - - 2- 9130028 Annual Regional Shoreline Management 750,201 112,176 9,050 - 628,975 - - 2- 933002801 Annual Coastal Regional Sediment Management Plan 10,000 - - - 10,000 - - 2- 9530030 Annual Regional Energy Planning 230,562 164,562 6,000 - 60,000 - - 2- 963003001 Multi-Yr Energy Efficient Buildings Grant 6,337 3,837 2,500 - - - - 2- 983003002 Multi-Yr California Energy Commission Planning Grant 184,452 144,452 - - 40,000 - - 2- 9930032 Annual Borders Planning and Coordination 377,819 365,819 12,000 - - - - 2- 10030039 Annual Subregional Transportation Planning and Coordination 407,864 407,364 500 - - - - 2- 10230051 Multi-Yr San Diego - Riverside Interrregional Partnership - Phase 3 135,471 107,971 2,500 - 25,000 - - 2- 1043005101 Multi-Yr Interregional Vanpool Buspool Study 121,043 31,013 - - 90,030 - - 2- 10630055 Multi-Yr SD&AE Railway Gateway Feasibility and Improvements Study 876,280 125,780 500 - 750,000 - - 2- 1083006201 Multi-Yr Transit Planning Grant 120,874 50,874 - - 70,000 - - 2- 11030063 Annual Implem. of Otay Mesa-Mesa de Otay Binational Corridor Strategic Pla 112,160 111,310 850 - - - - 2- 11230071 Multi-Yr State Route 11 and East Otay Mesa Port of Entry Planning 576,560 139,060 2,500 - 435,000 - - 2- 11430072 Annual Quality of Life Planning and Funding Strategies 530,305 335,305 - - 195,000 - - 2- 11630073 Annual NEW - Regional Airport Multi-Modal Airport Planning 310,965 104,833 4,132 - 202,000 - - 2- 118
SUB-TOTAL 8,621,731 5,056,944 148,577 - 3,329,005 - 87,205 4 - PROGRAMMING, PROJECT MONITORING, AND OVERSIGHT40001 Annual Transit Planning Administration and Coordination 246,130 244,629 1,500 - - - - 2- 1214000101 Multi-Yr San Diego Transit Service Planning Internship 61,351 31,503 29,848 - - - - 2- 12240001.06 Annual LOSSAN Intercity & High Speed Rail 60,461 50,461 10,000 - - - - 2- 12340001.07 Multi-Yr NEW - San Diego International Airport Master Plan 231,303 71,303 10,000 - 150,000 - - 2- 12440005 Annual Transportation Funding Administration 279,227 176,626 - - 102,601 - - 2- 12540006 Annual Regional Transportation Improvement Program 200,814 141,314 2,500 - 57,000 - - 2- 12740007 Multi-Yr Develop and Enhance Tools for Transportation Performance Monitori 491,184 91,184 - - 400,000 - - 2- 12940008 Annual NEW - Asset Evaluation & Management 127,120 27,120 - - 100,000 - - 2- 131
SUB-TOTAL 1,697,591 834,141 53,848 - 809,601 - - 5 - PROJECT DEVELOPMENT50003 Multi-Yr Encinitas Pedestrian Crossings Study 765,632 - - - 765,632 - - 2- 13350004 Multi-Yr Intermodal Transportation Management System 942,191 121,991 63,200 - 757,000 - - 2- 13450019 Annual SANDAG Rail, BRT, and Bus Transit Design Criteria 72,407 62,407 - 10,000 - - - 2- 13650020 Annual Intelligent Transportation Systems Operations 1,717,748 658,748 - - 1,059,000 - - 2- 138
SUB-TOTAL 3,497,978 843,146 63,200 10,000 2,581,632 - -
03/21/2008 8:21 AM
3-7
SAN DIEGO ASSOCIATION OF GOVERNMENTSFY 2009 DRAFT OVERALL WORK PROGRAMPROGRAM EXPENSES
OWP #ANNUAL OR MULTI-YEAR PROJECT TITLE
FY 09 TOTAL PROJECT BUDGET
SALARIES, BENEFITS, INDIRECT
OTHER DIRECT COSTS
CONTRACT EMPLOYEES
CONTRACT SERVICES
MATERIALS & EQUIPMENT
PASS THROUGH PAGE #
6 - SYSTEMS MANAGEMENT60001 Annual Transportation Demand Management 4,789,527 807,277 - - 3,982,250 - - 2- 1416000109 Multi-Yr Short Distance Vanpool Feasibility Study 134,740 59,740 - - 75,000 - - 2- 14360002 Annual I-15 FasTrak® Value Pricing Program 3,546,247 197,882 147,717 - 2,493,475 110,000 597,174 2- 14460003 Annual Freeway Service Patrol 4,072,430 219,930 128,500 - 3,724,000 - - 2- 14660004 Multi-Yr San Diego Station Car Pilot Program Study - Phases I and II 184,850 49,850 5,000 - 105,000 - 25,000 2- 14860007 Annual Compass Card Program 1,528,471 807,471 391,000 - 300,000 30,000 - 2- 15060008 Multi-Yr San Diego Smart Parking Pilot Project 329,029 44,529 - - - - 284,500 2- 15260009 Annual Transit Configuration Management System 32,114 32,114 - - - - - 2- 154
SUB-TOTAL 14,617,408 2,218,792 672,217 - 10,679,725 140,000 906,674
7 - PROGRAM MANAGEMENT AND EXTERNAL RELATIONS70001 Annual Interagency Coordination and OWP Program Management 1,050,805 1,049,455 750 - - 600 - 2- 15570003 Annual Intergovernmental Review Processing 385,020 385,020 - - - - - 2- 15870004 Annual Public Involvement Program 295,576 263,076 32,500 - - - - 2- 16070006 Annual Tribal Government Liaison 119,980 116,980 3,000 - - - - 2- 1637000601 Multi-Yr Tribal TDM Outreach Program 66,192 21,901 - - - - 44,291 2- 16570009 Annual Government Relations 683,065 535,065 8,000 - 140,000 - - 2- 16770011 Annual Regional Environmental & Public Facilities Planning & Coordination 95,041 85,041 - - 10,000 - - 2- 16970013 Multi-Yr Regional Intelligent Transportation Systems Program Management 853,028 341,028 - - 512,000 - - 2- 1717001301 Multi-Yr Development of I-805 Congestion System Management Plan 473,295 37,295 - - 436,000 - - 2- 17370018 Annual Marketing Coordination and Implementation 78,622 38,622 40,000 - - - - 2- 17475000 Annual Service Bureau 485,411 476,411 5,000 - 4,000 - - 2- 17675056 Multi-Yr SB - Border Master Plan 43,979 37,429 350 - 6,200 - - 2- 178
SUB-TOTAL 4,630,014 3,387,323 89,600 - 1,108,200 600 44,291
TOTAL PROJECT COSTS 54,661,838 22,258,001 1,784,829 625,020 27,885,949 1,069,869 1,038,170
03/21/2008 8:21 AM
3-8
CHAPTER 4
MULTI-YEAR TABLES
MULTI-YEAR TABLES
Most work elements contained in the OWP are recurring, annual efforts. Other work elements are one-time, multi-year efforts with definable start and end dates. These work elements are also often characterized by having discretionary grant funding and professional services contracts that may span fiscal years. These efforts are considered Multi-Year Projects, with their total project budgets managed in addition to the annual projections contained in the OWP. For tracking purposes, the following tables identify the total project budgets for this category of OWP projects. The FY 2009 column in these tables can also be found in Chapter 3 – Sources and Applications of Funds.
Section 1. Implementation
1109203 I-15 Violation Enforcement Study (VES) 11093 Regional Arterial Management System 11095 Traveler Information Service - 511
Section 2. Technical Services
20058 CJ: Promoting Responsible Fatherhood 20059 CJ: Juvenile Mentally Ill Offenders 20060 CJ: North County Gang Enforcement Collaborative 21003 Identifying Crime Patterns at Transit Stations 22002 ARJIS: Project Management and Enhancements 22004 ARJIS: Border Safe III/RISC 22005 ARJIS: Enterprise System 22006 ARJIS: SRFERS II Grant 22007 ARJIS: Regional Operability and Communications 22009 ARJIS: Domestic Violence Communications Systems 22011 ARJIS: NEW – Officer Notification and Smart Alerting System (ONASAS) 22012 ARJIS: NEW - Tactical Identification System (TACIDS) 22013 ARJIS: NEW - SmartSearch
030408 4-1
030408 4-2
Section 3. Planning
3000206 California Regional Blueprint Planning Program 3000207 Access to Community Medical Transportation Services 3000208 xxx 3000801 Regional Bike Plan 3002301 SRTP – New Freedom and JARC 3002303 Results of Market-Based Planning for the Comprehensive Ops Analysis 3003001 Energy Efficient Buildings Grant 3003002 California Energy Commission Planning Grant 30051 San Diego – Riverside Interregional Partnership – Phase 3 3005101 Interregional Vanpool Buspool Study 30055 San Diego & Arizona Eastern Railway Gateway Feasibility and Improvements Study 3006201 Transit Planning Grant 30063 Implementation of Otay Mesa-Mesa de Otay Binational Corridor Strategic Plan 30071 State Route 11 and East Otay Mesa Port of Entry Planning
Section 4. Programming, Project Monitoring, and Oversight
4000101 San Diego Transit Service Planning Internship 4000103 San Diego Transit Service Planning Internship FY 08 - 10 4000107 NEW – Airport Master Plan 40007 Develop and Enhance Tools for Transportation Performance Monitoring
Section 5. Project Development
50003 Encinitas Pedestrian Crossing Study 50004 Regional Intermodal Transportation Management System
Section 6. Systems Management
6000109 Short Distance Vanpool Feasibility Study 60004 San Diego Station Car Pilot Program Study - Phases I and II 60008 San Diego Smart Parking Pilot Project
Section 7. Program Management and External Relations
7000601 Tribal TDM Outreach Program 70013 Regional Intelligent Transportation Systems Program Management 7001301 Development of I805 CSMP 75056 Service Bureau – Border Master Plan
PROGRAM WORK ELEMENT: 1109203 FY 2009 BUDGET: $1,029,641 TITLE: I-15 VIOLATION ENFORCEMENT STUDY (VES)
Prior FY 2009 FY 2010-13 TOTAL
Federal Other* $805,642 $911,541 $66,254 $1,783,437
TransNet Highway $104,379 $118,100 $8,584 $231,063
Local Other** $0 $0 $0 $
TOTAL $910,021 $1,029,641 $74,838 $2,014,500
Funds Source
0
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $143,817 $76,328 $2,271 $222,416
Other Direct Costs $25,962 $25,000 $17,000 $67,962
Contracted Services $740,242 $928,313 $55,567 $1,724,122
TOTAL $910,021 $1,029,641 $74,838 $2,014,500
Funds Application
* FHWA Congestion/Value Pricing Pilot Programs.
** Toll Revenue.
PROGRAM WORK ELEMENT: 11093 FY 2009 BUDGET: $546,501 TITLE: REGIONAL ARTERIAL MANAGEMENT SYSTEM
Prior FY 2009 FY 2010-13 TOTAL
CMAQ $451,000 $0 $0 $451,000
Federal Other-ITS $906,676 $0 $0 $906,676
Local Other-FSP Coop $269,211 $0 $0 $269,211
TOTAL $1,626,887 $0 $0 $1,626,887
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $169,473 $38,297 $887 $208,657
Materials & Equipment $0 $26,000 $0 $26,000
Other Direct Costs $0 $11,824 $0 $11,824
Contracted Services $803,902 $470,380 $106,124 $1,380,406
TOTAL $973,375 $546,501 $107,011 $1,626,887
Funds Application
030408 4-3
PROGRAM WORK ELEMENT: 11095 FY 2009 BUDGET: 946,125 TITLE: ADVANCED TRAVELER INFORMATION SERVICE - 511
Prior FY 2009 FY 2010-13 TOTAL
FHWA CMAQ $3,541,000 $0 $0 $3,541,000
Federal Other -- ITS $800,000 $0 $0 $800,000
TransNet Program (Highway) $1,159,000 $0 $0 $1,159,000
Local Other - Revenue $12,333 $9,332 $27,996 $49,661
TOTAL $5,512,333 $9,332 $27,996 $5,549,661
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $535,480 $261,125 $1,400,000 $2,196,605
Other Direct Costs $7,375 $207,000 $200,000 $414,375
Contracted Services $4,011,020 $478,000 $5,000,000 $9,489,020
TOTAL $4,553,875 $946,125 $6,600,000 $12,100,000
Funds Application
NOTE: Authorized spending through FY 2009 only of $5,500,000.
PROGRAM WORK ELEMENT: 20058 FY 2009 BUDGET: $2,490 TITLE: PROMOTING RESPONSIBLE FATHERHOOD
Prior FY 2009 FY 2010-13 TOTAL
Vista Community Clinic $7,510 $2,490 $40,000 $50,000
TOTAL $7,510 $2,490 $40,000 $50,000
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $7,510 $2,331 $38,000 $47,841
Other Direct Costs $0 $159 $2,000 $2,159
TOTAL $7,510 $2,490 $40,000 $50,000
Funds Application
030408 4-4
PROGRAM WORK ELEMENT: 20059 FY 2009 BUDGET: $77,204 TITLE: JUVENILE MENTALLY ILL OFFENDERS
Prior FY 2009 FY 2010-13 TOTAL
San Diego County Probation* $2,796 $77,204 $0 $80,000
TOTAL $2,796 $77,204 $0 $80,000
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $1,279 $76,721 $0 $78,000
Other Direct Costs $1,517 $483 $0 $2,000
TOTAL $2,796 $77,204 $0 $80,000
Funds Application
* Contract not executed yet.
PROGRAM WORK ELEMENT: 20060 FY 2009 BUDGET: $ TITLE: NORTH COUNTY GANG ENFORCEMENT COLLABORATIVE
Prior FY 2009 FY 2010-13 TOTAL
SD Youth & Community Services $34,869 $15,131 $0 $50,000
TOTAL $34,869 $15,131 $0 $50,000
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $33,330 $14,941 $0 $48,271
Other Direct Costs $1,539 $190 $0 $1,729
TOTAL $34,869 $15,131 $0 $50,000
Funds Application
030408 4-5
PROGRAM WORK ELEMENT: 21003 FY 2009 BUDGET: $37,397 TITLE: IDENTIFYING CRIME PATTERNS AT TRANSIT STATIONS
Prior FY 2009 FY 2010-13 TOTAL
FTA 5305 $46,229 $64,433 $0 $110,662
TDA Planning/Administration $10,049 $4,289 $0 $14,338
TOTAL $56,278 $68,722 $0 $125,000
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $64,103 $30,897 $0 $95,000
Contracted Services $23,500 $6,500 $0 $30,000
TOTAL $87,603 $37,397 $0 $125,000
Funds Application
PROGRAM WORK ELEMENT: 22002 FY 2009 BUDGET: $1,482,584 TITLE: ARJIS: PROJECT MANAGEMENT AND ENHANCEMENTS
Prior FY 2009 FY 2010-13 TOTAL
Member Assessment $1,679,572 $1,482,584 $5,930,336 $9,092,492
TOTAL $1,679,572 $1,482,584 $5,930,336 $9,092,492
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $297,353 $188,665 $754,660 $1,240,678
Other Direct Costs $191,321 $191,321 $765,284 $1,147,926
Contract Employees $354,760 $402,860 $1,611,440 $2,369,060
Contracted Services $751,138 $614,738 $2,458,952 $3,824,828
Materials & Equipment $85,000 $85,000 $340,000 $510,000
TOTAL $1,679,572 $1,482,584 $5,930,336 $9,092,492
Funds Application
PROGRAM WORK ELEMENT: 22004 FY 2009 BUDGET: $365,668 TITLE: ARJIS: BORDER SAFE III/RISCS
030408 4-6
Prior FY 2009 FY 2010-13 TOTAL
Federal Other $91,449 $365,668 $0 $457,117
Member Assessment $1,999 $0 $0 $1,999
Other - Carryover $363,669 $0 $0 $363,669
TOTAL $457,117 $365,668 $0 $822,785
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $0 $65,668 $0 $65,668
Other Direct Costs $76,513 $0 $0 $76,513
Contract Employees $60,874 $0 $0 $60,874
Contracted Services $290,166 $150,000 $0 $440,166
Materials & Equipment $29,564 $150,000 $0 $179,564
TOTAL $457,117 $365,668 $0 $822,785
Funds Application
030408 4-7
PROGRAM WORK ELEMENT: 22005 FY 2009 BUDGET: $1,939,365 TITLE: ARJIS: ENTERPRISE SYSTEM
Prior FY 2009 FY 2010-13 TOTAL
Member Assessment $0 $266,141 $1,064,564 $1,330,705
Other - Reserves $1,946,075 $1,673,224 $6,692,896 $10,312,195
TOTAL $1,946,075 $1,939,365 $7,757,460 $11,642,900
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $188,535 $263,789 $1,055,156 $1,507,480
Contract Employees $27,300 $1,175,576 $4,702,304 $5,905,180
Contracted Services $1,230,240 $0 $0 $1,230,240
Materials & Equipment $500,000 $500,000 $2,000,000 $3,000,000
TOTAL $1,946,075 $1,939,365 $7,757,460 $11,642,900
Funds Application
PROGRAM WORK ELEMENT: 22006 FY 2009 BUDGET: $552,178 TITLE: ARJIS: SRFERS II GRANT
Prior FY 2009 FY 2010-13 TOTAL
Federal Other $999,953 $552,178 $0 $1,552,131
TOTAL $999,953 $552,178 $0 $1,552,131
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $63,725 $26,178 $0 $89,903
Other Direct Costs $35,041 $20,000 $0 $55,041
Contract Employees $27,300 $140,000 $0 $167,300
Contracted Services $134,102 $356,000 $0 $490,102
Materials & Equipment $5,865 $10,000 $0 $15,865
Pass-through/In-kind Services $733,920 $0 $0 $733,920
TOTAL $999,953 $552,178 $0 $1,552,131
Funds Application
030408 4-8
PROGRAM WORK ELEMENT: 22007 FY 2009 BUDGET: $50,000 TITLE: ARJIS: REGIONAL INTEROPERABILITY & COMMUNICATIONS
Prior FY 2009 FY 2010-13 TOTAL
Member Assessment $106,165 $50,000 $200,000 $356,165
TOTAL $106,165 $50,000 $200,000 $356,165
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $0 $50,000 $200,000 $250,000
Contract Employees $18,200 $0 $0 $18,200
Contracted Services $87,965 $0 $87,965
TOTAL $106,165 $50,000 $200,000 $356,165
Funds Application
PROGRAM WORK ELEMENT: 22009 FY 2009 BUDGET: $53,688 TITLE: ARJIS: DOMESTIMC VIOLENCE COMMUNICATIONS SYSTEM
Prior FY 2009 FY 2010-13 TOTAL
Federal Other $175,069 $53,688 $0 $228,757
TOTAL $175,069 $53,688 $0 $228,757
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $22,699 $15,288 $0 $37,987
Other Direct Costs $5,000 $0 $0 $5,000
Contract Employees $0 $38,400 $0 $38,400
Contracted Services $147,370 $0 $0 $147,370
TOTAL $175,069 $53,688 $0 $228,757
Funds Application
030408 4-9
PROGRAM WORK ELEMENT: 22011 FY 2009 BUDGET: $359,453 TITLE: ARJIS: OFFICER NOTIFICATION AND SMART ALERTING SYSTEM (ONASAS)
Prior FY 2009 FY 2010-13 TOTAL
Federal Other $0 $359,453 $12,547 $372,000
TOTAL $0 $359,453 $12,547 $372,000
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $0 $12,408 $12,547 $24,955
Other Direct Costs $0 $7,300 $0 $7,300
Contracted Services $314,000 $0 $314,000
Materials & Equipment $0 $25,745 $0 $25,745
TOTAL $0 $359,453 $12,547 $372,000
Funds Application
PROGRAM WORK ELEMENT: 22012 FY 2009 BUDGET: $415,509 TITLE: ARJIS: TACTICAL IDENTIFICATION SYSTEM (TACIDS)
Prior FY 2009 FY 2010-13 TOTAL
Federal Other $0 $415,509 $0 $415,509
TOTAL $0 $415,509 $0 $415,509
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $0 $111,733 $0 $111,733
Other Direct Costs $0 $7,320 $0 $7,320
Contracted Services $177,432 $0 $177,432
Materials & Equipment $0 $119,024 $0 $119,024
TOTAL $0 $415,509 $0 $415,509
Funds Application
030408 4-10
PROGRAM WORK ELEMENT: 22013 FY 2009 BUDGET: $171,564 TITLE: SMARTSEARCH
Prior FY 2009 FY 2010-13 TOTAL
Federal - Other * $209,815 $171,564 $22,760 $404,139
TOTAL $209,815 $171,564 $22,760 $404,139
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $50,000 $27,244 $27,760 $105,004
Other Direct Costs $25,295 $9,760 $0 $35,055
Contracted Services $129,560 $124,560 $0 $254,120
Materials & Equipment $4,960 $10,000 $0 $14,960
TOTAL $209,815 $171,564 $27,760 $409,139
Funds Application
* U.S. Dept. of Justice
PROGRAM WORK ELEMENT: 3000206 FY 2009 BUDGET: $339,208 TITLE: CALIFORNIA REGIONAL BLUEPRINT PLANNING PROGRAM
Prior FY 2009 FY 2010-13 TOTAL
State Other* $359,750 $250,000 $609,750
TDA Planning/Administration $92,750 $62,500 $0 $155,250
TOTAL $452,500 $312,500 $0 $765,000
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $300,000 $109,208 $60,000 $469,208
Other Direct Costs $5,792 $0 $0 $5,792
Contracted Services $120,000 $230,000 $140,000 $490,000
TOTAL $425,792 $339,208 $200,000 $965,000
Funds Application
* Blueprint Grants ! and II and a pending $200,000 grant for FY 2010.
030408 4-11
PROGRAM WORK ELEMENT: 3000207 FY 2009 BUDGET: $1,307 TITLE: ACCESS TO COMMUNITY MEDICAL TRANSPORTATION SERVICES
Prior FY 2009 FY 2010-13 TOTAL
State Other* $150,793 $1,307 $0 $152,100
TOTAL $150,793 $1,307 $0 $152,100
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $7,094 $1,157 $0 $8,251
Other Direct Costs $49 $150 $0 $199
Contracted Services $0 $0 $0 $0
Pass-through/In-kind Services $143,650 $0 $0 $143,650
TOTAL $150,793 $1,307 $0 $152,100
Funds Application
* Environmental Justice Transportation Planning Grant.
Note: Local share of $8,450 and in-kind contribution of $8,450 provided by the pass-through agency, “All
Congregations Together.”
PROGRAM WORK ELEMENT: 3000801 FY 2009 BUDGET: $175,915 TITLE: REGIONAL BIKE PLAN
Prior FY 2009 FY 2010-13 TOTAL
State Other* $10,468 $140,732 $8,800 $160,000
TDA Planning/Administration $2,617 $35,183 $2,200 $40,000
TOTAL $13,085 $175,915 $11,000 $200,000
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $12,685 $55,915 $1,000 $69,600
Other Direct Costs $400 $0 $0 $400
Contracted Services $0 $120,000 $10,000 $130,000
TOTAL $13,085 $175,915 $11,000 $200,000
Funds Application
* Community-Based Transportation Planning Grant.
030408 4-12
PROGRAM WORK ELEMENT: 3002301 FY 2009 BUDGET: $242,166 TITLE: STRP – NEW FREEDOM AND JARC
Prior FY 2009 FY 2010-13 TOTAL
Federal - Other* $237,441 $242,166 $0 $479,607
TOTAL $237,441 $242,166 $0 $479,607
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $172,875 $207,166 $0 $380,041
Other Direct Costs $0 $5,000 $0 $5,000
Contracted Services $64,566 $30,000 $0 $94,566
TOTAL $237,441 $242,166 $0 $479,607
Funds Application
* JARC/New Freedom SAFETEA-LU (5316/7)
030408 4-13
PROGRAM WORK ELEMENT: 3002303 FY 2009 BUDGET: $87,205 TITLE: RESULTS OF MARKET BASED PLANNING FOR THE COA (MTS)
Prior FY 2009 FY 2010-13 TOTAL
State Other* $97,205 $0 $97,205
TOTAL $97,205 $0 $0 $97,205
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Pass-through/In-kind Services $10,000 $87,205 $97,205
TOTAL $10,000 $87,205 $0 $97,205
Funds Application
* Statewide Transit Planning Grant
PROGRAM WORK ELEMENT: 3003001 FY 2009 BUDGET: $6,337 TITLE: ENERGY EFFICIENT BUILDINGS GRANT
Prior FY 2009 FY 2010-13 TOTAL
State Other* $9,784 $40,216 $0 $50,000
TOTAL $9,784 $40,216 $0 $50,000
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $16,902 $3,837 $21,261 $42,000
Other Direct Costs $0 $2,500 $500 $3,000
Contracted Services $5,000 $0 $0 $5,000
TOTAL $21,902 $6,337 $21,761 $50,000
Funds Application
* California Energy Commission, Rebuild America Grant.
030408 4-14
PROGRAM WORK ELEMENT: 3003002 FY 2009 BUDGET: $184,452 TITLE: CALIFORNIA ENERGY COMMISSION REGIONAL ENERGY AND CLIMATE PLANNING
Prior FY 2009 FY 2010-13 TOTAL
State Other* $215,548 $184,452 $0 $400,000
TOTAL $215,548 $184,452 $0 $400,000
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $142,508 $144,452 $0 $286,960
Other Direct Costs $2,582 $0 $0 $2,582
Contracted Services $67,126 $40,000 $0 $107,126
TOTAL $215,548 $184,452 $0 $400,000
Funds Application
* California Energy Commission Regional Energy and Climate Planning Grant.
030408 4-15
PROGRAM WORK ELEMENT: 30051 FY 2009 BUDGET: $135,471 TITLE: SAN DIEGO – RIVERSIDE INTERREGIONAL PARTNERSHIP – PHASE 3
Prior FY 2009 FY 2010-13 TOTAL
TDA Planning/Administration $0 $15,539 $9,461 $25,000
Local Other* $0 $119,932 $45,343 $165,275
TOTAL $0 $135,471 $54,804 $190,275
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $0 $107,971 $51,804 $159,775
Pass-through/In-kind Services $0 $0 $0 $0
Other Direct Costs $0 $2,500 $3,000 $5,500
Contracted Services $0 $25,000 $0 $25,000
TOTAL $0 $135,471 $54,804 $190,275
Funds Application
* WRCOG Pass through Grant from Caltrans
030408 4-16
PROGRAM WORK ELEMENT: 3005101 FY 2009 BUDGET: $121,043 TITLE: INTERREGIONAL VANPOOL BUSPOOL STUDY
Prior FY 2009 FY 2010-13 TOTAL
State Other* $3,166 $96,834 $0 $100,000
TDA Planning/Administration $791 $24,209 $0 $25,000
TOTAL $3,957 $121,043 $0 $125,000
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $3,957 $31,013 $0 $34,970
Contracted Services $0 90,030 $0 $90,030
TOTAL $3,957 $121,043 $0 $125,000
Funds Application
PROGRAM WORK ELEMENT: 30055 FY 2009 BUDGET: $876,280 TITLE: SAN DIEGO & ARIZONA EASTERN RAILWAY GATEWAY
FEASIBILITY AND IMPROVEMENTS STUDY
Prior FY 2009 FY 2010-13 TOTAL
Federal 5309 Earmark $64,071 $701,024 $514,905 $1,280,000
Local Other* $16,018 $175,256 $128,726 $320,000
TOTAL $80,089 $876,280 $643,631 $1,600,000
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $80,055 $125,780 $109,703 $315,538
Other Direct Costs $34 $500 $0 $534
Contracted Services $0 $750,000 $533,928 $1,283,928
TOTAL $80,089 $876,280 $643,631 $1,600,000
Funds Application
* SD&AE Reserve.
030408 4-17
PROGRAM WORK ELEMENT: 3006201 FY 2009 BUDGET: $120,874 TITLE: TRANSIT PLANNING GRANT
Prior FY 2009 FY 2010-13 TOTAL
FTA 5305 $42,990 $107,010 $0 $150,000
Local Other* $5,570 $13,864 $0 $19,434
TOTAL $48,560 $120,874 $0 $169,434
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $23,560 $50,874 $0 $74,434
Contracted Services $25,000 $70,000 $0 $95,000
TOTAL $48,560 $120,874 $0 $169,434
Funds Application
* Billboard sale proceeds.
PROGRAM WORK ELEMENT: 30063 FY 2009 BUDGET: $112,160 TITLE: IMPLEMENTATION OF OTAY MESA-MESA DE OTAY BINATIONAL CORRIDOR PLAN
Prior FY 2009 FY 2010-13 TOTAL
TDA $511,398 $112,160 $0 $623,558
TOTAL $511,398 $112,160 $0 $623,558
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $396,700 $111,310 $0 $508,010
Other Direct Costs $614 $850 $0 $1,464
Contracted Services $114,084 $0 $0 $114,084
TOTAL $511,398 $112,160 $0 $623,558
Funds Application
030408 4-18
PROGRAM WORK ELEMENT: 30071 FY 2009 BUDGET: $576,560 TITLE: STATE ROUTE 11 AND EAST OTAY MESA PORT OF ENTRY PLANNING
Prior FY 2009 FY 2010-13 TOTAL
FHWA Partnership Planning $29,600 $140,000 $0 $169,600
Caltrans $58,734 $312,919 $0 $371,653
TDA $7,400 $123,641 $0 $131,041
TOTAL $95,734 $576,560 $0 $672,294
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $70,734 $139,060 $0 $209,794
Other Direct Costs $0 $2,500 $0 $2,500
Contracted Services $25,000 $435,000 $0 $460,000
TOTAL $95,734 $576,560 $0 $672,294
Funds Application
PROGRAM WORK ELEMENT: 4000101 FY 2009 BUDGET: $61,351 TITLE: SAN DIEGO TRANSIT SERVICE PLANNING INTERNSHIP FY 08 10
Prior FY 2009 FY 2010-13 TOTAL
FTA - 5305* $16,490 $54,314 $0 $70,804
TDA Planning/Administration $2,137 $7,037 $0 $9,174
TOTAL $18,627 $61,351 $0 $79,978
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $18,627 $31,503 $0 $50,130
Other Direct Costs $0 $29,848 $0 $29,848
TOTAL $18,627 $61,351 $0 $79,978
Funds Application
* FTA 5305 TPD
030408 4-19
PROGRAM WORK ELEMENT: 4000107 FY 2009 BUDGET: $231,303 TITLE: SAN DIEGO INTERNATIONAL AIRPORT MASTER PLAN
Prior FY 2009 FY 2010-13 TOTAL
FHWA Planning $0 $5,692 $0 $5,692
Caltrans $0 $0 $0 $0
TDA $0 $225,611 $0 $225,611
TOTAL $0 $231,303 $0 $231,303
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $0 $71,303 $90,000 $161,303
Other Direct Costs $0 $10,000 $30,000 $40,000
Contracted Services $0 $150,000 $0 $150,000
TOTAL $0 $231,303 $120,000 $351,303
Funds Application
030408 4-20
PROGRAM WORK ELEMENT: 40007 FY 2009 BUDGET: $491,184 TITLE: DEVELOP AND ENHANCE TOOLS FOR
TRANSPORTATION PERFORMANCE MONITORING
Prior FY 2009 FY 2010-13 TOTAL
FHWA Metropolitan Planning $430,075 $0 $0 $430,075
FHWA CMAQ $212,313 $0 $0 $212,313
TDA Planning/Administration $83,842 $0 $0 $83,842
TransNet Program $27,637 $0 $0 $27,637
State Other $0 $300,000 $500,000 $800,000
TOTAL $753,867 $300,000 $500,000 $1,553,867
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $69,692 $91,184 $179,164 $340,040
Other Direct Costs $1,000 $0 $3,000 $4,000
Contracted Services 359,827 $400,000 $450,000 $1,209,827
TOTAL $430,519 $491,184 $632,164 $1,553,867
Funds Application
NOTE: Total funding available is $1,053,867 for expenditures through FY 2009 only.
PROGRAM WORK ELEMENT: 50003 FY 2009 BUDGET: $765,632 TITLE: ENCINITAS PEDESTRIAN CROSSINGS STUDY
Prior FY 2009 FY2010-13 TOTAL
Local Other* $682,368 $765,632 $0 $1,448,000
TOTAL $682,368 $765,632 $0 $1,448,000
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Contracted Services $682,368 $765,632 $0 $1,448,000
TOTAL $682,368 $765,632 $0 $1,448,000
Funds Application
* City of Encinitas.
030408 4-21
PROGRAM WORK ELEMENT: 50004 FY 2009 BUDGET: $942,191 TITLE: INTERMODAL TRANSPORTATION MANAGEMENT SYSTEM
Prior FY 2009 FY 2010-13 TOTAL
FHWA CMAQ (ITS) $4,162,365 $834,122 $757,963 $5,754,450
State - Caltrans FSP $76,673 $15,365 $13,962 $106,000
TransNet Program $4,464 $895 $813 $6,171
Local Other-FSP FY05 $204,976 $41,076 $37,326 $283,379
Local Other (Caltrans SHOPP) $253,165 $50,733 $46,101 $350,000
TOTAL $4,701,644 $942,191 $856,165 $6,500,000
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $629,152 $121,991 $344,903 $1,096,046
Other Direct Costs $43,699 $63,200 $0 $106,899
Contracted Services $3,918,627 $757,000 $165,549 $4,841,176
Materials & Equipment $110,166 $0 $345,713 $455,879
TOTAL $4,701,644 $942,191 $856,165 $6,500,000
Funds Application
PROGRAM WORK ELEMENT: 50020 FY 2009 BUDGET: $1,717,748 TITLE: INTELLIGENT TRANSPORTATION SYSTEMS OPERATIONS
Prior FY 2009 FY 2010-13 TOTAL
RSTP $1,737,000 $2,279,000 $4,982,000 $8,998,000
TransNet Program - MC $225,000 $295,000 $645,000 $1,165,000
TOTAL $1,962,000 $2,574,000 $5,627,000 $10,163,000
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $674,814 $658,748 $2,634,992 $3,968,554
Other Direct Costs $18,500 $0 $100,000 $118,500
Temporary Employees $100,000 $0 $204,773 $304,773
Contracted Services $421,173 $1,059,000 $4,236,000 $5,716,173
Materials & Equipment $55,000 $0 $0 $55,000
TOTAL $1,269,487 $1,717,748 $7,175,765 $10,163,000
Funds Application
030408 4-22
PROGRAM WORK ELEMENT: 6000109 FY 2009 BUDGET: $134,740 TITLE: SHORT DISTANCE VANPOOL FEASIBILITY STUDY
Prior FY 2009 FY 2010-13 TOTAL
FHWA 5313 $9,337 $115,876 $24,427 $149,640
Caltrans Match to 5313 $1,520 $18,864 $3,976 $24,360
TOTAL $10,857 $134,740 $28,403 $174,000
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $10,857 $59,740 $0 $70,597
Contracted Services $0 $75,000 $28,403 $103,403
TOTAL $10,857 $134,740 $28,403 $174,000
Funds Application
030408 4-23
030408 4-24
PROGRAM WORK ELEMENT: 60004 FY 2009 BUDGET: $184,850 TITLE: SAN DIEGO STATION CAR PILOT PROGRAM STUDY PHASES I & II
Prior FY 2009 FY 2010-13 TOTAL
CMAQ - SAN11A $0 $38,304 $0 $38,304
Federal Other - FTA 5313(b) $241,428 $102,572 $0 $344,000
TDA Planning/Administration $60,357 $25,643 $0 $86,000
TOTAL $301,785 $166,519 $0 $468,304
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $179,240 $49,850 $0 $229,090
Other Direct Costs $3,621 $5,000 $0 $8,621
Temporary Employees $8,586 $0 $0 $8,586
Contracted Services $91,708 $105,000 $0 $196,708
Materials & Equipment $299 $0 $0 $299
Pass-through/In-kind Services $0 $25,000 $0 $25,000
TOTAL $283,454 $184,850 $0 $468,304
Funds Application
030408 4-25
PROGRAM WORK ELEMENT: 60008 FY 2009 BUDGET: $329,029 TITLE: SAN DIEGO SMART PARKING PILOT PROJECT
Prior FY 2009 FY 2010-13 TOTAL
Federal Other (VPP grant) $175,000 $320,000 $145,000 $640,000
TOTAL $175,000 $320,000 $145,000 $640,000
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $15,971 $44,529 $10,500 $71,000
Contracted Services $150,000 $284,500 $134,500 $569,000
TOTAL $165,971 $329,029 $145,000 $640,000
Funds Application
030408 4-26
PROGRAM WORK ELEMENT: 7000601 FY 2009 BUDGET: $66,192 TITLE: TRIBAL TDM OUTREACH PROGRAM
Prior FY 2009 FY 2010-13 TOTAL
State Other* $124,258 $59,573 $14,170 $198,001
TDA Planning/Administration $13,806 $6,619 $1,574 $21,999
TOTAL $138,064 $66,192 $15,744 $220,000
Funds Source
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $30,564 $21,901 $15,744 $68,209
Other Direct Costs $2,500 $0 $0 $2,500
Contracted Services $20,000 $0 $0 $20,000
Pass-through/In-kind Services $78,209 $44,291 $0 $122,500
TOTAL $131,273 $66,192 $15,744 $213,209
Funds Application
* Environmental Justice Transportation Planning Grant.
030408 4-27
PROGRAM WORK ELEMENT: 70013 FY 2009 BUDGET: $853,028 TITLE: REGIONAL INTELLIGENT TRANSPORTATION SYSTEMS
PROGRAM MANAGEMENT
Prior FY 2009 FY 2010-13 TOTAL
FHWA CMAQ $1,150,890 $755,186 $307,174 $2,245,121
TransNet Highway $149,110 $97,842 $39,798 $290,879
TOTAL $1,300,000 $853,028 $346,972 $2,536,000
Prior FY 2009 FY 2010-13 TOTAL
Salaries, Benefits, Indirect $1,020,000 $341,028 $232,972 $1,594,000
Contracted Services $280,000 $512,000 $150,000 $942,000
TOTAL $1,300,000 $853,028 $382,972 $2,536,000
Funds Application
Total funding currently available is $2,153,028 with additional future expenditures subject to future funding.
030408 4-28
PROGRAM WORK ELEMENT: 7001301 FY 2009 BUDGET: $473,295 TITLE: DEVELOPMENT OF I-805 CSMP
Prior FY 2009 FY 2010-12 TOTAL
State - Other $1,000,000 $0 $0 $1,000,000
TOTAL $1,000,000 $0 $0 $1,000,000
Funds Source
Prior FY 2009 FY 2010-12 TOTAL
Salaries, Benefits, Indirect $20,000 $37,295 $27,705 $85,000
Contracted Services $150,000 $436,000 $329,000 $915,000
TOTAL $170,000 $473,295 $356,705 $1,000,000
Funds Application
*Caltrans Public Transportation Account (PTA)
030408 4-29
PROGRAM WORK ELEMENT: 750561 FY 2009 BUDGET: $43,979 TITLE: SERVICE BUREAU – BORDER MASTER PLAN
Prior FY 2009 FY 2010-12 TOTAL
FHWA CMAQ (5309) $0 $0 $0 $0
Federal Other* $0 $0 $0 $0TransNet Highway $0 $0 $0 $Other* $271,000 $15,000 $0 $286,000
TOTAL $271,000 $15,000 $0 $286,000
Funds Source
0
Prior FY 2009 FY 2010-12 TOTAL
Salaries, Benefits, Indirect $231,571 $37,429 $0 $269,000
Temporary Employees $0 $0 $0 $0
Contracted Services $7,800 $6,200 $0 $14,000
Materials & Equipment $2,650 $350 $0 $3,000
Pass-through/In-kind Services $0 $0 $0 $0
TOTAL $242,021 $43,979 $0 $286,000
Funds Application
* Caltrans Fund Transfer Agreement.
030408 4-30
CHAPTER 5
PENDING DISCRETIONARY GRANTS The following chapter describes additional work elements that are subject to pending discretionary grants. Since the award of these grants will not be determined at the time this document is approved, these work elements are not included as part of the baseline OWP.
As grant awards become available, amendments to the FY 2009 OWP will be requested. The table on the following page summarizes these potential elements.
5-1
FY 2009 OWP Work Elements Pending Discretionary Grants
OWP # OWP Description Project Manager
DepartmentDirector
FY 2009 Proposed Budget*
Proposed Grant
Amount
Local Match/ In-Kind
30007 Interstate 5 South Corridor Study Arias Leiter $0 $0 $0
C0001 Rural Transit Marketing – SR 78 Steinberger Windsor $0 $0 $0
C0002 Marketing Compass Card and Transit Fare Options Steinberger Leiter $0 $0 $0
G0001 Rural Coordinated Transportation Planning Project Levy Leiter $112,956 $100,000 $12,956
G0002 San Diego Transit Planning Internship Program Culp Leiter $56,478 $50,000 $6,478
G0003 Regional Trip Planner Bruccoleri Boda $405,000 $300,000 $105,000
G0004 A Rail Line Runs Through It: making Transit Work in the City of San Marcos Steinberger Windsor $100,000 $88,728 $11,272
G0005 Making Key Trail Connections in the Rose Creek Watershed Kluth Leiter $262,996 $210,000 $52,996
G0006 Improving San Diego and Tijuana Transit Connections Williamson Leiter $300,000 $265,590 $34,410
G0007 Integrated Transit Timetables and Customer Information at Rail Stations Culp Leiter $220,000 $176,000 $44,000
G0008 Feasibility of Implementing Truck Stop Electrification at San Diego-Tijuana POEs Arias Leiter $250,000 $200,000 $50,000
G0009 Developing Multimodal LOS Standards for Smart Growth Areas and Incorporating Eary Leiter $375,000 $300,000 $75,000 Standards into Regional Planning Tools
G0010 Get on Board with Compass Card: Expanding Options for Underserved Communities Steinberger Windsor $200,000 $180,000 $20,000
G0011 San Diego Regional 511 Spanish Phone System Bruccoleri Boda $278,000 $250,000 $28,000
G0012 Health Equity by Design Vance Leiter $281,743 $250,000 $31,743
G0013 Regional Transportation Model Enhancements: Microsimulation Approach to Sun Leiter $338,868 $300,000 $38,868 Trip Generation for Transit Equity Analysis
Total Pending Grants $ $ $O
*Total project cost
5-2
[THIS PAGE INTENTIONALLY LEFT BLANK]
5-3
MANDATED/COMMITTED: FULL DEDICATED FUNDING: < 40% (MINIMAL)
PROGRAM WORK ELEMENT: G#SERIES 30070 TITLE: INTERSTATE 5 SOUTH CORRIDOR STUDY
FY 2009 BUDGET: $0 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
This study will evaluate multImodal improvements to accommodate current and future traffic demand in the Interstate 5 (I-5) South corridor from Main Street through State Route (SR) 54. It focuses on freeway and interchange improvements, including current interchange spacing and operation, impacts of the light rail transit and freight rail services running parallel to I-5, and transit/pedestrian/bicycle circulation adjacent to I-5. This study will propose capital improvements, including preliminary engineering and environmental analysis with estimated costs and a conceptual phasing plan for financing and construction.
PREVIOUS ACCOMPLISHMENTS
The draft scope of work was prepared in FY 2007. Initiation of this study is pending while funding is secured.
Committee(s): Transportation Committee
Working Group(s): TBD
Project Manager: Elisa Arias
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE
MANDATED COMMITTED EMPHASIS AREA TASK # % OF
EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
MOUM CONGESTION MANAGE-
MENT
1 10 Task Description: Study coordination with member agencies, Port of San Diego, Metropolitan Transit System, and Caltrans.
Product: Meeting agendas and meeting notes
Completion Date: 6/30/2009
MOUM CONGESTION MANAGE-
MENT
2 20 Task Description: Define study area and prepare problem statement.
Product: Problem statement technical memo
Completion Date: 10/31/2007
MOUM CONGESTION MANAGE-
MENT
3 25 Task Description: Define multimodal transportation alternatives, conduct initial traffic forecasts, and prepare preliminary cost estimates.
Product: Travel demand forecasts and preliminary cost estimates for transportation alternatives
Completion Date: 12/31/07
MOUM CONGESTION MANAGE-
MENT
4 45 Task Description: Initial screening of alternatives and public outreach.
Product: Alternatives evaluation, public outreach materials, and public outreach activities
Completion Date: 6/30/2009
5-4
FUTURE ACTIVITIES
Future activities include collaboration with Caltrans on development of a project study report for Phase I Improvements and selection of a preferred transportation strategy for the I-5 south corridor.
5-5
MANDATED/COMMITTED: NONE DEDICATED FUNDING: < 40% (MINIMAL)
PROGRAM WORK ELEMENT: G#SERIES C0001 TITLE: RURAL TRANSIT MARKETING – STATE ROUTE 78
FY 2009 BUDGET: $0 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
Pending Caltrans grant approval, develop and evaluate marketing, advertising, and promotion options for expanding transit use in the heavily traveled State Route (SR) 78 corridor, specifically working with the city of San Marcos, a rural city of 79,000. A marketing plan would be created identifying the best strategies to build awareness and usage of the SPRINTER rail and BREEZE bus, the 511 Advanced Traveler Informatin System Web and phone service, and Compass Card to a variety of audiences (college students, commuters, and transit users). Using performance measures, SANDAG will evaluate the marketing plan’s success, what worked and what did not work, and then launch similar programs throughout the region to promote transit services and transportation resources.
Committee(s): Transportation Committee
Working Group(s): Transportation Demand Management Working Group
Project Manager: Anne Steinberger
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE
MANDATED COMMITTED EMPHASIS AREA TASK # % OF
EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA CONGESTION MANAGE-
MENT
1 0 Task Description: Develop and evaluate marketing, advertising and promotion options for expanding transit use in SR 78 corridor.
Product: xxx
Completion Date: xxx
FUTURE ACTIVITIES
xxx
5-6
MANDATED/COMMITTED: NONE DEDICATED FUNDING: < 40% (MINIMAL)
PROGRAM WORK ELEMENT: G#SERIES C0002 TITLE: MARKETING COMPASS CARD AND TRANSIT FARE OPTIONS
FY 2009 BUDGET: $0 STRATEGIC GOAL:
OBJECTIVE
Pending Caltrans grant approval, SANDAG will implement a communications and marketing program to build awareness of the Compass Card, promote reduced fare options, and increase use of the Compass Card. SANDAG proposes to conduct a targeted outreach, marketing, and advertising effort with residents, including low-income, minority, disabled, elderly, Native American, and other underrepresented communities. This grant funding will help SANDAG to work with key community-based organizations that are involved with providing services and assistance to the underrepresented communities listed above. Their input will help SANDAG develop a meaningful program that resonates with these communities. SANDAG also will collaborate with Metropolitan Transit System and North County Transit District to develop, manage, and implement this program.
Committee(s): xxx
Working Group(s): xxx
Project Manager: Anne Steinberger
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE
MANDATED COMMITTED EMPHASIS AREA TASK # % OF
EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
COMMUNI-CATION
1 0 Task Description: Develop public outreach program.
Product: xxx
Completion Date: xxx
FUTURE ACTIVITIES
xxx
5-7
PROGRAM WORK ELEMENT: G0001 TITLE: RURAL COORDINATED TRANSPORTATION PLANNING PROJECT
FY 2009 BUDGET: $112,956 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
Through the Rural Coordinated Transportation Planning Project grant proposal, SANDAG seeks to enhance the Coordinated Plan for San Diego County by providing a more in-depth analysis of the transit and human service transportation opportunities in the rural areas. The plan will develop solutions designed to improve coordination of the limited transportation resources allocated to rural areas.
Project Manager: Dan Levy
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE
MANDATED COMMITTED EMPHASIS AREA TASK # % OF
EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA FGC TDM 1 5 Task Description: Media announcements .
Product: Affidavits of publication and copies of press releases included in the invoices
RTPA FGC TDM 2 5 Task Description: Mail flyer to all health and human service agencies in rural San Diego County.
Product: Copy of flyer included in the invoices
RTPA FGC TDM 3 10 Task Description: Community meetings.
Product: Attendance figures and meeting locations will be provided with the invoices
RTPA FGC TDM 4 5 Task Description: Creation of survey instrument.
Product: Written copy of survey provided with the invoices
RTPA FGC TDM 5 5 Task Description: Complete surveys
Product: Copy of survey results provided with the invoices
RTPA FGC TDM 6 20 Task Description: Maps of identified Health and Human Service Agency transportation services.
Product: Copies of draft maps provided with the invoices
RTPA FGC TDM 7 15 Task Description: Coordinate Input from SSTAC regarding the Coordinated Plan update.
Product: Minutes from SSTAC meetings included with the invoices
RTPA FGC TDM 8 15 Task Description: Draft report.
Product: Five copies submitted with the invoices
RTPA FGC TDM 9 10 Task Description: Project management.
Product: Project administration/product delivery
RTPA FGC TDM 10 10 Task Description: Final report.
Product: Electronic copies (PDF) submitted to Caltrans
5-8
PROGRAM WORK ELEMENT: G0002 TITLE: SAN DIEGO TRANSIT PLANNING INTERNSHIP PROGRAM
FY 2009 BUDGET: $56,478 STRATEGIC GOAL: IMPROVE ORGANIZATIONAL EFFECTIVENESS
OBJECTIVE
This objective of this work element is to continue a collaborative project between San Diego State University (SDSU) and SANDAG to staff and train interns in transit planning in a joint agency context. This proposal builds upon previous grants received from Caltrans. SANDAG will manage the project, in cooperation with SDSU and the region’s transit operators.
Project Manager: Linda Culp
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE
MANDATED COMMITTED EMPHASIS AREA TASK # % OF
EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA FGC INTERNAL/ EXTERNAL COMMUNI-
CATION
1 10 Task Description: Intern orientation.
Product: Job announcement and registration information
RTPA FGC INTERNAL/ EXTERNAL COMMUNI-
CATION
2 15 Task Description: Agency orientation/
Product: Proposed work assignments
RTPA FGC INTERNAL/ EXTERNAL COMMUNI-
CATION
3 20 Task Description: Curriculumpreparation.
Product: Course materials
RTPA FGC INTERNAL/ EXTERNAL COMMUNI-
CATION
4 15 Task Description: Hire and train interns.
Product: New hire documentation
RTPA FGC INTERNAL/ EXTERNAL COMMUNI-
CATION
5 15 Task Description: Preparation of final report.
Product: Final assessment report
RTPA FGC INTERNAL/ EXTERNAL COMMUNI-
CATION
6 15 Task Description: Public outreach.
Product: Seminar
RTPA FGC INTERNAL/ EXTERNAL COMMUNI-
CATION
7 10 Task Description: Submit final study, plan, or concept product to Caltrans.
Product: Hard copies and electronic copies to the Caltrans contract manager
5-9
PROGRAM WORK ELEMENT: G0003 TITLE: REGIONAL TRIP PLANNER
FY 2009 BUDGET: $405,000 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
To objective of this work element is to develop an online commute trip planning tool that is map- and text-based and would reside on the San Diego regional 511 Web site, www.sd511.com. This tool would present a commuter with various trip choices as alternatives to driving alone when planning a trip.
Project Manager: Thomas Bruccoleri
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE
MANDATED COMMITTED EMPHASIS AREA TASK # % OF
EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA SGC TDM 1 5 Task Description: Evaluate factors that prevent commuters from using alternative transportation.
RTPA SGC TDM 2 10 Task Description: Determine what messaging will address current barriers to alternative modes.
RTPA SGC TDM 3 5 Task Description: Validate messaging with commuters.
Product: Develop messaging for alternative modes that have been validated
RTPA SGC TDM 4 5 Task Description: Develop request for proposal (RFP).
Product: RFP
RTPA SGC TDM 5 5 Task Description: Procurement Process.
Product: Procurement documentation
RTPA SGC TDM 6 5 Task Description: Reach agreement with contractor and award contract.
Product: Signed agreement/contract
RTPA SGC TDM 7 5 Task Description: Conduct meeting with SANDAG stakeholders to define trip planner requirements.
Product: Final requirement documentation
RTPA SGC TDM 8 5 Task Description: Develop release and testing schedule.
Product: Schedule and testing plan
RTPA SGC TDM 9 5 Task Description: Regular meetings to review status and provide updates.
Product: Meeting minutes
RTPA SGC TDM 10 10 Task Description: Documentation on any significant changes.
Product: Change request summary
RTPA SGC TDM 11 5 Task Description: First release of regional trip planner.
Product: First version of user manual
RTPA SGC TDM 12 10 Task Description: Usability testing.
Product: Written copy of survey
RTPA SGC TDM 13 10 Task Description: Second release of regional trip planner.
Product: Second version of user manual
5-10
LEVEL OF MANDATE
MANDATED COMMITTED EMPHASIS AREA TASK # % OF
EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA SGC TDM 14 10 Task Description: Final version release of regional trip planner.
Product: Final documentation on user manual
RTPA TDM 15 5 Task Description: SANDAG and 511 contractor will evaluate the launch of new feature.
Product: Launch plan documentation
5-11
PROGRAM WORK ELEMENT: G0004 TITLE: A RAIL LINE RUNS THROUGH IT: MAKING TRANSIT WORK IN THE CITY OF SAN MARCOS
FY 2009 BUDGET: $100,000 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
Working with the city of San Marcos, a city with 79,000 residents, SANDAG would develop and evaluate marketing, advertising, and promotion options for expanding transit use in the heavily traveled State Route 78 (SR 78) corridor. A marketing plan would be created by SANDAG identifying the best strategies to promote transit to a variety of audiences: college students, Native Americans, commuters, and transit users.
Project Manager: Anne Steinberger
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE
MANDATED COMMITTED EMPHASIS AREA TASK # % OF
EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA SGC TDM 1 10 Task Description: Coordinate with key stakeholders and promote outreach.
Product: Survey
RTPA SGC TDM 2 10 Task Description: Hold meetings and employer outreach to discuss how the 511 Advanced Traveler Information System and Compass Card can improve transit options.
Product: Meeting List
RTPA SGC TDM 3 10 Task Description: Hold meetings to begin discussing the transit issues in the neighborhood.
Product: Meeting list
RTPA SGC TDM 4 15 Task Description: Develop and implement public service announcement (PSA) campaign.
Product: PSA
RTPA SGC TDM 5 10 Task Description: Develop and perform survey and perform it on residents
Product: Survey and report
RTPA SGC TDM 6 15 Task Description: Compile survey results, community feedback, and other information into a report documenting the needs and concerns of residents and employees in San Marcos.
Product: Report
RTPA SGC TDM 7 20 Task Description: Analyze data and compile a report.
Product: Report
RTPA SGC TDM 8 10 Task Description: Final report.
Product: Final report
5-12
PROGRAM WORK ELEMENT: G0005 TITLE: MAKING KEY TRAIL CONNECTIONS IN THE ROSE CREEK WATERSHED
FY 2009 BUDGET: $262,996 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
This objective of this work element is to help implement key bicycle and pedestrian connections in the city of San Diego, including the Coastal Rail Trail and other connections recommended in the Rose Creek Watershed Opportunities Assessment.
Project Manager: Chris Kluth
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE
MANDATED COMMITTED EMPHASIS AREA TASK # % OF
EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA SGC SMART GROWTH
PLANNING
1 10 Task Description: Provide mapping, surveying, rights-of-way, and utilities.
Product: Mapping, surveying, rights-of-way, and utilities in the project area
RTPA SGC SMART GROWTH
PLANNING
2 15 Task Description: Undertake wetlands delineation and endangered species surveys (surveys only during non-nesting periods).
Product: Wetlands delineation and Endangered species surveys
RTPA SGC SMART GROWTH
PLANNING
3 10 Task Description: Perform cultural resource surveys.
Product: Cultural resources surveys
RTPA SGC SMART GROWTH
PLANNING
4 20 Task Description: Develop preliminary designs for both projects.
Product: Preliminary designs for both projects
RTPA SGC SMART GROWTH
PLANNING
5 10 Task Description: Develop final designs for both projects.
Product: Final designs for both projects
RTPA SGC SMART GROWTH
PLANNING
6 15 Task Description: Negotiate encroachment permits with property owners.
Product: Encroachment permits and/or preliminary approvals for encroachment
RTPA SGC SMART GROWTH
PLANNING
7 5 Task Description: Facilitate stakeholder coordination.
Product: Stakeholders report showing how input was incorporated into the designs
RTPA SGC SMART GROWTH
PLANNING
8 5 Task Description: Project management and administration.
Product: Stakeholders report showing how input was incorporated into the designs
RTPA SGC SMART GROWTH
PLANNING
9 5 Task Description: Project administration.
Product: Project management and administration/product
delivery
RTPA SGC SMART GROWTH
PLANNING
10 5 Task Description: Final product to Caltrans.
Product: Hard copies and electronic copies to the Caltrans contract manager
5-13
PROGRAM WORK ELEMENT: G0006 TITLE: IMPROVING SAN DIEGO AND TIJUANA TRANSIT CONNECTIONS
FY 2009 BUDGET: $300,000 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objective of this work element is to examine existing conditions and take inventory of existing data which identifies cross-border transit movements. It will create service scenarios for both pedestrian and crossborder transit vehicle movements, complete an assessment of border security, SENTRI, insurance, operations, and liability for vehicles crossing either side of the border and identify possible strategies to facilitate expedited crossborder transit movements.
Project Manager: Jennifer Williamson
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE
MANDATED COMMITTED EMPHASIS AREA TASK # % OF
EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA SGC NEW BORDER CROSSING/
TATE ROUTE (SR) 11
1 20 Task Description: Identify issues that would facilitate better cros-border transit service at the Otay Mesa and San Ysidro port of entry (POE).
Product: Meetings with stakeholders (five) meetings; inventory/matrix of issues
RTPA SGC NEW BORDER CROSSING
/SR 11
2 15 Task Description: Perform data dollection and existing conditions.
Product: Monthly progress reports, matrix of issues;,maps of transit services, memo of facility requirements, comprehensive report of data and existing conditions
RTPA SGC NEW BORDER CROSSING
/SR 11
3 15 Task Description: Service strategies.
Product: List of service alternatives, transit alternatives, operating and capital cost summary, aND outreach
RTPA SGC NEW BORDER CROSSING
/SR 11
4 20 Task Description: Facility Upgrades.
Product: Transit/pedestrian facility and border infrastructure upgrades, operating/capital cost for upgrades; and final report
RTPA SGC NEW BORDER CROSSING
/SR 11
5 10 Task Description: Conduct ublic and stakeholder outreach.
Product: Webpage, outreach material, and meetings
RTPA SGC NEW BORDER CROSSING
/SR 11
6 20 Task Description: Prepare implementation chedule and final report.
Product: Schedule for implementation and final report
5-14
PROGRAM WORK ELEMENT: G0007 TITLE: INTEGRATED TRANSIT TIMETABLES AND CUSTOMER INFORMATION AT RAIL STATIONS
FY 2009 BUDGET: $220,000 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The LOSSAN Rail Corridor Agency oversees the corridor and advocates for improvements. One of the areas that LOSSAN has focused on recently is customer information. The objective of this work element is to integrate rail timetables and provide better information to customers at the station, on the Web, and onboard.
Project Manager: Linda Culp
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE
MANDATED COMMITTED EMPHASIS AREA TASK # % OF
EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA SGC TDM 1 5 Task Description: Project management.
Product: Scope of work and regular updates to LOSSAN TAC
RTPA SGC TDM 2 10 Task Description: Existing conditions .
Product: Report and summary of onsite visits and interviews
RTPA SGC TDM 3 20 Task Description: Integrated rail schedule.
Product: Existing conditions report and summary of onsite visits and interviews
RTPA SGC TDM 4 20 Task Description: Customer information improvement plan.
Product: Report outlining improvements, costs, and implementation schedule
RTPA SGC TDM 5 15 Task Description: Monitoring and maintenance plan.
Product: Monitoring and maintenance plan report
RTPA SGC TDM 6 20 Task Description: Implementation.
Product: Station signage, Web pages, and onboard information
RTPA SGC TDM 7 5 Task Description: Final report .
Product: Final report
RTPA SGC TDM 8 5 Task Description: Submit final study, plan, or concept product to Caltrans.
Product: Hard copies and electronic copies to the Caltrans contract manager
5-15
PROGRAM WORK ELEMENT: G0008 TITLE: (FEASIBILITY OF IMPLEMENTING TRUCK STOP ELECTRIFICATION AT SAN DIEGO-TIJUANA PORTS OF ENTRY
FY 2009 BUDGET: $250,000 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objective of this work element is to conduct a feasibility study that would assess the viability of implementing truck stop electrification (TSE) facilities serving the existing Otay Mesa Port of Entry (POE) and the future Otay Mesa East POE. The feasibility study would include the evaluation of potential sites, high-level requirements for constructing and operating TSE facilities, cost estimation, and the identification of next steps.
Project Manager: Elisa Arias
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE
MANDATED COMMITTED EMPHASIS AREA TASK # % OF
EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA SGC NEW BORDER CROSSING/SR
11
1 25 Task Description: Outreach and education.
Product: Regular meetings (COBRO meetings, Borders Committee and/or Transportation Committee)and , presentations at community group meetings and other project stakeholder meetings
RTPA SGC NEW BORDER CROSSING/SR
11
2 30 Task Description: Research and analysis.
Product: Technical memorandum documenting literature review, comparable projects, and available proven technologies
RTPA SGC NEW BORDER CROSSING/SR
11
3 25 Task Description: Conduct feasibility study.
Product: Technical memorandum documenting site evaluation, cost-benefit analysis and potential operational issues
RTPA SGC NEW BORDER CROSSING/SR
11
4 20 Task Description: Final report and presentations.
Product: Draft report and final report
5-16
PROGRAM WORK ELEMENT: G0009 TITLE: DEVELOPING MULTI-MODAL LEVEL OF SERVICE STANDARDS FOR SMART GROWTH AREAS AND INCORPORATING STANDARDS INTO REGIONAL PLANNING TOOLS
FY 2009 BUDGET: $375,000 STRATEGIC GOAL: ENCOURAGE QUALITY OF LIFE IMPROVEMENTS
OBJECTIVE
In developing tools to help jurisdictions participate in implementing SANDAG’s blueprint plan, SANDAG is preparing Smart Growth Trip Generation and Parking Demand Guidelines for the San Diego region. This grant would fund three related, follow-on activities to further facilitate smart growth among local jurisdictions and encourage the use of alternative modes of transportation: (1) dissemination of the guidelines; (2) development of multimodal level of service (LOS) standards; and (3) field-testing of the multi-modal LOS standards in one to three neighborhood corridor improvement projects in the San Diego region.
Project Manager: Christine Eary
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE
MANDATED COMMITTED EMPHASIS AREA TASK # % OF
EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA SGC SMART GROWTH
PLANNING
1 5 Task Description: Distribute guidelines document and contact associations.
Product: Copy of mailing list and sample e-mail
RTPA SGC SMART GROWTH
PLANNING
2 5 Task Description: Develop timeline and meeting schedule and assemble internal review group.
Product: Timeline and meeting schedule and list of group members
RTPA SGC SMART GROWTH
PLANNING
3 5 Task Description: Assemble project working group, ID needs assessment study areas, and needs assessment.
Product: List of group members, list of study areas, and needs assessment report
RTPA SGC SMART GROWTH
PLANNING
4 5 Task Description: Research other regions.
Product: List of regions studied
RTPA SGC SMART GROWTH
PLANNING
5 5 Task Description: Produce report.
Product: Summary report
RTPA SGC SMART GROWTH
PLANNING
6 10 Task Description: Draft standards.
Product: Standards draft
RTPA SGC SMART GROWTH
PLANNING
7 10 Task Description: Vet and finalize standards.
Product: Staff reports and PPTs, final standards
RTPA SGC SMART GROWTH
PLANNING
8 10 Task Description: Draft proposal.
Product: Proposal draft
RTPA SGC SMART GROWTH
PLANNING
9 10 Task Description: Vet and finalize proposal and ID field-test projects.
Product: Staff reports and PPTs, final proposal, and list of projects
5-17
LEVEL OF MANDATE
MANDATED COMMITTED EMPHASIS AREA TASK # % OF
EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA SGC SMART GROWTH
PLANNING
11 5 Task Description: Evaluate multi-modal LOS.
Product: Draft report and final report
RTPA SGC SMART GROWTH
PLANNING
12 10 Task Description: Test at workshops and seek community input.
Product: PPTs and handouts
RTPA SGC SMART GROWTH
PLANNING
13 5 Task Description: Draft guidelines.
Product: Guidelines document
RTPA SGC SMART GROWTH
PLANNING
14 5 Task Description: Draft manual and vet and finalize manual.
Product: Manual draft and staff reports and final manual
RTPA SGC SMART GROWTH
PLANNING
15 5 Task Description: Final manual and printing and ID next steps.
Product: Final manual and action plan
RTPA SGC SMART GROWTH
PLANNING
17 5 Task Description: Final product to Caltrans.
Product: Hard and electronic copies in one Word/Excel document to the Caltrans contract manager
5-18
PROGRAM WORK ELEMENT: G00010 TITLE: GET ON BOARD WITH COMPASS CARD: EXPANDING OPTIONS FOR UNDERSERVED COMMUNITIES
FY 2009 BUDGET: $200,000 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objective of this work element is to build awareness of the Compass Card by promoting reduced fare options and to increase its use. SANDAG proposes to conduct a targeted outreach, marketing, and advertising effort with low-income, minority, disabled, elderly, Native American, and other underrepresented communities. This grant funding will help SANDAG to work with key community-based organizations that are involved with providing services and assistance to the underrepresented communities listed above.
Project Manager: Anne Steinberger
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE
MANDATED COMMITTED EMPHASIS AREA TASK # % OF
EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA SGC TDM 1 10 Task Description: Develop a public outreach program,secure participation, hold meetings, and finalize a plan to review with stakeholders.
Product: Meeting agendas and minutes and public outreach plan
RTPA SGC TDM 2 10 Task Description: Secure assistance from community-based organizations and hold advanced leadership training.
Product : Attendee numbers on monthly invoices
RTPA SGC TDM 3 10 Task Description: Organize and conduct community workshops.
Product: Attendee numbers on monthly invoices
RTPA SGC TDM 4 20 Task Description: Develop and implement public awareness campaign (PSA_.
Product: PSA, press release, news article, media list, Web links
RTPA SGC TDM 5 10 Task Description: Develop and implement marketing and advertising program.
Product: Copies of collateral including posters, advertisements, scripts, and other materials
RTPA SGC TDM 6 20 Task Description: Focus groups and analysis.
Product: Copy of focus group reports and other analysis
RTPA SGC TDM 7 10 Task Description: Draft report.
Product: Copy of draft report
RTPA SGC TDM 8 10 Task Description: Project management and final product.
Product: Final report
5-19
PROGRAM WORK ELEMENT: G00011 TITLE: SAN DIEGO REGIONAL 511 SPANISH PHONE SYSTEM
FY 2009 BUDGET: $278,000 STRATEGIC GOAL: IMPROVE MOBILITY
OBJECTIVE
The objective of this work element is to address the issue of emergency information access to Spanish-speaking residents in the San Diego region, SANDAG will use this funding to create a Spanish language complement to the English phone version of the SANDAG 511 Advanced Traveler Information Service(ATIS) .
Project Manager: Thomas Bruccoleri
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE
MANDATED COMMITTED EMPHASIS AREA TASK # % OF
EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA SGC TDM 1 10 Task Description: Develop a detailed list of all commands and phrases that will be needed in Spanish.
Product: Documentation outlining all Spanish language commands and phrases that will be needed
RTPA SGC TDM 2 10 Task Description: Telvent Farradyne will conduct competitive procurement for Spanish language persona.
Product: Supply SANDAG with procurement documentation and reporting
RTPA SGC TDM 3 5 Task Description: Contract with Spanish language persona.
Product: Telvent contract with agreed-upon persona
RTPA SGC TDM 4 5 Task Description: Completed recording session with persona.
Product: Notice of completion from contractor
RTPA SGC TDM 5 10 Task Description: Detailed schedule for releasing and testing new 511 ATIS Spanish phone functionality.
Product: Release schedule
RTPA SGC TDM 6 15 Task Description: Testing plan.
Product: Testing plan documentation
RTPA SGC TDM 7 15 Task Description: 511 ATIS Spanish language approval from SANDAG and approval of test plan.
Product: Signed contract by SANDAG
RTPA SGC TDM 8 20 Task Description: SANDAG and 511 ATIS contractor will evaluate the launch of new feature.
Product: Launch plan documentation
RTPA SGC TDM 9 10 Task Description: 511 ATIS contractor will conduct Spanish language tuning.
Product: Report identifying problems and solutions
5-20
PROGRAM WORK ELEMENT: G00012 TITLE: HEALTH EQUITY BY DESIGN
FY 2009 BUDGET: $281,743 STRATEGIC GOAL: QUALITY OF LIFE IMPROVEMENTS
OBJECTIVE
The objective of this work element is to gain health equity in underserved neighborhoods through community-driven, transit-oriented neighborhood development. SANDAG, in association with Walk SanDiego, the County of San Diego Public Health Services (PHS), and the Reduce and Eliminate Health Disparities Initiative (REHDI), will lead Health Equity by Design in the low-income, minority communities of City Heights and Barrio Logan.
Project Manager: Stephan Vance
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE
MANDATED COMMITTED EMPHASIS AREA TASK # % OF
EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA SGC SMART GROWTH
PLANNING
1 5 Task Description: Recruit/hire HED Coordinator.
Product: Copy of monthly progress reports
RTPA SGC SMART GROWTH
PLANNING
2 10 Task Description: Convene HED Project Team.
Product: Project administrationand meeting agendas
RTPA SGC SMART GROWTH
PLANNING
3 10 Task Description: Recruit neighborhood health advocates.
Product: Participation in three or more trainings and meetings per year
RTPA SGC SMART GROWTH
PLANNING
4 10 Task Description: Technical assistance/consultants and development of neighborhood action packs: maps, checklists, and tools.
Product: Copy of health-indicator map, asset map, disease-specific checklist, and appraisal tool
RTPA SGC SMART GROWTH
PLANNING
5 10 Task Description: Development of policy paper.
Product: Copy of policy paper
RTPA SGC SMART GROWTH
PLANNING
6 10 Task Description: Neighborhood presentations.
Product: Twenty neighborhood presentations: tally of attendees and feedback
RTPA SGC SMART GROWTH
PLANNING
7 5 Task Description: Local media outreach.
Product: Copy PSA, list of media contacted, and copy of educational newsletters
RTPA SGC SMART GROWTH
PLANNING
8 5 Task Description: Trainings.
Product: Six Trainings: agenda, attendees, and evaluations
RTPA SGC SMART GROWTH
PLANNING
9 5 Task Description: Neighborhood rorum.
Product: Two neighborhood forums: agenda
RTPA SGC SMART GROWTH
PLANNING
10 10 Task Description: Health equity blueprint development and presentations.
Product: Copy of CH/BL health equity blueprints and list of presentations
5-21
LEVEL OF MANDATE
MANDATED COMMITTED EMPHASIS AREA TASK # % OF
EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA SGC SMART GROWTH
PLANNING
11 10 Task Description: Develop evaluation plan, instruments, participatory evaluation process, and evaluation report
Product: Evaluation plan, instruments, completed surveys/resident input,and evaluation report
RTPA SGC SMART GROWTH
PLANNING
12 5 Task Description: Community information exchange.
Product: Requesting member/organization and mode of info exchange
RTPA SGC SMART GROWTH
PLANNING
13 5 Task Description: Final product to Caltrans
Product: Final report
5-22
PROGRAM WORK ELEMENT: G00013 TITLE: (REGIONAL TRANSPORTATION MODEL ENHANCEMENTS: MICRO-SIMULATION APPROACH TO TRIP GENERATION FOR TRANSIT EQUITY ANALYSIS
FY 2009 BUDGET: $338,868 STRATEGIC GOAL: IMPROVE MOBILITY
The objective of this work element is to enhance the current San Diego Regional Transportation Model by developing a new modeling method for the generation of trips. This new method is a micro-simulation approach to model individual daily travel patterns. Project components would include: (1) processing of transit onboard and household travel surveys, (2) population synthesizer model development, (3) daily travel pattern generation program, and (4) household level transit accessibility programs.
Project Manager: Wu Sun
PRODUCTS, TASKS, AND SCHEDULES
LEVEL OF MANDATE
MANDATED COMMITTED EMPHASIS AREA TASK # % OF
EFFORT TASK DESCRIPTION / PRODUCT / SCHEDULE
RTPA SGC MODELING 1 20 Task Description: Preparation and research.
Product: Written copy of technical memo, source codes, and user guides
RTPA SGC MODELING 2 10 Task Description: Data drocessing.
Product: ArcGIS network file, tour tables in ASCII format;, and written copy of transit onboard design
RTPA SGC MODELING 3 20 Task Description: Population synthesizer development.
Product : Improved source codes in JAR format, written copy of software design documents, and households and persons tables in ASCII format
RTPA SGC MODELING 4 15 Task Description: Daily travel activity pattern modeling.
Product: Written copy of design documents
RTPA SGC MODELING 5 15 Task Description: Trip generation enhancement to current four-step model.
Product: Written copy of design documents and production and attraction tables
RTPA SGC MODELING 6 15 Task Description: Calibration and validation.
Product: Written copy of estimation and validation reports
RTPA SGC MODELING 7 5 Task Description: Administration/coordination.
Product: Final reports
CHAPTER 6
CERTIFICATIONS/ASSURANCES AND RESOLUTION
6-1
APPENDIX A FHWA Metropolitan Transportation Planning Process Certification
FHWA and FTA require MPOs to annually self-certify their planning process. Fully executed versions of the FHWA and FTA certifications must be provided with each adopted, Final OWP. FHWA Metropolitan Transportation Planning Process Certification In accordance with 23 CFR 450.334 and 450.220, Caltrans and San Diego Association of Governments (SANDAG), Metropolitan Planning Organization for the San Diego urbanized area(s) hereby certify that the transportation planning process is addressing the major issues in the metropolitan planning area and is being conducted in accordance with all applicable requirements of: I. 23 U.S.C. 134 and 135, 49 U.S.C. 5303 through 5306 and 5323(1); as amended by the
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users; II. Sections 174 and 176 (c) and (d) of the Clean Air Act as amended (42 U.S.C. 7504, 7506
(c) and (d)) (Note – only for Metropolitan Planning Organizations with non-attainment and/or maintenance areas within the metropolitan planning area boundary);
III. Title VI of the Civil Rights Act of 1964 and the Title VI Assurance executed by California
under 23 U.S.C. 324 and 29 U.S.C. 794; IV. Section 1101(b) of the Transportation Equity Act for the 21st Century (Pub. L. 105-178
112 Stat. 107) regarding the involvement of disadvantaged business enterprises in the FHWA and FTA funded projects (FR Vol. 64 No. 21, 49 CFR part 26); and,
V. The provision of the Americans With Disabilities Act of 1990 (Pub. L. 101-336, 104 Stat
327, as amended) and the U.S. DOT implementing regulations (49 CFR 27, 37 and 38).
__________________________ ____________________________ MPO Authorizing Signature Caltrans District Approval Signature
__________________________ ____________________________ Title Title __________________________ ____________________________ Date Date
6-2
APPENDIX B FTA Certifications and Assurances
6-3
6-4
APPENDIX C California Department of Transportation
Debarment and Suspension Certification for Fiscal Year 2008/2009 As required by U.S. DOT regulations on governmentwide Debarment and Suspension
(Nonprocurement), 49 CFR 29.100: 1) The Applicant certifies, to the best of its knowledge and belief, that it and its
contractors, subcontractors and subrecipients: a) Are not presently debarred, suspended, proposed for debarment, declared
ineligible, or voluntarily excluded from covered transactions by any Federal department or agency;
b) Have not, within the three (3) year period preceding this certification, been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, state, or local) transaction or contract under a public transaction, violation of Federal or state antitrust statutes, or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property;
c) Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, state, or local) with commission of any of the offenses listed in subparagraph (1)(b) of this certification; and
d) Have not, within the three (3) year period preceding this certification, had one or more public transactions (Federal, state, and local) terminated for cause or default.
2) The Applicant also certifies that, if Applicant later becomes aware of any information contradicting the statements of paragraph (1) above, it will promptly provide that information to the State.
3) If the Applicant is unable to certify to all statements in paragraphs (1) and (2) of this certification, through those means available to Applicant, including the General Services Administration’s Excluded Parties List System (EPLS), Applicant shall indicate so in its applications, or in the transmittal letter or message accompanying its annual certifications and assurances, and will provide a written explanation to the State.
DEPARTMENT OF TRANSPORTATION DEBARMENT AND SUSPENSION CERTIFICATION
FISCAL YEAR 2008/2009 SIGNATURE PAGE
In signing this document, I declare under penalties of perjury that the foregoing certifications and assurances, and any other statements made by me on behalf of the Applicant are true and correct. Signature Date Printed Name As the undersigned Attorney for the above named Applicant, I hereby affirm to the Applicant that it has the authority under state and local law to make and comply with the certifications
6-5
and assurances as indicated on the foregoing pages. I further affirm that, in my opinion, these certifications and assurances have been legally made and constitute legal and binding obligations of the Applicant. I further affirm to the Applicant that, to the best of my knowledge, there is no legislation or litigation pending or imminent that might adversely affect the validity of these certifications and assurances or of the performance of the described project.
AFFIRMATION OF APPLICANT’S ATTORNEY
For (Name of Applicant) Signature Date Printed Name of Applicant’s Attorney taxation.
CHAPTER 7
REGIONALLY SIGNIFICANT TRANSPORTATION PLANNING
BY OTHER AGENCIES
7-1
REGIONALLY SIGNIFICANT TRANSPORTATION PLANNING BY OTHER AGENCIES
INTRODUCTION
This chapter describes the regionally significant transportation and transportation/air quality planning to be undertaken in accordance with the federal transportation planning regulations (23 CFR Part 450.314).
7-2
(Insert blank page) (Insert blank page)
[THIS PAGE INTENTIONALLY LEFT BLANK]
FY 2008/2009 Planning Activities Within The SANDAG Region – Information Element
7-37-3
Activity Description Funding
Type Cost in $1,000s Product(s)
Due Date Comments
Administration of Federal and State Planning Funds in the Region
Various Overall Work Program (OWP) development
OWP budget
OWP amendments and reimbursement vouchers OWP consistent with State and Federal planning emphasis areas
Ongoing The San Diego Association of Governments (SANDAG) and Caltrans contract administration
Advanced Transportation Technology
Federal Highway
Administra-tion (FHWA), SP&R, Local
Coordinate roll-out of Transportation Management System (TMS) Plan Master Plan initiatives
Planning liaison to Southern California fare collection system activities and intelligent transportation system (ITS) statewide efforts
TSM-related activities including changeable message signs, closed-circuit television on major corridors, and regional traffic manage-ment center
Ongoing Caltrans District 8 and Transit Agencies
Air Quality Coordination Conformity Working Groups
SP&R Regional Transportation Plan (RTP), Regional Transportation Improvement Program (RTIP) and project-level conformity determinations and interagency consultation
Varies Caltrans, SANDAG, SDAPCD, Environmental Protection Agency (EPA) EPA, FHWA, Federal Transit Administration (FTA)
Bi-National Transportation Studies
SP&R Ongoing Caltrans, SANDAG, local agencies of California, and Baja California
Bi-State Technical Transportation Advisory Committee (BTTAC)
SP&R Coordination and technical advice Ongoing Caltrans, SANDAG, county of San Diego, Calexico, SAHOPE, and five muni-cipalities in Baja
California/Baja Transportation Development Program (Technology Exchange)
FHWA, SP&R Train Mexican transportation agency engineers on California transportation technology
Ongoing FHWA, Caltrans, SANDAG, County of San Diego, Calexico, Secretaria de Infrastructura y Desarrollo Urbano Estatal (SIDUE), and five municipalities in Baja
Caltrans District 8-11 Coopera-tive I-15 County Line Study
A coordinated plan to handle short- and-long term transportation issues in the county line section of Interstate 15
Ongoing Caltrans Districts 8 and 11
Congestion Management Program (CMP) Update
SP&R Participation in development of CMP update policy Bi-annual Caltrans, SANDAG, and local agencies
FY 2008/2009 Planning Activities Within The SANDAG Region – Information Element
7-47-4
Activity Description Funding
Type Cost in $1,000s Product(s)
Due Date Comments
CMP Data and Analysis SP&R Level of service (LOS) calculations on state roadways Bi-annual
in June Req. Statues of 1994, Chp 1146 (AB 1963) Caltrans, and SANDAG
Coordinate Americans with Disabilities Act (ADA) Require-ments
Curb cuts to conform with ADA requirements Ongoing
Coordinate District's Community Planning Program, and Monitor Community-Based Transporta-tion Planning Grant
SHA Project delivery more consistent with community values
Grants in support of livable community
Ongoing Caltrans, SANDAG, and local agencies
Coordinate the Review, Distri-bution, and Evaluation of the Regional Transportation Plan (RTP), Federal Transportation Improvement Program (FTIP), Regional Transportation Improvement Program (RTIP) and Overall Work Program (OWP)
SP&R Accurate and coordinated regional planning documents 7/1/08 to 6/30/09
Corridor Analysis Varies Compatible regional plans and identified transportation corridors Ongoing Caltrans, cities, and
SANDAG Corridor Preservation State Route (SR) 11/Tijuana 2000 corridor 7/08 to
6/09 SANDAG, state of Baja California, county of San Diego, and Caltrans
Environmental Impact Report/Environmental Impact Statement (EIR/EIS) and Cat Ex Preparation for Highway Reports
Capital Outlay
Program
EIR/EIS and Cat Ex Ongoing
Federal Transportation Administration (FTA) (5311) (5310) (5316) (5317) Grant Programs
FTA Agreements to purchase vehicles and provide operating assistance Ongoing
Geographic Information System (GIS) and Binational Traffic Model Development
SP&R local Implementation of GIS and binational model in cooperation with SANDAG and Baja California agencies
Ongoing Caltrans, SANDAG, and local jurisdictions
FY 2008/2009 Planning Activities Within The SANDAG Region – Information Element
7-57-5
Activity Description Funding
Type Cost in $1,000s Product(s)
Due Date Comments
Goods Movement Planning SP&R Coordination and participation in various goods movement
planning activities Ongoing Caltrans District 11,
SANDAG, and Caltrans headquarters (HQ)
Intergovernmental Review/ California Environmental Equity Act (IGR/CEQA) Development Review Activities
SP&R Identification of impacts to Caltrans facilities and determination of mitigation
Ongoing
Intermodal Transportation Management System (ITMS) Planning Tool
SP&R Relational database and GIS planning tool update Ongoing Caltrans and SANDAG
ITMS Freight Model Assignment ITMS/
SP&R A statewide freight assignment for ITMS Ongoing Ongoing joint effort with
Caltrans HQ ITS Southern California Priority Corridor and Strategic Plan
FHWA, SP&R, Local
ITS priority corridor and strategic plan Ongoing SANDAG and Caltrans
Micro-simulation Modeling Pilot Study
SP&R Micro-simulation model of SR 163/Friars Road interchange Early Action Program (EAP) project corridors
Ongoing SANDAG and Caltrans
Monitor, Evaluate and Plan for Park and Ride (P&R) Lots
Highway project set-asides, lease agreement for P&Rs operating vanpools
Ongoing
Monitor, Evaluate, and Coordinate SANDAG's Policy and Technical Committees for OWP consistency and metropolitan planning agency (MPO) certifica-tion
SP&R Performance for 3C Process Ongoing
Non-motorized Bicycle and Pedestrian Planning
Transnet/ TDA
Bicycle coordination and planning Ongoing Caltrans, cities, and county
Participate in or Conduct Major Investment Studies/Corridor Studies
SR 54 corridor study
SR 76 East
Coronado Tunnel SR 75/252
I-805 corridor study
San Diego North/South Transportation Facilities study
South I-5
Ongoing
FY 2008/2009 Planning Activities Within The SANDAG Region – Information Element
7-67-6
Activity Description Funding
Type Cost in $1,000s Product(s)
Due Date Comments
Perform Regional Traffic and Occupancy Counts
Varies Varies Regional traffic count reports and occupancy counts reports As needed Caltrans and SANDAG
Prepare Transportation Concept Summaries
SP&R Transportation concept summaries/fact sheets for all state highways in the region
Ongoing Update each concept on an annual basis; completion of summaries spread out on a quarterly basis
Prepare Corridor System Management Plans (CSMPs)
CSMPs for I-5, I-15, and I-805 6/30/09 Caltrans District 11, Caltrans HQ, SANDAG, and consultants
Project Study Reports/Project Reports
Capital Outlay
Program
I-5 North Coast
I-15 Sorrento/Genesee
I-15 Managed Lanes, I-5/8 add lane/widen connector
SR 54/125 add high occupancy vehicle (HOV) lanes
SR 67 corridor
Regional Bottleneck Study
I-5/SR 78 revise interchange
SR 94 capacity enhancement
SR 56 add HOV lanes
I-5/SR 56 freeway interchange
SR76 widening
Ongoing
Regional Comprehensive Plan (RCP) Implementation
Publications and materials for public outreach meetings/workshops
Implementation of the RCP
Periodic RCP newsletters
Ongoing SANDAG
Regional Transportation Performance Monitoring
TBA TBA Vehicle speed and travel time studies to help monitor system performance
Ongoing Caltrans District 11, Caltrans headquarters, and SANDAG
Regional Vehicle Occupancy and Classification Counts
Various 50-75 A report by SANDAG in collaboration with Caltrans D11 docu-menting the counts and methodology.
Ongoing SANDAG, Caltrans, and consultant
SANDAG Truck Model-Develop Heavy-Duty Truck Component for San Diego Regional Model
TBA TBA Heavy-duty truck component for regional model Ongoing Ongoing joint effort with SANDAG
SB 580 Review SP&R Review document for public mass transit guideway projects Ongoing
FY 2008/2009 Planning Activities Within The SANDAG Region – Information Element
7-77-7
Activity Description Funding
Type Cost in $1,000s Product(s)
Due Date Comments
Statewide Integrated Travel Model
TSI/ SP&R
A statewide multimodal travel model Ongoing Ongoing joint effort with Caltrans HQ
Transit Capital Program Bond funds,
TP&D, SHA, TCRP
Varies Master agreements/supplements Ongoing
Tribal Government Involvement in Regional Planning
Various Various Strengthen government-to-government relations Ongoing Caltrans, tribal governments, and SANDAG
U.S./Mexico Joint Working Committee (JWC)
FHWA SP&R
Coordination and participation Ongoing Ten U.S. and Mexican border states and U.S./Mexico federal transportation agencies
Update Functional Classification SP&R Database As needed Caltrans, SANDAG, and
local agencies Update Maintained Mileage SP&R Certify mileage of maintained county roads Ongoing Caltrans and local agencies Update National Highway System
SP&R Database As needed
Update Urban Boundaries SP&R Submit revisions to Caltrans HQ Yearly Caltrans and local agencies Palm Avenue Commercial Corridor Master Plan
CBTP 188 The plan is to develop and identify specific, mixed-use, commercial, and retail development opportunities through the master plan
2/28/09 City of Imperial Beach Redevelopment Agency, Jerry Sewlby, Redevelop-ment Coordinator, Caltrans contract administration
Improving Safety and Mobility Across Freeways for All Users in La Mesa
CBTP 85 This project is aimed at improving pedestrian, bicycle and motor vehicle connections across two freeways, I-8 and SR 125
2/28/09 City of La Mesa, local government commission, and Caltrans contract administration
Pershing and Upas Corridor Pedestrian and Transportation Enhancement Study
CBTP 188 This study is to achieve community consensus on the design of traffic-calming measures and bicycle, parking, and pedestrian improvements in the community of North Park
2/28/09 City of San Diego, Greater North Park Community Planning Committee, and Caltrans contract admin-istration
FY 2008/2009 Planning Activities Within The SANDAG Region – Information Element
7-87-8
Activity Description Funding
Type Cost in $1,000s Product(s)
Due Date Comments
To Educate the Hispanic Communities on New SPRINTER Line
EJ 100 Hire a Spanish-speaking educator to give direction in regard to the SPRINTER rail line
2/28/09 North County Transit District (NCTD) and Caltrans contract admini-stration
Access to Community Medical Transportation Services Planning Project
EJ 169 This project is designed to identify the cause and effect of utilizing emergency transportation and associated vehicles, as well as emergency medical technicians and medical equipment in situations that are considered to be non-emergency trips
2/28/09 SANDAG, All Congre-gations Together, and Caltrans contract admini-stration
Freeway Transit Lane Monitoring Program
FTA 5313(b) 169 This program will monitor and evaluate the use of freeway transit-only lanes as a priority measure to bypass traffic congestion
6/30/09 SANDAG and Caltrans contract administration
Identifying Crime Patterns at Transit Stations
FTA 5313(b) 125 This study will provide valuable insight into the types of crime and crime patterns surrounding the regional transit system
6/30/10 SANDAG and Caltrans contract administration
Implementing Early Action Strategies in the Otay Mesa-Mesa de Otay
FHWA Partnership
300 This project is to begin implementation of strategies identified in the Binational Corridor Strategic Plan to address crossborder travel demand
6/30/10 SANDAG and Caltrans contract administration
San Diego Regional Bicycle Master Plan
CBTP 200 This project will be a component of the SANDAG RTP; a plan that is regional in focus and concentrates on broader policies and programs, while providing a framework for local decision-makers to determine specific local routes and facilities
2/28/09 SANDAG and Caltrans contract administration
Border Master Plan SP&R/CBI 286 California/Baja California binational agency port of entry and
transportation plan 2/28/09 SANDAG, Caltrans, SIDUE,
Customs and Border Patrol, FHWA, General Services Administration, OVAG, county of San Diego, city of San Diego, city of Calexico, Mexican Customs, INDAABIN, SCT, Instituto Municipal de Planeación, IMIP, SEDESOL, and Municipality of Tijuana
San Diego-Imperial County I-8 Corridor Strategic Plan
SP&R 240 This plan will address issues of common concern that affect transportation and its effects on economic development, housing, environmentally sensitive lands, and other planning-related issues between these two regions
2/28/09 SANDAG, Imperial Valley Association of Govern-ments and Caltrans contract administration
FY 2008/2009 Planning Activities Within The SANDAG Region – Information Element
7-97-9
Activity Description Funding
Type Cost in $1,000s Product(s)
Due Date Comments
Short Distance Vanpool Feasibility Study
FTA 5304 169 This study would evaluate the feasibility, efficiency, and effectiveness of using short-distance vanpools in conjunction with bus rapid transit , commuter rail, and other express transit services
6/30/10 SANDAG, Metropolitan Transit System (MTS), and Caltrans contract administration
Tribal Transportation Demand Management (TDM) Outreach Program
EJ 220 This program will partner with the Reservation Transportation Authority (RTA) to strengthen the participation of tribal nations in the San Diego region in SANDAG's TDM program
2/28/09 SANDAG, RTA, and Caltrans contract administration
Global Gateway Intermodal Access Improvements Project
FHWA Partnership
313 This study is to identify the essential access and infrastructure necessary to link the San Diego Unified Port District marine cargo terminals to the regional transportation network
6/30/09 SANDAG, San Diego Unified Port District, and Caltrans contract administration
San Diego Transit Planning Internship Program
FTA 5304 56 This proposal would provide for a collaborative project among San Diego State University (SDSU) and SANDAG to staff and train up to three interns in transit planning in a joint agency context
6/30/09 SANDAG, SDSU, and Caltrans contract administration
Hillcrest Corridor Bus Rapid Transit Planning and Conceptual
FTA 5304 149 The conceptual design study will build upon a community-led, traffic-calming study that recommends restricted-use transit lanes
6/30/09 SANDAG, Uptown Partnership, Inc., and Caltrans contract administration
San Diego Station Car Pilot Program Study Phase 2
FTA 5304 117 This study will serve as the basis for implementation of a two-year demonstration
It will measure the market demand for such a service and outline the material and personnel necessary to implement the program
Ongoing SANDAG and Caltrans contract administration
Kids Walk to School – Phase II CBTP 303 The final report will include a phasing plan for implementation and
will indicate how facilities should be phased to coordinate with: (1) planned and potential land uses; and (2) existing facilities, and each phase will indicate what is required in terms of capital, construction, service plan, and how the various components will be built up to achieve full implementation
2/28/10 City of Chula Vista, and Caltrans contract admini-stration
Rosecrans Corridor Study CBTP 375 The projects from a list of proposed improvements will be
evaluated by staff from different City departments for their respective costs, benefits, and feasibility.
They will be ranked and presented to the North Bay/Peninsula Traffic Task Force for their consideration
The selected traffic, bicycle, pedestrian, and transit access improvements will be included in the next update of the transportation elements of Midway and Peninsula Community Plans through appropriate plan amendment processes
2/28/10 City of San Diego and Caltrans contract admini-stration
FY 2008/2009 Planning Activities Within The SANDAG Region – Information Element
7-107-10
Activity Description Funding
Type Cost in $1,000s Product(s)
Due Date Comments
Barrio Logan Community Plan Update/Transportation Planning
EJ 278 Comprehensive update of the Barrio Logan/Harbor Community Plan, zoning program, and redevelopment plan amendment
2/28/10 City of San Diego and Caltrans contract admini-stration
City Heights Walks to School EJ 143 Outreach to parents, children, officials, community stakeholders,
and residents to plan for safe routes to schools in City Heights revolving around National Walk to School Day Events in October
2/28/10 SANDAG and Caltrans contract administration
Results of Market-Based Planning of the Comprehensive Operational Analysis
FTA 5304 110 To evaluate the effectiveness of the Comprehensive Operational Analysis based on the market research principles to answer a variety of questions
6/30/11 SANDAG and Caltrans contract administration
San Diego-Riverside Interregional Transit, Vanpool, and Bus pool Study
FTA 5304 125 This study aims at improving interregional transportation alternatives and increasing transit rider ship
It would fund research into determining origins and destinations of interregional commutes between Riverside and San Diego counties, analyze the data, and design effective alternatives to single-occupancy driving patterns by recommending vanpool, bus pool, bus rapid transit or other rideshare options for the interregional fleet
6/30/11 SANDAG and Caltrans contract administration
San Diego Transit Planning Internship Program
FTA 5304 56 This proposal would provide for a collaborative project among SDSU and SANDAG to staff and train up to three interns in transit planning in a joint agency context
6/30/11 SANDAG and Caltrans contract administration
Implementation of San Diego Regional Plan Phase 1
Blueprint 512 Phase 1 of this plan would focus on urban design and financing the Integrated Regional Infrastructure Strategy
6/30/08 SANDAG and Caltrans contract administration
Implementation of San Diego Regional Plan Phase 2
Blueprint 250 Phase 2 of this plan would focus on implement the actions contained in the RCP
The three key implementation strategies are modeling enhance-ment, improving mobility, and performance monitoring
6/30/09 SANDAG and Caltrans contract administration
Implementation of San Diego Regional Plan Phase 3
Blueprint 250 Phase 3 of this plan would develop a comprehensive "Quality of Life" funding program to address unfunded regional transportation and other infrastructure necessary to realize the RCP vision
TBD after grant award
SANDAG and Caltrans contract administration
San Ysidro Mobility Plan TPSS/CBTP 150 This plan would conduct a feasibility analysis and refine the
concepts developed in the San Ysidro Mobility Plan Phase 1 for traffic circulation, transit, bicycle, pedestrian, and parking improvement measures for San Ysidro by performing detailed multimodal and feasibility analyses, evaluating alternatives, developing refined concept plans
2/28/10 City of San Diego, San Ysidro Transportation Collaborative, and Caltrans
FY 2008/2009 Planning Activities Within The SANDAG Region – Information Element
7-117-11
Activity Description Funding
Type Cost in $1,000s Product(s)
Due Date Comments
Transit-Oriented Development Community Facilities District
TPSS/CBTP 100 Developing an institutional funding mechanism to implement smart growth outcomes to increase transit rider ship and reduce develop-ment costs and traffic impacts
2/28/10 NCTD, Caltrans, SANDAG, and city of San Marcos
I-805 Corridor System Management Plan
PTA 1,000
This plan would provide on unified concept for managing, operating, improving, and preserving a corridor across all modes and jurisdictions for highest productivity, mobility, reliability, accessibility, safety, and preservation outcomes
3/01/10 SANDAG and Caltrans contract administration
Performance Monitoring System (PeMS) Arterial Detection Systems Evaluation and Inte-gration
Fed/PTA 300 To perform a systems evaluations report of existing detection systems used for arterial data collections in the San Diego region
3/01/10 SANDAG and Caltrans contract administration
Follow-on Activities from the Smart Growth Trip Generation and Parking Demand Guide-lines: Developing Multimodal Level of Service Standards for Smart Growth Areas and Incorporating Standards into Regional Planning Tools
CBTP 375 Dissemination of the guidelines to local jurisdictions and national planning associations
Development of multimodal LOS standards and analysis of how they can facilitate smart growth and reduction of automobile dependency in the region
Field testing of the multimodal LOS standards.
TBD after grant award
SANDAG and Caltrans contract administration
Making Key Trail Connections in the Rose Creek Watershed
CBTP 263 Implement key bicycle and pedestrian connections in the Rose Creek Watershed Opportunities Assessment
TBD after grant award
SANDAG and Caltrans contract administration
Uptown Community Plan Mobility Element Study
CBTP 700 To achieve community consensus on the Uptown Community Plan Mobility Element that will include developing policies and recommended projects to achieve a balanced, multimodal plan for motor vehicle traffic, transit , bicycles, pedestrians, and parking in the principal corridors of the Uptown community planning area
TBD after grant award
SANDAG and Caltrans contract administration
Downtown/Santa Fe Corridor Transportation Connectivity Study
CBTP 260 This study will serve as a vital tool for the City to develop a comprehensive framework in which to efficiently maximize linkages between Vista's new public transportation hubs, mixed-use, and transit-oriented developments, pedestrian and bicycling pathways, downtown, the Vista Village entertainment and retail complex, and a new civic center
TBD after grant award
City of Vista and Caltrans contract administration
FY 2008/2009 Planning Activities Within The SANDAG Region – Information Element
7-127-12
Activity Description Funding
Type Cost in $1,000s Product(s)
Due Date Comments
Feasibility of Implementing Truck Stop Electrification at San Diego – Tijuana Ports of Entry
FHWA Partnership
250 In the fall of 2007, the SANDAG Board of Directors and the city of Tijuana approved the Otay Mesa-Mesa de Otay Binational Corridor Strategic Plan, the region’s first binational strategic plan
One section of the plan addresses air quality concerns in the border region; truck stop electrification is one of the strategies to eliminate unnecessary truck idling at the Otay Mesa Port of Entry
The elimination of excessive engine idling reduces fuel consump-tion, harmful greenhouse gas emissions, and population exposure to diesel particulate matter
TBD after grant award
SANDAG and Caltrans contract administration
Integrated Transit Timetables and Customer Information at Rail Stations
FHWA Partnership
220 This project will integrate rail timetables and provide better information to customers at the station, on the Web, and onboard
Products include an existing conditions report, integrated rail schedule, monitoring and maintenance plan, customer information improvement plan, and a final project report.
TBD after grant award
SANDAG and Caltrans contract administration
San Diego Transit Planning Internship Program
FTA 5304 56 This proposal would continue a collaborative project between San Diego State University (SDSU) and the SANDAG to staff and train interns in transit planning in a joint agency context
TBD after grant award
SANDAG and Caltrans contract administration
A Rail Line Runs Through It: Making Transit Work in the City of San Marcos
FTA 5304 100 This project will promote new transit services, 511 Advanced Traveler Information System, and Compass Card
A variety of marketing and advertising messages will be developed, tested, and evaluated to determine what works best with different audiences and use this information to launch similar programs throughout the region to promote transit
The goals of this project are increased transit rider ship, expanded use of 511, and secure additional Compass Card users
TBD after grant award
SANDAG, city of San Marcos, NCTD, California State University San Marcos, Palomar Commu-nity College, major employers, Southern California Tribal Chairman's Association, and Caltrans contract administration
Rural Coordinated Transportation Planning Project
FTA 5304 113 The project will involve the development of a five-year plan, which will promote transit and social service transportation coordination in the rural areas of San Diego County
TBD after grant award
SANDAG and Caltrans contract administration
Improving San Diego and Tijuana Transit Connections
FTA 5304 300 The SANDAG Board of Directors and the city of Tijuana approved the Otay Mesa-Mesa de Otay Binational Corridor Strategic Plan, the region’s first binational strategic plan
A key strategy approved in the strategic plan is to facilitate improve-ments to crossborder and regional public transportation services.
TBD after grant award
SANDAG and Caltrans contract administration
FY 2008/2009 Planning Activities Within The SANDAG Region – Information Element
7-137-13
Activity Description Funding
Type Cost in $1,000s Product(s)
Due Date Comments
Regional Transportation Model Enhancements: Micro-simulation Approach to Trip Generation for Transit Equity Analysis
FTA 5304 339 This project will enhance the current San Diego Regional Trans-portation Model by developing a new modeling method for the generation of trips
This new method is a micro-simulation approach to model individual daily travel patterns
TBD after grant award
SANDAG and Caltrans contract administration
Regional Trip Planner FTA 5304 405 Develop an online commute trip-planning tool that is map- and
text-based and would reside on the San Diego Regional 511 Web site – www.sd511.com
This tool would present a commuter with various trip choices as alternatives to driving alone when planning a trip
The Trip Planner will display all available travel options and use key messaging, such as potential time and cost savings, safety, etc.
TBD after grant award
SANDAG and Caltrans contract administration
San Diego Regional 511 Spanish Phone System
EJ 278 To create a Spanish language complement to the English version of the SANDAG 511 phone service
TBD after grant award
SANDAG and Caltrans contract administration
Get on Board with Compass Card: Expanding Options for Underserved Communities
EJ 200 In an effort to build awareness of the Compass Card, promote reduced fare options, and increase use of the Compass Card, SANDAG proposes to conduct a targeted outreach, marketing, and advertising effort with the regional communities
Their input will help SANDAG develop a meaningful program that resonates with various communities
TBD after grant award
SANDAG, MTS, NCTD, and Caltrans contract administration
Health Equity by Design EJ 282 The goal is to gain health equity in underserved neighborhoods
through community-driven, transit-oriented neighborhood development
Concentration will be in the low-income, minority communities of City Heights and Barrio Logan
TBD after grant award
SANDAG and Caltrans contract administration
CHAPTER 8
ADMINISTRATION AND BOARD BUDGETS
Overview
The budgets shown in this chapter describe the costs of providing administrative services, including staff time, facility rental, travel, and training. These costs are allocated across the OWP and CIP projects costs according to direct hours charged per project. Each year, the allocation method for assigning Administrative costs is reviewed and approved by Caltrans (California Department of Transportation), acting on the behalf of the other federal agencies involved in the SANDAG budget.
The Board Budget shows the costs associated with conducting Board of Directors and related Policy Advisory Committee meetings. As indicated on page 8-5, the Board of Directors budget is funded separately from the OWP with SANDAG member agency assessments and TransNet administrative funds.
8-1
SAN DIEGO ASSOCIATION OF GOVERNMENTSFY 2009 ADMINISTRATION BUDGET
PERSONNEL
Total Agency Salaries & Benefits $20,257,379 $22,835,415 $24,623,949 7.8%
Administrative Salaries & Benefits 4,167,278 $4,416,129 $4,787,737 8% (contained in total salaries number above)
NON-PERSONNEL
Office And Graphics Supplies $195,000 $208,000 $180,000 4% -13%
Postage 90,000 93,600 80,000 2% -15%
Contractual Services 300,000 521,000 452,000 11% -13%
Transportation Allowance 120,000 78,000 54,000 2% -31%
Travel 92,000 93,000 93,000 2% 0%
Meeting & Misc. Expense 59,000 35,000 41,000 1% 17%
Recruitment Expenses - 80,000 70,000 2% -13%
Memberships And Publications 85,000 88,000 87,000 2% -1%
Rent, Facilities 2,172,628 2,417,491 2,452,000 51% 1%
Lease/Purchase/Maintenance, Vehicles 85,000 9,000 25,000 0% 178%
Lease/Purchase/Maintenance, Office Equipment 170,000 103,000 140,000 2% 36%
Insurance 320,000 350,000 227,000 7% -35%
Telecommunications 125,000 140,000 150,000 3% 7%
Training Program 185,000 135,000 111,000 3% -18%
Information Systems - Maintenance & Equipment 470,000 455,000 415,000 10% -9%
Contingency 150,000 150,000 100,000 3% -33%
SUB - TOTAL NON-PERSONNEL $4,618,628 $4,956,091 $4,677,000 105% -6%
LESS: REIMBURSED COSTS (RENT) ($135,828) ($231,116) ($215,000) -5% -7%
TOTAL NON-PERSONNEL COSTS CHARGED TO OH $4,482,800 $4,724,975 $4,462,000 100% -6%
TOTAL ADMINISTRATION BUDGET $8,785,906 $9,141,104 $9,249,737 1%
The Administrative budget is allocated to the OWPand Capital Projects as follows:Salaries and Benefits allocated to OWP Projects 3,116,331 75% 3,362,308 76% 3,550,734 74%
Salaries and Benefits allocated to Capital Projects 1,050,947 25% 1,053,821 24% 1,237,003 26%Total Salaries & Benefits Allocated 4,167,278 100% 4,416,129 100% 4,787,737 100%
Non-Personnel allocated to OWP Projects 3,352,281 75% 3,597,454 76% 3,309,158 74%Non-Personnel allocated to Capital Projects 1,130,519 25% 1,127,521 24% 1,152,842 26%Total Non-Personnel Allocated 4,482,800 100% 4,724,975 100% 4,462,000 100%
FY 2007Budget
FY 2008Budget
AnnualPercentage
Change
% of Non-Personnel
CostsDraft FY 2009
Budget
8-2
SAN DIEGO ASSOCIATION OF GOVERNMENTSFY 2009 ADMINISTRATION BUDGET DETAIL
FY 2008 FY 2009 CHANGE % PRIMARY REASON ACCOUNT TITLE/PURPOSE BUDGET BUDGET AMOUNT CHANGE FOR CHANGE
OFFICE AND GRAPHICS SUPPLIES: $ 208,000 $ 180,000 $ (28,000) -13%
All standard office supplies, forms, paper, materials, etc.
POSTAGE: 93,600 80,000 (13,600) -15%
Annual bulk permits and standard mailing expense
CONTRACTUAL SERVICES: 521,000 452,000 (69,000) -13%
Annual financial audit, temporary clerical help, legal services, Board sound system management, annual support fees for financial system, payroll and HR system processing fees
TRANSPORTATION ALLOWANCE: 78,000 54,000 (24,000) -31%
Parking validations, permits, mileage reimbursement
TRAVEL: 93,000 93,000 0 0% Reflects FY 08 budgeted amount
All staff business travel not specifically charged to projects
MEETING & MISCELLANEOUS EXPENSES: 35,000 41,000 6,000 17%
Business meeting expense, public notices, outreach expenses
RECRUITMENT EXPENSES: 80,000 70,000 (10,000) -13%
Advertising, background checking, candidate travel, relocation
MEMBERSHIPS AND PUBLICATIONS: 88,000 87,000 (1,000) -1%
CALCOG, AMPO, APTA, ASCE, ITE, Bar Assoc. APA, UCLA Symposium and others
RENT, FACILITIES: 2,417,491 2,452,000 34,509 1%
Office lease and maintenance
LEASE/PURCHASE/MAINTENANCE, VEHICLES: 9,000 25,000 16,000 178%
Lease or maintenance of vehicles
LEASE/PURCHASE/MAINTENANCE, OFFICE EQUIP: 103,000 140,000 37,000 36%
Lease or purchase of graphics, word processing, sound system, projection and other equipment
INSURANCE: 350,000 227,000 (123,000) -35%
Blanket bond and general liability insurance
TELECOMMUNICATIONS: 140,000 150,000 10,000 7%
Telephone and voice mail system
TRAINING PROGRAM 135,000 111,000 (24,000) -18%
Professional development, management coaching, departmental training, tuition reimbursement
INFORMATION SYSTEMS 455,000 415,000 (40,000) -9%
Maintenance and Equipment costs
CONTINGENCY 150,000 100,000 (50,000) -33%
NON-PERSONNEL ADMINISTRATIVE EXPENSE $ 4,956,091 $ 4,677,000 $ (279,091) -6%
Less: Reimbursed Costs (Rent) ($231,116) ($215,000) 16,116 -7%
TOTAL NON-PERSONNEL COSTS CHARGED TO OH $ $4,724,975 $4,462,000 (262,975) -6%
Reflects actual experience
Decrease due to drop in advertising expenses budget
Reflects actual experience
Reflects changes in square footage leased: Addition of Suite 302 and drop of Suite 950
Decrease due to drop in cost for office supplies and decreased need for office supplies for new hires
Decrease primarily due to "paperless mailings"
Decrease in number of one time contracts including Job Order Contracting of $125K and Temp Services of $22K . Legal services have increased
Reflects reallocation of parking validation costs to the Board Budget
Reflects reduction in training services offered
Reflects no new computer purchases
Reflects change in reimbursable square footage with acquisition of Suite 302 and reduction of Suite
Reflects actual experience, rising fuel, repairs for fleet and replacement of Flex Car/Zip Car functionality
Reflects actual experience; also reflects $37K maintenance contract not included in FY 08
Reflects actual experience
Reflects increase in number of phone lines and increase in number of cell phone reimbursements
8-3
SAN DIEGO ASSOCIATION OF GOVERNMENTSFY 2009 BOARD OF DIRECTORS BUDGET
DRAFT
FY 07 FY 08 FY 09 PERCENTAGE
BOARD OF DIRECTORS EXPENSE BUDGET BUDGET BUDGET CHANGE
CONTRACTUAL SERVICES $ 52,000 $ 60,000 $ 25,000 -58%
TRANSPORTATION ALLOWANCE 95,000 138,000 95,000 -31%
TRAVEL 31,000 35,000 40,000 14%
MEETING & MISC. EXPENSE 65,000 68,000 68,000 0%
BOARD COMPENSATION 140,000 140,000 145,000 4%
FURNITURE & EQUIPMENT 0 52,000 0 -100%
TOTAL BOARD EXPENSE $ 383,000 $ 493,000 $ 373,000 -24%
SOURCE OF FUNDING:
MEMBER AGENCY ASSESSMENTS $ 191,500 $ 246,500 $ 186,500 -24%
TRANSNET ADMIN 191,500 246,500 186,500 -24%
TOTAL FUNDING SOURCES $ 383,000 $ 493,000 $ 373,000 -24%
8-4
SAN DIEGO ASSOCIATION OF GOVERNMENTSFY 2009 BOARD BUDGET DETAIL
FY 2008 FY 2009 AMOUNT OF PERCENTAGE ACCOUNT TITLE/PURPOSE BUDGET BUDGET CHANGE CHANGE PRIMARY REASON FOR CHANGE
CONTRACTUAL SERVICES: $ 60,000 $ 25,000 $ (35,000) -58%Board room sound system management; interactive polling
TRANSPORTATION ALLOWANCE: 138,000 95,000 (43,000) -31% Reduction based upon past experienceBoard of Directors mileage, parking permits and validation
TRAVEL: 35,000 40,000 5,000 14% Increased lobbying tripsAll Board Members business travel
MEETING AND MISC. EXPENSE: 68,000 68,000 0 0%Board, RTC and Policy Committees meeting expenses
BOARD COMPENSATION: 140,000 145,000 5,000 4% Reflects actual experienceBoard, RTC and Policy Committees meeting compensation
FURNITURE & EQUIPMENT: 52,000 0 (52,000) -100% No furniture anticipated in FY 09Board room expenses
TOTAL BOARD EXPENSE $ 493,000 $ 373,000 (120,000) -24%
Reduction due to SANDAG staff replacing outsourced services for A/V
8-5
CHAPTER 9
CAPITAL BUDGET
This Chapter includes a summary of regionally significant transit-related Capital Projects and applicable funds. With the passage of the TransNet extension ordinance passed by County voters in November 2004, SANDAG is partnering with Caltrans on the list of transit and highway projects approved in the ordinance. This chapter is divided into two main sections: (1) TransNet Early Action Program, which includes the current budgets for the projects approved as part of the TransNet Extension, and (2) Transit Capital Projects, which identifies regionally significant capital investments relating to public transit services. Projects over $1 million are described in more detail beginning on page 9-39.
Pro
ject
#Pro
ject
Tit
leA
pp
roved
B
ud
get
Fun
ded
B
ud
get
Thru
FY
2009
Est
imate
dExp
en
ded
Th
ru
Jun
e 2
008
Rem
ain
ing
B
ud
get
as
of
Jun
e 2
008
5307
5309
TEA
TCR
PSTI
PSH
ATC
ITr
an
sNet
TDA
RV
ES (
a)
APC
DO
THER
(c)
NO
TES
TRA
NSN
ET E
AR
LY A
CTI
ON
PR
OJE
CTS
1041
500
Mid
Coa
st C
orrid
or10
4150
1M
id C
oast
Lig
ht R
ail T
rans
it P
roje
c t1,
246,
292
1,24
6,29
238
,381
1,20
7,91
151
957
8,40
810
,000
32,7
5662
4,07
253
7S
610
4150
2S
uper
Loop
39,1
8739
,187
9,15
830
,029
447
38,7
40
1200
100
Tran
sNet
Pro
ject
Offi
c e21
,586
21,5
866,
015
15,5
7121
,586
1200
200
Tran
spor
tatio
n Pr
ojec
t Bio
logi
cal M
itiga
tion
Fund
($65
0 m
illio
n)44
0,00
044
0,00
070
,000
370,
000
440,
000
1200
300
Reg
iona
l Hab
itat C
onse
rvat
ion
Fund
($20
0 m
illio
n)49
,062
49,0
624,
143
44,9
1949
,062
1200
500
I-5 C
orrid
or12
0050
1I-5
Nor
th C
oast
50,6
7750
,677
35,8
9514
,782
2,79
622
,782
25,0
99F6
, F8,
F9,
F10
1200
502
I-5 H
OV
Ext
ensi
on &
Lom
as S
anta
Fe
Inte
rcha
nge
75,3
6675
,366
45,6
0429
,762
6,00
043
032
,191
36,7
45F7
, S2,
S3
1201
500
I-15
Cor
rido r
1201
501
I-15
Sou
th M
anag
ed L
anes
467,
097
467,
097
49,5
5541
7,54
260
,000
36,9
7737
0,12
0F1
, S3
1201
502
I-15
Mid
dle
Man
aged
Lan
e s42
8,33
042
8,33
041
7,83
010
,500
64,3
0024
2,20
03,
798
118,
032
F1, F
7, F
8, L
5, S
212
0150
3I-1
5 N
orth
Man
aged
Lan
e s25
0,52
225
0,52
224
,306
226,
216
5,00
010
1,62
114
3,90
1F1
, F7
12
0150
4I-1
5 Fa
sTra
k ®23
,872
23,8
725,
538
18,3
3423
,303
569
F312
0150
5I-1
5 B
RT
Sta
tions
(SR
163
to S
R 7
8)56
,400
56,4
0029
,984
26,4
163,
624
5,70
047
,076
1201
507
I-15
BR
T S
tatio
ns (D
ownt
own
to S
R 1
63)
31,9
2231
,922
263
31,6
5931
,922
1201
508
I-15
BR
T S
tatio
ns (P
lann
ing,
Veh
icle
s, O
pera
tions
)33
,160
33,1
602,
091
31,0
6911
,028
22,1
32F1
1205
200
SR-5
2 C
orrid
o r12
0520
1S
R-5
2 M
anag
ed L
anes
(I-1
5 to
SR
125
)11
,834
11,8
349,
208
2,62
69,
581
2,25
3F7
1205
202
SR
-52
Ope
ratio
nal I
mpr
ovem
ent s
56,8
3556
,835
33,0
5023
,785
53,8
353,
000
S2,
L5
1205
203
SR
-52
Ext
ensi
on59
9,50
059
9,50
028
8,06
231
1,43
845
,000
270,
891
177,
928
105,
681
F4, F
7, F
812
0760
0SR
-76
Cor
rido r
1207
602
SR
76
Mid
dle
158,
368
158,
368
13,0
9514
5,27
314
2,71
115
,657
F7, F
8, F
912
0760
6S
R 7
6 E
ast
241,
610
241,
610
5,08
523
6,52
523
4,17
47,
436
F7
1210
000
Blu
e Li
ne Im
prov
emen
ts12
1000
1B
lue
/ Ora
nge
Line
Upg
rad e
164,
400
164,
400
200
164,
200
88,8
9975
,502
L512
1000
2B
lue
Line
Veh
icle
s26
7,75
026
7,75
010
026
7,65
018
5,75
082
,000
L512
4000
0M
id-C
ity R
apid
Bus
1240
001
Mid
-City
Rap
id B
u s43
,645
43,6
4551
43,5
9421
,650
21
,995
1280
500
I-805
Cor
rido r
1280
501
I-805
Sou
th
22,0
3322
,033
14,0
897,
944
16,1
445,
889
F712
8050
3I-8
05 N
orth
8,23
58,
235
7,63
560
08,
235
1280
504
Sou
th B
ay B
RT
114,
127
114,
127
4,52
210
9,60
511
4,12
712
8050
5I-8
05 H
OV
/Car
roll
Can
yon
DA
R10
2,00
010
2,00
05,
200
96,8
0032
,800
69,2
00S
3, L
412
8050
6I-8
05 A
uxili
ary
Lane
s19
,445
19,4
451,
828
17,6
1719
,445
S2
TOTA
L TR
AN
SNET
EA
RLY
AC
TIO
N P
RO
JEC
TS5,
023,
255
5,02
3,25
51,
120,
888
3,90
2,36
751
960
4,12
90
131,
000
614,
073
00
2,57
0,33
70
00
1,10
3,19
8
SA
N D
IEG
O A
SSO
CIA
TIO
N O
F G
OV
ER
NM
EN
TSFY
2009 C
ap
ital
Bu
dg
et
($1,0
00s)
FUN
DIN
G S
OU
RC
ES (
b)
9-1
Pro
ject
#Pro
ject
Tit
leA
pp
roved
B
ud
get
Fun
ded
B
ud
get
Thru
FY
2009
Est
imate
dExp
en
ded
Th
ru
Jun
e 2
008
Rem
ain
ing
B
ud
get
as
of
Jun
e 2
008
5307
5309
TEA
TCR
PSTI
PSH
ATC
ITr
an
sNet
TDA
RV
ES (
a)
APC
DO
THER
(c)
NO
TES
SA
N D
IEG
O A
SSO
CIA
TIO
N O
F G
OV
ER
NM
EN
TSFY
2009 C
ap
ital
Bu
dg
et
($1,0
00s)
FUN
DIN
G S
OU
RC
ES (
b)
MA
JOR
TR
AN
SIT
CA
PITA
L PR
OJE
CTS
Exis
ting
Proj
ects
1045
500
Nob
el D
rive
Coa
ster
Sta
tion
17,6
4213
,090
1,65
211
,438
6,28
336
86,
439
1048
500
SB
MF
Pro
perty
Exp
ansi
on32
,733
8,13
36,
251
1,88
26,
507
1,62
610
4940
0C
ity C
olle
ge S
tatio
n R
ealig
nmen
t16
,497
16,4
9716
,226
271
1,10
92,
035
3,56
37,
031
752
82,
224
L3, L
5, F
210
4960
0E
ast C
ount
y B
us M
aint
enan
ce F
acili
ty30
,475
10,7
259,
071
1,65
45,
430
2,94
52,
100
250
L510
4970
0G
ross
mon
t Sta
tion
Ped
estri
an E
nhan
cem
ents
2,70
02,
700
861
1,83
92,
040
120
540
1049
800
Trol
ley
Sta
tion
Fibe
r Inf
rast
ruct
ure
4,67
44,
674
4,25
242
21,
205
2,53
461
624
970
S4
1094
000
San
Die
go T
rans
it R
adio
/ A
VL
Sys
tem
16,7
7416
,774
16,3
5442
031
920
6016
,375
S1
1095
400
Low
Flo
or V
ehic
le S
tatio
n P
latfo
rm R
etro
fit13
,669
13,6
6912
,270
1,39
92,
775
10,2
0064
450
1105
700
IAD
/ K
MD
Par
king
Lot
Res
urfa
ce2,
400
2,40
02,
290
110
1,80
045
015
0L5
1140
300
Trai
n Lo
catio
n1,
714
1,71
41,
500
214
287
557
419
145
5625
0S
411
4060
0S
an Y
sidr
o In
term
odal
Fre
ight
Fac
ility
10,9
0010
,900
010
,900
10,9
00F2
1141
300
Cat
enar
y Im
prov
emen
t Pro
ject
- P
hase
II2,
273
2,27
32,
260
1336
1,78
245
511
4160
0S
anta
Mar
garit
a R
iver
Brid
ge R
epla
cem
ent &
2nd
Tra
ck40
,200
40,2
0098
739
,213
23,0
0717
,193
1142
000
Cat
enar
y C
onta
ct W
ire18
,200
7,64
318
07,
463
2,90
41,
610
1,12
92,
000
S4
1142
100
Sub
stat
ion
Sta
ndar
diza
tion
- Pha
se II
9,04
83,
618
1,88
81,
730
255
600
178
352,
550
S4
1142
200
Sor
rent
o to
Mira
mar
Cur
ve R
ealig
nmen
t & 2
nd T
rack
150,
500
3,90
035
43,
546
3,90
011
4230
0E
ast D
ivis
ion
Mai
nten
ance
Fac
ilit y
7,26
67,
266
3,00
24,
264
3,18
368
02,
232
953
218
L5, S
411
4250
0C
entra
lized
Tra
in C
ontro
l12
,231
12,2
311,
946
10,2
853,
200
8,23
180
011
4260
0Jo
int T
rans
porta
tion
Ope
ratio
ns C
ente
r (JT
OC
)16
,400
4,85
90
4,85
996
3 3,
896
F211
4270
0E
ast C
ount
y B
us M
aint
enan
ce F
acili
ty -
CN
G S
tatio
n3,
251
3,25
165
3,18
620
150
3,00
0L5
, S4
1142
800
Cat
enar
y &
Sig
nalin
g Im
prov
emen
ts1,
186
1,18
615
1,17
11,
186
S4
1142
900
San
Die
guito
Riv
er B
ridge
Rep
lace
men
t92
,500
855
213
642
855
1143
000
Del
Mar
Blu
ffs S
tabi
lizat
ion
III5,
002
5,00
230
04,
702
4,59
740
5S
511
4330
0E
scon
dido
Bus
Rap
id T
rans
it6,
377
2,80
048
42,
316
2,80
011
4570
0Fa
re T
echn
olo g
y48
,025
48,0
2545
,505
2,52
08,
651
2,06
37,
300
100
29,9
11S
1, L
5, L
6TO
TAL
EXIS
TIN
G M
AJO
R T
RA
NSI
T C
API
TAL
PRO
JEC
TS56
2,63
724
4,38
512
7,92
611
6,45
937
,127
21,9
213,
563
30,0
3828
,615
036
838
,584
9,80
697
80
73,3
85
9-2
Pro
ject
#Pro
ject
Tit
leA
pp
roved
B
ud
get
Fun
ded
B
ud
get
Thru
FY
2009
Est
imate
dExp
en
ded
Th
ru
Jun
e 2
008
Rem
ain
ing
B
ud
get
as
of
Jun
e 2
008
5307
5309
TEA
TCR
PSTI
PSH
ATC
ITr
an
sNet
TDA
RV
ES (
a)
APC
DO
THER
(c)
NO
TES
SA
N D
IEG
O A
SSO
CIA
TIO
N O
F G
OV
ER
NM
EN
TSFY
2009 C
ap
ital
Bu
dg
et
($1,0
00s)
FUN
DIN
G S
OU
RC
ES (
b)
MIN
OR
TR
AN
SIT
CA
PITA
L PR
OJE
CTS
Exis
ting
Proj
ects
1074
000
LRT
Sta
tion
She
lter R
epla
cem
ent -
Pha
se I
897
897
825
7230
439
340
128
33L4
, L5,
F9
1106
100
Rai
l Rep
lace
men
t Bro
adw
ay &
MP
1381
081
070
310
716
046
011
540
35L5
11
0690
0R
egio
nal M
isce
llane
ous
Cap
ital (
MTD
B)
165
165
150
1510
722
276
4F9
1107
100
Reg
iona
l Mis
cella
neou
s C
apita
l (S
DTC
)70
7055
1556
1411
0840
0S
tatio
n R
esig
ning
(MV
E)
582
582
250
332
6640
011
611
0850
0S
witc
h In
dica
tor M
odifi
catio
n70
7062
856
1411
1100
0R
egio
nal M
isce
llane
ous
Cap
ital (
SA
ND
AG
/MTS
)76
7650
2649
1215
1111
100
Reg
iona
l Mis
cella
neou
s C
apita
l (S
DTC
)68
6825
4355
1411
1240
0S
BM
F E
quip
men
t (FY
05)
8080
728
6416
1115
100
Cap
ital N
eeds
Ass
essm
ent
100
100
199
8020
1115
600
Hea
d S
pans
700
700
2867
228
070
350
S4
1115
700
SD
TC G
emin
i Com
pres
sor U
pgra
des
(109
7200
)57
557
540
535
460
115
1128
000
Sub
stat
ion
and
Trac
tion
Pow
er Im
prov
emen
ts32
032
010
310
320
S4
1128
100
Mai
nlin
e D
rain
age
260
260
1224
826
0S
411
2820
0Ta
ylor
Stre
et G
rade
Cro
ssin
g Im
prov
emen
ts56
756
724
543
204
7670
217
S4
1128
300
AD
A S
tatio
n Im
prov
emen
ts11
511
57
108
115
S4
1128
400
Doc
umen
t Con
trol
100
100
298
100
S4
1128
500
SD
TC S
ite H
arde
ning
& S
ecur
ity10
010
03
9725
75F5
1128
600
LRV
Car
Was
h (R
epla
cem
ent/D
esig
n)15
015
09
141
8020
50S
411
2870
0L
Stre
et a
nd W
est P
ark
Ave
nue
Trac
k R
ehab
ilita
tion
550
550
431
119
160
4035
0L5
1128
800
Tran
sit P
riorit
y M
easu
res
219
219
1420
521
9L1
TOTA
L EX
ISTI
NG
MIN
OR
TR
AN
SIT
CA
PITA
L PR
OJE
CTS
6,57
36,
573
2,77
33,
800
2,01
91,
523
00
00
00
730
173
02,
127
FY 0
9 N
EW M
INO
R T
RA
NSI
T C
API
TAL
PRO
JEC
TS11
2890
0S
DTC
KM
D B
uild
ing
Reh
abili
tatio
n30
030
00
300
240
6011
2900
0Fa
shio
n V
alle
y Tr
ansi
t Cen
ter R
ehab
ilita
tion
200
200
020
016
040
1129
100
Brid
ge In
vent
ory
and
Sur
vey
180
180
018
014
436
1129
200
Cat
enar
y C
atch
Cab
le R
esto
ratio
n - I
I39
039
00
390
312
7811
2930
0S
yste
m G
rade
Cro
ssin
g R
epla
cem
ent
780
780
078
062
415
6
TOTA
L N
EW M
INO
R C
API
TAL
PRO
JEC
TS1,
850
1,85
00
1,85
054
493
60
00
00
037
00
00
TOTA
L EX
ISTI
NG
AN
D N
EW M
INO
R C
API
TAL
PRO
JEC
TS8,
423
8,42
32,
773
5,65
02,
563
2,45
90
00
00
01,
100
173
02,
127
TO
TAL
AC
TIVE
PR
OJE
CTS
(TR
AN
SNET
EA
P, M
AJO
R
TRA
NSI
T, A
ND
MIN
OR
TR
AN
SIT
CA
PITA
L PR
OJE
CTS
)5,
594,
315
5,27
6,06
31,
251,
587
4,02
4,47
640
,209
628,
510
3,56
316
1,03
864
2,68
80
368
2,60
8,92
110
,906
1,15
10
1,17
8,71
0
9-3
Pro
ject
#Pro
ject
Tit
leA
pp
roved
B
ud
get
Fun
ded
B
ud
get
Thru
FY
2009
Est
imate
dExp
en
ded
Th
ru
Jun
e 2
008
Rem
ain
ing
B
ud
get
as
of
Jun
e 2
008
5307
5309
TEA
TCR
PSTI
PSH
ATC
ITr
an
sNet
TDA
RV
ES (
a)
APC
DO
THER
(c)
NO
TES
SA
N D
IEG
O A
SSO
CIA
TIO
N O
F G
OV
ER
NM
EN
TSFY
2009 C
ap
ital
Bu
dg
et
($1,0
00s)
FUN
DIN
G S
OU
RC
ES (
b)
PRO
JEC
TS P
END
ING
CLO
SEO
UT
Maj
or L
RT
Ext
ensi
on C
lose
outs
300
300
030
030
010
4950
0S
prin
g V
alle
y Tr
ansi
t Cen
ter
1,20
020
01
199
160
4010
6920
0M
TDB
AD
A B
us S
top
Impr
ovem
ents
1,38
01,
380
1,37
19
1,12
617
1222
5L2
, L4,
L7,
S4,
F9
1081
800
Reb
uild
LR
V C
amsh
aft A
ssem
blie
s1,
470
1,47
01,
445
2558
059
614
514
910
8450
0IA
D C
NG
Fue
l Sta
tion
Exp
ansi
on2,
642
2,64
22,
630
121,
541
772
7526
228
1095
800
KM
D U
nder
grou
nd T
anks
(des
ign)
3,69
13,
691
3,04
964
21,
566
239
01,
733
L510
9600
0E
lect
roni
c M
essa
ge B
oard
s R
emot
e1,
380
1,38
01,
369
1127
884
017
245
1097
200
KM
D C
NG
Fue
l Sta
tion
Impr
ov.
4,90
04,
900
4,85
050
3,98
779
924
90F9
1140
500
LRV
Sho
p M
odifi
catio
ns2,
412
2,41
22,
203
209
711,
813
458
961
L511
4140
0D
el M
ar B
luffs
Sta
biliz
atio
n II
5,72
95,
729
5,34
338
62,
972
2,75
7S
5, S
7TO
TAL
PRO
JEC
TS P
END
ING
CLO
SEO
UT
24,8
0423
,804
22,2
611,
543
9,30
96,
221
077
20
170
01,
537
855
228
4,86
6
TOTA
L A
LL C
API
TAL
PRO
JEC
TS5,
619,
119
5,29
9,86
71,
273,
848
4,02
6,01
949
,517
634,
731
3,56
316
1,81
064
2,68
817
368
2,60
8,92
112
,443
2,00
622
81,
183,
576
(a)
Res
erve
s tra
nsfe
rred
with
MTS
pro
ject
s(b
) See
App
endi
x C
, Glo
ssar
y of
Acr
onym
s an
d Te
rms,
for d
escr
iptio
ns o
f fun
ding
sou
rces
(c) N
otes
to F
eder
al, S
tate
, and
Loc
al O
ther
Col
umn
belo
w
9-4
FED
ER
AL
OTH
ER
:(F
1)C
on
ges
tio
n M
itig
atio
n a
nd
Air
Qu
alit
y (C
MA
Q)
(F2)
Fed
eral
Hig
hw
ay A
dm
inis
trat
ion
's (
FHW
A)
(F3)
Fed
eral
Val
ue
Pric
ing
(F4)
Tran
spo
rtat
ion
, Co
mm
un
ity,
an
d
Syst
em P
rese
rvat
ion
Pro
gra
m (
TCSP
)(F
5)Tr
ansp
ort
atio
n S
ecu
rity
Gra
nt
Pro
gra
m (
TSG
P)(F
6)C
oo
rdin
ated
Bo
rder
Infr
astr
uct
ure
(C
BI)
(F7)
Reg
ion
al S
urf
ace
Tran
spo
rtat
ion
Pro
gra
m (
RST
P)(F
8)Fe
der
al H
igh
Pri
ori
ty P
roje
ct (
HPP
)(S
9)Su
rfac
e Tr
ansp
ort
atio
n P
rog
ram
(ST
P)(F
10)
Inte
rsta
te M
ain
ten
ance
(IM
)
STA
TE O
THER
:
(S1)
Bo
nd
Pro
ceed
s(S
2)C
altr
ans
(S3)
Co
rrid
or
Mo
bili
ty Im
pro
vem
ent
Acc
ou
nt
(CM
IA)
(S4)
Stat
e Tr
ansi
t A
ssis
tan
ce (
STA
)(S
5)Pr
op
osi
tio
n 1
16(S
6)Pu
blic
Tra
nsp
ort
atio
n A
cco
un
t (P
TA)
(S7)
Stat
e H
igh
way
Ass
ista
nce
(SH
A)
LOC
AL
OTH
ER
:(L
1)B
illb
oar
d R
even
ues
(L2)
Bri
dg
e To
lls(L
3)C
entr
e C
ity
Dev
elo
pm
ent
Co
rpo
rati
on
(C
CD
C)
Res
erve
(L4)
Cit
y o
f Sa
n D
ieg
o(L
5)M
isce
llan
eou
s Pr
oje
ct R
even
ue
(L6)
No
rth
Co
un
ty T
ran
sit
Dis
tric
t (N
CTD
)(L
7)Sa
n D
ieg
o C
ou
nty
Cit
izen
Ad
viso
ry C
om
mit
tee
(CA
C)
SA
N D
IEG
O A
SSO
CIA
TIO
N O
F G
OV
ER
NM
EN
TSFY
20
09
Cap
ital
Bu
dg
et
No
tes
9-5
Pro
ject
#Pro
ject
Tit
leA
pp
roved
B
ud
get
Fun
ded
B
ud
get
Thru
FY
20
09
Est
imate
dExp
en
ded
Th
ru
Ju
ne 2
00
8
Rem
ain
ing
B
ud
get
as
of
Jun
e 2
00
8FY
09
FY 1
0FY
11
FY 1
2FY
13
FY 1
4FY
15
FY 1
6FY
17
BEY
ON
D
FY 1
7TO
TAL
TRA
NSN
ET E
AR
LY A
CTI
ON
PR
OJE
CT S
1041
500
Mid
Coa
st C
orrid
or10
4150
1M
id C
oast
Lig
ht R
ail T
rans
it P
roje
ct1,
246,
292
1,24
6,29
238
,381
1,20
7,91
119
,415
44,6
8544
,936
62,7
7330
9,79
331
8,01
740
8,29
11,
207,
911
1041
502
Sup
erLo
op39
,187
39,1
879,
158
30,0
2924
,931
3,42
91,
669
30,0
29
1200
100
Tran
sNet
Pro
ject
Offi
ce21
,586
21,5
866,
015
15,5
714,
571
4,00
01,
000
1,00
01,
000
1,00
01,
000
1,00
01,
000
15,5
71
1200
200
Tran
spor
tatio
n Pr
ojec
t Bio
logi
cal M
itiga
tion
Fund
($65
0 m
illio
n)44
0,00
044
0,00
070
,000
370,
000
100,
000
100,
000
70,0
0030
,000
15,0
0015
,000
15,0
0015
,000
10,0
0037
0,00
0
1200
300
Reg
iona
l Hab
itat C
onse
rvat
ion
Fund
($20
0 m
illio
n)49
,062
49,0
624,
143
44,9
194,
260
4,42
64,
599
4,77
94,
966
5,16
15,
363
5,57
35,
792
44,9
19
1200
500
I-5 C
orrid
or12
0050
1I-5
Nor
th C
oast
50,6
7750
,677
35,8
9514
,782
14,7
8214
,782
1200
502
I-5 H
OV
Ext
ensi
on &
Lom
as S
anta
Fe
Inte
rcha
nge
75,3
6675
,366
45,6
0429
,762
29,7
6229
,762
1201
500
I-15
Cor
ridor
1201
501
I-15
Sou
th M
anag
ed L
anes
467,
097
467,
097
49,5
5541
7,54
211
0,53
712
3,25
689
,359
70,8
5023
,540
417,
542
1201
502
I-15
Mid
dle
Man
aged
Lan
es42
8,33
042
8,33
041
7,83
010
,500
9,79
326
722
022
010
,500
1201
503
I-15
Nor
th M
anag
ed L
anes
250,
522
250,
522
24,3
0622
6,21
667
,357
59,3
8355
,224
44,2
5222
6,21
612
0150
4I-1
5 Fa
sTra
k®23
,872
23,8
725,
538
18,3
3411
,922
2,05
61,
921
1,28
91,
146
18,3
3412
0150
5I-1
5 B
RT
Sta
tions
(SR
163
to S
R 7
8)56
,400
56,4
0029
,984
26,4
168,
850
3,66
04,
058
8,49
71,
351
26,4
1612
0150
7I-1
5 B
RT
Sta
tions
(Dow
ntow
n to
SR
163
)31
,922
31,9
2226
331
,659
795
2,29
710
,879
17,4
6222
631
,659
1201
508
I-15
BR
T S
tatio
ns (P
lann
ing,
Veh
icle
s, O
pera
tions
)33
,160
33,1
602,
091
31,0
691,
325
1,09
113
,030
13,7
611,
135
727
31,0
6912
0520
0SR
-52
Cor
ridor
1205
201
SR
-52
Man
aged
Lan
es (I
-15
to S
R 1
25)
11,8
3411
,834
9,20
82,
626
2,25
736
92,
626
1205
202
SR
-52
Ope
ratio
nal I
mpr
ovem
ents
56,8
3556
,835
33,0
5023
,785
23,7
8523
,785
1205
203
SR
-52
Ext
ensi
on59
9,50
059
9,50
028
8,06
231
1,43
810
2,50
012
8,99
072
,448
3,00
03,
000
1,50
031
1,43
812
0760
0SR
-76
Cor
ridor
1207
602
SR
76
Mid
dle
158,
368
158,
368
13,0
9514
5,27
325
,250
23,5
0033
,600
50,4
0012
,523
145,
273
1207
606
SR
76
Eas
t24
1,61
024
1,61
05,
085
236,
525
3,00
01,
800
15,6
0044
,800
69,1
0073
,000
29,2
2523
6,52
512
1000
0B
lue
Line
Impr
ovem
ents
1210
001
Blu
e / O
rang
e Li
ne U
pgra
de16
4,40
016
4,40
020
016
4,20
03,
450
11,7
2527
,200
36,9
25
33,4
0028
,720
22,7
8016
4,20
012
1000
2B
lue
Line
Veh
icle
s26
7,75
026
7,75
010
026
7,65
02,
400
3,45
014
,250
68,2
50
82,9
5073
,800
22,5
5026
7,65
012
3000
0SP
RIN
TER
/ Pa
lom
ar A
irpor
t Roa
d B
RT
1230
001
Spr
inte
r Con
tribu
tion
24,0
7024
,070
24,0
700
012
4000
0M
id-C
ity R
apid
Bus
1240
001
Mid
-City
Rap
id B
us43
,645
43,6
4551
43,5
941,
560
16,9
0725
,127
43,5
9412
8050
0I-8
05 C
orrid
or12
8050
1I-8
05 S
outh
22
,033
22,0
3314
,089
7,94
45,
500
2,44
47,
944
1280
503
I-805
Nor
th8,
235
8,23
57,
635
600
300
300
600
1280
504
Sou
th B
ay B
RT
114,
127
114,
127
4,52
210
9,60
59,
200
41,6
0046
,800
11,7
0530
010
9,60
512
8050
5I-8
05 H
OV
/Car
roll
Can
yon
DA
R10
2,00
010
2,00
05,
200
96,8
003,
500
56,3
0037
,000
96,8
0012
8050
6I-8
05 A
uxili
ary
Lane
s19
,445
19,4
451,
828
17,6
171,
117
9,10
06,
800
600
17,6
17
TOTA
L TR
AN
SNET
EA
RLY
AC
TIO
N P
RO
JEC
T S5,
047,
325
5,04
7,32
51,
144,
958
3,90
2,36
759
2,11
964
5,03
557
4,05
147
0,56
355
9,43
051
6,92
550
4,20
921
,573
18,4
610
3,90
2,36
7
SA
N D
IEG
O A
SSO
CIA
TIO
N O
F G
OV
ER
NM
EN
TSFY
2009 C
ap
ital
Pro
gra
m E
xp
en
dit
ure
s ($
1,0
00s)
9-6
Pro
ject
#Pro
ject
Tit
leA
pp
roved
B
ud
get
Fun
ded
B
ud
get
Thru
FY
20
09
Est
imate
dExp
en
ded
Th
ru
Ju
ne 2
00
8
Rem
ain
ing
B
ud
get
as
of
Jun
e 2
00
8FY
09
FY 1
0FY
11
FY 1
2FY
13
FY 1
4FY
15
FY 1
6FY
17
BEY
ON
D
FY 1
7TO
TAL
SA
N D
IEG
O A
SSO
CIA
TIO
N O
F G
OV
ER
NM
EN
TSFY
2009 C
ap
ital
Pro
gra
m E
xp
en
dit
ure
s ($
1,0
00s)
MA
JOR
TR
AN
SIT
CA
PITA
L PR
OJE
CTS
Exis
ting
Proj
ects
1045
500
Nob
el D
rive
Coa
ster
Sta
tion
17,6
4213
,090
1,65
211
,438
2,11
09,
328
11,4
3810
4850
0S
BM
F P
rope
rty E
xpan
sion
32,7
338,
133
6,25
11,
882
1,88
21,
882
1049
400
City
Col
lege
Sta
tion
Rea
lignm
ent
16,4
9716
,497
16,2
2627
127
127
110
4960
0E
ast C
ount
y B
us M
aint
enan
ce F
acili
ty30
,475
10,7
259,
071
1,65
41,
654
1,65
410
4970
0G
ross
mon
t Sta
tion
Ped
estri
an E
nhan
cem
ents
2,70
02,
700
861
1,83
91,
398
441
1,83
910
4980
0Tr
olle
y S
tatio
n Fi
ber I
nfra
stru
ctur
e4,
674
4,67
44,
252
422
232
161
2942
210
9400
0S
an D
iego
Tra
nsit
Rad
io /
AV
L S
yste
m16
,774
16,7
7416
,354
420
420
420
1095
400
Low
Flo
or V
ehic
le S
tatio
n P
latfo
rm R
etro
fit13
,669
13,6
6912
,270
1,39
91,
399
1,39
911
0570
0IA
D /
KM
D P
arki
ng L
ot R
esur
face
2,40
02,
400
2,29
011
011
011
011
4030
0Tr
ain
Loca
tion
1,71
41,
714
1,50
021
421
421
411
4060
0S
an Y
sidr
o In
term
odal
Fre
ight
Fac
ility
10,9
0010
,900
010
,900
1,21
01,
285
4,26
04,
145
10,9
0011
4130
0C
aten
ary
Impr
ovem
ent P
roje
ct -
Pha
se II
2,27
32,
273
2,26
013
1313
1141
600
San
ta M
arga
rita
Riv
er B
ridge
Rep
lace
men
t & 2
nd T
rack
40,2
0040
,200
987
39,2
139,
803
19,6
079,
803
39,2
1311
4200
0C
aten
ary
Con
tact
Wire
18,2
007,
643
180
7,46
37,
463
7,46
311
4210
0S
ubst
atio
n S
tand
ardi
zatio
n - P
hase
I9,
048
3,61
81,
888
1,73
01,
730
1,73
011
4220
0S
orre
nto
to M
iram
ar C
urve
Rea
lignm
ent &
2nd
Tra
ck15
0,50
03,
900
354
3,54
62,
366
1,18
03,
546
1142
300
Eas
t Div
isio
n M
aint
enan
ce F
acili
ty7,
266
7,26
63,
002
4,26
44,
264
4,26
411
4250
0C
entra
lized
Tra
in C
ontro
12,2
3112
,231
1,94
610
,285
4,58
13,
858
1,84
610
,285
1142
600
Join
t Tra
nspo
rtatio
n O
pera
tions
Cen
ter (
JTO
C)
16,4
004,
859
04,
859
3,00
01,
825
344,
859
1142
700
Eas
t Cou
nty
Bus
Mai
nten
ance
Fac
ility
- C
NG
Sta
tion
3,25
13,
251
653,
186
694
1,13
01,
362
3,18
611
4280
0C
aten
ary
& S
igna
ling
Impr
ovem
ents
1,18
61,
186
151,
171
1,17
11,
171
1142
900
San
Die
guito
Riv
er B
ridge
Rep
lace
men
t92
,500
855
213
642
642
642
1143
000
Del
Mar
Blu
ffs S
tabi
lizat
ion
III5,
002
5,00
230
04,
702
600
645
3,45
74,
702
1143
300
Esc
ondi
do B
us R
apid
Tra
nsit
6,37
72,
800
484
2,31
62,
316
2,31
611
4570
0Fa
re T
echn
olo g
y48
,025
48,0
2545
,505
2,52
02,
520
2,52
0TO
TAL
EXIS
TIN
G M
AJO
R T
RA
NSI
T C
API
TAL
PRO
JEC
TS56
2,63
724
4,38
512
7,92
611
6,45
950
,853
39,3
8517
,816
4,26
04,
145
00
00
011
6,45
9
9-7
Pro
ject
#Pro
ject
Tit
leA
pp
roved
B
ud
get
Fun
ded
B
ud
get
Thru
FY
20
09
Est
imate
dExp
en
ded
Th
ru
Ju
ne 2
00
8
Rem
ain
ing
B
ud
get
as
of
Jun
e 2
00
8FY
09
FY 1
0FY
11
FY 1
2FY
13
FY 1
4FY
15
FY 1
6FY
17
BEY
ON
D
FY 1
7TO
TAL
SA
N D
IEG
O A
SSO
CIA
TIO
N O
F G
OV
ER
NM
EN
TSFY
2009 C
ap
ital
Pro
gra
m E
xp
en
dit
ure
s ($
1,0
00s)
MIN
OR
TR
AN
SIT
CA
PITA
L PR
OJE
CTS
Exis
ting
Proj
ects
1074
000
LRT
Sta
tion
She
lter R
epla
cem
ent -
Pha
se I
897
897
825
7272
7211
0610
0R
ail R
epla
cem
ent B
road
way
& M
P13
810
810
703
107
107
107
1106
900
Reg
iona
l Mis
cella
neou
s C
apita
l (M
TDB
)16
516
515
015
1515
1107
100
Reg
iona
l Mis
cella
neou
s C
apita
l (S
DTC
)70
7055
1515
1511
0840
0S
tatio
n R
esig
ning
(MV
E)
582
582
250
332
332
332
1108
500
Sw
itch
Indi
cato
r Mod
ifica
tion
7070
628
88
1111
000
Reg
iona
l Mis
cella
neou
s C
apita
l (S
AN
DA
G/M
TS76
7650
2626
2611
1110
0R
egio
nal M
isce
llane
ous
Cap
ital (
SD
TC)
6868
2543
4343
1112
400
SB
MF
Equ
ipm
ent (
FY 0
5)80
8072
88
811
1510
0C
apita
l Nee
ds A
sses
smen
t10
010
01
9999
9911
1560
0H
ead
Spa
ns70
070
028
672
672
672
1115
700
SD
TC G
emin
i Com
pres
sor U
pgra
des
(109
7200
)57
557
540
535
535
535
1128
000
Sub
stat
ion
and
Trac
tion
Pow
er Im
prov
emen
ts32
032
010
310
310
310
1128
100
Mai
nlin
e D
rain
age
260
260
1224
824
824
811
2820
0Ta
ylor
Stre
et G
rade
Cro
ssin
g Im
prov
emen
ts56
756
724
543
543
543
1128
300
AD
A S
tatio
n Im
prov
emen
ts11
511
57
108
108
108
1128
400
Doc
umen
t Con
trol
100
100
298
9898
1128
500
SD
TC S
ite H
arde
ning
& S
ecur
ity10
010
03
9797
9711
2860
0LR
V C
ar W
ash
(Rep
lace
men
t/Des
ign)
150
150
914
114
114
111
2870
0L
Stre
et a
nd W
est P
ark
Ave
nue
Trac
k R
ehab
ilita
tion
550
550
431
119
119
119
1128
800
Tran
sit P
riorit
y M
easu
res
219
219
1420
520
520
5TO
TAL
EXIS
TIN
G M
INO
R T
RA
NSI
T C
API
TAL
PRO
JEC
TS6,
573
6,57
32,
773
3,80
03,
800
00
00
00
00
03,
800
FY 0
9 N
EW M
INO
R T
RA
NSI
T C
API
TAL
PRO
JEC
TS11
2890
0S
DTC
KM
D B
uild
ing
Reh
abili
tatio
n30
030
00
300
300
300
1129
000
Fash
ion
Val
ley
Tran
sit C
ente
r Reh
abili
tatio
n20
020
00
200
200
200
1129
100
Brid
ge In
vent
ory
and
Sur
vey
180
180
018
018
018
011
2920
0C
aten
ary
Cat
ch C
able
Res
tora
tion
- II
390
390
039
039
039
011
2930
0S
yste
m G
rade
Cro
ssin
g R
epla
cem
ent
780
780
078
078
078
0
TOTA
L N
EW M
INO
R C
API
TAL
PRO
JEC
T S1,
850
1,85
00
1,85
01,
850
00
00
00
00
01,
850
TOTA
L EX
ISTI
NG
AN
D N
EW M
INO
R C
API
TAL
PRO
JEC
TS8,
423
8,42
32,
773
5,65
05,
650
00
00
00
00
05,
650
TO
TAL
AC
TIVE
PR
OJE
CTS
(TR
AN
SNET
EA
P, M
AJO
RTR
AN
SIT,
AN
D M
INO
R T
RA
NSI
T C
API
TAL
PRO
JEC
TS)
5,61
8,38
55,
300,
133
1,27
5,65
74,
024,
476
648,
622
684,
420
591,
867
474,
823
563,
575
516,
925
504,
209
21,5
7318
,461
04,
024,
476
9-8
Pro
ject
#Pro
ject
Tit
leA
pp
roved
B
ud
get
Fun
ded
B
ud
get
Thru
FY
20
09
Est
imate
dExp
en
ded
Th
ru
Ju
ne 2
00
8
Rem
ain
ing
B
ud
get
as
of
Jun
e 2
00
8FY
09
FY 1
0FY
11
FY 1
2FY
13
FY 1
4FY
15
FY 1
6FY
17
BEY
ON
D
FY 1
7TO
TAL
SA
N D
IEG
O A
SSO
CIA
TIO
N O
F G
OV
ER
NM
EN
TSFY
2009 C
ap
ital
Pro
gra
m E
xp
en
dit
ure
s ($
1,0
00s)
PRO
JEC
TS P
END
ING
CLO
SEO
UT
Maj
or L
RT
Ext
ensi
on C
lose
outs
300
300
030
010
010
010
030
010
4950
0S
prin
g V
alle
y Tr
ansi
t Cen
ter
1,20
020
01
199
199
199
1069
200
MTD
B A
DA
Bus
Sto
p Im
prov
emen
ts1,
380
1,38
01,
371
99
910
8180
0R
ebui
ld L
RV
Cam
shaf
t Ass
embl
ies
1,47
01,
470
1,44
525
2525
1084
500
IAD
CN
G F
uel S
tatio
n E
xpan
sion
2,64
22,
642
2,63
012
1212
1095
800
KM
D U
nder
grou
nd T
anks
(des
ign)
3,69
13,
691
3,04
964
264
264
210
9600
0E
lect
roni
c M
essa
ge B
oard
s R
emot
e1,
380
1,38
01,
369
1111
1110
9720
0K
MD
CN
G F
uel S
tatio
n Im
prov
.4,
900
4,90
04,
850
5050
5011
4050
0LR
V S
hop
Mod
ifica
tions
2,41
22,
412
2,20
320
920
920
911
4140
0D
el M
ar B
luffs
Sta
biliz
atio
n II
5,72
95,
729
5,34
338
638
638
6TO
TAL
PRO
JEC
TS P
END
ING
CLO
SEO
UT
24,8
0423
,804
22,2
611,
543
1,54
30
00
00
00
00
1,54
3
TOTA
L A
LL C
API
TAL
PRO
JEC
TS5,
643,
189
5,32
3,93
71,
297,
918
4,02
6,01
965
0,16
568
4,42
059
1,86
747
4,82
356
3,57
551
6,92
550
4,20
921
,573
18,4
610
4,02
6,01
9
9-9
TRANSNET EARLY ACTION PROGRAM
Projects shown in this section describe efforts relating to the list of transit and highway projects being funded in part with the Countywide TransNet 1/2 cent sales tax extension. In November 2004, voters approved this extension of the TransNet sales tax for specific improvements to the County’s transportation network.
Project Number: Project Manager:Project Name: Phone Number:
PROJECT DESCRIPTION SITE LOCATION PROGRESS TO DATE
PROJECT FEATURES MAJOR MILESTONES
May-09
May-12
May-11
Dec-14
SANDAG EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Administration $5,323 $1,610 $6,783 $7,686 $9,429 $9,732 $9,046 $9,372 $9,709 $0 $0 $68,690
Environmental Document 5,548 5,903 12,632 2,304 0 0 0 0 0 0 0 26,387
Design 0 0 0 34,696 35,508 0 0 0 0 0 0 70,203
Right of Way Support 0 0 0 0 0 5,304 0 0 0 0 0 5,304
Right of Way Capital 19,997 0 0 0 0 47,737 0 0 0 0 0 67,734
Construction Support 0 0 0 0 0 0 28,618 29,369 30,148 0 0 88,134
Construction Capital 0 0 0 0 0 0 272,129 279,276 286,680 0 0 838,086
Vehicles 0 0 0 0 0 0 0 0 81,754 0 0 81,754
Total SANDAG $30,868 $7,513 $19,415 $44,685 $44,937 $62,773 $309,793 $318,017 $408,291 $0 $0 $1,246,292
CALTRANS EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Environmental Document $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Design 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Support 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 0 0 0 0 0 0 0 0 0 0
Construction Capital 0 0 0 0 0 0 0 0 0 0 0 0
Total Caltrans $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Total SANDAG & Caltrans $30,868 $7,513 $19,415 $44,685 $44,937 $62,773 $309,793 $318,017 $408,291 $0 $0 $1,246,292
TransNet Pass Through $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
FEDERAL: FTA 5309-NS1 $3,062 $0 $3,441 $0 $22,468 $31,387 $154,897 $159,009 $204,146 $0 $0 $578,408FTA5307 519 0 0 0 0 0 0 0 0 0 0 519
STATE: STIP-IIP 4,000 0 0 28,756 0 0 0 0 0 0 0 32,756 TCRP 1,300 4,891 3,809 0 0 0 0 0 0 0 0 10,000 PTA 537 0 0 0 0 0 0 0 0 0 0 537
LOCAL: TransNet-T 21,450 2,622 0 0 0 0 0 0 0 0 0 24,072 TransNet-MC 0 0 12,165 15,929 22,468 31,387 154,897 159,009 204,146 0 0 600,000
TOTAL: $30,868 $7,513 $19,415 $44,685 $44,936 $62,773 $309,793 $318,017 $408,291 $0 $0 $1,246,292
1Anticipate full funding grant agreement in FY 2011, estimate receipt of 50% of total cost (excluding PE)
Leslie Blanda(619) 699-6907
1041501 (SAN23)Mid-Coast Light Rail Transit Project
Design Complete/PS&E
Open for Service
New and modified transit stations at Tecolote Road, Clairemont Drive, Balboa Avenue, University Center Lane, UCSD West, UCSD East, Executive Drive, and the UTC transit center.
Provide transit service in San Diego from the Old Town transit center to University City.
Locally preferred alternative selected in 2006. Environmental document 50 percent complete as of February 2008.
Environmental Clearance
Right of Way Certification
All values are in escalated dollars. 9-11
Project Number: Project Manager:Project Name: Phone Number:
PROJECT DESCRIPTION SITE LOCATION PROGRESS TO DATE
PROJECT FEATURES MAJOR MILESTONES
Aug-07
Jun-08
Jun-08
Nov-08
SANDAG EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Administration $394 $990 $2,011 $267 $0 $0 $0 $0 $0 $0 $83 $3,745
Environmental Document 818 220 0 0 0 0 0 0 0 0 0 1,038
Design 219 2,637 659 269 0 0 0 0 0 0 0 3,784
Right of Way Support 0 195 49 13 0 0 0 0 0 0 0 257
Right of Way Capital 0 121 484 54 0 0 0 0 0 0 0 659
Construction Support 0 396 1,584 135 0 0 0 0 0 0 0 2,115
Construction Capital 0 3,168 12,674 2,691 0 0 0 0 0 0 0 18,533
Vehicles 0 0 7,470 0 0 0 0 0 0 0 1,586 9,056
Total SANDAG $1,431 $7,727 $24,931 $3,429 $0 $0 $0 $0 $0 $0 $1,669 $39,187
CALTRANS EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Environmental Document $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Design 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Support 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 0 0 0 0 0 0 0 0 0 0
Construction Capital 0 0 0 0 0 0 0 0 0 0 0 0
Total Caltrans $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Total SANDAG & Caltrans $1,431 $7,727 $24,931 $3,429 $0 $0 $0 $0 $0 $0 $1,669 $39,187
TransNet Pass Through $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
FEDERAL: FTA 5309-NS $447 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $447
LOCAL: TransNet-MC 984 7,727 24,931 3,429 0 0 0 0 0 0 1,669 38,740
TOTAL: $1,431 $7,727 $24,931 $3,429 $0 $0 $0 $0 $0 $0 $1,669 $39,187
Design Complete/PS&E to HQ
Open to Traffic/Open for Service
Traffic signal priority measures, queue jumper lanes, street modifications, new rapid bus vehicles, new and modified transit stations.
Rapid Bus transit service in San Diego in University City.
Design 60 percent complete as of February 2008.
Environmental Clearance
Right of Way Certification
Leslie Blanda(619) 699-6907
1041502 (SAN46)SuperLoop
All values are in escalated dollars. 9-12
Project Number: Project Manager:Project Name: Phone Number:
PROJECT DESCRIPTION SITE LOCATION PROGRESS TO DATE
PROJECT FEATURES MAJOR MILESTONES
NA
NA
NA
NA
SANDAG EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Administration $3,915 $1,500 $4,571 $4,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $20,986
Environmental Document 313 287 0 0 0 0 0 0 0 0 0 600
Design 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Support 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 0 0 0 0 0 0 0 0 0 0
Construction Capital 0 0 0 0 0 0 0 0 0 0 0 0
Vehicles 0 0 0 0 0 0 0 0 0 0 0 0
Total SANDAG $4,228 $1,787 $4,571 $4,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $21,586
CALTRANS EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Environmental Document $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Design 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Support 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 0 0 0 0 0 0 0 0 0 0
Construction Capital 0 0 0 0 0 0 0 0 0 0 0 0
Total Caltrans $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Total SANDAG & Caltrans $4,228 $1,787 $4,571 $4,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $21,586
TransNet Pass Through $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
LOCAL: TransNet-MC $4,228 $1,787 $4,571 $4,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $21,586
TOTAL: $4,228 $1,787 $4,571 $4,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $21,586
Richard Chavez(619) 699-6989
1200100TransNet Project Office
Design Complete/PS&E to HQ
Open to Traffic/Open for Service
Develop project development process improvements. Enhance TransNet Dashboard for reporting schedule adherence and cost containment. Investigate and evaluate trends effecting the cost and delivery of EAP projects. Administer consultant contracts.
TransNet Early Action Program (EAP) project and program management.
Program Management Assessment Dec. 2005. TransNet Dashboard deployed July 2006. Cost Management System 70 percent complete, Electronic Schedules Update system 30 percent complete as of February 2008.
Environmental Clearance
Right of Way Certification
All values are in escalated dollars. 9-13
Project Number: Project Manager:Project Name: Phone Number:
PROJECT DESCRIPTION SITE LOCATION PROGRESS TO DATE
PROJECT FEATURES MAJOR MILESTONES
NA
NA
NA
NA
SANDAG EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Administration $320 $700 $1,000 $1,000 $700 $300 $150 $150 $150 $150 $100 $4,720
Environmental Document 0 700 1,000 1,000 700 300 150 150 150 150 100 4,400
Design 0 700 1,000 1,000 700 300 150 150 150 150 100 4,400
Right of Way Support 21 700 1,000 1,000 700 300 150 150 150 150 100 4,421
Right of Way Capital 0 25,400 22,000 22,000 15,400 0 0 0 0 0 0 84,800
Construction Support 0 1,659 3,000 3,000 2,000 1,000 500 500 500 500 300 12,959
Construction Capital 0 0 0 0 0 0 0 0 0 0 0 0
Vehicles 0 0 0 0 0 0 0 0 0 0 0 0
Total SANDAG $341 $29,859 $29,000 $29,000 $20,200 $2,200 $1,100 $1,100 $1,100 $1,100 $700 $115,700
CALTRANS EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Environmental Document $0 $700 $1,000 $1,000 $700 $300 $150 $150 $150 $150 $100 $4,400
Design 0 700 1,000 1,000 700 300 150 150 150 150 100 4,400
Right of Way Support 0 700 1,000 1,000 700 300 150 150 150 150 100 4,400
Right of Way Capital 0 25,400 22,000 22,000 15,400 13,200 6,600 6,600 6,600 6,600 4,400 128,800
Construction Support 0 1,500 2,000 2,000 1,500 500 250 250 250 250 200 8,700
Construction Capital 0 10,800 44,000 44,000 30,800 13,200 6,600 6,600 6,600 6,600 4,400 173,600
Total Caltrans $0 $39,800 $71,000 $71,000 $49,800 $27,800 $13,900 $13,900 $13,900 $13,900 $9,300 $324,300
Total SANDAG & Caltrans $341 $69,659 $100,000 $100,000 $70,000 $30,000 $15,000 $15,000 $15,000 $15,000 $10,000 $440,000
TransNet Pass Through $0 $39,800 $71,000 $71,000 $49,800 $27,800 $13,900 $13,900 $13,900 $13,900 $9,300 $324,300
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
LOCAL: TransNet-EMP $341 $69,659 $100,000 $100,000 $70,000 $30,000 $15,000 $15,000 $15,000 $15,000 $10,000 $440,000
TOTAL: $341 $69,659 $100,000 $100,000 $70,000 $30,000 $15,000 $15,000 $15,000 $15,000 $10,000 $440,000
Design Complete/PS&E to HQ
Open to Traffic/Open for Service
Habitat acquisition, restoration, creation, enhancement, management and monitoring necessary for meeting project mitigation requirements.
Environmental Mitigation Program, Project Mitigation Fund. Mitigation efforts will focus on TransNet Early Action Program projects, then Regional Transportation Plan (RTP) Revenue Constrained projects, then the remaining RTP projects in this order.
The Grove mitigation property acquired January 2008. Master agreement with resource agencies 95% complete as of February 2008.
Environmental Clearance
Right of Way Certification
Keith Greer(619) 699-7390
1200200 (V07)Project Biological Mitigation Fund
All values are in escalated dollars. 9-14
Project Number: Project Manager:Project Name: Phone Number:
PROJECT DESCRIPTION SITE LOCATION PROGRESS TO DATE
PROJECT FEATURES MAJOR MILESTONES
NA
NA
NA
NA
SANDAG EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Administration $43 $100 $100 $100 $100 $100 $100 $100 $100 $100 $100 $1,043
Environmental Document 0 0 0 0 0 0 0 0 0 0 0 0
Design 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Support 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 0 0 0 0 0 0 0 0 0 0
Construction Capital 875 3,125 4,160 4,326 4,499 4,679 4,866 5,061 5,263 5,473 5,692 48,019
Vehicles 0 0 0 0 0 0 0 0 0 0 0 0
Total SANDAG $918 $3,225 $4,260 $4,426 $4,599 $4,779 $4,966 $5,161 $5,363 $5,573 $5,792 $49,062
CALTRANS EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Environmental Document $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Design 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Support 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 0 0 0 0 0 0 0 0 0 0
Construction Capital 0 0 0 0 0 0 0 0 0 0 0 0
Total Caltrans $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Total SANDAG & Caltrans $918 $3,225 $4,260 $4,426 $4,599 $4,779 $4,966 $5,161 $5,363 $5,573 $5,792 $49,062
TransNet Pass Through $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
LOCAL: TransNet-EMP $918 $3,225 $4,260 $4,426 $4,599 $4,779 $4,966 $5,161 $5,363 $5,573 $5,792 $49,062
TOTAL: $918 $3,225 $4,260 $4,426 $4,599 $4,779 $4,966 $5,161 $5,363 $5,573 $5,792 $49,062
Keith Greer(619) 699-7390
1200300 (V08)Regional Habitat Conservation Fund
Design Complete/PS&E to HQ
Open to Traffic/Open for Service
Regional habitat management and monitoring.
Environmental Mitigation Program, Regional Conservation Fund.
Master agreement 95 percent complete as of February 2008.
Environmental Clearance
Right of Way Certification
All values are in escalated dollars. 9-15
Project Number: Project Manager:Project Name: Phone Number:
PROJECT DESCRIPTION SITE LOCATION PROGRESS TO DATE
PROJECT FEATURES MAJOR MILESTONES
Jan-09
NA
NA
NA
SANDAG EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Administration $91 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $91
Environmental Document 1,612 1,000 1,000 0 0 0 0 0 0 0 0 3,612
Design 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Support 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 0 0 0 0 0 0 0 0 0 0
Construction Capital 0 0 0 0 0 0 0 0 0 0 0 0
Vehicles 0 0 0 0 0 0 0 0 0 0 0 0
Total SANDAG $1,703 $1,000 $1,000 $0 $0 $0 $0 $0 $0 $0 $0 $3,703
CALTRANS EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Environmental Document $21,692 $6,200 $3,182 $0 $0 $0 $0 $0 $0 $0 $0 $31,074
Design 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Support 0 300 600 0 0 0 0 0 0 0 0 900
Right of Way Capital 0 5,000 10,000 0 0 0 0 0 0 0 0 15,000
Construction Support 0 0 0 0 0 0 0 0 0 0 0 0
Construction Capital 0 0 0 0 0 0 0 0 0 0 0 0
Total Caltrans $21,692 $11,500 $13,782 $0 $0 $0 $0 $0 $0 $0 $0 $46,974
Total SANDAG & Caltrans $23,395 $12,500 $14,782 $0 $0 $0 $0 $0 $0 $0 $0 $50,677
TransNet Pass Through $2,722 $2,575 $13,782 $0 $0 $0 $0 $0 $0 $0 $0 $19,079
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
FEDERAL: CBI $500 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $500RSTP 9,674 8,925 0 0 0 0 0 0 0 0 0 18,599 STP 2,000 0 0 0 0 0 0 0 0 0 0 2,000 IM 4,000 0 0 0 0 0 0 0 0 0 0 4,000
STATE: STIP 2,796 0 0 0 0 0 0 0 0 0 0 2,796
LOCAL: TransNet-MC 4,425 3,575 14,782 0 0 0 0 0 0 0 0 22,782
TOTAL: $23,395 $12,500 $14,782 $0 $0 $0 $0 $0 $0 $0 $0 $50,677
Design Complete/PS&E to HQ
Open to Traffic/Open for Service
Two managed lanes in each direction. Direct access ramps at Voigt Drive, Via De La Valle, Manchester Avenue, Cannon Road, and Oceanside Boulevard.
Environmental document and advanced right of way acquisition for freeway widening on Interstate 5 from La Jolla Village Drive to Vandegrift Boulevard and Interstate 805 from Mira Mesa Boulevard.
Technical studies are 60% complete as of February 2008.
Environmental Clearance
Right of Way Certification
Arturo Jacobo(619) 688-6816
1200501 (CAL09)I-5 North Coast
All values are in escalated dollars. 9-16
Project Number: Project Manager:Project Name: Phone Number:
PROJECT DESCRIPTION SITE LOCATION PROGRESS TO DATE
PROJECT FEATURES MAJOR MILESTONES
Sep-06
Dec-06
Apr-07
Dec-08
SANDAG EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Administration $84 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $84
Environmental Document 0 0 0 0 0 0 0 0 0 0 0 0
Design 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Support 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 0 0 0 0 0 0 0 0 0 0
Construction Capital 0 0 0 0 0 0 0 0 0 0 0 0
Vehicles 0 0 0 0 0 0 0 0 0 0 0 0
Total SANDAG $84 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $84
CALTRANS EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Environmental Document $1,100 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,100
Design 2,352 0 0 0 0 0 0 0 0 0 0 2,352
Right of Way Support 21 0 0 0 0 0 0 0 0 0 0 21
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 1,312 3,000 3,000 0 0 0 0 0 0 0 0 7,312
Construction Capital 10,974 26,761 26,762 0 0 0 0 0 0 0 0 64,497
Total Caltrans $15,759 $29,761 $29,762 $0 $0 $0 $0 $0 $0 $0 $0 $75,282
Total SANDAG & Caltrans $15,843 $29,761 $29,762 $0 $0 $0 $0 $0 $0 $0 $0 $75,366
TransNet Pass Through $0 $1,370 $29,762 $0 $0 $0 $0 $0 $0 $0 $0 $31,132
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
FEDERAL: RSTP $2,525 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,525
STATE: CMIA 0 24,500 0 0 0 0 0 0 0 0 0 24,500 SHOPP 9,720 0 0 0 0 0 0 0 0 0 0 9,720 STIP 430 0 0 0 0 0 0 0 0 0 0 430 TCRP 2,109 3,891 0 0 0 0 0 0 0 0 0 6,000
LOCAL: TransNet-L1 975 0 0 0 0 0 0 0 0 0 0 975 TransNet-MC 84 1,370 29,762 0 0 0 0 0 0 0 0 31,216
TOTAL: $15,843 $29,761 $29,762 $0 $0 $0 $0 $0 $0 $0 $0 $75,366
1Lomas Santa Fe segment initiated by City of Solana Beach, some of the prior year revenues are based on uses by the City.
Arturo Jacobo(619) 688-6816
1200502 (CAL09A/B)I-5 HOV Extension & Lomas Santa Fe Interchange
Design Complete/PS&E to HQ
Open to Traffic/Open for Service
Extend existing northbound HOV lane from Del Mar Heights Road to Manchester Avenue. Construct southbound HOV lane from Sorrento Valley Boulevard to Manchester Avenue. Modify Lomas Santa Fe Avenue Interchange. Construct auxiliary lanes.
Construction on Interstate 5 in San Diego and Solana Beach from Sorrento Valley Boulevard to north of Lomas Santa Fe Avenue.
Construction is 30 percent complete as of February 2008.
Environmental Clearance
Right of Way Certification
All values are in escalated dollars. 9-17
Project Number: Project Manager:Project Name: Phone Number:
PROJECT DESCRIPTION SITE LOCATION PROGRESS TO DATE
PROJECT FEATURES MAJOR MILESTONES
Mar-03
Feb-08
Mar-08
Dec-12
SANDAG EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Administration $645 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $645
Environmental Document 545 880 400 0 0 0 0 0 0 0 0 1,825
Design 4,239 5,180 2,630 4,870 0 0 0 0 0 0 0 16,919
Right of Way Support 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 0 0 0 0 0 0 0 0 0 0
Construction Capital 0 0 0 0 0 0 0 0 0 0 0 0
Vehicles 0 0 0 0 0 0 0 0 0 0 0 0
Total SANDAG $5,429 $6,060 $3,030 $4,870 $0 $0 $0 $0 $0 $0 $0 $19,389
CALTRANS EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Environmental Document $65 $126 $20 $0 $0 $0 $0 $0 $0 $0 $0 $211
Design 12,821 9,500 1,700 1,950 4,392 0 0 0 0 0 0 30,363
Right of Way Support 149 2,282 300 1,436 367 0 0 0 0 0 0 4,534
Right of Way Capital 3 2,500 487 10,000 2,000 0 0 0 0 0 0 14,990
Construction Support 0 1,620 16,000 16,000 12,600 8,722 6,163 0 0 0 0 61,105
Construction Capital 0 9,000 89,000 89,000 70,000 62,128 17,377 0 0 0 0 336,505
Total Caltrans $13,038 $25,028 $107,507 $118,386 $89,359 $70,850 $23,540 $0 $0 $0 $0 $447,708
Total SANDAG & Caltrans $18,467 $31,088 $110,537 $123,256 $89,359 $70,850 $23,540 $0 $0 $0 $0 $467,097
TransNet Pass Through $0 $0 $0 $0 $0 $0 $17,588 $0 $0 $0 $0 $17,588
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
FEDERAL: CMAQ $3,038 $17,082 $0 $0 $0 $0 $0 $0 $0 $0 $0 $20,120
STATE: CMIA 0 7,946 107,507 118,386 89,359 26,802 0 0 0 0 0 350,000 STIP 10,000 0 0 0 0 44,048 5,952 0 0 0 0 60,000
LOCAL: TransNet-MC 5,429 6,060 3,030 4,870 0 0 17,588 0 0 0 0 36,977
TOTAL: $18,467 $31,088 $110,537 $123,256 $89,359 $70,850 $23,540 $0 $0 $0 $0 $467,097
Design Complete/PS&E to HQ
Open to Traffic/Open for Service
Four managed lanes, moveable median barrier, direct access ramp near Mira Mesa Boulevard.
Construction on Interstate 15 in San Diego from State Route 163 to State Route 56.
Design 90 percent complete as of February 2008. Three construction projects scheduled to be awarded in 2008. Environmental clearance for Mira Mesa DAR scheduled for 2008.
Environmental Clearance
Right of Way Certification
Andrew Rice(619) 688-3284
1201501 (CAL18B)I-15 South Managed Lanes
All values are in escalated dollars. 9-18
Project Number: Project Manager:Project Name: Phone Number:
PROJECT DESCRIPTION SITE LOCATION PROGRESS TO DATE
PROJECT FEATURES MAJOR MILESTONES
Mar-03
Aug-04
Apr-04
Dec-08
SANDAG EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Administration $16 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $16
Environmental Document 0 0 0 0 0 0 0 0 0 0 0 0
Design 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Support 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 0 0 0 0 0 0 0 0 0 0
Construction Capital 9,555 0 0 0 0 0 0 0 0 0 0 9,555
Vehicles 0 0 0 0 0 0 0 0 0 0 0 0
Total SANDAG $9,571 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $9,571
CALTRANS EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Environmental Document $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Design 29,863 600 0 0 0 0 0 0 0 0 0 30,463
Right of Way Support 2,249 505 0 0 0 0 0 0 0 0 0 2,754
Right of Way Capital 7,383 300 0 0 0 0 0 0 0 0 0 7,683
Construction Support 39,763 3,280 1,140 20 20 20 0 0 0 0 0 44,243
Construction Capital 237,183 87,133 8,653 247 200 200 0 0 0 0 0 333,616
Total Caltrans $316,441 $91,818 $9,793 $267 $220 $220 $0 $0 $0 $0 $0 $418,759
Total SANDAG & Caltrans $326,012 $91,818 $9,793 $267 $220 $220 $0 $0 $0 $0 $0 $428,330
TransNet Pass Through $0 $0 $3,091 $267 $220 $220 $0 $0 $0 $0 $0 $3,798
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
FEDERAL: CMAQ $35,586 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $35,586HPP-Sec 115 1,000 0 0 0 0 0 0 0 0 0 0 1,000 HPP-SAFETEA-LU 0 4,000 1,000 0 0 0 0 0 0 0 0 5,000 RSTP 56,500 0 0 0 0 0 0 0 0 0 0 56,500
STATE: STIP (inc. GARVEE) 158,049 78,449 5,702 0 0 0 0 0 0 0 0 242,200 SHOPP 4,136 0 0 0 0 0 0 0 0 0 0 4,136 TCRP 64,300 0 0 0 0 0 0 0 0 0 0 64,300
LOCAL: Local (Poway School) 6,441 9,369 0 0 0 0 0 0 0 0 0 15,810 TransNet-MC $0 $0 $3,091 $267 $220 $220 $0 $0 $0 $0 $0 $3,798
TOTAL: $326,012 $91,818 $9,793 $267 $220 $220 $0 $0 $0 $0 $0 $428,330
Andrew Rice(619) 688-3284
1201502 (CAL18)I-15 Middle Managed Lanes
Design Complete/PS&E to HQ
Open to Traffic/Open for Service
Four managed lanes, moveable median barrier, direct access ramps at Ted Williams Parkway and Rancho Bernardo Road.
Construction on Interstate 15 in San Diego and Escondido between SR 56 and Centre City Parkway.
Construction 75 percent complete as of February 2008.
Environmental Clearance
Right of Way Certification
All values are in escalated dollars. 9-19
Project Number: Project Manager:Project Name: Phone Number:
PROJECT DESCRIPTION SITE LOCATION PROGRESS TO DATE
PROJECT FEATURES MAJOR MILESTONES
Mar-03
Apr-08
Apr-08
Dec-11
SANDAG EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Administration $373 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $373
Environmental Document 0 0 0 0 0 0 0 0 0 0 0 0
Design 3,089 5,000 3,286 0 0 0 0 0 0 0 0 11,375
Right of Way Support 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 0 0 0 0 0 0 0 0 0 0
Construction Capital 0 0 0 0 0 0 0 0 0 0 0 0
Vehicles 0 0 0 0 0 0 0 0 0 0 0 0
Total SANDAG $3,462 $5,000 $3,286 $0 $0 $0 $0 $0 $0 $0 $0 $11,748
CALTRANS EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Environmental Document $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Design 8,454 5,048 500 0 0 0 0 0 0 0 0 14,002
Right of Way Support 227 200 770 766 0 0 0 0 0 0 0 1,963
Right of Way Capital 100 500 2,621 1,741 0 0 0 0 0 0 0 4,962
Construction Support 0 556 9,180 8,676 8,424 2,700 0 0 0 0 0 29,536
Construction Capital 0 759 51,000 48,200 46,800 41,552 0 0 0 0 0 188,311
Total Caltrans $8,781 $7,063 $64,071 $59,383 $55,224 $44,252 $0 $0 $0 $0 $0 $238,774
Total SANDAG & Caltrans $12,243 $12,063 $67,357 $59,383 $55,224 $44,252 $0 $0 $0 $0 $0 $250,522
TransNet Pass Through $0 $810 $7,349 $6,811 $30,651 $44,252 $0 $0 $0 $0 $0 $89,873
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
FEDERAL: CMAQ $2,276 $6,253 $56,722 $16,659 $0 $0 $0 $0 $0 $0 $0 $81,910RSTP 1,505 0 0 35,913 24,573 0 0 0 0 0 0 61,991
STATE: STIP 5,000 0 0 0 0 0 0 0 0 0 0 5,000
LOCAL: TransNet-MC 3,462 5,810 10,635 6,811 30,651 44,252 0 0 0 0 0 101,621
TOTAL: $12,243 $12,063 $67,357 $59,383 $55,224 $44,252 $0 $0 $0 $0 $0 $250,522
Design Complete/PS&E to HQ
Open to Traffic/Open for Service
Four managed lanes, fixed median barrier, direct access ramps at Hale Avenue.
Construction on Interstate 15 in Escondido from Centre City Parkway to SR 78.
Design 90 percent complete as of February 2008.
Environmental Clearance
Right of Way Certification
Andrew Rice(619) 688-3284
1201503 (CAL18A)I-15 North Managed Lanes
All values are in escalated dollars. 9-20
Project Number: Project Manager:Project Name: Phone Number:
PROJECT DESCRIPTION SITE LOCATION PROGRESS TO DATE
PROJECT FEATURES MAJOR MILESTONES
Oct-02
NA
NA
Dec-12
SANDAG EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Administration $443 $289 $441 $342 $343 $335 $190 $0 $0 $0 $0 $2,383
Environmental Document 11 0 0 0 0 0 0 0 0 0 0 11
Design 412 339 50 25 25 25 25 0 0 0 0 901
Right of Way Support 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 182 481 88 88 88 88 0 0 0 0 1,015
Construction Capital 0 3,612 10,550 1,601 1,465 841 843 0 0 0 0 18,912
Vehicles 0 0 0 0 0 0 0 0 0 0 0 0
Total SANDAG $866 $4,422 $11,522 $2,056 $1,921 $1,289 $1,146 $0 $0 $0 $0 $23,222
CALTRANS EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Environmental Document $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Design 0 100 50 0 0 0 0 0 0 0 0 150
Right of Way Support 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 50 0 0 0 0 0 0 0 0 50
Construction Capital 0 150 300 0 0 0 0 0 0 0 0 450
Total Caltrans $0 $250 $400 $0 $0 $0 $0 $0 $0 $0 $0 $650
Total SANDAG & Caltrans $866 $4,672 $11,922 $2,056 $1,921 $1,289 $1,146 $0 $0 $0 $0 $23,872
TransNet Pass Through $0 $250 $400 $0 $0 $0 $0 $0 $0 $0 $0 $650
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
FEDERAL: Value Pricing $569 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $569
LOCAL: TransNet-MC 297 4,672 11,922 2,056 1,921 1,289 1,146 0 0 0 0 23,303
TOTAL: $866 $4,672 $11,922 $2,056 $1,921 $1,289 $1,146 $0 $0 $0 $0 $23,872
Derek Toups(619) 699-1907
1201504 (SAN04)I-15 FasTrak®
Design Complete/PS&E to HQ
Open to Traffic/Open for Service
Electronic tolling equipment, operating system, toll operations office, customer service center.
Expansion of FasTrak® system on Interstate 15 in San Diego and Escondido between SR 163 and SR 78.
Value pricing study completed Feb. 2002. Preliminary engineering completed Sept. 2006. System Integrator contract awarded Oct. 2007. System design for Middle Segment 60 percent complete as of February 2008.
Environmental Clearance
Right of Way Certification
All values are in escalated dollars. 9-21
Project Number: Project Manager:Project Name: Phone Number:
PROJECT DESCRIPTION SITE LOCATION PROGRESS TO DATE
PROJECT FEATURES MAJOR MILESTONES
Sep-09
Jan-04
Oct-07
Oct-07
Dec-08
SANDAG EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Administration 902 425 460 350 270 85 50 0 0 0 0 2,542
Environmental Document 45 150 150 50 0 0 0 0 0 0 0 395
Design 1,760 425 440 425 138 47 46 0 0 0 0 3,281
Right of Way Support 0 75 50 50 25 0 0 0 0 0 0 200
Right of Way Capital 13,167 150 150 0 0 0 0 0 0 0 0 13,467
Construction Support 0 1,300 500 250 400 575 25 0 0 0 0 3,050
Construction Capital 35 11,500 7,050 2,485 3,175 7,740 1,230 0 0 0 0 33,215
Vehicles $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Total SANDAG $15,909 $14,025 $8,800 $3,610 $4,008 $8,447 $1,351 $0 $0 $0 $0 $56,150
CALTRANS EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Environmental Document 0 0 0 0 0 0 0 0 0 0 0 0
Design 0 10 10 10 10 10 0 0 0 0 0 50
Right of Way Support 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 40 40 40 40 40 0 0 0 0 0 200
Construction Capital 0 0 0 0 0 0 0 0 0 0 0 0
Total Caltrans $0 $50 $50 $50 $50 $50 $0 $0 $0 $0 $0 $250
Total SANDAG & Caltrans $15,909 $14,075 $8,850 $3,660 $4,058 $8,497 $1,351 $0 $0 $0 $0 $56,400
TransNet Pass Through $0 $50 $50 $50 $50 $50 $0 $0 $0 $0 $0 $250
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
FEDERAL: FTA 5309 - Bus $1,103 $2,521 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,624
STATE: TCRP 5,700 0 0 0 0 0 0 0 0 0 0 5,700
LOCAL: TransNet-T 9,106 0 0 0 0 0 0 0 0 0 0 9,106 TransNet-MC 0 11,554 8,850 3,660 4,058 8,497 1,351 0 0 0 0 37,970
TOTAL: $15,909 $14,075 $8,850 $3,660 $4,058 $8,497 $1,351 $0 $0 $0 $0 $56,400
Design Complete/PS&E to HQ
Open to Traffic/Open for Service (Transit Stations)
New transit stations at Mira Mesa Boulevard, SR 56, Rancho Bernardo Road, and Del Lago Boulevard. Modify Escondido transit center.
Construct transit stations in Escondido and San Diego for I-15 Bus Rapid Transit (BRT) service. This budget does not include construction of parking structures.
Station construction 10 percent complete as of February 2008.
Environmental Clearance (Parking Structures)
Right of Way Certification
Environmental Clearance (transit stations)
Frank Owsiany(619) 699-6948
1201505 (SAN26)I-15 BRT Stations (SR 163 to SR 78)
All values are in escalated dollars. 9-22
Project Number: Project Manager:Project Name: Phone Number:
PROJECT DESCRIPTION SITE LOCATION PROGRESS TO DATE
PROJECT FEATURES MAJOR MILESTONES
Jul-09
Jan-10
Jul-10
Dec-12
SANDAG EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Administration $43 $75 $445 $573 $605 $634 $226 $0 $0 $0 $0 $2,601
Environmental Document 0 75 150 150 0 0 0 0 0 0 0 375
Design 0 50 100 1,200 1,353 250 0 0 0 0 0 2,953
Right of Way Support 0 0 50 50 50 25 0 0 0 0 0 175
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 0 140 1,052 1,480 0 0 0 0 0 2,672
Construction Capital 0 0 0 0 7,518 14,863 0 0 0 0 0 22,381
Vehicles 0 0 0 0 0 0 0 0 0 0 0 0
Total SANDAG $43 $200 $745 $2,113 $10,578 $17,252 $226 $0 $0 $0 $0 $31,157
CALTRANS EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Environmental Document $0 $10 $25 $25 $0 $0 $0 $0 $0 $0 $0 $60
Design 0 10 15 85 85 15 0 0 0 0 0 210
Right of Way Support 0 0 10 10 10 10 0 0 0 0 0 40
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 0 64 206 185 0 0 0 0 0 455
Construction Capital 0 0 0 0 0 0 0 0 0 0 0 0
Total Caltrans $0 $20 $50 $184 $301 $210 $0 $0 $0 $0 $0 $765
Total SANDAG & Caltrans $43 $220 $795 $2,297 $10,879 $17,462 $226 $0 $0 $0 $0 $31,922
TransNet Pass Through $0 $20 $50 $184 $301 $210 $0 $0 $0 $0 $0 $765
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
LOCAL: TransNet-MC $43 $220 $795 $2,297 $10,879 $17,462 $226 $0 $0 $0 $0 $31,922
TOTAL: $43 $220 $795 $2,297 $10,879 $17,462 $226 $0 $0 $0 $0 $31,922
Design Complete/PS&E to HQ
Open to Traffic/Open for Service
New transit stations at University Avenue and El Cajon Boulevard. New and/or modified transit stations in Downtown San Diego.
Construct transit stations in San Diego for I-15 Bus Rapid Transit (BRT) service.
Mid-City stations design concept 30 percent complete as of February 2008.
Environmental Clearance
Right of Way Certification
Frank Owsiany(619) 699-6948
1201507 (SAN26C)I-15 BRT Stations (Downtown to SR 163)
All values are in escalated dollars. 9-23
Project Number: Project Manager:Project Name: Phone Number:
PROJECT DESCRIPTION SITE LOCATION PROGRESS TO DATE
PROJECT FEATURES MAJOR MILESTONES
Dec-12
SANDAG EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Administration $840 $153 $159 $195 $202 $230 $239 $248 $0 $0 $0 $2,266
Environmental Document 284 737 1,166 896 828 861 896 479 0 0 0 6,147
Design 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Support 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 0 0 0 0 0 0 0 0 0 0
Construction Capital 77 0 0 0 0 0 0 0 0 0 0 77
Vehicles 0 0 0 0 12,000 12,670 0 0 0 0 0 24,670
Total SANDAG $1,201 $890 $1,325 $1,091 $13,030 $13,761 $1,135 $727 $0 $0 $0 $33,160
CALTRANS EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Environmental Document $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Design 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Support 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 0 0 0 0 0 0 0 0 0 0
Construction Capital 0 0 0 0 0 0 0 0 0 0 0 0
Total Caltrans $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Total SANDAG & Caltrans $1,201 $890 $1,325 $1,091 $13,030 $13,761 $1,135 $727 $0 $0 $0 $33,160
TransNet Pass Through $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
FEDERAL: CMAQ $961 $712 $1,060 $872 $10,424 $8,103 $0 $0 $0 $0 $0 $22,132
LOCAL: TransNet-MC 240 178 265 219 2,606 5,658 1,135 727 0 0 0 11,028
TOTAL: $1,201 $890 $1,325 $1,091 $13,030 $13,761 $1,135 $727 $0 $0 $0 $33,160
Operational planning studies and vehicle type selection including analysis of Mid-City transit station design concept impacts on transit system.
Planning studies and vehicle acquisition for BRT service between Escondido and Downtown San Diego, Escondido and Sorrento Valley.
Downtown operations concept completed in 2007. Mid-City station design concept 30 percent complete, Mira Mesa Blvd bus priority and traffic study 50 percent complete as of February 2008.
Vehicle Procurement
Barrow Emerson(619) 699-1961
1201508 (SAN26A)I-15 BRT (Planning & Vehicles)
All values are in escalated dollars. 9-24
Project Number: Project Manager:Project Name: Phone Number:
PROJECT DESCRIPTION SITE LOCATION PROGRESS TO DATE
PROJECT FEATURES MAJOR MILESTONES
Nov-09
NA
NA
NA
SANDAG EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Administration $310 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $310
Environmental Document 1,910 2,875 769 0 0 0 0 0 0 0 0 5,554
Design 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Support 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 0 0 0 0 0 0 0 0 0 0
Construction Capital 0 0 0 0 0 0 0 0 0 0 0 0
Vehicles 0 0 0 0 0 0 0 0 0 0 0 0
Total SANDAG $2,220 $2,875 $769 $0 $0 $0 $0 $0 $0 $0 $0 $5,864
CALTRANS EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Environmental Document $2,261 $1,852 $1,488 $369 $0 $0 $0 $0 $0 $0 $0 $5,970
Design 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Support 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 0 0 0 0 0 0 0 0 0 0
Construction Capital 0 0 0 0 0 0 0 0 0 0 0 0
Total Caltrans $2,261 $1,852 $1,488 $369 $0 $0 $0 $0 $0 $0 $0 $5,970
Total SANDAG & Caltrans $4,481 $4,727 $2,257 $369 $0 $0 $0 $0 $0 $0 $0 $11,834
TransNet Pass Through $8 $1,852 $1,488 $369 $0 $0 $0 $0 $0 $0 $0 $3,717
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
FEDERAL: RSTP $2,253 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,253
LOCAL: TransNet-MC 2,228 4,727 2,257 369 0 0 0 0 0 0 0 9,581
TOTAL: $4,481 $4,727 $2,257 $369 $0 $0 $0 $0 $0 $0 $0 $11,834
John Rieger(619) 220-5391
1205201 (CAL26A)SR 52 Managed Lanes (I-15 to SR 125)
Design Complete/PS&E to HQ
Open to Traffic/Open for Service
Two reversible managed lanes.
Environmental document for SR 52 improvements in San Diego and Santee from Interstate 15 to SR 125.
Environmental document 10 percent complete as of February 2008.
Environmental Clearance
Right of Way Certification
All values are in escalated dollars. 9-25
Project Number: Project Manager:Project Name: Phone Number:
PROJECT DESCRIPTION SITE LOCATION PROGRESS TO DATE
PROJECT FEATURES MAJOR MILESTONES
May-06
May-07
Jul-07
Jul-09
SANDAG EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Administration $157 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $157
Environmental Document 287 600 0 0 0 0 0 0 0 0 0 887
Design 0 300 300 0 0 0 0 0 0 0 0 600
Right of Way Support 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 0 0 0 0 0 0 0 0 0 0
Construction Capital 0 0 0 0 0 0 0 0 0 0 0 0
Vehicles 0 0 0 0 0 0 0 0 0 0 0 0
Total SANDAG $444 $900 $300 $0 $0 $0 $0 $0 $0 $0 $0 $1,644
CALTRANS EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Environmental Document $974 $250 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,224
Design 2,257 900 0 0 0 0 0 0 0 0 0 3,157
Right of Way Support 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Capital 0 250 0 0 0 0 0 0 0 0 0 250
Construction Support 529 2,500 2,500 0 0 0 0 0 0 0 0 5,529
Construction Capital 3,061 20,985 20,985 0 0 0 0 0 0 0 0 45,031
Total Caltrans $6,821 $24,885 $23,485 $0 $0 $0 $0 $0 $0 $0 $0 $55,191
Total SANDAG & Caltrans $7,265 $25,785 $23,785 $0 $0 $0 $0 $0 $0 $0 $0 $56,835
TransNet Pass Through $3,821 $24,885 $23,485 $0 $0 $0 $0 $0 $0 $0 $0 $52,191
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
STATE: SHOPP $2,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,000
LOCAL: Local 1,000 0 0 0 0 0 0 0 0 0 0 1,000 TransNet-MC 4,265 25,785 23,785 0 0 0 0 0 0 0 0 53,835
TOTAL: $7,265 $25,785 $23,785 $0 $0 $0 $0 $0 $0 $0 $0 $56,835
Design Complete/PS&E to HQ
Open to Traffic/Open for Service
Construct third eastbound and westbound lane between Interstate 15 and Mast Boulevard.
Construction on SR 52 in San Diego from I-15 to SR 125.
Construction 30 percent complete as of February 2008.
Environmental Clearance
Right of Way Certification
John Rieger(619) 220-5391
1205202 (CAL26B/C)SR 52 Operational Improvements
All values are in escalated dollars. 9-26
Project Number: Project Manager:Project Name: Phone Number:
PROJECT DESCRIPTION SITE LOCATION PROGRESS TO DATE
PROJECT FEATURES MAJOR MILESTONES
Jul-89
Jun-08
Apr-08
Dec-10
SANDAG EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Administration $1,237 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,237
Environmental Document 79 50 0 0 0 0 0 0 0 0 0 129
Design 1,042 3,000 0 0 0 0 0 0 0 0 0 4,042
Right of Way Support 0 600 0 0 0 0 0 0 0 0 0 600
Right of Way Capital 482 0 0 0 0 0 0 0 0 0 0 482
Construction Support 0 200 2,500 2,500 1,500 0 0 0 0 0 0 6,700
Construction Capital 0 3,500 0 0 0 0 0 0 0 0 0 3,500
Vehicles 0 0 0 0 0 0 0 0 0 0 0 0
Total SANDAG $2,840 $7,350 $2,500 $2,500 $1,500 $0 $0 $0 $0 $0 $0 $16,690
CALTRANS EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Environmental Document $400 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $400
Design 24,632 8,000 1,000 0 0 0 0 0 0 0 0 33,632
Right of Way Support 24,326 4,000 0 0 0 0 0 0 0 0 0 28,326
Right of Way Capital 145,914 59,000 0 0 0 0 0 0 0 0 0 204,914
Construction Support 0 2,600 12,000 15,490 7,000 360 360 180 0 0 0 37,990
Construction Capital 0 9,000 87,000 111,000 63,948 2,640 2,640 1,320 0 0 0 277,548
Total Caltrans $195,272 $82,600 $100,000 $126,490 $70,948 $3,000 $3,000 $1,500 $0 $0 $0 $582,810
Total SANDAG & Caltrans $198,112 $89,950 $102,500 $128,990 $72,448 $3,000 $3,000 $1,500 $0 $0 $0 $599,500
TransNet Pass Through $72,689 $0 $0 $41,697 $39,352 $3,000 $3,000 $1,500 $0 $0 $0 $161,238
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
FEDERAL: HPP-TEA21 $2,250 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,250HPP-SAFETEA-LU 0 8,000 2,000 0 0 0 0 0 0 0 0 10,000 RSTP 22,438 0 0 38,397 31,596 0 0 0 0 0 0 92,431 TCSP 1,000 0 0 0 0 0 0 0 0 0 0 1,000
STATE: STIP 51,895 74,600 98,000 46,396 0 0 0 0 0 0 0 270,891 TCRP 45,000 0 0 0 0 0 0 0 0 0 0 45,000
LOCAL: TransNet-H 44,340 0 0 0 0 0 0 0 0 0 0 44,340 TransNet-MC 31,189 7,350 2,500 44,197 40,852 3,000 3,000 1,500 0 0 0 133,588
TOTAL: $198,112 $89,950 $102,500 $128,990 $72,448 $3,000 $3,000 $1,500 $0 $0 $0 $599,500
John Rieger(619) 220-5391
1205203 (CAL26)SR 52 Extension
Design Complete/PS&E to HQ
Open to Traffic/Open for Service
Four general purpose lanes, direct connectors at SR 125 and SR 67, interchanges at Fanita Drive, Magnolia Avenue, and Cuyamaca Street.
Construct new freeway in Santee from SR 125 to SR 67.
Construction 5 percent complete as of February 2008.
Environmental Clearance
Right of Way Certification
All values are in escalated dollars. 9-27
Project Number: Project Manager:Project Name: Phone Number:
PROJECT DESCRIPTION SITE LOCATION PROGRESS TO DATE
PROJECT FEATURES MAJOR MILESTONES
Mar-08
Feb-09
Feb-09
Dec-12
SANDAG EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Administration $147 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $147
Environmental Document 292 900 0 0 0 0 0 0 0 0 0 1,192
Design 0 1,700 600 600 0 0 0 0 0 0 0 2,900
Right of Way Support 0 0 200 200 0 0 0 0 0 0 0 400
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 0 0 0 0 0 0 0 0 0 0
Construction Capital 0 0 0 0 0 0 0 0 0 0 0 0
Vehicles 0 0 0 0 0 0 0 0 0 0 0 0
Total SANDAG $439 $2,600 $800 $800 $0 $0 $0 $0 $0 $0 $0 $4,639
CALTRANS EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Environmental Document $7,956 $700 $150 $0 $0 $0 $0 $0 $0 $0 $0 $8,806
Design 0 1,400 3,300 1,700 0 0 0 0 0 0 0 6,400
Right of Way Support 0 0 1,000 1,000 0 0 0 0 0 0 0 2,000
Right of Way Capital 0 0 20,000 20,000 0 0 0 0 0 0 0 40,000
Construction Support 0 0 0 0 3,600 5,400 1,523 0 0 0 0 10,523
Construction Capital 0 0 0 0 30,000 45,000 11,000 0 0 0 0 86,000
Total Caltrans $7,956 $2,100 $24,450 $22,700 $33,600 $50,400 $12,523 $0 $0 $0 $0 $153,729
Total SANDAG & Caltrans $8,395 $4,700 $25,250 $23,500 $33,600 $50,400 $12,523 $0 $0 $0 $0 $158,368
TransNet Pass Through $796 $241 $18,848 $21,664 $33,600 $50,400 $12,523 $0 $0 $0 $0 $138,072
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
FEDERAL: HPP-TEA 21 $1,560 $1,859 $713 $0 $0 $0 $0 $0 $0 $0 $0 $4,132HPP-SAFETEA-LU 0 0 4,000 240 0 0 0 0 0 0 0 4,240 RSTP 4,600 0 889 796 0 0 0 0 0 0 0 6,285 STP 1,000 0 0 0 0 0 0 0 0 0 0 1,000
LOCAL: TransNet-MC 1,235 2,841 19,648 22,464 33,600 50,400 12,523 0 0 0 0 142,711
TOTAL: $8,395 $4,700 $25,250 $23,500 $33,600 $50,400 $12,523 $0 $0 $0 $0 $158,368
Design Complete/PS&E to HQ
Open to Traffic/Open for Service
Reconstruct two lane conventional highway as a four lane conventional highway.
Highway realignment on SR 76 in Oceanside and the County of San Diego between Melrose Drive and Mission Road.
Draft environmental document completed September 2007.
Environmental Clearance
Right of Way Certification
Mark Phelan(619) 688-6803
1207602 (CAL29)SR 76 Middle
All values are in escalated dollars. 9-28
Project Number: Project Manager:Project Name: Phone Number:
PROJECT DESCRIPTION SITE LOCATION PROGRESS TO DATE
PROJECT FEATURES MAJOR MILESTONES
Jun-10
Dec-11
Jan-12
Dec-14
SANDAG EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Administration $132 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $132
Environmental Document 1,331 2,500 2,500 1,300 0 0 0 0 0 0 0 7,631
Design 0 0 0 0 4,500 4,500 2,000 0 0 0 0 11,000
Right of Way Support 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 0 0 0 0 2,000 4,000 1,000 0 0 7,000
Construction Capital 0 0 0 0 0 0 0 0 0 0 0 0
Vehicles 0 0 0 0 0 0 0 0 0 0 0 0
Total SANDAG $1,463 $2,500 $2,500 $1,300 $4,500 $4,500 $4,000 $4,000 $1,000 $0 $0 $25,763
CALTRANS EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Environmental Document $622 $500 $500 $500 $0 $0 $0 $0 $0 $0 $0 $2,122
Design 0 0 0 0 500 500 500 0 0 0 0 1,500
Right of Way Support 0 0 0 0 600 1,800 600 0 0 0 0 3,000
Right of Way Capital 0 0 0 0 10,000 38,000 10,000 0 0 0 0 58,000
Construction Support 0 0 0 0 0 0 4,000 4,000 2,000 0 0 10,000
Construction Capital 0 0 0 0 0 0 50,000 65,000 26,225 0 0 141,225
Total Caltrans $622 $500 $500 $500 $11,100 $40,300 $65,100 $69,000 $28,225 $0 $0 $215,847
Total SANDAG & Caltrans $2,085 $3,000 $3,000 $1,800 $15,600 $44,800 $69,100 $73,000 $29,225 $0 $0 $241,610
TransNet Pass Through $72 $58 $58 $58 $5,540 $40,300 $65,100 $69,000 $28,225 $0 $0 $208,411
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
FEDERAL: RSTP $550 $442 $442 $442 $5,560 $0 $0 $0 $0 $0 $0 $7,436
LOCAL: TransNet-MC 1,535 2,558 2,558 1,358 10,040 44,800 69,100 73,000 29,225 0 0 234,174
TOTAL: $2,085 $3,000 $3,000 $1,800 $15,600 $44,800 $69,100 $73,000 $29,225 $0 $0 $241,610
Mark Phelan(619) 688-6803
1207606 (CAL29B)SR 76 East
Design Complete/PS&E to HQ
Open to Traffic/Open for Service
Widen from two lanes to four lanes.
Highway widening and realignment on SR 76 in the County of San Diego between Mission Road and Interstate 15.
Technical studies 30 percent complete as of February 2008.
Environmental Clearance
Right of Way Certification
All values are in escalated dollars. 9-29
Project Number: Project Manager:Project Name: Phone Number:
PROJECT DESCRIPTION SITE LOCATION PROGRESS TO DATE
PROJECT FEATURES MAJOR MILESTONES
Dec-10
NA
Dec-13
Dec-14
SANDAG EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Administration $0 $75 $600 $1,200 $1,900 $2,825 $2,700 $2,100 $1,500 $0 $0 $12,900
Environmental Document 0 25 350 225 0 0 0 0 0 0 0 600
Design 0 100 2,500 3,300 4,300 3,000 3,000 520 480 0 0 17,200
Right of Way Support 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 0 700 2,000 3,100 2,700 2,100 2,700 0 0 13,300
Construction Capital 0 0 0 6,300 19,000 28,000 25,000 24,000 18,000 0 0 120,300
Start Up 0 0 0 0 0 0 0 0 100 0 0 100Total SANDAG $0 $200 $3,450 $11,725 $27,200 $36,925 $33,400 $28,720 $22,780 $0 $0 $164,400
CALTRANS EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Environmental Document $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Design 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Support 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 0 0 0 0 0 0 0 0 0 0
Construction Capital 0 0 0 0 0 0 0 0 0 0 0 0
Total Caltrans $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Total SANDAG & Caltrans $0 $200 $3,450 $11,725 $27,200 $36,925 $33,400 $28,720 $22,780 $0 $0 $164,400
TransNet Pass Through $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
LOCAL: Local (MTS) $0 $0 $0 $1,189 $13,600 $18,463 $16,700 $14,360 $11,190 $0 $0 $75,502 TransNet-T 0 100 1,725 4,674 0 0 0 0 0 0 0 6,499 TransNet-MC 0 100 1,725 5,862 13,600 18,463 16,700 14,360 11,590 0 0 82,400
TOTAL: $0 $200 $3,450 $11,725 $27,200 $36,925 $33,400 $28,720 $22,780 $0 $0 $164,400
Design (all phases)
Open to Traffic/Open for Service
Install crossovers, reconstruct stations with 8 inch high platforms, reconstruct track through stations, improve track signaling and other systems to increase capacity.
Design and construction for Trolley wayside and trackway modifications including stations to support new low-floor vehicle operations on the Blue and Orange Lines. Design and construction to be logically phased for construction and continued operations.
Analysis of construction sequencing 5 percent complete as of February 2008.
Environmental Clearance (all phases)
Right of Way Certification
John Haggerty(619) 699-6937
1210001 (SAN66)Blue/Orange Line Upgrade
All values are in escalated dollars. 9-30
Project Number: Project Manager:Project Name: Phone Number:
PROJECT DESCRIPTION SITE LOCATION PROGRESS TO DATE
PROJECT FEATURES MAJOR MILESTONES
Jun-11
Sep-09
Oct-14
SANDAG EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Administration $0 $50 $350 $350 $350 $350 $350 $350 $200 $0 $0 $2,350
Environmental Document 0 0 0 0 0 0 0 0 0 0 0 0
Design 0 50 2,050 2,000 700 200 0 0 0 0 0 5,000
Right of Way Support 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 0 100 200 1,200 1,600 1,450 350 0 0 4,900
Construction Capital 0 0 0 0 0 0 0 0 0 0 0 0
Vehicles 0 1,000 13,000 66,500 81,000 72,000 22,000 0 0 255,500
Total SANDAG $0 $100 $2,400 $3,450 $14,250 $68,250 $82,950 $73,800 $22,550 $0 $0 $267,750
CALTRANS EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Environmental Document $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Design 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Support 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 0 0 0 0 0 0 0 0 0 0
Construction Capital 0 0 0 0 0 0 0 0 0 0 0 0
Total Caltrans $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Total SANDAG & Caltrans $0 $100 $2,400 $3,450 $14,250 $68,250 $82,950 $73,800 $22,550 $0 $0 $267,750
TransNet Pass Through $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
LOCAL: Local (MTS) $0 $50 $1,200 $1,725 $7,125 $34,125 $37,775 $0 $0 $0 $0 $82,000 TransNet-MC 0 50 1,200 1,725 7,125 34,125 45,175 73,800 22,550 0 0 185,750
TOTAL: $0 $100 $2,400 $3,450 $14,250 $68,250 $82,950 $73,800 $22,550 $0 $0 $267,750
Delivery
New low floor light rail vehicles that provide for roll-on access for mobility devices on every train operating on the system. New vehicles and rehabilitated vehicles would be provisioned with a deployable bridge plate to provide vehicle access.
Provides for low floor vehicles to operate low floor light rail service on the San Diego Trolley system. This project procures new low floor light rail vehicles and rehabilitates existing light rail vehicles.
Review of current low floor vehicle technology and system compatibility completed
Specifications
Procurement
John Haggerty(619) 699-6937
1210002 (SAN67) Blue Line Vehicles
All values are in escalated dollars. 9-31
Project Number: Project Manager:Project Name: Phone Number:
PROJECT DESCRIPTION SITE LOCATION PROGRESS TO DATE
PROJECT FEATURES MAJOR MILESTONES
May-08
Dec-09
Jan-10
Jun-11
SANDAG EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Administration $0 $0 $60 $90 $120 $0 $0 $0 $0 $0 $0 $270
Environmental Document 0 0 0 0 0 0 0 0 0 0 0 0
Design 0 51 1,500 1,100 0 0 0 0 0 0 2,651
Right of Way Support 0 0 0 44 0 0 0 0 0 0 0 44
Right of Way Capital 0 0 0 442 0 0 0 0 0 0 0 442
Construction Support 0 0 1,500 2,000 0 0 0 0 0 0 3,500
Construction Capital 0 0 10,000 12,000 0 0 0 0 0 0 22,000
Vehicles 0 0 0 3,731 11,007 0 0 0 0 0 0 14,738
Total SANDAG $0 $51 $1,560 $16,907 $25,127 $0 $0 $0 $0 $0 $0 $43,645
CALTRANS EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Environmental Document $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Design 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Support 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 0 0 0 0 0 0 0 0 0 0
Construction Capital 0 0 0 0 0 0 0 0 0 0 0 0
Total Caltrans $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Total SANDAG & Caltrans $0 $51 $1,560 $16,907 $25,127 $0 $0 $0 $0 $0 $0 $43,645
TransNet Pass Through $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
FEDERAL: 5309-NS1 $0 $0 $0 $13,526 $8,124 $0 $0 $0 $0 $0 $0 $21,650
LOCAL: TransNet-MC 0 51 1,560 3,381 17,003 0 0 0 0 0 0 21,995
TOTAL: $0 $51 $1,560 $16,907 $25,127 $0 $0 $0 $0 $0 $0 $43,645
1Included in the current FY 2009 President's budget; actual amount subject to final budget appropriations
Design Complete/PS&E to HQ
Open to Traffic/Open for Service
Project features include stop consolidation, enhanced vehilces and stations, transit signal priority, real-time information, and improved frequencies.
Development of a Rapid Bus route from downtown San Diego to San Diego State University via Park and El Cajon Boulevards.
Very Small Starts application submitted to FTA October 2007.
Environmental Clearance
Right of Way Certification
Miriam Kirshner(619) 699-6995
1240001Mid-City Rapid Bus
All values are in escalated dollars. 9-32
Project Number: Project Manager:Project Name: Phone Number:
PROJECT DESCRIPTION SITE LOCATION PROGRESS TO DATE
PROJECT FEATURES MAJOR MILESTONES
Apr-10
NA
NA
NA
SANDAG EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Administration $294 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $294
Environmental Document 1,761 5,700 1,000 100 0 0 0 0 0 0 0 8,561
Design 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Support 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 0 0 0 0 0 0 0 0 0 0
Construction Capital 0 0 0 0 0 0 0 0 0 0 0 0
Vehicles 0 0 0 0 0 0 0 0 0 0 0 0
Total SANDAG $2,055 $5,700 $1,000 $100 $0 $0 $0 $0 $0 $0 $0 $8,855
CALTRANS EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Environmental Document $1,834 $4,500 $4,500 $2,344 $0 $0 $0 $0 $0 $0 $0 $13,178
Design 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Support 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 0 0 0 0 0 0 0 0 0 0
Construction Capital 0 0 0 0 0 0 0 0 0 0 0 0
Total Caltrans $1,834 $4,500 $4,500 $2,344 $0 $0 $0 $0 $0 $0 $0 $13,178
Total SANDAG & Caltrans $3,889 $10,200 $5,500 $2,444 $0 $0 $0 $0 $0 $0 $0 $22,033
TransNet Pass Through $311 $516 $4,118 $2,344 $0 $0 $0 $0 $0 $0 $0 $7,289
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
FEDERAL: RSTP $1,523 $3,984 $382 $0 $0 $0 $0 $0 $0 $0 $0 $5,889
LOCAL: TransNet-MC 2,366 6,216 5,118 2,444 0 0 0 0 0 0 0 16,144
TOTAL: $3,889 $10,200 $5,500 $2,444 $0 $0 $0 $0 $0 $0 $0 $22,033
Ramon Martinez(619) 688-2516
1280501 (CAL78) I-805 South
Design Complete/PS&E to HQ
Open to Traffic/Open for Service
HOV and/or managed lanes including direct access ramps, direct connectors, and in-line transit stations.
Environmental document for I-805 widening in San Diego, Chula Vista, and National City from SR 905 to SR 94.
The technical studies are 30 percent complete as of February 2008.
Environmental Clearance
Right of Way Certification
All values are in escalated dollars. 9-33
Project Number: Project Manager:Project Name: Phone Number:
PROJECT DESCRIPTION SITE LOCATION PROGRESS TO DATE
PROJECT FEATURES MAJOR MILESTONES
Apr-10
NA
NA
NA
SANDAG EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Administration $57 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $57
Environmental Document 758 2,800 100 100 0 0 0 0 0 0 0 3,758
Design 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Support 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 0 0 0 0 0 0 0 0 0 0
Construction Capital 0 0 0 0 0 0 0 0 0 0 0 0
Vehicles 0 0 0 0 0 0 0 0 0 0 0 0
Total SANDAG $815 $2,800 $100 $100 $0 $0 $0 $0 $0 $0 $0 $3,815
CALTRANS EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Environmental Document $1,349 $2,671 $200 $200 $0 $0 $0 $0 $0 $0 $0 $4,420
Design 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Support 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 0 0 0 0 0 0 0 0 0 0
Construction Capital 0 0 0 0 0 0 0 0 0 0 0 0
Total Caltrans $1,349 $2,671 $200 $200 $0 $0 $0 $0 $0 $0 $0 $4,420
Total SANDAG & Caltrans $2,164 $5,471 $300 $300 $0 $0 $0 $0 $0 $0 $0 $8,235
TransNet Pass Through $1,349 $2,671 $200 $200 $0 $0 $0 $0 $0 $0 $0 $4,420
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
LOCAL: TransNet-MC $2,164 $5,471 $300 $300 $0 $0 $0 $0 $0 $0 $0 $8,235
TOTAL: $2,164 $5,471 $300 $300 $0 $0 $0 $0 $0 $0 $0 $8,235
John Rieger(619) 220-5391
1280503 (CAL78) I-805 North
Design Complete/PS&E to HQ
Open to Traffic/Open for Service
HOV and/or managed lanes, direct access ramps, direct connectors, and in-line transit stations.
Environmental document for I-805 widening in San Diego from SR 52 to I-5 merge in Sorrento Valley.
Technical studies are 30 percent complete as of February 2008.
Environmental Clearance
Right of Way Certification
All values are in escalated dollars. 9-34
Project Number: Project Manager:Project Name: Phone Number:
PROJECT DESCRIPTION SITE LOCATION PROGRESS TO DATE
PROJECT FEATURES MAJOR MILESTONES
Sep-09
Jun-10
Jun-10
Jun-12
SANDAG EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Administration $897 $500 $600 $600 $600 $300 $300 $0 $0 $0 $0 $3,797
Environmental Document 1,807 1,200 1,800 500 0 0 0 0 0 0 0 5,307
Design 0 0 2,000 4,000 700 300 0 0 0 0 0 7,000
Right of Way Support 0 0 600 300 100 0 0 0 0 0 0 1,000
Right of Way Capital 18 0 4,000 2,000 0 0 0 0 0 0 0 6,018
Construction Support 0 0 0 2,000 4,000 1,000 0 0 0 0 0 7,000
Construction Capital 0 0 0 20,000 40,000 10,000 0 0 0 0 0 70,000
Vehicles 0 0 0 12,000 1,000 0 0 0 0 0 0 13,000
Total SANDAG $2,722 $1,700 $9,000 $41,400 $46,400 $11,600 $300 $0 $0 $0 $0 $113,122
CALTRANS EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Environmental Document $0 $100 $100 $100 $0 $0 $0 $0 $0 $0 $0 $300
Design 0 0 100 100 100 0 0 0 0 0 0 300
Right of Way Support 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 0 0 300 105 0 0 0 0 0 405
Construction Capital 0 0 0 0 0 0 0 0 0 0 0 0
Total Caltrans $0 $100 $200 $200 $400 $105 $0 $0 $0 $0 $0 $1,005
Total SANDAG & Caltrans $2,722 $1,800 $9,200 $41,600 $46,800 $11,705 $300 $0 $0 $0 $0 $114,127
TransNet Pass Through $0 $100 $200 $200 $400 $105 $0 $0 $0 $0 $0 $1,005
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
LOCAL: TransNet-MC $2,722 $1,800 $9,200 $41,600 $46,800 $11,705 $300 $0 $0 $0 $0 $114,127
TOTAL: $2,722 $1,800 $9,200 $41,600 $46,800 $11,705 $300 $0 $0 $0 $0 $114,127
Eric Adams(619) 699-1974
1280504 (SAN47) South Bay BRT
Design Complete/PS&E to HQ
Open to Traffic/Open for Service
Transit stations, transit way, local street and road modifications, freeway modifications. Includes environmental clearance for SR 94 improvements between I-805 and Downtown San Diego.
Bus Rapid Transit (BRT) service (Phase 1) from Otay to Downtown San Diego and Sorrento Valley.
Phasing plan completed 12/07.Advanced planning of Busses on Shoulders System (BOSS) 30 percent complete as of February 2008.
Environmental Clearance
Right of Way Certification
All values are in escalated dollars. 9-35
Project Number: Project Manager:Project Name: Phone Number:
PROJECT DESCRIPTION SITE LOCATION PROGRESS TO DATE
PROJECT FEATURES MAJOR MILESTONES
Jul-09
Oct-09
Oct-09
Jun-12
SANDAG EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Administration $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Environmental Document 0 0 200 0 0 0 0 0 0 0 0 200
Design 0 2,500 1,000 0 0 0 0 0 0 0 0 3,500
Right of Way Support 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 0 0 0 0 0 0 0 0 0 0
Construction Capital 0 0 0 0 0 0 0 0 0 0 0 0
Vehicles 0 0 0 0 0 0 0 0 0 0 0 0
Total SANDAG $0 $2,500 $1,200 $0 $0 $0 $0 $0 $0 $0 $0 $3,700
CALTRANS EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Environmental Document $0 $800 $0 $0 $0 $0 $0 $0 $0 $0 $0 $800
Design 0 1,000 300 0 0 0 0 0 0 0 0 1,300
Right of Way Support 0 900 0 0 0 0 0 0 0 0 0 900
Right of Way Capital 0 0 2,000 0 0 0 0 0 0 0 0 2,000
Construction Support 0 0 0 6,300 4,000 0 0 0 0 0 0 10,300
Construction Capital 0 0 0 50,000 33,000 0 0 0 0 0 0 83,000
Total Caltrans $0 $2,700 $2,300 $56,300 $37,000 $0 $0 $0 $0 $0 $0 $98,300
Total SANDAG & Caltrans $0 $5,200 $3,500 $56,300 $37,000 $0 $0 $0 $0 $0 $0 $102,000
TransNet Pass Through $0 $0 $0 $0 $29,100 $0 $0 $0 $0 $0 $0 $29,100
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
STATE: CMIA $0 $0 $0 $49,600 $7,900 $0 $0 $0 $0 $0 $0 $57,500
LOCAL: City of San Diego 0 2,700 2,300 6,700 0 0 0 0 0 0 0 11,700 TransNet-MC 0 2,500 1,200 0 29,100 0 0 0 0 0 0 32,800
TOTAL: $0 $5,200 $3,500 $56,300 $37,000 $0 $0 $0 $0 $0 $0 $102,000
Arturo Jacobo(619) 688-6816
1280505 (CAL09C)I-805 HOV/Carroll Canyon DAR
Design Complete/PS&E to HQ
Open to Traffic/Open for Service
Extend HOV lanes from I-5 to Carroll Canyon Road, construct Direct Access Ramps at Carroll Canyon Road, construct Carroll Canyon Road as a 4-lane arterial.
Construction on I-805 from I-5 to Carroll Canyon Road including the extension of Carroll Canyon Road from Scranton Road to Sorrento Valley Road.
Environmental document 50 percent complete as of February 2008.
Environmental Clearance
Right of Way Certification
All values are in escalated dollars. 9-36
Project Number: Project Manager:Project Name: Phone Number:
PROJECT DESCRIPTION SITE LOCATION PROGRESS TO DATE
PROJECT FEATURES MAJOR MILESTONES
Mar-08
Jun-08
Sep-08
May-10
SANDAG EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Administration $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Environmental Document 0 0 0 0 0 0 0 0 0 0 0 0
Design 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Support 0 0 0 0 0 0 0 0 0 0 0 0
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 0 0 0 0 0 0 0 0 0 0
Construction Capital 0 0 0 0 0 0 0 0 0 0 0 0
Vehicles 0 0 0 0 0 0 0 0 0 0 0 0
Total SANDAG $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
CALTRANS EXPENDITURE PLAN ($000)
TASKPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
Environmental Document $267 $418 $0 $0 $0 $0 $0 $0 $0 $0 $0 $685
Design 0 800 375 0 0 0 0 0 0 0 0 1,175
Right of Way Support 0 343 342 0 0 0 0 0 0 0 0 685
Right of Way Capital 0 0 0 0 0 0 0 0 0 0 0 0
Construction Support 0 0 100 800 1,800 200 0 0 0 0 0 2,900
Construction Capital 0 0 300 8,300 5,000 400 0 0 0 0 0 14,000
Total Caltrans $267 $1,561 $1,117 $9,100 $6,800 $600 $0 $0 $0 $0 $0 $19,445
Total SANDAG & Caltrans $267 $1,561 $1,117 $9,100 $6,800 $600 $0 $0 $0 $0 $0 $19,445
TransNet Pass Through $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR
YEARS FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 TOTAL
STATE: SHOPP $267 $1,561 $1,117 $9,100 $6,800 $600 $0 $0 $0 $0 $0 $19,445
TOTAL: $267 $1,561 $1,117 $9,100 $6,800 $600 $0 $0 $0 $0 $0 $19,445
Design Complete/PS&E to HQ
Open to Traffic/Open for Service
Auxiliary lane construction.
Widen I-805 in Chula Vista from SR 54 to E Street. Environmental document 90 percent complete as of February 2008.
Environmental Clearance
Right of Way Certification
Ramon Martinez(619) 688-2516
1280506I-805 Auxiliary Lanes
All values are in escalated dollars. 9-37
MAJOR TRANSIT CAPITAL PROJECTS
Projects described in this section are major transit-related capital investments (over $1 million) necessary for the renewal and improvement of the regional public transit network, with the exception of the transit projects included under the TransNet Early Action Program in the previous section.
TOTAL: $1,652 $2,110 $9,328 $0 $0 $0 $0 $13,090
maintenance costs or feeder services.
Project Number: 1045500 Project Manager: Linda CulpProject Name: Nobe o ter n Phonel Drive C as Statio Number: (619) 699-6957
PROJECT DESCRIPTION SITE LOCATIONThis project will provide a new COASTER rail station south of Nobel Drive in the University City area. This project includes: two coaster platforms, a parking lot, landscaping and other facilities and amenities for a functional station.
PROJECT JUSTIFICATIONThis is one of three Mid-Coast Corridor projects to reduce I-5 corridor traffic. This station provides a high-speed transit link to the north and south from a high density and rapidly growing area of San Diego.
PROGRESS TO DATE MAJOR MILESTONESThis project is currently on hold pending further direction. MILESTONE FINISH DATE
Environmental Jun-02
Right of Way Note 1
Design Aug-03
Open for Service Note 1
Note 1: Completion Dates are contingent upon obtaining additional fundsadditional funds
EXPENDITURE PLAN ($000)
TASKPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
Administration $330 $250 $258 $0 $0 $0 $0 $838
Utilities 0 0 2,300 0 0 0 0 2,300
Engineering & Design 960 985 0 0 0 0 0 1,945
Construction Management 50 0 856 0 0 0 0 906
Professional Services 62 150 52 0 0 0 0 264
Right of Way 100 725 0 0 0 0 0 825
Construction 150 0 8,960 0 0 0 0 9,110
Project Contingency 0 0 1,454 0 0 0 0 1,454Total $1,652 $2,110 $13,880 $0 $0 $0 $0 $17,642
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
FEDERAL:
FTA Section 5309 $733 $1,688 $3,862 $0 $0 $0 $0 $6,283
STATE:
TCI 368 0 0 0 0 0 0 368
LOCAL:TransNet 551 422 5,466 0 0 0 0 6,439
NOTE: (1) The entire cost of the project is estimated at $17,642,000. Continued funding is subject to the annual (2) 95% design cost estimate prepared in August 2003. Does not include annual station operations and
$6,251 $1,882 $0 $0 $0 $0 $0 $8,133
NOTE: The entire cost of the project is estimated at $32,732,900. Continued funding is subject to the annual capital programming process.
Project Number: 1048500 Project Manager: Pete d'AblaingProject Name: South Bay Maintenance Facility Phone Number: (619) 699-1906
PROJECT DESCRIPTION SITE LOCATIONThis project is an expansion of the existing MTS South Bay Maintenance Facility located at 3650A Main Street in Chula Vista. It consists of purchasing 5 parcels to expand the site from 4 to 9 acres which would allow up to 155 buses to be operated and serviced from this location. FY 09 activities will include procurement of right-of-way and associated environmental clearance.
PROJECT JUSTIFICATIONThe existing facility, originally designed for 80 buses, reached its capacity and was partially expanded in 2002-2003. There are 155 buses currently at this facility. Additional space is needed for bus and employee parking . It is expected that the highest priority for FY 09 will be to purchase as much of the north parcel with available right-of-way funds. All environmental documentation has been completed with the exception of new property acquisition.
PROGRESS TO DATE MAJOR MILESTONESThe Phase II construction project activities included demolition and removal of the existing structure at 2648 Main Street; asphalt and concrete improvements to the yard layout; storm drain, fence and lighting enhancements; and striping and signage.
MILESTONE FINISH DATE
Design (Phase II) Dec-05
Construction (Phase II) Sep-07
Right of Way (Phase III) Dec-08
EXPENDITURE PLAN ($000)
TASKPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
Administration $320 $100 $300 $300 $300 $0 $0 $1,320
Miscellaneous Equipment 0 0 0 0 0 0 0 0
Engineering & Design 300 100 400 300 75 0 0 1,175
Construction Management 227 100 400 400 400 0 0 1,527
Professional Services 100 100 150 150 150 0 0 650
Right of Way 2,908 1,482 4,310 0 0 0 0 8,700
Construction 2,396 0 5,205 5,405 5,605 0 0 18,611
Project Contingency 0 0 250 250 250 0 0 750Total $6,251 $1,882 $11,015 $6,805 $6,780 $0 $0 $32,733
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
FEDERAL:
FTA Section 5307 $5,001 $1,506 $0 $0 $0 $0 $0 $6,507
LOCAL:
TDA 1,250 376 0 0 0 0 0 1,626
TOTAL:
TOTAL: $16,226 $271 $0 $0 $0 $0 $0 $16,497
Project Number: 1049400 Project Manager: Eric AdamsProject Name: City Colle io ig Pge Stat n Real nment hone Number: (619) 699-1974
PROJECT DESCRIPTION SITE LOCATIONProject will provide for the realignment of the existing City College stations, located at Park Boulevard (formerly 12th Avenue) & C Streets.
PROJECTSITE
C STREET
BROADWAY
5TH
AV
ENU
E
12TH
AV
ENU
E
HARBOR BLVD
DOWNTOWN SAN DIEGO
PROJECT JUSTIFICATIONMTS is working with CCDC to improve stations and track along Park Boulevard. The project would improve inadequate East Village stations and realign tracks and catenary to accommodate a general upgrade to Park Boulevard and the City College block.
PROGRESS TO DATE MAJOR MILESTONESAll work along Park Avenue and City College Station is substantially complete. FY 09 activities will include completion of punchlist items and project closeout.
MILESTONE FINISH DATEDesign Mar-05
Cutover Trackway Alignment Jan-07
Open City College Station Jun-07
Construction Sep-07
EXPENDITURE PLAN ($000)
TASKPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
Administration $725 $25 $0 $0 $0 $0 $0 $750
Miscellaneous Equipment 0 0 0 0 0 0 0 0
Engineering & Design 350 0 0 0 0 0 0 350
Construction Management 1,426 100 0 0 0 0 0 1,526
Professional Services 25 0 0 0 0 0 0 25
Construction 13,700 146 0 0 0 0 0 13,846
Environmental 0 0 0 0 0 0 0 0
Project Contingency 0 0 0 0 0 0 0 0Total $16,226 $271 $0 $0 $0 $0 $0 $16,497
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
FEDERAL:
FTA Section 5307 $1,109 $0 $0 $0 $0 $0 $0 $1,109
FTA Section 5309 2,035 0 0 0 0 0 0 2,035
Federal TE 3,563 0 0 0 0 0 0 3,563
STATE:
Traffic Congestion Relief r am P ogr 7,031 0 0 0 0 0 0 7,031
STIP 7 0 0 0 0 0 0 7
LOCAL:
Local Reserve 521 0 0 0 0 0 0 521
Miscellaneous Project Revenue (CCDC) 1,694 271 0 0 0 0 0 1,965
7 SDTI Capital Replacement 7 0 0 0 0 0 0
STPMTS
9
250
0
0
0
0
0
0
0
0
0
0
0
0
9 250
programming process.
Project Number: 1049600 Project Manager: Pete d'AblaingProject Name: East County Bus Maintenance Facility Phone Number: (619) 699-1906
PROJECT DESCRIPTION SITE LOCATIONThis project will provide an operations and maintenance facility for up to 150 vehicles used by MTS bus contractors to provide service in East County and paratransit in the MTS region.
PROJECT JUSTIFICATIONThis project will provide for bus maintenance and operations of some MTS East County contractors including fueling, washing, cleaning, maintenance, training, and administrative offices. In addition, availability of appropriately zoned land or existing facilities to lease is rapidly diminishing. All three initial parcels have been purchased, however, additional property has been identified for complete development of this site.
PROGRESS TO DATE MAJOR MILESTONESTo date property has been purchased to allow for an operations and maintenance facility. The Phase I construction project was completed in February 2008 and included the demolition of existing buildings, site surface enhancements, lighting, installation of emergency generator, development of steam cleaning area, and remodel of existing maintenance buildings for electrical service upgrades.
MILESTONE FINISH DATEEnvironmental Mar-08
Design Apr-09
Right of Way Dec-08
Construction Aug-10
EXPENDITURE PLAN ($000)
TASKPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
Administration $300 $20 $225 $225 $225 $225 $0 $1,220
Miscellaneous Equipment 0 0 0 0 0 0 0 0
Engineering & Design 200 30 600 300 300 200 0 1,630
Construction Management 75 78 300 400 300 300 0 1,453
Professional Services 26 2 655 50 50 50 0 833
Right of Way 7,709 1,396 0 0 0 0 0 9,105
Construction 761 128 3,300 4,445 3,300 3,300 0 15,234
Project Contingency 0 0 250 250 250 250 0 1,000Total $9,071 $1,654 $5,330 $5,670 $4,425 $4,325 $0 $30,475
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
FEDERAL:
FTA Section 5307 $5,230 $200 $0 $0 $0 $0 $0 $5,430
FTA Section 5309 - Earmark 2,027 918 0 0 0 0 0 2,945
LOCAL:
TDA 1,814 286 0 0 0 0 0 2,100 Miscellaneous Project Revenue 0 250 0 0 0 0 0 250
TOTAL: $9,071 $1,654 $0 $0 $0 $0 $0 $10,725
NOTE: The entire cost of the project is estimated at $30,475,000. Continued funding is subject to the annual capital
Project Number: 1049700 Project Manager: Frank OwsianyProject Name: G orossmont Stati n Pedestrian Enhancements Phone Number: (619) 699-6948
PROJECT DESCRIPTION SITE LOCATIONThis project will provide for the enhancement of the Grossmont Trolley Station and integrate access to the station with the proposed transit oriented development (TOD) on the site and with the adjacent medical and retail activity node. This project will include improvements to the Alvarado Channel.
PROJECT JUSTIFICATIONCurrent access from the trolley station to high activity centers is by way of a steep wooden staircase, which is beyond its useful life, limits ridership to Grossmont businesses, and is a barrier for disabled passengers.
PROGRESS TO DATE MAJOR MILESTONESThe construction contract for the Alvarado Channel improvements has been awarded. The 95% design plans for the remaining features of work was submitted in Fall 2007. Comments are being solicited for inclusion into the final design plans.
MILESTONE FINISH DATEEnvironmental Jan-01
Right of Way May-08
Design Jun-08
Construction Dec-09
EXPENDITURE PLAN ($000)
TASKPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
Administration $245 $58 $30 $0 $0 $0 $0 $333
Miscellaneous Eq ntuipme 0 0 0 0 0 0 0 0
Engineering & Design 100 60 30 0 0 0 0 190
Construction Management 80 120 36 0 0 0 0 236
Professional Services 20 50 15 0 0 0 0 85
Right of Way 16 10 0 0 0 0 0 26
Construction 400 1,000 300 0 0 0 0 1,700
Project Contingency 0 100 30 0 0 0 0 130Total $861 $1,398 $441 $0 $0 $0 $0 $2,700
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
FEDERAL:
FTA Section 5307 $569 $1,118 $353 $0 $0 $0 $0 $2,040
FTA Section 5309 120 0 0 0 0 0 0 120
LOCAL:TDA 172 280 88 0 0 0 0 540
TOTAL: $861 $1,398 $441 $0 $0 $0 $0 $2,700
Project Number: 1049800 Project Manager: Chip FinchProject Name: Tro n er frastructure Phonelley Statio Fib In Number: (619) 235-2638
PROJECT DESCRIPTION SITE LOCATIONThis project is for the design and implementation of a communications network connecting all trolley stations to the future Central Control Facility. This communications project will include partial installation of fiber optics, wireless infrastructure, and leased data services.
Not ApplicablePROJECT JUSTIFICATION
This project is essential to our ITS projects including the regional automated fare collection project. It also paves the way for regional multi-agency efforts in infrastructure and data sharing.
PROGRESS TO DATE MAJOR MILESTONESFiber optic network system has been completed and is functioning along the San Diego Trolley from Qualcomm Stadium to Grossmont Station and from 12th and Imperial Transfer Station to Old Town. Leased data services are being used to connect all remaining trolley stations that are not currently connected by the fiber optic network.
MILESTONE FINISH DATEDesign Jul-05
Award Mar-06
Construction Jan-07
Lease Network Contract Close Out Dec-10
EXPENDITURE PLAN ($000)
TASKPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
Administration $666 $10 $5 $5 $0 $0 $0 $686
Miscellaneous Equipm ten 154 21 0 0 0 0 0 175
Engineering & Design 650 7 0 0 0 0 0 657
Construction Management 170 30 0 0 0 0 0 200
Professional Services 695 156 156 24 0 0 0 1,031
Construction 1,890 0 0 0 0 0 0 1,890
Communications Equi entpm 27 8 0 0 0 0 0 35
Project Contingency 0 0 0 0 0 0 0 0Total $4,252 $232 $161 $29 $0 $0 $0 $4,674
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
FEDERAL:
FTA Section 5307 $867 $186 $129 $23 $0 $0 $0 $1,205
FTA Section 5309 2,534 0 0 0 0 0 0 2,534
STATE:
STA 70 0 0 0 0 0 0 70
LOCAL:
TDA 532 46 32 6 0 0 0 616
SDTC Capital Replacement 40 0 0 0 0 0 0 40 SDTI Capital Replacement 209 0 0 0 0 0 0 209
TOTAL: $4,252 $232 $161 $29 $0 $0 $0 $4,674
Note: The entire cost of this project is estimated at $24,672. NCTD is participating in $7,898
Project Number: 1094000 Project Manager: James Dreisbach-TowleProject Name: Regiona sit anagement tem onl Tran M Sys Ph e Number: (619) 699-1914
PROJECT DESCRIPTION SITE LOCATIONThis project will provide funding for design and implementation of a new intelligent Transportation System to replace SDTC’s failing Radio/CAD and scheduling system. The new system will offer significant operational improvements through design of smart buses, increased integration and enhanced reporting.
NOT APPLICABLEPROJECT JUSTIFICATION
SDTC’s current system has outlived its useful life and is prone to failure. SDTC is the last property still using this model system and the manufacturer has discontinued support. When failures occur, replacing components requires extensive search effort.
PROGRESS TO DATE MAJOR MILESTONESThe RTMS project has completed all work as described in the original scope of work and is now expanded the functionality of elements of the system at the request of MTS.
MILESTONE FINISH DATE
Design Apr-04
Implementation Dec-06
Revenue Operation Jan-07
EXPENDITURE PLAN ($000)
TASKPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
Administration $795 $112 $0 $0 $0 $0 $0 $907
Miscellaneous Equipm ten 11 23 0 0 0 0 0 34
Engineering & Design 0 0 0 0 0 0 0 0
Construction Management 20 0 0 0 0 0 0 20
Professional Services 3,021 281 0 0 0 0 0 3,302
Right of Way 51 0 0 0 0 0 0 51
Construction 171 4 0 0 0 0 0 175
Communications Equi entpm 12,285 0 0 0 0 0 0 12,285Total $16,354 $420 $0 $0 $0 $0 $0 $16,774
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
FEDERAL:
FTA Section 5307 $319 $0 $0 $0 $0 $0 $0 $319
STATE:
Bond Proceeds 15,975 400 0 0 0 0 0 16,375
LOCAL:
SDTC Capital Replacement 60 0 0 0 0 0 0 60 TDA 0 20 0 0 0 0 0 20
TOTAL: $16,354 $420 $0 $0 $0 $0 $0 $16,774
Project Number: 1095400 Project Manager: John HaggertyProject Name: Stati la t Pon P tform Retrofi hone Number: (619) 699-6937
PROJECT DESCRIPTION SITE LOCATIONThis project raises the LRT station platforms to accommodate low floor light rail vehicles. Existing stations with platforms 6" above top of rail will be raised 2" and stations that are at top of rail will be raised 8". It also provides for turnbacks at Old Town and Weld Blvd in order to operate the new Green Line Service from Santee Town Center to Old Town.
Not ApplicablePROJECT JUSTIFICATION
In March of 2002, the MTD Board awarded a contract to procure low floor light rail vehicles as part of the Mission Valley East LRT project. These and future new low floor cars require an 8" platform height above the rail to allow for deployment of a mechanical ramp. The ramp would provide quick wheelchair access to the LRV. This project raises existing platforms to the required 8" height to allow the low floor vehicles to be placed into service with wheelchair access. The turnbacks at Old Town and Weld Blvd are also necessary in order to operate the Green Line Service from Santee Town Center to Old Town.
PROGRESS TO DATE MAJOR MILESTONESConstruction is complete. Work on closing out a contract claim and correcting contract work continues.
MILESTONE FINISH DATE
Design Oct-07
Construction May-08
Close Out May-09
EXPENDITURE PLAN ($000)
TASKPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
Administration $960 $100 $0 $0 $0 $0 $0 $1,060
Miscellaneous Equipm ten 8 0 0 0 0 0 0 8
Engineering & Design 940 120 0 0 0 0 0 1,060
Construction Management 850 140 0 0 0 0 0 990
Professional Services 131 150 0 0 0 0 0 281
Construction 9,381 850 0 0 0 0 0 10,231
Environmental 0 6 0 0 0 0 0 6
Project Contingency 0 33 0 0 0 0 0 33Total $12,270 $1,399 $0 $0 $0 $0 $0 $13,669
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
FEDERAL:
FTA Section 5309 $2,775 $0 $0 $0 $0 $0 $0 $2,775
LOCAL:
SDTC Capital Replacement 50 0 0 0 0 0 0 50
TDA 644 0 0 0 0 0 0 644 TransNet 8,801 1,399 0 0 0 0 0 10,200
TOTAL: $12,270 $1,399 $0 $0 $0 $0 $0 $13,669
Project Number: 1105700 Project Manager: Pete d'AblaingProject Name: IAD/KMD Parking Lot Resurface Phone Number: (619) 699-1906
PROJECT DESCRIPTION SITE LOCATIONThis project will provide concrete and asphalt surface improvements to the Imperial Avenue Division (IAD) and Kearny Mesa Division (KMD) Parking lot.
IAD FACILITY KMD FACILITY
PROJECT JUSTIFICATIONThe San Diego Transit Imperial Avenue Division (IAD) and Kearny Mesa Division (KMD) Bus Maintenance Facility are the locations where the San Diego Transit bus fleet is maintained and parked when not in service. The heavy weight of the vehicles along with the general deterioration of the pavement has left the site with numerous surface irregularities. These irregularities damage the under carriage of the buses and create a tripping hazard to the drivers, employees and others who utilize the maintenance facility. Due to the deteriorating site conditions major areas of the parking lot are in need of repair.
PROGRESS TO DATE MAJOR MILESTONESThe Imperial Avenue Division Pavement Rehabilitation project is nearly complete. The Driveway Entrance was re-profiled and new concrete pavement was poured. In addition, a large section of asphalt concrete pavement has been removed and replaced. New ADA Parking was created by adjusting the grade of the parking lot. The installation of a new storm water filter system has been installed and new parking lot striping has been painted .
MILESTONE FINISH DATE
Design Mar-07
Advertise and Award Jun-07
Construction Jun-08
EXPENDITURE PLAN ($000)
TASKPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
Administration $180 $15 $0 $0 $0 $0 $0 $195
Miscellaneous Equipment 0 0 0 0 0 0 0 0
Engineering & Design 165 0 0 0 0 0 0 165
Construction Management 161 10 0 0 0 0 0 171
Professional Services 2 7 0 0 0 0 0 9
Construction 1,782 61 0 0 0 0 0 1,843
Environmental 0 0 0 0 0 0 0 0
Project Contingency 0 17 0 0 0 0 0 17Total $2,290 $110 $0 $0 $0 $0 $0 $2,400
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
FEDERAL:
FTA Section 5307 $1,800 $0 $0 $0 $0 $0 $0 $1,800
LOCAL:
TDA 450 0 0 0 0 0 0 450
Miscellaneous Project Revenue 40 110 0 0 0 0 0 150
TOTAL: $2,290 $110 $0 $0 $0 $0 $0 $2,400
Project Number: 1140300 Project Manager: John HaggertyProject Name: Train Location onPh e Number: (619) 699-6937
PROJECT DESCRIPTION SITE LOCATIONThe train location system will install connections, hardware equipment, and software which will provide trolley with remote monitoring and system management capabilities for Mission Valley East. In FY 09, this project will upgrade equipment at five locations to be compatible with the rest of the train location system installed on Mission Valley East.
Not ApplicablePROJECT JUSTIFICATION
Installation of a Train Location System will provide the Controllers in Central Control the tools they need to properly manage train movements on the trolley system.
PROGRESS TO DATE MAJOR MILESTONESThe Mission Valley East train location network elements are complete and operating. Related train to wayside communications elements elsewhere on the system will be completed in FY09 to provide better system compatibility.
MILESTONE FINISH DATE
Design May-05
Construction Nov-07
Close Out Dec-08
EXPENDITURE PLAN ($000)
TASKPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
Administration $65 $23 $0 $0 $0 $0 $0 $88
Miscellaneous Equipm ten 0 0 0 0 0 0 0 0
Engineering & Design 405 6 0 0 0 0 0 411
Construction Management 0 20 0 0 0 0 0 20
Professional Services 0 0 0 0 0 0 0 0
Construction 1,030 150 0 0 0 0 0 1,180
Environmental 0 0 0 0 0 0 0 0
Project Contingency 0 15 0 0 0 0 0 15Total $1,500 $214 $0 $0 $0 $0 $0 $1,714
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
FEDERAL:
FTA Section 5307 $287 $0 $0 $0 $0 $0 $0 $287
FTA Section 5309 557 0 0 0 0 0 0 557
STATE:
STA 36 214 0 0 0 0 0 250
LOCAL:
TDA 145 0 0 0 0 0 0 145
TransNet 419 0 0 0 0 0 0 419
SDTI Capital Replacement 56 0 0 0 0 0 0 56
TOTAL: $1,500 $214 $0 $0 $0 $0 $0 $1,714
Project Number: 1140600 Project Manager: Pete d'AblaingProject Name: San Ysidro Intermodal Freight Facility Phone Number: (619) 699-1906
PROJECT DESCRIPTION SITE LOCATIONThis project will provide for preliminary engineering, design and construction for the expansion of the San Ysidro freight yard to expedite movement within the freight window. This project will also provide for increased storage capacity of freight trains to accommodate future growth of goods movement at the international border, and options to include a truck-to-rail freight facility interface at the existing San Diego and Arizona Eastern (SD&AE) freight yard in San Ysidro.
PROJECT JUSTIFICATIONExpansion of the San Ysidro Yard is needed to take full advantage of future increased throughput at the International Border. The existing lead between San Ysidro Yard and the trolley mainline is only 150 feet and is inadequate for the projected switching operations which will occur at the yard. Any switching done at the north end of the yard interferes with the trolley mainline requiring these operations to be conducted when the trolley is not operating. Providing the ability to switch in the yard outside of the already limited freight window will increase freight capacity. Also, more capacity at the facility is needed to accommodate increased freight movement.
PROGRESS TO DATE MAJOR MILESTONESWe are in the early stages of preliminary design to meet the projects objectives of increasing capacity and movement at the San Ysidro Yard. Various track alternatives have been studied to increase the yard lead and provide track storage. In addition, drainage issues are being studied and geotechnical investigations have commenced.
MILESTONE FINISH DATE
Design Feb-09
Construction Note 1
Note 1: Completion Dates are contingent upon obtaining additional funds
EXPENDITURE PLAN ($000)
TASKPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
Administration $0 $0 $60 $60 $200 $200 $0 $520
Miscellaneous Equipment 0 0 0 0 0 0 0 0
Engineering & Design 0 0 450 475 0 0 0 925
Construction Management 0 0 0 0 360 345 0 705
Professional Services 0 0 600 650 0 0 0 1,250
Right of Way 0 0 0 0 500 500 0 1,000
Construction 0 0 0 0 3,000 2,900 0 5,900
Project Contingency 0 0 100 100 200 200 0 600Total $0 $0 $1,210 $1,285 $4,260 $4,145 $0 $10,900
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
FEDERAL:
TEA-21 High Priority Project Funding $0 $0 $968 $1,028 $3,408 $3,316 $0 $8,720
LOCAL:TBD 0 0 242 257 852 829 0 2,180
TOTAL: $0 $0 $1,210 $1,285 $4,260 $4,145 $0 $10,900
Project Number: 1141300 Project Manager: Chip FinchProject Name: Catenar pro t ony Im vemen - Phase II Ph e Number: (619) 235-2638
PROJECT DESCRIPTION SITE LOCATIONThis project replaces worn trolley catenary system and traction power components.
Not ApplicablePROJECT JUSTIFICATION
This project continues to replace worn catenary and traction power distribution components that are worn and starting to fail. These elements are vital to operations of the trolley system.
PROGRESS TO DATE MAJOR MILESTONESPhase II completed the rehabilitation of all remaining balance weight assemblies and down guy assemblies and foundations that were not addressed on phase I of this project.
MILESTONE FINISH DATEDesign Nov-03
Award Mar-06
Construction Apr-08
Close Out Dec-08
EXPENDITURE PLAN ($000)
TASKPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
Administration $210 $13 $0 $0 $0 $0 $0 $223
Miscellaneous Equipm ten 0 0 0 0 0 0 0 0
Engineering & Design 153 0 0 0 0 0 0 153
Construction Management 316 0 0 0 0 0 0 316
Professional Services 10 0 0 0 0 0 0 10
Construction 1,571 0 0 0 0 0 0 1,571
Environmental 0 0 0 0 0 0 0 0
Project Contingency 0 0 0 0 0 0 0 0Total $2,260 $13 $0 $0 $0 $0 $0 $2,273
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
FEDERAL:
FTA Section 5307 $36 $0 $0 $0 $0 $0 $0 $36
FTA Section 5309 1,772 10 0 0 0 0 0 1,782
LOCAL:TDA 452 3 0 0 0 0 0 455
TOTAL: $2,260 $13 $0 $0 $0 $0 $0 $2,273
p
Project Number: 1141600 Project Manager: Leslie BlandaProject Name: Santa Margarita River Bridge
Replacement & Second Track Phone Number: (619) 699-6907
PROJECT DESCRIPTION SITE LOCATIONThe Santa Margarita River Bridge Replacement and Second Main Track Project would add a new 0.8 mile section of double-track to connect two existing passing tracks, would upgrade an existing 1.7 miles segment of passing track and replace the Santa Margarita River Bridge with a new double-track bridge.
As part of the project, the Fallbrook Junction Passing Track would be fully upgraded to match the adjacent main line track speed (up to 90 mph). Currently, the speed on this passing track is 40 mph.
PROJECT JUSTIFICATIONThe project’s benefits include increased schedule reliability, improved operational flexibility, and reduced future maintenance costs.
PROGRESS TO DATE MAJOR MILESTONESFederal environmental clearance under the National Environmental Policy Act (NEPA) has been obtained. All resource agency permits have been obtained. The design has been advanced to the 90% level of completion.
MILESTONE FINISH DATE
Environmental Mar-06
Design Jun-08
Open for Service Dec-10
EXPENDITURE PLAN ($000)
TASKPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
Administration $58 $348 $697 $348 $0 $0 $0 $1,451
Miscellaneous Equipment 0 0 0 0 0 0 0 0
Engineering & Design 921 174 348 174 0 0 0 1,617
Construction Management 8 14 28 14 0 0 0 64
Professional Services 0 697 1,393 697 0 0 0 2,787
Construction 0 7,292 14,584 7,292 0 0 0 29,168
Environmental 0 0 0 0 0 0 0 0
Project Contingency 0 1,278 2,557 1,278 0 0 0 5,113Total $987 $9,803 $19,607 $9,803 $0 $0 $0 $40,200
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
STATE:
TCRP $0 $5,752 $11,504 $5,752 $0 $0 $0 $23,007
STIP IIP 987 4,051 8,103 4,051 0 0 0 17,193
TOTAL: $987 $9,803 $19,607 $9,803 $0 $0 $0 $40,200
NOTE: The entire cost of this project is $42,700,000. NCTD completed the Engineering work prior to transferring the project to SANDAG in accordance with Senate Bill 1703. The cost of Engineering was $2,500,000.
programming process.
Project Number: 1142000 Project Manager: Chip FinchProject Name: Catenar ont t ire ony C ac W Ph e Number: (619) 235-2638
PROJECT DESCRIPTION SITE LOCATIONThis project will investigate existing contact wire condition and replace the worn out sections of contact wire and associated hardware from 12th and Imperial to San Ysidro.
Not ApplicablePROJECT JUSTIFICATION
The San Diego Trolley contact wire and associated hardware on the South Line is wearing out. The replacement of the wire will be done in segments with several contracts to limit the budget impact on any single fiscal year.
PROGRESS TO DATE MAJOR MILESTONESEvaluation of existing contact wire was completed in January 2008. This report will be used to determine which areas should be replaced first.
MILESTONE FINISH DATEDesign - Phase I Dec-08
Award - Phase I Apr-09
Construction - Phase I May-10
Close Out - Phase I Jun-13
EXPENDITURE PLAN ($000)
TASKPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
Administration $60 $476 $180 $180 $180 $0 $0 $1,076
Miscellaneous Equipm ten 0 0 0 0 0 0 0 0
Engineering & Design 60 476 280 260 0 0 0 1,076
Construction Management 0 536 260 260 260 0 0 1,316
Professional Services 0 0 0 0 0 0 0 0
Construction 60 5,440 2,670 2,670 2,670 0 0 13,510
Environmental 0 0 0 0 0 0 0 0
Project Contingency 0 535 229 229 229 0 0 1,222Total $180 $7,463 $3,619 $3,599 $3,339 $0 $0 $18,200
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
FEDERAL:
FTA Section 5307 $0 $2,904 $0 $0 $0 $0 $0 $2,904
FTA Section 5309 144 1,466 0 0 0 0 0 1,610
STATE:
STA 0 2,000 0 0 0 0 0 2,000
LOCAL:TDA 36 1,093 0 0 0 0 0 1,129
TOTAL: $180 $7,463 $0 $0 $0 $0 $0 $7,643
NOTE: The entire cost of the project is estimated at $18,200,000. Continued funding is subject to the annual capital
programming process.
Project Number: 1142100 Project Manager: John HaggertyProject Name: Substat n dard n onio Stan izatio - Phase II Ph e Number: (619) 699-6937
PROJECT DESCRIPTION SITE LOCATIONThis project will provide for the replacement of old contactors with breakers and bring older substations to current design and performance standards. In FY 08 and 09 one new substation will be placed near Fletcher Parkway in El Cajon and three Orange Line substations (Main and Marshal, Hill, and Grossmont) will be upgraded.
Not ApplicablePROJECT JUSTIFICATION
Older substations with contactors have more failures. In this project we will replace contactors with breakers in three substations, and add a substation to an underpowered section of the Orange Line.
PROGRESS TO DATE MAJOR MILESTONESThe project has been designed and is under construction. MILESTONE FINISH DATE
Design Oct-07
Construction Sep-08
Close Out Dec-08
EXPENDITURE PLAN ($000)
TASKPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
Administration $130 $100 $100 $100 $100 $50 $0 $580
Miscellaneous Equipm ten 0 0 0 0 0 0 0 0
Engineering & Design 260 40 150 150 150 140 0 890
Construction Management 146 140 150 150 150 110 0 846
Professional Services 2 0 0 0 0 0 0 2
Construction 1,350 1,450 1,030 1,000 1,000 500 0 6,330
Environmental 0 0 0 0 0 0 0 0
Project Contingency 0 0 100 100 100 100 0 400Total $1,888 $1,730 $1,530 $1,500 $1,500 $900 $0 $9,048
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
FEDERAL:
FTA Section 5307 $255 $0 $0 $0 $0 $0 $0 $255
FTA Section 5309 600 0 0 0 0 0 0 600
STATE:
STA 820 1,730 0 0 0 0 0 2,550
LOCAL:
SDTI Capital Replacement 35 0 0 0 0 0 0 35 TDA 178 0 0 0 0 0 0 178
TOTAL: $1,888 $1,730 $0 $0 $0 $0 $0 $3,618
NOTE: The entire cost of the project is estimated at $9,048,000. Continued funding is subject to the annual capital
1
Project Number: 1142200 Project Manager: Leslie BlandaProject Name: Sorrento to Miramar Curve
Realignment & Second Track Phone Number: (619) 699-6907
PROJECT DESCRIPTION SITE LOCATIONThe Sorrento-Miramar Curve Realignment and Second Main Track Project is located on the LOSSAN corridor in the City of San Diego. The project adds 3.1 miles of second main track, straightens a portion of existing track and replaces an existing bridge. Approximately 2.2 miles of this new second track will be within the existing railroad right-of-way, and the remaining 0.9 miles will be on new railroad right-of-way. This phase of the project is for the engineering and design work only. This project may be constructed in two phases depending on funding obtained.
PROJECT JUSTIFICATIONThe new second main track would reduce the curvature to permit train speeds of approximately 48 mph. The benefits of this project include:• Increased track capacity by adding a second track;• Reduced travel time of trains using the new track by an average of two minutes between CP Pines and CP Cumbres;• Increased operation efficiencies by providing a new second main track, thereby permitting more routing options for existing and future train traffic;• Increased operational reliability by providing an alternate track for routing trains; and• Reduced track maintenance costs by adding a second track and reducing the total number of curves and the sharpness of the curves in this line segment, thereby reducing overall rail and tie wear.
PROGRESS TO DATE MAJOR MILESTONESThe NCTD Board certified an Environmental Impact Report (EIR) prepared under the California Environmental Quality Act (CEQA) for the project in October 2003. Updating of this document may be required due to changed p g y q gconditions that may have occurred over the last five years. The design has been advanced to the 60% level of completion
MILESTONE FINISH DATEEnvironmental Oct-03
Right of WayRight of Way Note 1Note
Design Nov-09
Open for Service Note 1
Note 1: Completion Dates are contingent upon obtaining additional funds
EXPENDITURE PLAN ($000)
TASKPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
Administration $26 $158 $79 $0 $0 $0 $0 $263
Miscellaneous Equipment 0 0 0 0 0 0 0 0
Engineering & Design 279 1,671 835 0 0 0 0 2,785
Construction Management 0 0 0 0 0 0 0 0
Professional Services 42 255 128 0 0 0 0 425
Construction 7 44 22 0 0 0 0 73
Environmental 0 0 0 0 0 0 0 0
Project Contingency 0 238 116 0 0 0 0 354Total $354 $2,366 $1,180 $0 $0 $0 $0 $3,900
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
STATE:
STIP IIP $354 $2,366 $1,180 $0 $0 $0 $0 $3,900
TOTAL: $354 $2,366 $1,180 $0 $0 $0 $0 $3,900
NOTE: The entire cost of this project (Phase 1 and Phase 2) is estimated to be $150.5 million. NCTD completed the Engineering work prior to transferring the project to SANDAG in accordance with Senate Bill 1703. The cost of Engineering was $3,023,000. Continued funding is subject to the annual capital programming process.
TOTAL: $3,002 $4,264 $0 $0 $0 $0 $0 $7,266
Project Number: 1142300 Project Manager: Pete d'AblaingProject Name: East Division Maintenance Facility
(Escondido, CA)Phone Number: (619) 699-1906
PROJECT DESCRIPTION SITE LOCATIONThis project will build a new bus maintenance facility and renovate the existing maintenance garage building to include eight new service bays with life safety and other mechanical features required for servicing CNG fueled vehicles. The existing maintenance garage facility would be renovated to include new employee locker rooms and showers, lunchroom, machine shops, expanded stockroom and storage facilities, and renovated office space.
PROJECT JUSTIFICATIONDuring the last several years, NCTD has been renovating and expanding the bus maintenance facility in Escondido. The goal has been to provide flexibility to expand the Escondido fleet size and accommodate CNG fueled vehicles. To date, NCTD has built a new bus fueling and servicing island, increased bus parking capacity, built a natural gas fueling facility, renovated an office building for bus operations and dispatch, and built a new body shop and storage facility. The next and final phase of the project is to build a new CNG bus servicing bay facility and renovate the existing maintenance garage building to enhance the functionality of the space lay-out.
PROGRESS TO DATE MAJOR MILESTONESThis project is being constructed in two Phases. Phase I is the construction of the new 8-Bay maintenance building and Phase II is the remodel of the existing maintenance garage. Phase I has been in construction approximately six months. At start-up, excavation uncovered hazardous material requiring proper analysis and clean-up. After soil clean-up, concrete footing foundation work and installation of the concrete slab commenced. Steel Frame installation of the new maintenance building has begun.
MILESTONE FINISH DATE
Design Aug-05
Advertise and Award Jun-07
Construction Jun-09
EXPENDITURE PLAN ($000)
TASKPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
Administration $267 $164 $0 $0 $0 $0 $0 $431
Miscellaneous Equipment 3 4 0 0 0 0 0 7
Engineering & Design 100 200 0 0 0 0 0 300
Construction Management 418 210 0 0 0 0 0 628
Professional Services 14 50 0 0 0 0 0 64
Construction 2,200 3,620 0 0 0 0 0 5,820
Environmental 0 0 0 0 0 0 0 0
Project Contingency 0 16 0 0 0 0 0 16Total $3,002 $4,264 $0 $0 $0 $0 $0 $7,266
FUNDING PLAN ($000)PRIOR YEARS
FUTURE YEARSFUNDING SOURCE FY 09 FY 10 FY 11 FY 12 FY 13 TOTAL
FEDERAL:
FTA Section 5307 $2,402 $781 $0 $0 $0 $0 $0 $3,183
Federal Section 5309 - Bus Program 0 680 0 0 0 0 0 680
STATE:
STA 0 25 0 0 0 0 0 25
LOCAL:
TDA 600 353 0 0 0 0 0 953
TransNet * 0 2,232 0 0 0 0 0 2,232 Miscellaneous Project Revenue 0 193 0 0 0 0 0 193
* At its meeting on March 23, 2007 the SANDAG Board of Directors approved the swap between STIP and TransNet
Project Number: 1142500 Project Manager: James Dreisbach-TowleProject Name: Centraliz Ped Train Control (CTC) hone Number: (619) 699-1914
PROJECT DESCRIPTION SITE LOCATIONThis project will turn MTS' new Interim Trolley Control Center (ITCC) into a modern operation center like those currently operated by other properties. CTC combines elements of train location, switch control, fire/life & safety monitoring, as well as allows staff to control passenger information signs and public address systems. The project will procure both a back-end computer system as well as deploy the necessary field equipment to safely and efficiently control our train network.
NOT APPLICABLEPROJECT JUSTIFICATION
Installation of a Train Location System will provide the Controllers in Central Control the tools they need to properly manage the trains on the trolley system in a safe, effective, and efficient manner.
PROGRESS TO DATE MAJOR MILESTONESThe project has completed design of the system, released an RFP, and Awarded the contractor for system implementation.
MILESTONE FINISH DATEDesign Aug-06
Contract Award Dec-07
Phase I Implementation Jan-09
Operations Mar-09
EXPENDITURE PLAN ($000)
TASKPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
Administration $223 $121 $121 $121 $0 $0 $0 $586
Miscellaneous Equipment 1,000 1,200 500 1,725 0 0 0 4,425
Engineering & Design 0 115 115 0 0 0 0 230
Construction Management 0 250 250 0 0 0 0 500
Professional Services 680 225 200 0 0 0 0 1,105
Construction 43 2,318 2,319 0 0 0 0 4,680
Environmental 0 0 0 0 0 0 0 0
Project Contingency 0 352 353 0 0 0 0 705Total $1,946 $4,581 $3,858 $1,846 $0 $0 $0 $12,231
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
FEDERAL:
FTA Section 5307 $1,557 $1,643 $0 $0 $0 $0 $0 $3,200
LOCAL:
TDA 389 411 0 0 0 0 0 800
TransNet-H 0 2,527 3,858 1,846 0 0 0 8,231
TOTAL: $1,946 $4,581 $3,858 $1,846 $0 $0 $0 $12,231
* At its meeting on March 23, 2007 the SANDAG Board of Directors approved the swap between STIP and TransNet funding for this project.
Project Number: 1142600 Project Manager: James Dreisbach-TowleProject Name: Joint Trans tati ppor on O erations Center (JTOC) Phone Number: (619) 699-1914
PROJECT DESCRIPTION SITE LOCATIONJTOC is a continuing effort to implement coordinated operations across highways, arterial and transit. The project will result in the design and construction of a multi-modal control center combining elements from the Metropolitan Transit System’s bus and light-rail operations and City of San Diego traffic management existing control center facilities, along with regional systems for 511 traveler information, compass card, and value pricing in one integrated Regional Operation Center.
NOT APPLICABLEPROJECT JUSTIFICATION
This Regional Operation Center would coordinate and integrate several ITS deployments currently underway in the region to support management and information operations for transit, highways, and arterials. These systems include regional systems for 511 traveler information, modal integration, value pricing, and smart cards. The key outcomes of this project and its integrated systems are delivery of transportation network management; develop customer relationship management and support to public safety agencies and homeland security.
PROGRESS TO DATE MAJOR MILESTONESThe project has completed a concept of operations plan. MILESTONE FINISH DATE
Environmental Note 1
Design Note 1
Construction Note 1
Note 1: Completion Dates are contingent upon obtaining additional funds
EXPENDITURE PLAN ($000)
TASKPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
Administration $0 $200 $75 $75 $0 $0 $0 $350
Miscellaneous Equipment 0 0 0 0 0 0 0 0
Engineering & Design 0 1,000 0 0 0 0 0 1,000
Construction Management 0 3 15 115 0 0 0 133
Right of Way 0 1,500 0 0 0 0 0 1,500
Construction 0 297 1,735 11,385 0 0 0 13,417
Environmental 0 0 0 0 0 0 0 0
Project Contingency 0 0 0 0 0 0 0 0Total $0 $3,000 $1,825 $11,575 $0 $0 $0 $16,400
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
FEDERAL:
FHWA (ITS Earmark) $0 $2,400 $1,462 $34 $0 $0 $0 $3,896
LOCAL:TransNet -H 0 600 363 0 0 0 0 963
TOTAL: $0 $3,000 $1,825 $34 $0 $0 $0 $4,859
Note: The entire cost of this project is estimated at $16,400,000. Continued funding is subject to the annual capital programming process.
TOTAL: $65 $694 $1,130 $1,362 $0 $0 $0 $3,251
to the annual capital programming process.
Project Number: 1142700 Project Manager: Pete d'AblaingProject Name: East County Bus Maintenance Facility
(ECBMF) - CNG Station Phone Number: (619) 699-1906
PROJECT DESCRIPTION SITE LOCATIONThis project will provide for facility upgrades and site improvements for the ECBMF. This includes site development including CNG and gasoline fueling facilities and facility upgrades to accommodate CNG. Environmental documents will be required prior to the beginning of the project.
PROJECT JUSTIFICATIONThe MTS Contracted Services East County Division has approximately 62 diesel-powered buses. Many of them are near retirement and are beyond their useful lives. This project would provide fueling and facilities to be able to accommodate new CNG powered transit buses so older diesel buses can be retired.
PROGRESS TO DATE MAJOR MILESTONESEnvironmental assessment of the site is currently being developed taking into account possible site expansion and fueling type.
MILESTONE FINISH DATEEnvironmental Dec-08
Right of Way Sep-09
Design Dec-09
Construction Dec-10
EXPENDITURE PLAN ($000)
TASKPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
Administration $15 $68 $75 $92 $0 $0 $0 $250
Miscellaneous Equipment 0 0 0 0 0 0 0 0
Engineering & Design 50 175 30 20 0 0 0 275
Construction Management 0 25 75 150 0 0 0 250
Professional Services 0 50 25 0 0 0 0 75
Construction 0 351 900 1,000 0 0 0 2,251
Environmental 0 0 0 0 0 0 0 0
Project Contingency 0 25 25 100 0 0 0 150Total $65 $694 $1,130 $1,362 $0 $0 $0 $3,251
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
FEDERAL:
FTA Section 5307 $0 $201 $0 $0 $0 $0 $0 $201
STATE:
STA 0 308 1,130 1,362 0 0 0 2,800
LOCAL
0 50 0 0 0 0 0 50 TDA
Miscellaneous Project Revenue 65 135 0 0 0 0 0 200
NOTE: The estimated cost of this project is preliminarily estimated to be $92.5 million. Continued funding is subject
Project Number: 1142800 Project Manager: John HaggertyProject Name: Catenar d n g pro ts ony an Sig alin Im vemen Ph e Number: (619) 699-6937
PROJECT DESCRIPTION SITE LOCATIONThis project replaces worn trolley catenary system and traction power components; brings the catenary into compliance with General Order (GO) 95 requirements; and replaces corroded signal cases. FY 09 activities include design, testing, and start of construction.
Not ApplicablePROJECT JUSTIFICATION
This project will replace worn catenary, traction power distribution components, and signal cases that are worn and starting to fail. These elements are vital to operations of the trolley system. It is also imperative to ensure the Trolley system is compliant with CPUC General Orders.
PROGRESS TO DATE MAJOR MILESTONESDesign is underway with construction starting in mid to late FY09 MILESTONE FINISH DATE
Design Oct-08
Construction Sep-09
Close Out Dec-09
EXPENDITURE PLAN ($000)
TASKPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
Administration $5 $75 $0 $0 $0 $0 $0 $80
Miscellaneous Equipm ten 0 0 0 0 0 0 0 0
Engineering & Design 10 90 0 0 0 0 0 100
Construction Management 0 105 0 0 0 0 0 105
Professional Services 0 0 0 0 0 0 0 0
Construction 0 825 0 0 0 0 0 825
Environmental 0 0 0 0 0 0 0 0
Project Contingency 0 76 0 0 0 0 0 76Total $15 $1,171 $0 $0 $0 $0 $0 $1,186
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
STATE:
STA $15 $1,171 $0 $0 $0 $0 $0 $1,186
TOTAL: $15 $1,171 $0 $0 $0 $0 $0 $1,186
Project Number: 1142900 Project Manager: Leslie BlandaProject Name: San Dieguito River Bridge
Replacement & Second Track Phone Number: (619) 699-6907
PROJECT DESCRIPTION SITE LOCATIONThe project has two components. The first component involves the replacement of the existing worn single-track timber bridge over the San Dieguito River with a concrete and steel double track structure. The second component would add a new 1.1 mile segment of second main track from Milepost 242.2 and Milepost 243.3 to connect the existing short passing tracks at Solana Beach and Del Mar. The resultant double track segment would be 2.8 miles in length.
PROJECT JUSTIFICATIONThis project would increase schedule reliability, improve operational flexibility and increase capacity.
PROGRESS TO DATE MAJOR MILESTONESThe project is scheduled to be initiated in the second half of FY 08. The currently funded phase of the project includes conceptual engineering and an environmental constraints report. Once complete, this work will provide an estimated capital cost for the project, a description of any needed right-of-way and a description of the environmental constraints. At that time a schedule and scope for moving the project forward can be determined.
MILESTONE FINISH DATEEnvironmental Note 1
Right of Way Note 1
Design Note 1
Open for Service Note 1
Note 1: Completion Dates are contingent upon obtaining additionalNote 1: Completion Dates are contingent upon obtaining additional funds
EXPENDITURE PLAN ($000)
TASKPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
Administration $17 $51 $0 $0 $0 $0 $0 $68
Miscellaneous Equipment 0 0 0 0 0 0 0 0
Engineering & Design 140 421 0 0 0 0 0 561
Construction Management 0 0 0 0 0 0 0 0
Professional Services 56 170 0 0 0 0 0 226
Construction 0 0 0 0 0 0 0 0
Environmental 0 0 0 0 0 0 0 0
Project Contingency 0 0 0 0 0 0 0 0Total $213 $642 $0 $0 $0 $0 $0 $855
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
STATE:
State ITIP $213 $642 $0 $0 $0 $0 $0 $855
TOTAL: $213 $642 $0 $0 $0 $0 $0 $855
NOTE: The estimated cost of this project is preliminarily estimated to be $92.5 million. Continued funding is subject to the annual capital programming process.
Project Number: 1143000 Project Manager: Leslie BlandaProject Name: Del Mar Bluffs Stabilization III Phone Number: (619) 699-6907
PROJECT DESCRIPTION SITE LOCATIONThe Del Mar Bluffs consists of 1.6 miles of coastal bluff in the southern portion of the City of Del Mar at the edge of the Pacific Ocean. Ongoing degradation of the Del Mar Bluffs is occurring due to several factors which are detailed in the Del Mar Bluffs Geotechnical Study.
Del Mar Bluffs Stabilization Project 3 would focus on those areas that currently possess inadequate factors of safety or are projected to possess inadequate factors of safety in the near term, which, due to funding restrictions, could not be constructed as part of Del Mar Bluffs Stabilization Project 2 – Preserving Track Bed Support.
PROJECT JUSTIFICATIONThe coastal bluffs that support the LOSSAN rail alignment in the City of Del Mar are subject to ongoing erosion and failures that could threaten the viability of rail service to southern San Diego County. It is critical to implement a means of stabilizing the Bluffs and preserving track bed support in order to maintain use of the existing railroad tracks. The tracks are part of the LOSSAN Rail Corridor and are utilized by Coaster commuter rail service, Amtrak's Pacific Surfliner intercity service, and Burlington Northern and Santa Fe (BNSF) freight service.
PROGRESS TO DATE MAJOR MILESTONESThe Del Mar Bluffs Stabilization Project 3 is scheduled to be initiated during the fourth quarter of FY 08. As such, no progress has been made to date.
MILESTONE FINISH DATE
Environmental Nov-09
Design Mar-10
Open for Service Jun-11
EXPENDITURE PLAN ($000)
TASKPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
Administration $19 $37 $84 $127 $0 $0 $0 $267
Miscellaneous Equipment 0 0 0 0 0 0 0 0
Engineering & Design 176 353 376 60 0 0 0 965
Construction Management 0 0 0 240 0 0 0 240
Professional Services 7 14 42 181 0 0 0 244
Construction 0 0 0 2,397 0 0 0 2,397
Environmental 59 117 59 0 0 0 0 235
Project Contingency 39 79 84 452 0 0 0 654Total $300 $600 $645 $3,457 $0 $0 $0 $5,002
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
STATE:
STIP $300 $300 $540 $3,457 $0 $0 $0 $4,597
Proposition 116 0 300 105 0 0 0 0 405
TOTAL: $300 $600 $645 $3,457 $0 $0 $0 $5,002
Project Number: 1143300 Project Manager: Linda CulpProject Name: Escondi ran t Pdo Bus Rapid T si hone Number: (619) 699-6957
PROJECT DESCRIPTION SITE LOCATIONThis project makes improvements to NCTD's Route 350, a six-mile local bus route in the City of Escondido. This route is heavily used, including crunch loads from area schools, heavy use along the downtown Escondido business corridor, key connections with MTS Route 20 at North County Fair and local NCTD routes and future I-15 BRT and SPRINTER services at the Escondido Transit Center. Improvements include bus stop consolidation and enhancements, queue jumper, and transit signal priority.
To Be Provided LaterPROJECT JUSTIFICATION
This project will improve transit travel times and reliability without adversely impacting corridor traffic conditions. Future operational savings also are expected.
PROGRESS TO DATE MAJOR MILESTONESThis project is being planned, designed, and will be constructed by SANDAG, NCTD, and the City of Escondido. A project concept study was completed in 2006 and preliminary design was completed in 2007. Environmental and final design was completed in 2008, with construction expected to be completed in FY 2009.
MILESTONE FINISH DATE
Environmental Jun-09
Design Jun-11
Open for Service Jun-12
EXPENDITURE PLAN ($000)
TASKPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
Administration $14 $26 $14 $60 $0 $0 $0 $114
Utilities 0 0 0 0 0 0 0 0
Engineering & Design 470 0 200 0 0 0 0 670
Construction Management 0 300 0 363 0 0 0 663
Professional Services 0 150 0 0 0 0 0 150
Right of Way 0 0 0 0 0 0 0 0
Construction 0 1,931 0 2,300 0 0 0 4,231
Project Contingency 0 247 0 302 0 0 0 549Total $484 $2,654 $214 $3,025 $0 $0 $0 $6,377
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
LOCAL:TransNet $484 $2,316 $0 $0 $0 $0 $0 $2,800
TOTAL: $484 $2,316 $0 $0 $0 $0 $0 $2,800
Note: The entire cost of this project is estimated at $6,377,000 (including $3,138,000 for Phase 1).Continued funding is subject to the annual capital programming process.
TOTAL: $45,505 $2,520 $0 $0 $0 $0 $0 $48,025
funding for this project.
Project Number: 1145700 Project Manager: James Dreisbach-TowleProject Name: Fare Techno gy onlo Ph e Number: (619) 699-1914
PROJECT DESCRIPTION SITE LOCATIONThis project will develop a regional automated fare technology system using smart card technology. This project is a joint effort between MTDB and North County Transit District (NCTD).
NOT APPLICABLEPROJECT JUSTIFICATION
One card and one system will allow patrons to utilize transit throughout the region while we improve customer and operator interaction, eliminate confusion, and make transit more accessible. This project will increase security for passengers and employees by reducing cash transactions, reduce dwell times for both bus and rail boarding's, and increase efficiency because processing of electronic payments is more cost efficient than the manual process of cash and coin handling.
PROGRESS TO DATE MAJOR MILESTONESThe project has completed the first 3 phases of implementation including Phase 1, Bus deployment, Phase II, Rail deployment, and Phase II, central system implementation. Future work will have SANDAG launching and operating the Smart Card (Compass) system as well as deploying additional equipment to the MTS Contract Bus system.
MILESTONE FINISH DATE
Design Oct-03
Implementation Jun-08
Revenue Operation Sep-08
EXPENDITURE PLAN ($000)
TASKPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
Administration $1,226 $50 $0 $0 $0 $0 $0 $1,276
Miscellaneous Equipm ten 41,500 2,172 0 0 0 0 0 43,672
Engineering & Design 4 0 0 0 0 0 0 4
Construction Management 93 0 0 0 0 0 0 93
Professional Services 1,621 180 0 0 0 0 0 1,801
Construction 1,061 118 0 0 0 0 0 1,179
Environmental 0 0 0 0 0 0 0 0
Project Contingency 0 0 0 0 0 0 0 0Total $45,505 $2,520 $0 $0 $0 $0 $0 $48,025
FUNDING PLAN ($000)
FUNDING SOURCEPRIOR YEARS FY 09 FY 10 FY 11 FY 12 FY 13
FUTURE YEARS TOTAL
FEDERAL:
FTA Section 5307 $8,251 $400 $0 $0 $0 $0 $0 $8,651
STATE:
Bond Proceeds 29,701 0 0 0 0 0 0 29,701
STIP * 2,063 0 0 0 0 0 0 2,063
LOCAL:
Miscellaneous Project Revenue 60 0 0 0 0 0 0 60
NCTD 150 0 0 0 0 0 0 150
TransNet * 5,280 2,020 0 0 0 0 0 7,300 TDA 0 100 0 0 0 0 0 100
* At its meeting on March 23, 2007 the SANDAG Board of Directors approved the swap between STIP and TransNet
MINOR TRANSIT CAPITAL PROJECTS
Projects described in this section are improvement and replacement projects of less than $1 million related to LRT or bus operations. These are projects for which SANDAG, MTS, SDTI, and SDTC would be responsible to undertake. These projects are primarily funded from federal funds and matched with local funds.
1074000 LRT Station Shelter Replacement - Phase I $897This project would provide for the replacement of trolley station shelter canopies.
1106100 Rail Replacement Broadway & MP13 $810This project will replace the flange worn curved rail at the Broadway Wye. Existing wood ties willbe replaced with concrete ties and signaling system improvements will also be performed.
1106900 Regional Miscellaneous Capital (MTDB) $165This project provides for the purchase of miscellaneous equipment to supplement regionaloperations, including equipment and materials needed to continue maintaining working space,vehicles, and facilities in a proactive manner.
1107100 Regional Miscellaneous Capital (SDTC) $70This project provides for the purchase of miscellaneous equipment to supplement regionaloperations, including equipment and materials needed to continue maintaining working space,vehicles, and facilities in a proactive manner.
1108400 Station Resigning (MVE) $582This project provides for the resigning of trolley stations to reflect the Mission Valley East projectand the new operating plan.
1108500 Switch Indicator Modifications $70This project will provide for the modification of route and indication systems at switch locations innon-automatic block signal areas (i.e., Bayside, C Street, 12th Avenue, and Imperial Avenue) tomake them consistent with the new Broadway Wye control system. This project will also replacethe signal case at switches CC9 and CC11.
1111000 Regional Miscellaneous Capital (SANDAG/MTS) $76This project provides for the purchase of miscellaneous equipment to supplement regionaloperations, including equipment and materials needed to continue maintaining working space,vehicles, and facilities in a proactive manner.
1111100 Regional Miscellaneous Capital (SDTC) $68This project provides for the purchase of miscellaneous equipment to supplement regionaloperations, including equipment and materials needed to continue maintaining working space,vehicles, and facilities in a proactive manner.
1112400 SBMF Equipment $80This project provides for the purchase of equipment to supplement maintenance operations atthe South Bay Maintenance Facility (SBMF).
1115100 Capital Needs Assessment $100This project provides for the review, assessment, and creation of a priority list of fixed assets inneed of repair or replacement.
1115600 Head Spans $700This project will provide for the replacement of aging head spans on the existing catenary throughout the trolley system.
1115700 SDTC Gemini Compressor Upgrades $575This project provides for the installation of a single piece crankcase in four Gemini natural gas compressors installed at Imperial Avenue Division (IAD) and Kearny Mesa Division (KMD). This project will also replace the single Gemini storage tank buffer at IAD with three 10,000 square foot storage vessels.
SAN DIEGO ASSOCIATION OF GOVERNMENTS
Project # Project Title Budget($000s)
FY 2009 Minor Capital Project Descriptions
9-65
Project # Project Title Budget($000s)
1128000 Substation and Traction Power Improvements $320This project rehabilitates older traction power substations by replacing worn and outdated components with new equipment to improve reliability and safety. The project also adds isolation switches to bring these substations up to current standards to isolate traction power for safety and the maintainability of the substations and catenary systems.
1128100 Mainline Drainage $260This project will develop, design, and construct drainage improvements throughout the completeSan Diego Trolley, Inc. light rail transit (LRT) system to prevent track washouts and fouledballast.
1128200 Taylor Street Grade Crossing Improvements $567This project provides for the installation of pedestrian arm gates and swing gates for the sidewalkon the South side of Taylor Street at the grade crossing in Old Town. The project includesunderground conduit, cabling, modified signal relays, traffic control, and equipment installationand testing.
1128300 ADA Station Improvements $115This project will provide for the evaluation of transit stations for ADA violations and will addressany ADA deficiencies.
1128400 Document Control $100This project includes establishing procedures for document control, establishing data categories,review of the capital construction material and categorization of each file, recording the file name,category, and storage facility location in a data base, and filing the folders in the specifiedlocation in the storage facility.
1128500 SDTC Site Hardening & Security $100This project provides for pedestrian fence repairs, guard shacks, lot camera systems and accesscontrol equipment, and the construction of steel canopies over direct connections to the citysewer.
1128600 LRV Car Wash (Replacement/Design) $150This project will upgrade the LRV washing equipment including additional equipment to enhanceLRV appearance after washing.
1128700 L Street and West Park Avenue Track Rehabilitation $550This project provides for the rehabilitation of track at L Street in Chula Vista and West ParkAvenue in the community of San Ysidro on the MTS light rail system. The two crossings will bereplaced by demolishing and grading the existing crossing, removing any deteriorated track andreconstructing and replacing the trackway.
1128800 Transit Priority Measures $219This project provides for low cost transit priority treatments, such as signal priority, queue jumplanes, transit use of freeway shoulder lanes that will serve to improve bus transit operating speedand lower operating costs.
1128900 SDTC KMD Building Rehabilitation $300This project provides for the rehabilitation of the SDTC KMD Building by replacing worn anddeteriorating building facilities and replacing the main electrical service panel enclosure.
1129000 Fashion Valley Transit Center Rehabilitation $200This project will provide for the design and bid package for renovations to the Fashion ValleyTransit Center which is showing signs of deterioration.
1129100 Bridge Inventory and Survey $180This project will provide a detailed bridge inventory and inspection of all SDTI bridge and airstructures.
9-66
Project # Project Title Budget($000s)
1129200 Catenary Catch Cable Restoration - II $390This project provides for the installation of catch cables at all balance weight locations to complywith general ordinance 95 signal point failure. This project is necessary for the system to meetPUC requirements.
1129300 System Grade Crossing Replacement $780This project will replace grade crossing track structure and roadway material at two gradecrossing locations.
TOTAL MINOR CAPITAL PROJECTS $8,423
9-67
CHAPTER 10
TransNet PROGRAM
This chapter provides summary information related to the TransNet program, the region’s ½ percent sales tax dedicated for transportation-related improvements. The TransNet program was first approved by the voters in 1987 (Proposition A, November 1987) as a 20-year measure scheduled to expire on March 31, 2008. The programs authorized by the passage of the ballot measure extended from FY 1989 through FY 2008. In 2004, the voters enacted a 40-year extension to the TransNet program (Proposition A, November 2004), which will extend the program from FY 2009 through FY 2048. The TransNet Extension Ordinance and Expenditure Plan revise the distribution of revenues beginning with FY 2009. This FY 2009 budget reflects the first year of TransNet Extension program. The TransNet Ordinance and Expenditure Plan govern the distribution of the ½ percent sales tax revenues. The original Ordinance basically allocated one-third of the revenues for highway projects specified in the ballot measure, one-third for transit purposes, and one-third for local street and road improvements, after deducting a maximum of one percent for SANDAG’s administration of the program and $1,000,000 each year for regional bicycle facilities. The extension of the Ordinance has resulted in a substantial change to the distribution of funds to the various programs. After allocating up to 1% for administration, $250,000 (subject to Consumer Price Index Adjustment) and 2% for the Bicycle, Pedestrian and Neighborhood Safety Program, the net annual revenues are distributed among the various major program categories shown in the following “Flow of Funds” chart. The following tables provide the estimated revenue distribution for FY 2008 and FY 2009. Based on the basic distribution shown in the chart, the total annual revenue estimate of $249,703,000 for FY 2009 is allocated to each major program, as shown on the following table. The next table provides a further breakdown of the transit and street and road programs. The transit funds are distributed on a population formula basis to the MTS and NCTD areas of jurisdiction, with a set-aside for specialized services for seniors and disabled riders. The local street System Improvement funds are allocated by formula to each of the eighteen cities and the County of San Diego. Debt financing has been used to accelerate the implementation of key highway, transit, and local street and road projects. The debt service costs are assessed on a pro-rata basis to each program component receiving bond proceeds. The total debt service of $81,291,000 has been deducted from the annual revenue estimates for the agencies or programs receiving bond proceeds. The net revenues show are available for expenditure for pay-as-you-go projects.
10-1
SAN DIEGO COUNTY REGIONAL TRANSPORTATION COMMISSIONFY 2009 TRANSNET PROGRAM BUDGET
Estimated
TRANSNET PROGRAM REVENUES FY 2009
ESTIMATED SALES TAX RECEIPTS $249,702,966LESS: BOARD OF EQUALIZATION FEES (3,690,192)
NET SALES TAX RECEIPTS $246,012,774
INTEREST INCOME 1,500,000
TOTAL ESTIMATED REVENUES $247,512,774
TRANSNET PROGRAM ALLOCATIONS
ADMINISTRATIVE ALLOCATIONS: 1
COMMISSION/BOARD EXPENSES $0ADMINISTRATIVE/CONTRACT SERVICES 2,460,128
TOTAL ADMINISTRATIVE ALLOCATIONS $2,460,128
PROGRAM ALLOCATIONS:
BICYCLE FACILITIES2 $4,920,255
INDEPENDENT TAXPAYER OVERSIGHT COMMITTEE3 $323,930
MAJOR CORRIDORS PROGRAM4 $101,042,787
NEW BRT/RAIL OPERATIONS5 $19,302,985
TRANSIT SYSTEM IMPROVEMENT6 $39,320,896
LOCAL SYSTEM IMPROVEMENT7 $78,641,792
TOTAL PROGRAM ALLOCATIONS $243,552,646
TOTAL ALLOCATIONS $246,012,774
INTEREST (To be Allocated) 1,500,000
TOTAL ALLOCATIONS AND INTEREST $247,512,774
NOTES:
5 No more than 8.1% shall be allocated to operate new rail or BRT services.
The TransNet Ordinance established the rules for the allocation of all Commission revenues. Commission funds are allocated according to the following priorities:
1 No more than one percent of the annual revenues shall be allocated for administrative expenses. 2 Annually, 2 percent shall be allocated for bicycle facilities. 3
The ITOC allocation is based on the annual increase in CPI beginning with FY 2002, using $250,000 as the starting base.
6 No more than 16.5% shall be allocated for purposes of public transit services including
providing for senior and ADA related services. 7
Nor more than 33% shall be allocated for local street improvement services which includes roadway projects as well as local EMP and smart growth incentive programs.
4 No more than 42.4% shall be allocated for Major Corridor projects which include
transportation mitigation under the Environmental Mitigation (EMP) program and any finance charges incurred.
10-2
SAN DIEGO COUNTY REGIONAL TRANSPORTATION COMMISSIONFY 2009 TRANSNET PROGRAM BUDGET
ProjectedDETAIL OF ESTIMATED PROGRAM ALLOCATIONS 1 FY 2009
BICYCLE FACILITIES $4,920,255
MAJOR CORRIDORS PROGRAM4 $101,042,787
PUBLIC TRANSIT IMPROVEMENTS: 2
2.5% FOR ADA RELATED SERVICES $983,0223.25% FOR SERVICES FOR SENIORS AND DISABLED $1,277,929
MTS PROJECTS & SERVICES $26,282,322
NCTD PROJECTS & SERVICES: $10,777,622
TOTAL PUBLIC TRANSIT IMPROVEMENTS $39,320,896
LOCAL STREET & ROAD IMPROVEMENTS: 3
CARLSBAD $2,384,922 CHULA VISTA 4,576,808 CORONADO 518,291 DEL MAR 185,721 EL CAJON 2,068,938 ENCINITAS 1,479,355 ESCONDIDO 3,021,828 IMPERIAL BEACH 631,703 LA MESA 1,343,648 LEMON GROVE 621,972 NATIONAL CITY 1,258,440 OCEANSIDE 3,951,738 POWAY 1,351,719 SAN DIEGO 27,593,392 SAN MARCOS 1,754,266 SANTEE 1,236,885 SOLANA BEACH 394,561 VISTA 1,981,377 COUNTY OF SAN DIEGO 12,992,199
TOTAL LOCAL STREET & ROAD PROJECTS $69,347,762
Local EMP4 4,289,552 Local Smart Growth Incentive Program4 5,004,478
TOTAL PROGRAM ALLOCATIONS $78,641,792
NOTES:
2 Transit allocations are 2.5% for services to seniors and disabled and 3.25% for senior/disabled services with the balance allocated by population to MTS and NCTD.
3 Local program funds are allocated as $50,000 to each jurisdiction and the balance
allocated by a formula based on 2/3 population and 1/3 miles of local streets and roads.
4 The local EMP and Smart Growth programs are a subset under Local Systems
Improvement designed to encourage early project mitigation and smart growth planning. These funds are available on a competitive call for projects process.
1 This table does not include interest earnings, which are allocated to each agency based upon actual cash flow, or revenue bond proceeds allocated for specific projects.
10-3
SAN DIEGO COUNTY REGIONAL TRANSPORTATION COMMISSIONFY 2009 TRANSNET PROGRAM BUDGET
Actual Projected % Estimated %
TRANSNET PROGRAM REVENUES FY 2007 4 FY 2008 4 Change FY 2009 Change
ESTIMATED SALES TAX RECEIPTS $251,643,168 $244,327,755 $249,703,195LESS: BOARD OF EQUALIZATION FEES (3,718,865) (3,610,755) (3,690,195)
NET SALES TAX RECEIPTS $247,924,304 $240,717,000 -2.9% $246,013,000
INTEREST INCOME 3,268,958 1,500,000 -54.1% 1,500,000
TOTAL ESTIMATED REVENUES $251,193,262 $242,217,000 -3.6% $247,513,000 2.2%
TRANSNET PROGRAM ALLOCATIONS
ADMINISTRATIVE ALLOCATIONS: 1
COMMISSION/BOARD EXPENSES $191,500 $246,500 28.7% SEE PREVIOUS ADMINISTRATIVE/CONTRACT SERVICES 2,287,743 2,160,670 -5.6% PAGE
TOTAL ADMINISTRATIVE ALLOCATIONS $2,479,243 $2,407,170 -2.9%
PROGRAM ALLOCATIONS:
BICYCLE FACILITIES 2 $1,000,000 $1,000,000 0.0%
HIGHWAY IMPROVEMENTS 3 81,481,687 79,102,943 -2.9%
PUBLIC TRANSIT IMPROVEMENT 3 81,481,687 79,102,943 -2.9%
LOCAL STREET & ROAD IMPROVEMENTS 3 81,481,687 79,102,943 -2.9%
TOTAL PROGRAM ALLOCATIONS $245,445,061 $238,308,829 -2.9%
TOTAL ALLOCATIONS $247,924,304 $240,715,999 -2.9%
INTEREST (To be Allocated) 3,268,958 1,501,001 -54.1%
TOTAL ALLOCATIONS AND INTEREST 251,193,262 $242,217,000 -3.6%
NOTES:
The TransNet Ordinance established the rules for the allocation of all Commission revenues. Commission funds are allocated according to the following priorities:
4 Funds allocated to these program areas include annual debt service for TransNet revenue bonds and commercial
paper notes. 5
Revised FY 2007 revenues are based on actual receipts as of April 2007.
1 No more than one percent of the annual revenues shall be allocated for administrative expenses. 2 Annually, $1,000,000 shall be allocated for bicycle facilities. 3
The remaining funds shall be allocated equally among highway improvements, public transit improvements, and local street and road improvements. Partial funding came back to SANDAG as transit project funding.
10-4
SAN DIEGO COUNTY REGIONAL TRANSPORTATION COMMISSIONFY 2009 TRANSNET PROGRAM BUDGET
Revised Projected % Projected %
DETAIL OF ESTIMATED PROGRAM ALLOCATIONS 1 FY 2007 4,5 FY 2008 4Change FY 2009 Change
SEE PREVIOUS
BICYCLE FACILITIES $1,000,000 $1,000,000 0.0% PAGE
HIGHWAY IMPROVEMENTS $81,481,687 $79,102,943 -2.9%
PUBLIC TRANSIT IMPROVEMENTS: 2
1% FOR SERVICES FOR SENIORS AND DISABLED $814,817 $791,029 -2.9%
PUBLIC TRANSIT IMPROVEMENTS:
MTS PROJECTS & SERVICES: 60% FOR RAIL CAPITAL PROJECTS $34,654,487 $33,535,291 -3.2% SEE PREVIOUS PASS PROGRAMS & SERVICE IMPROVEMENTS 23,102,992 22,356,861 -3.2% PAGE Transfer of Planning for BRT projects to SANDAG (89,000) (628,000) 605.6%
TOTAL MTS $57,668,479 $55,264,152 -4.2% NCTD PROJECTS & SERVICES: 60% FOR RAIL CAPITAL PROJECTS $13,745,635 $13,452,055 -2.1% SERVICE IMPROVEMENTS & NON-RAIL CAPITAL 9,163,756 8,968,037 -2.1%
TOTAL NCTD $22,909,391 $22,420,092 -2.1%
Total SANDAG (BRT) $89,000 $628,000 605.6%
TOTAL PUBLIC TRANSIT IMPROVEMENTS $81,481,687 $79,103,273
LOCAL STREET & ROAD IMPROVEMENTS: 3
CARLSBAD $2,725,481 $2,697,019 -1.0% CHULA VISTA 5,267,298 5,194,261 -1.4% CORONADO 678,816 645,591 -4.9% DEL MAR 211,272 205,793 -2.6% EL CAJON 2,463,915 2,369,956 -3.8% ENCINITAS 1,743,798 1,689,031 -3.1% ESCONDIDO 3,580,967 3,454,518 -3.5% IMPERIAL BEACH 743,191 717,821 -3.4% LA MESA 1,570,036 1,515,893 -3.4% LEMON GROVE 732,641 707,414 -3.4% NATIONAL CITY 1,537,462 1,483,998 -3.5% OCEANSIDE 4,670,219 4,515,880 -3.3% POWAY 1,596,288 1,543,970 -3.3% SAN DIEGO 32,673,896 31,689,457 -3.0% SAN MARCOS 1,963,204 1,962,737 0.0% SANTEE 1,439,000 1,397,217 -2.9% SOLANA BEACH 459,696 445,195 -3.2% VISTA 2,325,544 2,255,810 -3.0% COUNTY OF SAN DIEGO 15,098,964 14,611,383 -3.2%
TOTAL LOCAL STREET & ROAD IMPROVEMENTS $81,481,687 $79,102,943 -2.9%
TOTAL PROGRAM ALLOCATIONS $245,445,061 $238,309,160 -2.9%
NOTES:
1 This table does not include interest earnings, which are allocated to each agency based upon actual cash flow, or revenue bond proceeds allocated for specific projects.
2 Transit allocations are 1% for services to seniors and disabled with the balance allocated by population to MTDB and NCTD (71.6% and 28.4% for FY 07; 71.4% and 28.6% for FY 08). 3 Local program funds are allocated as $50,000 to each jurisdiction and the balance allocated by a formula based on 2/3 population and 1/3 miles of local streets and roads. FY 2008 Final Budget is based on Dept. of Finance January 1, 2006 population estimates.
4 FY 2007 revenues are based on the final fiscal audit
10-5
CHAPTER 11
MEMBER AGENCY ASSESSMENTS
11-1
Overview
This chapter shows the three forms of member agency fees that are part of the SANDAG annual budget: SANDAG fees, Criminal Justice fees, and ARJIS (Automated Regional Justice Information Services) member assessments. The tables show the amount of fees for each jurisdiction relative to the previous year. No changes to these fees are anticipated.
11-2
SAN DIEGO ASSOCIATION OF GOVERNMENTSFY 2009 MEMBER AGENCY ASSESSMENTS
COMBINED COMBINEDCERTIFIED* FY 2008 CERTIFIED** FY 2009 PERCENT TOTAL TOTAL PERCENT
MEMBER AGENCY POPULATION % OF POPULATION % OF CHANGE ACTUAL BUDGET ACTUAL BUDGET COLUMNS PROPOSED CHANGE1/01/2007 REGION 1/01/2007 REGION OVER FY 08 FY 2008 FY 2009 FY 2008 FY 2009 FY 2008 FY 2009 OVER FY 08
(1) (4) (3) (4) (5) (6) (7) (8) (9) (10) (7)+(9) (8)+(10)
CARLSBAD 101,337 3.3% 101,337 3.3% 0.0% 17,905 17,905 4,721 4,721 22,626 22,626 0.0%
CHULA VISTA 227,723 7.4% 227,723 7.4% 0.0% 40,236 40,236 10,610 10,610 50,846 50,846 0.0%
CORONADO 22,957 0.7% 22,957 0.7% 0.0% 4,056 4,056 1,070 1,070 5,126 5,126 0.0%
DEL MAR 4,548 0.1% 4,548 0.1% 0.0% 804 804 212 212 1,015 1,015 0.0%
EL CAJON 97,255 3.1% 97,255 3.1% 0.0% 17,184 17,184 4,531 4,531 21,715 21,715 0.0%
ENCINITAS 63,259 2.0% 63,259 2.0% 0.0% 11,177 11,177 2,947 2,947 14,124 14,124 0.0%
ESCONDIDO 141,788 4.6% 141,788 4.6% 0.0% 25,052 25,052 6,606 6,606 31,658 31,658 0.0%
IMPERIAL BEACH 27,709 0.9% 27,709 0.9% 0.0% 4,896 4,896 1,291 1,291 6,187 6,187 0.0%
LA MESA 56,250 1.8% 56,250 1.8% 0.0% 9,939 9,939 2,621 2,621 12,559 12,559 0.0%
LEMON GROVE 25,451 0.8% 25,451 0.8% 0.0% 4,497 4,497 1,186 1,186 5,683 5,683 0.0%
NATIONAL CITY 61,115 2.0% 61,115 2.0% 0.0% 10,798 10,798 2,847 2,847 13,646 13,646 0.0%
OCEANSIDE 176,644 5.7% 176,644 5.7% 0.0% 31,211 31,211 8,230 8,230 39,441 39,441 0.0%
POWAY 50,830 1.6% 50,830 1.6% 0.0% 8,981 8,981 2,368 2,368 11,349 11,349 0.0%
SAN DIEGO 1,316,837 42.5% 1,316,837 42.5% 0.0% 232,669 232,669 61,352 61,352 294,021 294,021 0.0%
SAN MARCOS 79,812 2.6% 79,812 2.6% 0.0% 14,102 14,102 3,718 3,718 17,820 17,820 0.0%
SANTEE 55,158 1.8% 55,158 1.8% 0.0% 9,746 9,746 2,570 2,570 12,316 12,316 0.0%
SOLANA BEACH 13,418 0.4% 13,418 0.4% 0.0% 2,371 2,371 625 625 2,996 2,996 0.0%
VISTA 94,962 3.1% 94,962 3.1% 0.0% 16,779 16,779 4,424 4,424 21,203 21,203 0.0%
COUNTY 481,216 15.5% 481,216 15.5% 0.0% 85,025 85,025 78,071 78,071 163,096 163,096 0.0%
TOTAL REGION 3,098,269 100.0% 3,098,269 100.0% 0.0% 547,426 547,426 200,000 200,000 747,426 747,426 0.0%
*JANUARY 1, 2007 POPULATION ESTIMATES, FROM THE STATE DEPT. OF FINANCE MAY 2007 UPDATE*JANUARY 1, 2008 POPULATION ESTIMATES, TO BE UPDATED WITH THE STATE DEPT. OF FINANCE MAY 2008 UPDATE
CRIMINAL JUSTICEMEMBER ASSESSMENT
SANDAGMEMBER ASSESSMENT
11-3
FY 2007 FY 2008 FY 2009Member Proposed Member Proposed Member
Agency Name Assessments (1) Assessments (1) Assessments (1)
Carlsbad 35,423$ 36,131$ 36,131$ Chula Vista 99,289 101,275 101,275 Coronado 17,722 18,076 18,076 Del Mar 2,887 2,945 2,945 El Cajon 75,572 77,083 77,083 Encinitas 32,354 33,001 33,001 Escondido 69,354 70,741 70,741 Imperial Beach 15,798 16,114 16,114 La Mesa 42,736 43,591 43,591 Lemon Grove 13,974 14,253 14,253 National City 32,660 33,313 33,313 Oceanside 80,453 82,062 82,062 Poway 25,823 26,339 26,339 San Diego 843,048 859,909 859,909 San Marcos 26,887 27,425 27,425 Santee 30,379 30,987 30,987 Solana Beach 7,747 7,652 7,652 Vista 45,266 46,171 46,171 County Sheriff 270,774 276,189 276,189 Total: Member Agencies 1,768,146$ 1,803,259$ 1,803,259$
Sub-Total: Ex-Officio Members (2) 93,139 95,003 100,613
Total: ARJIS Membership Assessments 1,861,285$ 1,898,262$ 1,903,872$
Other ARJIS Sources of Revenue:ARJIS User & Network Connectivity Fees (3) 2,351,003$ 2,398,023$ 2,518,860$ Federal & Local Grants 1,579,235 1,630,140 1,918,060 Carryover from FY08 GrantsProjected Savings from FY 07/08 379,771 - - ARJIS Reserves - 1,946,075 1,673,030
TOTAL: ARJIS REVENUE SOURCES 6,171,294$ 7,872,500$ 8,013,822$
PROJECTED USE OF ARJIS REVENUEARJIS Work Elements (4) Expenses Expenses ExpensesMaintenance & Support # 2,311,955$ 2,508,549 2,623,813 Project Mgmt & Enhancements # 1,614,998 1,679,572 1,482,584 Border Safe III/RISC # 772,369 457,117 365,668Enterprise System # 462,599 1,946,075 1,939,365 SRF Enterprise Retreival System # 298,097 999,953 552,178 Regional Interoperability # 296,436 106,164 50,000 UDC/DHS First Responder # 369,776 - - Domestic Violence Comm. System # - 175,069 53,688 Officer Notification and Smart Alerting System # 359,453 Tactical Identification System # 415,509 SmartSearch # 171,564 Revenue to Reserves (See notes 2&3) 45,064 Addition to Reserves
6,171,294$ 7,872,500$ 8,013,822$
Notes:1) Member assessment charges cover the administrative costs of ARJIS, including salaries, development, rent, and other overhead. Assessments are based on population.
2) See next page for list of ex-officio agencies.
3) User & Network fees are 'pass-through' charges for system support and infrastructure maintenance. Charges are based on usage in 2001.
4) See Chapter 2 for description of work elements, listed by OWP number.
FY 2009 ARJIS MEMBER ASSESSMENTSAnd Other Revenue Sources
11-4
FY 07 FY 08 FY 09Member Member Proposed Member
Agency Name Assessments (1) Assessments (1) Assessments (1)
Cal State San Marcos 1,000$ 1,020$ 1,020$ California Department of Corrections and Rehabilitation - - 2,295 California Department of Health Services/Medical Fraud 789 804 804 California Department of Insurance 789 804 804 California Department of Justice BNE (Bureau of Narcotic Enforcement) 1,491 1,520 1,520 California Highway Patrol - Farnham St (Pd w/Grant) 750 765 - California Highway Patrol - Opportunity Rd (Pd w/Grant) 750 765 - City of Del Mar Park Ranger 750 765 765 DA Catch (SD DA-Computer & Technology Crime High-tech Response Team) 2,539 2,590 2,590 Department of Homeland Security - Office of Border Patrol - - - Donovan Correctional 818 834 834 Grossmont/Cuyamaca College Police Department 1,000 1,020 1,020 Imperial County LECC 7,885 8,043 8,043 Mira Costa College Police Department 789 804 804 Palomar College Police Department 789 804 804 RATT (Regional Auto Theft Task Force) 2,550 2,601 2,601 San Diego City Schools Police Department 2,651 2,704 2,704 San Diego Community College Police Department 1,626 1,659 1,659 San Diego Harbor Police Department 3,498 3,568 3,568 San Diego State University 1,787 1,823 1,823 Southwest College Police Department 788 804 804 United States Attorney 2,938 2,997 2,997 United States Bureau of ATF (Alcohol,Tobacco,Firearms) 1,183 1,206 1,206 United States Department of Justice Drug Enforcement Agency (DEA) 3,548 3,619 3,619 United States Department of Justice NIN DEA (SD & Imperial County) 1,971 2,010 2,010 United States Department of State 788 804 804 United States Department of Veterans Affairs 750 765 765 United States DHS: ICE (formerly US Customs) 3,148 3,211 3,211 United States DHS: ICE-DRO (formerly INS Fugitive Unit) 1,000 1,020 1,020 United States DHS: INS (Immigration&Naturalization Service) 1,419 1,447 1,447 United States DHS: OIG - El Centro 750 765 765 United States DHS: OIG - San Diego 750 765 765 United States DHS: OFO - - 765 United States DHS: ICE-OI - - 1,530 United States DHS: OBP - - 1,785 United States DHS: USBP (Border Patrol) 3,943 4,021 4,021 United States DHS: USCG (US Coast Guard) 788 804 804 United States Federal Bureau of Investigation (FBI) 8,962 9,141 9,141 United States Federal Bureau of Investigation -Squad 9 (only network/circuit) - - - United States Federal Probation 3,358 3,426 3,426 United States Forest Service 1,032 1,052 1,052 United States Internal Revenue Service Criminal Division 750 765 765 United States Marine Corps - Camp Pendleton Provost Marshal 1,000 1,020 1,020 United States Marine Corps - MCAS Provost Marshal - Miramar 1,000 1,020 1,020 United States Marine Corps - MCRD - - 765 United States Marshals Service 9,849 10,046 10,046 United States Naval Commander SW Region 1,000 1,020 1,020 United States Naval Consolidated Brig (Miramar) 788 804 804 United States Naval Criminal Investigative Service (NCIS)-Camp Pendleton 1,511 1,541 1,541 United States Naval Criminal Investigative Service (NCIS)-San Diego 1,511 1,541 1,541 United States Postal Service 2,094 2,136 2,136 United States Pretrial 1,407 1,435 1,435 United States Secret Service 750 765 765 United States Social Security Administration 750 765 765 University of CA, SD (UCSD) 1,366 1,393 1,393
93,139$ 95,003$ 100,613$
(1) Member assessment fees pay for all administrative costs of ARJIS, including development costs. Since Ex-Officio member agencies have no population base, rates are based on usage. During the year, new members may be added at their request.
FY 2009 ARJIS EX-Officio Member Assessments
CHAPTER 12
PERSONNEL AND ORGANIZATION STRUCTURE
This chapter contains the agency’s organization charts, a summary of personnel-related costs, changes to authorized positions, and the position classification/salary range table.
SA
ND
AG
Ag
ency
Str
uct
ure
Feb
ruar
y 22
, 200
8
BO
AR
D O
F D
IREC
TOR
S
Bo
rders
C
om
mit
tee
Exe
cuti
ve O
ffic
e
Ex
ecu
tiv
eC
om
mit
tee
Reg
ion
al
Pla
nn
ing
C
om
mit
tee
Pu
bli
c Safe
tyC
om
mit
tee
Dep
art
men
t o
f A
dm
inis
trati
on
Dep
art
men
t o
f Fi
nan
ce
Dep
art
men
t o
f Te
chn
ical
Se
rvic
es
De
part
men
t o
f La
nd
Use
an
d
Tran
spo
rtati
on
Pla
nn
ing
Dep
art
men
t o
f M
ob
ilit
y M
gm
t an
d P
roje
ct
Imp
lem
en
tati
on
Tran
spo
rtati
on
C
om
mit
tee
12-1
DEP
AR
TMEN
T O
F A
DM
INIS
TRA
TIO
ND
irec
tor
(1 p
osi
tio
n)
Bu
sin
ess
Serv
ices
(17
po
siti
on
s)
Hu
man
Reso
urc
es
(4 p
osi
tio
ns)
Cre
ati
ve
Serv
ices
(5 p
osi
tio
ns)
Co
ntr
act
s an
d
Pro
cure
men
t(8
po
siti
on
s)
DEP
AR
TMEN
T O
F TE
CH
NIC
AL
SER
VIC
ES
Dir
ecto
r (1
po
siti
on
)
Cri
min
al
Just
ice
Rese
arc
h(9
po
siti
on
s)
AR
JIS
(4 p
osi
tio
ns)
Info
rmati
on
Syst
ems
(6 p
osi
tio
ns)
Fore
cast
ing
an
d
Mo
nit
ori
ng
(13
po
siti
on
s)
Tech
nic
al
Ass
ista
nce
a
nd
Pro
du
ct
Co
ord
inati
on
(8 p
osi
tio
ns)
Tran
spo
rtati
on
M
od
eli
ng
(6 p
osi
tio
ns)
DEPA
RTM
EN
T O
F LA
ND
U
SE &
TR
AN
SPO
RTA
TIO
N
PLA
NN
ING
Dir
ecto
r (1
po
siti
on
)
Lan
d U
se P
lan
nin
g
an
d C
oo
rdin
ati
on
(8 p
osi
tio
ns)
En
vir
on
men
tal/
Pu
bli
c Fa
cili
ties
Pla
nn
ing
(4 p
osi
tio
ns)
Lon
g-R
an
ge
Tran
spo
rtati
on
an
d
Bin
ati
on
al
Pla
nn
ing
(8 p
osi
tio
ns)
Tra
nsi
t P
lan
nin
g(9
po
siti
on
s)
DEP
AR
TMEN
T O
F M
OB
ILIT
Y M
AN
AG
EM
EN
T &
PR
OJE
CT
IMPLE
MEN
TATI
ON
Dir
ecto
r (1
po
siti
on
)
Pro
ject
Im
ple
men
tati
on
(4 p
osi
tio
ns)
Tra
nsN
et
Pro
ject
O
ffic
e(2
po
siti
on
s)
Inte
llig
en
t Tr
an
spo
rtati
on
S
yst
em
s / M
ob
ilit
y(1
2 p
osi
tio
ns)
En
gin
ee
rin
g
an
d C
on
stru
ctio
n(2
0 p
osi
tio
ns)
DEP
AR
TMEN
T O
F FI
NA
NC
ED
irec
tor
(1 p
osi
tio
n)
Acc
ou
nti
ng
(12
po
siti
on
s)
Fin
an
cial
Pro
gra
mm
ing
an
d
Pro
ject
Co
ntr
ol
(6 p
osi
tio
ns)
Reg
ula
r16
po
siti
on
s35
po
siti
on
s19
po
siti
on
s30
po
siti
on
s39
po
siti
on
s47
po
siti
on
s
Lim
ited
Ter
m2
po
siti
on
s2
po
siti
on
s0
po
siti
on
s3
po
siti
on
s16
po
siti
on
s9
po
siti
on
s
TIPS
*0
po
siti
on
s2
po
siti
on
s1
po
siti
on
s5
po
siti
on
s7
po
siti
on
s 1
6 p
osi
tio
ns
Tota
l –
Reg
ula
r:186
po
siti
on
s
Tota
l –
Ltd
Term
:32
po
siti
on
s
Tota
l –
TIPS:
31
po
siti
on
s
LAN
D U
SE &
MO
BIL
ITY
MA
NA
GEM
EN
T &
TEC
HN
ICA
LEX
EC
UTI
VE
AD
MIN
ISTR
ATI
ON
FIN
AN
CE
TRA
NSPO
RTA
TIO
N P
LAN
NIN
GPR
OJE
CT
IMPLE
MEN
TATI
ON
SE
RV
ICE
S
*TIP
S =
Tem
po
rary
, In
tern
, Par
t-ti
me,
Sea
son
al; p
osi
tio
ns
are
par
t ti
me,
so
me
of
wh
ich
are
bro
ug
ht
in f
or
spec
ial p
roje
cts
or
as n
eed
ed.
Feb
ruar
y 22
, 200
8
SA
ND
AG
Dep
artm
enta
l Org
aniz
atio
n C
har
t
EX
EC
UTI
VE
OFF
ICE
Leg
al
(2 p
osi
tio
ns)
Leg
isla
tive A
ffair
s(3
po
siti
on
s)
Co
mm
un
icati
on
s(4
po
siti
on
s)
Ex
ecu
tive O
ffic
e(5
po
siti
on
s)
12-2
SAN
DIE
GO
ASS
OC
IATI
ON
OF
GO
VER
NM
ENFY
200
8 PE
RSO
NN
EL C
OST
SU
MM
AR
Y
AU
THO
RIZ
ED A
ND
BU
DG
ETED
REG
ULA
R P
OSI
TIO
NS:
LIM
ITED
TER
M P
OSI
TIO
NS:
TOTA
L TE
MPO
RA
RY,
INTE
RN
S, P
AR
T-TI
ME
(TIP
S) P
OSI
TIO
NR
EGU
LAR
FU
LL-T
IME
EMPL
OYE
ES:
LIM
ITED
TER
M P
OSI
TIO
NS:
TEM
POR
AR
Y, IN
TER
NS,
PA
RT-
TIM
E (T
IPS)
EM
PLO
YEES
:TO
TAL
SALA
RIE
S
EMPL
OYE
E B
ENEF
ITS
PAC
KA
GE:
RE
TIR
EM
EN
T (P
ER
S)
RE
TIR
EM
EN
T (P
AR
S)
CO
MB
INE
D H
EA
LTH
INS
UR
AN
CE
PLA
N D
EN
TAL/
VIS
ION
INS
UR
AN
CE
SH
OR
T/LO
NG
TE
RM
DIS
AB
ILIT
Y P
OS
T E
MP
LOY
ME
NT
HE
ALT
H C
AR
E W
OR
KE
RS
CO
MP
EN
SA
TIO
N S
OC
IAL
SE
CU
RIT
Y H
OS
PIT
AL
TAX
--M
ED
ICA
RE
LIF
E/A
CC
IDE
NT
INS
UR
AN
CE
EM
PLO
YE
E A
SS
ISTA
NC
E P
RG
M M
AN
AG
EM
EN
T B
EN
EFI
T 2.
5% A
UTO
MO
TIV
E A
LLO
WA
NC
E M
AN
AG
EM
EN
T P
AR
KIN
G B
EN
EFI
T S
125
FLE
XIB
LE S
PE
ND
ING
AC
CO
UN
T A
DM
INIS
TRA
TIO
N T
RA
NS
PO
RTA
TIO
N D
EM
AN
D M
GM
T P
RO
GR
AM
W
ELL
NE
SS
PR
OG
RA
MC
OM
PU
TER
PU
RC
HA
SE
/LO
AN
PR
OG
RA
M
TOTA
L E
MPL
OYE
E B
ENEF
ITS
Ben
efits
- R
egul
ar e
mpl
oyee
s B
enef
its -
Lim
ited
Term
em
ploy
ees
Ben
efits
- TI
PS
em
ploy
ees
TOTA
L PE
RSO
NN
EL C
OST
(SA
LAR
IES
& B
ENEF
ITS)
FY 2
008
BEN
EFIT
SM
IDFY
200
8FY
200
9B
ENEF
ITS
FIN
AL
% O
F R
EGYE
AR
YR-E
ND
DR
AFT
% O
F R
EG%
BU
DG
ETSA
LAR
IES
CH
AN
GES
TOTA
LB
UD
GET
SALA
RIE
SA
MO
UN
TC
HA
NG
E
186
018
618
60
199
2832
428
028
313
$15,
198,
516
(419
,397
)14
,779
,119
$15,
698,
595
919,
476
6.2%
$892
,334
419,
397
1,31
1,73
2$1
,444
,417
132,
685
10.1
%$4
82,3
260
482,
326
$384
,864
(97,
462)
-20.
2%$1
6,57
3,17
7$0
$16,
573,
177
$17,
527,
876
954,
699
5.8%
3,47
6,14
5
21
.0%
03,
476,
145
3,86
4,44
1
23
.3%
388,
296
11.2
%12
,058
0.
1%0
12,0
585,
007
0.0%
(7,0
51)
-58.
5%1,
661,
384
10.0
%0
1,66
1,38
41,
770,
022
10.7
%10
8,63
86.
5%19
2,90
1
1.2%
019
2,90
119
4,71
9
1.2%
1,81
80.
9%16
3,05
7
1.0%
016
3,05
717
2,47
9
1.0%
9,42
25.
8%10
0,00
0
0.6%
010
0,00
051
0,00
0
3.1%
410,
000
100.
0%23
2,97
5
1.4%
023
2,97
511
7,51
2
0.7%
(115
,463
)-4
9.6%
236,
326
1.
4%0
236,
326
254,
664
1.
5%18
,338
7.8%
66,8
29
0.4%
066
,829
66,9
31
0.4%
102
0.2%
11,4
31
0.1%
011
,431
13,5
04
0.1%
2,07
318
.1%
50,4
72
0.3%
050
,472
56,5
64
0.3%
6,09
212
.1%
16,8
00
0.1%
016
,800
16,8
00
0.1%
00.
0%-
0.
0%0
025
,200
0.
2%25
,200
100.
0%3,
860
0.0%
03,
860
3,57
0
0.
0%(2
90)
-7.5
%18
,000
0.
1%0
18,0
0018
,660
0.
1%66
03.
7%20
,000
0.
1%0
20,0
0010
,000
0.
1%(1
0,00
0)-5
0.0%
-
0.0%
00
5,00
0
0.
0%5,
000
100.
0%
$6,2
62,2
3837
.8%
$0$6
,262
,238
$7,1
05,0
7340
.5%
842,
835
13.5
%
$5,8
66,0
3238
.3%
(160
,629
)5,
705,
402
$6,4
80,4
1641
.3%
775,
014
13.6
%$3
61,7
6438
.3%
160,
629
522,
393
$596
,255
41.3
%73
,862
14.1
%$3
4,44
27.
1%34
,442
$28,
402
7.4%
(6,0
40)
-17.
5%
22,8
35,4
15$
-$
22
,835
,415
$
24,6
32,9
49$
1,79
7,53
4$
7.9%
214
218
4
FY 2
008
FY 2
009
YEA
R T
O Y
EAR
CH
AN
GE
MID
-YEA
R A
MEN
DM
ENTS
[FY
09 o
ver A
men
ded
FY 0
8]FY
200
8
205
12-3
SAN DIEGO ASSOCIATION OF GOVERNMENTSDRAFT FY 2009 AUTHORIZED STAFF BY POSITION
POSITION CLASSIFICATIONS
APPROVEDFY 2008
POSITIONS
MID-YEAR CHANGES
+/-
AMENDEDFY 2008
POSITIONS
FY 2009PROPOSEDCHANGES
+ / -
FY 2009PROPOSED
NEWPOSITIONS
TOTALFY 2009
PROPOSEDPOSITIONS
REGULAR STAFF POSITIONS
Accountant (I, II, Associate) 4 0 4 0 0 4
Accounting Specialist (I, II, III) 5 0 5 0 0 5
Administrative Office Specialist (I, II, III) 9 0 9 1 0 10
Administrative Analyst (I, II, Associate) 1 0 1 0 0 1
Borders Program Manager 1 0 1 0 0 1
Budget Program Manager 1 0 1 0 0 1
Business Services Manager 1 0 1 0 0 1
Business Services Supervisor 2 0 2 0 0 2
Chief Deputy Executive Director 1 0 1 0 0 1
Chief Economist 1 0 1 0 0 1
Communications Manager 1 0 1 -1 0 0
Contracts and Procurement Specialist; Analyst (I, II, Associate) 5 0 5 0 0 5
Contracts and Procurement Manager 1 0 1 0 0 1
Customer Service Representative (I, II, III) 3 0 3 0 0 3
Department Director 5 0 5 0 0 5
Deputy General Counsel 1 0 1 0 0 1
Division Director 5 0 5 -1 0 4
Economic Research Analyst (I, II, Associate) 0 0 0 1 0 1
Executive Assistant/Clerk of the Board 2 0 2 0 0 2
Executive Director 1 0 1 0 0 1
Executive Program Manager 1 0 1 -1 0 0
Finance Manager 1 0 1 0 0 1
Financial Analyst (I, II, Associate) 1 0 1 0 0 1
Financial Programming Manager 1 0 1 0 0 1
Financial Programming Manager/Senior Engineer 1 0 1 0 0 1
General Counsel 1 0 1 0 0 1
Goods Movement Policy Manager 1 0 1 0 0 1
Graphic Design Specialist; Designer (I, II, Associate) 4 0 4 0 0 4
Human Resources Specialist; Analyst (I, II, Associate) 3 0 3 0 0 3
Human Resources Manager 1 0 1 0 0 1
Information Systems Analyst (I, II, Associate) 2 0 2 0 0 2
Information Systems Manager 1 0 1 0 0 1
Information Systems Specialist (I, II, III) 3 0 3 0 0 3
Integrated Information Systems Manager 2 0 2 -2 0 0
Legislative Analyst (I, II, Associate) 1 0 1 0 0 1
Manager of Financial Programming and Project Control 1 0 1 0 0 1
Marketing Analyst (I, II, Associate) 3 0 3 0 0 3
Marketing Program Manager 1 0 1 0 0 1
Office Services Specialist (I, II, III) 4 0 4 -1 0 3
Pass Sales Manager 1 0 1 0 0 1
Policy and Legislative Affairs Program Manager 0 0 0 1 0 1
Principal Economic Research Analyst 0 0 0 1 0 1
Principal Engineer 3 0 3 0 0 3
Principal Management Internal Auditor 1 0 1 0 0 1
Principal Regional Planner 5 0 5 0 0 5
Principal Research Analyst 5 0 5 -2 0 3
Principal Technology Program Analyst 0 0 0 2 0 2
Principal Transportation Modeler 0 0 0 1 0 1
Programming Analyst (I, II, Associate) 2 0 2 0 0 2
Project Control Manager 1 0 1 0 0 1
Project Development Program Manager 1 0 1 0 0 1
Public Information Officer (I, II, Associate) 1 0 1 0 0 1
Receptionists (I, II, III) 2 0 2 0 0 2
Regional Planner (I, II, Associate) 9 0 9 0 0 9
Research Analyst (I, II, Associate) 19 0 19 -4 0 15
Senior Accountant 1 0 1 0 0 1
Senior Contracts and Procurement Analyst 1 0 1 0 0 1
Senior Contracts and Procurement Analyst/Senior Engineer 1 0 1 0 0 1
12-4
SAN DIEGO ASSOCIATION OF GOVERNMENTSDRAFT FY 2009 AUTHORIZED STAFF BY POSITION
POSITION CLASSIFICATIONS
APPROVEDFY 2008
POSITIONS
MID-YEAR CHANGES
+/-
AMENDEDFY 2008
POSITIONS
FY 2009PROPOSEDCHANGES
+ / -
FY 2009PROPOSED
NEWPOSITIONS
TOTALFY 2009
PROPOSEDPOSITIONS
REGULAR STAFF POSITIONS
Senior Engineer 16 0 16 0 0 16
Senior Information Systems Analyst 2 0 2 0 0 2
Senior Legislative Analyst 0 0 0 1 0 1
Senior Marketing Analyst 1 0 1 0 0 1
Senior Planner 16 0 16 0 0 16
Senior Programmer Analyst 1 0 1 0 0 1
Senior Public Information Officer 0 0 0 1 0 1
Senior Research Analyst 12 0 12 -3 0 9
Senior Technology Program Analyst 0 0 0 1 0 1
Senior Transportation Modeler 0 0 0 2 0 2
Supervisor of Graphic Design 1 0 1 0 0 1
TransNet Program Manager 1 0 1 0 0 1
Transportation Modeler (I, II, Associate) 0 0 0 3 0 3
REGULAR STAFF POSITIONS 186 0 186 0 0 186
LIMITED TERM POSITIONS
Administrative Office Specialist (I, II, III) 1 0 1 0 0 1
Business Services Supervisor 0 1 1 0 0 1
Contracts and Procurement Specialist; Analyst (I, II, Associate) 0 0 0 0 1 1
Customer Service Representative (I, II, III) 5 3 8 0 0 8
Economic Research Analyst (I, II, Associate) 0 0 0 1 0 1
Information Systems Analyst (I, II, Associate) 1 0 1 0 0 1
Information Systems Specialist (I, II, III) 0 1 1 0 0 1
General Counsel (I, II, Associate) 0 0 0 0 1 1
Marketing Specialist 0 1 1 0 0 1
Office Services Specialist (I, II, III) 1 0 1 0 0 1
Planning Technician 1 0 1 -1 0 0
Programmer Analyst (I, II, Associate) 1 0 1 0 0 1
Project Coordinator 1 0 1 0 0 1
Regional Planner (I, II, Associate) 2 1 3 1 0 4
Research Analyst (I, II, Associate) 1 0 1 -1 2 2
Research Technician 2 3 5 0 0 5
Senior Accountant 1 0 1 0 0 1
Senior Regional Planner 1 -1 0 0 0 0
Senior Research Analyst 1 -1 0 0 0 0
Senior Technology Program Analyst 0 1 1 0 0 1
LIMITED TERM POSITIONS 19 9 28 0 4 32
TOTAL REGULAR & LIMITED TERM POSITIONS 205 9 214 0 4 218
TEMP, INTERNS, PART-TIME (TIPS) 28 0 28 0 3 31
CITY OF SAN DIEGO POSITIONS PAID BY SANDAG
Division Director, ARJIS 1 1 1
Senior Traffic Engineer 1 1 1
Administrative Assistant 1 1 1
3 3 3
12-5
SAN DIEGO ASSOCIATION OF GOVERNMENTS
CLASS NO. CLASS SALARY RANGES MIN MID MAX
A CLASS SALARY RANGES...................................................... 1,759 2,287 2,815Intern
B CLASS SALARY RANGES...................................................... 1,847 2,402 2,956Intern
D CLASS SALARY RANGES...................................................... 2,037 2,648 3,259Assistant
E CLASS SALARY RANGES...................................................... 2,139 2,780 3,422Assistant
3 CLASS SALARY RANGES...................................................... 2,406 3,127 3,849Customer Service Representative IOffice Services Specialist IReceptionist I
5 CLASS SALARY RANGES...................................................... 2,454 3,190 3,926Accounting Specialist IAdministrative Office Specialist ICustomer Service Representative IIOffice Services Specialist IIReceptionist II
6 CLASS SALARY RANGES...................................................... 2,527 3,286 4,044Graphic Design Specialist
7 CLASS SALARY RANGES...................................................... 2,603 3,384 4,165Accounting Specialist IIAdministrative Office Specialist IICustomer Service Representative IIIOffice Services Specialist IIIReceptionist III
8 CLASS SALARY RANGES...................................................... 2,733 3,554 4,374Graphic Designer I
9 CLASS SALARY RANGES...................................................... 2,870 3,731 4,592Accounting Specialist IIIAdministrative Office Specialist III
10 CLASS SALARY RANGES...................................................... 3,014 3,918 4,822Contracts and Procurement SpecialistGraphic Designer IIHuman Resources SpecialistInformation Systems Specialist IMarketing SpecialistPublic Information Specialist
11 CLASS SALARY RANGES...................................................... 3,164 4,114 5,063Engineering TechnicianPlanning TechnicianResearch Technician
12 CLASS SALARY RANGES...................................................... 3,323 4,319 5,316Accountant IAdministrative Analyst IAssociate Graphic DesignerContracts and Procurement Analyst IFinancial Analyst IHuman Resources Analyst IInformation Systems Analyst IInformation Systems Specialist IIInternal Management Auditor ILegislative Analyst IMarketing Analyst IProgrammer Analyst IPublic Information Officer IRegional Economist IRegional Planner IResearch Analyst ISenior Administrative Office SpecialistTechnology Analyst ITransportation Modeler I
14 CLASS SALARY RANGES...................................................... 3,663 4,762 5,861Accountant IIAdministrative Analyst IIContracts and Procurement Analyst IIFinancial Analyst IIHuman Resources Analyst IIInformation Systems Analyst IIInformation Systems Specialist IIIInternal Management Auditor IILegislative Analyst IIMarketing Analyst IIProgrammer Analyst IIPublic Information Officer IIRegional Economist IIRegional Planner IIResearch Analyst IITechnology Analyst IITransportation Modeler II
15 CLASS SALARY RANGES...................................................... 3,846 5,000 6,154Assistant Engineer IExecutive Assistant/Clerk of the Board
DRAFT FY 2009 POSITION CLASSIFICATION/SALARY RANGE TABLE
MONTHLY SALARY RANGES
12-6
SAN DIEGO ASSOCIATION OF GOVERNMENTS
CLASS NO. CLASS SALARY RANGES MIN MID MAX
DRAFT FY 2009 POSITION CLASSIFICATION/SALARY RANGE TABLE
MONTHLY SALARY RANGES
16 CLASS SALARY RANGES...................................................... 4,039 5,250 6,462Administrative Office SupervisorAssociate AccountantAssociate Administrative AnalystAssociate Contracts and Procurement AnalystAssociate Financial AnalystAssociate Human Resources AnalystAssociate Internal Management AuditorAssociate Legislative AnalystAssociate Marketing AnalystAssociate Public Information OfficerAssociate Regional EconomistAssociate Regional PlannerAssociate Research AnalystAssociate Transportation ModelerSupervisor of Graphic Design
17 CLASS SALARY RANGES...................................................... 4,241 5,513 6,785Assistant Engineer IIAssociate Information Systems AnalystAssociate Programmer AnalystAssociate Technology AnalystPass Sales Manager
19 CLASS SALARY RANGES...................................................... 4,676 6,079 7,482Senior AccountantSenior Administrative AnalystSenior Contracts and Procurement AnalystSenior Financial AnalystSenior Human Resources AnalystSenior Marketing Analyst
20 CLASS SALARY RANGES...................................................... 4,910 6,383 7,856Associate Engineer
21 CLASS SALARY RANGES...................................................... 5,156 6,702 8,249Communications ManagerSenior Public Information Officer
22 CLASS SALARY RANGES...................................................... 5,414 7,038 8,662Borders Program ManagerBudget Program ManagerBusiness Services ManagerFinancial Programming ManagerMarketing ManagerProject Control ManagerSenior Information Systems AnalystSenior Internal Management AuditorSenior Legislative AnalystSenior Programmer AnalystSenior Regional EconomistSenior Regional PlannerSenior Research AnalystSenior Technology AnalystSenior Transportation Modeler
23 CLASS SALARY RANGES...................................................... 5,684 7,389 9,095Senior EngineerSenior Engineer / Financial Programming ManagerSenior Engineer / Contracts Manager
24 CLASS SALARY RANGES...................................................... 5,968 7,759 9,550Manager of Contracts and ProcurementManager of Human Resources
25 CLASS SALARY RANGES...................................................... 6,267 8,147 10,027Executive Program ManagerInformation Systems ManagerPrincipal Technology Program Manager (was Integrated Information Systems Manager)Manager of Financial Programming and Project ControlPrincipal Regional EconomistPrincipal Regional PlannerPrincipal Research AnalystPrincipal Transportation ModelerProject Development Program ManagerTransNet Program Manager
26 CLASS SALARY RANGES...................................................... 6,580 8,554 10,528Finance ManagerPrincipal EngineerPrincipal Internal Management Auditor
29 CLASS SALARY RANGES...................................................... 7,617 9,903 12,188Deputy General Counsel
30 CLASS SALARY RANGES...................................................... 7,998 10,398 12,797Chief Economist
Goods Movement Policy Manager
33 CLASS SALARY RANGES...................................................... 9,259 12,037 14,814Department Director
35 CLASS SALARY RANGES...................................................... 10,208 13,270 16,333Chief Deputy Executive DirectorGeneral Counsel
N/A EXECUTIVE DIRECTOR........................................................ (Set by Board of Directors)
Director: Communications, Criminal Justice,Engineering, Public Safety
Policy and Legislative Affairs Program Manager
12-7
APPENDICES
APPENDIX A
FY 2009 CONTRACTED SERVICES
SAN
DIE
GO
ASS
OC
IAT
ION
OF
GO
VE
RN
ME
NT
S FY
200
9 O
VE
RA
LL W
OR
K P
RO
GR
AM
— C
ON
TR
AC
TE
D S
ER
VIC
ES
C
on
tract
No
. C
on
tract
Typ
e
CO
NTI
NU
ING
C
ON
TRA
CT
FY 2
009
STA
RT
DA
TE C
OM
PLE
TIO
N
OWP #
(I
f avail
ab
le)
Sco
pe
VEN
DO
R
OR
NEW
A
MO
UN
T A
MO
UN
T
DA
TE
1 -
Im
ple
men
tati
on
1109
1.
Eco
no
mic
An
alys
es/A
sses
smen
ts
TBD
New
RFP
$1
50,0
00
$150
,000
07
/01/
2008
06
/30/
2009
Priv
ate
Pub
lic P
artn
ersh
ip E
valu
atio
n
1109
1.
Au
dit
s TB
D
New
RFP
$1
0,00
0 $1
0,00
0 07
/01/
2008
06
/30/
2009
Au
dit
fo
r C
oro
nad
o T
oll
Bri
dg
e Fu
nd
s 11
092.
03
Gen
eral
En
gin
eeri
ng
& P
lan
nin
g S
ervi
ces
(GEC
) C
H2M
Hill
, In
c.
Co
nti
nu
ing
$75,
000
$70,
000
06/3
0/20
07
12/3
0/20
08
1109
2.03
50
0030
7 Pr
ofe
ssio
nal
En
gin
eeri
ng
Ser
vice
s -
HN
TB C
orp
ora
tio
n
Co
nti
nu
ing
$1,2
20,0
00
$358
,313
01
/01/
2005
06
/30/
2010
Co
nti
nu
atio
n o
f Ta
sk O
rder
Zer
o f
or
VES
Pro
of-
of-
con
cep
t te
stin
g p
has
e, in
clu
des
ad
dit
ion
al
co
st f
or
mo
nit
ori
ng
an
d e
valu
atio
n s
ub
con
sult
ant
and
pro
ject
-rel
ated
tra
vel a
nd
rep
rog
rap
hic
s ex
pen
se.
1109
2.03
St
ipen
d/P
artn
ersh
ip T
esti
ng
Ag
reem
ent(
s)
On
e o
r m
ore
per
RFI
200
8 Pe
nd
ing
$500
,000
$5
00,0
00
06/0
1/20
08
03/3
1/20
09
D
irec
t ve
nd
or
sub
sid
y/st
ipen
d t
o c
om
ple
te
p
roo
f-o
f-co
nce
pt
VES
tes
tin
g p
urs
uan
t to
req
ues
t
fo
r in
form
atio
n (
RFI
) to
be
rele
ased
in s
eco
nd
hal
f
FY
200
8. E
xact
nu
mb
er o
f ve
nd
ors
an
d p
aym
ents
TBD
. To
tal a
llow
ance
no
t to
exc
eed
$50
0,00
0
cu
mu
lati
ve a
ll fi
rms
1109
3.
5000
045
Gen
eral
En
gin
eeri
ng
& P
lan
nin
g S
ervi
ces
(GEC
) B
I Tra
n S
yste
ms,
Inc.
Co
nti
nu
ing
$1,0
00,0
00
$470
,380
10
/01/
2002
12
/30/
2008
McC
ain
(B
i Tra
n S
yste
ms)
are
to
per
form
so
ftw
are
dev
elo
pm
ent/
enh
ance
men
t o
f th
e ex
isti
ng
QN
4
p
rod
uct
use
d b
y al
l San
Die
go
Reg
ion
al T
raff
ic
D
epar
tmen
ts.
Ven
do
r is
to
pro
cure
all
serv
er h
ard
-
war
e, in
stal
l, an
d t
rain
use
rs
1109
5.
Gen
eral
En
gin
eeri
ng
& P
lan
nin
g S
ervi
ces
(GEC
) Te
lven
t Fa
rrad
yne
New
Tas
k O
rder
$278
,000
$2
78,0
00
07/0
1/20
08
06/3
0/20
09
Im
ple
men
t Sp
anis
h v
ersi
on
of
511
serv
ices
. 11
095.
G
ener
al E
ng
inee
rin
g &
Pla
nn
ing
Ser
vice
s (G
EC)
TBD
New
RFP
$2
5,00
0 $2
5,00
0 07
/01/
2008
06
/30/
2009
511
tele
ph
on
e ro
uti
ng
ser
vice
s d
uri
ng
dis
aste
rs.
1109
5.
Gen
eral
En
gin
eeri
ng
& P
lan
nin
g S
ervi
ces
(GEC
) Te
lven
t Fa
rrad
yne
New
Tas
k O
rder
$50,
000
$50,
000
07/0
1/20
08
06/3
0/20
09
M
od
ify
syst
em t
o in
corp
ora
te r
oad
clo
sure
fun
ctio
nal
ity
1109
5.
5000
381
Gen
eral
En
gin
eeri
ng
& P
lan
nin
g S
ervi
ces
(GEC
) Te
lven
t C
on
tin
uin
g
$250
,000
$1
25,0
00
01/0
1/20
05
12/3
1/20
10
51
1 C
om
mer
cial
Veh
icle
Op
erat
ion
s 11
102.
50
0038
9 Fi
nan
cial
Ad
viso
r Pu
blic
Fin
anci
al M
anag
emen
t C
on
tin
uin
g
$1,0
00,0
00
$90,
000
07/1
8/20
05
06/3
0/20
10
M
on
thly
fin
anci
al a
dvi
ser
serv
ices
, plu
s ad
dit
ion
al
as
sist
ance
fo
r sp
ecia
l pro
ject
s re
late
d t
o f
inan
cin
g.
Tota
l co
ntr
act
amo
un
t is
dep
end
ent
up
on
use
fo
r
1110
2.
Gen
eral
En
gin
eeri
ng
& P
lan
nin
g S
ervi
ces
(GEC
) Ec
oin
tera
ctiv
e N
ew T
ask
Ord
er
$35,
000
$35,
000
07/0
1/20
08
06/3
0/20
09
M
ain
ten
ance
of
new
mo
del
to
inte
ract
wit
h
Pr
oje
ctTr
ak w
hic
h w
ill t
rack
an
d a
cco
un
t fo
r fi
nan
-
cial
act
ivit
ies
rela
ted
to
Tra
nsN
et E
xten
sio
n.
1110
2.
5000
444
Eco
no
mic
An
alys
es/A
sses
smen
ts
Cap
ori
cci &
Lar
son
Co
nti
nu
ing
$1,1
60,4
25
$98,
000
11/0
1/20
05
10/3
1/20
10
A
nn
ual
au
dit
s o
f Tr
ansN
et s
ub
reci
pie
nts
fo
r FY
200
8 11
102.
50
0044
4 A
ud
it S
ervi
ces
Cap
ori
cci &
Lar
son
Co
nti
nu
ing
$1,1
60,4
25
$17,
760
11/0
1/20
05
10/3
1/20
10
A
nn
ual
au
dit
of
Reg
ion
al T
ran
spo
rtat
ion
Co
mm
issi
on
1139
0.00
A
ud
it S
ervi
ces
TBD
New
RFP
$2
50,0
00
$200
,000
07
/01/
2008
12
/31/
2009
ITO
C P
erfo
rman
ce A
ud
its
and
fea
sib
ility
an
alys
is
re
lati
ng
to
th
e Tr
ansN
et p
rog
ram
11
390.
00
Eco
no
mic
An
alys
es/A
sses
smen
ts
Cap
ori
cci &
Lar
son
New
Tas
k O
rder
$50,
000
$50,
000
07/0
1/20
08
06/3
0/20
09
Pe
rfo
rman
ce A
ud
it o
n t
he
RTC
IP
1 -
Im
ple
men
tati
on
Su
bto
tal
$7,2
13,8
50
$2,5
27,4
53
A-1
SAN
DIE
GO
ASS
OC
IAT
ION
OF
GO
VE
RN
ME
NT
S FY
200
9 O
VE
RA
LL W
OR
K P
RO
GR
AM
— C
ON
TR
AC
TE
D S
ER
VIC
ES
C
on
tract
No
. C
on
tract
Typ
e
CO
NTI
NU
ING
C
ON
TRA
CT
FY 2
009
STA
RT
DA
TE C
OM
PLE
TIO
N
OWP #
(I
f avail
ab
le)
Sco
pe
VEN
DO
R
OR
NEW
A
MO
UN
T A
MO
UN
T
DA
TE
2 -
Te
chn
ica
l S
erv
ices
2000
3.
Mo
del
Dev
elo
pm
ent
TBD
New
RFP
$1
,200
,000
$1
50,0
00
07/0
1/20
08
06/3
0/20
12
D
evel
op
men
t o
f A
ctiv
ity-
Bas
ed M
od
el
2000
5.
Mo
del
Dev
elo
pm
ent
HB
A S
pec
to
Co
nti
nu
ing
$699
,000
$2
33,0
00
05/1
5/20
07
06/3
0/20
10
D
evel
op
th
e PE
CA
S Fo
reca
stin
g a
nd
Sim
ula
tio
n M
od
el.
2000
5.
Eco
no
mic
An
alys
es/A
sses
smen
ts
Itro
n
New
RFP
$1
00,0
00
$100
,000
07
/01/
2008
06
/30/
2009
Mo
del
up
dat
es r
equ
ired
to
inte
gra
te e
xist
ing
DEF
M f
ore
cast
ing
mo
del
wit
h n
ew P
ECA
S fo
re-
ca
stin
g f
ram
ewo
rk
2000
7.
Tran
sit
Pass
eng
er S
urv
ey
TBD
New
RFP
$3
60,0
00
$280
,000
10
/01/
2008
10
/01/
2009
Co
nd
uct
on
bo
ard
tra
nsi
t p
asse
ng
er s
urv
ey o
n
al
l 160
fix
ed-r
ou
te t
ran
sit
serv
ices
in t
he
reg
ion
.
C
on
sult
ant
will
be
req
uir
ed t
o a
dm
inis
ter
the
surv
ey
o
nb
oar
d b
use
s an
d r
ail v
ehic
les,
ed
it a
nd
co
de
surv
ey f
orm
s an
d p
erfo
rm Q
C c
hec
ks o
n t
he
dat
a.
2000
7.
Surv
ey D
esig
n
TBD
New
RFP
$2
0,00
0 $2
0,00
0 07
/01/
2008
12
/01/
2008
Des
ign
a q
ues
tio
nn
aire
an
d s
amp
ling
pla
n f
or
2009
Reg
ion
al O
nb
oar
d T
ran
sit
Pass
eng
er S
urv
ey
th
at im
pro
ves
stat
isti
cal r
elia
bili
ty o
f th
e su
rvey
dat
a an
d is
th
e m
ost
co
st e
ffic
ien
t.
2000
7.
Soft
war
e D
ev. /
Dat
a C
olle
ctio
n
Dik
ita
Man
agem
ent
Serv
ices
New
Tas
k O
rder
$5,6
83,0
00
$568
,000
07
/01/
2008
06
/30/
2009
Pass
eng
er C
ou
nti
ng
Pro
gra
m d
ata
colle
ctio
n a
nd
rep
ort
ing
. In
clu
des
incr
ease
d s
oft
war
e lic
ense
fee
of
$38,
000
for
Spri
nte
r A
PC's
, an
d a
lso
incl
ud
es
$1
0,00
0 fo
r sp
ecia
l u
nsc
hed
ule
d p
asse
ng
er c
ou
nts
.
2002
6.
5000
423
Secu
rity
Ser
vice
s Sh
erif
f's
Dep
artm
ent
Co
nti
nu
ing
$34,
440
$17,
220
07/0
1/20
07
06/3
0/20
09
A
s p
art
of
con
du
ctin
g in
terv
iew
s in
loca
l jai
ls,
SA
ND
AG
mu
st c
on
trac
t w
ith
th
e Sh
erif
f's
Dep
art-
men
t to
pay
dep
uti
es t
o e
sco
rt in
mat
es. T
his
is a
n
o
ng
oin
g r
elat
ion
ship
an
d t
her
e is
no
op
tio
n f
or
ano
ther
co
ntr
acto
r to
pro
vid
e th
is s
ervi
ce.
2100
2.
Eco
no
mic
An
alys
es/A
sses
smen
ts
Eco
Inte
ract
ive
New
Tas
k O
rder
$65,
000
$65,
000
07/0
1/20
08
06/3
0/20
09
M
ain
ten
ance
, sto
rag
e, a
nd
ho
stin
g o
f w
eb-b
ased
dat
a fo
r Pl
ace3
s 21
003.
50
0084
2 G
IS/S
tati
stic
al A
nal
ysis
Co
nsu
ltin
g
Geo
rge
Tita
Co
nti
nu
ing
$30,
000
$6,5
00
04/3
0/20
07
02/2
8/20
09
C
on
sult
ant
will
ass
ist
in t
he
pro
ject
res
earc
h d
esig
n
an
d a
dvi
se p
roje
ct s
taff
on
GIS
ho
t sp
ot
and
stat
isti
cal m
eth
od
s.
2200
1.
Net
wo
rk H
ost
ing
Mai
nte
nan
ce
SDD
PC
New
P.O
. $3
,680
,531
$1
,266
,046
07
/01/
2008
06
/30/
2009
Um
bre
lla c
on
trac
t- F
ixed
Mai
nfr
ame
($10
9623
2)
an
d S
erve
r h
ost
ing
($1
6972
3) m
ain
ten
ance
. 22
001.
50
0089
5 So
ftw
are
Mai
nte
nan
ce
The
Om
ega
Gro
up
Co
nti
nu
ing
$74,
000
$1,5
00
07/0
6/20
07
06/3
0/20
10
(T
enta
tive
) So
ftw
are
licen
ses
for
Cri
mev
iew
an
d
D
ash
bo
ard
2200
1.
Soft
war
e M
ain
ten
ance
i2
Co
nti
nu
ing
$21,
548
$21,
548
07/0
1/20
06
06/3
0/20
09
Y
earl
y so
ftw
are
licen
se f
or
i2
A-2
SAN
DIE
GO
ASS
OC
IAT
ION
OF
GO
VE
RN
ME
NT
S FY
200
9 O
VE
RA
LL W
OR
K P
RO
GR
AM
— C
ON
TR
AC
TE
D S
ER
VIC
ES
C
on
tract
No
. C
on
tract
Typ
e
CO
NTI
NU
ING
C
ON
TRA
CT
FY 2
009
STA
RT
DA
TE C
OM
PLE
TIO
N
OWP #
(I
f avail
ab
le)
Sco
pe
VEN
DO
R
OR
NEW
A
MO
UN
T A
MO
UN
T
DA
TE
2 -
Te
chn
ica
l S
erv
ices
2200
1.
Soft
war
e M
ain
ten
ance
SD
DPC
N
ew P
.O.
$3,6
80,5
31
$3,1
45
07/0
1/20
08
06/3
0/20
09
Y
earl
y lic
ense
s fo
r W
ebtr
end
s ($
1400
),
O
racl
e ($
1250
) an
d S
un
($4
95)
2200
1.
Co
mp
ute
r N
etw
ork
Ser
vice
s SD
DPC
N
ew P
.O.
$3,6
80,5
31
$387
,313
07
/01/
2008
06
/30/
2009
Fixe
d N
etw
ork
Su
pp
ort
fro
m D
PC.
Pers
on
nel
incl
ud
es N
ick
Bia
sott
i, A
lan
Wo
ng
, Ser
gio
Ag
uel
iar
and
oth
er N
etw
ork
sta
ff
2200
1.
5000
450
Cit
y o
f Sa
n D
ieg
o M
OU
Cit
y o
f Sa
n D
ieg
o
Co
nti
nu
ing
$332
,320
$7
2,16
0 07
/01/
2006
06
/30/
2008
MO
U b
etw
een
Cit
y o
f SD
an
d S
AN
DA
G f
or
staf
fin
g
se
rvic
es t
o A
RJI
S (
1760
ho
urs
at
$41
per
ho
ur)
22
001.
So
ftw
are
Mai
nte
nan
ce
KC
C
New
P.O
. $2
07,4
00
$49,
650
01/0
1/20
08
12/3
1/20
11
Th
is is
fo
r ye
arly
Mai
nte
nan
ce f
ee f
or
Co
plin
k
ap
plic
atio
ns:
Ver
3.4
or
4.0
($18
K),
Mo
bile
($5
.25K
)
A3
($6.
75K
), R
DEX
($3
.75K
), Im
per
ial C
ou
nty
($7
.95K
)
an
d
Mu
g/B
oo
kin
gs
($7.
95K
)
2200
1.
Co
mp
ute
r Se
rvic
es L
abo
r SD
DPC
N
ew P
.O.
$3,6
80,5
31
$664
,705
07
/01/
2008
06
/30/
2009
DPC
Lab
or
Ch
arg
es f
or
Leg
acy
Mai
nte
nan
ce, D
BA
sup
po
rt, C
al P
ho
to, a
nd
Des
ktip
An
alys
ts
2200
1.
5000
894
Map
an
d G
eofi
le M
ain
ten
ance
MO
U
SAN
GIS
Co
nti
nu
ing
$16,
000
$16,
000
07/1
0/20
07
06/3
0/20
10
Y
earl
y SA
NG
IS L
icen
se
2200
2.
Leg
al S
ervi
ces
Gra
y C
ary
New
P.O
. $5
0,00
0 $5
0,00
0 07
/01/
2008
06
/30/
2009
Leg
al c
on
sult
ant
for
AR
JIS
2200
2.
Lab
or
Serv
ices
SDD
PC
New
P.O
. $3
,680
,531
$5
60,7
38
07/0
1/20
08
06/3
0/20
09
D
PC la
bo
r fo
r A
pp
licat
ion
Dev
elo
pm
ent:
Du
stin
Hen
son
($1
8512
0), J
oe
Alld
er($
7404
8), J
im W
hif
fen
($27
768)
, Pra
san
th M
oh
an (
$647
92)
and
oth
er P
roje
ct
2200
2.
5000
444
Au
dit
Ser
vice
s C
apo
ricc
i & L
arso
n
Co
nti
nu
ing
$1,1
60,4
25
$4,0
00
11/0
1/20
05
10/3
1/20
10
A
nn
ual
au
dit
of
AR
JIS
2200
2.
5000
450
Cit
y o
f Sa
n D
ieg
o M
OU
Cit
y o
f Sa
n D
ieg
o
Co
nti
nu
ing
$332
,320
$1
76,9
60
07/0
1/20
06
06/3
0/20
08
Fo
r la
bo
r co
sts
for
168
ho
urs
at
$100
/hr
and
176
0 h
rs
at
$91
/hr
2200
2.
Pro
gra
m M
anag
emen
t Su
pp
ort
Dat
aski
ll N
ew P
.O.
$555
,900
$2
25,9
00
07/0
1/20
08
06/3
0/20
09
D
ataS
kill
Staf
f Se
rvic
es
2200
4.
TBD
TBD
Pen
din
g
$150
,000
$1
50,0
00
07/0
1/20
08
06/3
0/20
09
Th
is w
ill v
ary
dep
end
ing
on
th
e ta
sks
that
DH
S
as
sig
ns.
Wai
tin
g o
n F
eder
al b
ud
get
ap
pro
val
2200
5.
Soft
war
e D
evel
op
men
t TB
D
New
P.O
. $1
85,1
20
$185
,120
07
/01/
2008
06
/30/
2009
For
Ap
plic
atio
n D
evel
op
men
t La
bo
r 22
005.
So
ftw
are
Dev
elo
pm
ent
SDD
PC
New
P.O
. $3
,680
,531
$8
03,7
94
07/0
1/20
08
06/3
0/20
09
Fo
r A
pp
licat
ion
Dev
elo
pm
ent
un
der
um
bre
lla
c
on
trac
t fo
r SD
DPC
lab
or.
2200
5.
5002
005
RFP
Dev
elo
pm
ent
MTG
Co
nsu
ltan
ts, I
nc.
Co
nti
nu
ing
$1,0
00,0
00
$186
,662
12
/15/
2006
12
/15/
2011
To a
ssis
t in
RFP
dev
elo
pm
ent.
2200
6.
Pro
ject
Man
agem
ent
Dat
aSki
ll N
ew P
.O.
$555
,900
$1
40,0
00
07/0
1/20
08
06/3
0/20
09
R
eim
bu
rsem
ent
agre
emen
t fo
r D
atas
kill
emp
loye
es
ti
me
spen
t o
n S
RFE
RS
- So
uth
wes
t an
d N
ort
hw
est
PM's
A-3
SAN
DIE
GO
ASS
OC
IAT
ION
OF
GO
VE
RN
ME
NT
S FY
200
9 O
VE
RA
LL W
OR
K P
RO
GR
AM
— C
ON
TR
AC
TE
D S
ER
VIC
ES
C
on
tract
No
. C
on
tract
Typ
e
CO
NTI
NU
ING
C
ON
TRA
CT
FY 2
009
STA
RT
DA
TE C
OM
PLE
TIO
N
OWP #
(I
f avail
ab
le)
Sco
pe
VEN
DO
R
OR
NEW
A
MO
UN
T A
MO
UN
T
DA
TE
2 -
Te
chn
ica
l S
erv
ices
2200
6.
5002
407
MO
U
Nle
ts
Co
nti
nu
ing
$599
,000
$3
56,0
00
01/0
7/20
07
09/3
0/20
09
Th
e cu
rren
t N
lets
/AR
JIS
MO
U w
ill n
eed
to
be
amen
ded
to
incl
ud
e th
e $3
56,0
00.(
the
tota
l co
ntr
act
amo
un
t lis
ted
ab
ove
has
no
t b
een
ap
pro
ved
fo
r 09
)
Th
is f
un
din
g w
ill b
e u
sed
to
dev
elo
p im
age
exch
ang
e
ca
pab
iliti
es f
or
the
Wes
t C
oas
t SR
FER
S p
arti
cip
ants
.
2200
7.
Stra
teg
ic C
on
sult
ing
Tou
chto
ne
New
P.O
. $5
0,00
0 $5
0,00
0 07
/01/
2008
06
/30/
2009
Stra
teg
ic C
on
sult
ant
for
AR
JIS
2200
9.
Tech
nic
al A
ssis
tan
ce
SDD
PC
New
P.O
. $3
,680
,531
$3
8,40
0 07
/01/
2008
06
/30/
2009
Fun
din
g c
on
trac
t em
plo
yees
to
co
mp
lete
MM
R p
roto
typ
e. T
he
gra
nt
exp
ires
on
8/3
0/07
.
This
fu
nd
ing
co
vers
tim
e fo
r tw
o m
on
ths.
2201
1.00
TB
D
TBD
New
P.O
. $4
8,00
0 $4
8,00
0 01
/30/
2008
03
/30/
2009
This
fu
nd
ing
will
be
pro
vid
ed t
o a
n A
RJI
S ag
ency
CA
D v
end
or
to d
evel
op
men
t an
d im
ple
men
t a
CA
D
in
terf
ace
2201
1.00
Pr
oje
ct M
anag
emen
t D
atas
kill
Pen
din
g
$555
,900
$5
0,00
0 07
/01/
2008
06
/30/
2009
This
fu
nd
ing
will
be
allo
cate
d t
o D
atas
kill
con
trac
t
em
plo
yee
for
pro
ject
man
agem
ent
assi
stan
ce o
n
th
is p
roje
ct. (
25,0
00 o
f th
e g
ran
t aw
ard
to
be
allo
cate
d in
22
011.
00
tech
nic
al d
evel
op
men
t TB
D
New
P.O
. $2
16,0
00
$216
,000
07
/01/
2008
06
/30/
2009
The
con
sult
ant
will
be
resp
on
sib
le f
or
des
ign
ing
,
dev
elo
pin
g, t
esti
ng
an
d d
ocu
men
tin
g t
he
ALE
RT
en
try
and
man
agem
ents
sys
tem
s, t
he
wat
cher
sys
tem
& t
he
aler
t d
atab
ase
& n
oti
fica
tio
n m
eth
od
s
2201
2.00
TB
D
TBD
New
P.O
. $1
77,4
32
$177
,432
04
/01/
2008
06
/30/
2009
A c
on
sult
ant
will
be
hir
ed t
o d
esig
n, d
evel
op
, tes
t
an
d d
ocu
men
t th
e TA
CID
S p
latf
orm
, ap
plic
atio
n a
nd
dat
abas
e. E
stim
ate
350
ho
urs
fo
r d
esig
n, 1
280
ho
urs
for
pla
tfo
rm d
evel
op
men
t &
176
fo
r te
stin
g a
nd
do
cum
enta
tio
n.
2201
3.00
TB
D
Paci
fic
No
rth
wes
t La
b N
ew T
ask
Ord
er
$249
,120
$1
24,5
60
02/0
1/20
08
09/3
0/20
08
Th
e co
ntr
act
agen
cy w
ill b
e re
spo
nsi
ble
fo
r d
esig
n,
d
evel
op
men
t, t
esti
ng
an
d d
ocu
men
tin
g t
he
Smar
tsea
rch
ap
plic
atio
n.
2 -
Te
chn
ica
l S
erv
ices
Su
bto
tal
$40
,491
,542
$7,4
65,3
53
3 -
Pla
nn
ing
3000
2.
Gen
eral
En
gin
eeri
ng
& P
lan
nin
g S
ervi
ces
(GEC
) Pe
nd
ing
Co
nti
nu
ing
$305
,000
$5
5,00
0 04
/01/
2008
06
/30/
2009
Prep
arat
ion
of
Smar
t G
row
th D
esig
n G
uid
elin
es.
This
fu
nd
ing
will
su
pp
lem
ent
Blu
epri
nt
Plan
nin
g
G
ran
t fu
nd
s.
3000
2.
Dep
artm
ent
Stra
teg
ic P
lan
TBD
Pen
din
g
$30,
000
$25,
000
04/0
1/20
08
06/3
0/20
08
C
reat
e a
five
-yea
r 's
trat
egic
pla
n' t
o p
rovi
de
a
fr
amew
ork
fo
r p
rio
riti
zin
g t
he
Plan
nin
g D
epar
t-
m
ent'
s w
ork
eff
ort
s
A-4
SAN
DIE
GO
ASS
OC
IAT
ION
OF
GO
VE
RN
ME
NT
S FY
200
9 O
VE
RA
LL W
OR
K P
RO
GR
AM
— C
ON
TR
AC
TE
D S
ER
VIC
ES
C
on
tract
No
. C
on
tract
Typ
e
CO
NTI
NU
ING
C
ON
TRA
CT
FY 2
009
STA
RT
DA
TE C
OM
PLE
TIO
N
OWP #
(I
f avail
ab
le)
Sco
pe
VEN
DO
R
OR
NEW
A
MO
UN
T A
MO
UN
T
DA
TE
3 –
Pla
nn
ing
(co
nt’
d)
3000
2.
Gen
eral
En
gin
eeri
ng
& P
lan
nin
g S
ervi
ces
(GEC
) Pe
nd
ing
Co
nti
nu
ing
$49,
000
$49,
000
03/0
1/20
08
09/3
0/20
08
C
reat
e th
ree
“3-D
vis
ual
sim
ula
tio
ns”
fo
r se
lect
loca
tio
ns
in t
he
San
Die
go
reg
ion
. Eac
h s
imu
lati
on
will
co
nsi
st o
f a
3-D
dig
ital
mo
del
an
d a
nim
ated
fly-
thro
ug
h f
or
a fo
ur-
blo
ck a
rea.
(Th
is is
carr
yove
r fu
nd
ing
fro
m F
Y 0
8)
3000
2.
Pro
fess
ion
al S
ervi
ces
Pen
din
g
Co
nti
nu
ing
$145
,000
$1
04,0
00
04/0
1/20
08
06/0
1/20
09
D
eter
min
e o
bse
rved
tri
p g
ener
atio
n r
ates
(au
tom
ob
ile, t
ran
sit,
an
d n
on
-mo
tori
zed
) an
d
p
arki
ng
dem
and
ass
oci
ated
wit
h s
mar
t g
row
th
d
evel
op
men
ts. F
ind
ing
s w
ill b
e sy
nth
esiz
ed in
to
a
gu
idel
ines
pu
blic
atio
n f
or
use
by
loca
l pla
nn
ing
and
pu
blic
wo
rks
staf
f.
3000
2.06
Pr
ofe
ssio
nal
Ser
vice
s Pe
nd
ing
Co
nti
nu
ing
$305
,000
$2
30,0
00
04/0
1/20
08
06/0
1/20
09
D
evel
op
gu
idel
ines
to
ref
ine
the
smar
t g
row
th a
rea
def
init
ion
s, d
escr
ibe
key
des
ign
fea
ture
s o
f g
oo
d
sm
art
gro
wth
an
d d
evel
op
co
mm
un
ity
sup
po
rt f
or
smar
t
3000
4.
Leg
al S
ervi
ces
TBD
New
Tas
k O
rder
$60,
000
$60,
000
07/0
1/20
08
12/3
1/20
08
O
uts
ide
Co
un
sel f
or
RTP
. 30
008.
01
5000
805
Pro
fess
ion
al S
ervi
ces
Pen
din
g
Co
nti
nu
ing
$160
,000
$1
20,0
00
04/0
1/20
08
06/3
0/20
09
3000
9.
Man
aged
Lan
es T
ruck
Stu
dy
TBD
Pen
din
g
$200
,000
$1
50,0
00
03/0
1/20
08
03/0
1/20
09
C
on
sult
ants
will
ass
ess
seve
ral p
oss
ible
op
tio
n
ro
ute
s (s
cen
ario
s) f
or
man
aged
tru
ck la
nes
.
O
pp
ort
un
itie
s an
d c
hal
len
ges
fo
r ea
ch m
anag
ed
tr
uck
lan
e sc
enar
io w
ill b
e o
utl
ined
in t
he
stu
dy.
3002
3.01
50
0066
4 G
ener
al E
ng
inee
rin
g &
Pla
nn
ing
Ser
vice
s (G
EC)
BI T
ran
Sys
tem
s, In
c.
New
RFP
$1
,800
,000
$3
0,00
0 01
/01/
2009
06
/30/
2009
Co
nsu
ltan
t s
up
po
rt in
dev
elo
pm
ent
of
the
up
dat
e
to
th
e C
oo
rdin
ated
Pla
n in
FY
200
9 30
028.
50
0040
7 Pr
ofe
ssio
nal
ser
vice
s C
oas
tal F
ron
tier
s C
orp
. C
on
tin
uin
g
$600
,000
$1
03,9
75
10/0
6/20
05
08/3
1/20
10
M
on
ito
rin
g p
rog
ram
wh
ich
incl
ud
es s
urv
eyin
g t
he
b
each
an
d la
go
on
en
tran
ces
twic
e an
nu
ally
to
do
cum
ent
chan
ges
in t
he
reg
ion
’s c
oas
tlin
e. E
ffo
rts
will
mea
sure
ch
ang
es in
th
e sh
ore
zo
ne,
mo
nit
or
san
d m
ove
men
t, a
nd
th
e ef
fect
of
no
uri
shm
ent
acti
viti
es.
3002
8.
Gen
eral
En
gin
eeri
ng
& P
lan
nin
g S
ervi
ces
(GEC
) TB
D
New
RFP
$5
00,0
00
$400
,000
04
/01/
2008
12
/31/
2008
The
nex
t p
has
e o
f d
evel
op
men
t o
f a
reg
ion
al
b
each
san
d r
eple
nis
hm
ent
pro
ject
will
incl
ud
e fi
nal
en
gi-
nee
rin
g a
nd
co
nst
ruct
ion
wo
rk. W
e an
tici
pat
e th
e
wo
rk
beg
inn
ing
in t
he
seco
nd
hal
f o
f FY
200
9
b
ut
wo
rk w
ill n
ot
be
com
ple
ted
un
til 2
010.
3002
8.
Envi
ron
men
tal S
ervi
ces
On
-cal
l N
ew T
ask
Ord
er
$500
,000
$1
25,0
00
01/0
1/20
09
10/0
1/20
10
Th
e n
ext
ph
ase
of
dev
elo
pm
ent
of
a re
gio
nal
bea
ch
sa
nd
rep
len
ish
men
t p
roje
ct w
ill in
clu
de
envi
ron
-
men
tal a
nal
ysis
. We
anti
cip
ate
this
wo
rk b
egin
nin
g
in
th
e s
eco
nd
hal
f o
f FY
200
9 b
ut
wo
rk w
ill n
ot
be
com
ple
ted
un
til 2
010.
A-5
SAN
DIE
GO
ASS
OC
IAT
ION
OF
GO
VE
RN
ME
NT
S FY
200
9 O
VE
RA
LL W
OR
K P
RO
GR
AM
— C
ON
TR
AC
TE
D S
ER
VIC
ES
C
on
tract
No
. C
on
tract
Typ
e
CO
NTI
NU
ING
C
ON
TRA
CT
FY 2
009
STA
RT
DA
TE C
OM
PLE
TIO
N
OWP #
(I
f avail
ab
le)
Sco
pe
VEN
DO
R
OR
NEW
A
MO
UN
T A
MO
UN
T
DA
TE
3 –
Pla
nn
ing
(co
nt’
d)
3002
8.01
50
0086
3 Pr
ofe
ssio
nal
Ser
vice
s M
off
at &
Nic
ho
l C
on
tin
uin
g
$150
,000
$1
0,00
0 10
/01/
2007
06
/30/
2008
Dev
elo
pm
ent
of
a C
oas
tal R
egio
nal
Sed
imen
t
Man
agem
ent
Plan
th
at w
ill d
iscu
ss h
ow
man
agem
ent
of
sed
imen
t ta
rget
ed a
t co
asta
l ero
sio
n c
an b
e im
ple
-
men
ted in
an
exp
edit
iou
s, c
ost
-eff
ecti
ve, a
nd
reso
urc
e-p
rote
ctiv
e m
ann
er t
hro
ug
ho
ut
the
San
Die
go
reg
ion
.
3003
0.
5000
234
Gen
eral
En
gin
eeri
ng
& P
lan
nin
g S
ervi
ces
(GEC
) C
A C
tr f
or
Sust
ain
able
En
erg
y Pe
nd
ing
$100
,000
$6
0,00
0 07
/01/
2008
06
/30/
2009
Co
nsu
ltan
t w
ill a
ssis
t SA
ND
AG
wit
h e
ner
gy
pla
nn
ing
pro
gra
m a
ctiv
itie
s, in
clu
din
g s
up
po
rt f
or
the
Ener
gy
Wo
rkin
g G
rou
p.
3003
0.02
50
0023
4 En
viro
nm
enta
l Ser
vice
s C
A C
ente
r Su
stai
nab
le E
ner
gy
Pen
din
g
$100
,000
$4
0,00
0 07
/01/
2008
09
/30/
2009
Co
nsu
ltan
t w
ill a
ssis
t w
ith
co
ntr
act
task
s, in
clu
din
g
th
e R
egio
nal
En
erg
y St
rate
gy
Up
dat
e an
d t
ech
nic
al
an
d a
dm
inis
trat
ive
task
s as
soci
ated
wit
h t
he
Sust
ain
-
able
Reg
ion
en
erg
y ef
fici
ency
pro
gra
m f
or
loca
l
go
vern
men
ts.
3005
1.
Pro
fess
ion
al s
ervi
ces
(ho
usi
ng
) TB
D
New
RFP
$2
5,00
0 $2
5,00
0 07
/01/
2008
06
/30/
2009
SAN
DA
G w
ill c
on
trac
t fo
r as
sist
ance
wit
h t
he
d
evel
op
men
t o
f a
wo
rkfo
rce
ho
usi
ng
pro
ject
alo
ng
the
SPR
INTE
R li
ne.
Th
e co
nsu
ltan
t w
ill a
ssis
t in
th
e
d
evel
op
men
t o
f a
gra
nt
pro
po
sal t
o a
ssis
t in
th
e
fi
nan
cin
g o
f a
wo
rkfo
rce
ho
usi
ng
pro
ject
.
3005
1.01
Tr
ansp
ort
atio
n P
lan
nin
g
TBD
Co
nti
nu
ing
$95,
030
$90,
030
01/0
1/20
08
06/3
0/20
09
R
esea
rch
ori
gin
s an
d d
esti
nat
ion
s o
f in
terr
egio
nal
co
mm
ute
s b
etw
een
Riv
ersi
de
and
San
Die
go
cou
nti
es, a
nal
yze
dat
a, a
nd
des
ign
eff
ecti
ve a
lter
-
nat
ives
to
sin
gle
occ
up
ancy
dri
vin
g p
atte
rns.
3005
5.
SDA
&E
Gat
eway
Fea
sib
ility
Stu
dy
TBD
Co
nti
nu
ing
$900
,000
$7
50,0
00
03/0
1/20
08
12/3
1/20
09
Th
e st
ud
y w
ill lo
ok
at f
reig
ht
fore
cast
info
rmat
ion
for
US-
Mex
ican
tra
de,
em
erg
ing
po
rt/r
ail a
nd
hig
h-
w
ay is
sues
imp
acti
ng
tra
de,
an
d o
utl
ine
inte
rmo
dal
gat
eway
inve
stm
ent
op
tio
ns.
Will
info
rm f
reig
ht
in
vest
men
t d
ecis
ion
mak
ing
at
the
bo
rder
reg
ion
.
3006
2.01
Tr
ansp
ort
atio
n P
lan
nin
g
TBD
New
RFP
$9
5,00
0 $7
0,00
0 01
/01/
2008
06
/30/
2009
An
alyz
e h
igh
-po
ten
tial
fre
eway
sh
ou
lder
lan
e se
g-
m
ents
to
eva
luat
e ca
pit
al im
pro
vem
ents
, co
sts,
an
d
sa
fety
issu
es.
Purs
ue
pro
ject
dev
elo
pm
ent
acti
viti
es
o
n h
igh
-pri
ori
ty c
and
idat
e lo
cati
on
s.
3007
1.
Leg
al S
ervi
ces
TBD
New
Tas
k O
rder
$10,
000
$10,
000
07/0
1/20
08
12/3
1/20
08
O
uts
ide
Co
un
sel o
n f
or
rig
ht
of
way
acq
uis
itio
n
3007
1.
Pro
fess
ion
al s
ervi
ces
TBD
New
$1
75,0
00
$175
,000
07
/01/
2008
12
/31/
2009
Eval
uat
ion
of
inn
ova
tive
fin
anci
ng
mec
han
ism
s fo
r
th
e O
tay
Mes
a Ea
st-O
tay
II PO
E an
d c
on
nec
tin
g r
oad
s
an
d p
rep
arat
ion
of
feas
ibili
ty s
tud
ies
(e.g
., fi
nan
cial
,
ben
efit
-co
st).
(C
altr
ans
gra
nt)
3007
1.
Pro
fess
ion
al s
ervi
ces
TBD
New
RFP
$2
50,0
00
$250
,000
07
/01/
2008
06
/30/
2009
Eval
uat
ion
of
inn
ova
tive
fin
anci
ng
mec
han
ism
s fo
r
th
e O
tay
Mes
a Ea
st-O
tay
II PO
E an
d c
on
nec
tin
g r
oad
s
an
d p
rep
arat
ion
of
feas
ibili
ty s
tud
ies
(e.g
., fi
nan
cial
,
A-6
SAN
DIE
GO
ASS
OC
IAT
ION
OF
GO
VE
RN
ME
NT
S FY
200
9 O
VE
RA
LL W
OR
K P
RO
GR
AM
— C
ON
TR
AC
TE
D S
ER
VIC
ES
C
on
tract
No
. C
on
tract
Typ
e
CO
NTI
NU
ING
C
ON
TRA
CT
FY 2
009
STA
RT
DA
TE C
OM
PLE
TIO
N
OWP #
(I
f avail
ab
le)
Sco
pe
VEN
DO
R
OR
NEW
A
MO
UN
T A
MO
UN
T
DA
TE
3 –
Pla
nn
ing
(co
nt’
d)
3007
2.
Pro
fess
ion
al S
ervi
ces
TBD
New
Tas
k O
rder
$70,
000
$70,
000
07/0
1/20
08
06/3
0/20
09
Pu
blic
op
inio
n r
esea
rch
an
d f
ocu
s g
rou
ps
3007
2.
Leg
al S
ervi
ces
TBD
New
P.O
. $5
0,00
0 $1
25,0
00
08/0
1/20
08
06/3
0/20
10
Pr
ovi
de
leg
al a
dvi
se o
n C
EQA
do
cum
ents
rel
ativ
e
to
a p
rop
ose
d Q
ual
ity
of
Life
mea
sure
30
073.
00
Plan
nin
g
TBD
New
P.O
. $2
,000
,000
$1
82,0
00
07/0
1/20
08
06/0
1/20
10
Th
e co
nsu
ltan
t w
ill c
on
du
ct t
he
San
Die
go
Air
-Rai
l
Net
wo
rk S
tud
y. T
he
$2,0
00,0
00 t
ota
l co
ntr
act
is
co
nti
ng
ent
on
rec
eivi
ng
ou
tsid
e fu
nd
ing
. If
ou
tsid
e
fu
nd
ing
is n
ot
secu
red
, so
me
con
sult
ant
assi
stan
ce
w
ou
ld
still
be
req
uir
ed.
3007
3.00
Pl
ann
ing
Peg
gy
Du
cey
Co
nti
nu
ing
$50,
000
$20,
000
09/0
1/20
07
06/0
1/20
09
C
on
sult
ant
will
ass
ist
SAN
DA
G s
taff
in v
ario
us
pro
ject
man
agem
ent
resp
on
sib
iliti
es s
uch
as
con
sult
ant
sele
ctio
n a
nd
rep
ort
rev
iew
.
3 -
Pla
nn
ing
Su
bto
tal
$8,7
24,0
30
$3,3
29,0
05
4 -
Pro
gra
mm
ing
, Pro
ject
Mo
nit
ori
ng
,
4000
1.07
Plan
nin
g S
ervi
ces
TBD
New
RFP
$2
50,0
00
$150
,000
07
/01/
2008
12
/31/
2009
Pro
gra
m m
anag
emen
t se
rvic
es t
o a
ssis
t SD
RA
A
in
dev
elo
pm
ent
of
mas
ter
pla
n f
or
SDIA
4000
5.
5000
444
Au
dit
Ser
vice
s C
apo
ricc
i & L
arso
n
Co
nti
nu
ing
$1,1
60,4
25
$102
,601
11
/01/
2005
10
/31/
2010
An
nu
al f
isca
l au
dit
s o
f TD
A s
ub
reci
pie
nts
40
006.
50
0029
2 G
ener
al E
ng
inee
rin
g &
Pla
nn
ing
Ser
vice
s (G
EC)
Eco
nin
tera
ctiv
e C
on
tin
uin
g
$240
,000
$5
7,00
0 01
/24/
2005
06
/30/
2009
On
-lin
e d
atab
ase
for
RTI
P p
roje
cts
and
fo
r
Tr
ansN
et p
aym
ents
40
007.
50
0077
5 G
ener
al E
ng
inee
rin
g &
Pla
nn
ing
Ser
vice
s (G
EC)
Syst
ems
Met
rics
New
Tas
k O
rder
$825
,000
$4
00,0
00
07/0
1/20
07
06/3
0/20
09
D
evel
op
men
t an
d In
teg
rati
on
of
A-P
eMS
and
T-Pe
MS
into
th
e Pe
MS
Syst
em
4000
8.00
G
ener
al E
ng
inee
rin
g &
Pla
nn
ing
Ser
vice
s (G
EC)
TBD
New
Tas
k O
rder
$100
,000
$1
00,0
00
02/0
1/20
08
02/0
1/20
11
D
evel
op
a p
lan
fo
r re
view
of
maj
or
tran
sit
faci
litie
s, p
erfo
rm in
spec
tio
n a
nd
tes
tin
g o
f
sp
ecif
ic f
acili
ties
, p
rep
are
a re
po
rt in
dic
atin
g
th
e g
ener
al c
on
dit
ion
of
cate
go
ries
of
faci
litie
s
an
d id
enti
fyin
g f
acili
ties
mo
st in
nee
d o
f re
pai
r o
r
re
pla
cem
ent
4 -
Pro
gra
mm
ing
, Pro
ject
Mo
nit
ori
ng
, an
d O
vers
igh
t Su
bto
tal
$2,5
75,4
25
$80
9,6
01
5 -
Pro
ject
De
velo
pm
en
t 50
003.
50
0002
35
Gen
eral
En
gin
eeri
ng
& P
lan
nin
g S
ervi
ces
(GEC
) T.
Y. L
in
Co
nti
nu
ing
$1,2
48,0
00
$765
,632
03
/28/
2005
06
/30/
2009
50
004.
50
0006
G
ener
al E
ng
inee
rin
g &
Pla
nn
ing
Ser
vice
s (G
EC)
Del
can
New
Tas
k O
rder
$50,
000
$50,
000
07/0
1/20
08
06/3
0/20
09
Tr
ain
ing
fo
r A
TMS
Cal
tran
s TM
C P
erso
nn
el
5000
4.
5000
006
Gen
eral
En
gin
eeri
ng
& P
lan
nin
g S
ervi
ces
(GEC
) D
elca
n
New
Tas
k O
rder
$100
,000
$1
00,0
00
06/3
0/20
08
06/3
0/20
09
Sy
stem
s Su
pp
ort
fo
r IM
TMS
- R
egio
nal
Inte
gra
tio
n
fo
r 51
1 50
004.
G
ener
al E
ng
inee
rin
g &
Pla
nn
ing
Ser
vice
s (G
EC)
Ora
cle
New
P.O
. $7
,000
$7
,000
07
/01/
2008
06
/30/
2009
Ora
cle
soft
war
e su
pp
ort
A-7
SAN
DIE
GO
ASS
OC
IAT
ION
OF
GO
VE
RN
ME
NT
S FY
200
9 O
VE
RA
LL W
OR
K P
RO
GR
AM
— C
ON
TR
AC
TE
D S
ER
VIC
ES
C
on
tract
No
. C
on
tract
Typ
e
CO
NTI
NU
ING
C
ON
TRA
CT
FY 2
009
STA
RT
DA
TE C
OM
PLE
TIO
N
OWP #
(I
f avail
ab
le)
Sco
pe
VEN
DO
R
OR
NEW
A
MO
UN
T A
MO
UN
T
DA
TE
5 -
Pro
ject
De
velo
pm
en
t 50
004.
50
0000
6 G
ener
al E
ng
inee
rin
g &
Pla
nn
ing
Ser
vice
s (G
EC)
Del
can
New
Tas
k O
rder
$562
,176
$5
00,0
00
08/0
1/20
08
06/3
0/20
10
D
evel
op
sys
tem
en
han
cem
ents
fo
r R
IWS/
IMTM
S/
A
TMS,
pro
vid
e co
nsu
ltin
g s
ervi
ces
on
reg
ion
al n
et-
w
ork
dep
loym
ents
. 50
004.
50
0000
6 G
ener
al E
ng
inee
rin
g &
Pla
nn
ing
Ser
vice
s (G
EC)
Del
can
New
Tas
k O
rder
$100
,000
$1
00,0
00
06/3
0/20
08
06/3
0/20
09
Sy
stem
Su
pp
ort
fo
r A
TMS
- Fr
eew
ay M
anag
emen
t
Syst
em
5001
9.
5000
0230
G
ener
al E
ng
inee
rin
g &
Pla
nn
ing
Ser
vice
s (G
EC)
Cit
y o
f Sa
n D
ieg
o
Co
nti
nu
ing
$250
,000
$1
0,00
0 07
/01/
2004
06
/30/
2009
The
Cit
y o
f Sa
n D
ieg
o p
rovi
des
Tra
ffic
En
gin
eeri
ng
Liai
son
Ser
vice
s to
SA
ND
AG
th
rou
gh
a r
eim
bu
rse-
men
t ag
reem
ent.
Th
e sc
op
e in
clu
des
pro
vid
ing
a
tr
affi
c e
ng
inee
r to
su
pp
ort
SA
ND
AG
pla
nn
ing
an
d
en
gin
eeri
ng
in d
evel
op
men
t o
f p
roje
cts.
5002
0.
Trai
nin
g S
ervi
ces
McC
ain
Co
nti
nu
ing
$42,
000
$14,
000
07/0
1/20
06
06/3
0/20
10
O
ng
oin
g o
per
atio
ns
trai
nin
g f
or
reg
ion
al p
artn
er
ag
enci
es w
ork
ing
wit
h S
AN
DA
G's
reg
ion
al p
ort
al
so
ftw
are.
50
020.
G
ener
al E
ng
inee
rin
g &
Pla
nn
ing
Ser
vice
s (G
EC)
TBD
Co
nti
nu
ing
$126
,000
$3
0,00
0 07
/01/
2006
06
/30/
2010
IMTM
S, R
AM
S, R
AV
L A
FC C
OTS
Pac
kag
e-O
ng
oin
g
so
ftw
are
op
erat
ion
al &
mai
nte
nan
ce
5002
0.
5000
381
Gen
eral
En
gin
eeri
ng
& P
lan
nin
g S
ervi
ces
(GEC
) Te
lven
t Fa
rrad
yne
Co
nti
nu
ing
$3,6
86,0
00
$1,0
00,0
00
03/0
1/20
06
06/3
0/20
09
51
1 p
roje
ct m
anag
emen
t, s
up
po
rt a
nd
mai
nte
nan
ce
fo
r W
eb, t
elep
ho
ne
and
Co
mm
un
ityT
V s
ervi
ces.
5002
0.
Gen
eral
En
gin
eeri
ng
& P
lan
nin
g S
ervi
ces
(GEC
) C
lear
Vie
w C
om
pu
ters
Co
nti
nu
ing
$30,
000
$15,
000
07/0
1/20
06
06/3
0/20
10
O
ng
oin
g o
per
atio
nal
mai
nte
nan
ce c
on
trac
t
5 -
Pro
ject
De
velo
pm
en
t Su
bto
tal
$6,2
01,1
76
$2,5
91,6
32
6 -
Syst
em
s M
an
ag
em
en
t 60
001.
50
0011
2 B
icyc
le L
ock
er M
ain
ten
ance
C
yclin
g P
rom
oti
on
s W
est,
Inc.
Co
nti
nu
ing
$166
,154
$4
5,00
0 12
/01/
2003
06
/30/
2009
To p
rovi
de
mai
nte
nan
ce f
or
the
San
Die
go
Reg
ion
al B
ike
Lock
er P
rog
ram
. 60
001.
G
uar
ante
ed R
ide
Ho
me
Pro
gra
m F
Y08
-12
Ad
min
istr
ativ
e Se
rvic
es o
f SD
C
on
tin
uin
g
$10,
500
$4,2
75
07/0
1/20
06
06/3
0/20
12
To
pro
vid
e ta
xi s
ervi
ces
for
the
San
Die
go
Reg
ion
al G
uar
ante
ed R
ide
Ho
me
Pro
gra
m.
6000
1.
5000
686
Bik
e to
Wo
rk D
ay F
Y07
-11
Cyc
ling
Pro
mo
tio
ns
Wes
t, In
c.
Co
nti
nu
ing
$125
,000
$2
5,00
0 11
/01/
2006
06
/30/
2011
Mar
keti
ng
ser
vice
s fo
r th
e an
nu
al B
ike
to W
ork
Day
. Ad
d B
ike
to W
ork
Mo
nth
an
d B
ike
to W
ork
Wee
k ev
ents
. 60
001.
50
0063
0 R
egio
nal
Van
po
ol P
rog
ram
FY
07-1
1 En
terp
rise
Rid
esh
are
Co
nti
nu
ing
$9,2
00,0
00
$2,0
00,0
00
01/0
1/20
07
06/3
0/20
11
To
pro
vid
e va
np
oo
l ser
vice
s an
d v
ehic
les
for
the
San
Die
go
Reg
ion
al V
anp
oo
l Pro
gra
m.
6000
1.
5000
698
Reg
ion
al V
anp
oo
l Pro
gra
m F
Y07
-11
VPS
I, In
c.
Co
nti
nu
ing
$6,0
50,0
00
$1,3
00,0
00
01/0
1/20
07
06/3
0/20
11
To
pro
vid
e va
np
oo
l ser
vice
s an
d v
ehic
les
for
the
San
Die
go
Reg
ion
al V
anp
oo
l Pro
gra
m.
6000
1.
Gu
aran
teed
Rid
e H
om
e Pr
og
ram
FY
08-1
2 En
terp
rise
Ren
t A
Car
Co
nti
nu
ing
$10,
500
$9,9
75
07/0
1/20
06
06/3
0/20
12
To
pro
vid
e re
nta
l car
ser
vice
s fo
r th
e Sa
n D
ieg
o
R
egio
nal
Gu
aran
teed
Rid
e H
om
e Pr
og
ram
. 60
001.
W
eb-b
ased
Rid
emat
chin
g S
ervi
ces
FY08
-12
Un
kno
wn
New
$1
05,0
00
$105
,000
07
/01/
2007
06
/30/
2012
To p
rovi
de
a W
eb-b
ased
rid
emat
chin
g s
ervi
ce f
or
the
San
Die
go
reg
ion
's c
om
mu
ters
via
Rid
eLin
k.o
rg.
A-8
SAN
DIE
GO
ASS
OC
IAT
ION
OF
GO
VE
RN
ME
NT
S FY
200
9 O
VE
RA
LL W
OR
K P
RO
GR
AM
— C
ON
TR
AC
TE
D S
ER
VIC
ES
C
on
tract
No
. C
on
tract
Typ
e
CO
NTI
NU
ING
C
ON
TRA
CT
FY 2
009
STA
RT
DA
TE C
OM
PLE
TIO
N
OWP #
(I
f avail
ab
le)
Sco
pe
VEN
DO
R
OR
NEW
A
MO
UN
T A
MO
UN
T
DA
TE
6 -
Syst
em
s M
an
ag
em
en
t (c
on
t’d
) 60
001.
TD
M M
arke
tin
g -
Inte
rnet
Ser
vice
Pro
vid
er
Emai
l Wo
rks
Co
nti
nu
ing
$7,5
00
$3,0
00
02/0
1/20
07
02/0
1/20
10
To
pro
vid
e e-
mai
l co
mm
un
icat
ion
ser
vice
s fo
r R
ideL
ink.
6000
1.
Web
-bas
ed R
idem
atch
ing
Ser
vice
s TB
D
Pen
din
g
$105
,000
$4
0,00
0 07
/01/
200
06/3
0/20
12
To
pro
vid
e a
Web
-bas
ed r
idem
atch
ing
ser
vice
for
the
San
Die
go
reg
ion
's c
om
mu
ters
via
Rid
eLin
k.o
rg.
6000
1.
5000
699
Reg
ion
al V
anp
oo
l Pro
gra
m F
Y07
-11
Mid
way
Rid
esh
are
Co
nti
nu
ing
$2,2
00,0
00
$450
,000
01
/01/
2007
06
/30/
2011
To p
rovi
de
van
po
ol s
ervi
ces
and
veh
icle
s fo
r th
e
Sa
n D
ieg
o R
egio
nal
Van
po
ol P
rog
ram
. 60
001.
09
Gen
eral
En
gin
eeri
ng
& P
lan
nin
g S
ervi
ces
(GEC
) TB
D
New
RFP
$7
5,00
0 $7
5,00
0 07
/01/
2008
06
/30/
2009
Mar
keti
ng
Res
earc
h a
nd
Pla
nn
ing
fo
r sh
ort
-
dis
tan
ce V
anp
oo
ling
6000
2.
5000
680
Tem
po
rary
Mai
nte
nan
ce/O
pn
s o
f Fa
sTra
k To
ll C
olle
ctio
n
Tran
sco
re, L
.P.
New
Tas
k O
rder
$378
,047
$3
78,0
47
07/0
1/20
08
12/3
1/20
08
Th
is is
fo
r O
pti
on
al T
ask
Ord
er Z
ero
(0)
to
Co
ntr
act
#500
0680
fo
r Te
mp
ora
ry O
per
atio
n o
f th
e I-
15
Fa
sTra
k To
ll C
olle
ctio
n S
yste
m a
nd
CSC
/Bac
k-o
ffic
e
an
d
mai
nte
nan
ce r
esp
on
sib
iliti
es d
uri
ng
th
e
tr
ansi
tio
n f
rom
Exp
ress
Lan
es t
o M
anag
ed L
anes
6000
2.
5000
680
Cu
sto
mer
Ser
vice
an
d V
iola
tio
ns
Pro
cess
ing
Cen
ter
Tran
sCo
re, L
.P.
New
Tas
k O
rder
$3,8
04,4
65
$954
,587
07
/01/
2008
06
/30/
2009
This
is f
or
Task
Ord
er 1
0 fo
r in
itia
l 3 y
ears
Cu
sto
mer
Serv
ice
and
Vio
lati
on
s Pr
oce
ssin
g t
asks
to
I-15
Man
aged
Lan
es F
asTr
ak p
roje
ct. F
Y 2
009
cost
der
ived
as f
ollo
ws:
1/2
Yea
r 1
cost
plu
s tr
ansi
tio
n
co
st o
f $4
20,5
34 d
uri
ng
init
ial s
ix m
on
ths
7/1-
12/3
1/08
6000
2.
5000
680
Toll
Co
llect
ion
Bac
k O
ffic
e O
per
atio
ns
and
Mai
nte
nan
ce
Tran
sCo
re, L
.P.
New
Tas
k O
rder
$6,7
02,0
85
$696
,681
01
/01/
2009
12
/31/
2013
Task
Ord
er 6
fo
r M
ain
ten
ance
an
d B
ack-
off
ice
op
erat
ion
s fo
r I-
15 M
anag
ed L
anes
To
ll C
olle
ctio
n
Sy
stem
. Est
sta
rt d
ate
Jan
1, 2
009
follo
win
g
co
mm
issi
on
ing
of
toll
colle
ctio
n s
yste
m in
to
o
per
atio
ns/
mai
nte
nan
ce a
nd
"w
arra
nty
" m
od
e
co
uld
var
y
6000
2.
5000
400
FasT
rak
Op
erat
ion
s an
d M
ain
ten
ance
Tr
ansC
ore
, L.P
. N
ew T
ask
Ord
er
$4,5
33,5
47
$0
01/0
1/20
03
12/3
1/20
08
C
on
tin
gen
cy t
o c
ove
r ad
dit
ion
al T
ask
Ord
er 7
c
co
nti
nu
atio
n o
f ex
isti
ng
I-15
Fas
Trak
® o
per
atio
ns
and
mai
nte
nan
ce s
ervi
ce le
vels
pen
din
g d
elay
in
I-
15 M
anag
ed L
anes
op
en t
o t
raff
ic d
ate
(co
st T
BD
if n
eed
ed).
6000
2.
5000
680
Pro
fess
ion
al M
arke
tin
g S
ervi
ces
Fran
k W
ilso
n &
Ass
oci
ates
New
Tas
k O
rder
$1,3
97,0
00
$324
,160
02
/01/
2008
01
/31/
2013
This
is f
or
a n
ew T
ask
Ord
er t
o e
xist
ing
Co
ntr
act
No
. 500
0680
I-15
Man
aged
Lan
es T
oll
Co
llect
ion
Syst
em Im
ple
men
tati
on
fo
r Fa
sTra
k® m
arke
tin
g
se
rvic
es t
o s
up
po
rt n
ew t
oll
syst
em la
un
ch c
om
men
-
sura
te w
ith
I-15
Man
aged
Lan
es s
ched
ule
d o
pen
ing
2nd
hal
f o
f200
8
6000
2.
5000
005
Law
En
forc
emen
t Se
rvic
es
Cal
ifo
rnia
Hig
hw
ay P
atro
l C
on
tin
uin
g
$888
,000
$1
20,0
00
03/0
1/19
98
12/3
1/20
12
M
emo
ran
du
m o
f U
nd
erst
and
ing
wit
h C
HP
to
p
rovi
de
pat
rol s
ervi
ces
for
I-15
Man
aged
Lan
es
u
sin
g o
vert
ime
off
icer
res
ou
rces
. Co
ntr
act
is
c
on
tin
uin
g u
nd
er a
7th
am
end
men
t d
ue
to b
e
p
roce
ssed
in F
Y 2
008
and
ad
ds
$120
,000
fo
r en
forc
e-
m
ent
in F
Y 2
009
A-9
SAN
DIE
GO
ASS
OC
IAT
ION
OF
GO
VE
RN
ME
NT
S FY
200
9 O
VE
RA
LL W
OR
K P
RO
GR
AM
— C
ON
TR
AC
TE
D S
ER
VIC
ES
C
on
tract
No
. C
on
tract
Typ
e
CO
NTI
NU
ING
C
ON
TRA
CT
FY 2
009
STA
RT
DA
TE C
OM
PLE
TIO
N
OWP #
(I
f avail
ab
le)
Sco
pe
VEN
DO
R
OR
NEW
A
MO
UN
T A
MO
UN
T
DA
TE
6 -
Syst
em
s M
an
ag
em
en
t (c
on
t’d
) 60
002.
50
0090
1 C
olle
ctio
ns
Serv
ices
Law
En
forc
emen
t Sy
stem
s, In
c.
Ap
pro
ved
$50,
000
$20,
000
09/0
1/20
07
08/3
1/20
08
D
elin
qu
ent
Co
llect
ion
s se
rvic
es f
or
I-15
Fas
Trak
®
6000
3.
FSP
Serv
ice
Exte
nsi
on
TBD
New
$5
76,0
00
$192
,000
07
/01/
2008
06
/30/
2010
Att
ain
ing
new
to
win
g s
ervi
ces
for
FSP
pro
gra
m
ex
pan
sio
n.
Staf
f an
alys
is o
f fl
eet
op
erat
ion
s w
ill
d
eter
min
e ex
pan
sio
n o
f se
rvic
es h
ou
rs.
6000
3.
5000
927
FSP
Sou
thB
ay E
xpre
ssw
ay S
BX
125
TBD
Pen
din
g
$412
,000
$1
37,0
00
02/0
1/20
08
06/3
0/20
10
To
win
g s
ervi
ces
for
pro
vid
ing
FSP
ser
vice
s al
on
g
th
e SR
125
So
uth
Bay
Exp
ress
way
To
ll R
oad
. 60
003.
50
0039
2 FS
P TM
P I-
5 V
. De
la V
alle
- 6
0003
17
Ro
adO
ne
Co
nti
nu
ing
$253
,000
$1
61,0
00
09/0
1/20
05
06/3
0/20
10
To
win
g s
ervi
ces
for
FSP
I-5
Via
De
La V
alle
Au
x.
La
nes
Mit
igat
ion
Pro
ject
. 60
003.
FS
P A
VL-
MD
T M
anag
emen
t Sy
stem
TB
D
New
$2
60,0
00
$200
,000
07
/01/
2008
06
/30/
2011
This
eff
ort
incl
ud
es r
evie
win
g a
nd
eva
luat
ing
th
e
exis
tin
g F
SP f
leet
man
agem
ent
and
mo
nit
ori
ng
pro
cess
to
op
tim
ize
FSP
op
erat
ion
al o
vers
igh
t an
d
6000
3.
5000
451
FSP
Bea
ts 1
-9 -
600
0314
JC
To
win
g
Co
nti
nu
ing
$7,9
29,8
00
$1,5
86,0
00
07/0
1/20
05
06/3
0/20
10
To
win
g s
ervi
ces
for
FSP
reg
ion
al s
yste
m c
ove
rag
e
(B
eats
1-9
).
6000
3.
I-15
FSP
Ser
vice
s -
I-15
ML
So
uth
Seg
men
t C
on
st.
TBD
New
RFP
$5
25,0
00
$161
,000
07
/01/
2008
06
/30/
2010
Per
Cal
tran
s R
equ
est.
An
tici
pat
ed F
SP s
ervi
ces
alo
ng
I-15
ML
con
stru
ctio
n p
roje
ct f
or
Sou
th
Se
gm
ent.
6000
3.
Co
nti
nu
atio
n o
f R
ovi
ng
Ser
vice
Tru
cks
FSP
serv
ices
TBD
New
RFP
$1
,800
,000
$5
07,0
00
07/0
1/20
08
06/3
0/20
10
FS
P Se
rvic
es U
sin
g R
ovi
ng
Ser
vice
Pic
k-U
ps
Pen
din
g
FS
P Fl
eet
An
alys
is.
6000
3.
5000
392
FSP
Bea
ts 1
0 to
13
- 6
0003
15
Ro
adO
ne
Co
nti
nu
ing
$3,0
94,0
00
$619
,000
07
/01/
2005
06
/30/
2010
Tow
ing
ser
vice
s fo
r th
e FS
P re
gio
nal
sys
tem
cove
rag
e (B
eats
10-
13).
6000
3.
I-15
ML
FSP
Serv
ices
- N
ort
h S
eg. C
on
stru
ctio
n
TBD
New
RFP
$5
25,0
00
$161
,000
07
/01/
2008
06
/30/
2010
Per
Cal
tran
s R
equ
est.
New
FSP
ser
vice
s d
uri
ng
exp
ecte
d I-
15 M
L N
ort
h S
egm
ent
con
stru
ctio
n.
6000
4.
Gen
eral
En
gin
eeri
ng
& P
lan
nin
g S
ervi
ces
(GEC
) TB
D
New
RFP
$6
0,00
0 $6
0,00
0 07
/01/
2008
06
/30/
2009
Op
erat
ion
s Pl
an
6000
4.
Gen
eral
En
gin
eeri
ng
& P
lan
nin
g S
ervi
ces
(GEC
) TB
D
New
RFP
$4
5,00
0 $4
5,00
0 07
/01/
2008
06
/30/
2009
Bas
elin
e M
arke
tin
g S
urv
ey
6000
7.
Gen
eral
En
gin
eeri
ng
& P
lan
nin
g S
ervi
ces
(GEC
) H
POp
envi
ew
New
P.O
. $9
,000
$9
,000
07
/01/
2008
06
/30/
2009
An
nu
al s
oft
war
e lic
ensi
ng
6000
7.
Gen
eral
En
gin
eeri
ng
& P
lan
nin
g S
ervi
ces
(GEC
) H
um
min
gB
ird
New
P.O
. $7
,000
$7
,000
07
/01/
2008
06
/30/
2009
An
nu
al s
oft
war
e lic
ensi
ng
6000
7.
Gen
eral
En
gin
eeri
ng
& P
lan
nin
g S
ervi
ces
(GEC
) C
od
a N
ew P
.O.
$9,0
00
$9,0
00
07/0
1/20
08
06/3
0/20
09
A
nn
ual
so
ftw
are
licen
sin
g
6000
7.
Gen
eral
En
gin
eeri
ng
& P
lan
nin
g S
ervi
ces
(GEC
) C
ub
ic
New
P.O
. $2
75,0
00
$275
,000
07
/01/
2008
06
/30/
2009
An
nu
al s
oft
war
e lic
ense
6 -
Syst
em
s M
an
ag
em
en
t Su
bto
tal
$51
,462
,598
$10
,679
,725
A-10
SAN
DIE
GO
ASS
OC
IAT
ION
OF
GO
VE
RN
ME
NT
S FY
200
9 O
VE
RA
LL W
OR
K P
RO
GR
AM
— C
ON
TR
AC
TE
D S
ER
VIC
ES
C
on
tract
No
. C
on
tract
Typ
e
CO
NTI
NU
ING
C
ON
TRA
CT
FY 2
009
STA
RT
DA
TE C
OM
PLE
TIO
N
OWP #
(I
f avail
ab
le)
Sco
pe
VEN
DO
R
OR
NEW
A
MO
UN
T A
MO
UN
T
DA
TE
7 -
Pro
gra
m M
an
ag
em
en
t an
d
7000
9.
Stat
e Le
gis
lati
ve R
epre
sen
tati
on
Ellis
on
Wils
on
Ad
voca
cy
Co
nti
nu
ing
$60,
000
$60,
000
06/3
0/20
08
06/3
0/20
09
A
ssis
t w
ith
pu
rsu
it o
f st
ate
leg
isla
tio
n a
nd
po
licie
s
in
su
pp
ort
of
SAN
DA
G L
egis
lati
ve a
nd
Ove
rall
Wo
rk P
rog
ram
s 70
009.
Fe
der
al L
egis
lati
ve R
epre
sen
tati
on
Bla
nk
Ro
me
Go
vern
men
t R
elat
ion
Co
nti
nu
ing
$80,
000
$80,
000
10/0
1/20
07
09/3
0/20
08
A
ssis
t w
ith
pu
rsu
it o
f fe
der
al le
gis
lati
on
an
d
p
olic
ies
in s
up
po
rt o
f SA
ND
AG
Leg
isla
tive
an
d
Ove
rall
Wo
rk P
rog
ram
s 70
011.
En
viro
nm
enta
l Ser
vice
s H
elix
En
viro
nm
enta
l Pla
nn
ing
Co
nti
nu
ing
$10,
000
$10,
000
07/0
1/20
07
C
on
du
ct a
nn
ual
mo
nit
ori
ng
fo
r th
e D
el M
ar
B
luff
s St
abili
zati
on
Pro
ject
2 a
nd
pre
par
e an
nu
al
m
on
ito
rin
g r
epo
rt f
or
sub
mis
sio
n t
o t
he
Cal
ifo
rnia
Co
asta
l Co
mm
issi
on
7001
3.
5000
650
Gen
eral
En
gin
eeri
ng
& P
lan
nin
g S
ervi
ces
(GEC
) PB
S&J
Co
nti
nu
ing
$1,2
50,0
00
$512
,000
01
/01/
2006
06
/30/
2010
Co
nti
nu
ing
eff
ort
to
dev
elo
p a
nd
beg
in im
ple
men
t-
at
ion
of
a n
ew R
egio
nal
Inte
llig
ent
Tran
spo
rtat
ion
Syst
ems
Stra
teg
ic P
lan
. 70
013.
01
Gen
eral
En
gin
eeri
ng
& P
lan
nin
g S
ervi
ces
(GEC
) TB
D
New
RFP
$9
49,0
00
$436
,000
07
/01/
2008
06
/30/
2010
Dev
elo
pm
ent
of
I-80
5 C
SMP
7500
0.
Eco
no
mic
An
alys
es/A
sses
smen
ts
TBD
New
P.O
. $4
,000
$4
,000
01
/01/
2009
06
/30/
2009
An
nu
al a
ud
it f
or
Sou
rceP
oin
t 75
056.
Tr
ansl
atio
n S
ervi
ces
Pen
din
g
Co
nti
nu
ing
$20,
000
$6,2
00
02/0
1/20
07
02/2
8/20
09
To
pro
vid
e tr
ansl
atio
n s
ervi
ces
for
bin
atio
nal
mee
tin
gs
wit
h U
.S. a
nd
Mex
ican
off
icia
ls a
nd
to
tran
slat
e th
e Ex
ecu
tive
Su
mm
ary
into
Sp
anis
h
7
- P
rog
ram
Man
ag
em
en
t an
d E
xte
rnal
Rela
tio
ns
Su
bto
tal
$2,3
73,0
00
$1,1
08,2
00
TO
TAL
F
Y 2
009
C
ON
TRA
CT
AM
OU
NT
SU
B-T
OTA
L O
WP C
ON
TRA
CTE
D E
MPLO
YE
ES
$
1,1
66,3
21
$
6
25,0
20
SU
B-T
OTA
L O
WP
CO
NTR
AC
TED
SE
RV
ICES
$1
18,2
00,3
00
$2
7,8
85,9
49
TO
TAL
OW
P C
ON
TRA
CTE
D S
ER
VIC
ES
$1
19
,366
,62
1*
$2
8,5
10
,96
9
A-11
SAN
DIE
GO
ASS
OC
IAT
ION
OF
GO
VE
RN
ME
NT
S FY
200
9 O
VE
RA
LL W
OR
K P
RO
GR
AM
— C
ON
TR
AC
TE
D S
ER
VIC
ES
C
on
tract
No
. C
on
tract
Typ
e
CO
NTI
NU
ING
C
ON
TRA
CT
FY 2
009
STA
RT
DA
TE C
OM
PLE
TIO
N
OWP #
(I
f avail
ab
le)
Sco
pe
VEN
DO
R
OR
NEW
A
MO
UN
T A
MO
UN
T
DA
TE
8 -
Ad
min
istr
ati
on
8000
1.
Fin
anci
al A
ud
it S
ervi
ces
Cap
ori
cci &
Lar
son
Co
nti
nu
ing
$1,2
50,0
00
$54,
000
11/0
1/20
05
10/3
1/20
10
Pr
ovi
de
fin
anci
al a
ud
itin
g s
ervi
ces
for
gen
eral
agen
cy f
inan
cial
rep
ort
ing
8000
1.
Fin
anci
al S
oft
war
e Sy
stem
Su
ng
ard
Bi-
Tech
C
on
tin
uin
g
$32,
000
$32,
000
06/0
1/20
03
05/3
0/20
09
A
nn
ual
lice
nsi
ng
, mai
nte
nan
ce, a
nd
hel
plin
e fe
es
fo
r ex
isti
ng
fin
anci
al a
cco
un
tin
g s
yste
m (
IFA
S)
8000
1.
Payr
oll
Mai
nte
nan
ce &
Su
pp
ort
Cer
idia
n
Co
nti
nu
ing
$35,
000
$35,
000
06/1
0/20
07
06/3
0/20
09
Pr
oce
ssin
g f
ees
for
thir
d-p
arty
pro
vid
er o
f p
ayro
ll
and
hu
man
res
ou
rces
ser
vice
s 80
001.
Le
gal
Ser
vice
s V
ario
us
Co
nti
nu
ing
$250
,000
$1
35,0
00
04/0
1/20
05
03/3
1/20
10
Se
rvic
es f
or
ou
tsid
e le
gal
co
un
sel f
or
issu
es
im
pac
tin
g S
AN
DA
G a
s an
ag
ency
80
001.
10
TBD
TBD
New
RFP
$6
4,00
0 $6
4,00
0 07
/01/
2008
06
/30/
2009
Pro
fess
ion
al s
ervi
ces
to p
rovi
de
qu
alif
ied
cle
rica
l,
ad
min
istr
ativ
e, t
ech
nic
al, a
nd
pro
fess
ion
al
te
mp
ora
ry p
erso
nn
el o
n a
n "
on
-cal
l" b
asis
fo
r
as
sig
nm
ents
80
001.
20
Bu
sin
ess
serv
ices
TBD
New
P.O
. $1
0,00
0 $1
0,00
0 07
/01/
2008
06
/30/
2009
Emer
gen
cy n
oti
fica
tio
n s
yste
m f
or
no
tify
ing
SAN
DA
G e
mp
loye
es
8000
1.20
Ec
on
om
ic A
nal
yses
/Ass
essm
ents
TBD
New
P.O
. $5
0,00
0 $5
0,00
0 07
/01/
2008
06
/30/
2009
Insu
ran
ce r
isk
man
agem
ent
serv
ices
to
ass
ist
Co
ntr
acts
& P
rocu
rem
ent
8000
1.41
H
R C
on
sult
ant
TBD
New
P.O
. $3
0,00
0 $3
0,00
0 07
/01/
2008
06
/30/
2009
HR
Co
nsu
ltin
g s
ervi
ces
for
Succ
essF
acto
rs,
B
enef
its,
an
d C
om
pen
sati
on
exp
erti
se
8000
1.60
D
BE
Co
nsu
ltan
ts
Pad
illa
& A
sso
c C
on
tin
uin
g
$50,
000
$27,
000
01/0
1/20
07
01/0
1/20
11
D
BE
go
als
and
pro
gra
m m
on
ito
rin
g
8000
1.60
B
usi
nes
s Se
rvic
es
TBD
New
P.O
. $1
5,00
0 $1
5,00
0 07
/01/
2008
06
/30/
2009
Ven
do
r d
ata
bas
e
8 -
Ad
min
istr
ati
on
Su
bto
tal
$
1,7
86,0
00
$
45
2,0
00
TO
TAL
OW
P &
AD
MIN
ISTR
ATI
ON
CO
NTR
AC
TED
SER
VIC
ES
$1
21,1
52,6
21*
$
29,0
62,9
69
*Th
e To
tal C
on
trac
t A
mo
un
t o
f co
ntr
acts
use
d in
mu
ltip
le O
WPs
is o
nly
co
un
ted
on
th
e fi
rst
inst
ance
rptC
ontra
cts
02
/26/
2008
6:3
1:53
A-12
APPENDIX B
POLICY COMMITTEE INVOLVEMENT
FY 2009 Overall Work Program – Policy Committee Involvement*
COMMITTEES
Project Number Project Name Borders Regional
Planning Public Safety
Trans-portation Executive General
Services**
B-1
1 – Implementation
11091 Project Development and Oversight
1109203 I-15 Violation Enforcement System Study
11093 Regional Arterial Management System
11095 Traveler Information Service - 511
11102 TransNet Financial Management
11103 TransNet Public Information Program
11139 Independent Taxpayer Oversight Committee Program
2 – Technical Services
20001 Information Systems Management
20002 PC, Internet, and Database Applications
20003 Transportation Model Application and Development
20004 Census and Product Coordination
20005 Demographic and Economic Forecasts
20006 Geographic Information Systems Services
20007 Assistance to Transit Operations and Planning
20009 Performance Indicator Data Management
20011 Regional Economic and Municipal Finance Services
20014 Regional Criminal Justice Research and Clearinghouse
20018 CJ – Youth Evaluation Projects (20019, 41, 46, 47, 54, 57, 59)
20026 CJ – Substance Abuse Monitoring
20031 Creative Services Program
20036 CJ – Public Health Orihects (20023, 36, 38, 39, 58)
20055 CJ – Adult Criminal Justice Projects (20055, 60)
21002 I-PLACE3S Modeling for Community Sustainability
21003 Crime Patterns at Transit Stations
22001 ARJIS: Maintenance and Support
22002 ARJIS: Project Management and Enhancements
22004 ARJIS: Border Safe III/RISC
22005 ARJIS: Enterprise System
22006 ARJIS: SRFERS II Grant
22007 ARJIS: Regional Interoperability and Communications
22009 ARJIS: Domestic Violence Communications Systems
FY 2009 Overall Work Program – Policy Committee Involvement*
COMMITTEES
Project Number Project Name Borders Regional
Planning Public Safety
Trans-portation Executive General
Services**
B-2
2 – Technical Services (cont’d)
22011 ARJIS: Officer Notification and Smart Alerting System
22012 ARJIS: Tactical Identification System
22013 ARJSI: SmartSearch
3 – Planning
30002 RCP Planning and Implementation (3000206, 07, 08)
30004 Regional Mobility and Transportation Planning
30008 Nonmotorized Transportation Planning and Project Development (3000801)
30009 Goods Movement Planning
30023 Regional Short-Range Transit Service Planning (3002301, 03)
30026 Regional Housing and Smart Growth Development
30027 Natural Resource Planning and Coordination
30028 Regional Shoreline Management (3002801)
30030 Regional Energy Planning (3003001, 02)
30032 Borders Planning and Coordination
30039 Subregional Transportation Planning and Coordination
30051 San Diego - Riverside Interregional Partnership – Phase III (3005101)
30055 San Diego & Arizona Eastern Railway Gateway Feasibility and Improvements Study
3006201 Transit Priority Measures Planning Grant
30063 Implementation of Otay Mesa-Mesa de Otay Binational Corridor Strategic Plan
30071 State Route 11 and East Otay Mesa Port of Entry Planning
30072 Regional Facilities Planning and Financing
30073 Regional Multimodal Airport Planning
4 – Programming, Project Monitoring, and Oversight
40001 Transit Planning Administration and Coordination (4000101, 03, 06, 07)
40005 Transportation Funding Administration
40006 Regional Transportation Improvement Program
40007 Develop and Enhance Tools for Transportation Performance Monitoring
40008 Asset Evaluation and Management
FY 2009 Overall Work Program – Policy Committee Involvement*
COMMITTEES
Project Number Project Name Borders Regional
Planning Public Safety
Trans-portation Executive General
Services**
B-3
5 – Project Development
50003 Encinitas Pedestrian Crossings Study
50004 Intermodal Transportation Management System
50019 SANDAG Rail, Bus Rapid Transit, and Bus Transit Design Criteria
50020 Intelligent Transportation System Operations
6 – Systems Management
60001 Transportation Demand Management (6000109)
60002 I-15 FasTrak® Value Pricing Program
60003 Freeway Service Patrol
60004 San Diego Station Car Pilot Program Study - Phases I and II
60007 Compass Card Program
60008 San Diego Smart Parking Pilot Project
60009 Transit Configuration Management System
7 – Program Management and External Relations
70001 Interagency Coordination and OWP Program Management
70003 Intergovernmental Review Processing
70004 Public Involvement Program
70006 Tribal Government Liaison (7000601)
70009 Government Relations
70011 Regional Environmental and Public Facilities Planning and Coordination
70013 Regional Intelligent Transportation Systems Program Management (7001301)
70018 Marketing Coordination and Implementation
75000 Service Bureau
75056 Service Bureau – Border Master Plan
* This listing identifies the primary committees; in several cases multiple committees may share a balanced policy interest. ** These tasks identified normally do not have any direct involvement in the policy aspect of the committee, but provide information and technical support to one or more committees.
APPENDIX C
GLOSSARY
A
AB – Assembly Bill
ACS – American Community Survey
ACT – All Congregations Together
ADA – Americans with Disabilities Act
ADT – Average Daily Traffic
AFC – Automatic Fare Collection
APC – Automated Passenger Counter
APCB – Air Pollution Control Board
APCD – Air Pollution Control District
APRISS – a Technology Company
ARB – Air Resources Board
ArcGIS – Enterprise GIS Software
AREMA – American Railway Engineering and Maintenance-of-Way Association
ArcSDE – Database (GIS-Related) Software Product used by SANDAG
ARJIS – Automated Regional Justice Information System
ARJISNET – Automated Regional Justice Information System Network
ATIS – Advanced Traveler Information System
ATIS/511 – Advanced Traveler Information System/511
ATOP – Assistance to Transit Operations and Planning
AVL – Automatic Vehicle Location
B
BPWG – Bicycle-Pedestrian Working Group
BRT – Bus Rapid Transit
C
CAC – Citizens Advisory Committee
CAD – Computer-Aided Dispatch
CAL-DOJ – California Department of Justice
Cal-Photo – ARJIS Web-based application for statewide mugshots
Caltrans – California Department of Transportation
CASS – Crime Analysis Statistical System
CBC – California Biodiversity Council
CCDC – Centre City Development Corporation
CCTV – Closed Circuit Television
CEC – California Energy Commission
CEO – Chief Executive Officer
CEQA – California Environmental Quality Act
CGIA – California Geographic Information Association
CHP – California Highway Patrol
CIP – Capital Improvement Project
CJ – Criminal Justice
CJRD – Criminal Justice Research Division
CMAQ – Congestion Mitigation and Air Quality
ACRONYMS IN THE FY 2009 SANDAG BUDGET
GLOSSARY
C-1
C (cont'd)
CMP – Congestion Management Program
CMS – Changeable Message Sign
CNG – Compressed Natural Gas
COA – Comprehensive Operations Analysis
Coaster – Express Rail Service between San Diego and Oceanside
COBRO – Committee on Binational Regional Opportunities
COG – Council of Governments
COPLINK – Law Enforcement Software (for organizing/analyzing data)
CPG – Consolidated Planning Grant
CPS – Child Protective Services
CPUC – California Public Utilities Commission
CRT – Tube-type Computer Monitor
CSC – Customer Service Center
CSMC – Chief’s/Sheriff’s Management Committee
CSU – California State University
CTAC – Cities/County Transportation Advisory Committee
CTSA – Coordinated Transportation Services Agency
CVO – Commercial Vehicle Operations
D
DEMS – Demographic and Economic Mapping System
DMU – Diesel Multiple Unit
DMV – Department of Motor Vehicles
DVCS – Domestic Violence Communication System
E
EAP – Early Action Program
EIR – Environmental Impact Report
EMP – Environmental Mitigation Program
EPA – Environmental Protection Agency
EAP – Early Action Program
EWG – Energy Working Group
ETCS – Electronic Toll Collection System
eWatch – Automatic E-mail Alert Service of Recent Neighborhood Crime
F
FasTrak™ – Fee-based Transportation Program Allowing Single Drivers Use Of I-15 Fast Lanes
FBA – Facilities Benefit Assessment
FBI – Federal Bureau of Investigation
FHCSD – Family Health Centers of San Diego
FHWA – Federal Highway Administration
FOT – Field Operational Test
FSP – Freeway Service Patrol
FSTIP – Federal/State Transportation Improvement Program
FTA – Federal Transit Administration
G
GIS – Geographic Information System
GMAP – Goods Movement Action Plan
GPS – Global Positioning System
C-2
H
HIV – Human Immunodeficiency Virus
HOV – High Occupancy Vehicle
I
IAD – Imperial Avenue Division
ICM – Integrated Corridor Management
IEPR – Integrated Energy Policy Report
IFAS – SANDAG's Software Accounting System
IGR – Intergovernmental Review
IMPlan – Instituto Municipal de Planeación
IMTMS – Inter-Modal Transportation Management System
info – SANDAG Information Bulletin
Interpol – World's Largest International Police Organization
IPLACE3S – Software Planning Model
IRIS – Integrated Regional Infrastructure Strategy
IRP – Interregional PartnershipITOC – Independent Taxpayer Oversight Committee
ITS – Intelligent Transportation System
IVAG – Imperial Valley Association of Governments
J
JARC – Job Access and Reverse Commute
JJCPA – Juvenile Justice Crime Prevention Act
K
KIVA – OWP Work Element 20040 - Part Of Combined Adult Criminal Justice Projects
KMD – Kearny Mesa Division
L
LCD – Liquid Crystal Display
LOS – Level of Service
LOSSAN – Los Angeles to San Diego (Rail Corridor Agency)
LRT – Light Rail Transit
LRV – Light Rail Vehicle
M
MA – SANDAG Software Application (for handling meeting agenda items)
Maglev – Magnetic Levitation
MCGMAP – Multi-County Goods Movement Action Plan
MCP – Master’s of City Planning
MHCP – Multiple Habitat Conservation Program
MMPI – Mobility Management and Project Implementation
MOA – Memoranda of Agreement
MOBILITY 2030 – Title of RTP (Adopted March 2003)
MOU – Memorandum of Understanding
MPO – Metropolitan Planning Organization
MPR – Monthly Progress Report
MSCP – Multiple Species Conservation Program
MTDB – Metropolitan Transit Development Board
MTS – Metropolitan Transit System
C-3
N
NCCP – Natural Communities Conservation Program
NCTD – North County Transit District
NEPA – National Environmental Policy Act
NGO – Non-Governmental Organization
NISP – an East Coast (public safety) Sharing Initiative
NLETS – National Law Enforcement Telecommunication System
NTD – National Transit Database
O
OCTA – Orange County Transportation Authority
OS – Operating System
OWP – Overall Work Program
P
PA – SANDAG Software Application (for progress-tracking of OWP elements)
PATH – Partners For Advanced Transit and Highways
PC – Personal Computer
PCP – Passenger Counting Program
PEA – Planning Emphasis Area
PECAS – Production, Exchange, and Consumption Allocation System
PeMS – Performance Monitoring System
PIP – Performance Improvement Program
PM2.5 – a Particulate Matter Standard
POE – Port of Entry
POF – Plan of Finance
POP – Program of Projects
PSC – Public Safety Committee
PSN – Project Safe Neighborhoods
PSR – Project Study Report
PTA – Public Transportation Account
Q
QC – Quality Control
R
RAVL – Regional Automatic Vehicle Location
RCDC – Regional Census Data Center
RCMS – SANDAG'S Former Software Accounting System
RCP – Regional Comprehensive Plan
RCTC – Riverside County Transportation Commission
RDex – Regional Data Exchange
REDI – Regional Economic Development Information System
rEgion – SANDAG's Monthly Email Newsletter
REPS – Regional Economic Prosperity Strategy
RES – Regional Energy Strategy
RFP – Request for Proposals
RHNA – Regional Housing Needs Assessment
RHWG – Regional Housing Working Group
C-4
R (cont'd)
RideLink – Region Commuter and Employer Transportation Assistance Programs
RIP – Regional Improvement Program
RIS – Regional Information System
RSRTP – Regional Short-Range Transit Plan
RTA – Reservation Transportation Authority
RTA – Riverside Transit Agency
RTIP – Regional Transportation Improvement Program
RTP – Regional Transportation Plan
RTPA – Regional Transportation Planning Agency
RTrMS – Regional Transit Management System
RVES – Reserves
S
SAFE – Service Authority for Freeway Emergencies
SAFETEA-LU – Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users
SAM – Substance Abuse Monitoring
SANDAG – San Diego Association of Governments
SanGIS – San Diego Geographic Information Source
SANTEC – San Diego Regional Traffic Engineers Council
SB – Senate Bill
SCAG – Southern California Association of Governments
SCAT – Subcommittee for Accessible Transportation
SCOUP – San Compatibility and Opportunistic Use Program
SCTCA – Southern California Tribal Chairmen's Association
SD&AE – San Diego and Arizona Eastern Railway
SDCommute – SANDAG-supported Web Site for Information on Public Transportation
SDCWA – San Diego County Water Authority
SDCRAA – San Diego County Regional Airport Authority
SDDPC – San Diego Data Processing Corporation
SDG&E – San Diego Gas and Electric
SDREO – San Diego Regional Energy Office
SDRGC – San Diego Regional GIS Council
SDSU – San Diego State University
SDTC – San Diego Transit Corporation
SDTI – San Diego Trolley, Inc.
SDUPD – San Diego Unified Port District
SDUSD – San Diego Unified School District
SGIP – Smart Growth Incentive Program
SGOA – Smart Growth Opportunity Area
SHA – State Highway Account
SIDUE – Secretaria de Infrastructura y Desarrollo Urbano Estatal
SIP – State Implementation Plan
SOV – Single-Occupant Vehicle
SPRINTER – Commuter Light Rail Service
SQL – Structured Query Language
SR – State Route
SRFERS – State Federal Enterprise Retrieval System
SR2S – Safe Route To School
STA – State Transportation Assistance
STIP – State Transportation Improvement Program
C-5
S (cont'd)
STIP-RIP – State Transportation Improvement Program-Regional Improvement Program
STP – Surface Transportation Program
STRIDE – Specialized Transportation Referral and Information for the Disabled and Elderly
SWG – Stakeholders Working Group
T
TAAC – Transit Access Advisory Committee
TBD – To Be Determined
TCI – Transit Capital Improvement
TCM – Transportation Control Measure
TCRP – Transportation Congestion Relief Program
TCSP – Transportation, Community, and System Preservation
TDA – Transportation Development Act
TMC – Transportation Management Center
TDM – Transportation Demand Management
TEA – Transportation Enhancement Activities
TFIC – Transportation Forecast Information Center
3d – Three Dimensional
TI – Tenant Improvement
TIM – Traffic Incident Management
TMA – Transportation Management Association
TMC – Transportation Management Center
TransCAD – Transportation Modeling System
TransMODELER – Traffic Simulation Software
TransNet – SANDAG’s Local Transportation Sales Tax Program
TSM – Transportation System Management
TSP – Transit Signal Priority
TWG – Technical Working Group
U - ZUCSD – University of California, San Diego
U.S. – United States
UTC – University Town Center
VanPool – RideLink program
VCC – Vista Community Clinic
VES – Violation Enforcement System
VINE – National Victim Notification Network
VMWare – Software (partitions workstations/servers into separate virtual machines) to work with
WCCC – West Coast Corridor Coalition
WENET – Washington Enterprise Network
WINGS – Working to Insure and Nurture Girls Success (OWP 20017)
WRCOG – Western Riverside Council of Governments
WWW – World Wide Web
XML – Extensible Markup Language
C-6
APPENDIX D
MILESTONES IN SANDAG REGIONAL DECISION-MAKING
Milestones in SANDAG Regional Decision-Making
(over)
1966 • Local governments create the Comprehensive Planning Organization (CPO) as a long-range planning department within the San Diego County government under a state authorized joint powers agreement.
1970 - 1979 • Governor designates CPO as the Metropolitan Planning Organization (MPO) to assure areawide coordination and to serve as the technical and informational resource for local governments. • State further designates CPO as the Regional Transportation Planning Agency; Airport Land Use Commission; and Areawide Clearinghouse for federal/state grant reviews. • Local governments establish CPO as an independent Joint Powers Agency. • CPO develops & adopts the first ever Regional Transportation Plan. • Lemon Grove becomes a city and joins CPO. • CPO establishes the Criminal Justice Research Division. • CPO helps establish the Automated Regional Justice Information System (ARJIS). • CPO is jointly designated with the county government to implement federal & state Clean Air Acts. • State designates CPO to prepare the Regional Housing Needs Assessment.
1980 - 1989 • CPO renames itself as the San Diego Association of Governments (SANDAG). • Poway and Santee become cities and join SANDAG. • SANDAG creates SourcePoint as a nonprofit corporate subsidiary to customize and sell research products. • Encinitas and Solana Beach become cities and join SANDAG. • State designates SANDAG as the Regional Transportation Commission. • Voters countywide pass Proposition A — the local half-cent transportation sales tax measure known as TransNet, a $3.3 billion program for highways, transit, local roads, & bicycles. • Voters countywide pass an advisory measure calling for creation of a Regional Planning and Growth Management Board. • Cities/County designate SANDAG as the Regional Planning and Growth Management Review Board.
1990 - 1999 • State designates SANDAG as the Integrated Waste Management Task Force. • SANDAG helps start the San Dieguito River Valley Park Joint Powers Authority. • Member agencies designate SANDAG as the Congestion Management Agency. • State designates SANDAG as the San Diego-Coronado Bridge Toll Authority. • SANDAG helps form a five-county rail coalition, and purchases rail right-of-way from Santa Fe Railway for the COASTER, and the SPRINTER rail commuter services. • TransNet opens SR 52 East to Santee, widens SR 54 in the South Bay, opens SR 56 East in the North City area, and completes improvements to SR 78/I-15 interchange in the North County. • The Freeway Service Patrol begins under a cooperative arrangement among SANDAG, Caltrans, and the California Highway Patrol. • SANDAG approves the first ever Regional Economic Prosperity Strategy. • At the request of Caltrans, SANDAG assumes the management of Commuter Computer and transforms the operation into the RideLink service. • The San Diego County Water Authority joins SANDAG as an advisory member. • SANDAG plays a major role in bringing together all participants in the San Diego County Investment Fund. • SANDAG starts the I-15 FasTrak Program to improve traffic flow, and expand bus and rideshare services in the corridor. • The National Institute of Justice lauds SANDAG for its outstanding work on Drug Use Forecasting. • TransNet provides more than half the funds for the Mission Valley West trolley line between Old Town San Diego and QUALCOMM Stadium. • SANDAG Committee on Binational Regional Opportunities holds public forums on cross border planning in transportation, environment, education, water supply, and economic development. • Halfway through the 20-year TransNet program, 68% of the highway projects, 55% of the transit projects, and 53% of the local street program are completed.
D-1
As of 1/23/08
2000 • MTDB and NCTD become advisory members; SANDAG joins the Joint Committee on Regional Transit.
2001 • Using $14.7 million in federal and state funds, SANDAG puts sand on badly eroded beaches. • Working in close cooperation with MTDB, NCTD, and Caltrans, SANDAG approves the Regional Transit Vision.
2002 • SANDAG eliminates tolls from the San Diego - Coronado Bridge. • Directors launch effort to develop a Regional Comprehensive Plan, a long-term planning framework.
2003 • With the passage of state law (SB 1703), SANDAG becomes the consolidated regional agency and is responsible for transit planning, programming, project development, and construction. • Imperial County joins SANDAG as an advisory member. • SANDAG adopts the $42 billion, Mobility 2030 Regional Transportation Plan.
2004 • ARJIS is consolidated into SANDAG. Directors create the Public Safety Policy Committee. • The Regional Comprehensive Plan is adopted. • Voters extend the TransNet sales tax program for 40 years to generate $14 billion to help fund highway, transit, and local street improvements. • State Route 56 is completed, linking the east and west portions of the highway, and connecting Interstates 15 and 5.
2005 • SANDAG jump-starts highway and transit projects using new TransNet dollars by launching the Early Action Program. • The Independent Taxpayer Oversight Committee (ITOC) is formed in accordance with the TransNet ordinance to monitor program operations. • Mission Valley East Green Line trolley from QUALCOMM Stadium under SDSU to La Mesa begins service. • SPRINTER commuter rail begins construction to link Oceanside, Vista, San Marcos, and Escondido. • Service Bureau launched to provide demographic and economic information, custom mapping, transportation modeling and analysis projects, and survey design and analysis to public and private entities.
2006 • Construction on the I-15 managed lanes project continues with the middle segment nearing completion and construction underway on the northern segment. • Supplemental environmental work begins on the 11-mile Mid-Coast Trolley extension from Old Town north to UCSD and University Towne Centre. • Progress continues on implementing the Regional Comprehensive Plan. All jurisdictions identify opportunities for smart growth development in a new concept map. • SANDAG Public Safety Committee identifies interoperability and communications as a top priority in enhancing and protecting the region’s security. • SANDAG launches Web site with interactive Dashboard feature to track schedule and cost information for TransNet projects. • ARJIS, in collaboration with the District Attorney’s Office, launches new San Diego County Regional Crime Mapping Application for Public Safety (MAPS)
2007 • SANDAG awarded $432 million in state infrastructure bond dollars for transportation improvements. • Board adopts $57 billion 2030 Regional Transportation Plan. • Southern California Tribal Chairman’s Association joins SANDAG as advisory member. • Construction continues on I-15, I-5, I-805, and SR 52. • California Energy Commission awards $450,000 to SANDAG for energy planning. • SANDAG and the City of Tijuana approve the Otay Mesa-Mesa de Otay Binational Corridor Strategic Plan. • SANDAG launches 511 – a free phone and Web service for transportation information.
2008 • SANDAG competes for state infrastructure bond dollars for transportation and goods movement. • Compass Card brings “smart card” technology to transit passes. • First stretch of I-15 Managed Lanes to open. • Construction begins on SR 52 extension from SR 125 to SR 67. • Progress continues on SR 905 at the U.S./Mexico border.
D-2
APPENDIX E
RTP MAJOR PROJECTS
Smart Growth