DRAFT DEVELOPMENT PLAN (2007-2012) BHADRESWAR MUNICIPALITY HOOGHLY DISTRICT 23 rd Feb’07 Presentation to KMPC Technical Committee
Dec 18, 2015
DRAFT DEVELOPMENT PLAN (2007-2012)
BHADRESWAR MUNICIPALITY
HOOGHLY DISTRICT
23rd Feb’07
Presentation to KMPC Technical Committee
Structure of the presentation
Background
Bhadreswar Municipality: An Overview
Vision
Key Issues
Features
The Process
Component 1: Sub-component wise projects
Component 2: Sub-component wise projects
Component 3: Sub-component wise projects
Financial plan
Background
West Bengal Municipal Act, 1993 in the context of DDP
BM inspired by Perspective Plan of Kolkata-Vision 2025
Boost for DDP with assistance from DFID
Launch workshop for DDP
Focus on decentralized and participatory Planning
Bhadreswar Municipality: An Overview
Area: 8.28 Sq. Km.
No. of Wards: 20
Population: 1.06 lakhs
Literacy Rate: 89%
CBR: 9.26(2005-06)
CDR: 4.14(2005-06)
IMR: 2.63(2005-06)
No. of Slums: 6
Slum population: 53.4%
Male:55% Female:45%
Total quantity of water supply:2.74 MGD
Total Road Network:100618Km
Capacity of STP: 7.6 MLD
Key Issues… Provision for 24X7 Water Supply Integrated Sanitation Programme (elimination of
Open Defecation) Shelter Upgradation for slum dwellers Improved Road network, Sewerage and Drainage
network and Solid Waste Management System Improved Health and Education for all Strengthening of Income Generation Programme Providing Quality Service to the citizens
Our Vision…..
“Bhadreswar Municipality Town will be
economically prosperous,
environmentally sustainable and
socially harmonious”
DDP: Features
Vision: Comprehensive and Holistic
Participation from citizens and stakeholders have been ensured
Prioritized on the basis of needs of the urban poor
Used specialized skills of experts
Realistic budget
DDP Launch and Sensitization WorkshopFormulation of Municipal visionCovering steps of stages 1,2,3 as per guidelinesPreparation of component wise proposals through… Problem identification Formation of teams/appointments of
external agencies Situational analysis Considering schemes proposed by Ward
Committees and stakeholders Identification of gaps Technical analysis
DDP Preparation: The Process
Component1
Infrastructure, Land Use and Environment Development Plan
Slum Infrastructure Improvement Plan: Features
Total No. of Slums in Bhadreswar Municipality: 6 Slum Population: 53.4% of total population(1.06 lakh
app.) Aims to Improve the quality of life through providing
Basic services to the urban poor Betterment of services like:Water supply,
Sanitation,Drainage system, Road network,Solid Waste Management
Prioritization of slums follow QSS with some modifications Plan Includes:
Improvement in Maintenance of Assets,Capital Intensive projects and projects related with community participation
Excluded group will be covered through the above
Slum Infrastructure Improvement Plan:At a glance… Project cost (INR in Lakhs)Name of slum Capital-intensive projects O&M Projects
Bhadreswar Basti 164.33 31.0Sarat Chandra Basti 411.5 44.30Mujjafar Ahmed Basti 104.85 24.0Sarada Basti 104.95 65.67Jwaharlal Nehru Basti 208.95 18.85Munsi Premchand Basti 147.90 46.50 Community Participation projects: 28.0Major fund source: KUSP, JNNURM,ULB No. of Drop down list of projects:11
Improvement in Operations includes: 6 Projects related to Operation in SWM, Road Junction development, Construction of rickshaw stand, Construction of Auto rickshaw stand, Construction of Jetty, Water supply works with an estimated investment of Rs. 627.5 Lakhs
Improvement in Maintenance includes: 21 projects related to improvement of Playground, Crematorium, Roads, Street Light, Municipal assets etc. with an investment of Rs. 326.20 Lakhs
Intra Municipal Infrastructure Development Plan
Continued…
16 Significant Capital Intensive Projects include Augmentation of Water Supply, STP, Construction
and Widening of Roads, Drainage etc. with an investment of Rs. 8660 Lakhs.
The project Construction of Fly over & Approach Road (cost Rs. 5000.0 lakhs) has been kept in the Drop down list of projects.
4 other projects related to Street light arrangement and construction of Community Halls and Seva Kendras are also kept in the Drop down list.
Identified projects include:
Renovation of Kumra Khal, Ghungir Khal & Saraswati Khal
Supply of treated Surface water
Chandannagore ditch & DVC canal
Excavation of rail borrow pit
Construction of bridge over river Ganga
Const. of Floating jetty at Babu ghat
Trans Municipal Linkages
Continued…
Ferry Service Bhadreswar to Babughat(Kolkata-Howrah)
Widening of culvert & GT road
Development of Mankundu Mental Hospital
Development of Nasibpur Road
Development of J C Khan Road from Mankundu & Delhi Road
Total Project Cost:11458.0 lakhs with an O&M cost:119.20 lakhs. Collaboration will be sought from KMDA (Govt. of West Bengal) as it is not reflected in estimated Financial Plan
Land Use Development Plan
Identified projects are:
Land Use and Development Monitoring Cell
Shelter up gradation for Slum Dwellers
Completion of Remaining portion of Subhas Maidan Playground
Social Forestry Project
Electrification through Solar energy
Provision would be made for projects related with other sub-component plans
Environment Management Plan
Identified projects are:
Procurement of one dead body carrying vehicle
Environment Monitoring Cell
Peripheral Drain surrounding the waste disposal ground
Awareness Generation Programme.
Collection of waste (excreta) from cattle sheds
Continued…
Water Testing Laboratory
Renovation of Polluted Water Bodies.
Preservation of Heritage Buildings
Rain Water Harvesting
Total Project cost: 146.2 lakhs
The project on Water Testing Laboratory will be merged with Augmentation of Water supply system of Intra- Municipal infrastructure project. The project on Disaster Preparedness has been kept in the Drop Down list
Component 2
Social and Livelihood Development Plan
Livelihoods and Poverty Management Plan Vocational Training for enhancement of
Skills for building center related activities Promotion of Self Help Groups (SHG- 400
Nos), DWCUA (50 Nos) and handholding support to women
Rickshaw Bank Creation of Help Desk for convergence of
all existing government Sponsored Programme through BSKP cell
Sewing Machine bank
Continued… Setting up of Auto mobile service centre and
Motor vehicle related training UPE Cell Strengthening by providing Capacity
building training Training for TCG leaders Vocational Training for enhancement of Skills
Computer, Sebika, Physiotherapy, beautician, tailoring, 3 wheeler motor winding.
Setting up of Fishery project including setting up of hatchery
Awareness & facilitation of implementation of social security programme
Total Project Cost:124.29 lakhs
Local Economic Development Plan
Development of 4 Municipal Markets (Vegetable hub)
Mini Cold Storage
Solid Waste Management involving CDS (Env)
Dairy development programme Cluster
Service Centre - Jute Diversified Products
Silk Screen Printing & designing training
Continued…
Haldia Petrochemical down stream industries Umbrella branding and Market linkages
strategy to sell SHG products Food processing cluster Leaf Plate and Thermocol Plate
Manufacturing Unit Awareness & Cleanliness of food vendors Supply of cooked food, milk by setting up
facility center Total Project Cost:147.75 lakhs
Procurement of six Ambulances
Up gradation of IPP unit, ESOPD
Equipment of RDC up gradation USG, Scan, Potable Xray, Digital Xray
Upgradation of Health Infrastructure for HAU, preventive services
Municipality IPP Maternity Home strengthening
All District Level Programme Training
Health Care Service Delivery Improvement Plan
Continued…
Computerised Register of Birth, Death & License Ankur (Municipality Hospital) computerisation
Central Medical Store
Electric Crematorium Additional unit
Symphonic Water Scale
Dog Pound & Sterilisation units
Total Project Cost: 429.0 lakhs
Primary Education Improvement Plan
Teaching Aids and Furniture
IEC on Safety Measures, Health Education, Quality of education, vocation training opportunity, Entrepreneurship ability etc.
New School building 7 SSK + 15 Pvt Schools
Construction / completion of Class rooms
Provision of Girls’ Toilet and Urinal
Continued…
Provision of Boys’ Toilet and Urinal
Provision of Kitchen Shed
Water & Electricity connection
Minor repairing of School building
Provision of Adult Education Centre
Total Project Cost:Rs. 151.75 lakhs
Development of detailed Role manual & Performance appraisal system of HODs, Councillors & various committees
Purchase of Computers and hand holding Computer Training
Develop and implement training programmed
Resource mobilization cell integrated with collection monitoring cell
Introduction of Financial Manual Ward Office strengthening Human Resource Cell
Total Project Cost: Rs.82.0 lakhs
Organizational Development Plan
Ascertaining Manpower requirement as per emerging need for meeting the future operation requirement (At least 26personnel required in various categories).
Yearly 26 lakhs (app.) required as salary (Not included in the financial plan; Depends upon 80% Govt. contribution)
To introduce WAN integrating Ward Administration
Construct 15 Ward Offices
Identification of New OD Proposal (Version II)
Decentralized Approach to Service Delivery Implement Computerization Programme &
LAN connectivity Introduce Information Systems to improve
access to information Introduction of Internal Management Audit
and system audit in all departments in once in quarterly
Total Project Cost: 44.5 lakhs
Process and Systems Improvement Plan
Introduction of website
Setting up of Grievance redress Cells at every Ward office
Awareness creation among all citizens
Total Project Cost:Rs.18.0lakhs
Citizens Interface Plan
Financial Plan
Revenue Enhancement Initiatives
Expenditure Management Initiative
Asset Management Initiatives
Major Projections (FP-1)
0
50
100
150
200
250
300
350
400
450
500
2006-07 2007-08 2008-09 2009-10 2010-11 2011-12
Water Tax Other FeesSalary & Wages Power & Fuel (incl. Bulk)Property Tax
Particulars Project Cost (Rs/La
cs)
Operational Strategies
5 Years Phasing
2,007
2,008
2,009
2,010
2,011
COMPONENT I
Slum Infrastructure 1406.1412.0
8571.0
7301.4
5 93.75 27.75
Intra- Municipal Infrastructure 4613.7 1058 1226 917.2 671 741.5
Trans municipal Linkages 0 0 0 0 0 0
Land Use4577.4
52222.
82242.
6 35.6 30.85 45.6
Environment Management Plan 146.2 26 7.8 110.8 0.8 0.8
Total10743.
453718.
884047.
471365.
05 796.4815.6
5
Particulars Project Cost (Rs/La
cs)
5 Years Phasi
ng
2,007
2,008
2,009
2,010
2,011
Livelihood cost 124.29 30 31.37 59.2 2.86 0.86
LED Cost 147.75 36.75 51.5 36 15 8.5
Health 429 43 39.25 34.25 126.5 186
Education 151.75 44.5 33.75 53.5 11.25 8.75
Total 852.79 154.25 155.87 182.95 155.61 204.11
Particulars Project Cost
(Rs/Lacs)
5 Years Phasin
g
2,007
2,008
2,009
2,010
2,011
OD 82 31.5 20.5 15 5 10
Process & System 44.5 32 12.5 0 0 0
Citizens Interface 18 10 2 2 2 2
Total 144.5 73.5 35 17 7 12
Total of Component 1, 2 &
3
11740.74
3946.63 4238.34 1565.00 959.01 1031.76
Point of Measurement
What is Measured Indicators ( examples )
Input The set of resources brought together to accomplish the project
Manpower, financial resources, space, project beneficiaries ( they are considered partners in development )
Process The set of activities by which resources are used in pursuit of the expected results
Trainings Infrastructure building
Outputs The products that result from the combination of inputs and processes.
Number of trainees participated; number of immunized children; kilometers of road built
Outcomes The set of beneficiary and population-level results expected to change from the intervention.
Increased knowledge, improved practices, improved commuting conditions, improved time efficiency
Impact The set of beneficiary and population-level long-term results achieved by changing practices, knowledge and attitudes.
Improved income, Improvement in Health Indicators,
Monitoring and Evaluation Framework