Page 1
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 1/104
10/6/201110/6/2011 11
The Little Trail that DidThe Little Trail that Did……
Hudson Valley Rail TrailHudson Valley Rail Trail – –
Town of LloydTown of Lloyd
Ted M. Kolankowski, RLA LEED APTed M. Kolankowski, RLA LEED AP
Welcome Page – Assume Glenn will introduce us…
Page 2
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 2/104
Page 3
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 3/104
10/6/2011 3
Success FactorsSuccess Factors
►►Tireless PromotionTireless Promotion►►Patience and PersistencePatience and Persistence
►►Maintain FlexibilityMaintain Flexibility
►►Face ChallengesFace Challenges
►►Plan Ahead for ImpactPlan Ahead for Impact
GBG - There will be challenges, be patient persistent flexible and plan ahead
Introduce Supervisor Ray Costantino with brief bio.
Page 4
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 4/104
10/6/2011 4
1980 1985 1990 1995 2000 2005 2010 2015
Hudson Valley Rail Trail TimelineHudson Valley Rail Trail Timeline
Oct. 2009
Walkway
Over the
Hudson
Opens
Rail
ROW
sold to
Town of
Lloyd
Oct. 2010
HVRT
connects
to the
Walkway
1997 - First
2.5 miles of
the Hudson
Valley Rail
Trail Opens
Oct. 2013
HVRT
Complete
to the
Town Line
Rotary
Pavilion
Completed
Fiber
Optic
routed
down
HVRT
Bridge
Burns
in Late
70’s
Rail
Line
no
longer
used
Ray
Page 5
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 5/104
10/6/2011 5
Hudson Valley Rail TrailHudson Valley Rail Trail – – Phase IPhase I
HVRT
Phase I
Beginning of the first segment
Page 6
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 6/104
10/6/2011 6
Hudson Valley Rail TrailHudson Valley Rail Trail – – Phase IPhase I
HighlandHamlet
Tony Williams
Park
Close up view of Phase 1
Page 7
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 7/104
10/6/2011 7
Promoting the IdeaPromoting the Idea
Promotional Poster created by Landscape Architecture students fromConnecticut.
Page 8
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 8/104
10/6/2011 8
Hudson Valley Rail TrailHudson Valley Rail Trail – – Phase IPhase I
Trail Head at Commercial Avenue
Page 9
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 9/104
10/6/2011 9
Hudson Valley Rail TrailHudson Valley Rail Trail – – Phase IPhase I
Pavillion and Caboose
Page 10
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 10/104
10/6/2011 10
Hudson Valley Rail TrailHudson Valley Rail Trail – – Phase IPhase I
The trail, dedicated on July 12, 2003
Page 11
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 11/104
10/6/2011 11
Hudson Valley Rail TrailHudson Valley Rail Trail – – Phase IPhase I
Typical Scene on the Hudson Valley Rail Trail
Page 12
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 12/104
10/6/2011 12
Hudson Valley Rail TrailHudson Valley Rail Trail – – Phase IPhase I
http://www.hudsonvalleyrailtrail.net/photos/
Typical Scene on the Hudson Valley Rail Trail
Page 13
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 13/104
10/6/2011 13
Hudson Valley Rail TrailHudson Valley Rail Trail – – Phase IPhase I
Western terminus is at Tony Williams Park, Illinois Mountain in thebackground.
Page 14
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 14/104
10/6/2011 14
Phase IIPhase II
HVRT
Phase I
HVRTPhase I I
Next objective to bring the trail into the hamlet
Page 15
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 15/104
10/6/2011 15
Phase IIPhase II
HVRT
Phase I
HVRT
Phase I I
Haviland
Road
Close up of Phase 2
Page 16
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 16/104
10/6/2011 16
BudgetBudget
►► Phase I BudgetPhase I Budget Fiber Optic PayoutFiber Optic Payout
Volunteers and Donations Volunteers and Donations
►► Phase II BudgetPhase II Budget
Pedestrian Bridge over NYS 44/55Pedestrian Bridge over NYS 44/55 (120(120’ ’ Span)Span)
Replace Underpass at Mile Hill RoadReplace Underpass at Mile Hill Road
First phase was somewhat inexpensive, using funds from agreement tolocated FiberOptic in the corridor, volunteers and donations.
This next phase, we needed a bridge and an underpass, we needed lots
more money and could not be done by volunteers…
Page 17
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 17/104
10/6/2011 17
BudgetBudget
We were not sitting on a stack of money, so we needed some big time help.
Page 18
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 18/104
10/6/2011 18
Growth PainsGrowth Pains……
►►Ulster County Transportation CouncilUlster County Transportation Council --Transportation Improvements PlanTransportation Improvements Plan
►►2006 Budget:2006 Budget: Engineering/ROWEngineering/ROW $$ 178,000.00178,000.00
Const.Const. InspInsp /Admin /Admin 25,000.0025,000.00
ConstructionConstruction 705,000.00705,000.00
TotalTotal $$ 908,000.00908,000.00
2006 20112010200920082007
We requested transportation funding through the Ulster County Transp.Council
Page 19
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 19/104
10/6/2011 19
PrerequisitesPrerequisites……
►► Follow Federal Highway ProcurementFollow Federal Highway ProcurementGuidelinesGuidelines
Qualifications v. Cost Based SelectionQualifications v. Cost Based Selection
Regional LDSA List v. Contract ReporterRegional LDSA List v. Contract Reporter
Next we needed to follow the procurement guidelines that went with thefunding to select a consultant team…
Page 20
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 20/104
10/6/2011 20
Design ContractDesign Contract
►►Contract Reporter Ad Date November 2006Contract Reporter Ad Date November 2006►►Proposal Evaluation and InterviewsProposal Evaluation and Interviews
December 2006December 2006
►►Quality Based Selection January 2007Quality Based Selection January 2007
►► Award Letter January 15, 2007 Award Letter January 15, 2007
2006 20112010200920082007
Awarded the project to B&L based on qualifications.
Page 21
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 21/104
10/6/201110/6/2011 2121
Phase 2Phase 2……Takes TimeTakes Time
……and Moneyand Money
And project manager was to be Ted…
Page 22
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 22/104
10/6/2011 22
HVRT EastHVRT East – – Key ObjectivesKey Objectives
►► Paved extension of the HVRT from Commercial Avenue toPaved extension of the HVRT from Commercial Avenue toHavilandHaviland Road.Road.
►► Install a pedestrian bridge over Vineyard Ave./NYS RouteInstall a pedestrian bridge over Vineyard Ave./NYS Route4444--45.45.
►► Enhance the Route 9W Railroad underpass and connectEnhance the Route 9W Railroad underpass and connectthe sidewalk to the HVRT.the sidewalk to the HVRT.
►► Excavate a buried structure at Mile Hill Road to reExcavate a buried structure at Mile Hill Road to re--establishestablish
the former railroad underpass with a new passageway.the former railroad underpass with a new passageway.
These were the key elements of the original scope of work
Page 23
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 23/104
10/6/2011 23
HVRT Phase 2 ObjectivesHVRT Phase 2 Objectives
HVRT
Phase I
Vineyard
Bridge
Connect to
Rte 9W
Mile HillUnderpass
Page 24
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 24/104
10/6/2011 24
LAFAP Process (FederallyLAFAP Process (FederallyFunded)Funded)
ContractsDOT w Town, Town w Consultants
Design Approval
Advanced Detail Plans (ADP)
Plans, Specifications and Estimate (PS&E)
Design Report, Public Information Meeting, SEQR
Because the project was federally funded, the Locally Administered FederalAid Program process had to be followed…
Page 25
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 25/104
10/6/2011 25
Impetus and StimulusImpetus and Stimulus
Page 26
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 26/104
10/6/2011 26
A A ‘ ‘Pipe DreamPipe Dream’ ’ becomes Realitybecomes Reality……
Photo: Walkway.org
As Ray mentioned earlier, the idea of actually creating the walkway wasthought to be in the distant future, but the future came in 2007, the trail
project changed in response.
Page 27
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 27/104
10/6/2011 27
Original ConceptOriginal Concept
The original concept was to direct trail users down Haviland Road to the MidHudson Bridge and on to Poughkeepsie.
Page 28
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 28/104
10/6/2011 28
MidMid--Course CorrectionCourse Correction
►►Initial Project would not Connect to theInitial Project would not Connect to theWalkwayWalkway
►►During Preliminary Design, Town urged toDuring Preliminary Design, Town urged tofill the gap by DOTfill the gap by DOT
►►Required Revision to Contracts, Work inRequired Revision to Contracts, Work inProgress (Design Approval Documents)Progress (Design Approval Documents)
2006 20112010200920082007
As a result, the Town agreed to re-scope the HVRT project and add aconnection to the bridge, which was already under design.
Page 29
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 29/104
10/6/2011 29
Revised Design Project ProceedsRevised Design Project Proceeds
►► Town requests additional fundsTown requests additional funds►► DOT Approves Agreements June 2008DOT Approves Agreements June 2008
►► Design Approval Document RevisedDesign Approval Document Revised
►► Additional Site Investigations and Survey Additional Site Investigations and Survey
►► Acquire an Easement from CHGE Acquire an Easement from CHGE
►► Coordinate with the Walkway DesignersCoordinate with the Walkway Designers
2006 20112010200920082007
Contracts had to be revised and reviewed and approved by DOT.
Page 30
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 30/104
10/6/2011 30
Draft Design ReportDraft Design Report
►►Submitted to Region 8Submitted to Region 8in September 2008in September 2008
►►Requested ExpeditedRequested ExpeditedReview to Construct forReview to Construct forOctober 2009 WalkwayOctober 2009 WalkwayOpeningOpening
2006 20112010200920082007
Page 31
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 31/104
10/6/2011 31
Final Design Report ResponseFinal Design Report Response
►►One Month Turnaround by Region 8One Month Turnaround by Region 8►►Presented Options for Funding GapPresented Options for Funding Gap
►►RightRight--of of --Way concernsWay concerns
Walkway Parking LotWalkway Parking Lot
Easement with CHGEEasement with CHGE
2006 2010200920082007
Town decided to avoid potential delays and fund the easements withWalkway and CHGE on their own.
Page 32
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 32/104
10/6/2011 32
Funding Gap SolutionFunding Gap Solution
A new opportunity to fill the funding gap. 100% federal funding
Page 33
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 33/104
10/6/2011 33
Stimulus (ARRA) FundingStimulus (ARRA) Funding Approved Approved
►► Aggressive Schedule to meet Deadlines Aggressive Schedule to meet Deadlines►► Anticipated $$, but not guaranteed Anticipated $$, but not guaranteed
►► Additional Contract Language and Reporting Additional Contract Language and Reporting
►►Construction FundingConstruction Funding
►► ARRA Continued to Evolve ARRA Continued to Evolve……
The HVRT is put on the list of potential projects, but design approval wasneeded by June 29th
Page 34
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 34/104
10/6/2011 34
Outstanding IssuesOutstanding Issues
►►CHGE EasementCHGE Easement Required Mandatory 90 Day WaitRequired Mandatory 90 Day Wait
►►Utility Agreement Catch 22Utility Agreement Catch 22
Adesta Adesta assets now owned by NYS OFTassets now owned by NYS OFT
2006 2010200920082007
Two barriers remained.
Page 35
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 35/104
10/6/2011 35
Authorization to Proceed Authorization to Proceed
►► August 2009 August 2009 – – Detailed Design and ROWDetailed Design and ROW Acquisition Acquisition
►►New Stimulus Deadline Met (October 30,New Stimulus Deadline Met (October 30,2009)2009)
2006 2010200920082007
Page 36
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 36/104
10/6/2011 36
Design StandardsDesign Standards
►►Widths and ClearancesWidths and Clearances
Page 37
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 37/104
10/6/2011 37
Design StandardsDesign Standards
►►Typical SectionsTypical Sections
Page 38
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 38/104
10/6/2011 38
Design StandardsDesign Standards
►►DrainageDrainage
Page 39
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 39/104
10/6/2011 39
Design StandardsDesign Standards
►►SlopesSlopes
Page 40
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 40/104
10/6/2011 40
Design StandardsDesign Standards
►►Erosion ControlErosion Control
Page 41
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 41/104
10/6/2011 41
Design StandardsDesign Standards
►►SignageSignage
Page 42
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 42/104
10/6/2011 42
Design StandardsDesign Standards
►►MPTMPT
Page 43
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 43/104
10/6/2011 43
Design StandardsDesign Standards
►►Trailheads, Landscape and AmenitiesTrailheads, Landscape and Amenities
Page 44
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 44/104
10/6/2011 44
Design StandardsDesign Standards
►►Final Budget and ScheduleFinal Budget and Schedule
Page 45
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 45/104
10/6/2011 45
FHWA Authorization to AdvertiseFHWA Authorization to Advertise
►► Flurry of ActivityFlurry of Activity Final Con DocsFinal Con Docs
Construction Mgt PlanConstruction Mgt Plan
ROWROW
2006 2010200920082007
The months of September and October required a frenetic series of meetings, phone conferences, emails and juggling
Page 46
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 46/104
10/6/2011 46
Bidding and AwardBidding and Award
►►Bids opened in DecemberBids opened in December►►Low Bid 14% under EstimateLow Bid 14% under Estimate
►► ARRA Funding Secured ARRA Funding Secured
►►Construction start early 2010Construction start early 2010
2006 2010200920082007 2011
Page 47
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 47/104
10/6/201110/6/2011 4747
Construction is Easy!?Construction is Easy!?
Page 48
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 48/104
10/6/2011 48
March 2010March 2010
Might be hard to imagine, but last year construction work started in earlyMarch.
Page 49
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 49/104
10/6/2011 49
March 2010March 2010
One early issue was the amount of discarded material found along thecorridor
Page 50
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 50/104
10/6/2011 50
March 2010March 2010
Then the Town received a complaint that the trail was being built on privateproperty…
Page 51
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 51/104
10/6/2011 51
April 2010 April 2010
A big unknown was the old bridge structure under Mile Hill. Utility workincluded relocation of Town water lines, fiber optic lines, and overhead
electric
Page 52
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 52/104
10/6/2011 52
April 2010 April 2010
Work progressed quickly including footings for the pedestrian bridge.
Page 53
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 53/104
10/6/2011 53
May 2010May 2010
The approach to 9W was cleared, under this segment the Town had installeda major sanitary trunk line.
Page 54
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 54/104
10/6/2011 54
May 2010May 2010
And of course more fiber optic lines were found.
Page 55
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 55/104
10/6/2011 55
June 2010June 2010
The old Mile Hill bridge removed, the new structure quickly took shape.
Page 56
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 56/104
10/6/2011 56
June 2010June 2010
A precast structure was lowered into place creating the underpass in a fewhours.
Page 57
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 57/104
10/6/2011 57
July 2010July 2010
With the abutments ready, the new pedestrian bridge was delivered
Page 58
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 58/104
10/6/2011 58
July 2010July 2010
Page 59
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 59/104
10/6/2011 59
July 2010July 2010
Page 60
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 60/104
10/6/2011 60
July 2010July 2010
Page 61
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 61/104
10/6/2011 61
July 2010July 2010
And as the sun set, the bridge was in place and Vineyard was opened totraffic again.
Page 62
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 62/104
10/6/2011 62
July 2010July 2010
Page 63
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 63/104
10/6/2011 63
August 2010 August 2010
With the major structures in place, the trail itself began to take shape…andget used…
Page 64
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 64/104
10/6/2011 64
September 2010September 2010
One morning in September…
Page 65
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 65/104
10/6/2011 65
September 2010September 2010
The pavers arrived
Page 66
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 66/104
10/6/2011 66
September 2010September 2010
Pavement work progressed quickly in September, this stretch showing theRoute 9W underpass
Page 67
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 67/104
10/6/2011 67
October 2010October 2010
As the leaves started to fall, the trail was ready to go.
Page 68
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 68/104
10/6/2011 68
October 2010October 2010
A few finishing touches remained as the trail was opened for business.
Page 69
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 69/104
10/6/2011 69
October 2010October 2010
A formerly overgrown, refuse strewn former rail corridor is now a scenicpublic recreation amenity
Page 70
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 70/104
10/6/2011 70
October 2010October 2010
Page 71
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 71/104
10/6/2011 71
November 2010November 2010
Page 72
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 72/104
10/6/201110/6/2011 7272
The CommunityThe CommunityRespondsResponds
The Ribbon cutting on the first anniversary of the opening of the Walkway
Page 73
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 73/104
10/6/2011 73
What Now?What Now?
►►Plans were in placePlans were in place……
……a long wait was over.a long wait was over.
In many ways the Town and the Rail Trail Association had been prepared for the opening of the West segment and Walkway.
Page 74
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 74/104
10/6/2011 74
Local PromotionLocal Promotion
A seasonal newsletter has been distributed.
Page 75
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 75/104
10/6/2011 75
Local PromotionLocal Promotion
A new Brochure was in the works and unveiled shortly after the trail ribboncutting
Page 76
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 76/104
10/6/2011 76
Community ResponseCommunity Response
The trail was an established and valued part of the community prior to theWest extension. These are newsletter articles…
Page 77
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 77/104
10/6/2011 77
Town ResponseTown Response
►►OutreachOutreach -- ‘ ‘Bike Friendly BusinessBike Friendly Business’ ’
www.pedbikeimages.org / Dan Burden
Page 78
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 78/104
10/6/2011 78
Town ResponseTown Response
►►OutreachOutreach -- ‘ ‘Bike Friendly BusinessBike Friendly Business’ ’
http://www.lewbryson.com
Page 79
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 79/104
10/6/2011 79
Town ResponseTown Response
►►OutreachOutreach HVRT Association WebsiteHVRT Association Website
Page 80
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 80/104
10/6/2011 80
Town ResponseTown Response
►►Planning Work Planning Work – – Food Vendor LawFood Vendor Law
Page 81
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 81/104
10/6/2011 81
Town ResponseTown Response
►►Planning Work Planning Work -- Trail Overlay DistrictTrail Overlay District
Page 82
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 82/104
10/6/2011 82
Town ResponseTown Response
►►PlanningPlanning -- Highland Hamlet StudyHighland Hamlet Study
Page 83
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 83/104
10/6/2011 83
Other Local CommunitiesOther Local Communities
►►Evaluating Links to the HVRTEvaluating Links to the HVRT HVRT to WVRT Link HVRT to WVRT Link
►►Transportation ProjectsTransportation Projects
NewNew PaltzPaltz Road BridgesRoad Bridges
Page 84
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 84/104
10/6/2011 84
Economic ImpactsEconomic Impacts
►►During Construction/Post Walkway OpeningDuring Construction/Post Walkway Opening Busy Local EateriesBusy Local Eateries
Parking OverloadParking Overload
Vendors at the Walkway Vendors at the Walkway
►►Post CompletionPost Completion
Site for several major eventsSite for several major events
Page 85
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 85/104
10/6/2011 85
ImpactsImpacts – – Catalyst Project forCatalyst Project for……
►►HavilandHaviland Road ParkingRoad Parking►►Lloyd Welcome CenterLloyd Welcome Center
►►HVRT Phase 3HVRT Phase 3
►►Special EventsSpecial Events
Page 86
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 86/104
10/6/2011 86
ImpactsImpacts -- Private InvestmentPrivate Investment
►►HavilandHaviland Road ProjectRoad Project
Page 87
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 87/104
10/6/2011 87
ImpactImpact – – Private InvestmentPrivate Investment
H V R T
Page 88
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 88/104
10/6/2011 88
Perception of PlacePerception of Place
Page 89
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 89/104
10/6/2011 89
Perception of PlacePerception of Place
http://blogs.artvoice.com/avdaily/tag/walkway-over-the-hudson/
Photo by David Rocco
Page 90
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 90/104
10/6/2011 90
Perception of PlacePerception of Place
Before the Vineyard Avenue Bridge
Page 91
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 91/104
10/6/2011 91
Perception of PlacePerception of Place
Before the Vineyard Avenue Bridge
Page 92
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 92/104
10/6/2011 92
Perception of PlacePerception of Place
Former view from th4e 9W Bridge
Page 93
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 93/104
10/6/2011 93
Perception of PlacePerception of Place
Former view from th4e 9W Bridge
Page 94
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 94/104
10/6/2011 94
Perception of PlacePerception of Place
Former view from th4e 9W Bridge
Page 95
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 95/104
10/6/2011 95
Perception of PlacePerception of Place
Former view from th4e 9W Bridge
Page 96
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 96/104
10/6/2011 96
Perception of Perception of ‘ ‘PlacePlace’ ’
Page 97
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 97/104
10/6/2011 97
Economic ImpactsEconomic Impacts
An economic impact study prepared prior to the opening of the bridgepredicted about 250,000 users per year. The actual count was 760,000.
Page 98
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 98/104
10/6/2011 98
Economic ImpactsEconomic Impacts
►► ‘ ‘Trail Users and Economic ImpactTrail Users and Economic Impact’ ’ by theby theRailsRails--toto--Trails Conservancy 2009Trails Conservancy 2009
Larger/Regional Systems had 25Larger/Regional Systems had 25--75%75%
nonnon--local userslocal users
Average User spent $10 Average User spent $10--30 per visit30 per visit
Page 99
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 99/104
10/6/2011 99
Rails to Trail User ProjectionsRails to Trail User Projections
►►Studies have found an average of aroundStudies have found an average of around275 users per mile/month275 users per mile/month
►►The HVRT would add about 12,000 usersThe HVRT would add about 12,000 usersper year.per year.
►►Economic impacts from user spending wouldEconomic impacts from user spending wouldbe between $120,000 and $360,000be between $120,000 and $360,000
Based on a similar methodology employed in the Walkway Economic ImpactStudy. These are extremely conservative projections. They could obviously
be at least tripled…
Page 100
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 100/1041
10/6/2011 100
The FutureThe Future
►►HVRT to WVRT Link HVRT to WVRT Link Colleges (SUNY NewColleges (SUNY New PaltzPaltz, Marist, Vassar, Marist, Vassar……))
Journey to Work (Park and Bike, Bike and RideJourney to Work (Park and Bike, Bike and Ride
MTA/Amtrak MTA/Amtrak ……))
Special Event Commutes (UC Fair,Special Event Commutes (UC Fair,
Trail/Walkways Events, River RambleTrail/Walkways Events, River Ramble……))
Page 101
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 101/1041
10/6/2011 101
The FutureThe Future
►►Link toLink to DutchessDutchess Rail Trail and HarlemRail Trail and Harlem Valley Rail Trail via Walkway Valley Rail Trail via Walkway
100100’ ’ s of miles of contiguouss of miles of contiguous TrailwaysTrailways
Page 102
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 102/1041
10/6/2011 102
Pop QuizPop Quiz
►► Q. A bikeway physically separated from motorizedQ. A bikeway physically separated from motorizedtraffic and available for use by a variety of nontraffic and available for use by a variety of non--motorized users is called a...?motorized users is called a...?
►► A. Shared Use Path A. Shared Use Path
►► Q. What is the recommended width for a sharedQ. What is the recommended width for a shareduse path?use path?
►► A. 10 A. 10’ ’ with 2with 2’ ’ shoulders.shoulders.
►► Q. What is the maximum grade for a Shared UseQ. What is the maximum grade for a Shared UsePath?Path?
►► A. 12.5% for up to 10 A. 12.5% for up to 10’ ’
Page 103
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 103/1041
10/6/2011 103
More Information on DesignMore Information on Design
Page 104
8/3/2019 DRAFT Lloyd HVRT Presentation - ITE Case Study
http://slidepdf.com/reader/full/draft-lloyd-hvrt-presentation-ite-case-study 104/104
10/6/201110/6/2011 104104
Questions & CommentsQuestions & Comments