LOBBY WAITING LOBBY FEMALE TOILET MALE TOILET OFFICE ROOM RECEPTION GROUND FLOOR PLAN 3950 3900 3900 GL1 GL2 UPPER FLOOR PLAN RESTURANT BUFFET HAND WASHING D4 D5 D6 D1 D1 D1 D1 D3 D2 D2 D2 D2 FG FG FG FG FG FG FG FG FG FG FG FG W1 W1 W1 W1 W1 W1 W1 W1 W1 2080 2110 2110 2090 2170 2100 2130 2120 2080 2180 2100 2110 2130 2100 2140 2110 2120 2090 2100 2090 1985 2130 2160 1000 1282.5 3900 4650 2810 4710 1800 960 9840 23550 1200 2482.5 1800 1050 Down Up Down Up Laminated Tempered Glass Partition Up To Slab/Beam Level Floor Carpet High Pressure laminated compact board Toilet Partition Decorative Timber Panel Wall G.I.Hand Rail High Pressure laminated compact board Toilet Partition High Pressure laminated compact board Toilet Partition W2 SCHEDULE OF DOORS & WINDOWS TYPE SIZE DESCRIPTION CILL HT. D3 - 900x2100 - D1 - D4 1200x2100 FG 750x2100 D2 Powder coated Al. framed single sash Al. composite panel (both sides) door W1 W2 12mm Thick laminated tempered glass twin sash door with 12mm thick fixed laminated tempered glass up to slab beam level - High Pressure Laminated compact board toilet door 1200x2100 Powder coated Al. framed twin sash Al. composite panel (both sides) door 10mm Thick Laminated Tempered glass window 10mm Thick Laminated Tempered fixed glass Powder coated Al. framed window GL1 GL2 G.I. Box section grill G.I. Box section grill 3950 3940 Laminated Tempered Glass Partition Up To Slab/Beam Level 4500 4665 900 Full Mirror L1 x H1 L2 x H2 L3 x H3 L4 x H4 Approx. 900 mm Approx. 900 mm h3 h4 Note:- Sizes of the W1, W2 ,FG , GL1 & GL2 depend on the site condition. 1270x1330 Existing Walls to be demolished Existing Walls to be demolished Link to New Building Hand Rail Hand Rail 2130 2045 P1 FG P2 12mm Thick fixed laminated tempered glass with 12mm thick fixed laminated tempered glass up to slab beam level D5 1200x2100 12mm Thick laminated tempered glass twin sash door with 12mm thick fixed laminated tempered glass up to slab beam level 960x2100 12mm Thick fixed laminated tempered glass with 12mm thick fixed laminated tempered glass up to slab beam level D6 1200x2100 12mm Thick laminated tempered glass twin sash door with 12mm thick fixed laminated tempered glass up to slab beam level 845x2100 12mm Thick fixed laminated tempered glass with 12mm thick fixed laminated tempered glass up to slab beam level - - 2/ 465x2100 (Existing window) Proposed Wall Proposed H.P.L. Partitions Existing Wall Proposed Tempered glass partitions A 1800 1200 2482.5 1800 2100mm High Pressure laminated compact board Toilet Partition D1 D2 D2 GL1 W.C W.C Stainless steel soap tray (900mm above from F.F.L.) 1000 1282.5 W.B. 1800 S.S.Bidet spray 600mm above from F.F.L S.S.Toilet paper holder fixed to wall 600mm above from F.F.L. 25 Drop 25 Drop 25 Drop 500 1800mmx750mm Plate glass mirror fixed to wall1750mm above from F.F.L. 2100mm High Pressure laminated compact board Toilet Partition 300mm x 600mm vitreous porcelain homogenous matt tile(Non slippery) on earlier laid to slope. 600mm x 300mm vitreous porcelain semi glazed full body tile l ining up to a height of 2100mm from finished floor level 18mm Thick Granite finished vanity top 500 450 D1 D2 D2 GL2 W.B. W.B. W.C W.C S.S.Bidet spray 600mm above from F.F.L 1145 Stainless steel soap tray (825mm above from F.F.L.) 600mmx750mm Plate glass mirror fixed to wall1750mm above from F.F.L. 25 Drop 25 Drop 25 Drop S.S.Toilet paper holder fixed to wall 600mm above from F.F.L. 2100mm High Pressure laminated compact board Toilet Partition 2100mm High Pressure laminated compact board Toilet Partition 300mm x 600mm vitreous porcelain homogenous matt tile(Non slippery) on earlier laid to slope. 500 500 Staircase line above TOILET PLAN -FEMALE TOILET PLAN -MALE A B B 1800mmx750mm Plate glass mirror fixed to wall1750mm above from F.F.L. Stainless steel soap tray (900mm above from F.F.L.) 1750 25mm Drop W.C Bidet spray 600mm above F.F.L Stainless Bottle Trap D1 D2 2100mm High Pressure laminated compact board Toilet Door 825 2100 25mm Drop 75 mm Mass concrete Dry Earth Filling SECTION A-A 75mm Thk. R.C.C.slab with 18mm Thick Granite finished vanity top 18mm Thick Granite facia. 2100 W.B. Foundation (See Structural details) GL2 600mm x 300mm vitreous porcelain semi glazed full body tile l ining up to a height of 2100mm from finished floor level 600mmx750mm Plate glass mirror fixed to wall1750mm above from F.F.L. Stainless steel soap tray (825mm above from F.F.L.) 1750 25mm Drop W.C Bidet spray 600mm above F.F.L D2 2100mm High Pressure laminated compact board Toilet Door 825 25mm Drop 75 mm Mass concrete Dry Earth Filling SECTION B-B 2100 W.B. Foundation (See Structural details) W.B. 825 Existing Walls to be demolished Existing Walls to be demolished DB/CON-ARCH/FM-C/01 NOTES S.A.T.Sooriyaarachchi NOTES Refer Structural Drawings for exact sizes of R.C.C.Columns,Beams,Steel structures etc. 1.0 All dimensions to be checked at site prior to any construction is commenced. 2.0 Any discrepancy in Architectural,Structural,Water supply and Electrical Drawings and other items should be brought to notice of the consultant for clarification and finalization. 3.0 C.K.Jayasooriya Ceiling Height may verified according to the beam height . (It is necessary to maintain 2700mm of clear height) 4.0 Any changes made after obtaining council - approval regarding Architectural design, site location & orientation without Architect's written consent & responsibility of their adverse effects on final product shall not be borne by the Architect. 5.0 Copyright of Architectural design shown, are retained by the Architect & authority is required for any reproduction. 6.0 BUILDINGS DEPARTMENT CONSULTANCY SERVICES DIVISION ARCHITECTURAL SERVICES "SETHSIRIPAYA" BATTARAMULLA A MARK DATE MADE BY: (CONCEPT & DESIGN BY) PROJECT ARCHITECT SENIOR ARCHITECT DIRECTOR (ARCHITECTURAL SERVICES) DRAWING NO : SHEET NO : PROJECT: ADDITIONAL DIRECTOR GENERAL (CONSULTANCY SERVICES) REVISION SKETCH DESIGN NO: PROPOSED RENOVATION NATIONAL HOLIDAY RESORT AT ANURADHAPURA DRAWN : SCALE : CHKD : FILE NO : DATE : T.A.O. : PID: S.A.T.Sooriyaarachchi 03-01-15-AR150 2019-SD-03-004 Connected Architectural Drawings : 2019-03-004AR01 - Ground floor plan ,upper floor plan , schedule of openings & details of toilets 2019-03-004AR02 - Details doors & windows 2019-03-004AR03 - Details of partitions & miscellaneous 1:100 , 1:50 09.07.2019 2019-03-004AR01 01/03 GROUND FLOOR PLAN ,UPPER FLOOR PLAN , SCHEDULE OF OPENINGS & DETAILS OF TOILETS DRAFT