Page 1: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 1/104

10/6/201110/6/2011 11

The Little Trail that DidThe Little Trail that Did……

Hudson Valley Rail TrailHudson Valley Rail Trail – –

Town of LloydTown of Lloyd

Ted M. Kolankowski, RLA LEED APTed M. Kolankowski, RLA LEED AP

Welcome Page – Assume Glenn will introduce us…

Page 2: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 2/104

Page 3: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 3/104

10/6/2011 3

Success FactorsSuccess Factors

►►Tireless PromotionTireless Promotion►►Patience and PersistencePatience and Persistence

►►Maintain FlexibilityMaintain Flexibility

►►Face ChallengesFace Challenges

►►Plan Ahead for ImpactPlan Ahead for Impact

GBG - There will be challenges, be patient persistent flexible and plan ahead

Introduce Supervisor Ray Costantino with brief bio.

Page 4: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 4/104

10/6/2011 4

1980 1985 1990 1995 2000 2005 2010 2015

Hudson Valley Rail Trail TimelineHudson Valley Rail Trail Timeline

Oct. 2009

Walkway

Over the

Hudson

Opens

Rail

ROW

sold to

Town of 

Lloyd

Oct. 2010

HVRT

connects

to the

Walkway

1997 - First

2.5 miles of 

the Hudson

Valley Rail

Trail Opens

Oct. 2013

HVRT

Complete

to the

Town Line

Rotary

Pavilion

Completed

Fiber 

Optic

routed

down

HVRT

Bridge

Burns

in Late

70’s

Rail

Line

no

longer 

used

Ray

Page 5: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 5/104

10/6/2011 5

Hudson Valley Rail TrailHudson Valley Rail Trail – – Phase IPhase I

HVRT

Phase I

Beginning of the first segment

Page 6: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 6/104

10/6/2011 6

Hudson Valley Rail TrailHudson Valley Rail Trail – – Phase IPhase I

HighlandHamlet

Tony Williams

Park

Close up view of Phase 1

Page 7: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 7/104

10/6/2011 7

Promoting the IdeaPromoting the Idea

Promotional Poster created by Landscape Architecture students fromConnecticut.

Page 8: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 8/104

10/6/2011 8

Hudson Valley Rail TrailHudson Valley Rail Trail – – Phase IPhase I

Trail Head at Commercial Avenue

Page 9: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 9/104

10/6/2011 9

Hudson Valley Rail TrailHudson Valley Rail Trail – – Phase IPhase I

Pavillion and Caboose

Page 10: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 10/104

10/6/2011 10

Hudson Valley Rail TrailHudson Valley Rail Trail – – Phase IPhase I

The trail, dedicated on July 12, 2003

Page 11: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 11/104

10/6/2011 11

Hudson Valley Rail TrailHudson Valley Rail Trail – – Phase IPhase I

Typical Scene on the Hudson Valley Rail Trail

Page 12: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 12/104

10/6/2011 12

Hudson Valley Rail TrailHudson Valley Rail Trail – – Phase IPhase I

http://www.hudsonvalleyrailtrail.net/photos/

Typical Scene on the Hudson Valley Rail Trail

Page 13: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 13/104

10/6/2011 13

Hudson Valley Rail TrailHudson Valley Rail Trail – – Phase IPhase I

Western terminus is at Tony Williams Park, Illinois Mountain in thebackground.

Page 14: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 14/104

10/6/2011 14

Phase IIPhase II

HVRT

Phase I

HVRTPhase I I

Next objective to bring the trail into the hamlet

Page 15: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 15/104

10/6/2011 15

Phase IIPhase II

HVRT

Phase I

HVRT

Phase I I

Haviland

Road

Close up of Phase 2

Page 16: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 16/104

10/6/2011 16

BudgetBudget

►► Phase I BudgetPhase I Budget Fiber Optic PayoutFiber Optic Payout

 Volunteers and Donations Volunteers and Donations

►► Phase II BudgetPhase II Budget

Pedestrian Bridge over NYS 44/55Pedestrian Bridge over NYS 44/55 (120(120’ ’ Span)Span)

Replace Underpass at Mile Hill RoadReplace Underpass at Mile Hill Road

First phase was somewhat inexpensive, using funds from agreement tolocated FiberOptic in the corridor, volunteers and donations.

This next phase, we needed a bridge and an underpass, we needed lots

more money and could not be done by volunteers…

Page 17: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 17/104

10/6/2011 17

BudgetBudget

We were not sitting on a stack of money, so we needed some big time help.

Page 18: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 18/104

10/6/2011 18

Growth PainsGrowth Pains……

►►Ulster County Transportation CouncilUlster County Transportation Council --Transportation Improvements PlanTransportation Improvements Plan

►►2006 Budget:2006 Budget: Engineering/ROWEngineering/ROW $$ 178,000.00178,000.00

Const.Const. InspInsp /Admin /Admin 25,000.0025,000.00

ConstructionConstruction 705,000.00705,000.00

TotalTotal $$ 908,000.00908,000.00

2006 20112010200920082007

We requested transportation funding through the Ulster County Transp.Council

Page 19: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 19/104

10/6/2011 19

PrerequisitesPrerequisites……

►► Follow Federal Highway ProcurementFollow Federal Highway ProcurementGuidelinesGuidelines

Qualifications v. Cost Based SelectionQualifications v. Cost Based Selection

Regional LDSA List v. Contract ReporterRegional LDSA List v. Contract Reporter

Next we needed to follow the procurement guidelines that went with thefunding to select a consultant team…

Page 20: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 20/104

10/6/2011 20

Design ContractDesign Contract

►►Contract Reporter Ad Date November 2006Contract Reporter Ad Date November 2006►►Proposal Evaluation and InterviewsProposal Evaluation and Interviews

December 2006December 2006

►►Quality Based Selection January 2007Quality Based Selection January 2007

►► Award Letter January 15, 2007 Award Letter January 15, 2007

2006 20112010200920082007

Awarded the project to B&L based on qualifications.

Page 21: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 21/104

10/6/201110/6/2011 2121

Phase 2Phase 2……Takes TimeTakes Time

……and Moneyand Money

And project manager was to be Ted…

Page 22: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 22/104

10/6/2011 22

HVRT EastHVRT East – – Key ObjectivesKey Objectives

►► Paved extension of the HVRT from Commercial Avenue toPaved extension of the HVRT from Commercial Avenue toHavilandHaviland Road.Road.

►► Install a pedestrian bridge over Vineyard Ave./NYS RouteInstall a pedestrian bridge over Vineyard Ave./NYS Route4444--45.45.

►► Enhance the Route 9W Railroad underpass and connectEnhance the Route 9W Railroad underpass and connectthe sidewalk to the HVRT.the sidewalk to the HVRT.

►► Excavate a buried structure at Mile Hill Road to reExcavate a buried structure at Mile Hill Road to re--establishestablish

the former railroad underpass with a new passageway.the former railroad underpass with a new passageway.

These were the key elements of the original scope of work

Page 23: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 23/104

10/6/2011 23

HVRT Phase 2 ObjectivesHVRT Phase 2 Objectives

HVRT

Phase I

Vineyard

Bridge

Connect to

Rte 9W

Mile HillUnderpass

Page 24: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 24/104

10/6/2011 24

LAFAP Process (FederallyLAFAP Process (FederallyFunded)Funded)

ContractsDOT w Town, Town w Consultants

Design Approval

Advanced Detail Plans (ADP)

Plans, Specifications and Estimate (PS&E)

Design Report, Public Information Meeting, SEQR

Because the project was federally funded, the Locally Administered FederalAid Program process had to be followed…

Page 25: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 25/104

10/6/2011 25

Impetus and StimulusImpetus and Stimulus

Page 26: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 26/104

10/6/2011 26

 A  A  ‘ ‘Pipe DreamPipe Dream’ ’ becomes Realitybecomes Reality……

Photo: Walkway.org

As Ray mentioned earlier, the idea of actually creating the walkway wasthought to be in the distant future, but the future came in 2007, the trail

project changed in response.

Page 27: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 27/104

10/6/2011 27

Original ConceptOriginal Concept

The original concept was to direct trail users down Haviland Road to the MidHudson Bridge and on to Poughkeepsie.

Page 28: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 28/104

10/6/2011 28

MidMid--Course CorrectionCourse Correction

►►Initial Project would not Connect to theInitial Project would not Connect to theWalkwayWalkway

►►During Preliminary Design, Town urged toDuring Preliminary Design, Town urged tofill the gap by DOTfill the gap by DOT

►►Required Revision to Contracts, Work inRequired Revision to Contracts, Work inProgress (Design Approval Documents)Progress (Design Approval Documents)

2006 20112010200920082007

As a result, the Town agreed to re-scope the HVRT project and add aconnection to the bridge, which was already under design.

Page 29: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 29/104

10/6/2011 29

Revised Design Project ProceedsRevised Design Project Proceeds

►► Town requests additional fundsTown requests additional funds►► DOT Approves Agreements June 2008DOT Approves Agreements June 2008

►► Design Approval Document RevisedDesign Approval Document Revised

►► Additional Site Investigations and Survey Additional Site Investigations and Survey

►► Acquire an Easement from CHGE Acquire an Easement from CHGE

►► Coordinate with the Walkway DesignersCoordinate with the Walkway Designers

2006 20112010200920082007

Contracts had to be revised and reviewed and approved by DOT.

Page 30: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 30/104

10/6/2011 30

Draft Design ReportDraft Design Report

►►Submitted to Region 8Submitted to Region 8in September 2008in September 2008

►►Requested ExpeditedRequested ExpeditedReview to Construct forReview to Construct forOctober 2009 WalkwayOctober 2009 WalkwayOpeningOpening

2006 20112010200920082007

Page 31: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 31/104

10/6/2011 31

Final Design Report ResponseFinal Design Report Response

►►One Month Turnaround by Region 8One Month Turnaround by Region 8►►Presented Options for Funding GapPresented Options for Funding Gap

►►RightRight--of of --Way concernsWay concerns

Walkway Parking LotWalkway Parking Lot

Easement with CHGEEasement with CHGE

2006 2010200920082007

Town decided to avoid potential delays and fund the easements withWalkway and CHGE on their own.

Page 32: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 32/104

10/6/2011 32

Funding Gap SolutionFunding Gap Solution

A new opportunity to fill the funding gap. 100% federal funding

Page 33: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 33/104

10/6/2011 33

Stimulus (ARRA) FundingStimulus (ARRA) Funding Approved Approved

►► Aggressive Schedule to meet Deadlines Aggressive Schedule to meet Deadlines►► Anticipated $$, but not guaranteed Anticipated $$, but not guaranteed

►► Additional Contract Language and Reporting Additional Contract Language and Reporting

►►Construction FundingConstruction Funding

►► ARRA Continued to Evolve ARRA Continued to Evolve……

The HVRT is put on the list of potential projects, but design approval wasneeded by June 29th

Page 34: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 34/104

10/6/2011 34

Outstanding IssuesOutstanding Issues

►►CHGE EasementCHGE Easement Required Mandatory 90 Day WaitRequired Mandatory 90 Day Wait

►►Utility Agreement Catch 22Utility Agreement Catch 22

 Adesta Adesta assets now owned by NYS OFTassets now owned by NYS OFT

2006 2010200920082007

Two barriers remained.

Page 35: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 35/104

10/6/2011 35

 Authorization to Proceed Authorization to Proceed

►► August 2009 August 2009 – – Detailed Design and ROWDetailed Design and ROW Acquisition Acquisition

►►New Stimulus Deadline Met (October 30,New Stimulus Deadline Met (October 30,2009)2009)

2006 2010200920082007

Page 36: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 36/104

10/6/2011 36

Design StandardsDesign Standards

►►Widths and ClearancesWidths and Clearances

Page 37: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 37/104

10/6/2011 37

Design StandardsDesign Standards

►►Typical SectionsTypical Sections

Page 38: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 38/104

10/6/2011 38

Design StandardsDesign Standards

►►DrainageDrainage

Page 39: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 39/104

10/6/2011 39

Design StandardsDesign Standards

►►SlopesSlopes

Page 40: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 40/104

10/6/2011 40

Design StandardsDesign Standards

►►Erosion ControlErosion Control

Page 41: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 41/104

10/6/2011 41

Design StandardsDesign Standards

►►SignageSignage

Page 42: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 42/104

10/6/2011 42

Design StandardsDesign Standards

►►MPTMPT

Page 43: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 43/104

10/6/2011 43

Design StandardsDesign Standards

►►Trailheads, Landscape and AmenitiesTrailheads, Landscape and Amenities

Page 44: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 44/104

10/6/2011 44

Design StandardsDesign Standards

►►Final Budget and ScheduleFinal Budget and Schedule

Page 45: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 45/104

10/6/2011 45

FHWA Authorization to AdvertiseFHWA Authorization to Advertise

►► Flurry of ActivityFlurry of Activity Final Con DocsFinal Con Docs

Construction Mgt PlanConstruction Mgt Plan

ROWROW

2006 2010200920082007

The months of September and October required a frenetic series of meetings, phone conferences, emails and juggling

Page 46: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 46/104

10/6/2011 46

Bidding and AwardBidding and Award

►►Bids opened in DecemberBids opened in December►►Low Bid 14% under EstimateLow Bid 14% under Estimate

►► ARRA Funding Secured ARRA Funding Secured

►►Construction start early 2010Construction start early 2010

2006 2010200920082007 2011

Page 47: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 47/104

10/6/201110/6/2011 4747

Construction is Easy!?Construction is Easy!?

Page 48: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 48/104

10/6/2011 48

March 2010March 2010

Might be hard to imagine, but last year construction work started in earlyMarch.

Page 49: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 49/104

10/6/2011 49

March 2010March 2010

One early issue was the amount of discarded material found along thecorridor 

Page 50: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 50/104

10/6/2011 50

March 2010March 2010

Then the Town received a complaint that the trail was being built on privateproperty…

Page 51: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 51/104

10/6/2011 51

 April 2010 April 2010

A big unknown was the old bridge structure under Mile Hill. Utility workincluded relocation of Town water lines, fiber optic lines, and overhead

electric

Page 52: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 52/104

10/6/2011 52

 April 2010 April 2010

Work progressed quickly including footings for the pedestrian bridge.

Page 53: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 53/104

10/6/2011 53

May 2010May 2010

The approach to 9W was cleared, under this segment the Town had installeda major sanitary trunk line.

Page 54: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 54/104

10/6/2011 54

May 2010May 2010

And of course more fiber optic lines were found.

Page 55: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 55/104

10/6/2011 55

June 2010June 2010

The old Mile Hill bridge removed, the new structure quickly took shape.

Page 56: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 56/104

10/6/2011 56

June 2010June 2010

A precast structure was lowered into place creating the underpass in a fewhours.

Page 57: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 57/104

10/6/2011 57

July 2010July 2010

With the abutments ready, the new pedestrian bridge was delivered

Page 58: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 58/104

10/6/2011 58

July 2010July 2010

Page 59: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 59/104

10/6/2011 59

July 2010July 2010

Page 60: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 60/104

10/6/2011 60

July 2010July 2010

Page 61: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 61/104

10/6/2011 61

July 2010July 2010

And as the sun set, the bridge was in place and Vineyard was opened totraffic again.

Page 62: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 62/104

10/6/2011 62

July 2010July 2010

Page 63: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 63/104

10/6/2011 63

 August 2010 August 2010

With the major structures in place, the trail itself began to take shape…andget used…

Page 64: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 64/104

10/6/2011 64

September 2010September 2010

One morning in September…

Page 65: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 65/104

10/6/2011 65

September 2010September 2010

The pavers arrived

Page 66: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 66/104

10/6/2011 66

September 2010September 2010

Pavement work progressed quickly in September, this stretch showing theRoute 9W underpass

Page 67: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 67/104

10/6/2011 67

October 2010October 2010

As the leaves started to fall, the trail was ready to go.

Page 68: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 68/104

10/6/2011 68

October 2010October 2010

A few finishing touches remained as the trail was opened for business.

Page 69: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 69/104

10/6/2011 69

October 2010October 2010

A formerly overgrown, refuse strewn former rail corridor is now a scenicpublic recreation amenity

Page 70: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 70/104

10/6/2011 70

October 2010October 2010

Page 71: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 71/104

10/6/2011 71

November 2010November 2010

Page 72: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 72/104

10/6/201110/6/2011 7272

The CommunityThe CommunityRespondsResponds

The Ribbon cutting on the first anniversary of the opening of the Walkway

Page 73: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 73/104

10/6/2011 73

What Now?What Now?

►►Plans were in placePlans were in place……

……a long wait was over.a long wait was over.

In many ways the Town and the Rail Trail Association had been prepared for the opening of the West segment and Walkway.

Page 74: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 74/104

10/6/2011 74

Local PromotionLocal Promotion

A seasonal newsletter has been distributed.

Page 75: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 75/104

10/6/2011 75

Local PromotionLocal Promotion

A new Brochure was in the works and unveiled shortly after the trail ribboncutting

Page 76: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 76/104

10/6/2011 76

Community ResponseCommunity Response

The trail was an established and valued part of the community prior to theWest extension. These are newsletter articles…

Page 77: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 77/104

10/6/2011 77

Town ResponseTown Response

►►OutreachOutreach -- ‘ ‘Bike Friendly BusinessBike Friendly Business’ ’ 

www.pedbikeimages.org / Dan Burden

Page 78: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 78/104

10/6/2011 78

Town ResponseTown Response

►►OutreachOutreach -- ‘ ‘Bike Friendly BusinessBike Friendly Business’ ’ 

http://www.lewbryson.com

Page 79: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 79/104

10/6/2011 79

Town ResponseTown Response

►►OutreachOutreach HVRT Association WebsiteHVRT Association Website

Page 80: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 80/104

10/6/2011 80

Town ResponseTown Response

►►Planning Work Planning Work  – – Food Vendor LawFood Vendor Law

Page 81: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 81/104

10/6/2011 81

Town ResponseTown Response

►►Planning Work Planning Work -- Trail Overlay DistrictTrail Overlay District

Page 82: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 82/104

10/6/2011 82

Town ResponseTown Response

►►PlanningPlanning -- Highland Hamlet StudyHighland Hamlet Study

Page 83: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 83/104

10/6/2011 83

Other Local CommunitiesOther Local Communities

►►Evaluating Links to the HVRTEvaluating Links to the HVRT HVRT to WVRT Link HVRT to WVRT Link 

►►Transportation ProjectsTransportation Projects

NewNew PaltzPaltz Road BridgesRoad Bridges

Page 84: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 84/104

10/6/2011 84

Economic ImpactsEconomic Impacts

►►During Construction/Post Walkway OpeningDuring Construction/Post Walkway Opening Busy Local EateriesBusy Local Eateries

Parking OverloadParking Overload

 Vendors at the Walkway Vendors at the Walkway

►►Post CompletionPost Completion

Site for several major eventsSite for several major events

Page 85: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 85/104

10/6/2011 85

ImpactsImpacts – – Catalyst Project forCatalyst Project for……

►►HavilandHaviland Road ParkingRoad Parking►►Lloyd Welcome CenterLloyd Welcome Center

►►HVRT Phase 3HVRT Phase 3

►►Special EventsSpecial Events

Page 86: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 86/104

10/6/2011 86

ImpactsImpacts -- Private InvestmentPrivate Investment

►►HavilandHaviland Road ProjectRoad Project

Page 87: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 87/104

10/6/2011 87

ImpactImpact – – Private InvestmentPrivate Investment

H   V   R   T  

Page 88: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 88/104

10/6/2011 88

Perception of PlacePerception of Place

Page 89: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 89/104

10/6/2011 89

Perception of PlacePerception of Place

http://blogs.artvoice.com/avdaily/tag/walkway-over-the-hudson/

Photo by David Rocco

Page 90: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 90/104

10/6/2011 90

Perception of PlacePerception of Place

Before the Vineyard Avenue Bridge

Page 91: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 91/104

10/6/2011 91

Perception of PlacePerception of Place

Before the Vineyard Avenue Bridge

Page 92: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 92/104

10/6/2011 92

Perception of PlacePerception of Place

Former view from th4e 9W Bridge

Page 93: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 93/104

10/6/2011 93

Perception of PlacePerception of Place

Former view from th4e 9W Bridge

Page 94: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 94/104

10/6/2011 94

Perception of PlacePerception of Place

Former view from th4e 9W Bridge

Page 95: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 95/104

10/6/2011 95

Perception of PlacePerception of Place

Former view from th4e 9W Bridge

Page 96: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 96/104

10/6/2011 96

Perception of Perception of  ‘ ‘PlacePlace’ ’ 

Page 97: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 97/104

10/6/2011 97

Economic ImpactsEconomic Impacts

An economic impact study prepared prior to the opening of the bridgepredicted about 250,000 users per year. The actual count was 760,000.

Page 98: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 98/104

10/6/2011 98

Economic ImpactsEconomic Impacts

►► ‘ ‘Trail Users and Economic ImpactTrail Users and Economic Impact’ ’ by theby theRailsRails--toto--Trails Conservancy 2009Trails Conservancy 2009

Larger/Regional Systems had 25Larger/Regional Systems had 25--75%75%

nonnon--local userslocal users

 Average User spent $10 Average User spent $10--30 per visit30 per visit

Page 99: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 99/104

10/6/2011 99

Rails to Trail User ProjectionsRails to Trail User Projections

►►Studies have found an average of aroundStudies have found an average of around275 users per mile/month275 users per mile/month

►►The HVRT would add about 12,000 usersThe HVRT would add about 12,000 usersper year.per year.

►►Economic impacts from user spending wouldEconomic impacts from user spending wouldbe between $120,000 and $360,000be between $120,000 and $360,000

Based on a similar methodology employed in the Walkway Economic ImpactStudy. These are extremely conservative projections. They could obviously

be at least tripled…

Page 100: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 100/1041

10/6/2011 100

The FutureThe Future

►►HVRT to WVRT Link HVRT to WVRT Link  Colleges (SUNY NewColleges (SUNY New PaltzPaltz, Marist, Vassar, Marist, Vassar……))

Journey to Work (Park and Bike, Bike and RideJourney to Work (Park and Bike, Bike and Ride

MTA/Amtrak MTA/Amtrak ……))

Special Event Commutes (UC Fair,Special Event Commutes (UC Fair,

Trail/Walkways Events, River RambleTrail/Walkways Events, River Ramble……))

Page 101: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 101/1041

10/6/2011 101

The FutureThe Future

►►Link toLink to DutchessDutchess Rail Trail and HarlemRail Trail and Harlem Valley Rail Trail via Walkway Valley Rail Trail via Walkway

100100’ ’ s of miles of contiguouss of miles of contiguous TrailwaysTrailways

Page 102: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 102/1041

10/6/2011 102

Pop QuizPop Quiz

►► Q. A bikeway physically separated from motorizedQ. A bikeway physically separated from motorizedtraffic and available for use by a variety of nontraffic and available for use by a variety of non--motorized users is called a...?motorized users is called a...?

►► A. Shared Use Path A. Shared Use Path

►► Q. What is the recommended width for a sharedQ. What is the recommended width for a shareduse path?use path?

►► A. 10 A. 10’ ’ with 2with 2’ ’ shoulders.shoulders.

►► Q. What is the maximum grade for a Shared UseQ. What is the maximum grade for a Shared UsePath?Path?

►► A. 12.5% for up to 10 A. 12.5% for up to 10’ ’ 

Page 103: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 103/1041

10/6/2011 103

More Information on DesignMore Information on Design

Page 104: DRAFT  Lloyd HVRT Presentation - ITE Case Study

8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study

http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 104/104

10/6/201110/6/2011 104104

Questions & CommentsQuestions & Comments