DRAFT GENERAL PLAN OF ELECTRICITY (RUKN) 2012 - 2031 MINISTRY OF ENERGY AND MINERAL RESOURCES DIRECTORAT GENERAL OF ELECTRICITY Jakarta, 7 Februari 2013 PRESENTED BY: Hasril Nuzahar Director of Electricity Program Supervision on : Coffee Morning Directorate General of Electricity with Stakeholders in Electricity Sector
15
Embed
DRAFT GENERAL PLAN OF ELECTRICITY (RUKN) 2012 - …energy-indonesia.com/02electrcitylaw/0130213RUKN.pdf · DRAFT GENERAL PLAN OF ELECTRICITY (RUKN) 2012 - 2031 ... PP. No. 14/2012
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
DRAFT GENERAL PLAN OF ELECTRICITY (RUKN) 2012 -
2031
MINISTRY OF ENERGY AND MINERAL RESOURCES
DIRECTORAT GENERAL OF ELECTRICITY
Jakarta, 7 Februari 2013
PRESENTED BY: Hasril Nuzahar
Director of Electricity Program Supervision
on :
Coffee Morning Directorate General of Electricity with Stakeholders in Electricity Sector
ESDM untuk Kesejahteraan Rakyat
Legal Basis
Law No. 30 Year 2009 on electricity:
Article 7 : RUKN is prepared based on national energy policy and set by
Government after consulting with Parliament. RUKN prepared together with
local government and further the RUKN becomes base for preparation of
General Plan for Local Government (RUKD)
Government Regulation No. 14 Year 2012 on Power Supply Business Activity :
Article 8: power supply business for public need is carried out in line with
General Plan of Electricity and Power Supply Business Plan (RUPTL), where
RUPTL prepared by power supply business stakeholders that apply for power
supply business license (applicant) must concern on General Plan of Electricity
ESDM untuk Kesejahteraan Rakyat
Consideration of Changes of RUKN
New regulation that arranges electricity sector (Law No. 30/2009 concerning
electricity, PP. No. 14/2012 on Power Supply Business Activity, PP. No. 42/
2012 on Cross Country Power Trade, and PP No. 62/2012 on Power Supporting
Business Services ).
Progress of development achievement of 10,0000 MW Phase I. .
Progress of the implementation of 10.000 MW Phase II.
The implementation of Masterplan Acceleration and Expansion of Indonesia
Economy Development (MP3EI).
Direction for Power Supply Development
Development of power plant capacity in term of :
− To Support MP3EI
− To finish the shortage of power supply
− To increase reserves by mostly using local energy source and also to limit the plan for
development of oil fuel power plant.
Development of power plant for peak load by using gas and PLTA (pump storage or
ordinary type of damp), so fuel oil power plant development is minimized
.
To support other power plants that use new renewable energy, in addition to fulfill power
need, in reducing CO2 emission level by giving interesting investment scheme and more
ocmpetitive selling price of power
Mix Primary Energy Policy for Power Generation
Primary energy source should be used optimally in line with National Energy Policy (KEN)
to guarantee sustainable power supply, and its utilization prioritized from new renewable
energy source
As for deduction of oil fuel dependency, Government guarantees coal supply for power
generation through DMO policy and supports domestic gas use for power plants.
The utilization of new energy source such as nuclear energy is last option after optimizing
the use of renewbale nergy source and other new energy source potency. .
Oil fuel 15.02%
Coal 51.08%
Gas 22.60% Geotherma
l 4.75%
Water 6.44%
others 0.12%
Oil fuel 0.8%
coal 62.8%
Gas 18.8% Geothermal
11.0%
Water 6.5%
others 0.1%
2012 2021
Rural Electricity Program Policy and Electrification
Ratio
Handling of social mission meant to hep less fortunate society group, and electrify the
whole area of Indonesia conits of underprevilaged area, remote area, and rural electricity
development .
National electrification ratio targets 80% by the end of 2014, it is expected to become